CLE
ME
NT
A A
VE
S
W
1ST S
T N
CO
UN
TY
R
OA
D 1
2 S
US HIGHWAY 12 SW
NELSON BLVD / US HIGHWAY 12 SW
7TH ST N
ASPEN LN
EM
ER
SO
N A
VE
N
55TH ST SW
BU
FF
ALO
A
VE
S
2ND ST S
MINDY LN
3RD ST S
45TH ST SW
3RD ST N
QUAIL DR
1ST S
T S
WHITE TAIL LN
BR
EC
KE
N
R
ID
G
E L
N
C
O
L
E
A
V
E
3RD ST
CE
NT
ER
A
VE
S
5TH ST N
CR
YS
TA
L L
N
HILL S
T
PH
EA
SA
NT
RID
GE
DR
ZE
PH
YR
A
VE
CHARITY LN
GA
RF
IE
LD
A
VE
S
BU
FF
AL
O A
VE
N
H
O
G
A
N
D
R
DIL
LO
N A
VE
N
4TH ST N
FA
IR
MO
NT
A
VE
N
6TH ST N
SH
ER
I L
N
FA
IR
MO
NT
A
VE
RINGNECK DR
2ND ST N
EM
ER
SO
N A
VE
S
GA
RN
ER
C
IR
DOZER CIR
FIE
LD
CR
ES
T A
VE
W
Y
A
T
T
C
I
R
C
H
A
R
IT
Y
C
IR
B
U
R
T
O
N
C
I
R
A
L
E
X
A
N
D
E
R
C
T
GA
RF
IE
LD
A
VE
N
C
H
R
I
S
T
O
F
C
T
AR
IZ
ON
A A
VE
C
R
Y
S
T
A
L
C
IR
C
E
N
T
E
R
A
V
E
N
F
I
N
C
H
C
T
PH
EA
SA
NT
R
UN
D
R
CRYSTAL CT
DA
KO
TA
A
VE
S
AR
AP
AH
OE
L
N
P
A
T
R
I
O
T
C
I
R
ME
AD
OW
B
RO
OK
W
AY
H
O
G
A
N
C
IR
E
M
E
R
S
O
N
C
T
G
R
O
U
S
E
C
I
R
P
A
R
K
P
L
A
C
E
C
I
R
US HIGHWAY 12 SW
3RD ST S
2ND ST S
3RD ST S
3RD ST S
DILLO
N A
VE
N
4TH ST S
WY
AT
T C
T
FIELDCREST CT
RINGNECK
EM
ER
SO
N A
VE
S
7TH ST N
CIR
BURLINGTON N
ORTHERN RAILROAD
ST
EA
M
BOAT LN
L
O
V
E
L
A
N
D
C
I
R
ASPEN LN
EM
ER
SO
N A
VE
N
EM
ER
SO
N A
VE
N
EMERSON AVE N
STEAMBOAT LN
7TH ST N
7TH ST N
CO
UN
TY
R
OA
D 1
2 S
1ST S
T N
1ST ST N
H
I
L
L
S
T
ENERGY DRIVE
PH
EA
SA
NT
R
ID
GE
D
R
CIR
Q
U
A
I
L
D
R
P
H
E
A
S
A
N
T
R
I
D
G
E
D
R
ME
AD
OW
B
RO
OK
W
AY
US HIGHWAY 12 SW
1.1CONTRACTOR:
OBSERVER:
INFORMATIONRECORD DRAWING
DATE:
PROJECT LOCATION
PROJECT LIMITS
WRIGHT COUNTY, MNCITY OF MONTROSE
OWNER LOCATION
MAP LEGEND
MAP OF THE
TITLE SHEET
SHEET
UTILITIES
GAS & ELECTRICXCEL ENERGY
(763) [email protected]
TELEPHONEWINDSTREAM(320) 274-1176CURT OLSEN
CABLECOMCAST(612) 490-7750TOM [email protected]
SHEET NO.
SHEET INDEX
DATE:REVIEWED & APPROVEDSEAN DIERCKS, PUBLIC WORKS DIRECTOR
TITLE
1.1
2.13.1 - 3.4
STANDARD CONSTRUCTION PLANS4.1 - 4.45.1-5.5
MARCH 2017 GRADING - PHASE III & IV
ROLLING MEADOWS CONSTRUCTION PLANS FOR
CITY OF MONTROSE
NOTE: EXISTING UTILITY INFORMATION SHOWN ON THIS PLAN HAS BEENPROVIDED BY THE UTILITY OWNER. THE CONTRACTOR SHALL FIELD VERIFYEXACT LOCATIONS PRIOR TO COMMENCING CONSTRUCTION AS REQUIRED BYSTATE LAW. NOTIFY GOPHER STATE ONE CALL , 1-800-252-1166 OR651-454-0002.
THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITYLEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THEGUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THECOLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA."
DATE:LIC. NO.
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDI HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
TABLES
TITLE SHEET
DETAILS
FINAL GRADING PLANSTORMWATER POLLUTION PREVENTION PLAN (SWPPP)
PROJECT DATUM:
HORIZONTAL: NAD83(2011) WRIGHT COUNTY COORDINATE SYSTEM
VERTICAL: NAVD88
APPROVED BYSHEET NUMBERDATEPLAN REVISIONS
CITY OF MONTROSE, MINNESOTA
03/22/201745055
JUSTIN KANNAS
ROLLING MEADOWS REGIONAL PARK
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\106805TTL_GRADE.dwg 3/29/17 3:41 pm
FEETSCALE
0 1200600
MINNESOTA
REGIONAL PARK
1.2 LEGEND
MONTROSE CITY HALL311 BUFFALO AVEMONTROSE, MN
CITY ENGINEER: (CONSULTANT)JUSTIN KANNAS, P.E.BOLTON & MENK, INC.2040 HWY 12 EASTWILLMAR, MN 56201(320)-231-3956(320)-231-9710(FAX)
CITY OF MONTROSE
CITY HALLPO BOX 25311 BUFFALO AVENUE SOUTHMONTROSE, MN 55363PHONE: (763) 575-7422Web Site: http://www.montrose-mn.com
CLERK / TREASURER: MARGARET McCALLUM
MAYOR: MICHELLE OTTO
CITY COUNCIL MEMBERS:BEN KUEHLJILL MENARDLLOYD JOHNSONMELISSA GUDVANGEN
RESOURCE LIST
[email protected] BAUERNSCHMITT(763) 477-3095WRIGHT-HENNEPIN COOPERATIVE ELECTRIC ASSOCIATIONELECTRIC
DEREK ANDERSON
6.1-6.3 ARAPAHOE LANE PLAN & PROFILE7.1 UTILITIES
WETLAND - DELINEATED
WETLAND / MARSH
DITCH TOP
TILE LINE
WATER EDGE
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC LINE
GAS LINE
FIBER OPTIC LINE
UNDERGROUND COMMUNICATIONS LINE
OVERHEAD UTILITY LINE
WATER SYSTEM
STORM SEWER
SANITARY SEWER
SANITARY FORCEMAIN
CULVERT
INTERMEDIATE CONTOURS
INDEX CONTOURS
ADJACENT LINES
EASEMENT LINE
BUILDING SETBACK LINE
FENCE LINE
GUARD RAIL
ACCESS CONTROL LINE
CENTERLINE
PROPERTY / LOT LINE
ROAD RIGHT-OF-WAY LINE
RAILROAD RIGHT-OF-WAY LINE
GRAVEL EDGE
BITUMINOUS EDGE
CONCRETE EDGE
CURB & GUTTER
WATER CENTERLINE
WATER VALVE
WATER METER
WELL
BUSH
STUMP
CONIFEROUS TREE
DECIDUOUS TREE
VENT PIPE
VACUUM
UTILITY POLE
TRANSMISSION TOWER
TILE INLET
PUBLIC TELEPHONE
TELEPHONE MANHOLE
WATER SPIGOT
SIREN
SIGNAL POLE - RR
SIGNAL BOX
SPRINKLER HEAD
TRAFFIC SIGN
SEMAPHORE TRAFFIC LIGHT
SOIL BORING
SATELLITE DISH
PARKING METER
POST INDICATOR VALVE
GAS PUMP
PARK GRILL
ORDER MICROPHONE
MONITORING WELL
LIFT STATION MANHOLE
MANHOLE
POST
METER
MAILBOX
LIGHT POLE
LIGHT DECORATIVE
IRRIGATION CONTROL VALVE
HYDRANT
HAND HOLE
HANDICAPPED PARKING
ACCESS GRATE
GAS METER
GAS VALVE
GAS REGULATOR
FILL PIPE
FLAG POLE
EXHAUST VENT
ELECTRIC TRANSFORMER
ELECTRIC PEDESTAL
ELECTRIC METER
DOWN SPOUT
DRINKING FOUNTAIN
CURB STOP VALVE
CLEAN OUT
CONTROL POINT
CLOTHES LINE POLE
CATCH BASIN
BRACE POLE
BENCH
BIRD FEEDER
BASKETBALL HOOP
TRAFFIC ARM BARRIERAPRON
AIR PUMP
ANCHOR
AIR CONDITIONER
ANTENNA
AUTO SPRINKLER
BENCH MARK
STONE MONUMENT FOUND
CAST IRON MONUMENT FOUND
MONUMENT FOUND
IRON PIPE MONUMENT SET
EXISTING
WETLAND EDGE
COUNTY LINE
CITY LIMITS
SIXTEENTH LINE
QUARTER LINE
SECTION LINE
HIGHWATER LINE
SWALE CENTERLINE
RAILROAD TRACKS
TREE DRIP LINE
LEGEND
SHEETDATEBYREV.DESIGNED
DRAWN
DATELIC. NO.
