____________________________________________________________________www.lwrtest.it
COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO IMPIANTI E CONDOTTE
LWR srl R.E.A. CCIAA di Chieti n° 151136 – Capitale Sociale € 50.000,00 – i.v. ARIELLI (ch) Abruzzo – ITALIA / EU – 66030 Via Valle, 42 tel. +39 0871 396046 – fax +39 0871 938837 / e-mail: [email protected] partita IVA 02086900699
CURRICULUM AZIENDALE
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
2
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: LECCO DISTRICT (ITALY)
PROJECT: PIPELINE CALCO - PIANTEDO DN 750 (30”)
TECHNICAL NOTE: CROSSING ADDA RIVER
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
3
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TARANTO (ITALY)
PROJECT: PIPELINE FRAGAGNANO E CAROSINO CONNECTION DN 250 (10”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
4
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
INERTISATION WITH NITROGEN
LOCATION: NAPOLI (ITALY)
PROJECT: SEALINE BACOLI - ISCHIA DN 250 (10”)
TECHNICAL NOTE: CROSSING MEDITERRANEAN SEA
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
5
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
INERTISATION WITH NITROGEN
LOCATION: NAPOLI (ITALY)
PROJECT: SEALINE BACOLI - ISCHIA DN 250 (10”)
TECHNICAL NOTE: CROSSING MEDITERRANEAN SEA. SUPPLY AND INSTALLATION OF TRAPS FOR LAUNCH AND
RECEPTION OF PIGS.
NOTE: REDONE TESTING FOR BREAKING SEALINE.
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
6
CUSTOMER:
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE (CROATIA)
PROJECT: SEALINE PULA DN 250 (10”)
TECHNICAL NOTE: CROSSING ADRIATIC SEA.
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
7
CUSTOMER:
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE (CROATIA)
PROJECT: SEALINE IZABELA NOTH – IZABELA SOUTH DN 250 (10”)
SEALINE IZABELA NOTH – IZABELA SOUTH DN 75 (3”)
IZABELA SOUTH – IVANA K DN 400 (16”)
TECHNICAL NOTE: CROSSING ADRIATIC SEA.
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
8
CUSTOMER:
CONTRACTOR: ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
LEAK TEST
DEWATERING TEST
DRYING AIR DRY
LOCATION: OFF- SHORE ANCONA (ITALY)
PROJECT: SEALINE BONACCIA PROJECT DN 150 (6”)
TECHNICAL NOTE: CONNECTION BETWEEN PLATFORMS IN ADRIATIC SEA
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
9
CUSTOMER:
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE (EGYPT)
PROJECT: SEALINE DENISE - B PROJECT DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
10
CUSTOMER: CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE RAVENNA (ITALY)
PROJECT: SEALINE GUENDALINA PROJECT DN 75 (3”) A
SEALINE GUENDALINA PROJECT DN 75 (3”) B
SEALINE GUENDALINA PROJECT DN 250 (10”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
11
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE (ISRAEL)
PROJECT: SEALINE HADERA GAS IMPORT TERMINAL DN 250 (10 ”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
12
CUSTOMER: GHANA NATIONAL GAS COMPANY CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE GAUGING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: OFF- SHORE (GHANA)
PROJECT: SEALINE GHANA PROJECT DN 300 (12”)
