Regional Planning Meetings Regional Planning Meetings 20052005
Oklahoma Airport System Plan
Presented by:
Dr. George Dresser, System Planner
Oklahoma Administrative Code Oklahoma Administrative Code Title 25Title 25
Establishes airport planning requirementsEstablishes airport planning requirements Establishes requirements for grant programEstablishes requirements for grant program Establishes OAC administrative proceduresEstablishes OAC administrative procedures
Title 25 - Oklahoma Aeronautics Commission
Chapter 1 Commission OperationsChapter 1 Commission Operations Chapter 10 Airport Zoning Act [Revoked]Chapter 10 Airport Zoning Act [Revoked] Chapter 15 OAC Grant ProgramChapter 15 OAC Grant Program Chapter 20 Aircraft Excise Tax Credit ProgramChapter 20 Aircraft Excise Tax Credit Program
Oklahoma Airport System Plan Oklahoma Airport System Plan (OASP)(OASP)
Adopted in December Adopted in December
1999 and amended in 1999 and amended in
February 2005February 2005
Guides state policy and Guides state policy and
fundingfunding
Guides FAA policy and Guides FAA policy and
fundingfunding
Guides development of Guides development of
CIPCIP
Guides airport sponsorsGuides airport sponsors
Guides classification of Guides classification of
system airportssystem airports
Continuous Continuous Airport Planning Airport Planning
ProcessProcess
Maintaining inventoriesMaintaining inventories
Forecasting aviation Forecasting aviation
activityactivity
Classifying airportsClassifying airports
Conducting public Conducting public
participation programsparticipation programs
Identifying capital Identifying capital
improvement needsimprovement needs
Preparing annual CIPPreparing annual CIP
Regional Business AirportRegional Business Airport
Serves multiple Serves multiple
communitiescommunities
Provides all weather Provides all weather
accessaccess
Provides access for Provides access for
business jetsbusiness jets
Provides full servicesProvides full services
District AirportDistrict Airport
Provides access for an Provides access for an
area not served well by area not served well by
a regional business a regional business
airportairport
Provides some servicesProvides some services
Financially capable Financially capable
airport sponsorairport sponsor
Community AirportCommunity Airport
Serves a small Serves a small
communitycommunity
Provides few or no Provides few or no
servicesservices
Financially limited Financially limited
airport sponsorairport sponsor
Airport Reference Code (ARC) Airport Reference Code (ARC) DefinitionsDefinitions
Relates airplane Relates airplane
approach speed approach speed
(operational (operational
characteristic) andcharacteristic) and
Relates airplane Relates airplane
wingspan (physical wingspan (physical
characteristic) tocharacteristic) to
An airport’s design and An airport’s design and
dimensional standardsdimensional standards
Identification of Critical Identification of Critical AircraftAircraft
What types of aircraft What types of aircraft
needs to come to your needs to come to your
airport?airport?
How often do they How often do they
need to come?need to come?
What services need to What services need to
be provided?be provided?
What is the ARC for the What is the ARC for the
most critical aircraft?most critical aircraft?
Airport Development WorksheetAirport Development Worksheet
Prepared by sponsor Prepared by sponsor
and OAC staffand OAC staff
Shows airport Shows airport
classificationsclassifications
Identifies Identifies
deficiencies from deficiencies from
standardsstandards
Identifies needed Identifies needed
capital capital
improvementsimprovements
Regional Business Airport Project Regional Business Airport Project EligibilityEligibility
Runway extension to Runway extension to
5,000 ft5,000 ft
Full parallel taxiwayFull parallel taxiway
Runway, taxiway, and Runway, taxiway, and
apron construction, apron construction,
reconstruction, or overlayreconstruction, or overlay
Lighting, beacon, Lighting, beacon,
approach aids, wind cone, approach aids, wind cone,
segmented circle, AWOSsegmented circle, AWOS
District Airport Project EligibilityDistrict Airport Project Eligibility
Runway extension to 4,000 Runway extension to 4,000
ftft
Partial or full parallel Partial or full parallel
taxiway based on activitytaxiway based on activity
Runway, taxiway, and Runway, taxiway, and
apron construction, apron construction,
reconstruction, or overlayreconstruction, or overlay
Lighting, beacon, approach Lighting, beacon, approach
aids, wind cone, and aids, wind cone, and
segmented circlesegmented circle
Community Community Airport Project Airport Project
EligibilityEligibility
Runway extension to 3,200 Runway extension to 3,200
ftft
Stub taxiwayStub taxiway
Runway, taxiway, and Runway, taxiway, and
apron crack seal, slurry apron crack seal, slurry
seal, and markingseal, and marking
Lighting, beacon, wind Lighting, beacon, wind
cone, and segmented circlecone, and segmented circle