CHECKED
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
CITY OF MONTROSE, MINNESOTA
03/22/201745055 JLK
KBW
JJH
JUSTIN KANNAS
1.2
COMMUNICATION PEDESTAL
POST SET
WATER MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
SANITARY MANHOLE
STORM MANHOLE
C L
W
S
D
W
TILE RISER
ROLLING MEADOWS REGIONAL PARK
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\106805_LEGEND.dwg 3/29/17 3:41 pm
DECIDUOUS TREE
BUSH
CONIFEROUS TREE
WETLAND
GUARD RAIL
SOIL BORING
SIGN
LIGHT POLE
SANITARY MANHOLE NUMBER
HYDRANT W/ VALVE
SLEEVE
CAP
TEE
CROSS
REDUCER
BEND
WATER SYSTEM MANHOLE
WATERMAIN SERVICE
SANITARY SEWER SERVICE
SANITARY MANHOLE
STORM MANHOLE NUMBER
STORM DRAIN TILE
APRON
STORM INLET
CURBSTOP
WATERMAIN
CONSTRUCTION LIMITS
ALIGNMENT/CENTERLINE
TEMPORARY EASEMENT
RIGHT-OF-WAY LINE
SILT FENCE-PREASSEMBLED
CONCRETE EDGE
SILT FENCE-HEAVY DUTY
CURB & GUTTER
BITUMINOUS EDGE
GRAVEL EDGE
MANHOLE
SANITARY LIFT STATION
SANITARY FORCEMAIN
EROSION PROTECTION AT INLET
CATCH BASIN
SANITARY SEWER
STORM SEWER
HYDRANT
VALVE
PERFORATED PIPE DRAIN
CULVERT W/APRON
CURB & GUTTER (OUT)
L
AA
1
PROPOSED
22+00
PROPOSED
SWPPP
RESIDENTIAL TURF RESTORATIONSEED, FERTILIZER, AND MULCH(REVIEW SPECIFICATIONS)
SILT FENCE
INLET PROTECTION
ROCK CONSTRUCTION ENTRANCE
RIP RAP
DRAINAGE ARROW
EXISTING DRAINAGE ARROW
BIOROLL
EROSION CONTROL BLANKET, CATEGORY 3
#1 SOIL BORING
TABLES
SHEETDATEBYREV.DESIGNED
DRAWN
CHECKED
H:\MTRS\W13106805\CAD\106805TABLES.dwg 3/29/17 3:41 pm DATELIC. NO.
CITY OF MONTROSE, MINNESOTA
2.1JLK
KBW
JJH
03/22/201745055JUSTIN KANNAS
ROLLING MEADOWS REGIONAL PARK
©Bolton & Menk, Inc. 2014, All Rights Reserved
PHASE
3&4TOTAL
NOTE:1. 0.5FT TOPSOIL IN ALL EXISTING AREAS (ASSUME)2. COMMON EXCAVATION & EMBANKMENT INCLUDES TOPSOIL VOLUMES
CONVERSION FACTORSEXCAVATED VOLUME (EV) TO COMPACTED VOLUME (CV) (95% STANDARD PROCTOR DENSITY)1.1 (CY) (EV) = 1 (CY) (CV)
COMPACTED VOLUME (CV) TO LOOSE VOLUME (LV)1 (CY) (CV) = 1.3 (CY) (LV)
EXCAVATED VOLUME (EV) TO LOOSE VOLUME (EV)1.2 (CY) (EV) = 1 (CY) (LV)
EARTHWORK TABULATIONCONSTRUCTED
SURFACE AREA(SF)
646833646833
TOPSOILDEPTH
(FT)0.5
EXCAVATED VOLUME
TOPSOIL (EV)(CV) (CY)
1317613176
COMMON EXCAVATION
(EV) (CY)4243042430
COMMONEMBANKMENT
(CV) (CY)2937229372
EXCESS/SHORTAGECOMMONMATERIAL(LV) (CY)1214512145
BASIS FOR QUANTITIESSEED MIX 250 70 LBS/AC
FERTILIZER TYPE 1 20-10-10 350 LBS/AC
MULCH MATERIAL TYPE 1 2 TONS/AC
DETAILS
SHEETDATEBYREV.
NOTE: DETAILS ARE NOT TO SCALE
DESIGNED
DRAWN
CHECKED
H:\MTRS\W13106805\CAD\106805DET.dwg 3/29/17 3:41 pm DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
CITY OF MONTROSE, MINNESOTA
3.1JLK
KBW
JJH
03/22/201745055JUSTIN KANNAS
ROLLING MEADOWS REGIONAL PARK
© Bolton & Menk, Inc. 2014 , All Rights Reserved
2.0%
15.5'4'TRAIL 10' 15.5'
2.0%2.0% 2.0%6:1
VARIES
2" TYPE SP12.5 NON-WEARING COURSE MIXTURE (SPNWB230B)(2360)(FUTURE - BY OTHERS)
1.5" TYPE SP9.5 WEARING COURSE MIXTURE (SPWEA240B)(2360)(FUTURE - BY OTHERS)
12" SELECT GRANULAR BORROW (PLACED WITH GRADING PROJECT)
BITUMINOUS TACK COAT (2357)(FUTURE - BY OTHERS)
8" AGGREGATE BASE PLACED CL 5 (2211) (3" PLACED WITH GRADING PROJECT)
2'
NOTE:DRAINTILE SHALL BE TRENCHED INTO SUBGRADE
SELECT GRANULAR
NOT TO SCALEEDGE DRAIN DETAIL
12"
4" PE PERF. PIPE
38" (
TYP.
)
2" MIN.
COURSE FILTER AGGREGATE (3149H)
2" MIN.GEOTEXTILE FABRIC
BITUMINOUS
CLASS 5 AGGREGATE
6"
3'
1'-2
"
7" 1'-2"8-1/2"
8"
7"
1'-2"
1'-1"
1'-2
"
3"
3"
3"
3-1/2"
SEE PLAN FOR PIPESIZE
DRAINPIPE
4"
PLAN
SECTION END VIEW
RODENT SHIELD
NOTE: HEADWALL DIMENSION MAY VARYDEPENDING ON PIPE SIZE
4" CONCRETE HEADWALL AND OUTLETNOT TO SCALE
8" AGGREGATE BASE CLASS 5 (FUTURE - BY OTHERS)3" BITUMINOUS WEAR (FUTURE - BY OTHERS)
BITUMINOUS TRAILNOT TO SCALE
PARKING LOTS PAVEMENT SECTIONNOT TO SCALE
TYPICAL SECTION - ARAPAHOE LANENOT TO SCALE
B618 CURB & GUTTER (TYP)(FUTURE - BY OTHERS)
4" PERF. PE EDGE DRAIN (TYP)(PLACED WITH GRADING PROJECT)
1.5" TYPE SP9.5 WEARING COURSE MIXTURE (SPWEA240B)(2360)(FUTURE - BY OTHERS)
2" TYPE SP12.5 NON-WEARING COURSE MIXTURE (SPNWB230B)(2360)(FUTURE - BY OTHERS)
12" SELECT GRANULAR BORROW (FUTURE - BY OTHERS)
BITUMINOUS TACK COAT (2357)(FUTURE - BY OTHERS)
8" AGGREGATE BASE PLACED CL 5 (2211) (FUTURE - BY OTHERS)
DETAILS
SHEETDATEBYREV.
