+ All Categories
Home > Documents > Regional Connector Transit Corridor Final Environmental...

Regional Connector Transit Corridor Final Environmental...

Date post: 03-Jan-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
22
Regional Connector Transit Corridor Final Environmental Impact Statement/ Final Environmental Impact Report APPENDIX 1 LOCALLY PREFERRED ALTERNATIVE DRAWINGS State Clearinghouse Number: 2009031043
Transcript
Page 1: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

Regional Connector Transit Corridor

Final Environmental Impact Statement/

Final Environmental Impact Report

APPENDIX 1

LOCALLY PREFERRED ALTERNATIVE DRAWINGS

State Clearinghouse Number: 2009031043

Page 2: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

 

Page 3: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

39

38

37

36

35

34

33

32

31

30

29

28

27

26

25

24

23

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

R-112

R-111

R-110

R-109

R-108

R-107

R-106

R-105

R-104

R-103

R-102

R-101

GR-100

A-103

A-102

A-101

SG-005

SG-004

SG-003

SG-002

SG-001

TC-103

TC-102

TC-101

C-112

C-111

C-110

C-109

C-108

C-107

C-106

C-105

C-104

C-103

C-102

C-101

GC-100

G-100

TITLE

NO

SHT

NO

DWG

RIGHT OF WAY PARCEL IMPACTS DATA TABLE

RIGHT OF WAY PLAN MANGROVE PROPERTY TCE

RIGHT OF WAY PLAN STA R 82+00 TO STA R 93+29

RIGHT OF WAY PLAN STA R1 89+00 TO STA R1 96+09

RIGHT OF WAY PLAN STA R 76+00 TO STA R1 89+00

RIGHT OF WAY PLAN STA R 69+00 TO STA R 76+00

RIGHT OF WAY PLAN STA R 57+00 TO STA R 69+00

RIGHT OF WAY PLAN STA R 45+00 TO STA R 57+00

RIGHT OF WAY PLAN STA R 34+00 TO STA R 45+00

RIGHT OF WAY PLAN STA R 22+00 TO STA R 34+00

RIGHT OF WAY PLAN STA R 10+00 TO STA R 22+00

RIGHT OF WAY PLAN STA R 0+00 TO STA R 10+00

RIGHT OF WAY KEY MAP

1ST/CENTRAL AVENUE STATION SITE FOOTPRINT

2ND/BROADWAY STATION SITE FOOTPRINT

2ND/HOPE STREET STATION SITE FOOTPRINT

CONSTRUCTION AREA PLAN WALLS AND EMBANKMENT

CONSTRUCTION AREA PLAN 1ST/CENTRAL STATION SITE AND MANGROVE PROPERTY

CONSTRUCTION AREA PLAN 2ND/BROADWAY STATION SITE

CONSTRUCTION AREA PLAN 2ND/HOPE STREET STATION SITE

CONSTRUCTION AREA PLAN STRUCTURE CUT AND COVER

CROSS SECTION 2ND AT VIBIANAS PORTAL ON 1ST STREET

CROSS SECTION UNDER BROAD MUSEUM 2ND AT LAPD

CROSS SECTION FLOWER/6TH STREET FLOWER/5TH STREET

TRACK ALIGNMENT PLAN AND PROFILE STA R1 89+00 TO STA R1 96+10

TRACK ALIGNMENT PLAN AND PROFILE STA R1 80+00 TO STA R1 89+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 83+00 TO STA R 94+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 76+00 TO STA R 83+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 66+00 TO STA R 76+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 57+00 TO STA R 66+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 47+00 TO STA R 57+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 37+00 TO STA R 47+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 28+00 TO STA R 37+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 20+00 TO STA R 28+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 9+00 TO STA R 20+00

TRACK ALIGNMENT PLAN AND PROFILE STA R 0+00 TO STA R 9+00

TRACK ALIGNMENT KEY MAP

INDEX OF DRAWINGS

COVER PAGE

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

4:5

8

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

...\

cadd\

EIR\

C098

0G

100.plg

2

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

INDEX OF DRAWINGS

G-100

NONE

FA

MA

Page 4: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

SPA

POOL

POOL

SPA

POOL

POOL

POOL

ELE

VATE

D

WAL

KW

AY

GROUND NOT VISIBLE

GR

OU

ND

NOT

VISI

BLE

POOL

POOL

PO

OL

POOL

COURT

ROOFTOP TENNIS

COURT

ROOFTOP TENNIS

COURT

ROOFTOP TENNIS

COURT

ROOFTOP TENNIS

COURT

ROOFTOP TENNIS

COURT

ROOFTOP TENNIS

ELE

VATE

D

WAL

KW

AY

UTILITY

MISC.

UTILITY

MISC.

UTILITY

MISC.

SPA

NOT VISIBLE

GROUND

NOT VISIBLE

GROUND

COURTS

ROOFTOP TENNIS

PARKING

ROOFTOP

PARKING

ROOFTOP

PARKING

ROOFTOP

PARKING

ROOFTOP

PARKING

ROOFTOP

PARKING

ROOFTOP

PARKING

ROOFTOP

COURT

TENNIS

COURT

TENNIS

PATIO AREA

PATIO AREA

GR

OU

ND

NOT

VISI

BLE

GR

OU

ND

NOT

VISI

BLE

GR

OU

ND

NOT

VISI

BLE

ELE

VATE

D

WAL

KW

AY

ELE

VATE

D

WAL

KW

AY

ELE

VATE

D

WAL

KW

AY

ELE

VATE

D

WAL

KW

AY

ELE

VATE

D

WAL

KW

AY

DIS

TRIC

T ST

ATIO

NT

OK

YO/

ARTS

EXIS

T LIT

TLE

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

4:5

9

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

...\

cadd\

EIR\

C098

0G

C001.plg

0+00

5+00

10+00

15+00

20+00

25+00

30+00

35+00

40+0

0

45+0

0

50+0

0

55+0

0

60+0

0

65+0

0

70+0

0

75+00

76+30

76+30

0+00

5+00

10+00

15+00

20+00

25+00

30+00

35+00

40+0

0

45+0

0

50+0

0

55+0

0

60+0

0

65+0

0

70+0

0

75+00

0 150’ 300’300’

S FLO

WER ST

S FIG

UEROA ST

W 7TH ST

WILSHIRE BLVD

W 6TH ST

W 5TH ST

W 3RD ST

S OLIV

E ST

S HILL ST

S LOS ANGELES ST

SA

N PE

DR

O ST

CE

NT

RAL

AV S

AL

AM

ED

A ST

S

HE

WIT

T ST

S

GA

RE

Y ST

N

VIG

NES ST

E TEM

PLE S

T

ALISO ST

W 4TH ST

S HOPE ST

2ND ST

E COMMERCIAL ST

MADRETO SIERRA

TO ATLANTIC

BEACHTO LONG

TEMPLE ST

STATION2ND/HOPE STREET

STATION

2ND/BROADWAY

METRO STATIO

N

EXIS

T 7TH

C-101

C-102

C-103

C-104 C-105

C-106

C-107

C-108

C-109 C-110

C-111

C-112

AVENUE STATION1ST/C

ENTRAL

TRACTION AVE

W 1ST STREET

2ND ST

TRACK ALIGNMENT

KEY MAP

GC-100

1"=300’

3

JS

MA

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

BROAD

WAY

95

+00

95

+00

90

+00

90

+00

85

+00

85

+00

85+00

90+00

93+6593+65

85+00

90+00

94+0394+03

80+00

80+0080+00

DUCOMMUN ST

S SPRIN

G ST

MAIN ST

ROSE ST

S GRAND AVE

LINE BELOW

RED/PURPLE

Page 5: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

UTILIT

Y

MIS

C.