TECHNICAL NOTE: THE TOTAL LENGTH OF THE OFF-SHORE AND ON-SHORE IS
58.000 Mt OF WHICH 44.000 Mt OF SEALINE AND 14.000 OF EXISTANT SEALINE.
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
13
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: ENNA DISTRICT (ITALY)
PROJECT: PIPELINE GELA – ENNA DN 900 (36”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
14
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: VENEZIA DISTRICT (ITALY)
PROJECT: ADRIATIC LNG DN 750 (30”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
15
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: ISTRANA CENTRAL GAS
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
16
CUSTOMER: CONTRACTOR:
ACTIVITY: HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: ISTRANA CENTRAL GAS DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
17
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: BOLOGNA DISTRICT (ITALY)
PROJECT: MINERBIO METERING STATION
TECHNICAL NOTE: SIMULACRI REPLACEMENT AND ASSEMBLY OF
RETURN VALVE
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
18
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: LIVORNO DISTRICT (ITALY)
PROJECT: TERMINAL PIPELINE CONNECTION OLT LIVORNO DN 800 (32”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
19
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: CREMONA DISTRICT (ITALY)
PROJECT: PIPELINE CREMONA SERGNANO DN 1200 (48”)
TECHNICAL NOTE: SUPPLY TEST HEADS DN 42” – DN 48”
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
20
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: CREMONA DISTRICT (ITALY)
PROJECT: BORDOLANO PLANT LINE DN 800 (32”) LINE DN 1020 (42”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
21
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: VERBANIA DISTRICT (ITALY)
PROJECT: COMPRESSION CENTRAL MASERA DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
22
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: PARMA DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION TO PARMA DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
23
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: REGGIO EMILIA DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION TO REGGIO EMILIA DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
24
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: REGGIO EMILIA DISTRICT (ITALY)
PROJECT: VILLA MASSONE CENTRAL REDUCTION
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
25
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: ENNA DISTRICT (ITALY)
PROJECT: PIPELINE GELA- ENNA (II LOT ENNA) DN 900 (36”)
TECHNICAL NOTE: PIPELINE FROM LYBIA
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
26
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: SULMONA DISTRICT (ITALY)
PROJECT: PIPELINE CAMPOCHIARO - SULMONA DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
27
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: PERUGIA DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION TO ENEL OF PIETRAFITTA DN 400 (16”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
28
CUSTOMER: CONTRACTOR: LE COSTE S.p.A.
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: BRESCIA DISTRICT (ITALY)
PROJECT: PIPELINE POLAVENO - DARFO DN 500 (20”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
29
CUSTOMER: CONTRACTOR: LE COSTE S.p.A.
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: SONDRIO DISTRICT (ITALY)
PROJECT: PIPELINE PIANTEDO - BERBENNO DN 500 (20”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
30
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: CHIETI DISTRICT (ITALY)
PROJECT: 6 TRUNK OF TRESTE RIVER CENTRA DN 400 (16”)
DN 500 (20”) LINES A,B.C
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
31
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
INERTISATION WITH NITROGEN
LOCATION: CHIETI DISTRICT (ITALY)
PROJECT: PIPELINE OF STOGIT POLE LINE TRUNK 4 AND TRUNK BCC1
DN 150 (6”) - DN 500 (8”) – 400 (16”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
32
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TERAMO DISTRICT (ITALY)
PROJECT: LINES OF PINETO CENTRAL GAS DN 200 (8”) - DN 100 (4”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
33
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: ALEXANDROUPOLIS DISTRICT (GREECE)
PROJECT: PIPELINE ALEXANDROUPOLIS – KOMOTINI DN 900 (36”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
34
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: MAVRONERI DISTRICT (GREECE)
PROJECT: MAVRONERI - ANTIKYRA DN 500 (20”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
35
CUSTOMER:
CONTRACTOR:
STROYTRANSGAZ GREECE
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: THESSALONIKI DISTRICT (GREECE)
PROJECT: COMPRESSOR STATION NEA MESSIMVRIA
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
36
CUSTOMER:
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE FILLING
SEALINE GAUGING
SEALINE HYDROTEST
SEALINE DEWATERING
LOCATION: OFFSFORE (ITALY)
PROJECT: TEA - AMELIA
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
37
CONTRACTOR:
ACTIVITY: SEALINE CLEANING
SEALINE FLOODING
SEALINE FILLING
SEALINE GAUGING
SEALINE HYDROTEST
SEALINE DEWATERING
LOCATION: OFFSFORE VLORE (ALBANIA)
PROJECT: EPC OF A COMBINED CYCLE POWER PLANT AT VLORE
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
38
CUSTOMER: CONTRACTOR:
ACTIVITY: PIPELINE INSPECTION
Kaliper Pig
DRYING AIR DRY
LOCATION: SULMONA DISTRICT (ITALY)
PROJECT: PIPELINE CAMPOCHIARO - SULMONA DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
39
CUSTOMER: PFD LIMITED LTD CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: TENGIZ DISTRICT (KAZAKHSTAN)
PROJECT: ASSOCIATED WITH SGI STAGE 1 SGI STAGE 2 AND KOROLEV OF THE
SGP NEXT GENERATION GHATERING SISTEM (NGGS) TENGIZ
DN 50 (2”), DN 75 (3”), DN 150 (6”), DN 200 (8”), DN 300 (12”),
DN 400 (16”), DN 450 (18”), DN 600 (24”)
TECHNICAL NOTE: WORK PERFORMED UP TO TEMPERATURE OF - 50 ° + 50° C
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
40
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: KOUILOU DISTRICT (REPUBLIC OF CONGO)
PROJECT: GAS VALORISATION PROJECT & EPC FOR THE NEW GAS
GATHERING NETWORK AND ITS CONNECTIONS AT THE DN 250 (10")
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
41
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: BOGOTA’ DISTRICT (COLOMBIA)
PROJECT: PIPELINE OBC – DN 1050 (42”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
42
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: FOGGIA DISTRICT (ITALY)
PROJECT: SAN GIOVANNI ROTONDO DN 250(10”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
43
CUSTOMER:
CONTRACTOR: .
