RELEASES FOR TYPHOON YOLANDA - FYs 2013, 2014, 2015 & 2016 as of March 31, 2016 (In pesos) No. Date FY 2013 FY 2014 FY 2015 FY 2016 NATIONAL GOVERNMENT AGENCIES 15,371,041,891 25,724,423,763 19,353,527,017 55,386,342 60,504,379,013 Department of Agriculture 1,728,720,000 1,045,569,785 58,620,000 2,832,909,785 Office of the Secretary SA, RA 10634 SARO-BMB-E- 14-0002003 4-Mar-14 Funding requirements for Reconstruction Assistance for Yolanda- affected farmers 1,045,569,785 1,045,569,785 BFAR 1,728,720,000 0 1,728,720,000 RS, RA 10352 SARO-BMB-E- 13-0021033 2-Dec-13 Procurement of 4,890 units of 5.5hp Marine Gasoline Engine as a relief assistance to the four regions affected by Typhoon Yolanda (Regions 4B, 6, 7 and 8) 23,000,000 23,000,000 UF, RA 10352 SARO-BMB-E- 13-0025942 27-Dec-13 Government Facility (BFAR Offices) 500,000,000 500,000,000 UF, RA 10352 SARO-BMB-E- 13-0025942 27-Dec-13 Provision of banca and fishing paraphernalia 800,010,000 800,010,000 UF, RA 10352 SARO-BMB-E- 13-0025942 27-Dec-13 Assistance to Aquaculture 405,710,000 405,710,000 Office of the Secretary RRP, RA 10633, C.A. SARO-BMB-E- 15-0006361 23-May-15 Repair/rehabilitation of various irrigation systems of the National Irrigation Administration (NIA) 58,620,000 58,620,000 Department of Agrarian Reform 100,000 100,000 Office of the Secretary RS, RA 10352 ABM-BMB-E-13- 0007049 29-Jan-13 Clearing operations in support to areas in Region VIII affected by typhoon Yolanda (Office building) 100,000 100,000 Department of Budget and Management 1,200,000 1,551,493 6,115,500 8,939,000 17,805,993 Office of the Secretary RS, RA 10352 SARO-BMB-C- 13-0025079 19-Dec-13 Reconstruction of office building roof 1,200,000 1,200,000 RS, RA 10633 SARO-BMB-C- 14-0005816 20-May-14 Repair of office building destroyed by Super Typhoon Yolanda 1,551,493 1,551,493 Office of the Secretary NF, RA 10651 SARO-ROVIII-15- 0018633 9-Nov-14 Payment for the 4,530 bags of rice procured from the NFA which were distributed to various municipalities/cities during relief operations after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU FUND SOURCE 1/ SARO/ABM Purpose Y E A R TOTAL RELEASES Page 1 of 39
Transcript
Page 1: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

RELEASES FOR TYPHOON YOLANDA - FYs 2013, 2014, 2015 & 2016

as of March 31, 2016

(In pesos)

No. Date FY 2013 FY 2014 FY 2015 FY 2016

NATIONAL GOVERNMENT AGENCIES 15,371,041,891 25,724,423,763 19,353,527,017 55,386,342 60,504,379,013

Department of Agriculture 1,728,720,000 1,045,569,785 58,620,000 2,832,909,785

Office of the

Secretary SA, RA 10634

SARO-BMB-E-

14-0002003 4-Mar-14

Funding requirements for

Reconstruction Assistance for Yolanda-

affected farmers 1,045,569,785 1,045,569,785

BFAR 1,728,720,000 0 1,728,720,000

RS, RA 10352

SARO-BMB-E-

13-0021033 2-Dec-13

Procurement of 4,890 units of 5.5hp

Marine Gasoline Engine as a relief

assistance to the four regions affected

by Typhoon Yolanda (Regions 4B, 6, 7

and 8) 23,000,000 23,000,000

UF, RA 10352

SARO-BMB-E-

13-0025942 27-Dec-13 Government Facility (BFAR Offices) 500,000,000 500,000,000

UF, RA 10352

SARO-BMB-E-

13-0025942 27-Dec-13

Provision of banca and fishing

paraphernalia 800,010,000 800,010,000

UF, RA 10352

SARO-BMB-E-

13-0025942 27-Dec-13 Assistance to Aquaculture 405,710,000 405,710,000

Office of the

Secretary

RRP, RA 10633,

C.A.

SARO-BMB-E-

15-0006361 23-May-15

Repair/rehabilitation of various

irrigation systems of the National

Irrigation Administration (NIA) 58,620,000 58,620,000

Department of Agrarian Reform 100,000 100,000

Office of the

Secretary RS, RA 10352

ABM-BMB-E-13-

0007049 29-Jan-13

Clearing operations in support to areas

in Region VIII affected by typhoon

Yolanda (Office building) 100,000 100,000

Department of Budget and Management 1,200,000 1,551,493 6,115,500 8,939,000 17,805,993

Office of the

Secretary RS, RA 10352

SARO-BMB-C-

13-0025079 19-Dec-13 Reconstruction of office building roof 1,200,000 1,200,000

RS, RA 10633

SARO-BMB-C-

14-0005816

20-May-14 Repair of office building destroyed by

Super Typhoon Yolanda 1,551,493 1,551,493

Office of the

Secretary NF, RA 10651

SARO-ROVIII-15-

0018633

9-Nov-14 Payment for the 4,530 bags of rice procured

from the NFA which were distributed to various

municipalities/cities during relief operations

after onslaught of Typhoon "Yolanda"6,115,500 6,115,500

By Year/Implementing Agency/Fund Source/SARO/Purpose

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Page 1 of 39

Page 2: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

DBM Reg VINF, RA 10651,

C.A.

SARO-BMB-D-

16-000702421-Mar-16

support the construction/spot concreting with

box culvert of Brgy. Cairohan-Bulabog Farm-to-

Market Road, damaged by Typhoon "Quinta"

(2012)

8,939,000 8,939,000

Department of Education 1,110,290,000 3,859,346,000 751,932,518 5,721,568,518

Office of the

Secretary RS, RA 10352

SARO-BMB-B-

13-0024624 16-Dec-13

Provision of school seats in newly

constructed classrooms (119,070

armchairs and 2,646 teacher's table and

chair) 94,905,000 94,905,000

RS, RA 10352

SARO-BMB-B-

13-0024780 16-Dec-13 Repair and rehabilitation of classrooms 974,076,000 974,076,000

RRP, RA 10633

SARO-BMB-B-

14-0006064

27-May-14

Repair and rehabilitation of classrooms 1,000,000,000 1,000,000,000

RS, RA 10352

SARO-BMB-B-

13-0005589 30-May-13 Classroom Repairs (2013 BEFF) 40,169,0004/

40,169,000

RS, RA 10352

ABM-BMB-B-13-

0001192 4-Jan-13 Temporary learning spaces - 1,140,000 4/ 1,140,000

RS, RA 10352,

C.A

issued thru a

letter authority 11-Nov-14

Construction and/or renovation Library

Hubs (Leyte Province) 2,000,000 2,000,000

RS, RA 10352,

C.A

issued thru a

letter authority 11-Nov-14

Construction and/or renovation Library

Hubs (Ormoc City) 2,000,000 2,000,000

RS, RA 10352,

C.A

issued thru a

letter authority 11-Nov-14

Construction and/or renovation Library

Hubs (Tacloban City) 2,000,000 2,000,000

RS, RA 10352,

C.A

SARO-BMB-B-

14-0009823 22-Jul-14

Construction, repair, rehabilitation,

including provision of furniture of

schools 2,300,000,0002/

2,300,000,000

RS, RA 10633

SARO-BMB-A-

14-0005514 13-May-14 Construction of new classrooms 553,346,000 553,346,000

RF, RA 10633 C.A.

SARO-BMB-B-

15-0006265 21-May-15

Repair/ rehabilitation of school

buildings 751,932,518 751,932,518

Department of Energy 0 951,079 951,079

Office of the

Secretary AA

SARO-BMB-A-

14-0004504

15-Apr-14 Payment of customs duties and internal

revenue taxes for the importation of 3

units STC: JCB Backhoe Loaders

(donation) intended for the

reconstruction assistance on Typhoon

Yolanda-affected areas

951,079 951,079

Page 2 of 39

Page 3: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

State Universities and Colleges 0 826,527,595 1,099,250,055 1,925,777,650

Repair and Reconstruction of Academic

Buildings in the ff.:

Cebu Normal

University RRP, RA 10633

SARO-ROVII-14-

0006198 29-May-14 Cebu Normal University 1,238,1781/

1,238,178

Cebu

Technological

University RRP, RA 10633

SARO-ROVII-14-

0006197 29-May-14 Cebu Technological University 14,399,5791/

14,399,579

Romblon State

University RRP, RA 10633

SARO-ROIVB-14-

0006255 2-Jun-14 Romblon State University 23,697,758 23,697,758

Palawan State

University RRP, RA 10633

SARO-ROIVB-14-

0006251 2-Jun-14 Palawan State University 241,110 241,110

Western

Philippines

University RRP, RA 10633

SARO-ROIVB-14-

0006252 2-Jun-14 Western Philippines University 2,108,310 2,108,310

Oriental Mindoro

State University RRP, RA 10633

SARO-ROIVB-14-

0006253 2-Jun-14 Oriental Mindoro State University 6,626,700 6,626,700

Occidental

Mindoro State

University RRP, RA 10633

SARO-ROIVB-14-

0006254 2-Jun-14 Occidental Mindoro State University 1,561,600 1,561,600

Iloilo State College

of Fisheries RRP, RA 10633

SARO-ROVI-14-

0006216 30-May-14 Iloilo State College of Fisheries 16,727,339 16,727,339

Northern Iloilo

Polytechnic State

College RRP, RA 10633

SARO-ROVI-14-

0006217 30-May-14

Northern Iloilo Polytechnic State

College 94,061,887 94,061,887

Western Visayas

College for

Science

and Technology RRP, RA 10633

SARO-ROVI-14-

0006218 30-May-14

Western Visayas College for Science

and Technology 5,174,366 5,174,366

Guimaras State

College RRP, RA 10633

SARO-ROVI-14-

0006220 30-May-14 Guimaras State College 1,522,500 1,522,500

Aklan State

University RRP, RA 10633

SARO-ROVI-14-

0006221 30-May-14 Aklan State University 18,443,684 18,443,684

Univ. of Antique RRP, RA 10633

SARO-ROVI-14-

0006222 30-May-14 Univ. of Antique 20,036,180 20,036,180

Capiz State

University RRP, RA 10633

SARO-ROVI-14-

0006223 30-May-14 Capiz State University 76,902,356 76,902,356

Southern Leyte

State University RRP, RA 10633

SARO-ROVIII-14-

0006299 2-Jun-14 Southern Leyte State University 6,651,813 6,651,813

Eastern Visayas

State University RRP, RA 10633

SARO-ROVIII-14-

0006300 2-Jun-14 Eastern Visayas State University 125,041,807 125,041,807

Visayas State

Universiyt RRP, RA 10633

SARO-ROVIII-14-

0006301 2-Jun-14 Visayas State Universiyt 113,801,918 113,801,918

University of

Eastern

Philippines RRP, RA 10633

SARO-ROVIII-14-

0006302 2-Jun-14 University of Eastern Philippines 4,713,365 4,713,365

Page 3 of 39

Page 4: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Northwest Samar

State University RRP, RA 10633

SARO-ROVIII-14-

0006303 2-Jun-14 Northwest Samar State University 233,808 233,808

Samar State

University RRP, RA 10633

SARO-ROVIII-14-

0006304 2-Jun-14 Samar State University 1,235,363 1,235,363

Eastern Samar

State University RRP, RA 10633

SARO-ROVIII-14-

0006305 2-Jun-14 Eastern Samar State University 217,708,830 217,708,830

Palompon

Institute of

Technology RRP, RA 10633

SARO-ROVIII-14-

0006306 2-Jun-14 Palompon Institute of Technology 21,831,564 21,831,564

Naval State

University RRP, RA 10633

SARO-ROVIII-14-

0006307 2-Jun-14 Naval State University 12,121,939 12,121,939

UPS (Tacloban

and Palo Campus) RRP, RA 10633

SARO-NCR-14-

0007231 9-Jun-14 UPS (Tacloban and Palo Campus) 39,671,955 39,671,955

TUP (Negros

Occidental

Campus) RRP, RA 10633

SARO-NCR-14-

0007233 9-Jun-14 TUP (Negros Occidental Campus) 773,686 773,686

Rehabilitation and/or repair of

damaged buildings and infrastructure of

the following SUCS:

Marinduque State

College

RRP, RA 10633,

C.A.

SARO-ROIVB-15-

0007054 3-Jun-15 Marinduque State College 486,340 486,340

Catanduanes State

University

RRP, RA 10633,

C.A.

SARO-ROV-15-

0007382 8-Jun-15 Catanduanes State University 4,374,450 4,374,450

Dr. Emilio B.

Espinosa Sr.

Memorial State

College of

Agriculture and

Technology

RRP, RA 10633,

C.A.

SARO-ROV-15-

0007891 11-Jun-15

Reconstruction/repair of buildings and

other structures damaged by Typhoon

Yolanda 14,253,400 14,253,400

Central Bicol State

University of

Agriculture

RRP, RA 10633,

C.A.

SARO-ROV-15-

0007379 8-Jun-15

Central Bicol State University of

Agriculture 6,545,053 6,545,053

Partido State

University

RRP, RA 10633,

C.A.

SARO-ROV-15-

0007377 8-Jun-15 Partido State University 3,209,010 3,209,010

Sorsogon State

University

RRP, RA 10633,

C.A.

SARO-ROV-15-

0007376 8-Jun-15 Sorsogon State University 5,973,160 5,973,160

Leyte Normal

University

RRP, RA 10633,

C.A.

SARo-ROVIII-15-

0007840 11-Jun-15 Leyte Normal University 13,294,958 13,294,958

Rehab/repair of damaged buildings and

infrastructure of Western Visayas State

University for the following campuses

Calinog Campus 21,499,435 21,499,435

Pototan Campus 8,061,005 8,061,005Western Visayas

State University

SARO-ROVI-15-

000892630-Jun-15

RRP, RA 10633,

C.A.

Page 4 of 39

Page 5: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Janiuay Campus 2,656,565 2,656,565

Lambunao Campus 23,887,435 23,887,435

CAPSU, ISCOF,

NIPSC, WVSU, ASU

and UA

RRP, RA 10633,

C.A.

ROVI-15-

0020023-28 17-Nov-15

Replacement/acquisition of laboratory

equipment and facilities damaged by

typhoon "Yolanda" in FY 2013 140,699,525 140,699,525

University of the

Philippines System

RRP, RA 10633,

C.A.

SARO-NCR-15-

0021827 3-Dec-15

Replacement/acquisition of laboratory

equipment and facilities of the University

which were damaged by Typhoon "Yolanda" 49,897,700 49,897,700

Eastern Samar State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020060 20-Nov-15

312,614,000 312,614,000

Eastern Visayas State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020061 20-Nov-15

274,586,659 274,586,659

Leyte Normal Univ.

RRP, RA 10633,

C.A.ROVIII-15-0020063 20-Nov-15

30,485,919 30,485,919

Naval State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020065 20-Nov-15

13,544,230 13,544,230

Palompon Institute of Tech

RRP, RA 10633,

C.A.ROVIII-15-0020066 20-Nov-15

19,454,000 19,454,000

Samar State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020067 20-Nov-15

1,171,600 1,171,600

So. Leyte State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020069 20-Nov-15

12,000,000 12,000,000

Visayas State Univ

RRP, RA 10633,

C.A.ROVIII-15-0020071 20-Nov-15

129,181,860 129,181,860

Cebu Technological

University

RRP, RA 10633,

C.A.

ROIVB-15-0021070 25-Nov-15

Replacement/acquisition of laboratory

equipment and facilities which were

damaged by Typhoon Yolanda as approved

by OP dated April 22, 2015 and Nov 9, 2015

for the purpose3,131,551 3,131,551

Western Philippines

University

RRP, RA 10633,

C.A.

ROIVB-15-0021185 26-Nov-15

Replacement/acquisition of laboratory

equipment and facilities which were

damaged by Typhoon Yolanda1,242,200 1,242,200

Palawan State

University

RRP, RA 10633,

C.A.

ROIVB-15-0022171 7-Dec-15

Replacement/acquisition of laboratory

equipment and facilities of PSU

damaged by Typhoon Yolanda4,500,000 4,500,000

Cebu Normal

University

RRP, RA 10633,

C.A.

ROIVB-15-0021068 25-Dec-15

Replacement/acquisition of laboratory

equipment and facilities which were

damaged by Typhoon Yolanda as approved

by OP dated April 22, 2015 and Nov 9, 2015

for the purpose 2,500,000 2,500,000

Western Visayas

State University

SARO-ROVI-15-

000892630-Jun-15

RRP, RA 10633,

C.A.

Replacement/acquisition of laboratory

equipment and facilities damaged by

Typhoon "Yolanda"

Page 5 of 39

Page 6: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

CHED 0 4,844,525 4,844,525

AA

SARO-BMB-B-

14-0010458 31-Jul-14

Rehabilitation of CHED Regional Office

Building 4,844,525 4,844,525

Department of Environment and Natural Resources 176,558,358 0 1,000,000,000 1,176,558,358

Office of the

Secretary RS, RA 10352

Various ABMs

transferred

thru Sub

Allotments

Advice (SAA)

Rehabilitation including cash for work,

financial assistance, repair and

improvement of office building 176,258,358 176,258,358

RRP, RA 10633,

C.A.

SARO-BMB-E-

15-0000796 15-Feb-15

National Greening Program - Mangrove

and Beach Forest Development

Program 400,000,0005/

400,000,000

RRP, RA 10633,

C.A.

SARO-BMB-E-

15-0012031 28-Aug-15

National Greening Program - Mangrove

and Beach Forest Development

Program 600,000,000 600,000,000

EMB RS, RA 10352

Various ABMs

transferred

thru SAA

Calamity Assistance to EMB Personnel

(Food, medicine and clothing) 300,000 300,000

Department of Finance 2,000,000,000 2,000,000,000

Office of the

Secretary AA

SARO-BMB-C-

14-0004875

25-Apr-14 To cover the requirements of Credit

Support Fund to provide assistance to

victims in areas affected by Typhoon

Yolanda funded by the Federal Republic

of Germany - Kredintanstalt Fur

Weideraufbau - Interest Differential

Fund (KFW-IDF) Grant2,000,000,000 2,000,000,000

Department of Health 1,453,350,000 500,000,000 1,953,350,000

Office of the

Secretary RS, RA 10352

Recovery and Rehabilitation Program

for Typhoon Yolanda 453,350,000 453,350,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13

Hospitals, RHUs and BHUs Health

Services 717,410,000 717,410,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Hiring of health personnel 4,000,000 4,000,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13

Maternal and Child Health and

Nutrition 27,390,000 27,390,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Prevention of communicable diseases 1,900,000 1,900,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Provision of essential medicines 6,500,000 6,500,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Medical/Surgical Assistance 20,000,000 20,000,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13

Provision of WASH (water, sanitation,

and health facilities) 115,200,000 115,200,000

Page 6 of 39

Page 7: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Provision of service vehicles 10,500,000 10,500,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13

Provision of Pneumococcal and

influenza vaccines for Senior Citizens 29,000,000 29,000,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13

Prevention of non-communicable

diseases 17,600,000 17,600,000

OS, RA 10352

SARO-BMB-B-

13-01354 27-Dec-13 Generation sets for hospitals 50,500,000 50,500,000

CF, RA 10352, C.A.