286.8

287.2

286.9

287.4

288.1

8+

50.4

6

TS

9+

10.4

6

SC

8+

51.2

1

TS

9+

11.2

1

SC

VERT: 1"=10’

0 10’ 20’

280

270

260

250

240

230

220

290

8+00 9+00

300

310

C-101

HORZ: 1" = 40’

VERT: 1" = 10’

4

MATC

H

LIN

E ST

A

R 9+

00 SEE

DW

G

C-10

2

PO

OL

290

282.4

284.6

285.8

286.5

286.5

287.7

288.6

289.4

288.4

285

6+

86.2

7

CS

7+

46.2

7

ST

6+

89.4

1

CS

7+

49.4

1

ST

10’0 40’ 80’20’40’

HORIZ: 1"=40’

7+00

S FLOWER ST

W

6T

H ST

1980

W

6T

H ST

TRACK ALIGNMENT PLAN AND PROFILE

STA R 0+00 TO STA R 9+00

MIN

STRUCTURE WALL

280

280.5

282.5

284.6

283.6

285

285

5+00

5+

21.7

3

TS

5+

81.7

3

SC

5+00

5+

34.2

5

TS

5+

94.2

5

SC

5+00 6+00

RcI

CURVE DATA

Lc

35

35

990

5000’60’ 104.54’

60’ 8000’ 95.16’

EXIST ROW

EXIST ROW

OUT

Ls

(mph)V

0.75

0.50

0.25

0.25

SD 72" x 84"

EX RCP

ORIGINAL GROUND

(in)Ea

(in)Eu

STRUCTURE WALL

280

276.4

276.6

277.6

278.7

279.5

281.5

3+00 4+00

WIL

SHIR

E

BL

VD

1980

990 60’

60’

WIL

SHIR

E

BL

VD

IN

Ls

NO

CURVE

TOP OF RAIL

STRUCTURE

TOP OF EXISTING

PO

OL

275

272.7 274.5

1+00 2+00

JS

MA

METRO CENTER STATION

EXIST 7TH ST/

272.5

271.6

270.3

270

0+00

0+

00.0

0

PO

B

0+00

0+

00.0

0

PO

B

0+00

280

270

260

250

240

230

220

W

7T

H ST

290

300

310

EXIST PLATFORM

TO LONG BEACH

EXISTING BLUE LINE

NOTES:

3.

2.

1.

EASTBOUND TRACK

TRACK. RIGHT TRACK CENTERLINE IS

LEFT TRACK CENTERLINE IS WESTBOUND

THE SAME AS PROFILE OF RIGHT TRACK

PROFILE OF LEFT TRACK IS APPROXIMATELY

TO BE VERIFIED WITH FIELD SURVEY

ALIGNMENT TO EXISTING LONG BEACH TRACK

CENTERLINE GEOMETRY OF EXISTING TRACK

CONCRETE SLAB

6.3

3’

5+4

2.5

0

BV

C

EL 238.8

6

5+92.5

0

EL 239.0

0

6+4

2.5

0

EV

C

EL 239.4

4

EL 237.3

5

0.28%

L = 100’

0.88%

SD 72" x 84"

EX RCP

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

1 A

MU

SE

R=

Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

101.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

Page 6: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

EXIST ROW

TUNNEL

19

+00.0

0

BV

C

EL 250.4

7

20

+00.0

0

ORIGINAL GROUND

DE

NSE T

REES

DE

NSE T

REES

DE

NSE T

REES

285

285

290

295

290

290

287.4

287.7 287.9

288.4

288.8

287.7

288.6

288.6

288.6

292.6

289.4

291.4

290.7

289.7

289.2

289.8

290.2

290.4

293.6

291.3

291.4

290.4

290.1

290.1

290.3

289.9

292.6

293.6

295.5

297.3

299.5

300.6

302.5

PATI

O

ARE

A

GROUND NOT VISIBLE

EL

EV

AT

ED

WA

LK

WA

Y

ELEVATED WALKWAY

EL

EV

AT

ED

WA

LK

WA

Y

290

290

295

300

310

310

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

2

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

102.plg

0.88%

L = 200’

TOP OF RAIL

TOP OF TUNNEL

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

10+00 15+00 20+00

9+

10.4

6

SC

9+

85.2

2

CS

10

+45.2

2

ST

10+00 15+00 20+00

9+

11.2

1

SC

10

+03.3

2

CS

10

+63.3

2

ST

VERT: 1"=10’

0 10’ 20’10’0 40’ 80’20’40’

HORIZ: 1"=40’

MATC

H

LIN

E ST

A

R 20+

00 SEE

DW

G

C-10

3

9+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00

MATC

H

LIN

E ST

A

R 9+

00 SEE

DW

G

C-10

1

RcI

CURVE DATA

Lc

351000

1000

W

5T

H ST

S FLOWER ST

COMPLEX

BONAVENTURE HOTEL

PLAZA

CITYCORP

OUT

Ls

IN

Ls

NO

CURVE

220

230

240

250

260

270

280

290

300

10+00 11+00 19+00 20+00

351990

1990

5000’

6000’

60’ 60’

60’ 60’

74.76’

92.10’

W

5T

H ST

ST

4T

H

270’ POCKET TRACKTUNNEL

AB

OV

EO

VE

RP

ASS

W

4T

H ST

(in)Ea

(in)Eu

(mph)V

0.75

0.75

0.25

0.25

AREAS OF CONFLICT

TO BE REMOVED IN

ELECTRIC TUNNEL

ABANDONED PACIFIC

STRUCTURE WALL

STRUCTURE WALL

STRUCTURE

TOP OF

AREAS OF CONFLICT

TO BE REMOVED IN

ELECTRIC TUNNEL

ABANDONED PACIFIC

TRACK ALIGNMENT PLAN AND PROFILE

STA R 9+00 TO STA R 20+00

C-102

HORZ: 1" = 40’

VERT: 1" = 10’

5

JS

MA

OR PIP

TO BE RELOCATED

STORM DRAIN

EX 72" x 84" RCP

CROSSWALKPEDESTRIAN EXIST OVERHEAD

CROSSWALKPEDESTRIAN OVERHEADEXIST

RELOCATED OR PIP

(BEHIND) TO BE

STORM DRAIN

EX 72" x 84" RCP

310

220

230

240

250

260

270

280

290

300

CONCRETE SLAB

EXIST ROW

Page 7: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

TOP OF RAIL

EL 251.3

4

21+00.0

0

EV

C

EL 251.3

4

DE

NSE T

REES

DE

NSE T

REES

CO

URT

RO

OFT

OP TE

NNIS

CO

URT

RO

OFT

OP TE

NNIS

CO

URT

RO

OFT

OP TE

NNIS

EL

EV

AT

ED

WA

LK

WA

Y

TREES

DENSE

TREES

DENSE

TREES

DENSE

315

315

315

315

320

325

320

325

330

306.7

308.5

310.6

311.6

312.5

313.5

314.8

315.6

315.6

314.6

316.2

316.3

315.5

321.5

341.9

305

310

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

3

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

103.plg

0.00%

L = 200’