NOTE: DETAILS ARE NOT TO SCALE
DESIGNED
DRAWN
CHECKED
H:\MTRS\W13106805\CAD\106805DET.dwg 3/29/17 3:41 pm DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
CITY OF MONTROSE, MINNESOTA
3.2JLK
KBW
JJH
03/22/201745055JUSTIN KANNAS
ROLLING MEADOWS REGIONAL PARK
© Bolton & Menk, Inc. 2014 , All Rights Reserved
SILT FENCE - MACHINE SLICEDNOT TO SCALE
DIRECTION OFRUNOFF FLOW
2'-0
" MIN
STEEL STUDDED 'T' POST
AT 6' MAXIMUM SPACING5' MINIMUM LENGTH POSTSPLASTIC 'ZIP' TIES
(50# TENSILE)LOCATED IN TOP 8"
GEOTEXTILE FABRIC, 36" WIDTH
8"-12" DEPTH(PLUS 6" FLAP)
MACHINE SLICE
T-PO
ST
PLAN VIEW
SECTIONAL VIEW
4"-24"
MIN
MIN
6"
6"
NOT TO SCALE
1'
4' MAXIMUMPOST SPACING
NOTE:SILT FENCE SHALL CONFORM TOTHE REQUIREMENTS OF MnDOTSPECIFICATION 3886
3/4" WASHED ROCK1' DEEP X 1' WIDEAROUND PERIMETER
2" X 2" WOOD POST
INLET OPENING
FILTER FABRIC
2" X 2" WOODPOST 4' MIN LENGTH
GEOTEXTILE FABRIC
FABRIC ANCHORAGE TRENCHBACKFILL WITH TAMPEDNATURAL SOIL30
" MIN
1.5'
MIN
POST
EMBE
DMEN
T
INLET PROTECTIONPREASSEMBLED SILT FENCE
41
A A
B
B
RIPRAP AT RCP CULVERT END
SECTION A-A
SECTION B-B
PLAN
1'
NOT TO SCALE
DIAOF
ROUNDPIPE(IN)12151821242730364248
L(FT)
88
1010121214161820
CLASS IId50=6"
12"DEPTHRIPRAP(CU YD)
5568
101015182020
CLASS IIId50=9"
18"DEPTHRIPRAP(CU YD)
88
1015151520253040
CLASS IVd50=12"
24"DEPTHRIPRAP(CU YD)
10101515202025304050
GEOTEXTILE FABRIC, PER SPEC 3733;THE FABRIC SHOULD COVER THE AREAOF THE RIPRAP AND EXTEND UNDERTHE CULVERT APRON THREE FEET
"L"
RIPRAP2'
2'SEE
PLAN
S
SEE TABLE FORMINIMUM DEPTH 1'
STD DETAIL 3018A
STD DETAIL 3018B
STD DETAIL 3011
NOT TO SCALE
NOTES:
1. POINT A MUST BE A MINIMUM OF 12 INCHES HIGHER THAN POINT B.
2. HEAVY DUTY SILT FENCE SHALL CONFORM TO THE REQUIREMENTS OF MnDOT SPECIFICATION 3886.
3. DIMENSIONS SHOWN ARE FOR TYPICAL 8' DITCH BOTTOM. MODIFICATIONS MAY BE NECESSARY FOR VARYING SLOPES AND DITCH WIDTHS.
4. REFER TO PLAN OR MnDOT EROSION CONTROL MANUAL FOR SPACING INTERVALS OF CHECKS.
HEAVY DUTY SILT FENCE
6'
4'
8'2'2'
VELOCITY CHECKHEAVY DUTY SILT FENCE
STD DETAIL 3019
NOT TO SCALESTD DETAIL 4014
OUTLET
OUTLET
SECTION VIEW
DETAIL "A-A"
ELEVATIONPOND OVERFLOW
36" PIPE
5'-0"
NWL
MONOLITHIC BOTTOM
EL. 936.00
EL. 939.00
EL. 936.50
EL. 942.50EL. 943.00
6"
36" PIPE
1/4" STL. PLATE
SEWER
GALVANIZED.
2.ALL METAL SHALL BE HOT-DIPPED 1.GRATE TO BE MADE IN (2) PIECESNOTE:
POND SKIMMER GRATE57"Ø (2) PIECE 5/8" ROD4" O.C. BOTH WAYS5/8"Ø SMOOTH RND. STOCK
WITH NUTS AND WASHERSHEAD STAINLESS STL. BOLTS(4) 1/2"Ø-13 UNC HEX
SEE DETAIL "A-A"57"Ø O.D.
1/4"x1" FLAT STL.
7'-0
"
POND SKIMMER STRUCTURE
ELEVATION OF RCP INSTALLATIONELEVATION OF CSP INSTALLATION
CULVERT STANDPIPE
21
PLAN VIEW
1" HOLES SPACED8"-10" ON CENTER
d d
TACK WELD
TACK WELDMETAL PIPE
ANTIVORTEX ROD, 5/8"MIN DIAMETER TACKWELD TO STANDPIPEAND SET PARALLELTO FLOW
TACK WELD 2'-0"
ROAD EMBANKMENTINLET END OF PLAN CULVERTPERFORATED METALSTANDPIPE
2'-0"
ROAD EMBANKMENT
INLET ENDOF PLANCULVERT
L
CUT OPENING INSTANDPIPE TO FITSAME DIAMETERPIPE AS CULVERT
GEOTEXTILE 3
PERFORATEDMETAL STANDPIPEWRAPPED WITHGEOTEXTILE 3
COUPLING BANDSEE STANDARD PLATE 3221
NOT TO SCALE
FOR SEDIMENT CONTROL ON CULVERT INLET(TYPE D SPEC. 3891)CULVERT SIZE: 12"-36"d = DIAMETER OF STANDPIPE EQUAL TO DIAMETER OF PLAN CULVERTL = LENGTH OF PERFORATED STANDPIPE (d+12")
NOTES:
1. FOR CSP, REMOVE TEMPORARY STANDPIPE AND INSTALL CULVERT APRON AFTER VEGETATION IS ESTABLISHED.
2. FOR RCP, INSTALL CULVERT APRON AND SLIDE TEMPORARY STANDPIPE INTO RCP. AFTER VEGETATION IS ESTABLISHED, REMOVE TEMPORARY STANDPIPE.
3. ALL GEOTEXTILE USED FOR INLET PROTECTION SHALL BE MONOFILAMENT IN BOTH DIRECTIONS.
INLET PROTECTIONCULVERT STANDPIPE
STD DETAIL 3023
4"
EL. 940.506"
6" WIER WALL
4" ORIFICEEL. 939.00
NOTE:#4 Ø - 12" X 12" PATTER REBAR IN WEIR WALL
INLET36" PIPE
EL. 938.50
INLET36" PIPESEWER
EL. 943.70
EL. 935.00POND BOTTOM
DETAILS
SHEETDATEBYREV.
NOTE: DETAILS ARE NOT TO SCALE
DESIGNED
DRAWN
CHECKED
H:\MTRS\W13106805\CAD\106805DET.dwg 3/29/17 3:41 pm DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
CITY OF MONTROSE, MINNESOTA
3.3JLK
KBW
JJH
03/22/201745055JUSTIN KANNAS
ROLLING MEADOWS REGIONAL PARK
© Bolton & Menk, Inc. 2014 , All Rights Reserved
6"
FLAP POCKET
OR
NOT TO SCALE
1
1
2
2
2
INLET SPECIFICATIONS AS PERTHE PLAN DIMENSION LENGTHAND WIDTH TO MATCH
GEOTEXTILE FABRIC, TYPEWOVEN MONOFILAMENTCONFORMING TOSPEC. 3886, TABLE 3886-1MACHINE SLICE
FRONT, BACKAND BOTTOM TO BEMADE FROM SINGLEPIECE OF FABRIC
USE REBAR ORSTEEL ROD FORREMOVAL
FOR INLETS WITH CAST CURBBOX USE WOOD 2x4, EXTEND10" BEYOND GRATE WIDTH ONBOTH SIDES, LENGTH VARIES,SECURE TO GRATE WITH WIREOR PLASTIC TIES
4"x6" OVAL HOLESHALL BE HEAT CUTINTO ALL FOUR SIDEPANELSMINIMUM DOUBLESTITCHED SEAMS ALLAROUND SIDE PIECESAND ON FLAP POCKETS
NOTES:INLET PROTECTION DEVICES SHALL BE MAINTAINED OR REPLACED AT THE DIRECTION OF THE ENGINEER. MANUFACTUREDALTERNATIVES APPROVED AND LISTED ON THE DEPARTMENTS EROSION CONTROL PRODUCT ACCEPTABILITY LIST MAY BESUBSTITUTED. WHEN REMOVING OR MAINTAINING INLET PROTECTION, CARE SHALL BE TAKEN SO THAT THE SEDIMENTTRAPPED ON THE GEOTEXTILE FABRIC DOES NOT FALL IN THE INLET. ANY MATERIAL FALLING INTO THE INLET SHALL BEREMOVED IMMEDIATELY.