SARO-BMB-14-

0005520 13-May-14

Release of funds to cover the

construction of Phase 1 of Eastern

Visayas Regional Medical Center 500,000,000 500,000,000

Department of the Interior and Local Government 2,012,180,000 2,467,732,486 737,938,480 5,217,850,966

Office of the

Secretary OS, RA 10352

SARO-BMB-D-

13-01357 27-Dec-13 Municipal Halls 982,180,000 982,180,000

OS, RA 10352

SARO-BMB-D-

13-01357 27-Dec-13 Public Markets 582,350,000 582,350,000

OS, RA 10352

SARO-BMB-D-

13-01357 27-Dec-13 Civic Centers/Evacuation Centers 175,700,000 175,700,000

OS, RA 10352

SARO-BMB-D-

13-01357 27-Dec-13

DILG RO 8 and Project Administrative

Cost 51,170,000 51,170,000

Region VII CF, RA 10352, C.A.

SARO-BMB-D-

14-0006333 2-Jun-14

Rescue/Recovery/Relief and

Rehabilitation 290,702 290,702

RRP, RA 10633

SARO-BMB-D-

14-0006256 2-Jun-14

Recovery and rehabilitation assistance

for Typhon Yolanda 2,000,000,000 2,000,000,000

PNP OS, RA 10352

SARO-BMB-D-

13-01358 27-Dec-13 Police Stations 124,140,000 124,140,000

CF, RA 10352, C.A.

SARO-BMB-D-

14-0005552 4-Mar-14

Rescue/Recovery 262,897,450 262,897,450

BFP OS, RA 10352

SARO-BMB-D-

13-01359 27-Dec-13

Fire Prevention and Suppression

Activities 72,360,000 72,360,000

CF, RA 10352, C.A.

SARO-BMB-D-

14-0005517 4-Mar-14

Rescue/Recovery 189,092,900 189,092,900

BJMP OS, RA 10352

SARO-BMB-D-

13-01360 27-Dec-13

Supervision, Security and Control Over

District, City and Municipal 24,280,000 24,280,000

CF, RA 10352, C.A.

SARO-BMB-D-

14-00055194-Mar-14

Rescue/Recovery 15,451,434 15,451,434

DILG

OS, FY2014

DPWH

SARO-BMB-D-

14-002879729-Dec-15 Repair and rehabilitation of typhoon

Yolanda damaged facilities 737,938,480 737,938,480

Department of Justice 2,000,000 50,000,000 52,000,000

BUCOR RS, RA 10352

SARO-BMB-D-

13-0024597 16-Dec-13

Construction of two-storey prison

dormitory

(Leyte Regional Prison) 2,000,000 2,000,000

NBI SA, RA 10634

SARO-BMB-D-

14-0003944 7-Apr-14

Implementation of Disaster Victims

Identification (DVI) in areas affected by

Typhoon Yolanda 50,000,000 50,000,000

Page 7 of 39

Page 8: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Department of Labor and Employment 113,500,933 892,726,765 1,006,227,698

Office of the

Secretary RS, RA 10352

savings and

realignment

within DOLE

authority

Skills Training and Emergency

Employment in Region VII (Northern

Cebu)8,518,750 8,518,750

Emergency Employment program (EEP)

in the following Yolanda affected

municipalities:RS, RA 10352 Region VI 7,072,913 7,072,913

RS, RA 10352 Region IV-B 9,295,293 9,295,293

RS, RA 10352

savings and

realignment

within DOLE

authority Region VIII 611,835 611,835

RS, RA 10352

two letter

authorities

18 & 26

Nov-13 Region VIII 83,502,142 83,502,142

RS, RA 10352

SARO-BMB-B-

13-0022289 9-Dec-13 Region VIII 4,500,000 4,500,000

Emergency Employment Program and

Livelihood Assistance

SA, RA 10634

SARO-BMB-D-

14-0004057 8-Apr-14 Region IVB 57,493,000 57,493,000

SA, RA 10634

SARO-BMB-D-

14-0004059 8-Apr-14 Region VI 265,947,000 265,947,000

SA, RA 10634

SARO-BMB-D-

14-0004060 8-Apr-14 Region VII 88,822,000 88,822,000

SA, RA 10634

SARO-BMB-D-

14-0004061 8-Apr-14 Region VIII 203,968,000 203,968,000

SA, RA 10634

SARO-BMB-A-

14-0006796 4-Jun-14

Recovery and rehabilitation of DOLE

Region 8 and North and West Leyte

Field Offices 6,921,000 6,921,000

PRC

RS, RA 10352,

C.A

SARO-BMB-B-

14-0009176 4-Jul-14

Rehabilitation of PRC Tacloban: Rental

Cost and Purchase of Equipment 924,765 924,765

PRC

RS, RA 10352,

C.A letter authority

Rehabilitation of PRC Tacloban: Rental

Cost and Purchase of Equipment 901,000 901,000

TESDA SA, RA 10634

SARO-BMB-D-

14-0004062 8-Apr-14

Training Programs for the Yolanda

affected regions; TESDA RO VI (P81.2M),

RO VII (P40.5M), RO VIII (P146M)267,750,000 267,750,000

Page 8 of 39

Page 9: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Department of Public Works and Highways 737,000,000 2,370,492,863 1,591,646,938 46,447,342 4,745,587,143

Office of the

Secretary OS, RA 10352

SARO-BMB-A-

13-01250 13-Nov-13

Various infrastructure projects (no

details) 600,000,000 600,000,000

RS, RA 10352

realignment

within DPWH

authority

Various infrastructure projects (no

details) 137,000,000 137,000,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Rehabilitation / improvement of Iloilo –

Capiz Road (old route) 4,489,0001/

4,489,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair of Suage Bridge along Iloilo –

Capiz Road (old route), Janiuay, Iloilo 3,681,000 1/ 3,681,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair/rehabilitation of Lambunao –

INCA Road 3,786,000 1/ 3,786,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair / rehabilitation / improvement

of Barotac Nuevo – Polot-an, Bga. Bante

Road 13,480,0001/

13,480,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair / rehabilitation / improvement

of Passi – Calinog Road 2,472,0001/

2,472,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair/rehabilitation of Maasin –

Cabatuan Road 9,392,000 1/ 9,392,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Rehabilitation / improvement of Baje –

San Julian – Ngingi-an – Bingawan Road 5,413,0001/

5,413,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair / rehabilitation / improvement

of Polot-an – Pototan – Poblacion Road 3,805,0001/

3,805,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004984 30-Apr-14

Repair/rehabilitation of Pototan – Tina

– Lambunao Road 15,555,0001/

15,555,000

Rehabilitation / construction of various

flood control structures:

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

a. Canturing Flood Control along

Boundary Southern Leyte – Maasin –

Macrohon Road, Maasin City, Southern

Leyte 47,310,000 47,310,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

b. Subang Daku Flood Control along

Boundary Southern Leyte – Maasin –

Macrohon Road, Maasin City, Southern

Leyte 47,300,000 47,300,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

c. Das-ay Flood Control (Phase II)

along Junction Himay-angan – Silago –

Abuyog Road, Hinunangan, Southern

Leyte 45,990,000 45,990,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Repair of Mabuhay River Control,

K1136+127 – K1136+159, Brgy.

Mabuhay, Sison, Surigao del Norte 2,000,000 2,000,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Repair of road slip along Surigao –

Agusan Road, K1139+900 –

K1139+929.20, Sison, Surigao del Norte 200,000 200,000

Page 9 of 39

Page 10: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Restoration of DPWH Dinagat covered

court, Brgy. Don Ruben, San Jose,

Dinagat Islands 350,000 350,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Restoration of DPWH stockroom

(bodega), San Jose, Dinagat Islands 205,000 205,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of flood control / drainage

facilities along Cebu North Hagnaya

Wharf Road 31,500,000 31,500,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of flood control / drainage

facilities along Bogo – Curva – Medellin

– Daanbantayan Road 31,500,000 31,500,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Ipil San Fernando River

Control, Ipil, San Fernando, Romblon 45,950,000 45,950,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Poblacion Magdiwang

River Control, Poblacion, Magdiwang,

Romblon 35,292,000 35,292,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Ipil Magdiwang River

Control, Magdiwang, Romblon 29,246,000 29,246,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Parpagoha River

Control, San Andres, Romblon 44,471,000 44,471,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Progreso Este River

Control, Odiongan, Romblon 37,063,000 37,063,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Construction of Cambijang River

Control, Cajidiocan, Romblon 34,197,000 34,197,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Rehabilitation of flood control

structure, Brgy. Cagmanipis, Calbayog

City, Samar 14,730,000 14,730,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Rehabilitation of flood control

structure, Brgy. Payahan, Calbayog City,

Samar 16,720,000 16,720,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

Rehabilitation of flood control

structure, Brgy. Carayman, Calbayog

City, Samar 19,200,000 19,200,000

Repair/rehabilitation of Cluster I –

Regional Office Compound

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

a. RD’s Office, Legal, ICT, ARD’s Office,

Administrative, Monitoring, Cashier,

Accounting and RDMC Office 23,933,620 23,933,620

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

b. Maintenance, Construction and

COA’s Office 22,795,640 22,795,640

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 c. BAC Office 4,094,280 4,094,280

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 d. Training/PMS and Quarters 8,568,000 8,568,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 e. Multi-purpose and Kitchen 13,816,750 13,816,750

Page 10 of 39

Page 11: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 f. PJHL Office 3,012,570 3,012,570

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 g. Supply Office 2,237,200 2,237,200

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 h. Planning and Design Division 5,389,850 5,389,850

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 i. Motorpool and Canteen 8,679,690 8,679,690

Repair/rehabilitation of Cluster II –

Regional Equipment Compound

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 a. ARD’s Staff House 3,993,000 3,993,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 b. RES Staff House 3,283,000 3,283,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 c. RD’s Office Staff House 8,568,000 8,568,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

d. Multi-Purpose Building Regional

Equipment Services Compound 2,941,000 2,941,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 e. Generator Powerhouse 1,385,000 1,385,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 f. Fuel Station, RES Compound 408,000 408,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 g. Annex “A” Building, RES Compound 15,000,000 15,000,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

h. Area Base Shop Building, RES

Compound 62,000,000 62,000,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14 i. Main Building, RES Compound 14,814,000 14,814,000

CF, RA 10352, C.A.

