____________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale € 50.000,00 – i.v. ARIELLI (ch) Abruzzo – ITALIA / EU – 66030 Via Valle, 42 tel. +39 0871 396046 – fax +39 0871 938837 / e-mail: [email protected] partita IVA 02086900699 CURRICULUM AZIENDALE
Transcript
Page 1: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

____________________________________________________________________www.lwrtest.it

COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE

LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale € 50.000,00 – i.v. ARIELLI (ch) Abruzzo – ITALIA / EU – 66030 Via Valle, 42 tel. +39 0871 396046 – fax +39 0871 938837 / e-mail: [email protected] partita IVA 02086900699

CURRICULUM AZIENDALE

Page 2: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

2

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: LECCO DISTRICT (ITALY)

PROJECT: PIPELINE CALCO - PIANTEDO DN 750 (30”)

TECHNICAL NOTE: CROSSING ADDA RIVER

Page 3: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

3

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TARANTO (ITALY)

PROJECT: PIPELINE FRAGAGNANO E CAROSINO CONNECTION DN 250 (10”)

TECHNICAL NOTE:

Page 4: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

4

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

INERTISATION WITH NITROGEN

LOCATION: NAPOLI (ITALY)

PROJECT: SEALINE BACOLI - ISCHIA DN 250 (10”)

TECHNICAL NOTE: CROSSING MEDITERRANEAN SEA

Page 5: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

5

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

INERTISATION WITH NITROGEN

LOCATION: NAPOLI (ITALY)

PROJECT: SEALINE BACOLI - ISCHIA DN 250 (10”)

TECHNICAL NOTE: CROSSING MEDITERRANEAN SEA. SUPPLY AND INSTALLATION OF TRAPS FOR LAUNCH AND

RECEPTION OF PIGS.

NOTE: REDONE TESTING FOR BREAKING SEALINE.

Page 6: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

6

CUSTOMER:

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE (CROATIA)

PROJECT: SEALINE PULA DN 250 (10”)

TECHNICAL NOTE: CROSSING ADRIATIC SEA.

Page 7: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

7

CUSTOMER:

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE (CROATIA)

PROJECT: SEALINE IZABELA NOTH – IZABELA SOUTH DN 250 (10”)

SEALINE IZABELA NOTH – IZABELA SOUTH DN 75 (3”)

IZABELA SOUTH – IVANA K DN 400 (16”)

TECHNICAL NOTE: CROSSING ADRIATIC SEA.

Page 8: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

8

CUSTOMER:

CONTRACTOR: ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

LEAK TEST

DEWATERING TEST

DRYING AIR DRY

LOCATION: OFF- SHORE ANCONA (ITALY)

PROJECT: SEALINE BONACCIA PROJECT DN 150 (6”)

TECHNICAL NOTE: CONNECTION BETWEEN PLATFORMS IN ADRIATIC SEA

Page 9: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

9

CUSTOMER:

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE (EGYPT)

PROJECT: SEALINE DENISE - B PROJECT DN 1200 (48”)

TECHNICAL NOTE:

Page 10: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

10

CUSTOMER: CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE RAVENNA (ITALY)

PROJECT: SEALINE GUENDALINA PROJECT DN 75 (3”) A

SEALINE GUENDALINA PROJECT DN 75 (3”) B

SEALINE GUENDALINA PROJECT DN 250 (10”)

TECHNICAL NOTE:

Page 11: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

11

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE (ISRAEL)

PROJECT: SEALINE HADERA GAS IMPORT TERMINAL DN 250 (10 ”)

TECHNICAL NOTE:

Page 12: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

12

CUSTOMER: GHANA NATIONAL GAS COMPANY CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE GAUGING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: OFF- SHORE (GHANA)

PROJECT: SEALINE GHANA PROJECT DN 300 (12”)

TECHNICAL NOTE: THE TOTAL LENGTH OF THE OFF-SHORE AND ON-SHORE IS

58.000 Mt OF WHICH 44.000 Mt OF SEALINE AND 14.000 OF EXISTANT SEALINE.

Page 13: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

13

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: ENNA DISTRICT (ITALY)

PROJECT: PIPELINE GELA – ENNA DN 900 (36”)

TECHNICAL NOTE:

Page 14: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

14

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: VENEZIA DISTRICT (ITALY)