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: CHIETI DISTRICT (ITALY)
PROJECT: BRECCIAROLA PLANT DN 400(16”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
44
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TARANTO DISTRICT (ITALY)
PROJECT: PIPELINE MANDURIA DN 200 (8”) DN 100 (4”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
45
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: LECCE DISTRICT (ITALY)
PROJECT: PIPELINE DERIVATION TO SANNICOLA – UGENTO –TRICASE
DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
46
CUSTOMER:
CONTRACTOR:
ACTIVITY: HYDROSTATIC TEST
LOCATION: OGLIASTRA DISTRICT (ITALY)
PROJECT: PIPELINE TAP PROJECT 106407 PILOT LINE A&B
TECHNICAL NOTE: HIGH PRESSURE GAS TRANSPORT “X” 100 SARDEGNA
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
47
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: SAVONA DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION TIRRENO POWER OF VADO LIGURE
DN 500 (20”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
48
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: NOVARA DISTRICT (ITALY)
PROJECT: PROGETTO 278012 – TRECATE NOT TARGHET COST
TECHNICAL NOTE:
Energy Maintenance Services
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
49
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: FERRARA DISTRICT (ITALY)
PROJECT: COMPRESSOR CENTRAL OF POGGIO RENATICO
DN 1200 (48”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
50
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
PIPELINE INSPECTION Kaliper Pig
DRYING AIR DRY
LOCATION: BOLOGNA DISTRICT (ITALY)
PROJECT: PIPELINE FAENZA – FORLI DN 400 (16”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
51
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: PIPELINE THROUGH MESTRE
DN 200 (8”)
DN 400 (16”)
DN 750 (30”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
52
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: PIPELINE DN 1050 (42”) REPLACEMENT PIPELINE PORTOBUFOLE’
AND MANSUE’
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
53
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: VERONA DISTRICT (ITALY)
PROJECT: TRAPS OF VIGASIO DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
54
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TRENTO DISTRICT (ITALY)
PROJECT: TRAPS DN 300 (12”) TRENTO
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
55
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: MILANO DISTRICT (ITALY)
PROJECT: PIPELINE SETTALA – RODANO DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
56
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: RAVENNA DISTRICT (ITALY)
PROJECT: CENTRAL PROCESSING LINES FORM B4-130-XY-001
TECHNICAL NOTE: MANIFOLD PROJECT
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
57
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TERAMO DISTRICT (ITALY)
PROJECT: FLOW LINE FROM EDISON CENTRAL IN CELLINO ATTANASIO
TO CELLINO ATTANASIO DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
58
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: NAPOLI DISTRICT (ITALY)
PROJECT: PIPELINE DERIVATION TO BAGNOLI P.I.D.I. 12 DN 600 (24”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
59
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: BOLZANO DISTRICT (ITALY)
PROJECT: NEW CONNECTION IN DOGAS SALORNO DN 100 (4”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
60
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PADOVA DISTRICT (ITALY)
PROJECT: REDUCTION PLANT HPRS50 IN RUBANO DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
61
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: BOLZANO DISTRICT (ITALY)
PROJECT: PIPELINE BOLZANO – BRUNICO DN 500 (20”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
62
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: BOLZANO DISTRICT (ITALY)
PROJECT: CONNECTION ME.BO. – RAST IN APPIANO DN 100 (4”)
DN 250 (10”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
63
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: ROVIGO DISTRICT (ITALY)
PROJECT: PIPELINE JUNCTION TO ADRIA DN 550 (22”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
64
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: ROVIGO DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION TO HOTEL ALPENOF IN VANDOIES COUNTRY