230

ORIGINAL GROUND

TOP OF TUNNEL

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

20+0025+00

24

+03.3

9

TS

25

+03.3

9

SC

20+0025+00

24

+21.5

6

TS

25

+21.5

6

SC

VERT: 1"=10’

0 10’ 20’10’0 40’ 80’20’40’

HORIZ: 1"=40’

MATC

H

LIN

E ST

A

R 20+

00 SEE

DW

G

C-10

2

MAT

CH LINE

STA

R 28

+00 S

EE D

WG C-104

WORLD TRADE CENTER

S FLOWER ST

WORLD TRADE CENTER

240

250

260

270

280

290

300

310

320

W

3R

D ST

RcI

CURVE DATA

Lc

10583’1010

OUT

Ls

IN

Ls

NO

CURVE

10583’2000

1010

2000

TUNNEL

TUNNEL

4T

H ST

100’

100’

401.79’

397.79’

32’

40’

0.50

0.50

0.25

0.25

(in)Ea

(in)Eu

(mph)V

OV

ERP

ASS

AB

OV

E

W

4T

H ST

TRACK ALIGNMENT PLAN AND PROFILE

STA R 20+00 TO STA R 28+00

C-103

HORZ: 1" = 40’

VERT: 1" = 10’

6

JS

MA

22+00 23+00 24+00 25+00 26+00 27+00 28+0021+0020+00

230

310

300

290

280

270

260

250

240

320

EXIST ROW

EXIST ROW

Page 8: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

L = 300’

33

+03.2

1 B

VC

EL 251.3

4

34

+53.2

1

EL 251.3

4

36

+03.2

1 E

VC

EL 24

4.8

6

31+00 32+00 33+00 34+00 35+00 36+00 37+0030+0029+0028+00

TRACK ALIGNMENT

JS

MA

PLAN AND PROFILE

STA R 28+00 TO STA R 37+00

C-104

HORZ: 1" = 40’

VERT: 1" = 10’

7

DENSE TREES

DENSE TREES

315

325

330

335

340

345

350

355

360

350

355

365

365

370

375

380 3

85

370

375

380

360

364.4

363.5

362.9

363.2360.6

357.6

352.6

362.7

351.3

363.3

362.6

363.5

363.8

364.5

364.6

363.5

362.5

361.6

360.3

361.6

363.4

366.5

365.7

366.5

368.6

386.3

386.7

385.8

382.7

377.5

372.7

362.4

360.4

359.3

359.5

360.4

361.4

358.3

361.5

360.5

359.5

363.2

363.7

385.8

360

360

365

360

30+00

35+00

29

+05.1

8

CS

29

+37.1

8

ST

32

+80.9

4

TS

33

+15.9

4

SC

30+00

35+00

29

+19.3

5

CS

29

+59.3

5

ST

33

+26.6

6

TS

33

+66.6

6

SC

37+44.5

9CS

36+96.3

2

CS

0.00% 0.00%

-4.32%

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

0 40’ 80’20’40’

RcI

CURVE DATA

Lc

10380.43’583’

40’ 583’ 377.93’ 10

MATC

H LIN

E STA R 28+

00 SEE D

WG

C-103

MAT

CH LINE

STA

R 37+00 S

EE D

WG C-105

1020

2010

100’

100’

OUT

Ls

IN

Ls

NO

CURVE

KOSCIUSZKO

W

Y

W

GEN THADDEUS

230

240

250

260

270

280

290

300

310

320

2010

1020

35’

TUNNEL

TUNNELEXIST ROW

EXIST ROW

TOP OF RAIL

(in)Ea

(in)Eu

(mph)V

0.50

0.50

0.25

0.25

TOP OF TUNNEL

TOP OF TUNNEL

FOR STATION BOX

REFER TO DWG A-101

S HOPE

ST

BROAD MUSEUM

PROPOSED

CONCERT HALL

WALT DISNEY

STATION WALL

2ND/HOPE

STATION WALL

2ND/HOPE

S

HOPE ST

STATION2ND/HOPE STREET

CEN

TRAL P

LANT

EXIST

ELEV 310 AT 2ND ST TUNNEL

ELEV 360 AT E 2ND ST

ELEV 390 AT GRAND AVE

ORIGINAL GROUND ABOVE

2ND/HOPE STREET STATION PLATFORM

230

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/29/2011

4:2

5:0

0

PM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C0980

C104.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

240

250

260

270

280

290

300

310

320

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

Page 9: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

L = 400’

40+00 41+00 42+00 43+00 44+0039+0038+0037+00 45+00 46+00 47+00

2020

44

+00.0

0

BV

C

EL 210.4

1

46

+00.0

0

EL 201.7

6

NO

CURVE

2020

IN

Ls

OUT

LsI Rc Lc

257.88’ 011500’0 0 0 35

EXIST ROW

(in)Ea

(in)Eu

(mph)

V

190

200

210

220

230

240

250

260

270

280

TREESDENSE

TREESDENSE

TREESDENSE

385

380

375

370

365

360 355

355

330

335

340

345

350

345

325

305

300

310

300

305

386.4

386.1

385.8

385.9

353.7

353.8

355.6

357.6

308.3

308.2

307.7

315.6

312.2

310.6

309.4

302.5

301.6

300.8

301.7

306.5

306.5

PAR

KI

NG

RO

OFT

OP

350

350

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

6

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

105.plg

-4.32%

40+00 45+00

37

+96.3

2

ST

40+00 45+00

38

+44.5

9

ST

43

+54.0

0

PC

46

+19.5

5

PT

37

+44.5

9

CS

36

+96.3

2C

S

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

0 40’ 80’20’40’

MATC

H LIN

E STA R 37+

00 SEE D

WG

C-104

MATC

H

LIN

E ST

A

R 47+

00 SEE

DW

G

C-10

6

CURVE DATA

MUSIC

SCHOOL OF

COLBURN

S

OLIV

E ST

S

HIL

L ST

LAW BLDG

LOS ANGELES

E 2ND ST

EXIST ROW

ENTER 2ND ST TUNNEL

STORM DRAIN BOX 11.5’x13’

EXIST LA COUNTY

AP

PR

OX.

NORTH OF TUNNEL

BOX SHIFTS

UPPE

R LE

VEL

S

GR

AN

D

AV

E

ELEV 310 AT 2ND ST TUNNEL

ELEV 355 AT OLIVE ST

ORIGINAL GROUND ABOVE

12’

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

TRACK ALIGNMENT

JS

MA

PLAN AND PROFILE

STA R 37+00 TO STA R 47+00

C-105

HORZ: 1" = 40’

VERT: 1" = 10’

8

190

200

210

220

230

240

250

260

270

280

TUNNEL

TUNNEL

(EXISTING)

RED LINE TUNNELS

TOP OF RAIL

STORM DRAIN BOX 11.5’x13’

EXIST LA COUNTY

RED LINE TUNNELS TO BE VERIFIED

LOCATION AND DEPTH OF EXISTING

1.