SARO-BMB-A-

14-0004985 30-Apr-14

j. San Juanico Field Office, Staff House

and Quarters 10,000,000 10,000,000

SA, RA 10634

SARO-BMB-A-

14-0003255 24-Mar-14

Repair/maintenance of the roadside

structures and government buildings in

Cebu 140,116,700 140,116,700

SA, RA 10634

SARO-BMB-A-

14-0005400 9-May-14

Repair / rehabilitation of Candauay-

Ocoy River Control, Dumaguete City,

Negros Oriental 12,404,000 12,404,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

a. National Road

1. Side slope protection along

Mambusao – Imbug Road, Km 96+000 –

Km 97+700, intermittent section (1.5M)

2. Rehabilitation of national road along

junction national road Mianay – Duyoc

– Panitan Road, Km 0094+950 – Km

0095+000, with except

5,500,000 5,500,000

National Road

Page 11 of 39

Page 12: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

1. Repair / resurfacing of unpaved road

shoulder along Bacolod South Road,

K0096+590 – K0099+500, with

exception, Ilog, Negros Occidental 398,000 398,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

2. Repair/resurfacing of unpaved road

shoulder along Bacolod South Road,

K0102+000 – K0110+000, with

exception, Cauayan, Negros Occidental

576,000 576,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

3. Repair / rehabilitation of slope

protection at Abutment along Bacolod

South Road, K0206+601 – K0260+616,

Brgy. Culipapa, Hinoba-an, Negros

Occidental 587,000 587,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

4. Repair / resurfacing of unpaved road

surface along Kabangkalan Junction

Salong Tapi Dacongcogon Banatayan

Road, K0130+000 – K0134+807, with

exception, Kabangkalan City

946,000 946,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

5. Repair / resurfacing of unpaved road

surface along Dancalan – Candoni

Damutan Valley Road, K0132+000 –

K0147+807, with exception, Candoni

1,579,000 1,579,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

6. Repair / resurfacing of unpaved road

surface along Candoni Sipalay Road,

K0144+000 – K0154+000, with

exception, Sipalay, Negros Occidental 691,000 691,000

Flood Control

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

1. Ilog Hilabangan Flood Control, Sitio

Paril, Barangay VI, Kabangkalan City

2,606,000 2,606,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

2. Construction of grouted rip-rap along

Bacolod South Road, K0164+000 –

K0164+900, with exception, Brgy. Gil

Montilla, Sipalay, Negros Occidental

3,000,000 3,000,000

SA, RA 10634

SARO-BMB-A-

14-0005401 9-May-14

a. National Road

1. Construction of slope protection /

coconet along Bago Mambucal Road,

Negros Occidental 1,000,000 1,000,000

1. Repair / rehabilitation /

reconstruction of Daguitan Bridge and

Approach along Maharlika Highway,

Dulag, Leyte, K0941+759

Page 12 of 39

Page 13: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0005443 12-May-14

a. for pier 2 and 3

45,100,000 45,100,000

SA, RA 10634

SARO-BMB-A-

14-0005443 12-May-14

b. abutment only

5,500,000 5,500,000

2. Repair / rehabilitation / construction

of Hilataban Bridge along Burauen-

Albuera Road, Burauen, Leyte

SA, RA 10634

SARO-BMB-A-

14-0005443 12-May-14

a. Bridge to Regional Office

31,900,000 31,900,000

SA, RA 10634

SARO-BMB-A-

14-0005443 12-May-14

b. Box Culvert - Central Office

4,000,000 4,000,000

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

1. Repair/rehabilitation of roadside

structure along Toledo - Naga - Uling

Road, K0037+020 1,573,660 3/ 1,573,660

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

2. Repair/rehabilitation of roadside

structure along Cebu - Toledo - Wharf

Road, K0031+800 437,0153/

437,015

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

3. Repair/rehabilitation of roadside

structure along Cebu - Toledo - Wharf

Road, K0045+250 938,7443/

938,744

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

4. Repair/maintenance of roadside

structure/road shoulder along Toledo -

Tabuelan - San Remegio Road,

K0050+485 139,892 139,892

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

5. Repair/maintenance of road shoulder

along Toledo - Tabuelan - San Remegio

Road, K0067+400 - K0068+860

94,900 94,900

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

6. Repair/maintenance of roadside

structure/road shoulder along Cebu -

Balamban Trancentral Road, K0036+000

- K0042+600 379,312 379,312

Bridges

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

1. Repair/rehabilitation of scoured

bridge footing and Piers 3 and 4 at Sangi

Bridge, Toledo City, Cebu 724,972 724,972

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

2. Repair/rehabilitation of scoured

bridge footing at Buanoy Bridge, Pier 4,

Buanoy, Balamban, Cebu 459,660 459,660

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

3. Repair/rehabilitation of scoured

bridge footing at Pondol Bridge, Pier 1,

Pondol, Balamban, Cebu 309,245 309,245

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

4. Repair/rehabilitation of Caridad

Bridge - Abutment "B", Brgy. Caridad,

Tuburan, Cebu 474,825 474,825

Page 13 of 39

Page 14: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

5. Repair/rehabilitation of Campanga

Bridge - Abutment "B" Brgy. Campanga,

Barili, Cebu 759,000 759,000

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

6. Repair/rehabilitation of Ylaya Bridge

II - Abutment "B", Brgy. Ylaya, Barili,

Cebu 539,367 539,367

Flood Control

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

1. Repair/maintenance of Sta. Ana

revetment, Brgy. Sta. Ana, Barili, Cebu

1,300,000 1,300,000

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

1. Rehabilitation/reconstruction of

slope protection structure along

Santander - Barili - Toledo Road,

K0149+980 and K0163+200, Samboan

and Malabuyoc Sections 8,400,000 8,400,000

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

2.

Rehabilitation/reconstruction/reclamati

on of shore protection structures of

Poblacion, Boljoon, Cebu 43,930,000 43,930,000

SA, RA 10634

SARO-BMB-A-

14-0005860 21-May-14

3. Widening of critical/landslide section

along Natalio Bacalso Avenue,

K0101+780 - K0101+960, Boljoon, Cebu

45,260,000 45,260,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

1. Repair/rehabilitation of damaged

lined canal along Tacloban - Baybay -

South Road 2,490,000 2,490,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

2. Repair/rehabilitation of damaged

guardrails and other signages of

national road along Tacloban - Baybay -

South Road 2,080,000 2,080,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

3. Repair/restoration of damaged/drop

off pavement of national road along

Bato - Bontoc Road, K1111+900,

K1112+300, K1112+500, K1113+200,

K1113+900, K1114+900

4,670,000 4,670,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

4. Repair/restoration of eroded

shoulder/washed shouldering materials

of national road along Tacloban -

Ormoc - Baybay - Southern Leyte

Boundary Road, K1052+100,

K1063+100, K1075+300, K1097+300,

K1054+300, K1074+200, K1088+100,

K1098+400, K1112+200, K1115

7,630,000 7,630,000

Page 14 of 39

Page 15: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

5. Repair/restoration of damaged slope

protection of national road and bridges

along Lapaz - Javier - Bito Road,

K0962+000 - K0971+524 at Pinocawan

Bridge, Rizal Bridge 2,800,000 2,800,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

6. Rehabilitation of Bangkerohan Flood

Control Structure along Ormoc - Baybay

- Southern Leyte Boundary Road,

Hilongos Leyte 7,430,000 7,430,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

7. Rehabilitation/repair/improvement

of Mahaplag River Flood Control,

Kinawit, Poblacion, Mahaplag, Leyte

17,120,000 17,120,000

SA, RA 10634

SARO-BMB-A-

14-0005856 21-May-14

8. Rehabilitation of Baybay seawall,

Baybay, Leyte 6,460,000 6,460,000

SA, RA 10634

SARO-BMB-A-

14-0005863 21-May-14

Repair/Rehabilitation of spillway

conecting Barangays Banban,

Arebasore, and Barras 7,910,000 7,910,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

1. Repair/rehabilitation/construction of

Bulwang Revetment Wall, Numancia,

Aklan 19,599,000 19,599,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

2. Repair/rehabilitation/construction of

Kalibo Revetment Wall, Kalibo, Aklan

19,599,000 19,599,000

Construction/repair/rehabilitation of:

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

1. Iloilo Capiz Road (new route), Km

105+100 - Km 122+568, Capiz 14,146,000 14,146,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

2. IloiloEast Coast Capiz Road, Km 106+(-

279) - Km 171+773, Capiz 21,903,000 21,903,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

3. Roxas City Boundary Panitan Bailan

Road, Km 112+(-267) - Km 122+739,

Capiz 11,303,000 11,303,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

4. Maayon Junction Bailan Road, Km

121+(-465) - Km 131+068, Capiz 7,957,000 7,957,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

5. Junction National Road Cuartero -

Mianay-Duyoc-Calaan- Panitan Road,

Km 103+(-128) - Km110+757 10,358,000 10,358,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

6. Junction National Road Cuartero -

Maindang - Tapulang Road, Km 115+(-

394) - Km 120+357, Capiz 6,883,000 6,883,000

Implementation of various

infrastructure projects :

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

1. Construction of side slope protection

along Iloilo - Capiz Road (new route),

Km 68+800 - Km 100+100 (intermittent

section) 6,770,000 6,770,000

Page 15 of 39

Page 16: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

2. Construction of side slope protection

along Iloilo - Capiz Road (old route), Km

92+000 - Km 95+200 with exception

6,453,000 6,453,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

3. Road upgrading/rehabilitation along

Junction National Road Ayuyan -

Tinaytayan Road, Km 92+000 - Km

95+180 with exception 7,942,000 7,942,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

4. Side slope protection along Capiz -

Aklan Road, Km 326+000 - Km 346+000

(intermittent section) 6,777,000 6,777,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

5. Side slope protection along Sigma -

Mambusao - Jamindan Road, Km

86+000 - Km 101+800 (intermittent

section) 7,101,000 7,101,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

6. Side slope protection along Junction

Cuartero - Maindang - Tapulang -

Maayon Road, Km 89+000 - Km

101+800 (intermittent section)

6,983,000 6,983,000

Implementation of various

infrastructure projects

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

1. Concreting with slope protection

works along Bacolod South Road,

K0207+900 - K0208+356, Barangay

Culipapa, Hinob - an, Negros Occidental

8,195,000 8,195,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14

2. Construction of slope protection

works along Bacolod South Road,

Barangay Maricalum, Sipalay City

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14 a. K0170+400 - K0170+420 3,781,000 3,781,000

SA, RA 10634

SARO-BMB-A-

14-0006022 26-May-14 b. K0171+300 - K0171+326 2,079,000 2,079,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

1.      Construction of Slope Protection

along DM-Junction-Legaspi-Sto.

