Southwest Power Pool, Inc. SPP-ITO LG&E/KU Stakeholder Meeting Agenda
May 4, 2010 Hyatt Regency Louisville, 320 W Jefferson Louisville, KY 40202
• A G E N D A • 8:30 AM (Breakfast 7:30 – 8:30)
Dial in Access: 1-877-937-6918 Participant Code: 5038185 7:30 - 8:30 Breakfast
Introductions & Overview ……….….……………….….…Katherine Prewitt (Director, Engineering Planning)
Action Items from Fall 2009 Stakeholders ………….….…………………………Katherine Prewitt (ITO)
ITO Operations …………………………………………………………………………..Jonathan Hayes (ITO)
• Operation Data
• AFC/ATC
ITO Tariff & Large Generator Interconnection (LGI) Studies …………………………Jonathan Hayes (ITO)
• GI Queue
ITO System Impact Studies (SIS) ....……………………..………...………………………Chris Mann (ITO)
• SIS Metrics
ITO Update of 2009 TEP Review………….………………………………………..………….Chris Mann (ITO)
E.ON Expansion Plan Update………………….……………..………………….…………..Tom Seeley (E.ON)
ITO Transition ………………..………………………..……Keith Yocum (E.ON), Katherine Prewitt (ITO)
Open Forum – Stakeholder Feedback & Wrap-Up ……………………..……………Katherine Prewitt (ITO)
Adjourn/Break
Network Operating Committee (NOC)……………………………… ........ ……………..... Keith Yocum (E.ON)
Stakeholder Planning Committee (SPC) Meeting……………………………………..... Keith Yocum (E.ON)
Relationship-Based • Member-Driven • Independence Through Diversity
Evolutionary vs. Revolutionary • Reliability & Economics Inseparable
1
SPP Presentation -ITO
HELPING OUR MEMBERS WORK TOGETHERTO KEEP THE LIGHTS ON… TODAY AND IN THE FUTURE
Spring 2010 Stakeholders MeetingMay 4, 2010
Prepared by:Independent Transmission Organization
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Katherine Prewitt
Introductions & Overview
2
May 4, 2010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
2
Introductions & Overview
Logistics
Independent Transmission Organization
Logistics♦ Safety♦ Breaks/Lunch♦ Restrooms♦ Silence Cell Phones and Blackberries
3
♦ Name & Company when Speaking
Introductions
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Overview of MeetingAction Items from Fall 2009 Stakeholders
ITO Operations PresentationITO Operations Presentation
ITO Generator Interconnection (GI) Studies
ITO System Impact Studies (SIS)
ITO Update of 2009 Transmission Expansion Plan (TEP) Review
4
3
Overview of MeetingE.ON Expansion Plan Update
ITO TransitionITO Transition
Open Forum
Adjourn/Break
Network Operating Committee (NOC) Meeting
Stakeholder Planning Committee (SPC) Meeting
5
Independent Transmission Organization
Katherine Prewitt
Open Action Items from Fall 2009 Stakeholder Meeting
6
May 4, 2010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
4
Open Action ItemsSubmit requests for different statistics at future stakeholders meetings to Katherine Prewitt or Keith Yocum
Independent Transmission Organization
meetings to Katherine Prewitt or Keith Yocum
ITO will review the proposed DNR/NITS process changes and NITS Application changes based on the feedback from Stakeholders (carryover)
ITO will provide the flowgate breakdown of how many days the top five most limiting flowgate show up as a constraint
ITO will check with OATI and report to the group to see if OATI l th i ith d t il i i l
7
can resolve the issue with no details given on scenario analyzer tool
The TSR Exception File discussion
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Questions?
8
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
5
Contact SPPITO
Independent Transmission Organization
http://www.spp.org/itoGeneral Inquiries: 501-614-3200
p g
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
1
SPP Presentation -ITO
HELPING OUR MEMBERS WORK TOGETHERTO KEEP THE LIGHTS ON… TODAY AND IN THE FUTURE
Spring 2009 Stakeholders MeetingMay 4, 2010
Prepared by:Independent Transmission Organization
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
ITO – Operations
2
May 4, 2010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
2
ITO Operations
Operational Data
Independent Transmission Organization
♦ Tariff Administration
♦ Scheduling
♦ TLR Statistics
Available Transfer Capacity
♦ Daily Firm Statistics
3
♦ Hourly Non-firm Statistics
Stakeholder Questions
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Tariff Administration
Reservations
Independent Transmission Organization
♦ 4946 Total Reservations processed
♦ 4513 TSRs Confirmed
♦ 4 TSRs in Study
♦ 169 TSRs Refused or Declined
260 TSR Withd R t t d A ll d I lid Di l d
4
♦ 260 TSRs Withdrawn, Retracted, Annulled, Invalid, Displaced or Superseded
Additional reservation statistics can be found at http://www.spp.org.