PROJECT: ADRIATIC LNG DN 750 (30”)

TECHNICAL NOTE:

Page 15: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

15

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: ISTRANA CENTRAL GAS

TECHNICAL NOTE:

Page 16: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

16

CUSTOMER: CONTRACTOR:

ACTIVITY: HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: ISTRANA CENTRAL GAS DN 1200 (48”)

TECHNICAL NOTE:

Page 17: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

17

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: BOLOGNA DISTRICT (ITALY)

PROJECT: MINERBIO METERING STATION

TECHNICAL NOTE: SIMULACRI REPLACEMENT AND ASSEMBLY OF

RETURN VALVE

Page 18: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

18

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: LIVORNO DISTRICT (ITALY)

PROJECT: TERMINAL PIPELINE CONNECTION OLT LIVORNO DN 800 (32”)

TECHNICAL NOTE:

Page 19: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

19

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: CREMONA DISTRICT (ITALY)

PROJECT: PIPELINE CREMONA SERGNANO DN 1200 (48”)

TECHNICAL NOTE: SUPPLY TEST HEADS DN 42” – DN 48”

Page 20: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

20

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: CREMONA DISTRICT (ITALY)

PROJECT: BORDOLANO PLANT LINE DN 800 (32”) LINE DN 1020 (42”)

TECHNICAL NOTE:

Page 21: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

21

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: VERBANIA DISTRICT (ITALY)

PROJECT: COMPRESSION CENTRAL MASERA DN 1200 (48”)

TECHNICAL NOTE:

Page 22: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

22

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: PARMA DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION TO PARMA DN 300 (12”)

TECHNICAL NOTE:

Page 23: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

23

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: REGGIO EMILIA DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION TO REGGIO EMILIA DN 300 (12”)

TECHNICAL NOTE:

Page 24: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

24

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: REGGIO EMILIA DISTRICT (ITALY)

PROJECT: VILLA MASSONE CENTRAL REDUCTION

TECHNICAL NOTE:

Page 25: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

25

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: ENNA DISTRICT (ITALY)

PROJECT: PIPELINE GELA- ENNA (II LOT ENNA) DN 900 (36”)

TECHNICAL NOTE: PIPELINE FROM LYBIA

Page 26: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

26

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: SULMONA DISTRICT (ITALY)

PROJECT: PIPELINE CAMPOCHIARO - SULMONA DN 1200 (48”)

TECHNICAL NOTE:

Page 27: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

27

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: PERUGIA DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION TO ENEL OF PIETRAFITTA DN 400 (16”)

TECHNICAL NOTE:

Page 28: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

28

CUSTOMER: CONTRACTOR: LE COSTE S.p.A.

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: BRESCIA DISTRICT (ITALY)

PROJECT: PIPELINE POLAVENO - DARFO DN 500 (20”)

TECHNICAL NOTE:

Page 29: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

29

CUSTOMER: CONTRACTOR: LE COSTE S.p.A.

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: SONDRIO DISTRICT (ITALY)

PROJECT: PIPELINE PIANTEDO - BERBENNO DN 500 (20”)

TECHNICAL NOTE:

Page 30: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

30

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: CHIETI DISTRICT (ITALY)

PROJECT: 6 TRUNK OF TRESTE RIVER CENTRA DN 400 (16”)

DN 500 (20”) LINES A,B.C

TECHNICAL NOTE:

Page 31: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

31

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

INERTISATION WITH NITROGEN

LOCATION: CHIETI DISTRICT (ITALY)

PROJECT: PIPELINE OF STOGIT POLE LINE TRUNK 4 AND TRUNK BCC1

DN 150 (6”) - DN 500 (8”) – 400 (16”)

TECHNICAL NOTE:

Page 32: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

32

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TERAMO DISTRICT (ITALY)

PROJECT: LINES OF PINETO CENTRAL GAS DN 200 (8”) - DN 100 (4”)

TECHNICAL NOTE:

Page 33: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

33

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: ALEXANDROUPOLIS DISTRICT (GREECE)

PROJECT: PIPELINE ALEXANDROUPOLIS – KOMOTINI DN 900 (36”)

TECHNICAL NOTE:

Page 34: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

34

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: MAVRONERI DISTRICT (GREECE)

PROJECT: MAVRONERI - ANTIKYRA DN 500 (20”)