TOP OF TUNNEL

(EXISTING)

RED LINE TUNNELS

NOTES:

Page 10: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

TUNNEL

STATION WALL

2ND/BROADWAY

EXIST ROW

TUNNEL

TOP OF TUNNEL

52+00 53+00 54+00 55+00 56+0051+0050+0049+0047+00 48+00 57+00

48

+00.0

0

EV

C

EL 201.7

6

56

+10.0

0

BV

C

EL 201.7

6

NO

CURVE

1030

2030

IN

Ls

OUT

Ls

34°41’39"

46°00’00"

I Rc Lc

101.53’

121.04’ 25

35

2030

7600’

14000’0

00

0

TUNNEL

TUNNEL

ELEV 282 AT MAIN ST

ELEV 285 AT SPRING ST

ORIGINAL GROUND ABOVE

(in)Ea

(in)Eu

(mph)

V

0

0

0

0

TOP OF TUNNEL

STATION WALL

2ND/BROADWAY

STORM DRAIN BOX 11.5’x13’

EXIST LA COUNTY

295

290

295

290

285

285

285

298.5

296.5

295.4

294.4

292.6

291.5

289.6

288.7

288.4

291.6

293.5

296.6

288.2

288.1

286.8

287.9

286.3

285.7

285.1

287.9

287.2

287.7

287.7

287.2

287.2

286.6

285.3

285.4

285.7

285.3

284.9

284.3

287.2

287.8

285.4

285.9

284.2 2

83.2

283.6

284.4

283.7

282.8

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

7

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

106.plg

0.00%0.00%

50+0055+00

47

+65.4

4

PC

48

+66.9

7

PT

57

+15.4

8

TS

50+0055+00

48

+10.2

6

PC

49

+31.3

0

PT

57

+72.2

1

TS

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

MATC

H

LIN

E ST

A

R 57+

00 SEE

DW

G

C-10

7

MATC

H

LIN

E ST

A

R 47+

00 SEE

DW

G

C-10

5

0 40’ 80’20’40’

CURVE DATA

1030

LAW BLDG

LOS ANGELES

E 2ND ST

BR

OA

DW

AY

2ND/BROADWAY STATION

N SP

RIN

G ST

LA TIMES

LA TIMES PARKING

EXIST ROW

HIGGINS BLDG

LAPD

E 2ND ST

TOP OF RAIL

STORM DRAIN BOX 11.5’x13’

EXIST LA COUNTY

FOR STATION BOX

REFER TO DWG A-102

2ND/BROADWAY STATION PLATFORM

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

TRACK ALIGNMENT

PLAN AND PROFILE

STA R 47+00 TO STA R 57+00

C-106

HORZ: 1" = 40’

VERT: 1" = 10’

9

JS

MA

180

210

200

190

220

230

240

250

260

270

180

190

200

210

220

230

240

250

260

270

Page 11: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

TUNNEL

EXIST ROW

TOP OF TUNNEL

62+00 63+00 64+00 65+00 66+0061+0060+0059+0057+00 58+00

E 2ND ST

57

+10.0

0

EL 201.7

6

58

+10.0

0

EV

C

EL 203.1

2

L = 200’

EXIST ROW

ORIGINAL GROUND

TOP OF RAIL

DRAIN BOX 11.5’x13’

EXIST COUNTY STORM

NOT

VISIBLE

GR

OU

ND

NOT

VISIBLE

GR

OU

ND

270

282.4

282.8

283.3

282.9

282.2

282.2

282.2

282.1

270.6

270.5

270.7

272.5

274.5

277.5

279.5

281.4

272.6

269.3

269.8

269.5

270.4

269.6

269.3

269.7

269.6

269.2

269.4

269.8

269.7

269.4

268.8

269.2

268.8

280

275

270

190

200

210

220

230

240

250

260

270

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:0

8

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

107.plg

1.36%

60+00

65+00

57

+15.4

8

TS

58

+15.4

8

SC

59

+46.9

8

CS 60

+46.9

8

ST

60+00

65+0057

+72.2

1

TS

58

+72.2

1

SC

60

+03.7

1

CS

61+

03.7

1

ST

BLDG

CALTRANS

MAIN ST

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

MATC

H LI

NE STA R 66

+00 S

EE D

WG

C-108

MATC

H LI

NE STA R 57

+00 S

EE D

WG

C-106

0 40’ 80’20’40’

280

MALLSHOPPINGCOURT

WELLER

AN

GELES ST

S L

OS

HOTEL

GRAND

KYOTO

NO

CURVE

1040

2040

IN

Ls

OUT

LsI Rc Lc

CURVE DATA

131.50’

131.50’ 455000’

5000’

2040

1040

100’ 100’

100’ 100’

DRAIN BOX 11.5’x13’

EXIST COUNTY STORM

(in)Ea

(in)Eu

(mph)

V

1.50

1.50

0.25

0.25

45

VIBIANA’S

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

LIBRARY

TOKYO

LITTLE

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

TRACK ALIGNMENT

PLAN AND PROFILE

STA R 57+00 TO STA R 66+00

C-107

HORZ: 1" = 40’

VERT: 1" = 10’

10

JS

MA

TUNNEL

280

200

270

260

250

240

230

220

210

190

Page 12: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

L = 200’

TOP OF RAIL

TOP OF TUNNEL

69

+39.8

5

BV

C

EL 218.5

1

70

+39.8

5

EL 219.8

7

71+39.8

5

EV

C

EL 221.0

2

ORIGINAL GROUND

1.15%

1.36%

TUNNEL

TUNNEL

76+0074+00 75+0071+00 72+00 73+0070+0069+0068+0066+00 67+00

280

270

260

250

240

230

220

210

200

270

270

269.

4

269.

5

268.

9

268.

8

268.

7

268.

6

268.

5

267.

7

268.

4

268.

7

269.

5

268.

6

268.

4

267.

8

267.

5

267.

4

266.

9

268.

7

266.

8

268.

4

268.

2

268.

9

266.

4

269.

3

PARKING

ROOFTOP

290

EXIST ROW

JAPANESE VILLAGE PLAZA

TRACK ALIGNMENT

PLAN AND PROFILE

STA R 66+00 TO STA R 76+00

C-108

HORZ: 1" = 40’

VERT: 1" = 10’

11

JS

MA

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

0 40’ 80’20’40’

220

210

200

SEE DWG C-109

MATCH LINE STA R 76+

00

70+00

75+0

0

69

+91.4

0

TS

70

+91.4

0

SC

75+18.6

5

CS

76+3

0

76+3

0

75+93.6

5

ST

70+00

75+0

0

70

+28.1

0

TS

71+

28.1

0

SC

75+55.3

5CS

76+30.3

5ST

MATC

H LI

NE STA R 66

+00 S

EE D

WG

C-107

E 2ND ST

240

230

290

SA

N PE

DR

O ST

2ND STREET

ST

SA

N PE

DR

O

2N

D ST

NO

CURVE

IN

Ls

CURVE DATA

25

OUT

LsI Rc Lc

100’

100’

1060

2060

1060

2060 75’

75’ 600’

600’

427.25’

427.25’

EXIST ROW

(in)Eu

(in)Ea

(mph)

V

2.00

2.00

2.00

2.00

25

MIN

BOX 11.5’x13’