3
SchedulingThe ITO processed 4658 e-Tags from October 2009 through March 2010
Independent Transmission Organization
through March 2010.
5
TLR Statistics2 TLRs were called on LGEE flowgates over the 6 month period. Please refer to the charts below for more detailed information.
6
*Note the TLR information was provided by the Reliability Coordinator (TVA).
4
Daily Firm (Day Ahead) ATC MetricsBelow are the most frequently limited (ATC ≤ 0) flowgates for Daily
Independent Transmission Organization
Firm
♦ Alcalde-Elihu 161
♦ Pineville 345/161 XFM (flo) Pineville 345/500 XFM
♦ Newtonville 138/161 XFM T3 (flo) Newtonville 138/161 XFM T5
♦ StLouis_East_Interface
G h ill S P d h 161 kV (fl ) Sh M h ll 500 kV
7
♦ Grahamville-S Paducah 161 kV (flo) Shawnee-Marshall 500 kV
Analysis of the Daily Firm ATC Metrics can be found at http://www.spp.org.
Hourly Non-Firm ATC Metrics
Below are the most frequently limited (ATC ≤ 0) flowgates for Hourly
Independent Transmission Organization
q y ( ) g yNon-Firm
♦ Newtonville 138/161 XFM T3 (flo) Newtonville 138/161 XFM T5
♦ Speed-Ghent 345
♦ Albion-Crossville 138 (flo) Newton-Xenia 345
♦ Pineville 345/161 XFM (flo) Pineville 345/500 XFM
8
♦ Livingston-Earlington North 161 (flo) Livingston-Crittenden 161
Analysis of the HNF ATC Metrics can be found at http://www.spp.org.
5
Questions
Independent Transmission Organization
9
Contact SPPITO
Email: [email protected]
Independent Transmission Organization
http://www.spp.org/itoGeneral Inquiries: 501-614-3200
p g
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
1
SPP Presentation -ITO
HELPING OUR MEMBERS WORK TOGETHERTO KEEP THE LIGHTS ON… TODAY AND IN THE FUTURE
Spring 2010 Stakeholders MeetingMay 4, 2010
Prepared by:Independent Transmission Organization
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
May 4, 2010
ITO – LGI Studies
2
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
2
Topics
Independent Transmission Organization
Update
New Agreements (Ad Hoc)
Achievements
3
Update / Coordination
♦ 9 Active requests (end of 1st Quarter)
Independent Transmission Organization
q ( Q )
♦ Public info (Oasis)
4
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
3
Public Info Update Generation
Interconnectio Nearest Town State CA In-Service Date CAPACITY (MW) Type STATUS
Independent Transmission Organization
Interconnection Number or County State CA (proposed) CAPACITY (MW) Type STATUS
LGE-GIS-2007-004
Henderson County KY LGEE 3/31/2011 640.0
Combined Cycle
RESTUDY SET TO BEGIN
LGE-GIS-2008-001 Wise County VA LGEE 12/1/2011 150.0 Wind AD HOC
LGE-GIS- 2008 – 002 Ohio County KY LGEE 8/01/2010 5.4 Small Gen
WAITING FOR QUEUE POSITION
LGE-GIS-2008-003 Sulphur KY LGEE 8/1/2010 9.0 Small Gen
WAITING FOR QUEUE POSITION
LGE-GIS-2008-004 Stanford KY LGEE 8/1/2010 5.4 Small Gen
WAITING FOR QUEUE POSITION004 Stanford KY LGEE 8/1/2010 5.4 Small Gen POSITION
LGE-GIS-2009-001 Paducah KY LGEE 5/1/2010 123.4
Pratt & Whitney
FT-8 Swift Pacs AD HOC
LGE-GIS-2009-003 Green River KY LGEE 4/1/2017 690.0
Combined Cycle
REQUEST RECEIVED
LGE-GIS-2009-004 Trimble County KY LGEE 5/1/2010 35.0
Combined Cycle REQUEST RECEIVED
LGE-GIS-2010-001 Cane Run KY LGEE 1/1/2016 690.0
Combined Cycle REQUEST RECEIVED
5
Ad Hoc Process
A tAgreements♦ SISA
♦ AD-HOC
Process Overview
6
4
Achievements
Independent Transmission Organization
Running Enfuzion ♦ New dedicated server for studies
Business Analysis♦ Bi weekly calls
AD HOC Process
7
Questions/Comments
??8
5
Contact SPPITO
Email: [email protected]
Independent Transmission Organization
http://www.spp.org/itoGeneral Inquiries: 501-614-3200
p g
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
1
SPP Presentation -ITO
HELPING OUR MEMBERS WORK TOGETHERTO KEEP THE LIGHTS ON… TODAY AND IN THE FUTURE
Spring 2010 Stakeholder MeetingMay 4, 2010
Prepared by:Independent Transmission Organization
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Chris Mann
ITO – Tariff Studies
2