TECHNICAL NOTE:

Page 35: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

35

CUSTOMER:

CONTRACTOR:

STROYTRANSGAZ GREECE

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: THESSALONIKI DISTRICT (GREECE)

PROJECT: COMPRESSOR STATION NEA MESSIMVRIA

TECHNICAL NOTE:

Page 36: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

36

CUSTOMER:

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE FILLING

SEALINE GAUGING

SEALINE HYDROTEST

SEALINE DEWATERING

LOCATION: OFFSFORE (ITALY)

PROJECT: TEA - AMELIA

TECHNICAL NOTE:

Page 37: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

37

CONTRACTOR:

ACTIVITY: SEALINE CLEANING

SEALINE FLOODING

SEALINE FILLING

SEALINE GAUGING

SEALINE HYDROTEST

SEALINE DEWATERING

LOCATION: OFFSFORE VLORE (ALBANIA)

PROJECT: EPC OF A COMBINED CYCLE POWER PLANT AT VLORE

TECHNICAL NOTE:

Page 38: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

38

CUSTOMER: CONTRACTOR:

ACTIVITY: PIPELINE INSPECTION

Kaliper Pig

DRYING AIR DRY

LOCATION: SULMONA DISTRICT (ITALY)

PROJECT: PIPELINE CAMPOCHIARO - SULMONA DN 1200 (48”)

TECHNICAL NOTE:

Page 39: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

39

CUSTOMER: PFD LIMITED LTD CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: TENGIZ DISTRICT (KAZAKHSTAN)

PROJECT: ASSOCIATED WITH SGI STAGE 1 SGI STAGE 2 AND KOROLEV OF THE

SGP NEXT GENERATION GHATERING SISTEM (NGGS) TENGIZ

DN 50 (2”), DN 75 (3”), DN 150 (6”), DN 200 (8”), DN 300 (12”),

DN 400 (16”), DN 450 (18”), DN 600 (24”)

TECHNICAL NOTE: WORK PERFORMED UP TO TEMPERATURE OF - 50 ° + 50° C

Page 40: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

40

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: KOUILOU DISTRICT (REPUBLIC OF CONGO)

PROJECT: GAS VALORISATION PROJECT & EPC FOR THE NEW GAS

GATHERING NETWORK AND ITS CONNECTIONS AT THE DN 250 (10")

TECHNICAL NOTE:

Page 41: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

41

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: BOGOTA’ DISTRICT (COLOMBIA)

PROJECT: PIPELINE OBC – DN 1050 (42”)

TECHNICAL NOTE:

Page 42: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

42

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: FOGGIA DISTRICT (ITALY)

PROJECT: SAN GIOVANNI ROTONDO DN 250(10”)

TECHNICAL NOTE:

Page 43: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

43

CUSTOMER:

CONTRACTOR: .

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: CHIETI DISTRICT (ITALY)

PROJECT: BRECCIAROLA PLANT DN 400(16”)

TECHNICAL NOTE:

Page 44: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

44

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TARANTO DISTRICT (ITALY)

PROJECT: PIPELINE MANDURIA DN 200 (8”) DN 100 (4”)

TECHNICAL NOTE:

Page 45: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

45

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: LECCE DISTRICT (ITALY)

PROJECT: PIPELINE DERIVATION TO SANNICOLA – UGENTO –TRICASE

DN 300 (12”)

TECHNICAL NOTE:

Page 46: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

46

CUSTOMER:

CONTRACTOR:

ACTIVITY: HYDROSTATIC TEST

LOCATION: OGLIASTRA DISTRICT (ITALY)

PROJECT: PIPELINE TAP PROJECT 106407 PILOT LINE A&B

TECHNICAL NOTE: HIGH PRESSURE GAS TRANSPORT “X” 100 SARDEGNA

Page 47: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

47

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: SAVONA DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION TIRRENO POWER OF VADO LIGURE

DN 500 (20”)

TECHNICAL NOTE:

Page 48: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

48

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: NOVARA DISTRICT (ITALY)

PROJECT: PROGETTO 278012 – TRECATE NOT TARGHET COST

TECHNICAL NOTE:

  Energy Maintenance Services

Page 49: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

49

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: FERRARA DISTRICT (ITALY)