STORM DRAIN

EXIST LA COUNTY

2ND STREET

CONTINUES ON

STORM DRAIN

BOX 11.5’x13’

STORM DRAIN

EXIST LA COUNTY

8.1

1’

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:1

0

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

108.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

280

270

260

250

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

Page 13: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

ORIGINAL GROUND

INV 252.99

BOTTOM OF PIPE 252.32

EXIST 75" RCP SD

79

+08.5

0

BV

C

EL 229.8

5

79

+57.5

0

EV

C

EL 231.3

2

L = 49’

79

+33.0

0

EL 230.1

3

1.15%

4.87%

TOP OF RAIL

STATION WALL

STRUCTURE

TOP OF

83+0080+00 81+00 82+0079+0078+0077+0076+00

STATION WALL

FOR STATION BOX

REFER TO DWG A-103

STREET WIDENING

PROPOSED

DENSE TREES

266.3

267.5

267.6

268.5

268.4

269.4

268.7

268.2

268.9

269.7

269.3

266.5

269.3

268.7

267.7

269.2

267.3

267.4

267.8

267.2

267.3

267.9

268.6

268.2

267.6

267.3

CONCRETE SLAB

EXIST ROW

EXIST ROW

76+3076+30

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

MATC

H LI

NE STA R 83

+00 S

EE D

WG C-110

MATC

H

LIN

E ST

A

R 76+

00 SEE

DW

G

C-10

8

0 40’ 80’20’40’

200

CE

NT

RAL A

VE

AL

AM

ED

A ST

1ST ST

AV

E

CE

NT

RA

L

AL

AM

ED

A

ST

1S

T

ST

1070

2070

NO

CURVE

IN

Ls

CURVE DATA

OUT

LsI Rc Lc

2070 190’

400’1070 0 0

0 0

80

+18.5

5

PC

81+

80.5

1

PT

81+

20.8

7PT8

0+

43.9

4

PC

161.96’

76.93’

(in)Ea

(in)Eu

(mph)

V

0

0

0

0

5

5

REFER TO DWG C-111 FOR CONTINUATION

TRACK ALIGNMENT

JS

MA

1ST/CENTRAL AVENUE STATION

1ST/CENTRAL AVENUE STATION PLATFORM

PLAN AND PROFILE

STA R 76+00 TO STA R 83+00

C-109

HORZ: 1" = 40’

VERT: 1" = 10’

12

EXIST 75" RCP SD

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

12:4

8:0

1 P

MU

SE

R=

Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

109.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

280

270

260

250

240

230

220

210

290

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

R TRACK PROFILE

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

X-OVER LOCATION

ALTERNATE

200

280

270

260

250

240

230

220

210

290

80+00

80+0080+00

Page 14: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

ORIGINAL GROUND

EXIST ROW

EXIST ROWX-OVER LOCATION

ALTERNATIVE

RETAINING WALL

RETAINING WALL

Plot Driv

er=

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

APPROVEDDATESHEET NO

05/04/2011 F 213.312-3114

IN CHARGESUBMITTED

T 213.312-3100

SCALE

LOS ANGELES, CA 90017

CHECKED BY

10TH FLOOR

0 MT

A_

HA

LF_

BW

_P

DF.pltcfg

777 S. FIGUEROA STREET

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS REVDRAWING NO

DRAWN BY

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR CONTRACT NODESIGNED BY

C0980

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

VERT: 1"=10’

0 10’ 20’10’

HORIZ: 1"=40’

0 40’ 80’20’40’

R TRACK PROFILEPRELIMINARY

200

Pentable

=M

TA_

H_

BW.T

BL

US

ER

=Al-

Mashat

m

PARAPET

FENCE

12:4

8:2

5

PM

4/2

9/2

011

4.87%

L = 120’

...\

cadd\

EIR\

C098

0C

110.plg

-0.09%

86

+93.0

0

BV

C

EL 267.1

7

88

+13.0

0

EV

C

EL 27

0.0

4

91+01.0

5

EL 269.7

8

87

+53.0

0

EL 27

0.0

9

STREET WIDENING

PROPOSEDSTREET WIDENING

PROPOSED

TREESDENSE

TREESDENSE

TREESDENSE

270

270

270

270

270

270

270

270

269.7

269.5 268.

6

268.6

269.5

269.5

268.6

269.3

269.3

269.1 269.

5270.

1

270.3

270.4

269.7

269.3

270.3 270.

6 270.4

270.3 270.

3

270.3

267.7

268.6

268.6

270.2

269.9

269.5

269.8

270.2

269.5 269.

8

268.4

269.3

270.4 269.

8

269.9

269.5269.

7 269.5

269.8 269.

8

270.5

270.3

269.9

269.4269.

1

271.5

270.7

269.3

270.8270.

7

271.3

270.6

270.3

270.8

269.7

269.5

269.6

268.6

270

270

270

270

PLAN

TOP OF RAIL

CONCRETE SLAB

86+00 87+00 88+00 89+00 90+00 92+0091+00 93+00

280

270

260

250

240

230

220

210

200

290

83+00 84+00 85+00 94+00

1ST STREET

MATC

H

LIN

E ST

A

R 83+

00 SEE

DW

G

C-10

9

CURVE DATA

0 100

I Rc LcNO

CURVE

IN

Ls

OUT

Ls

20902080

1080 1090

1080

1090

1600’

1300’

74.93’

HE

WIT

T ST

GARE

Y ST

ROSE ST

VIG

NES ST

0 0

100000

100000

(in)Ea

(in)Eu

(mph)

V

MANGROVE PROPERTY

TEMPLEBUDDHIST HONGWANJINISHI HOMPA

0

0 0

0

0

0 0 10

100

2090

2100

2100

1100

11500’

1500’

259.03’

71.31’

1100 0 0 11500’ 218.41’ 0 0 10

70.24’2080

66.72’1300’

TRACK ALIGNMENT

JS

MA

PLAN AND PROFILE

STA R 83+00 TO STA R 94+00

C-110

HORZ: 1" = 40’

VERT: 1" = 10’

13

280

270

260

250

240

230

220

210

290

85+0090+00

93+6593+65

PC

86

+28.9

4

PT

87

+03.8

7

PC

88

+15.2

2

PT

88

+86.5

3

PT

92

+44.4

1

PO

E

93

+65.1

9

85+0090+00

94+0394+03

PC

86

+69.3

5

PT

87

+39.5

9

PC

88

+55.4

8

PT

89

+22.1

9

PC

90

+43.1

8 PT

93

+02.2

1

PO

E

94

+02.5

6

PC

90

+26.0

0

Page 15: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

86

+4

5.0

0

BV

C

EL 24

4.5

4

88

+4

5.0

0

EV

C

EL 250.4

1

L = 200’

81+99.1

7

BV

C

EL 24

2.4

0

82

+4

9.1

7

EL 24

4.6

9

82

+99.1

7

EV

C

EL 24

4.6

7

L = 100’