Domingo-Tabaco-Tiwi-Camarines Sur

Boundary Road, Tiwi, Albay KO574+945-

575+219 & KO575+300-575+480 16,050,000 1/16,050,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

2.      Construction of Slope Protection

along DM Junction-Legaspi- Sto

Domingo-Tabaco-Tiwi-Camarines Sur

Boundary Road, Tiwi, Albay KO577+400-

577+582 & KO578+600-579+140 16,000,000 1/ 16,000,000

Page 16 of 39

Page 17: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

3.      Construction of Slope Protection

along DM Junction-Legaspi- Sto

Domingo-Tabaco-Tiwi-Camarines Sur

Boundary Road, Tiwi, Albay KO580+200-

580+301 & KO581+700-581+791 15,280,000 1/15,280,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

4.      Basud River Control, Basud, Sto

Domingo, Albay (Sta. 0+000 - Sta.

0+250) 12,760,000 1/12,760,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

5.      Tuliw River Control, Tuliw,

Malinao, Albay (Sta. 0+000 - Sta. 0+113) 12,435,000 1/12,435,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

6.      Basud River Control, Labanon,

Bacacay, Albay (Sta. 0+000 - Sta. 0+113) 13,500,000 1/13,500,000

SA, RA 10634

SARO-BMB-A-

14-0006246 2-Jun-14

7.      Repair/Improvement of Line Canal

along DMT-Junction-Legaspi-Sto

Domingo-Tabaco-Tiwi-Camarines Sur

Boundary (Cararayan Section), Tiwi,

Albay 4,125,000 1/4,125,000

SA, RA 10634

SARO-BMB-A-

14-0006794 4-Jun-14

Repair/rehabilitation of Llorente River

Flood Control (Phase II), Llorente

Eastern Samar 28,880,000 28,880,000

SA, RA 10634

SARO-BMB-A-

14-0007241 10-Jun-14

1. Construction of Arpili Revetment,

Balamban, Cebu, K0055+301 19,030,000 19,030,000

SA, RA 10634

SARO-BMB-A-

14-0007241 10-Jun-14

2. Construction of Buanoy Revetment,

Balamban, Cebu, K0059+115 37,750,000 37,750,000

SA, RA 10634

SARO-BMB-A-

14-0007241 10-Jun-14

3. Construction of Barili Revetment,

Barili, Cebu, K0060+800 19,030,000 19,030,000

SA, RA 10634

SARO-BMB-A-

14-0007241 10-Jun-14

4. Construction of Suba Revetment,

Tuburan, Cebu,K0096+309 37,750,000 37,750,000

SA, RA 10634

SARO-BMB-A-

14-0009054 2-Jul-14

1. Loading of hauling GI sheets, various

affected municipalities in Leyte and

Samar 2,656,426 2,656,426

SA, RA 10634

SARO-BMB-A-

14-0009054 2-Jul-14

2. Digging/excavation of grave sites,

Tacloban City, Tanauan and Palo City 32,967 32,967

SA, RA 10634

SARO-BMB-A-

14-0009054 2-Jul-14

3. Debris collection and clean-up

operation, Tacloban City and Palo, Leyte 12,234,390 12,234,390

SA, RA 10634

SARO-BMB-A-

14-0009054 2-Jul-14

4. Immediate repair/rehabilitation of

damaged Tacloban DZR Airport,

Tacloban City 886,908 886,908

SA, RA 10634

SARO-BMB-A-

14-0009054 2-Jul-14

5. Clearing of the following waterways

including disposal of debris: 5,080,000 5,080,000

Page 17 of 39

Page 18: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

a. Clearing of waterways along

Burayan Creek

b. Clearing designated site of

temporary shelters at Brgy. Abucay

government Center, Palo, leyte and

Brgy. Caiban along Maharlika Highway

c. Clearing/disposal of debris within

area equipment services compund

d. Clearing of Astrodome

e. Clearing/cleaning activities at

Daniel Z. Romualdez (DZR) Airport

Terminal Building

f. Clearing debris at Deped office

compund

g. Clearing/ leveling of disposed

debris at designated dump sites

h. Clearing of debris/ logs at Daguitan

Bridge

SA, RA 10634

SARO-BMB-A-

14-0009055 2-Jul-14

1. Rehabilitation/reconstruction of

drainage along Picas-San Jose-daniel Z.

Rodriguez (DZR) Airport, Tacloban City 1,363,000 1,363,000

SA, RA 10634

SARO-BMB-A-

14-0009055 2-Jul-14

2. Emergency

repair/rehabilitation/construction of

flood control structure along Tanghas -

Lirang Creek and drainage structures,

Tacloban City 14,420,000 14,420,000

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

1. Rehabilitation/Construction of Road

Slip along Burauen-Mahagnao Road,

Burauen, Leyte, K0988+200 and

K0989+800 18,292,370 18,292,370

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

2. Repair/rehabilitation of Dulag

Seawall, Brgy. San Jose / Luan, Dulag,

Leyte, K0936+685 – K0936+935 19,220,877 19,220,877

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

3. Repair/rehabilitation/reconstruction

of Bil-at Seawall along Maharlika

Highway, Dulag, Leyte, K0934+816 –

K0935+000 19,286,923 19,286,923

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

4. Repair/rehabilitation/reconstruction

of damaged slope

protection/revetment wall along Jaro-

Dagami-Burauen-La Paz Road, Burauen,

Leyte, K0976+580 – K0976+603 6,041,686 6,041,686

Page 18 of 39

Page 19: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

5. Rehabilitation/construction of box

culvert (Malitbog River) along Burauen-

Albuera Road, Burauen, Leyte,

K0976+027.90 8,613,664 8,613,664

SA, RA 10634

SARO-BMB-A-

14-0009167 4-Jul-14

6. Construction of Double Barrel Box

Culvert along Burauen-Mahagnao Road,

Burauen, Leyte, K0985+800 7,001,060 7,001,060

SA, RA 10634

Implementation of various

infrastructure projects

SA, RA 10634

SARO-BMB-A-

14-0009537 15-Jul-14

1. Fabrication/ installation of Tetrapods

along Bato Flood Control, K0939+500 -

K0940+365 along Borongan-Guiuan

Road 44,540,000 44,540,000

SA, RA 10634

SARO-BMB-A-

14-0009537 15-Jul-14

2. Fabrication/ installation of Tetrapods

along Bato Flood Control, K0993+000 -

K0993+800 along Borongan-Guiuan

Road 44,975,000 44,975,000

SA, RA 10634

SARO-BMB-A-

14-0009537 15-Jul-14

3. Fabrication/ installation of Tetrapods

along Cabay - Balangkayan Flood

Control, K0967+200 -K0968+000 along

Borongan-Guiuan Road 44,935,000 44,935,000

SA, RA 10634

SARO-BMB-A-

14-0009922 23-Jul-14

Repair/rehabilitation of Somoje Flood

Control, Somoje, San Juan, Southern

Leyte 5,672,000 5,672,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Basic housing assistance in Regions VI

and VIII 58,800,000 58,800,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Additional Basic Housing assistance in

Regions VI and VIII 88,200,000 88,200,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Roofing of various school buildings in

Region VIII 28,519,470 28,519,470

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Major repair of the 2-storey DBM

Regional Office Building in Region VIII 3,138,079 3,138,079

Construction/restoration of

infrastructure projects:

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Construction of single box culveret,

Baras, Palo, Leyte 1,487,302 1,487,302

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Restoration of Daniel Z. Romualdez

Airport - San Jose Baras Road,

Candahug Section, Palo Leyte 45,521,166 45,521,166

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Construction of Payapay Bridge

Approach along San Jose Manlurip

Road, Candahug, Palo, Leyte 3,894,683 3,894,683

Repair/rehabilitation projects in Eastern

Samar

Page 19 of 39

Page 20: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Repair/rehabilitation/improvement of

Bato Flood Control along Borongan-

Guian Road, K0939+500-K0940+365,

Borongan City 46,117,000 46,117,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Repair/rehabilitation/improvement of

Suribao Flood Control along Borongan-

Guian Road, K0951+000-K0951+716,

Borongan City 13,826,000 13,826,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Repair/rehabilitation/improvement of

Cabay, Balangkayan Flood Control along

Borongan-Guian Road, K0967+200-

K0968+000, Balangkayan 9,050,000 9,050,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Repair/rehabilitation/improvement of

Hernani Flood Control along Borongan-

Guian Road, K0993+000-K0993+800,

Hernani 46,632,000 46,632,000

SA, RA 10634

SARO-BMB-A-

14-001173 11-Aug-14

Repair/rehabilitation/improvement of

eroded shoulder along Junction

Buenavista-Lawaan Road, K0995+680;

