+ All Categories
Home > Documents > REGIONAL LRT, COMMUTER, AND PASSENGER RAIL PLAN

REGIONAL LRT, COMMUTER, AND PASSENGER RAIL PLAN

Date post: 21-Jan-2016
Category:
Upload: alexa
View: 42 times
Download: 0 times
Share this document with a friend
Description:
REGIONAL LRT, COMMUTER, AND PASSENGER RAIL PLAN. Regional map provided by the Counties Transit Improvement Board. LRT REGIONAL PLANNING AT THE INTERCHANGE. Facilitate transit services Become an asset to the surrounding community Fit into the surrounding environment - PowerPoint PPT Presentation
17
1 MnDOT-ACEC Annual Consultant Conference Living Within Our Means March 5, 2012 Chuck Ballentine, Senior Administrative Manager (612) 543-7274
Transcript
Page 1: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

1

MnDOT-ACECAnnual Consultant Conference

Living Within Our Means

March 5, 2012

Chuck Ballentine, Senior Administrative Manager(612) 543-7274

Page 2: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

2

REG

ION

AL

LRT,

CO

MM

UTER

, A

ND

PA

SS

EN

GER

RA

IL

PLA

N

Regional map provided by theCounties Transit Improvement Board

Page 3: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

3

LRT R

EG

ION

AL

PLA

NN

ING

A

T T

HE IN

TER

CH

AN

GE

Page 4: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

4

Facilitate transit services Become an asset to the surrounding community Fit into the surrounding environment Provide ease of movement in and around the area Provide a sense of safety and security Be a catalyst for growth Provide year-round activity Incorporate sustainable practices Seamlessly integrate with the Ballpark Be compatible with local zoning and adopted area plans Be adaptable to the future

GU

IDIN

G P

RIN

CIP

LES

Page 5: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

55

EV

EN

T D

AY

LR

T Q

UE

UIN

G

Page 6: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

66

LRT

PA

RT

ON

CR

OS

SIN

G

TH

RO

UG

H P

AID

FA

RE

ZO

NE

Page 7: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

7

LRT QUEUING AT THE INTERCHANGE

Page 8: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

8

Potential Public Space Features & Functions

– Urban Park / Garden– Amphitheater / Outdoor Entertainment– Lawn / Open Space– Pavilion / Shelter– Vendor Area– Informal Gathering Space– Water Feature– Outdoor Seating / Tables & Chairs– Site Furniture Amenities (benches, planters, bike storage)

– Playground– Public Art / Sculpture

UR

BA

N D

ES

IGN

GU

IDELI

NES

Page 9: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

9

DES

IGN

-BU

ILD

RFP

TO

SH

OR

T-L

ISTED

PR

OPO

SER

S O

N 1

2/2

3/1

1

Page 10: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

10

OPEN

PLA

ZA

S F

OR

10,0

00

PEO

PLE

Page 11: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

11

HER

C O

PS /

TR

AC

K /

UPPER

PLA

ZA

Page 12: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

12

STO

RM

WA

TER

MA

NA

GEM

EN

T

BM

P’s

Page 13: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

13

Four Short-Listed Teams:

• M. A. Mortenson; • Adolfson and Peterson; • Graham Construction; • and Knutson Construction

DE

SIG

N-B

UIL

D R

FP

PR

OC

ES

S

Page 14: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

14

• Public Comment Period Occurred

Jan. 17 – Feb. 16

• Finding of No Significant Impact (FONSI) received from FTA March 9

• Publication of Final EA March 15

EN

VIR

ON

ME

NT

AL

AS

SE

SS

ME

NT

Page 15: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

15

CURRENT FUNDING STATUS

TOTAL COMMITTED: $37.7 Million 55% Project Funds Secured

LAST UPDATED: 1/3/12

$14 Million

$13 Million

$12 Million

$11 Million

$10 Million

$9 Million

$8 Million

$7 Million

$6 Million

$5 Million

$4 Million

$3 Million

$2 Million

$1 Million

$10.8 Million $1.7 Million $14.7 Million $10.5 MillionHCRRA MBA State of MN FTA

Page 16: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

16

AN

TIC

IPA

TED

FU

ND

ING

S

OU

RC

ES

Federal$20.5 Million

State/Met Council$23 Million

Other$13.4 Million

Current Estimated Cost $67.7 Million

County$10.8 Million

Page 17: REGIONAL LRT, COMMUTER,  AND PASSENGER RAIL PLAN

17

MnDOT-ACECAnnual Consultant Conference

Living Within Our Means

March 5, 2012

Chuck Ballentine, Senior Administrative Manager(612) 543-7274


Recommended