PROJECT: COMPRESSOR CENTRAL OF POGGIO RENATICO

DN 1200 (48”)

TECHNICAL NOTE:

Page 50: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

50

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

PIPELINE INSPECTION Kaliper Pig

DRYING AIR DRY

LOCATION: BOLOGNA DISTRICT (ITALY)

PROJECT: PIPELINE FAENZA – FORLI DN 400 (16”)

TECHNICAL NOTE:

Page 51: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

51

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: PIPELINE THROUGH MESTRE

DN 200 (8”)

DN 400 (16”)

DN 750 (30”)

TECHNICAL NOTE:

Page 52: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

52

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: PIPELINE DN 1050 (42”) REPLACEMENT PIPELINE PORTOBUFOLE’

AND MANSUE’

TECHNICAL NOTE:

Page 53: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

53

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: VERONA DISTRICT (ITALY)

PROJECT: TRAPS OF VIGASIO DN 300 (12”)

TECHNICAL NOTE:

Page 54: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

54

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TRENTO DISTRICT (ITALY)

PROJECT: TRAPS DN 300 (12”) TRENTO

TECHNICAL NOTE:

Page 55: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

55

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: MILANO DISTRICT (ITALY)

PROJECT: PIPELINE SETTALA – RODANO DN 300 (12”)

TECHNICAL NOTE:

Page 56: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

56

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: RAVENNA DISTRICT (ITALY)

PROJECT: CENTRAL PROCESSING LINES FORM B4-130-XY-001

TECHNICAL NOTE: MANIFOLD PROJECT

Page 57: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

57

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TERAMO DISTRICT (ITALY)

PROJECT: FLOW LINE FROM EDISON CENTRAL IN CELLINO ATTANASIO

TO CELLINO ATTANASIO DN 150 (6”)

TECHNICAL NOTE:

Page 58: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

58

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: NAPOLI DISTRICT (ITALY)

PROJECT: PIPELINE DERIVATION TO BAGNOLI P.I.D.I. 12 DN 600 (24”)

TECHNICAL NOTE:

Page 59: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

59

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: BOLZANO DISTRICT (ITALY)

PROJECT: NEW CONNECTION IN DOGAS SALORNO DN 100 (4”)

TECHNICAL NOTE:

Page 60: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

60

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PADOVA DISTRICT (ITALY)

PROJECT: REDUCTION PLANT HPRS50 IN RUBANO DN 150 (6”)

TECHNICAL NOTE:

Page 61: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

61

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: BOLZANO DISTRICT (ITALY)

PROJECT: PIPELINE BOLZANO – BRUNICO DN 500 (20”)

TECHNICAL NOTE:

Page 62: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

62

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: BOLZANO DISTRICT (ITALY)

PROJECT: CONNECTION ME.BO. – RAST IN APPIANO DN 100 (4”)

DN 250 (10”)

TECHNICAL NOTE:

Page 63: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

63

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: ROVIGO DISTRICT (ITALY)

PROJECT: PIPELINE JUNCTION TO ADRIA DN 550 (22”)

TECHNICAL NOTE:

Page 64: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

64

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: ROVIGO DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION TO HOTEL ALPENOF IN VANDOIES COUNTRY

DN 100 (4”)

TECHNICAL NOTE:

Page 65: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

65

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: PIPELINE CASALE SUL SILE DN 150 (6”)

TECHNICAL NOTE:

Page 66: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

66

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: JUNCTION TO MELZO VARIANT DN 300 (12”)

TECHNICAL NOTE:

Page 67: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

67

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

PIPELINE INSPECTION Kaliper Pig

LOCATION: TREVISO DISTRICT (ITALY)

PROJECT: PIPELINE IN BRE. BE. MI. DN 100 (4”)DN 300 (12”)

TECHNICAL NOTE:

Page 68: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

68

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PIACENZA DISTRICT (ITALY)

PROJECT: PIPELINE CASTEL SAN GIOVANNI-CASTELL’ARQUATO DN 150 (6”)

TECHNICAL NOTE:

Page 69: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

69

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PIACENZA DISTRICT (ITALY)

PROJECT: PIPELINE VIGOLSONE DN 200 (8”) INCLUDING IMPIANT DN 150 (6”)

TECHNICAL NOTE:

Page 70: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

70

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PIACENZA DISTRICT (ITALY)