FINISHED SIZE, INCLUDING POCKETS WHERE REQUIRED, SHALL EXTEND A MINIMUM OF 10" AROUND THE PERIMETER TOFACILITATE MAINTENANCE OR REMOVAL.
FLAP POCKETS SHALL BE LARGE ENOUGH TO ACCEPT WOOD 2x4.
INSTALLATION NOTES:DO NOT INSTALL PROTECTION IN INLETS SHALLOWER THAN 30", MEASURED FROM THE BOTTOM OF THE INLET TO THE TOPOF THE GRATE.
TRIM EXCESS FABRIC IN THE FLOW LINE TO WITHIN 3" OF THE GRATE.
THE INSTALLED BAG SHALL HAVE A MINIMUM SIDE CLEARANCE, BETWEEN THE INLET AND THE BAG, MEASURED AT THEBOTTOM OF THE OVERFLOW HOLES, OF 3". WHERE NECESSARY THE CONTRACTOR SHALL CLINCH THE BAG, USING PLASTIC ZIPTIES, TO ACHIEVE THE 3" CLEARANCE. THE TIES SHALL BE PLACED AT A MAXIMUM OF 4" FROM THE BOTTOM OF THE BAG.
INLET PROTECTIONGEOTEXTILE BAG
GRADATION
65-9530-6510-35
SIEVE SIZE1 1/2" 100
95-100
3-200-80-3
1"3/4"3/8"NO 4
NO 10NO 40
NO 200
5"Ø GEOTEXTILE SOCK,TYPE WOVEN MONOFILAMENTCONFORMING TO SPEC. 3886TABLE 3886-1. MACHINE SLICE
SEAM JOINED BY TWO ROWSOF STITCHING WITH A PLASTICMESH BACKING OR HEAT BONDED(OR APPROVED EQUAL)
ENDS SECURELY CLOSED TOPREVENT LOSS OF OPEN GRADEDAGGREGATE FILL, SECUREDWITH 50 PSI ZIP TIE
PERCENTPASSING
FILL ROCK LOG WITH 45 LBS.OF OPEN GRADED AGGREGATECONSISTING OF SOUND, DURABLEPARTICLES OF CRUSHED QUARRYROCK OR GRAVEL CONFORMINGTO THE FOLLOWING GRADATION.
NOTE:CRUSHED CONCRETE OR BITUMINOUSSHALL NOT BE USED FOR OPENGRADED AGGREGATE.
INLET PROTECTIONWITH ROCK LOG
NOT TO SCALE
1'-0
"
1'-0" 1'-0"MIN MIN
MIN
BACK OF SIDEWALK
BACK OF CURB
CURB INLET
NOTE:
INLET PROTECTIONROCK BAG
PAYMENT SHALL INCLUDE ALL MATERIALS,FILLING OF LOG, PLACEMENT,MAINTENANCE & REMOVAL;80% OF BID PRICE SHALL BE PAID UPONPROPER PLACEMENT WITH THE FINAL 20%PAID UPON REMOVAL
THIS INLET PROTECTION IS USED DURINGROUGH GRADING ONLY, USE BEFORE ROADIS OPEN TO TRAFFIC OR IS PAVED
NOT TO SCALE
DITCH CHECK - BIOROLL
CATEGORY 3 EROSIONCONTROL BLANKET
NOTE:POINT 'A' MUST BE 1'-0" MIN HIGHER THANPOINT 'B' TO ENSURE THAT WATER FLOWS OVERTHE DITCH CHECK AND NOT AROUND THE ENDS
12' MINBLANKETS MUST
OVERLAP BY 4" MIN
POINT'A'
POINT 'B'4"x4" TRENCH BACKFILLEDOVER EROSION CONTROL BLANKET
6"-7" DIA STRAW OR WOODFIBER ROLL ENCLOSED INPLASTIC OR POLYESTER NETTING
8", 11ga STAPLESSPACED 1'-0" ON CENTER
2"x2"x18" LONG WOOD STAKESAT 2'-0" SPACING DRIVE THROUGHNETTING AND FIBER ROLL
STD DETAIL 3017
STD DETAIL 3024
STD DETAIL 3015
ANCHOR BOTH SIDES
6"
24" MAX
PIPE SIZE BARS "H" BOLTSTRASH GUARD SIZES
NOT TO SCALE
12"-18"21"-42"42"-72"
4" 5/8"3/4"Ø6"1"Ø 3/4"
12" 1"
PROVIDE 3 ANCHOR CLIPSTO FASTEN TRASH GUARDTO FLARED END SECTIONHOT DIP GALVANIZEAFTER FABRICATION
TIE LAST 3 PIPE JOINTS,USE 2 TIE BOLT FASTENERSPER JOINT, INSTALL AT 60°FROM TOP OR BOTTOM OF PIPE
ANCHOR CLIP
RC APRON TRASH RACK(STEEL BARS)STD DETAIL 4030
ROCK CONSTRUCTION ENTRANCENOT TO SCALE
THICKNESS
HARD SURFACEPUBLIC ROAD
PROVIDE RADIUSAS NEEDED (TYP)
3" MINUS WASHEDCOARSE AGGREGATE
6" MIN
25' MINIMUM
30' MINIMUM
(OR APPROVED EQUAL)
STD DETAIL 3005
3
PIPE DIA. B
TRENCH DETAILR.C. STORM SEWER
CLASS "C" BEDDING CONDITION
NOT TO SCALESTD DETAIL 4001
1:41:3
1:10
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
DETAILS - POND GRADING
CITY OF MONTROSE, MINNESOTA
3.4ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\106805DET_POND.dwg 3/29/17 4:07 pm
FEETSCALE
0 2010HORZ.
1:111:4
1:101:3 1:3
1:101:4
1:7
10' BENCH 10' BENCH
NWL = 939.00
INVERT = 935.00 FT36" FES WITHTRASH GUARDINVERT = 935.00 FT
48" OUTLETSTRUCTURE
33 LF - 36" RCP
109 LF - 36" RCP
36" FES = EL. 937.80 FT
INVERT = 938.50 FT
INVERT = 936.50 FT
2 YEAR STORM WATER LEVEL = 941.2
10 YEAR STORM WATER LEVEL = 942.1
100 YEAR STORM WATER LEVEL = 943.3
2040 HIGHWAY 12 EASTWILLMAR, MINNESOTA 56201
Phone: (320) 231-3956Email: [email protected]
www.bolton-menk.comR
RIP-RAPE.0.F. = 943.70
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH CITY OF MONTROSE, MINNESOTA
4.1ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\SWPPP\SWPPP UPDATE\SWPPP_1_PROJ_INFO_MAP.dwg 3/29/17 3:41 pm
FEETSCALE
0 20001000
CITY OF MONTROSEWRIGHT COUNTY, MINNESOTA
STORM WATERPOLLUTION PREVENTION
PLAN (SWPPP)
SPECIAL ENVIRONMENTAL CONSIDERATIONS:
PROJECT AREAS:Total Project Size (disturbed area) =Existing area of impervious surface =Post construction area of impervious surface =Total new impervious surface area created =
Planned Construction Start Date: Estimated Construction Completion Date:
PERMANENT STORMWATER MANAGEMENT SYSTEM:Type of storm water management used if more than 1 acre of new impervious surface is created:
15.7
Individuals listed above, including the SWPPP preparer, individual overseeing implementation of, revising, and amending theSWPPP, individuals performing or supervising the installation, maintenance and repair of BMPs must be trained. At least oneindividual present on the permitted project, or available on site within 72 hours, shall be trained in the applicable job duties.Documentation showing training commensurate with the job duties and responsibilities is required to be included in the SWPPPprior to any work beginning on the site. Copies of the SWPPP preparer information is included in the Project Manual. TheContractor shall provide information for the individual(s) overseeing implementation, supervising installation, maintenance, andrepair of BMP’s to be included in the Project Manual prior to the start of construction. This information shall be kept up to dateuntil the project NOT is filed.