K0953+990-K0954+600; K0955+300-

K0955+620 18,905,000 18,905,000

NF, RA 10633

SARO-BMB-A-

14-0015815 14-Oct-14

Repair/rehabilitation of Borongan

Seawall along Wright/Taft-Borongan

Road, K0920+350-K0920+800,

Borongan, Eastern Samar 41,400,000 41,400,000

NF, RA 10633

SARO-BMB-A-

14-0015815 14-Oct-14

Repair/rehabilitation of Brgy. Sto. Nino

Seawall along Wright/Taft-Borongan

Road, K0889+100-K0889+700, Sulat,

Eastern Samar 41,600,000 41,600,000

NF, RA 10633

SARO-BMB-A-

14-0015815 14-Oct-14

Repair/rehabilitation of Nabuangan

Seawall along Wright/Taft-Borongan

Road, K0901+500-K0902+100, Sulat,

Eastern Samar 39,900,000 39,900,000

NF, RA 10633

SARO-BMB-A-

14-0015815 14-Oct-14

Repair/rehabilitation of Revetment,

Barangay 6 Poblacion, San Julian along

Wright/Taft-Borongan Road, K0918+800-

K0919+100, San Julian, Eastern Samar 9,800,000 9,800,000

NF, RA 10633

SARO-BMB-A-

14-0015815 14-Oct-14

Repair/rehabilitation of Barangay

Pagbabangan Seawall, K0920+350-

K0920+800, San Julian, Eastern Samar 35,600,000 35,600,000

NF, RA 10633

SARO-BMB-A-

14-00127756 29-Dec-14

Construction of access road, Pago

Resettlement Site, Pago, Tanauan, Leyte 2,000,000 2,000,000

Page 20 of 39

Page 21: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Mindoro

Occidental DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/restoration of Mindoro West

Coastal Road, Barokan-Sahing Section,

K0306+770 – KO307+010, Barangay Sta.

Lucia, Sablayan 24,200,000 24,200,000

Mindoro Oriental

DEO

Repair/restoration of Calapan North

Road

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

a. Km 40+020-Km 40+039.80, Puerto

Galera 1,447,000 1,447,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

b. Km 41+800 – Km 41+812.80 Puerto

Galera 955,000 955,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

c. Km 45+100, Puerto Galera

5,000,000 5,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

d. Km 22+900, San Teodoro

1,500,000 1,500,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

e. Km 40+500, Puerto Galera

2,000,000 2,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

f. Km 58+150, Puerto Galera

1,500,000 1,500,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

g. Km 59+850, Puerto Galera

600,000 600,000

Southern Mindoro

DEO

Repair/restoration of Calapan South

Road

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

a. K0115+275.60 – K0115+295.10

248,000 248,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

b. K0115+343.70 – K0115+387.90

558,500 558,500

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

c. K0116+414.40 – K0116+428.40

377,500 377,500

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

d. K0119+143.50 – K0119+225.40

866,000 866,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

e. K0160+540.20 – K0160+519.20

536,000 536,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

f. K0169+642 – K0169+682

476,500 476,500

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

g. K0170+788.70 – K0170+820

381,000 381,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

h. K0171+807.60 – K0171+847.60

472,000 472,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

i. K0116+167.40 – K0116+179.90

346,000 346,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/maintenance of Orcunoma River

Control (Upstream), Bongabong2,300,000 2,300,000

Repair/restoration of Mindoro

Oriental/Occidental East Coast Road

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

a. K0194+740.20 – K0194+768

298,100 298,100

Page 21 of 39

Page 22: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

b. K0195+073.30 – K0195+132.18

564,000 564,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

c. K0198+242.30 – K0198+257.30

178,200 178,200

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/restoration of Bansud Seawall,

Sta. 0+260 – Sta. 0+305 1,700,000 1,700,000

Palawan 3rd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Roadside Structure,

K0044+500 – K0044+516, Junction

Puerto Princesa South Road (PPSR) –

Napsan -Apurawan Road, Barangay

Napsan, Puerto Princesa City 1,636,500 1,636,500

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of drainage Structures,

K0213+300, K-0212+500 & K0207+320,

Aramaywan-Berong-Puerto Princesa

Road, Aborlan, Palawan

993,500 993,500

Romblon DEO

Repair/rehabilitation of Damaged

Slope/Shore Protection along Tablas

Circumferential Road (Naabang

Section)RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

a. K0080+480-K0081+032.50

19,000,000 19,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

b. K0081+100 – K0081+397.50

17,000,000 17,000,000

Repair/maintenance of Damaged Road

Sections along Tablas Circumferential

RoadRRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

a. K0040+800 – K0040+900

8,704,000 8,704,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

b. K0041+200 – K0041+250

9,081,000 9,081,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

c. K0042+050 – K0042+085

2,608,000 2,608,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

d. K0044+950 – K0044+975

1,243,000 1,243,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

e. K0110+060 – K0110+080

797,000 797,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

f. K0007+150 – K0007+200

2,817,000 2,817,000

Albay 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Legaspi City-

Punta de Jesus Road, K0552+000 –

K0574+000, Manito, Albay 2,680,000 2,680,000

Catanduanes DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/maintenance of Line Canal along

Caramoran-San Andres Road Section,

Tubli, Caramoran, Catanduanes

(K0126+800) 2,000,000 2,000,000

Page 22 of 39

Page 23: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Emergency Repair/maintenance of

Slope Protection along Viga-Bagamanoc

Road Section, Del Pilar, Viga,

Catanduanes (K0047+300) 500,000 500,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

WC-II Resurfacing Unpaved Road

Surface along Baras-Gigmoto-Viga Road

Section with Exception, San Vicente-

Sioron-Sicmil, Catanduanes 182,000 182,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

WC-II Resurfacing Unpaved Road

Surface along Baras-Gigmoto-Viga Road

Section with Exception, Tinago-Soboc-

Buenavista, Catanduanes 280,000 280,000

Antique DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Iloilo-Antique Road,

Paliwan Bridge approach (South

Approach), Barangay Cubay North,

Bugasong, Antique 12,071,000 12,071,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Bugasong-Valderama

Road, Barangay Ilaures, Bugasong,

Antique 19,140,000 19,140,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Odion-Sibalom-San

Remegio-Leon Road, Barangay

Aningalan, San Remigio, Antique 6,521,000 6,521,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/maintenance of DPWH

Office/Warehouse Building, Antique

DEO, San Jose, Antique 172,000 172,000

Iloilo 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of slope protection and

concreting of shoulder along Passi-

Calinog road, K0050+482 – K0051+232

with exception, Iloilo 10,070,000 10,070,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Upgrading/concreting of Balabag-

Maquina-Cayos-Patlad Road including

slope protection, K0284+865 –

K0289+886 with exception, Iloilo80,120,000 80,120,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of Slope Protection and

Concreting of Shoulder along Polot-an-

Pototan-Poblacion Road, K0279+(-777)

– K0279+250 with exceptions, Iloilo2,710,000 2,710,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of Slope Protection and

Concreting of Shoulder along Iloilo-

Capiz road (New Route), K0042+000 –

K0057+300 with exceptions, Iloilo 13,390,000 13,390,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of Slope Protection and

Concreting of Shoulder along Iloilo East

Coast-Capiz Road, K0280+400 –

K02822+500 with exceptions, Iloilo 8,230,000 8,230,000

Page 23 of 39

Page 24: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of Slope Protection of

Abutments A & B of Punong Grande

Bridge along Dueñas-Diversion Road,

K0045+631, Iloilo; L =22.00 lm 1,311,000 1,311,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/maintenance of Maquina Bridge

Approach along Balabag-Maquina-

Cayos-Patlad Road, K0287+163, Iloilo; L

= 29.80 lm 2,840,000 2,840,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Balabag River Control,

Sta. 1+120 – Sta. 0+336, Iloilo; L = 0.216

km 26,180,000 26,180,000

Aklan DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation/construction of

Tambak Seawall, New Washington,

Aklan 51,626,000 51,626,000

Iloilo 4th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Slope Protection and

Drainage along Cabatuan-New Lucena-

Banga-Bante Road, New Lucena, Iloilo1,404,000 1,404,000

Iloilo 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation / reconstruction /

replacement / retrofitting of Baje

Bridge, Barangay Calinog, Calinog, Iloilo18,296,000 18,296,000

Iloilo 3rd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Passi-Sara

Road, K0069+(-345)-K0097+750

(Intermittent Section), Iloilo 4,988,000 4,988,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Ajuy-

Conception Road, K0215+(-097)-

K0220+925, Iloilo 4,916,000 4,916,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Concepcion-

San Dionisio Road,K0219+381-

K0220+161,Iloilo 7,650,000 7,650,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Iloilo East Coast-

Capiz Road, K0171+(-251) -K0150+669

(Intermittent Section), Iloilo7,747,000 7,747,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of San Dionisio-

Capinang Road, K0198+(-880) -

K0203+039 (Intermittent Section), Iloilo997,000 997,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Sara-San

Dionisio Road, K0203+(-350)-K0207+598

(Intermittent Section), Sara and San

Dionisio, Iloilo 998,000 998,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Iloilo East Coast

Estancia Wharf, K0182+965-K0183+408,

Iloilo 9,721,000 9,721,000

Page 24 of 39

Page 25: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Sara-

Concepcion Road, K0217+720-

K0218+105, Concepcion Iloilo 1,995,000 1,995,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Balasan-Carles

Road, K0174+(-099)-K0186+455,

(Intermittent Section), Balasan and

Carles, Iloilo 1,995,000 1,995,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Barotac Viejo-

San Rafael Road, K0075+(-801)-

K0091+1000, (Intermittent Section),

Barotac Viejo and San Rafael, Iloilo 1,995,000 1,995,000

Capiz 1st DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Planning,

Accounting, Construction Section and

Motor Pool at the DPWH Compound,

Km I, Roxas City 4,852,851 4,852,851

Capiz 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Reconstruction/rehabilitation of DPWH

Main Building Office, Barangay

Consolacion, Dumalag, Capiz2,500,000 2,500,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction of Slope Protection along

Junction North Road Dumarao-San

Rafael Road, Km 82+500 –Km 83+0001,500,000 1,500,000

Cebu 3rd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Arpili revetment along

Toledo-Tabuelan-San Remegio Road,

K0055+300 – K0055+389.19 1,200,000 1,200,000

Tacloban City DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair / rehabilitation / reconstruction

of drainage system along Magsaysay

Boulevard, Tacloban City K0909+295 –

K0910+244, with exception19,620,000 19,620,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation / reconstruction of Shore

Protection along Magsaysay Boulevard,

Tacloban Cty, K0909+390 - K0909+430,

K0909+867 - K0909+878, K0910+075 -

K0910+240

40,000,000 40,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Flood Control

Structure along Burayan River, Tacloban

City 3,682,000 3,682,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Flood Control

Structure along Esperas Avenue

(Magallanes Old Road), Tacloban City 28,560,000 28,560,000

Leyte 1st DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Construction / rehabilitation of Flood

Control along Daang Maharlika Highway

K0922+527 – K0922+927, Barangay Sto.