5.91%

4.58%

87

+4

5.0

0

EL 24

4.5

0

-0.04%

89+0087+00 88+0084+0082+00 83+00 85+0080+00 86+0081+00

REFER TO DWG C-1

09 FOR CONTINUATION

240

280

270

250

230

220

200

260

290

210

DE

NS

E

TR

EE

S

270

270

270

266.3

266.5

267.3

267.4

267.5

267.7

268.4

268.5

268.5

269.2

269.5

269.8

270.4

272.6

272.7

269.8

269.5

270.1

269.8

269.3

269.8

269.8

269.5

271.2

269.5

268.7

269.2

267.8

267.2

267.3

267.9

269.9

269.8

267.6

267.3

270

270

270

270

CONCRETE SLAB

240

280

270

250

230

220

200

260

290

210

VERT: 1"=10’HORIZ: 1"=40’

40’40’ 20’80’20’ 10’10’ 00

ALAMEDA STREET

ALAMEDA STREET

1ST ST

REET

GEFFEN MOCA

MANGROVE PROPERTY

STREET

TE

MPLE

TE

MP

LE

ST

AL

AM

ED

A

ST

STRUCTURE WALL

5

PC

80+62

.45

PC

80+37

.80

CS

82

+12.6

8

CS

82

+26.0

8

ST

83

+26.0

8

ST

83

+12.6

8

2075

1075

X-OVER LOCATION

ALTERNATE

ARTS DISTRICT STATION

EXISTING LITTLE TOKYO/

RcI

CURVE DATA

LcOUT

Ls

IN

Ls

NO

CURVE

ORIGINAL GROUND

TOP OF RAILTEMPLE STREET BRIDGE

(in)Ea

(in)Eu

(mph)V

EXIST ROW

EXIST ROW

STRUCTURE WALL

1075

2075

174.88’

163.63’

200’

190’

50 00

000

100

100

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:1

3

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

111.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

R1 TRACK PROFILE

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

REFER TO DWG C-110 FOR CONTINUATION

MATC

H LI

NE STA R1 89

+00 S

EE D

WG

C-112

TRACK ALIGNMENT

PLAN AND PROFILE

STA R1 80+00 TO STA R1 89+00

C-111

HORZ: 1" = 40’

VERT: 1" = 10’

14

JS

MA

85+00

85+00

80

+00

80

+00

80

+00

Page 16: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

L = 75’

I

Lc

20’

10’

Rc

VERT: 1"=10’

0

320

310

300

290

280

270

260

250

240

230

OUT

Ls

ALAMEDA STREET

IN

Ls

10’80’

CONCRETE SLAB

275

255

275

253.6

40’

TRACK ALIGNMENT

260

274.9

265

HORIZ: 1"=40’

0

274.8

20’40’

275

274.3

275.5

275.7

273.4

275.4

275.4

1105

273.4

275.2

96+00

275

273.4

272.3

2105

273.3

1000’

1000’

272.7

95+00

1105

DU

CO

MM

UN ST

272.3

272.9

2105

272.7

271.4

TR

EES

DE

NS

E272.6

272.7

94+00

73.07’

72.98’

272.4

273.4

93+00

271.7

JS

MA

271.6

273.9

NO

CURVE

271.2

92+00

273.4

271.4

272.1

272.3

91+00

ALAMEDA ST

270.8

90+00

270

270

270.5

270.6

272.4

89+00

320

310

300

290

280

270

260

250

240

230

94

+7

2.5

8

BV

C

EL 287.5

3

95

+10.0

8

EL 289.7

4

95

+4

7.5

8

EV

C

EL 290.9

3

96

+14.0

7

EL 293.0

4

5.91%

3.17%

0

0

0

0

MATC

H LI

NE STA R1 89

+00 S

EE D

WG

C-111

ORIGINAL GROUND

TOP OF RAIL

RETAINING WALL

JOIN

EXIS

TJ

OIN

EXIS

T

RETAINING WALL

EXIST ROW

(mph)V

(in)Eu

(in)Ea

CURVE DATA

C-112

HORZ: 1" = 40’

VERT: 1" = 10’

15

PLAN AND PROFILE

STA R1 89+00 TO STA R1 96+10

JS

MA

0

0

0

0

10

10

TS

96

+04.9

1

TS

96

+14.3

4

ST

95

+31.3

4

ST

95

+27.4

5

95+00

CS

94

+66.3

4

95+00

CS

94

+62.4

5

SC

93

+93.3

6

SC

93

+89.3

8

TS

92

+93.3

6

TS

92

+89.3

8

90+00

90+00

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:1

4

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

PLAN

...\

cadd\

EIR\

C098

0C

112.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

R1 TRACK PROFILE

Page 17: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

170

175

180

185

190

195

200

205

210

215

220

225

230

235

240

245

250

255

260

265

270

275

280

285

290

295

300

305

310

315

320

325

330

335

340

345

PLAZACITYCORPEXISTING

APPROX

AT 245.0

FOUNDATION

OF

BOTTOM

1" = 20’

20’ 40’

TC-101

16

(TYP.)

SUPPORT

EXCAVATION

TEMPORARY

(TYP.)

WALKWAY

BEDROCK

APPROX.

PL

0

7’-7"

WATER LEVEL 270.8 APPROX

B

20’

16FT-2�

TN

GRADE

FINISH

TC-101

FLOWER/6TH STREET

FLOWER/5TH STREET

48’-7"

RELOCATEDTO BEEX. 72" SD

T/R

CL

TRACKPOCKET

CROSS SECTION

5FT-0T

N

(TYP.)1FT-0TN

12’-6"

BACKFILL

FLOWER/5TH STREET

DECKING

TEMPORARY

STRUCTURE

TRACKWAY

STREETFLOWER

56FT-5TN

30FT-5TN

16’-5"

SECTION - STA R 15+50

5FT-0T

N

(TYP.)4FT-0TN

51’-5"

FANS

BOOSTER

LP

APPROX

AT 275.0

FOUNDATION

OF

BOTTOM

12FT-9�TN

HOTELBONAVENTUREEXISTING

BEDROCK

APPROX.

L (BEYOND)P

GRADE

FINISH

(TYP.)

WALKWAY

(TYP.)

SUPPORT

EXCAVATION

TEMPORARY

WATER LEVEL 270.8 APPROX

ATC-101

CK

CK

T/R

25FT-4�

TN

16FT-0T

N

STRUCTURETRACKWAY

VARIES

VARIES

5FT-0T

N

1FT-0TN

5FT-0T

N

BACKFILL

FLOWER/6TH STREET

SECTION - STA R 6+70

STREETFLOWER

DECKING

TEMPORARY

(TYP.)4FT-0TN

27FT-4�

TN

L (BEYOND)P

190

195

200

205

210

215

220

225

230

235

240

245

250

255

260

265

270

275

280

285

290

295

300

305

310

315

320

325

330

335

340

345

180

185

175

170

REV

0

CONTRACT NO

DRAWING NO

SCALE

SHEET NO

SUBMITTED

APPROVED

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONEXPIRES SEAL HOLDERREG NODATE BY APPREV

4/2

9/2

011

11:2

5:1

5

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

...\

cadd\

EIR\

C098

0T

C101.plg

C0980

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

05/04/2011

PRELIMINARY

Page 18: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

AT 353.0 APPROX

FUTURE BOTTOM OF FOUNDATION

AT 260.0 APPROX

TOP OF ROCK

AT 278.0 APPROX

BOTTOM OF FOUNDATION

RCB SD TO REMAIN

EXISTING 11’-6" X 13’

