Records Management Training Cyndi Fout Lead Project Controls August 27, 2008 1
Transcript
Page 1: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Records Management Training

Cyndi FoutLead Project Controls

August 27, 2008

1

Page 2: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Agenda

• Purpose of Records Management

• Project File Set Up

• Hardcopy File Management

• Break

• Electronic File Management

• Break

• E-mail Management & Correspondence

• Consolidating Existing Files

• Closeout, Archiving, and File Maintenance

• Activity

• Question & Answer2

Page 3: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

3

Purpose of Records Management

• Purpose of Records Management– Complete and thorough project records– Documents are easily retrievable– Maintain consistency across projects– Ease the merging of electronic and hardcopy

files– Internal Audit Report

Page 4: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

4

Purpose of Records Management

• What is a Project Record?– Documents the function, policies, decisions,

procedures, operations, and activities – Examples:

• FIPA Form• Contracts• Change Orders• E-mails with directives• Payment Request

Page 5: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

5

Purpose of Records Management

• What is a Non-Project Record?– DOES NOT document the function, policies,

decisions, procedures, operations, and activities

– Examples • Preliminary drafts (when superseded)• Simple Transactional Communication• Personal Copy or Extra Copy

Page 6: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

6

Project File Set-up

• Project File Set-Up– Data Control Technician responsible to set up

both hardcopy and electronic file folders– Project File Structure

• Hardcopy Initial Folder• Electronic File Template

Page 7: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Project File Set-up

• Communication to A/E, Construction Manager, and Consultants– Project Manager is responsible to share

Project File Structure– Strongly encourage them to organize their

files in same manner

7

Page 8: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Location– Lektriever– Cabinets across from FDC mail boxes– Cabinets along the hallway by the kitchen– Times 2 along the south wall (Medical Center

Team)

• Projects filed in numerical order

• File cabinets labeled

8

Page 9: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Supplies– File folders– Hanging folders– Pendaflex– Pre-printed colored file labels– Blank white file labels– In/Out guide– “Personal Copy” stamp– File stamp

9

Page 10: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Supply Location– Shelves below Lektriever– Shelf in Times 2– Maintenance Building– 2nd Floor Central Service Bldg– PARE

10

Page 11: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Folder Labels– Color coded labels (green, blue, yellow, red)– Existing folders cannot be renamed or

renumbered– Add subfolders as needed (yellow and red

levels only)

11

Page 12: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

12

Hardcopy File Management

• Pre-printed labels for file folders– Vendor name may need to be hand written or

typed

• Personal Copy Stamps PERSONAL COPY

– Copies kept at desk for reference

Page 13: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Project File Responsibility and Checklist– List documents that are to be filed under

specific folders– Chronological order, most recent on top– Numerical order, highest number on top– Identifies person responsible to place

document in file or in the designated “To Be Filed” trays

13

Page 14: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• Project File Responsibility and Checklist (cont’d)– All procurement activities are under folder

0100 (including construction; SoV & SMSD)– SD, DD, CD, Bid Documents, Conformed

Documents to be submitted as a PDF• Will be added to the Building Design Standards

14

Page 15: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

15

Hardcopy File Management

• Stamp documents to be filed:

FILE COPY

Project #_____________________

Folder #______________________

Main Subfolder #_______________

Subfolder Name:_______________

• Checking Out Files– In/Out Guides

Page 16: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

16

• Records may need to be kept at employee’s desk until task is complete– Professional Services Contracts &

Amendments– Construction Contracts– Bid & Conformed Documents (Plans & Specs)

• Prevailing Wage– Required to be kept in a secure location

separate from project records

Hardcopy File Management

Page 17: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Hardcopy File Management

• A central file will be available for all 5-15 Day Notices and Professional Services/Contractor Evaluations– Data Control Technician (DCT)

will maintain file– Located in Lektriever

17

Page 18: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Break

• 10-Minute Break

18

Page 19: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

19

Electronic File Management

• Location– Accessible via NetLink (must be connected to server)

Page 20: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Accessing from Remote Location– Use VPN Connection– Instructions for Accessing FOD VPN– Contact FOD IT Help Desk if you have

problems

20

Page 21: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Main Project Folders (green)

21

Page 22: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Main Subfolders (blue)

22

Page 23: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Subfolders to main subfolders (yellow)

23

Page 24: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Additional Subfolders (red)

24

Page 25: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Project Team may need to add additional yellow or red level folders– Correspondence folders– Vendor/Contractor specific folders– Copy template subfolders when needed– Copying folders will also copy subfolders

