+ All Categories
Home > Documents > Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development...

Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development...

Date post: 17-Mar-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
23
Northern Corridor Economic Region (NCER) Regional Impacts, Opportunities & Prospects Presentation by: Hasri Hasan Northern Corridor Implementation Authority (NCIA)
Transcript
Page 1: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Northern Corridor Economic Region (NCER)

Regional Impacts, Opportunities & Prospects

Presentation by:

Hasri Hasan

Northern Corridor Implementation Authority (NCIA)

Page 2: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Close the urban-rural skills gap

NCER Is One Of The

Five Economic Corridors

Established In Malaysia

5 Regional Corridors were established across

Malaysia between 2006 – 2008 to address uneven

development across the nation

Northern Corridor Economic Region

2 3

Why Corridors?

1

Boost economic potential

Address uneven development

and regional imbalances

Population (2016)

6.6 mil 1

Total employment

(2016)

2.8 mil

1

GDP as at 2016 (at

2010 constant price)

RM 176 bil

1

Total investment into

NCER (2016)

RM 79.9 bil

1

Jobs created (2016)

103,597 jobs 1

Perlis

Kedah

Perak

Pulau Pinang

2

Page 3: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

The Northern Corridor

Implementation Authority

(NCIA)

3

NCIA’S MANDATE:

Created under Act

687, NCIA is

mandated to drive

regional strategies in

the context of the

Government’s

economic

development agenda

Prime Minister

of Malaysia

(Chairman)

Deputy PM

Minister in

The PM’s

Department

Chief

Secretary

Menteri

Besar

of Perlis

Menteri

Besar

of Perak

Menteri

Besar

of Kedah

Chief

Minister

of P. Pinang

Chief Executive,

NCIA (Secretary)

CEO,

Sime Darby

Minister of

MITI

Plan

Promote

Facilitate

NCIA’S ROLES:

Page 4: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Capitalising The Unique

Strengths Of NCER

2 Key To The

Nation’s Food

Security Agenda

• Modern Agriculture

• Usage of Technology

3 Top Tourists

Destinations

• Langkawi

• Pulau Pinang

• Belum Rainforest

1 Strategically

Located

• IMT-GT & ASEAN

• Good infrastructure

and connectivity

4 Strong

Manufacturing

Ecosystem

• Strong Cluster and

ecosystem

• Existing Talents &

Skills

4

Page 5: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Air

Sea

Land

Public

Transport

Logistics &

Connectivity

Tourism

Medical

Tourism Recreation &

Entertainment

Business

Tourism Niche Tourism

Electrical & Electronic

Machinery

& Equipment

Manufacturing

Agriculture &

Bio-industries

Bio-industries Agriculture

Global Business

Services

Services

NCER Focuses On 3 Priority

Sectors, Leveraging On Its

Economic Strength

NCER is a brownfield area that leverages on the strengths of its economic

activities

5

Page 6: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

1st Wave: Catalytic

Infrastructure

Development

2nd Wave: Capacity

Development

3rd Wave: Concentration and

Specialisation

NCER Is Currently At The 3rd

Wave Of Its Development

The NCER has come a long way, through tailored

development programmes that have been delivered

up gradually to ensure a smooth implementation

Northern Corridor Economic Region

6

Page 7: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

NCER Is Currently At The 3rd

Wave Of Its Development

7

1st Wave: Catalytic Infrastructure Development 1 To ensure seamless

connectivity & mobility of

people and goods

2 Ultimately, to boost the

economic growth of NCER

• Infra connectivity has the power to

integrate economies by deepening trade,

investment and business links.

• It can expand and strengthen regional

production networks and supply chains of

goods and services.

• It improves inclusivity, productivity and

competitiveness; and stimulates

economic activity, trade and investment.

Page 8: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

8

NCER Is Currently At The 3rd

Wave Of Its Development

Legend:

Airport

Bridge

Railway

1

Upgrading of Penang

International Airport

RM250 mil 2 Penang Second Bridge

RM4.5 bil

3 Electrified Double Track

Project

RM12.5 bil

RM17.25 bil Investment By Federal Government

2009 2016

RM79.9 bil Total Cumulative Investment

103,597 Total Cumulative Jobs Creation

Private Investment

Jobs Creation

1st Wave: Catalytic Infrastructure Development

2nd Wave: Capacity Development

Page 9: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

NCER Is Currently At The 3rd

Wave Of Its Development

Investments

1.4 7.48 17.39

29.67 40.34

59.14 71.62

79.92

2009 2010 2011 2012 2013 2014 2015 2016

Cumulative Private Investments 2009 - 2016

1,050

1,777

3,751

11,532

13,350

0 5,000 10,000 15,000

China

Taiwan

Japan

Germany

USA

Top 5 Origin Of Investments By Country (In RM mil)

2,608

56,619

15,475

3,818

Cumulative Private Investments By Sector (In RM mil)