May 4, 2010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
2
Outline
SIS Metrics
Independent Transmission Organization
SIS MetricsFS MetricsQuestions
3
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
SIS Metrics – 2009 Q4 and 2010 Q1
New SISA delivered 13
Independent Transmission Organization
New SISA delivered – 13New SISA executed – 11SIS Completed – 9SIS Completed Late – 0
4
SIS Avg. Completion time – 57
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
3
FS Metrics – 2009 Q4 and 2010 Q1
New FSA delivered 4
Independent Transmission Organization
New FSA delivered – 4New FSA executed – 1FS Withdrawn - 2FS Completed – 1
5
FS Completed Late – 0FS Avg. Completion time – 26
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Questions?
6
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
4
Contact SPPITO
[email protected]@ pp g
Independent Transmission Organization
http://www.spp.org/itoGeneral Inquiries: 501-614-3200
p g
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
1
SPP Presentation -ITO
HELPING OUR MEMBERS WORK TOGETHERTO KEEP THE LIGHTS ON… TODAY AND IN THE FUTURE
Spring 2010 Stakeholder MeetingMay 4, 2010
Prepared by:Independent Transmission Organization
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Chris Mann
Transmission Expansion Planning
2
May 4, 2010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
2
ITO’s Assessment of E.ON’s 2009 TEP
2009 TEP based on summer and winter peak
Independent Transmission Organization
pmodels for 2010, 2014, and 2019ITO Assessment Includes:♦ Planning Guidelines♦ Model Validation♦ Powerflow Analysis
33
♦ Operating Guidelines Assessment♦ Planned Project Assessment
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
TEP Changes
Independent Transmission Organization
Projects in 2008 TEP 168Projects Completed -9
Projects Delayed or Eliminated -98
Projects Accelerated 23
Projects Added 32
Projects in 2009 TEP 123
44
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
3
Powerflow Analysis
Contingency Analysis:
Independent Transmission Organization
♦ N-1: Loss of a single generator, line, or transformer♦ N-1-1: Loss of a generator AND line or generator AND
transformer♦ Loss of two generators
Results analyzed against criteria provided in planning guidelines♦ Thermal issues: Flow above 100 percent of applicable normal
or contingency rating
5
or contingency rating♦ Voltage issues: Voltage below 94 percent or above 105
percent nominal during normal conditions and below 90 percent and above 105 percent nominal during contingency conditions
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Powerflow Analysis Results
Started Powerflow analysis
Independent Transmission Organization
y♦ Anticipate having results at Fall
Stakeholder Meeting
♦ Final report by end of the year
6
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
4
Operating Guidelines Assessment
Operating Guidelines independently verified to:
Independent Transmission Organization
to:♦ Mitigate the problem
♦ Check for any resulting new problems
♦ Identify coordination issues
7
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Planned Project Assessment
Projects independently verified for:
Independent Transmission Organization
♦ Proper modeling
♦ Timing
♦ Problem resolution
8
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
5
2010 TEP
Request for stakeholder input on development
Independent Transmission Organization
q p pof 2010 expansion plan♦ Questions or comments may be submitted via
IssueTrak
99
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
Independent Transmission Organization
Questions?
1010
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable
6
Contact SPPITO
http://spp.issuetrak.com/Login.asp
Independent Transmission Organization
http://www.spp.org/itoGeneral Inquiries: 501-614-3200
p g
Relationship-Based • Member-Driven • Independence Through DiversityEvolutionary vs. Revolutionary • Reliability & Economics Inseparable