AT 263.0 APPROX

BOTTOM OF FOUNDATION

SURFACE

EXISTING GROUND

OUTSIDE BUILDING LINE

SUPPORT AND DRAINAGE SYSTEM 2’

EXISTING EXCAVATION

AT 311.3 APPROX

TOP OF PAVEMENT

2ND STREET CROSSOVER STRUCTURE

T/R 201.76

AT TOP OF ROCK

EXISTING GROUND SURFACE

T/R 249.57

BEYOND

2ND STREET BORED TUNNEL

EXISTING 2ND STREET TUNNEL

WALKWAY (TYP)

2ND AT LAPDUNDER BROAD MUSEUM

REV

0

CONTRACT NO

DRAWING NO

SCALE

SHEET NO

40’

17

20’020’

SUBMITTED

APPROVED

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONSEAL HOLDEREXPIRESREG NOAPPREV DATE BY

4/2

9/2

011

11:2

5:1

6

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

...\

cadd\

EIR\

C098

0T

C102.plg

C0980

1" = 20’

TC-102

CROSS SECTION UNDER BROAD MUSEUM

2ND AT LAPD

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

05/04/2011

FA

JC

PRELIMINARY

365

370

375

380

340

345

350

355

360

290

295

300

305

310

315

320

325

330

335

245

250

255

260

265

270

275

280

285

SECTION - STA R 34+60

CTC-102

SECTION - STA R 55+40

DTC-102

WATER LEVEL 285.0 APPROX

330

325

320

315

310

305

300

295

290

285

280

275

270

265

260

255

250

245

240

235

230

225

220

215

210

205

200

195

38.48’

30.00’

62.00’

41.0

0’

21’

BASEMENTEXISTING LAPD

EXISTING COMMERCIAL BUILDING

255.44 APPROX

WATER LEVEL 265.0 APPROX

PL

FUTURE DEVELOPMENT

LP

PL

Page 19: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

AT 272.0 APPROX

BOTTOM OF FOUNDATION

EXISTING GROUND SURFACE

EXISTING GROUND SURFACE

AT 229.5 APPROX

BOTTOM OF FOUNDATION

AT 254.58 APPROX

EXISTING 11’-6" X 13’ RCB SD

T/R 253.38

T/R 204.29

305

310

315

320

310

315

320

14.00’

36.00

22’

285

290

295

300

285

290

295

300

305

235

240

245

250

255

260

265

270

275

280

235

240

245

250

255

260

265

270

275

280

190

195

200

205

210

215

220

225

230

200

205

210

215

220

225

230

30.00’

BUILDING

COMMERCIAL

EXISTING

PL

X

X

PL

TO EAST LA

EXISTING GOLD LINE

TO PASADENA

EXISTING GOLD LINE

X

X

PL PL

WATER LEVEL 262.0 APPROX

BUILDING

CALTRANS

EXISTING

EXISTING VIBIANA’S - EAST PORTION

EXISTING VIBIANA’S

WATER LEVEL 220.0 APPROX

2ND AT VIBIANA’S PORTAL ON 1ST STREET

REV

0

18

CONTRACT NO

DRAWING NO

SCALE

SHEET NO

20’ 40’020’

SUBMITTED

APPROVED

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONEXPIRES SEAL HOLDERREG NODATE BY APPREV

4/2

9/2

011

11:2

5:1

6

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

...\

cadd\

EIR\

C098

0T

C103.plg

C0980

TC-103

1" = 20’ 2ND AT VIBIANAS

PORTAL ON 1ST STREET

CROSS SECTION

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

05/04/2011

JC

FA

PRELIMINARY

AT 265.0 APPROX

BOTTOM OF FOUNDATION

AT 210.0 APPROX

TOP OF ROCK

STRUCTURE

1ST ST PORTAL

AT 260.0 APPROX

TOP OF ROCK

SECTION - STA R 58+90

ETC-103

SECTION - STA R 84+10

FTC-103

21’

Page 20: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

CUT AND COVER

SG-001

CONSTRUCTION AREA PLAN STRUCTURE

1" = 50’

19

LM

MA

0 50’ 100’50’

DE

NSE T

REES

DE

NSE T

REES

DE

NSE T

REES

DE

NSE T

REES

DE

NSE T

REES

GR

OU

ND

NOT

VISI

BLE

GROUND NOT VISIBLE

PO

OL

PO

OL

TREES

DENSE

TREES

DENSE

UTILIT

Y

MIS

C.

280

280

280

280

275

290

295

295

290

285

295

285

290

290

295

300

295

290

290

305

315

284.6

280.2

280.5

278.6

282.4

284.6

285.8

286.5

286.5

287.7

288.6

292.7

294.5

296.4

298.5

296.6

289.4

288.4

286.8

282.7

281.4

279.4

282.6

287.2

283.7

286.9

287.4

287.7 287.9

288.4

288.8

288.1

287.7

296.5

296.7

296.7

288.6

288.6

288.6

297.5

293.7

292.6

289.4

298.7

296.6

293.6

291.4

290.7

289.7

289.2

289.8

290.2

290.4

293.6

297.6

302.6

304.4

291.3

291.4

290.4

290.1

290.1

290.3

290.2

289.9

292.6

293.6

295.5

297.3

299.5

300.6

302.5

306.6

309.9

310.5

306.7

308.5

PATI

O

ARE

A

PATI

O

ARE

A

GROUND NOT VISIBLE

GROUND NOT VISIBLE

ELEVATED WALKWAY

EL

EV

AT

ED

WA

LK

WA

Y

ELEVATED WALKWAY

EL

EV

AT

ED

WA

LK

WA

Y

285

285

285

290

295

295

290

290

295

300

310

310

305

10+00 15+00 20+00

10+00 15+00 20+00

(OV

ERP

ASS

AB

OV

E)

W

4T

H ST

COMPLEX

BONAVENTURE HOTEL

PLAZA

CITYCORP

W

5T

H ST

W

6T

H ST

S FLOWER ST

AREA LIMITS (TYP)CONSTRUCTION

STATION7TH/METRO JOIN EXIST

OVER EXCAVATIONDECK ROADWAY

EASEMENTCONSTRUCTIONTEMPORARY

TEMPORARY CONSTRUCTION EASEMENT

TUNNELSEND BORED

CUT AND COVER TEMPORARY DECK

EXCAVATION SUPPORT OF

EXCAVATION SUPPORT OF

PLAZA

CITY NATIONAL

CLUB

CALIFORNIA

CENTRAL LIBRARY

LOS ANGELES

CONSTRUCTION AREA LIMITS

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

9/1/2

011

6:0

1:1

2

PM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

...\

cadd\

EIR\

C098

0S

G001.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

Page 21: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

TBM

CONSTRUCTION AREA PLAN

STATION SITE

PR

MA

2ND/HOPE STREET

SG-002

1" = 50’

20

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

DENSE TREES

SPA

POOL

POOL

ELE

VATE

D

WAL

KW

AY

116485794.6571842081.797384.969

156484912.4811842362.987316.655

COURT

ROOFTOP TENNIS

TREES

DENSE

ELE

VATE

D

WAL

KW

AY

TREES

DENSE

TREES

DENSE

TREES

DENSE

TREES

DENSE

TREES

DENSE

TREES

DENSE

UTILITY

MISC.