Documentation shall include:a. Names of trained personnel associated with this project.b. Dates of training, names of instructor(s) and entity providing training.c. Content of training course or workshop including the number of hours trained.d. As an alternative to a, b, and c listed above, a photocopy of a current Erosion and Stormwater Management card issued by
the University of Minnesota can be attached to the SWPPP as suitable documentation of training.
GENERAL STORMWATER DISCHARGE REQUIREMENTSAll requirements listed in Part III of the Permit for the design of the permanent stormwater management system and dischargehave been included in the preparation of this SWPPP. These include but are not limited to::
1. The expected amount, frequency, intensity, and duration of precipitation.2. The nature of stormwater runoff and run-on at the site3. Peak flow rates and stormwater volumes to minimize erosion at outlets and downstream channel and stream bank erosion.4. The range of soil particle sizes expected to be present on the site.
DOCUMENT RETENTIONThe following documentation will be retained for a period of not less than 3-years from the date of submittal of theNOT in compliance with Part III.E of the Permit.
1. The final SWPPP2. Copies of all stormwater related permits required for the project3. Records of all inspection and maintenance conducted during construction4. Copies of all permanent operation and maintenance agreements; including all right-of-way, contracts,
covenants and other binding requirements regarding perpetual maintenance, and5. All required calculations for design of the temporary and permanent BMPs.
ACRESACRESACRESACRES
04/30/1507/01/17
0.04.24.2
Wet Sedimentation Basin Infiltration/Filtration Regional Pond Permanent Storm Water Management Not Required
PROJECTLOCATION
1-MILE PROJECTBOUNDARY RADIUS
RECEIVINGWATERS
DITCH
ROLLING MEADOW REGIONAL PARKCITY OF MONTROSE
WRIGHT COUNTY, MINNESOTA
PROJECT LOCATION:
BMP SUMMARY:
COUNTY TOWNSHIP RANGE SECTION LATITUDE LONGITUDEWRIGHT 119 26 26 45.0856 -93.9132
BMP QUANTITY UNIT
SILT FENCE 2067 LIN FT
ROCK CONSTRUCTION ENTRANCE 1 EACH
EROSION CONTROL BLANKET 7827 SQ YD
INLET PROTECTION 3 EACH
BIOROLL 121 LIN FT
SEEDING 12.58 ACRE
NAME OF WATER BODYTYPE (ditch, pond,wetland, lake, etc.)
Appendix ASpecial Water?
Flows to ImpairedWater Within 1
Mile?
USEPA ApprovedTMDL?
DRAINAGE DITCH DITCH NO NO NO
NWI WETLAND WETLAND NO NO NO
Impairments: NONE
COMPANY CONTACT PERSON PHONE
OWNER: CITY OF MONTROSE Sean Diercks 763-575-7470
SWPPP DESIGNER: Bolton & Menk, Inc. Joshua Halvorson 320-231-9132
CONTRACTOR: CITY OF MONTROSE Sean Diercks 763-575-7470
SITE MANAGER: Bolton & Menk, Inc. Jason Buboltz 320-212-7567
PARTY RESPONSIBLE FOR LONG TERM O&M: CITY OF MONTROSE Sean Diercks 763-575-7470
MINNESOTA
PROJECT BOUNDARY
NATIONAL WETLANDS INVENTORY
IMPAIRED, SPECIAL OR PROTECTED WATERS
RECEIVING WATERS:Receiving waters, including surface water, wetlands, Public Waters, and stormwater ponds, are identified on the USGS 7.5 min quad mapwithin one mile of the project boundary. Receiving waters that are impaired, the impairment, and WLA are listed as follows. All specificBMPs relative to construction activities listed in this permit for special and impaired waters have been incorporated into this plan. Allspecific BMPs listed in approved TMDLs and those BMPs listed for construction related waste load allocations have also been incorporated.
SWPPPPROJECT INFORMATION AND LOCATION MAP
RESPONSIBLE PARTIES:The Contractor and Owner must apply for coverage under the MPCA's General Storm Water Permit for Construction Activity asrequired by the National Pollutant Discharge Elimination System (NPDES) Phase II program. Coverage under the permit will beginautomatically 7 calendar days after the electronic submittal date or after the postmarked date of a complete application. [Longertime frames apply to sites that disturb areas greater than 50 acres.]
DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT:Construction activities include: Site grading
This construction is a phase of the Rolling Meadows Park located in the northerly limits of the City of Montrose onthe west side of County Road 12 north of Aspen Lane. The project will provide the mass soil grading to facilitate theproposed future layout, plans, and construction of the recreational complexes.
The existing drainage from the property has four watersheds within. These watersheds and draining characteristicsare as depicted in sheet 4.9. Drainage Area (DA) one one the north side of the project consists of 4.0 acres (ac.) anddrains by sheet flow to the existing ditch northwest of the site. DA two is 2.86 ac. and primarily consists of the ditcharea adjacent to the west side of County Road (CR)12. This drains by sheet and shallow concentrated flow to theculvert that discharges to the Drainage Ditch. DA three is the majority of the site consisting of 16.0 ac. and drains tothe drainage ditch by sheet flow. DA four located in the southwest portion of the site drains by sheet flow to theexisting catch basins which flow to an existing regional pond system. DA 5 also flows to an existing regional pondsystem to the south by sheet flow.
The construction site grading will retain the same drainage patterns with subtle changes to the DA's and are asshown in sheet 4.10. The addition of a wet sedimentation basin in DA three will relieve the additional runoff createdby future build out of the site.
IMPLEMENTATION SCHEDULE AND PHASING:1) Submit SWPPP Updates to Engineer. Submittal shall include any requested changes to the SWPPP, including but not limited to:
Trained Personnel, Locations for Stockpiles, Concrete Washout, Sanitation Facilities, Types and Locations of Erosion &Sediment Control. Failure to submit updates shall be considered acceptance of the SWPPP as designed with no changes.
2) Install perimeter sediment control, inlet protection, and construction exit.3) Grade site in phases.4) Remove inlet protection from catch basins along streets.5) Seed, fertilize, and mulch area of phase.6) Remove all temporary BMP's.7) Add additional temporary BMP's as necessary during construction base on inspection reports.8) Ensure final stabilization measures are complete.9) Submit Notice of Termination (NOT) to MPCA within 30 days of final stabilization.
LEGEND
RIVERS, STREAMS, & DITCHES RECEIVINGWATERS
WETLAND
MALARDI LAKE
X
X
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH CITY OF MONTROSE, MINNESOTA
4.2ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\SWPPP\SWPPP_3_SOILS.dwg 3/29/17 3:42 pm
SWPPPNARRATIVE
STORMWATER POLLUTION PREVENTION PLAN NARRATIVE
Information contained in this SWPPP summarizes requirements of the GENERAL PERMIT AUTHORIZATION TODISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANTDISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM - Permit No: MN Rl0000l as they apply tothis project. All provisions of the permit including those not specifically cited herein shall apply to this project. TheContractor is responsible to be familiar with and comply with all conditions of the permit. The full text of thepermit is available at:http://www.pca.state.mn.us/index.php/water/water-types-and-programs/stormwater/construction-stormwater/mpca-to-re-issue-construction-stormwater-general-permit.html.
SWPPP AMENDMENTS
Permittee must amend SWPPP as necessary to include additional requirements to correct problems identified oraddress the following situations.
1. There is a change in design, construction, operation, maintenance, weather or seasonal conditions.
2. Inspections or investigations by site owner or operators, USEPA or MPCA officials determine the SWPPP isnot minimizing discharge of pollutants to surface waters or underground waters or discharges are causingwater quality standard exceedances.
3. The SWPPP is not achieving the objectives of minimizing pollutants in stormwater discharges associatedwith construction activity, or the SWPPP is not consistent with the terms and conditions of the permit.
