TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
Airport: System description:
Liège Airport (LLG) ULD handling system
Project Place: Start date:
Liège 2007, October
Project Country: Commissioning date:
Belgium 2008, June
Included components:
• 20 Airside interfaces (dolly docks) with hydraulic side shift
• 28 Workstations for building/breaking of ULD's with integrated weighing system
• 87 Right angle decks (RAD)
• 2 Turntables with integrated RAD
• 2 Hinged roller decks (bridge) with hydraulic lift
• 4 Truck docks with pop-up ball transfer units winch
• Castor deck area for manual ULD manoeuvring
• Two-phase delivery, installation, commissioning, training
Control system:
• Overall PLC control system
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
TNT Express EuroHub (LGG)
Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium
Saco Airport Equipment Industrieweg 2 P.O. Box 47 Tel: +31 (0)492 430 059 i [email protected]
5731 HR Mierlo NL 5730 AA Mierlo NL Fax:+31 (0)492-432 713 www..saco.aero