25

Page 26: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Right click on subfolder name then select “copy”

26

Page 27: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Right click inside window and select “paste”

27

Page 28: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Right click on folder name and select “rename”

28

Page 29: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• New subfolder is created with vendor name

29

Page 30: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Subfolders are also copied

30

Page 31: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Are you consistently adding yellow or red folders?– Discuss with Lead Project Controls to include

in project folder template– Does not include specific vendor folders

• Do not add green or blue level folders– Discuss with Lead Project Controls what your

needs are– Changes can be made to the standard

template

31

Page 32: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Creating Shortcut Folders– Locate project folder on L drive under FDC-

Projects folder

32

Page 33: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

– Right click on the project folder and select “create shortcut”

– “shortcut to <project #>” will appear at the end of the folder listing

33

Page 34: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

– Right click shortcut folder, select “cut”– Right click on desktop, select “paste”

Shortcut folder will appear

34

Page 35: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

– To rename the folder, right click on the folder name, select “rename” and enter new folder name

35

Page 36: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Proper File Identification– Describes the document– Accurately tracks document production and

distribution (version control)– Footer includes path and file name– Consistency helps meet legal requirements

and identifies the content of the document

36

Page 37: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• File Path– Identifies the location of the document

L:\FDC-Projects\OSU-071534\0100 Procure_Products-Services\ 0110_Associate\Selection_Process

• File Name– Name of the file as it stands alone

0100_Interview_Agenda

*note you may need to update certain tools/templates that could be filed in multiple folders (i.e., 0110_Interview_Agenda;

0120_Interview Agenda

37

Page 38: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Version Control– Tracks revisions and comments

• Dates – place at the beginning of the file name as:

yyyy-mm-dd• Revision numbers – place at the end of the file

name as:

Rev_1 or V_1

38

Page 39: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Project Delivery Site (New Look)

39

ExpandableSections

Page 40: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Templates/Tools under each section

40

Click on triangle to expand and collapse

Page 41: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

41

Project policies, guidelines, and instructions

Page 42: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Templates/Tools– Footer already includes file path and file name– File name includes folder number and

document nameL:\FDC-Projects\_Documents\0000_Initiate-

Plan_The_Project\0030_Estimate_Letter.doc

– Once saved in the project file the hard copy file will have all the information in the footer to file the document – no file stamp is needed

42

Page 43: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Saving tools/templates into project file– Open tool/template from the

Project Delivery Site– File download message will appear. Select

“Save”

43

Page 44: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select L drive

44

Page 45: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select FDC Project folder

45

Page 46: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select project folder (numerical order)

46

Page 47: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select main project folder

47

Page 48: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select main subfolder

48

Page 49: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select subfolder

49

Page 50: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Select “Save”

Note: the file name does not need to be changed

50

Page 51: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

This window message will appear

Click on “open”

51

Page 52: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

52

Page 53: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Footer has now been updated – note it is NOT saved

53

Page 54: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

– After the document is printed, you must save the document for the updated footer to be saved permanently.

– The below message box will appear each time you open the document and print it

– Select yes to save changes

54

Page 55: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Footer has now been saved

55

Page 56: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Documents available via NetLink– Invoices/Payment Request– Change Orders – Purchase Orders (future phase)

• Typically available within 1-2 weeks after final approval

56

Page 57: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• View documents via main project module

Click on DMS icon

57

Page 58: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Search brought back all items scanned for project

Select document to view

Click on icon beside the check box to open document

58

Page 59: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

Document displays

Click on blue arrow to navigate through pages

59

Page 60: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• Selected documents available to view via NetLink – Contracts Module – view change orders and

purchase orders– Invoice Module – view invoices and payment

request

60

Page 61: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

View selectedChange Order

61

Page 62: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

62

Page 63: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

View all ChangeOrders for vendor

63

Page 64: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

64

Page 65: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

View all change orders 65

Page 66: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

66

Page 67: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Electronic File Management

• File Backup– Full backup of server is performed weekly– Modified files are backed up 4 to 5 times daily– Monthly backups are stored offsite– Remember your computer hard drive is NOT

backed up by IT. Loss of data can occur.