Agriculture Manufacturing Tourism Logistics

Share Of Private Investments

Local Participation Foreign Participation

RM

35.8 bil RM

44.1 bil

1st Wave: Catalytic Infrastructure Development

2nd Wave: Capacity Development

Page 10: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Broader Economic Impact

10

Economic Impact (Up To 2016)

87,593 95,159

101,464 106,268 100,584

127,720 135,972

143,776 151,000

159,924

176,404

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2016

Overall NCER GDP 2005 - 2009 and 2010 - 2016 At Constant Prices (RM 'mil) 1

1,810 1,927 2,111

2,315

3,023

3,797

4,317

2002 2004 2007 2009 2012 2014 2016

Estimated* Median Monthly Household Income Of NCER (RM) 2

1st Wave: Catalytic Infrastructure Development

2nd Wave: Capacity Development

NCER experienced higher annual GDP growth

rate of 5.5% compared to Malaysia’s 5.1% during the period of 2010 – 2016 (Dept of Statistics)

Median household income in NCER has grown by

9.3% (CAGR) from 2009 – 2016 compared to 3% from 2002 to 2007 (Dept of Statistics)

Page 11: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Progress In RMK-11

11

Targets Set For All Corridor

Authorities by 2020

2 Job Creation:

470,000

Realised Investment:

RM236 bil 1

Focus Area C Strategy C2

Encouraging more private investment in rural areas

Focus Area D

Accelerating regional growth for better geographic

balance

Strategy D1 has identified the need to have

Strategic Review of the Master Plans

3rd Wave: Concentration and Specialisation

Page 12: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

12

NCER Is Currently At The 3rd

Wave Of Its Development

The Northern Corridor Economic Region

Development Blueprint (2016 -2025)

(Blueprint 2.0)

5 Strategic Thrusts

Cumulative

Investments

Cumulative

Jobs Creation

Mean B40

Income

Mean

Household

Income

RM

147.2

billion

161,197

jobs

Targets by 2025

RM

6,043

RM

12,964

RM

300

billion GDP

80 Projects

3rd Wave: Concentration and Specialisation

Page 13: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

7 Growth Nodes Of NCER

Pulau Pinang

Perlis

Greater Kamunting

Conurbation (GKC)

Manjung-Aman Jaya Maritime City

Kedah Science & Technology Park

(KSTP)

Kedah Rubber City (KRC)

Kedah

Perak

13

Agro

Science Advanced

Materials ICT

Focus Clusters

Adv. Latex

Products

Rubber

Automotive

Components

Tyre & Tyre

Related Products

Engineering

Rubber

Products

Education &

Human Capital

Agriculture Tourism

Tourism

Mfg.

Agriculture

Perlis Inland

Port (PIP)

Chuping Valley

Industrial Area

(CVIA)

Focus Clusters

Green

Manufacturing Halal

Industries

Renewable

Energy

Generation

Consolidation & Distribution Centre

Focus Sectors

Focus Sectors

Manufacturing

Green

Technology

Adv. Rubber &

Rubber

Materials

Biotechnology

&

Pharmaceutical

Services & Support

Spatial

Transformation

Maritime

Batu Kawan

Development

Manufacturing Property

Logistics Tourism

Focus Sectors

Focus Clusters

Page 14: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Cluster 1:

Advanced

Materials

Potential Economic Impacts

Project Estimated Timeline

Project Facts

Kedah Science & Technology

Park (KSTP)

14

Brief Overview

Bukit Kayu Hitam,Kedah

Land Size

1,938 acres

Priority Clusters

District

Kubang Pasu

Cluster 4:

Green

Technology

Cluster 2:

Agro

Science

Cluster 3:

ICT

1 2

• Phase 1B

2016 – 2020

• Phase 2

2019 – 2024

• Phase 3A & 3B

2025 - 2026

3

1

2

Advantages • Located at the main entry point

between Malaysia - Thailand

• Located right next to North-South

Expressway (Asian Highway,

AH2)

+

Economic Impact (Up to 2030)

Job Creation (By 2030)

RM57.4 bil 23,244 jobs

Page 15: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Project Estimated Timeline

Project Facts

Kedah Rubber City (KRC)

15

Brief Overview

Ladang Bukit Ketapang,

Kedah Land Size

1,242.38 acres

District

Padang Terap

1

• Integrated Business Centre (IBC)

2018

1

2

KRC aims to be a

global leader in the

production of latex

and dry rubber

products RM15.0 bil

GDP

Contribution

New

Investments

RM10.0 bil

Employment

Opportunity

15,000 jobs

Economic Impact In 15 Years

Source: NCIA’s Special Tax Incentives Package for Rubber City

Page 16: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Project Estimated Timeline

Project Facts

Chuping Valley Industrial

Area (CVIA)

16

Brief Overview

Land Size

2,482 acres

Focus Clusters

District

Padang Besar

1 2

• Integrated Business Centre (IBC)