4. The MPCA determines that the project's stormwater discharges may cause, have reasonable potential tocause, or contribute to non-attainment of any applicable water quality standard, or the SWPPP does notincorporate the applicable requirements of the permit.
EROSION PREVENTION PRACTICES:
The location of areas not to be disturbed must be delineated on the project before site work begins.
Disturbance on steep slopes (>33.3%) shall be minimized. Where required, techniques such as phasing andstabilizing practices designed for steep slopes shall be used.
All exposed soils must be stabilized as soon as possible but in no case later than 7 days after the constructionactivity has temporarily or permanently ceased.
For public waters that have been promulgated "work in water restrictions" during fish spawning time frames, allexposed soil areas that are within 200 feet of the water's edge, and drain to these waters must completestabilization within 24-hours during the time period.
Stormwater conveyance channels shall be routed around unstabilized areas. Erosion controls and velocitydissipation devices shall be used at outlets within and along the length of any constructed conveyance channel.
The normal wetted perimeter of all ditches or swales, including storm water management pond slopes, that drainwaters from the site must be stabilized within 200' of any property edge or discharge point, including storm sewerinlets, within 24 hours of connection.
Stabilization of the remaining portions of any temporary or permanent ditches or swales with 7 calendar days afterconnecting to a surface water or property edge and construction in that portion of the ditch has temporary orpermanently ceased.
Temporary or permanent ditches or swales used as sediment containment during construction do not need to bestabilized during temporary period of use and shall be stabilized within 24 hours after no longer used as sedimentcontainment.
Mulch, hydromulch, tackifier, or similar practice shall not be used in any portion of a temporary or permanentdrainage ditch. Refer to erosion and sediment control plan for temporary and permanent stabilization measuresfor ditches and swales.
Stormwater discharges shall be directed to vegetated areas where feasible. Velocity dissipation devices shall beused at discharge point.
Phased construction will be used to extent practical or as indicated in the plans to minimize exposed soils.
Rapid stabilization shall be of type and quantity indicated in the project specifications. Additional rapidstabilization may be necessary to minimize erosion throughout the duration of the project. Type and quantity shallbe determined by the engineer or inspector prior to installation. In extreme cases, the contractor shall use anyavailable rapid stabilization to immediately mitigate erosion, then further remedy the situation with approval byowner or engineer.
SEDIMENT CONTROL PRACTICES:
Practices must be established on all down gradient perimeters and be located up gradient of any buffer zones.Perimeter controls must be in place before up gradient land- disturbing activities begin and shall remain in placeuntil final stabilization.
All sediment controls practices shall be re-installed if they have been adjusted or removed to accommodate short-term activities and replaced immediately after the short term activity has ceased. Short term activities shall beperformed as quickly as possible. Sediment control practices shall be re-installed even before the nextprecipitation event if the activity is not complete.
All storm drains must be protected by appropriate BMPs during construction until all sources to the inlet havebeen stabilized. Inlet protection may be removed for specific safety concerns identified by the Permittee orjurisdictional authority. The removal shall be documented in the SWPPP and retained on site. Temporarystockpiles must have silt fence or other effective sediment controls and shall not be placed in surface waters ornatural buffers.
Vehicle tracking BMPs shall be installed to minimize track out of sediment from the construction site. Methodshall be approved by engineer prior to commencement of construction activities. Street sweeping shall be used ifvehicle tracking BMPs are not adequate to prevent sediment from being tracked onto the street.
Soil compaction shall be minimized and topsoil shall be preserved, unless infeasible or if construction activitiesdictate soil compaction or topsoil stripping.
A 100 foot natural buffer, or redundant BMPs (where a buffer is infeasible) must be maintained when a surfacewater is located within 100 feet of disturbance activities and site runoff flows to the surface water.
If polymers, flocculants, or other sedimentation treatment chemicals are used on site, 1) conventional erosion andsediment controls shall be sowed prior to chemical placement, 2) chemicals shall be chosen based on soil types,and expected turbidity, pH, and flow rate of stormwater flowing into the treatment system, and 3) chemicals shallbe used with accepted engineering practices and dosing specifications.
TEMPORARY SEDIMENTATION BASINS:
The temporary sedimentation basin shall be constructed and made operational prior to disturbance of 10 or moreacres draining to a common location.
Temporary sedimentation basins are required prior to runoff leaving the construction site or entering surfacewaters when 5 or more acres of disturbed soils drain to a common location. The basin must provide 3,600 cubicfeet of storage below the outlet per acre drained. If hydraulic calculations are available, the temporarysedimentation basin must provide a storage volume equivalent to the 2-year, 24-hour storm, but in no case lessthan 1800 cubic feet per acre drained. The temporary sedimentation basin must be constructed and madeoperational concurrent with the start of soil disturbance up gradient of the pond. The temporary sedimentationbasin shall be designed to prevent short circuiting. The outfall shall be designed to remove floatable debris, allowfor complete drawdown of the pond for maintenance activities, and have energy dissipation. The emergencyspillway shall be stabilized.
Temporary sedimentation basins shall be situated outside of surface waters and any required buffer zone, andmust be designed to avoid draining wetlands, unless the impact is in compliance with the requirements of thispermit.
Excessive sediment-laden water that is not properly filtered will not be permitted to discharge from site.
DEWATERING AND BASIN DRAINING
Turbid or sediment-laden waters related to dewatering or basin draining shall be discharged to a temporary orpermanent sedimentation basin on the project site unless infeasible. The temporary or permanent basin maydischarge to surface waters if the basin water has been visually checked to ensure adequate treatment has beenobtained in the basin and that the nuisance conditions will not result from the discharge. Discharge points shall beadequately protected from erosion and proper velocity dissipation provided.
All water from dewatering or basin-draining activities must be discharged in a manner that does not causenuisance conditions, erosion in the receiving channels or on down slope properties, or inundation in wetlandscausing significant adverse impacts to the wetland.
If filters with backwash waters are used, the backwash water shall be hauled away for disposal, returned to thebeginning of the treatment process, or incorporated into site in a manner that does not cause erosion. Backwashwater may be discharged to sanitary sewer if permission is granted by the sanitary sewer authority.
POLLUTION PREVENTION:
Building products that have the potential to leach pollutants must be under cover to prevent discharge orprotected by an effective means designed to minimize contact with stormwater.
Pesticides, herbicides, insecticides, fertilizers, treatment chemicals, and landscape materials must be under cover.
Hazardous materials and toxic waste must be properly stored in sealed containers to prevent spills, leaks or otherdischarge. Restricted access storage areas must be provided to prevent vandalism.
Solid waste must be stored, collected and disposed of in compliance with Minn. R. CH 7035.
Portable toilets must be positioned so that they are secure and will not be tipped or knocked over. Sanitary wastemust be disposed of properly in accordance with Minn. R. CH 7041.
Discharge of spilled or leaked chemicals, including fuel, from any area where chemicals or fuel will be loaded orunloaded shall be prevented using drip pans or absorbents. Supplies shall be available at all times to clean updischarged materials and that an appropriate disposal method must be available for recovered spilled materials.
Exterior vehicle or equipment washing on the project site shall be limited to a defined area of the site. Runofffrom the washing area shall be contained in a sediment basin or other similarly effective controls and waste fromthe washing activity must be properly disposed of. No engine degreasing is allowed on site.
Effective containment for all liquid and solid wastes generated by concrete and other washout operations relatedto construction activity shall be effectively contained. Liquid and solid washout waste shall not contact theground, and containment must be designed so that it does not result in runoff from the washout operations orareas. A sign must be installed adjacent to each washout facility that requires site personnel to utilize the properfacilities for disposal of concrete and other washout wastes.
INSPECTION & MAINTENANCE:
A trained person shall routinely inspect the entire construction site at least once every 7 days during activeconstruction and within 24-hours after a rainfall event greater than 0.5 inches in 24 hours. Following an inspectionthat occurs within 24-hours after a rainfall event, the next inspection must be conducted within 7 days.
All inspections and maintenance conducted during construction must be recorded within 24 hours in writing andrecords must be retained with the SWPPP. Inspection report forms are available in the Project Specifications.Inspection report forms other than those provided shall be approved by the engineer.
Where parts of the project site have permanent cover, but work remains on other parts of the site, inspectionsmay be reduced on these areas to once per month.
Where the site has permanent cover on all exposed areas and no construction activity is occurring anywhere onsite, the site must be inspected during non-frozen conditions at least once per month for 12 months. Followingthe 12th month of permanent cover and no construction activity, inspections shall be terminated untilconstruction activity resumes or notification from MPCA has been issued that erosion has been detected at thesite.