67

Page 68: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Break

• 10-Minute Break

68

Page 69: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

E-mail Management

• Considered Public Record

• FOD IT Policy – allows IT to access any project related e-mail for Public Records request

• Mimosa – an additional program B&F has purchased that will provide additional functionality for public records requests and e-mail archiving

69

Page 70: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

E-mail Management

• Create a project folder in your Personal mailbox in Microsoft Outlook– Folders should be created following the

Project File Structure– Create a “Completed Projects” folder in your

Personal mailbox– Move e-mail records once project is marked

closed in NetLink

70

Page 71: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

E-mail Management

• Subject line should always begin with Project Number followed by the topic

Ex: OSU-071534_Estimate Letter

• Remember to proofread for accuracy

• E-mail threads should typically not exceed three replies – telephone or face-to-face conversation is more effective

• Avoid personal comments

71

Page 72: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

E-mail Management

• Typing in ALL CAPS denotes yelling or screaming in e-mail

• Don’t forget your manners – “please” and “thank you”

• Use read receipts sparingly

• Do not over use “High Importance”

72

Page 73: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

E-mail Management

• Out of Office message– Use if you are going to be out of the office for

one day or more– Include duration of time out of the office– Make sure you include the name and other

contact information for someone who can handle concerns in your absence

– Out of Office Assistant is located under the Tools menu in Outlook

73

Page 74: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Correspondence

• Correspondence– to be filed in folder 0710 by source– Most recent date on top for the hardcopy files– Project Team member listed first in the

addressee area or in the cc field is responsible to place official record in the project file

74

Page 75: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Correspondence

• Correspondence (cont’d)– All other copies should be marked as

“Personal Copy” (purge at end of project)– Correspondence that addresses multiple

projects should be filed in each referenced project

75

Page 76: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

76

Archiving Files

• Complete Project File Responsibility and Checklist

• Hardcopy will be placed in the first Pendaflex or hanging file folder for hardcopy files

• Electronic copy will be placed directly under the electronic project folder

• Fill out as tasks are completed

• Purge drafts, duplicate copies, and personal copies

Page 77: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

77

Archiving Files

• Obtain project records from Associate, Construction Manager, and Consultants– PM/CM to review files for completeness– Electronic files (including Prolog,

Constructware, etc.) are to be submitted on a DVD as a PDF file

– These files will be placed in a separate box from our files and sent to off-site storage

Page 78: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

78

Archiving Files

• Once projects are marked “closed” in NetLink, the final archiving process begins– Project Accountant will notify the Data Control

Technician when project is marked “closed”

Page 79: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

79

Archiving Files

• Data Control Technician responsibilities include:– Reviewing the

Project File Responsibility and Checklist for completeness

– Contacting the project team to verify no additional records need filed

– Coordinate the marking of project files as “read only”– Label archival boxes and update archive inventory

database accordingly– Transport project records to off-site storage

Page 80: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Archiving Files

• Project Records filed separately:– As-Built Drawings – FDC Technical

Services/Data Storage & Retrieval– Small Scale Drawings – PARE– O&M Manuals

• FOD Programmed Maintenance (bldg maintained by FOD)• Facility Manager (branch campus)• Medical Center Project Manager (bldg maintained by Medical

Center)

– Electronic images accessible via NetLink

80

Page 81: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Archiving Files

• Any records that were missed during archiving should be marked accordingly and given to DCT to place in files at off-site storage

• To obtain files from offsite storage, contact the DCT– Request needs to include the project number,

project name, folders, and document names

81

Page 82: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Archiving Files

• DCT will be responsible for sending the project records required to be retained permanently to University Archives– Currently working on updating the retention

schedule

82

Page 83: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Consolidating Existing Files

• All existing project records (hardcopy and electronic) need consolidated into the main project file by December 31, 2008.

83

Page 84: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Consolidating Existing Files

• Electronic Files– Create a new folder directly under the main

project folder using your Novell Windows login• (ex: cfout)

84

Page 85: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Consolidating Existing Files

• Hardcopy Files– Need to be organized and stamped with the

file location information before placing them in the “To Be Filed” tray (unless you opt to file yourself)

– Project phases that are complete have a minimum requirement to be filed at the green folder level

85

Page 86: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Consolidating Existing Files

• All documents for future phases of the project will need to follow the new Project File Structure

86

Page 87: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

File Maintenance

• Best Practices– File items throughout the life of the project– File names are consistent

• Project#_DocName

– Purge drafts as they are superseded by final documents (keep only those that show significant work or changes)

87

Page 88: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

File Maintenance

• Best Practices (continued)– Limit “extra copy”, “duplicates”, or “personal

copy” files • Purge when no longer needed • Remove at the end of the project

– Complete the Project File Responsibility and Checklist as phases are complete

88

Page 89: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Records Management Activity

89

Page 90: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

Clean Up Day

• September 24th – File Cleaning Day

90

Page 91: Records Management Training Cyndi Fout Lead Project Controls August 27, 2008

91

Records Management Pilot

Questions/Discussion?