TREES

DENSE

315

315

315

315

315

320

325

320

325

330

335

340

345

350

355

360

365

330

335

340

345

350

365

340

350

355

365

355

370

375

380

385

365

370

375

380

370

375

380 3

85

370

375

380

360

355

385

385

380

375

370

365

360

312.5

313.5

314.8

315.6

315.6

314.6

313.8

313.8

362.8

316.2

316.3

316.3

316.7

317.2

315.5

366.5

365.9

364.4

363.5

362.9

363.2360.6

357.6

352.6

318.3

318.4

321.5

362.7

341.9

368.5

351.3

363.3

362.6

363.5

363.8

364.5

365.5

364.6

363.5

362.5

361.6

360.3

361.6

363.4

366.5

365.7

343.4

342.4341.5340.4

347.7

351.4

372.6

377.5

358.1

358.5

354.1

341.5

387.4

366.4

366.5

368.6

386.5

386.9

386.6

386.3

386.4

386.1

386.3

386.7

385.8

382.7

377.5

372.7

362.4

360.4

359.3

359.5

360.4

361.4

358.3

357.5

361.5

360.5

359.5

358.4

357.5

356.4

363.2

363.7

362.5

361.5

360.5

359.5

358.5

357.5

356.5

384.7

384.7

385.3

385.2

385.2

385.8

385.8

385.9

359.3

PARKING

ROOFTOP

COURT

TENNIS

COURT

TENNIS

GR

OU

ND

NOT

VISIBLE

365

355

360

345

360

360

350

360

385

365

360

385

385

25+0

0

30+00

35+00

40+00

25+0

0

30+00

35+00

40+00

LO

ADIN

G

AR

EA

STORAGEFUEL

STORAG

E

MIS

C

0 50’ 100’50’

AREA

WHEE

L W

ASH

TRUCK EN

TER

TO FW

Y

BRIDGE UNDER PINNINGABUTMENT FOR 2ND PLACECONSTRUCT TEMPORARY

OVER EXCAVATIONDECK RDWY

CONVEYORTRANSFERSPOIL

W 3RD ST

S FL

OWER ST

CONC

ERT HALL

WALT DISNEY

KOSCIUSZKO

W

Y

W

GEN THADDEUS

MUSIC

SCHO

OL O

F

COLBURN

(TYP)AREA LIMITSCONSTRUCTION

TUNNELSBORED

TUNNELSBORED

CONSTRUCTION STAGING SITE

CUT AND COVER TEMPORARY DECK

S

HOPE ST

S HOPE

ST

W 2ND ST

UPPER LE

VEL

S GRAN

D AV

AREASPOIL STORAGE

PLA

NT

EXISTIN

G CEN

TRAL

EXCAVATION SUPPORT OF

ELEV 265TOP OF SOE EXCAVATION SUPPORT OF

CONSTRUC

TION TRAILERS

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

11:2

5:1

9

AM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

...\

cadd\

EIR\

C098

0S

G002.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114

TBM

CRANE

STORAG

E

Page 22: Regional Connector Transit Corridor Final Environmental ...media.metro.net/projects_studies/connector/images/Final...Regional Connector Transit Corridor Final Environmental Impact

2ND/BROADWAY

SG-003

CONSTRUCTION AREA PLAN

STATION SITE

1" = 50’

21

LM

MA

DE

NSE TREES

DE

NSE TREES

DE

NSE TREES

DE

NSE TREES

NOT

VISIBLE

GR

OU

ND

315

325

340

305

305

300

295

290

300 290

310

315

310

300

290

285

285

2953

00

305

290

285

285

285

285

280

308.2

307.7

315.5

312.2

313.5

315.4

318.5

316.5

314.6

312.5

310.6

309.4

292.6

295.3

295.2

289.8

288.4

289.4

302.5

301.6

300.8

298.5

296.5

295.4

294.4

292.6

291.5

290.2

290.3

291.7

290.6

289.6

288.7

288.4

291.6

293.5

296.6

301.7

306.5

306.5

305.5

305.4

304.6

303.6

302.9

298.5

296.7

295.5

288.3

288.8

288.3

288.2

287.1

287.8

288.3

286.7

287.2

288.1

286.8

287.9

286.3

285.7

285.1

287.9

287.2

287.7

287.7

287.2

287.2

286.6

285.3

285.4

288.2

287.7

286.7

285.7

285.3

284.9

284.3

283.9

283.4

283.1

287.2

287.8

285.4

286.1

285.9

284.2 2

83.2

283.6

282.4

284.4

283.7

282.8

283.8

283.5

283.3

282.9

282.2

282.2

282.1

281.9

283.5 2

82.3

283.3

283.2 2

82.2

283.1

282.8

282.2

282.1

281.5

279.5

281.4

281.3

278.6

278.5

CO

URTS

RO

OFT

OP TE

NNIS

PAR

KI

NG

RO

OFT

OP

PAR

KI

NG

RO

OFT

OP

315

295

295

295

295

290

290

290

280

45+00 50+00 55+00

45+0050+00 55+00 60+00

0 50’ 100’50’

ENTRY PLAZA2ND STREET/BROADWAY STATION

BORED TUNNELS BORED TUNNELS

(TYP)AREA LIMITSCONSTRUCTION

S

HIL

L ST

LAW BLDG

LOS ANGELES

BR

OA

DW

AY

PARKING STRUCTURE

LA TIMES

LA TIMES

COMMERCIAL

EXISTING

LAPD

BLDG

CALTRANS

MAIN ST

EASEMENT AREACONSTRUCTION TEMPORARY

OVER EXCAVATIONDECK ROADWAY

CUT AND COVER TEMPORARY DECK

CONSTRUCTION STAGING SITE

VIBIANA’S

HIGGINS BLDG

BLDG

KAWADA HOTEL

SP

RIN

G ST

E 2ND ST E 2ND ST

EXCAVATION SUPPORT OF

EXCAVATION

SUPPORT OF

REV

CONTRACT NO

DRAWING NO

SCALE

DESIGNED BY

DRAWN BY

CHECKED BY

IN CHARGE

DATE

DESCRIPTIONREV DATE BY EXPIRESREG NOAPP SEAL HOLDER

4/2

9/2

011

12:4

6:5

5

PM

US

ER

=Al-

Mashat

mM

TA_

HA

LF_

BW

_P

DF.pltcfg

MT

A_

H_

BW.T

BL

Pentable

=Plot Driv

er=

SHEET NO

THE STATE OF CALIFORNIA.

LOS ANGELES COUNTY AND OF

THE TAXES OF THE CITIZENS OF

DRAWING HAS BEEN FINANCED BY

THE PREPARATION OF THIS

0

SUBMITTED

APPROVED

...\

cadd\

EIR\

C098

0S

G003.plg

ADVANCED CONCEPTUAL ENGINEERING

REGIONAL CONNECTOR TRANSIT CORRIDOR

METROPOLITAN TRANSPORTATION AUTHORITYLOS ANGELES COUNTY

C0980

PRELIMINARY

05/04/2011

10TH FLOOR

777 S. FIGUEROA STREET

LOS ANGELES, CA 90017

T 213.312-3100

F 213.312-3114


Recommended