Reconstruction of HHS CourtyardCarson EdgeJeremy ChwastowskiRyan LandryJoel Griffith
OverviewIntroduction
Phase 1
Phase 2
Total Cost
Conclusion/Questions
Introduction•Objectives
▫Visually pleasing▫More seating▫Increase everyday use▫Address special events
•Constrained to remove orange pad
Phase 1
Rounding of Paths
Lunchroom Paths
New Eating Area
Terraced Plant Beds
Terraced Planting Beds Continued
Benches
Umbrella Tables
PA System
Art Area
Phase 1 Overview•Removal of two trees•Removal of four light poles•170 total seats•Cost - $71,000•Flexible design•Tables are path oriented•Removal of bushes
Phase 2
Pathways
Flooring
Tables
Phase 2 Overview•24 additional seats•Address special events• Dances• Luncheons• Ceremonies
Final Costs
Questions