Redesign of the Redesign of the Arborway: Kelley Circle to Murray Circle Design By: HUB Engineering, Inc. Michelle Boccia Andrew Caparco Michelle Boccia Andrew Caparco Joseph Mayotte Jocelyn Rothstein
Transcript
Page 1: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Redesign of the Redesign of the Arborway:y

Kelley Circle to Murray Circle

Design By: HUB Engineering, Inc.

Michelle Boccia Andrew CaparcoMichelle Boccia Andrew CaparcoJoseph Mayotte Jocelyn Rothstein

Page 2: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Existing Conditions:

Emerald Necklace

Jamaica Pond

Arnold Arboretum

Project Area

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 3: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Existing Conditions:

Kelley CircleKelley Circle

Murray Circle

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 4: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Objectives:

• Provide a high quality multi‐use path.

• Maintain arterial capacity.

• Convert road space to green 

• Provide a high quality multi‐use path.

• Maintain arterial capacity.

• Provide safe pedestrian crossings.

• Convert road space to green space.

• Convert inaccessible green 

• Provide safe pedestrian crossings.

• Separate regional and local traffic.

• Provide reasonable access to 

space to accessible green space.

• Preserve existing landscape 

• Separate regional and local traffic.

• Provide reasonable access to Provide reasonable access to and from local streets while discouraging cut‐thru traffic.

g pand mature trees.

Provide reasonable access to and from local streets while discouraging cut‐thru traffic.

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 5: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Northeastern Proposed Design:

Signal added at Eliot Street. Signalized

intersection replaces Two coordinated signals replace current rotary at Kelley Circle.

intersection replaces existing rotary at Murray Circle.

Outer Arborways now two-way 18’ roadways.

Proposed 10’ Paved Multi-Use Path and 6’ Stone Dust Path

Existing signal at Pond Street

Crossover signal separates EB Left and EB Through

HUB Engineering, Inc. Redesign of the Arborway April 2008

on Str t replaced with all-way stop.

EB Left and EB Through traffic in order to increase capacity.

Page 6: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Paths:

Existing Cross Section

HUB Engineering, Inc. Redesign of the Arborway April 2008

Proposed Cross Section

Page 7: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Origin-Destination Study:

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 8: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Analysis of Proposed ImprovementsWeekday AM:v/c 0.57 LOS AWeekday PM:/ 0 65 LOS A Weekday AM:v/c 0.65 LOS A

Weekday AM:v/c 0.67 LOS BWeekday PM:/ 0 60 LOS B

W ay Mv/c 0.59 LOS BWeekday PM:v/c 0.74 LOS B

v/c 0.60 LOS B

Weekday AM:v/c 0.97 LOS BWeekday PM:/ 0 80 LO

Weekday AM:v/c 0.57 LOS B

Weekday AM:v/c 0.53 LOS BW kd PM

v/c 0.80 LOS A

HUB Engineering, Inc. Redesign of the Arborway April 2008

Weekday PM:v/c 0.36 LOS B

Weekday PM:v/c 0.64 LOS B

Page 9: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Existing Recreational Greenspace:

Accessible Greenspace

Inaccessible Inaccessible Greenspace

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 10: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Proposed Recreational Greenspace:

New Greenspace = 4.45 Acres

N l Acc ssibl G nsp c 5 60 Ac sNewly Accessible Greenspace = 5.60 Acres

Total Greenspace Gained = 10.05 Acres

Inaccessible Accessible

HUB Engineering, Inc. Redesign of the Arborway April 2008

Inaccessible Greenspace

Accessible Greenspace

Page 11: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

VISSIM…

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 12: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Evaluation:

• Design provides a 10’ paved multi‐  th    ll     6’  t  d t 

• Design maintains current arterial it

• Design provides a 10’ paved multi‐  th    ll     6’  t  d t 

• Design maintains current arterial ituse path as well as a 6’ stone dust 

path.

• All crossings are signal protected.

capacity.

• Design converts road space to green space.

use path as well as a 6’ stone dust path.

• All crossings are signal protected.

capacity.

• Design geometrically separates regional and local traffic.

• Design provides reasonable 

• Design converts inaccessible green space to accessible green space.

• Design geometrically separates regional and local traffic.

• Design provides reasonable • Design provides reasonable access to and from local street. • No mature trees along the 

Arborway disrupted.

• Design provides reasonable access to and from local street.

HUB Engineering, Inc. Redesign of the Arborway April 2008

Page 13: Redesign of the Arborway - Northeastern Universityv/c 0.65 LOS A Weekday AM: v/c 0.67 LOS B Weekday PM: / 0 60 LOS B Wa My v/c 0.59 LOS B Weekday PM: v/c 0.74 LOS B v/c 0.60 LOS B

Questions?

HUB Engineering, Inc. Redesign of the Arborway April 2008


Recommended