PROJECT: PIPELINE ALSENO DN 100 (4”)

TECHNICAL NOTE:

Page 71: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

71

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PIACENZA DISTRICT (ITALY)

PROJECT: PIPELINE CASTEL SAN GIOVANNI DN 400 (16”)

TECHNICAL NOTE:

Page 72: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

72

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: PIACENZA DISTRICT (ITALY)

PROJECT: PIPELINE CONNECTION ARP IN PODENZANO DN 200 (8”)

TECHNICAL NOTE:

Page 73: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

73

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: CUNEO DISTRICT (ITALY)

PROJECT: PIPELINE NEW CONNECTION MONGE & C. SPA IN SAVIGLIANO E

MONASTEROLO DI SAVIGLIANO DN 150 (6”)

TECHNICAL NOTE:

Page 74: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

74

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

LOCATION: MILANO DISTRICT (ITALY)

PROJECT: CONNECTION TO PIEVE EMANUELE DN 200 (8”)

TECHNICAL NOTE:

Page 75: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

75

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DIMENSIONAL CONTROL

DRYING AIR DRY

Kaliper pig

LOCATION: COMO DISTRICT (ITALY)

PROJECT: PIPELINE LURAGO – PONTE LAMBRO, TRACT ERBA CASTEL MARTE

DN 300 (12”)

TECHNICAL NOTE:

Page 76: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

76

CUSTOMER:

CONTRACTOR:

ACTIVITY: PIPELINE CLEANING

HYDROSTATIC TEST

DRYING AIR DRY

PIPELINE INSPECTION Kaliper Pig

LOCATION: AQUILA DISTRICT (ITALY)

PROJECT: GAS SERVICE ABRUZZO DN 100 (4") IN TAGLIACOZZO

TECHNICAL NOTE:

Page 77: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

77

C U R R I C U L U M V I T A E

R O C C O D I P O M P O

T E C H N I C A L M A N A G E R L W R S . r . l .

Esperienze professionali: 1979-1980 - SAIPEM S.p.A. Corso di formazione di Collaudi Idrostatici 1980-1992 - SAIPEM S.p.A. Collaudatore

1992-1999 - BONATTI S.p.A. Responsabile Collaudi Idrostatici

1999-2000 - CMTI Society P. Responsabile Tecnico

2000 a tutt’oggi – LWR S.r.l. Technical manager

ATTIVITÀ cantieristiche svolte:

METANODOTTO IMPORTAZIONE DALL’ ALGERIA GAME /A

Page 78: REFERENZE AZIENDALI REV 01 09 10 2013_____ COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale

_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE

78

DN 48” TRATTO PALMI-CASTROVILLARI (SAIPEM)

METANODOTTO YASSUI-ISFHAN (IRAN) DN 52” (SAIPEM)

ACQUEDOTTO DI ABHA (ARABIA SAUDITA) DN 42” (SAIPEM)

OLEODOTTO STRATEGICO IRAQ-TURCHIA DN 46” (SAIPEM)

OLEODOTTO DI YANBU (ARABIA SAUDITA) DN 56” (SAIPEM)

OLEODOTTO DI MOROGORO (TANZANIA) DN 12” (SAIPEM)

METANODOTTO MONTALCINO-GROSSETO DN 36” (SAIPEM)

METANODOTTO VASTO-VASTOGIRARDI DN 42” (SAIPEM)

VARI SEA-LINE SUL MARE ADRIATICO (SAIPEM)

METANODOTTO IMPORTAZIONE DALL’ ALGERIA GAME B

DN 48” TRATTO SCIACCA-MESSINA (SAIPEM)

METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B DN 48”

TRATTO PALMI-TARSIA (BONATTI)

METANODOTTO ALIANO-BERNALDA DN 42” (BONATTI)

METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B

DN 48” TRATTO LAURIA-MONTESANO (BONATTI)

METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B DN 48”

TRATTO TERRANOVA MARRADI (BONATTI)

OLEODOTTO FERREIRA-CHAMPDEPRAZ DN 16” (BONATTI)

METANIZZAZIONE REGIONI BASILICATA E CALABRIA (BONATTI)

COLLEGAMENTO AREE POZZI 43,44,45 ALLA C. LE GAS DI CANDELA (FG)

AMPLIAMENTO E COLLAUDI