2017 - 2018

• Phase 1 - CVIA

2016 – 2020

• Phase 2 - CVIA

2021 - 2025

1

2

Cluster 1:

Green

Industries

Cluster 2:

Halal

Industries

Cluster 3:

Renewable

Energy Generation

Potential Economic Impacts 3

Advantages • Rail connectivity to main ports in

Malaysia (Penang Port, Port

Klang)

• Located next to the upcoming

Perlis Inland Port

Lembah Chuping,Perlis

+

GNI Contribution/Year (By 2025)

Job Creation (By 2025)

RM2.58 bil 12,674 jobs

Page 17: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Project Estimated Timeline

Project Facts

Perlis Inland Port (PIP)

17

Brief Overview

Lembah Chuping,Perlis

Land Size

500 acres

District

Padang Besar

1 2

• Phase 1 (Planning & Approval)

2015 – 2016

• Phase 2 (Completion of PIP)

2016 – 2019

• Phase 3 (Industrial Development

Area)

2018 - 2025

1

2

Logistics

Hub

Administrative

Buildings

Warehouses

PIP is part of Logistics And Trade

Facilitation Masterplan

Main Components

Advantages • Accessible to North – South

Expressway via Changlun - Kuala

Perlis Highway

• Rail connectivity to major ports

i.e. Penang Port & Port Klang

Industrial

Development

Area

+

GNI Contribution/Year (By 2030)

Job Creation (By 2030)

RM0.94 bil 4,056 jobs

Potential Economic Impacts 3

Page 18: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Project Estimated Timeline

Project Facts

Batu Kawan Development

18

Brief Overview

Batu Kawan, P. Pinang

Land Size

2,887 acres

Focus Sectors

District

Seberang Perai

Selatan

1 2

• Overall Development

15 years

1

2

Sector 1:

Manufacturing

Sector 2:

Property

Sector 3:

Logistics

Advantages • Easily accessible to North –

South Expressway & Penang

Second Bridge

• Home to manufacturing

industry & mixed

development

Sector 4:

Tourism

Estimated Future

Population

250,000

+

Page 19: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Project Facts

Greater Kamunting

Conurbation (GKC)

19

Brief Overview

Greater Kamunting

Area Size

1,000 sq km

Focus Clusters

District

Larut, Matang &

Selama

1 2 1

Manufacturing

Potential Economic Impacts 3

GKC Study was

completed in 2015 and

identified 66 initiatives

Advantages • Easily accessible to North –

South Expressway

• Will be connected to West Coast

Expressway

• Possesses various tourist

attractions

Tourism Agri-

Culture

Education &

Human Capital

+

Total GDP Contribution

(By 2030)

Job Creation (By 2030)

RM12.96 bil 90,263 jobs

Page 20: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Excerpt Of Budget 2018 Announcement

Declare Pulau Pangkor in Perak as a Duty-Free Island.

However, the duty-free status excludes products such as

alcoholic beverages, tobacco and motor vehicles;

Potential Economic Impacts

Total GDP Contribution

(By 2030)

Job Creation (By 2030)

RM22.5 bil 35,310 jobs

Highlights Of The Manjung Blueprint 2017 - 2030

Manjung-Aman Jaya

Maritime City

Project Facts

Brief Overview

Manjung

Area Size

1,171 sq km

District

Manjung

1 1

Manjung Blueprint was

completed in 2017 and

identified 58 projects

Manjung as a Tourism and

Maritime City

Immediate Focus

Pangkor As A Duty

Free Island

Rapid Manjung

Rapid Manjung

30 min

Service

Frequency

2

No. Of

Routes

No. Of

Buses

Required

10

Page 21: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Northern Corridor

Economic Region

(NCER)

2 “Software” Aspect

Readily available talent

for the industries

Human capital

development programs

Availability of tax

incentives

Excellent business-

friendly ecosystem

1 “Hardware” Aspect

Excellent logistics

infrastructure

Strategically located

politically stable

Industry Support

Clusters

Relatively safe with

minimal natural disasters

The NCER Value Proposition

21

Page 22: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

Plan Facilitate Promote

Devise standards and

policies, direction and

strategies to accelerate

development of NCER

Ensure integration of

plans and policies between

the Federal Government,

state governments and local

authorities

Ensure the vision for key

thrust areas are aligned

with NCER’s vision

Promote and uphold

NCER’s brand to attract

investments to the region

Engage with government

agencies and potential

investors

Assist investors in

other investment

matters to ensure ease

of doing business e.g.

licensing, land matters

etc.

Ensure alignment of key

thrust area developments

and key enablers in line with

NCER’s vision

Secure private investors into

NCER through providing

assistance to investors

and coordinating

investment approvals

22

NCIA’s Unique Approach

Ensures Effective Delivery

Page 23: Regional Impacts, Opportunities & Prospects8 NCER Is Currently At The 3rd Wave Of Its Development Legend: Airport Bridge Railway 1 Upgrading of Penang International Airport RM250 mil

THANK YOU


Recommended