Reducing level is the process of leveling thearea of the site to the required level as statedin the layout plan of project.

Generally, there are 3 method of reducinglevel include such as cut method, fill methodand cut and fill method.

Page 3: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 3/19

Reducinglevel

Cut Fill Cut & Fill

Page 4: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 4/19

To identify the method of reducing level. To identify the procedure of reducing level.

To identify the machineries that suitable for

the method. To define the advantage and disadvantage of 

the method that use on the chosen site.

Page 5: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 5/19

The project is to upgrade the flood resistancesystem in UiTM Shah Alam.

By using method of Cut and Fill in the process of reducing level.

There is three methods to calculate cut and fillvolume, that is cross sectional area and gridmethod.

Page 6: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 6/19

Formula: Area of cut or fill

A1= bd1 + sd21 

Volume of cut or fillV= [(A1 + A2 )/2 ] x length

Page 7: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 7/19

The ground is20x20 and

proposed RL 47.0

Page 8: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 8/19

Cut

GP Height Modfac

Weight

Fill

GP Height Modfac

Weight

Formula: volume of fillingV= total cutting weight (20x20) / 6

Volume of cut or fillV= total filling weight (20x20) / 6

Page 9: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 9/19

  Project title : CADANGAN MEREKABENTUK, MENBINA DAN

MENYIAPKAN KERJA-KERJANAIKTARAF SISTEM TEBATAN BANJIR SERTA KERJAKERJA BERKAITAN DIKAITAN DI UiTM SHAH ALAM, SELANGOR D.E.

No. of contract : UiTM/PER/T/166/09Client : UNIVERSITI TEKNOLOGI MARA, 40450, SHAH ALAM,

SELANGOR D.E.

Contractor : JAROM BUILDER SDN. BHD (615594 D), NO.1C, LOT 2112, JALAN HAJI IDRIS,42600 JENJAROM, KUALA LANGAT, SELANGOR D.E.

Consultant : JURUTERA PERUNDING AYY, 616 LEVEL 6, BLOCK AKELANA CENTRE POINT,NO.3, JALAN SS/19, KELANA JAYA, 47301, PETALING JAYA,SELANGOR D.E.

Surveyor : HALIM ASSOCIATES, 328B & C, MELAWATI SQUARE,

 JALAN BANDAR ,MELAWATI, TAMAN MELAWATI, 53100 KUALA LUMPUR.

Date site entering : 27 JULY 2010.Date work done : 07 MAC 2011.

Page 10: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 10/19

UiTM Backgate

Section7

Site

Location

Page 11: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 11/19

I. Method of reducing levelII. The procedure for cut and fill

III. Machinery that used in construction

IV. Problems occurring on the site.V. Advantages and disadvantages of using

those machines.

Page 12: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 12/19

The construction is using cut and fill method.The ways are open cut and sheet pile.

Open cut usually used for reducing level atslope and high strength soil.

Sheet pile is used for lower strength soil.

Page 13: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 13/19

  After installedsheet pile,excavator is usedto excavate the

whole area.

At 2 meter the

excavation stagewill stop to checkwhether the areand depth arecorrect.

the area anddepth of the

excavationbeendetermined.

The sheet pile

installed atexcavationcircumferences

After that,excavationstage isstarted.

Page 14: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 14/19

After the processsurveying finished,the excavationprocess iscontinued until itreach the 3 meterdepth.

At the level 3 meter,the cut stage is stop.After that the base of excavation area is

installed castingslab.

The sewerspipe is putand thestage of backfill isstarted.

Page 15: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 15/19

Excavator Mobile crane

Truck

Page 16: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 16/19

The type of the soil is clay, so when raining, the

ground will turn into a mud. Wheeled type vehicle and will not able to move on

the soft and muddy ground condition.

Limited movement will be the cause of delay.

Page 17: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 17/19

Advantageso easily move

around the siteo Capable to do

the requiredwork.

o Time efficiento the crawler

tracker is veryuseful in the sitearea that is fullof mud.

Disadvantageso Large machines has

limited access in thesite.

o crawler tracker it iseasier to travel in thesite but it is difficult to

travel on road.

Page 18: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 18/19

Proposed cut and fill areas shall carefully planned.

Volume of excavation increases significantly as the depth of the cut increases, and therefore usually tries to avoidexcessive cut depths

Volume of excavation increases significantly as the depth of the cut increases, and therefore usually tries to avoidexcessive cut depths

Page 19: Reducing Level

8/3/2019 Reducing Level

http://slidepdf.com/reader/full/reducing-level 19/19

Cut and Fill method is the common type been used forreducing level in a site.

A detailed engineering soils analysis of a proposed cut and fillcross section is a crucial part of the reducing level design

process.

The results of the soils analysis are used to develop thedesign details of cut and fill sections such as depth and slopeof the cut or fill.