Niño, Tanauan, Leyte 4,530,000 4,530,000

Page 25 of 39

Page 26: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Leyte 1st DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Tigbao-Pulak-Sta. Fe

Road (Road ID S00039LT) Road Slip and

Slope Protection, San Isidro, Sta. Fe,

Leyte K0910+369- K0910+900 18,100,000 18,100,000

Leyte 1st DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Critical Section (Road

Slip) along Palo-Carigara-Ormoc Road,

(S00034LT) K0935+182 – K0935+332,

Barangay Binongtoan, Alangalang, Leyte30,000,000 30,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Dapdap Flood Control

along Palo-Carigara-Ormoc Road,

(S00034LT), K0928+673 Bridge ID

(B00047LT), Barangay Dapdap,

Alangalang, Leyte 1,960,000 1,960,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Lingayon Flood

Control along Palo-Carigara-Ormoc

Road, (S00034LT), K0927+227, Bridge ID

(B00046LT), Lingayon, Alangalang, Leyte2,000,000 2,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Restoration of Palo-East by Pass Road,

Salvacion-Baras, Palo, Leyte, Newly

Constructed Road, (K0917+763.3 –

K0917+863.3), Barangay Baras, Palo,

Leyte 4,251,900 4,251,900

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Restoration of Revetment Works, San

Joaquin Flood Control, K0916+911

(Abutment A, Cogon Section), Barangay

Cogon, Palo, Leyte1,739,200 1,739,200

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Candahug

Shoreline Protection along Baras-

Candahug-DZR Airport Road,

(K0916+031 – K0916+431), Candahug,

Palo, Leyte 23,916,000 23,916,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation/reconstruction of

Kaurangan Flood Control (K0917+000 –

K0919+000), Palo, Leyte

39,323,600 39,323,600

Leyte 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair / rehabilitation / reconstruction

of Damaged PCCP and Slope

Protection/Revetment Wall along Jaro-

Dagami-Burauen-La Paz Road, Burauen,

Leyte, K0975+966 – K0976+1067,300,000 7,300,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation / reconstruction of

Spillway (Matagara River) along

Burauen-Albuera Road, Burauen, Leyte,

K0991+585 3,000,000 3,000,000

Page 26 of 39

Page 27: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Leyte 3rd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Roadslip along Calubian-San

Isidro-Tabango-Villaba-Palompon Road,

K1014+249 – K1014+530, San Isidro

7,505,000 7,505,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Roadslip along Calubian-San

Isidro-Tabango-Villaba-Palompon Road,

K1015+800 – K1015+900, San Isidro

2,045,000 2,045,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Roadslip along Calubian-San

Isidro-Tabango-Villaba-Palompon Road,

K1026+200 – K1026+300, Tabango

3,574,000 3,574,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Roadslip along Calubian

Junction-San Isidro-Tabango-Villaba-

Palompon Road (installation of RCBC),

K1039+500, Villaba 1,394,000 1,394,000

Leyte 4th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation/reconstruction of Critical

Section along National Roads, Road Slip

along Palo-Carigara-Ormoc Road,

K1001+870 – K1001+900 1,360,000 1,360,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Tugbong Flood Control

along Libunao-Matag-ob-Palompon

Road, K0992+67 5,000,000 5,000,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Bao Flood Control

along Palo-Carigara-Ormoc Road,

K0908+616 6,600,000 6,600,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Palanas Flood Control

along Ormoc-Baybay-Southern Leyte

Boundary Road, K01031+710

9,360,000 9,360,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Calingatnan Flood

Control along Ormoc-Baybay-Southern

Leyte Boundary Road, K01028+0884,690,000 4,690,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Bacan Flood Control

along Ormoc-Baybay-Southern Leyte

Road, K01034+265 4,230,000 4,230,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Sibugay Flood Control

along Ormoc-Baybay-Southern Leyte

Boundary Road, K01027+113

1,460,000 1,460,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of Bagongbong Flood

Control along Ormoc-Baybay-Southern

Leyte Boundary Road, K01018+334

2,310,000 2,310,000

Page 27 of 39

Page 28: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation of DPWH Office Building,

Leyte 4th District Engineering Office,

Barangay Punta, Ormoc City4,596,000 4,596,000

Northern Samar

2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/improvement of Bantayan River

Control along Catarman (Boundary) -

Rawis Road, Bantayan-San Roque

section, K0768+100 – K0768+200, San

Roque, Northern Samar

17,809,000 17,809,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/improvement of Dale River

Control along Catarman (Boundary) -

Rawis Road, Dale-Pambujan Section,

KO773+800 – KO773+900, San Roque,

Northern Samar 17,794,000 17,794,000

Biliran DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of DPWH Biliran

District Engineering Office, Barangay

Calumpang, Naval, Biliran 3,340,959 3,340,959

Biliran DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Washed-out Shoulders,

Clogged-up Waterways and Road Slip

along Biliran Circumferential Road

(Culaba-Caibiran Section) K1083+000 –

K1093+000 12,513,000 12,513,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Damaged Slope Protection

along Biliran circumferential Road

(Culaba-Caibiran Section) 4,676,000 4,676,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Damaged Slope Protection

along Naval-Caibiran Cross Country

Road 1,869,000 1,869,000

Eastern Samar

DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Balangkayan

Seawall along Borongan-Guiuan Road,

K0936+300 – K0936+940, Balangkayan41,300,000 41,300,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Barangay Del

Remedio Seawall along Wright-Taft-

Borongan Road, Sulat K0906+500 –

K0907+150, Sulat 41,600,000 41,600,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Barangay Nato

Seawall along Junction Taft-Oras-

Arteche Road,

K0893+300 – K0893+700, Taft 20,100,000 20,100,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Guinob-an

Seawall along Junction Buenavista-

Lawaan Road, Lawaan, K0955+200 –

K0955+400, Lawaan 7,700,000 7,700,000

Eastern Samar

DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/rehabilitation of Maintenance

Repair Shop, Area III Equipment

Services, Borongan City 1,401,648 1,401,648

Page 28 of 39

Page 29: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Rehabilitation / replacement of Roofing

and Framing Part of Workshop Building

1 & 2 at Area III, Equipment Services,

Borongan City 2,267,523 2,267,523

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair/improvement of DPWH Building,

Guiuan, Eastern Samar 926,256 926,256

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0000728 4-Feb-15

Repair of Damaged DPWH building,

Barangay Cabong, Borongan City,

Eastern Samar 6,860,197 6,860,197

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

Procurement of construction materials

for the victims of Typhoon Yolanda in

regions IV-B, VI and VIII, see details

below:

Accessories for Housing Roof Materials

for use of Families affected by typhoon

Yolanda at Regions VI and VIII

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

Umbrella nails (20,600 kgs.)

1,236,000 1,236,000

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15 Common Wire Nails (20,600kgs.) 824,000 824,000

Housing and School Building Roof

Assistance to various affected by

typhoon Yolanda

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

44,190 pcs. Of G.I. sheets

21,653,100 21,653,100

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

umbrella nails (7,600 kgs.)

456,000 456,000

Housing Roof Assistance for Region IV-B

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

Common Wire Nails (7,600 kgs.)

304,000 304,000

Balance of umbrella nails for school

building repair at Region VIII

NF, RA 10633, C.A.

SARO-BMB-A-

15-0001769 23-Feb-15

umbrella nails (5,113 kgs.)

306,780 306,780

Mindoro Oriental

DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation.reconstruction of Gabion

at Gutad, Calapan City, Oriental

Mindoro (Sta.0+000 - Sta. 0+247)

13,130,000 13,130,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation.reconstruction of Gabion

at Alag River, Baco, Oriental Mindoro

(Sta.0+000 - Sta. 0+304)

18,440,000 18,440,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation.reconstruction of San

Rafael Gabion,San Teodoro, Oriental

Mindoro (Sta.0+000 - Sta. 0+304) 18,070,000 18,070,000

Page 29 of 39

Page 30: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation/ reconstruction of

Dulangan Rier Control, Puerto Galera,

Oriental Mindoro 14,070,000 14,070,000

Leyte 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Repair/rehabilitation/imrovement of

Flood Control, Barugo-Carigara Road

K0492+396, Barangay Can-isak, Barugo,

Leyte 15,407,000 15,407,000

Samar 1st DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation/improvement of

concrete revetment flood contol

structure in the Municipality of San

Jorge, Samar 131,884,000 131,884,000

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation/improvement of flood

control structure, Barangay San

Joaquin, Tinambacan District, Calbayog

City, Samar 15,707,153 15,707,153

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation/improvement of flood

control structure, Barangay Peña (Phase

II), Tinambacan District, Calbayog City,

Samar 16,851,203 16,851,203

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Rehabilitation/improvement of flood

control structure, Barangay Malaga

(Phase II), Tinambacan District,

Calbayog City, Samar 13,865,944 13,865,944

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0001770 23-Feb-15

Repair/ improvement of Drainage

System along Daang maharlika,

(S00062SM), Barangay Ba-ay,

K0709+800 - K0711+100, Calbayog City,

Samar 5,760,393 5,760,393

Central Office NF, RA 10633, C.A.