During frozen ground conditions, inspections may be suspended and shall resume within 24 hours after runoffoccurs or 24 hours prior to resuming construction activity, whichever is first.
Inspection and maintenance shall resume until another Permittee has obtained coverage under this Permit or theproject has undergone Final Stabilization, and an NOT has bee submitted.
All erosion prevention and sediment control BMPs shall be inspected to ensure integrity and effectiveness duringall routine and post-rainfall inspections. All non-functioning BMPs must be repaired, replaced, or supplementedwith functional BMPs by the end of the next business day after discovery, or as soon as field conditions allowaccess.
All perimeter control devices must be repaired, replaced, or supplemented when they become non-functional orthe sediment reaches one-half (1/2) of the height of the device. These repairs must be made by the end of thenext business day after discovery, or as soon as field conditions allow.
Temporary and permanent sediment basins must be drained and the sediment removed when the depth ofsediment collected in the basin reaches one-half (1/2) the storage volume. Drainage and sediment removal mustbe completed within 72 hours of discovery, or as soon as field conditions allow.
Surface waters, including drainage ditches and conveyance systems, must be inspected for erosion and sedimentdeposition during each inspection. All deltas and sediment deposited in drainage ways, catch basins, and otherdrainage systems shall be removed. The removal and stabilization must take place within seven (7) days ofdiscovery unless precluded by legal, regulatory, or physical access constraints. The Permittee is responsible forobtaining all applicable permits prior to conducting any work in surface waters.
Construction site vehicle exit locations must be inspected for evidence of off-site sediment tracking onto pavedsurfaces. Tracked sediment must be removed from all paved surfaces both on and off site within 24-hours ofdiscovery, or if applicable, within a shorter time to comply with the permit.
Streets and other areas adjacent to the project must be inspected for evidence of off-site accumulations ofsediment. If sediment is present, it must be removed in a manner and at a sufficient frequency to minimizeoff-site impacts.
All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reachingthe infiltration area and that equipment is not being driven across the infiltration area.
FINAL STABILIZATION:
Final Stabilization is not complete until all of the following requirements have been met:
1. All soil disturbing activities at the site have been completed and all soils are stabilized by a uniformperennial vegetative cover with a density of 70% of its expected final growth density over the entirepervious surface area, or other equivalent means necessary to prevent soil failure under erosive conditions.
2. Permanent stormwater management system is constructed, meets all requirements of the Permit, and isoperating as designed. Temporary or permanent sedimentation basins that are to be used as permanentwater quality management basins have been cleaned of any accumulated sediment. All sediment has beenremoved from conveyance systems, and ditches are stabilized with permanent cover.
3. All temporary synthetic and structural erosion prevention and sediment control BMPs have been removed.BMPs designed to decompose on site may be left in place.
4. For residential construction only, individual lots are considered finally stabilized if the structure(s) arefinished, temporary erosion protection and down gradient perimeter control has been completed and theresidence has been sold to the homeowner. Also, the "Homeowner Fact Sheet" has been provided to thehomeowner.
2040 HIGHWAY 12 EASTWILLMAR, MINNESOTA 56201
Phone: (320) 231-3956Email: [email protected]
www.bolton-menk.comR
945C2
539
1035B
106C2
1066C
414
1901B
414
1035C
392
945D2
106C2
392
106C2
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH CITY OF MONTROSE, MINNESOTA
4.3ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\SWPPP\SWPPP_3_SOILS.dwg 3/29/17 3:42 pm
FEETSCALE
0 400200
SWPPPSOILS MAP
LEGEND
PROJECT BOUNDARY
SOIL TYPE BOUNDARY
SOIL TYPE SUMMARYMap Unit
Symbol Soil Name Hyd. SoilGroup Erodibility
MUSYM MUNAME HYDGRP MUHELCL1035B CROWFORK SANDY-LOAM A PHEL1066C MALARDI SANDY-LOAM A PHEL106C2 LESTER FINE-LOAM B HEL1901B ANGUS CLAY-LOAM B PHEL
414 HAMEL FINE-LOAM C/D HEL539 KLOSSNER SILT-LOAM C/D PHEL
945C2 STORDEN CLAY-LOAM B HEL392 BISCAY-LOAM B PHEL
945D2 LESTER-STORDEN COMPLEX-LOAM B HEL
NHEL - Not Highly Erodible LandPHEL - Potentially Highly Erodible LandHEL - Highley Erodible Land
SOIL BORING#1
#1
#2
#3
#4
#9
#5
#8
#6
#7
NOTE: SOIL BORING LOGS INCLUDED IN THE PROJECT MANUAL
PROJECTBOUNDARY
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
SWPPP - OVERALL
CITY OF MONTROSE, MINNESOTA
4.4ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\CAD\SWPPP\SWPPP UPDATE\106805SWPPP_PLAN.dwg 3/29/17 3:42 pm
FEETSCALE
0 12060HORZ.
DRAINAGE DITCH
DRAINAGE DITCH
PRIVATE PROPERTY
COUNTY ROAD 12 SOUTH
ASPEN LAN
E
ARAPAHOE LANE (FUTURE)
PROPERTYLINE
PROPERTY LINE
PROPERTY LINE
PHASE II BOUNDARY
PHASE I BOUNDARY
PHASE IV BOUNDARY
PHASE III BOUNDARY
RESIDENTIAL TURF RESTORATIONSEED, FERTILIZER, AND MULCH(REVIEW SPECIFICATIONS) - ALLDISTURBED AREAS
SILT FENCE
LEGEND
INLET PROTECTION (STD DETAIL 3015)
ROCK CONSTRUCTION ENTRANCE(STD DETAIL 3005)
BIOROLL (STD DETAIL 3024)
EROSION CONTROL BLANKET(CATEGORY 3)
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
FINAL GRADING - OVERALL
CITY OF MONTROSE, MINNESOTA
5.1ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_FINAL GRADE.dwg 3/29/17 3:42 pm
FEETSCALE
0 12060HORZ.
PRIVATE PROPERTY
ARAPAHOE LANE
ASPEN LAN
E
COUNTY ROAD 12 SOUTH
DRAINAGE DITCH
DRAINAGE DITCH
PHASE II(GRADING ALREADY COMPLETED)
PHASE III
PHASE IV
SEE SHEET 3.3 FOR POND DETAIL
PROPERTY LINE
PROPERTYLINE
PROPERTY LINE
PHASE I(FUTURE PHASE)
PARKINGLOT
DOGPARK
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
FINAL GRADING - PHASE I
CITY OF MONTROSE, MINNESOTA
5.2ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_FINAL GRADE.dwg 3/29/17 4:08 pm
FEETSCALE
0 6030HORZ.
ASPEN LANE
COU
NTY
RO
AD 1
2 SO
UTH
PRIVATE PROPERTY
GRADE INTO EXISTING GROUNDELEVATION BEHIND SIDEWALK
GRADE INTO EXISTING GROUND ELEVATIONAT PROPERTY BOUNDARY
PROPERTYLINE
PROPERTYLINE
PHASE I BOUNDARY
ARAP
AHO
E LA
NE
PARKINGLOT
SOCCER/FOOTBALLFIELDS
HOCKEYRINK
DOGPARK
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
FINAL GRADING - PHASE II
CITY OF MONTROSE, MINNESOTA
5.3ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_FINAL GRADE.dwg 3/29/17 3:42 pm
FEETSCALE
0 6030HORZ.
ARAP
AHO
E LA
NE
ASPEN LANE
PRIVATE PROPERTY
GRADE INTO EXISTING GROUNDELEVATION BEHIND SIDEWALK
GRADE INTO EXISTING GROUND ELEVATIONAT PROPERTY BOUNDARY
PROPERTYLINE
PROPERTYLINE
PHASE IIBOUNDARY
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
FINAL GRADING - PHASE III
CITY OF MONTROSE, MINNESOTA
5.4ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_FINAL GRADE.dwg 3/29/17 3:42 pm
FEETSCALE
0 6030HORZ.
PRIVATE PROPERTY
GRADE INTO EXISTINGGROUND ELEVATIONAT PROPERTY BOUNDARY
PHASE III BOUNDARY
PROPERTYLINE
ARAPAHOE LANE (FUTURE)
DRAINAGE DITCH
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
FINAL GRADING - PHASE IV
CITY OF MONTROSE, MINNESOTA
5.5ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_FINAL GRADE.dwg 3/29/17 3:42 pm
FEETSCALE
0 6030HORZ.