DN 100 (4”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
65
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: PIPELINE CASALE SUL SILE DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
66
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: JUNCTION TO MELZO VARIANT DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
67
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
PIPELINE INSPECTION Kaliper Pig
LOCATION: TREVISO DISTRICT (ITALY)
PROJECT: PIPELINE IN BRE. BE. MI. DN 100 (4”)DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
68
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PIACENZA DISTRICT (ITALY)
PROJECT: PIPELINE CASTEL SAN GIOVANNI-CASTELL’ARQUATO DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
69
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PIACENZA DISTRICT (ITALY)
PROJECT: PIPELINE VIGOLSONE DN 200 (8”) INCLUDING IMPIANT DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
70
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PIACENZA DISTRICT (ITALY)
PROJECT: PIPELINE ALSENO DN 100 (4”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
71
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PIACENZA DISTRICT (ITALY)
PROJECT: PIPELINE CASTEL SAN GIOVANNI DN 400 (16”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
72
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: PIACENZA DISTRICT (ITALY)
PROJECT: PIPELINE CONNECTION ARP IN PODENZANO DN 200 (8”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
73
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: CUNEO DISTRICT (ITALY)
PROJECT: PIPELINE NEW CONNECTION MONGE & C. SPA IN SAVIGLIANO E
MONASTEROLO DI SAVIGLIANO DN 150 (6”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
74
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
LOCATION: MILANO DISTRICT (ITALY)
PROJECT: CONNECTION TO PIEVE EMANUELE DN 200 (8”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
75
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DIMENSIONAL CONTROL
DRYING AIR DRY
Kaliper pig
LOCATION: COMO DISTRICT (ITALY)
PROJECT: PIPELINE LURAGO – PONTE LAMBRO, TRACT ERBA CASTEL MARTE
DN 300 (12”)
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
76
CUSTOMER:
CONTRACTOR:
ACTIVITY: PIPELINE CLEANING
HYDROSTATIC TEST
DRYING AIR DRY
PIPELINE INSPECTION Kaliper Pig
LOCATION: AQUILA DISTRICT (ITALY)
PROJECT: GAS SERVICE ABRUZZO DN 100 (4") IN TAGLIACOZZO
TECHNICAL NOTE:
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
77
C U R R I C U L U M V I T A E
R O C C O D I P O M P O
T E C H N I C A L M A N A G E R L W R S . r . l .
Esperienze professionali: 1979-1980 - SAIPEM S.p.A. Corso di formazione di Collaudi Idrostatici 1980-1992 - SAIPEM S.p.A. Collaudatore
1992-1999 - BONATTI S.p.A. Responsabile Collaudi Idrostatici
1999-2000 - CMTI Society P. Responsabile Tecnico
2000 a tutt’oggi – LWR S.r.l. Technical manager
ATTIVITÀ cantieristiche svolte:
METANODOTTO IMPORTAZIONE DALL’ ALGERIA GAME /A
_______________________________________________________________________www.lwrtest.it COLLAUDI IDROSTATICI CONTROLLO DIMENSIONALE ESSICCAMENTO INPIANTI E CONDOTTE
78
DN 48” TRATTO PALMI-CASTROVILLARI (SAIPEM)
METANODOTTO YASSUI-ISFHAN (IRAN) DN 52” (SAIPEM)
ACQUEDOTTO DI ABHA (ARABIA SAUDITA) DN 42” (SAIPEM)
OLEODOTTO STRATEGICO IRAQ-TURCHIA DN 46” (SAIPEM)
OLEODOTTO DI YANBU (ARABIA SAUDITA) DN 56” (SAIPEM)
OLEODOTTO DI MOROGORO (TANZANIA) DN 12” (SAIPEM)
METANODOTTO MONTALCINO-GROSSETO DN 36” (SAIPEM)
METANODOTTO VASTO-VASTOGIRARDI DN 42” (SAIPEM)
VARI SEA-LINE SUL MARE ADRIATICO (SAIPEM)
METANODOTTO IMPORTAZIONE DALL’ ALGERIA GAME B
DN 48” TRATTO SCIACCA-MESSINA (SAIPEM)
METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B DN 48”
TRATTO PALMI-TARSIA (BONATTI)
METANODOTTO ALIANO-BERNALDA DN 42” (BONATTI)
METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B
DN 48” TRATTO LAURIA-MONTESANO (BONATTI)
METANODOTTO IMPORTAZIONE DALL’ALGERIA GAME B DN 48”
TRATTO TERRANOVA MARRADI (BONATTI)
OLEODOTTO FERREIRA-CHAMPDEPRAZ DN 16” (BONATTI)
METANIZZAZIONE REGIONI BASILICATA E CALABRIA (BONATTI)
COLLEGAMENTO AREE POZZI 43,44,45 ALLA C. LE GAS DI CANDELA (FG)
AMPLIAMENTO E COLLAUDI