PRIV
ATE
PRO
PERT
Y
ARAPAHOE LANE (FUTURE)
COUNTY ROAD 12 SOUTH
PHASE IV LINE
GRADE INTO EXISTINGGROUND ELEVATION
PROPERTYLINE
L:\MONTROSE\M
trs-cty11.sid
0+00
1+00
2+003+00
4+00
5+006+00
BOP
0+00
.00
PC 0
+02.
42
PT 3+53.09
PC 4+35.77
0+00
1+00
2+003+00
4+00
5+006+00
BOP
0+00
.00
PC 0
+02.
42
PT 3+53.09
PC 4+35.77
935
940
945
950
955
960
965
970
975
980
935
940
945
950
955
960
965
970
975
980
953.
8395
4.19
952.
9495
4.67
952.
2295
5.15
955.
63
956.
11
1+00
956.
59
956.
96
957.
12
957.
6295
7.08
957.
3595
6.85
2+00
956.
5595
6.41
955.
4195
5.78
953.
8795
4.95
952.
1195
3.92
950.
8195
2.73
3+00
949.
1295
1.52
947.
7895
0.31
946.
5494
9.15
945.
3894
8.13
944.
3394
7.23
4+00
943.
4594
6.47
942.
8994
5.84
942.
3294
5.34
941.
8394
4.98
941.
5994
4.75
5+00
941.
4094
4.65
941.
1594
4.68
940.
8994
4.79
940.
7594
4.90
2.41%
-6.04%
VPI 0
+00.
00EL
EV 9
53.7
1 HP 1
+66.
38EL
EV 9
57.1
3
LP 5
+25.
22EL
EV 9
44.6
4
VPI 2+02.98ELEV 958.59
CURVE LEN=170.00'E=1.80'
VPC
1+17
.98
ELEV
956
.55
VPT
2+87
.98
ELEV
953
.45
VPI 4+42.41ELEV 944.12
CURVE LEN=200.00'E=1.65'
VPC
3+42
.41
ELEV
950
.16
VPT
5+42
.41
ELEV
944
.69
© Bolton & Menk, Inc. 2017, All Rights Reserved
CITY OF MONTROSE, MINNESOTAROLLING MEADOWS REGIONAL PARK
SHEET
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
JUSTIN KANNAS03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
DATEISSUED FORREV
6.1???
PLAN & PROFILEARAPAHOE LANEH:\MTRS\W13106805\C3D\106805_PNP.dwg 3/29/2017 3:42 PM
FEETSCALEHORZ.
20 400
FEETSCALEVERT.
5 1002040 HIGHWAY 12 EAST
WILLMAR, MINNESOTA 56201Phone: (320) 231-3956
Email: [email protected]
CONNECT TO EXISTING DRAINTILE
CONNECT TO EXISTING DRAINTILE
4" PE DRAINTILE (TYP)
CLEANOUT (TYP)
4" PERF. PVCSDR 26
4" PERF. PVCSDR 26
4" CONCRETE HEADWALL
6+00
7+00
8+00
9+00
10+00
11+00
12+00
PT 1
1+69
.46
6+00
7+00
8+00
9+00
10+00
11+00
12+00
PT 1
1+69
.46
925
930
935
940
945
950
955
960
965
970
925
930
935
940
945
950
955
960
965
970
940.
5794
0.57
6+00
940.
3994
0.39
940.
4294
0.42
940.
4694
0.46
940.
5694
0.56
940.
7394
0.73
7+00
941.
1294
1.12
941.
4994
1.49
941.
7994
1.79
942.
0994
2.09
942.
4594
2.45
8+00
942.
8094
2.80
943.
2194
3.21
943.
6594
3.65
944.
2794
4.27
944.
9294
4.92
9+00
945.
3994
5.39
945.
8294
5.82
946.
1394
6.13
946.
6694
6.66
947.
4594
7.45
10+00
948.
3194
8.31
949.
2094
9.20
949.
4394
9.43
949.
2594
9.25
948.
4494
8.44
11+00
947.
4594
7.45
946.
8694
6.86
946.
3394
6.33
0.57%
HP 1
0+25
.41
ELEV
947
.35
VPI 10+78.92ELEV 947.74
CURVE LEN=170.00'E=0.65'
VPC
9+93
.92
ELEV
947
.26
VPT
11+6
3.92
ELEV
945
.61
© Bolton & Menk, Inc. 2017, All Rights Reserved
CITY OF MONTROSE, MINNESOTAROLLING MEADOWS REGIONAL PARK
SHEET
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
JUSTIN KANNAS03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
DATEISSUED FORREV
6.2???
PLAN & PROFILEARAPAHOE LANE H:\MTRS\W13106805\C3D\106805_PNP.dwg 3/29/2017 3:42 PM
FEETSCALEHORZ.
20 400
FEETSCALEVERT.
5 1002040 HIGHWAY 12 EAST
WILLMAR, MINNESOTA 56201Phone: (320) 231-3956
Email: [email protected]
CLEANOUT (TYP)
4" PE DRAINTILE (TYP)
10+00 11+00
12+00
13+00
13+56
PT 1
1+69
.46
PC 1
2+71
.45
PT 13+38.73
EOP 13+56.21
10+00 11+00
12+00
13+00
13+56
PT 1
1+69
.46
PC 1
2+71
.45
PT 13+38.73
EOP 13+56.21
930
935
940
945
950
955
960
965
970
975
930
935
940
945
950
955
960
965
970
975
948.
3194
8.31
949.
2094
9.20
949.
4394
9.43
949.
2594
9.25
948.
4494
8.44
11+00
947.
4594
7.45
946.
8694
6.86
946.
3394
6.33
945.
6094
5.60
944.
9694
4.96
12+00
944.
2694
4.26
943.
5594
3.55
943.
0394
3.03
942.
5894
2.58
942.
1294
2.12
13+00
941.
7794
1.77
941.
5394
1.53
14+00 15+00
-2.50%
VPI 1
3+06
.42
ELEV
942
.05
HP 1
0+25
.41
ELEV
947
.35
VPI 10+78.92ELEV 947.74
CURVE LEN=170.00'E=0.65'
VPT
11+6
3.92
ELEV
945
.61
© Bolton & Menk, Inc. 2017, All Rights Reserved
CITY OF MONTROSE, MINNESOTAROLLING MEADOWS REGIONAL PARK
SHEET
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
JUSTIN KANNAS03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
DATEISSUED FORREV
6.3???
PLAN & PROFILEARAPAHOE LANEH:\MTRS\W13106805\C3D\106805_PNP.dwg 3/29/2017 3:42 PM
FEETSCALEHORZ.
20 400
FEETSCALEVERT.
5 1002040 HIGHWAY 12 EAST
WILLMAR, MINNESOTA 56201Phone: (320) 231-3956
Email: [email protected]
4" PE DRAINTILE (TYP)
CLEANOUT (TYP)
4" PERF. PVCSDR 26
4" CONCRETE HEADWALL
4" PERF. PVCSDR 26
SHEETDATEBYREV.
DATELIC. NO.
DESIGNED
DRAWN
CHECKED
JLK
KBW
JJH
UTILITIES
CITY OF MONTROSE, MINNESOTA
7.1ROLLING MEADOWS REGIONAL PARKJUSTIN KANNAS
03/22/201745055
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME ORUNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEERUNDER THE LAWS OF THE STATE OF MINNESOTA.
© Bolton & Menk, Inc. 2014 , All Rights ReservedH:\MTRS\W13106805\C3D\106805_UTL.dwg 3/29/17 3:42 pm
FEETSCALE
0 6030HORZ.
PRIVATE PROPERTY
ARAPAHOE LANE
305 LF 8" PVC SAN @ 1.33%307 LF 8" PVC WMN
8' MIN. COVER F&I:1 EA 8" CAPSTA.3+12.67, 66.05' RT
F&I:1 EA 8" CAPSTA. 3+17.02, 56.18' RTINVERT= 939.29'
CONNECT TO EXISTING MANHOLE
F&I:1 EA 8" GV & BOXCONNECT TO EXISTING 8" WMN
FUTURE 6" SEWER SERVICE 471' @ 1.00%
FUTURE SERVICE:F.F. = 951.00INVERT= 944.00