SARO-BMB-A-

15-0001791 23-Feb-15

Construction of 20 units of Bunkhouses

in Concepcion and Estancia, Iloilo5,983,956 5,983,956

Central Office NF, RA 10633, C.A.

SARO-BMB-A-

15-0003571 24-Mar-15

Procurement of roofing accessories and

other construction kit as "Basic

Assistance Program" for the families

affected by Typhoon Yolanda in Regions

VI and VIII 10,262,500 10,262,500

Romblon DEO

Repair and rehabilitation of ports in

Romblon:

1. Port of San Agustin, Poblacion, San

Agustin 29,963,000 29,963,000

2. Port of Carmen, Carmen, San Agustin,

Tablas 19,246,000 19,246,000

3. Port of Cajidiocan, Poblacion,

Cajidiocan, Sibuyan Island 19,843,000 19,843,000

4. Port of Alcantara, Poblacion,

Alcantara, Tablas Island 30,628,000 30,628,000

5. Port of Malbog, Malbog, Looc, Tablas

Island 37,144,000 37,144,000

24-Mar-15NF, RA 10651SARO-BMB-A-

15-0003573

Page 30 of 39

Page 31: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Regional Office

VIII and Eastern

Samar DEO NF, RA 10651

SARO-BMB-A-

15-0003574 24-Mar-15

Site clearing/ development

activities/programs for the victims of

Typhoon Yolanda 23,511,755 23,511,755

Samar 2nd DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/improvement of flood control

structures along Lawaan River, Bgrys.

Palaypalay and Buscada, Basey, Samar

64,690,995 64,690,995

Leyte 1st DEO RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Rehabilitation of DPWH Leyte 1st DEO

(Quarter House) Sto. Niño, Tanauan,

Leyte 19,613,595 19,613,595

Leyte 5th DEO RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Construction/rehabilitation of flood

control structure (Phase III), Baybay

City, Southern Leyte 22,076,000 22,076,000

Northern Samar

2nd DEO RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of Pangpang-

Palapag Mapanas-Gamay-Lapinig Road

(S00037SM), Mapanas Anito Section

K0831+000-K0832-000 4,570,000 4,570,000

Northern Samar

2nd DEORRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/reinstallation of damaged

guardrails along Catarman-Rawis Road,

Rawis-Catubig Road, Catubig-Las Navas 7,397,000 7,397,000

Samar 1st DEO RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation/improvement of

motorpool building, DPWH Calbayog

City, Samar 3,197,000 3,197,000

Tacloban City DEO RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Road rehabilitation along San Jose -

Candahug Road K0913+(-956)-

K0914+000, Tacloban City 37,169,000 37,169,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Bartolini

Bridge along Tacloban-Baybay-Maasin

Road K1038+249, Baybay City, Leyte1,114,000 1,114,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Lunsoc

Bridge along Tacloban-Baybay-Maasin

Road K1047+145, Baybay City, Leyte1,193,000 1,193,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Cambanoy

Bridge along Tacloban-Baybay-Maasin

Road K1048+090, Baybay City, Leyte1,193,000 1,193,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Calbig-a

Bridge along Tacloban-Baybay-Maasin

Road, K1049+916, Baybay City, Leyte785,000 785,000

Page 31 of 39

Page 32: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Leyte 5th DEORRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Bagalongon

Bridge along Maharlika Highway,

K0976+057, Abuyog, Leyte 305,000 305,000

Leyte 5th DEORRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Sewing

Bridge along Lapaz-Javier-Bito Road,

K0969+643, Javier, Leyte 203,000 203,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of slope

protection at abutment of Kangapo

Bridge along Tacloban-Baybay-Maasin,

K1043+324, Baybay City, Leyte504,000 504,000

Leyte 5th DEO

RRP, RA 10633,

C.A.

SARO-BMB-A-

15-0007363 8-Jun-15

Repair/rehabilitation of damaged flood

control structure, Taganas Flood

Control along Tacloban-Ormoc-Baybay-

Southern Leyte Bdry. Road,

K1100+263.2-K1100+350, Hilongos,

Leyte 6,362,000 6,362,000

DPWH-CO

NF, RA 10651

SARO-BMB-A-

15-0020299 2-Nov-15

Implementattion of various projects in

Catanduanes which were damaged by

Typhoon "Yolanda".55,296,000 55,296,000

NF, RA 10651

SARO-BMB-A-

15-0028338 28-Dec-15

Implementation of various calamity-

related projects (P399,633,284 SARO

Amount)16,004,630 16,004,630

Aklan - DEO

NF, RA 10651, C.A.

SARO-BMB-A-

16-0000266 22-Jan-16

Release of funds to cover the

reconstruction of seawall, Brgy. Fatima,

New Washington Aklan, which was

damaged by Typhoon "Yolanda"46,447,342 46,447,342

Department of Social Welfare and Development 5,906,604,000 11,441,571,882 13,449,523,526 30,797,699,408

Office of the Secretary

For implementation of various

programs and projects (Yolanda

Recovery & Rehabilitation Plan)

OS, RA 10352

SARO-BMB-B-

13-01355 27-Dec-13

Central Office - National Project

Monitoring Office 953,490,000 953,490,000

OS, RA 10352

SARO-BMB-B-

13-01355 27-Dec-13 Supplemental Feeding Program 113,010,000 113,010,000

AA

SARO-BMB-B-

14-0003767 3-Apr-14

Asian Development Bank Grant for

Typhoon Haiyan (Yolanda) Project (ADB

Grant No. 0369) under the Asia Pacific

Disaster Response Fund 131,208,0006/

131,208,000

Page 32 of 39

Page 33: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

AA

SARO-BMB-B-

14-0014889 2-Oct-14

Grant proceeds from ADB-JFPR for

Emergency Assistance and Early

Recovery for Poor Municipalities

Affected by Typhoon Yolanda, Grant

No. 9175-PHI, withdrawal Application

No. 004 18,591,8827/

18,591,882

OS, RA 10352

SARO-BMB-B-

13-01252 14-Nov-13 For disaster relief and assistance 2,005,234,000 2,005,234,000

CF, RA 10352

SARO-BMB-B-

13-0025902 27-Dec-13

Augmentation of DSWD QRF for

Typhoon Yolanda 991,538,261 991,538,261

CF, RA 10155, C.A.

SARO-BMB-B-

13-01323

27-Dec-13 Augmentation of DSWD QRF for

Typhoon Yolanda 76,971,739 76,971,739

OS, RA 10352

SARO-BMB-B-

13-01324 27-Dec-13

Augmentation of the QRF for the

Yolanda Recovery and Rehabilitation

Plan (Social Assistance-General Food

Distribution) 1,766,360,000 1,766,360,000

SA, RA 10634

SARO-BMB-B-

14-0018681 20-Nov-14

Recovery and Rehabilitation Programs

and Activities for Typhoon Yolanda

affected families and communities in

Regions IV-B, VI, VII, VIII and CARAGA 2,737,500,000 2,737,500,000

RRP, RA 10633

SARO-BMB-B-

14-0020109 5-Dec-14 Sustainable Livelihood Project 1,500,000,000 1,500,000,000

RRP, RA 10633

SARO-BMB-B-

14-0020109 5-Dec-14 Cash for Work Livelihood Program 1,000,000,000 2/ 1,000,000,000

OS, RA 10633

SARO-BMB-B-

14-0026598 29-Dec-14

Emergency shelter assistance to LGUs in

Yolanda affected areas 4,265,880,000 4,265,880,000

UF, RA 10654

(Support to

FAPs)

SARO-BMB-B-

14-00010113 25-Jul-14

Initial implementation in FY 2014 of the

KALAHI-CIDDS NCDDP, in support of

adopting community-driven

development (CDD) as a national

strategy for fast recovery of areas badly

hit by Typhoon Yolanda 1,788,392,000 1,788,392,000

SA, RA 10652

SARO-BMB-B-

15-0000249 22-Jan-15

Emergency shelter assistance for

Typhoon Yolanda victims 2,084,480,000 2,084,480,000

AA

SARO-BMB-B-

15-0003038 16-Mar-15

Revalidation of allotment to cover the

grant proceeds from ADB-JFPR for

emergency Assistance and Early

Recovery for Poor Municipalities

affected bt Typhoon Yolanda 3,701,753 3,701,753

AA

SARO-BMB-B-

15-0003891 30-Mar-15

Revalidation of allotment to cover Asian

Development Bank Grant for Typhoon

Haiyan (Yolanda) Project under the Asia

pacific Disaster Response Fund 80,668,000 80,668,000

Page 33 of 39

Page 34: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

UF (RRP), RA

10651

SARO-BMB-B-

15-0005420 7-May-15

Emergency shelter assistance under the

Comprehensive Rehabilitation and

Recovery Plan for Typhoon Yolanda 5,000,000,000 5,000,000,000

UF (SIPSIP), RA

10651

SARO-BMB-B-

15-0006300 21-May-15

Emergency shelter assistance under the

Comprehensive Rehabilitation and

Recovery Plan for Typhoon Yolanda 6,180,520,000 6,180,520,000

AA

SARO-BMB-B-

15-0006127 19-May-15

Grant proceeds from ADB-JFPR for

Emergency Assistance and Early

Recovery for Poor Municipalities

Affected by Typhoon Yolanda, Grant

No. 9175-PHI 100,153,773 100,153,773

Department of Science and Technology 0 31,000,000 31,000,000

Office of the

Secretary SA, RA 10634

SARO-BMB-E-

14-0005964 23-May-14

Reconstruction/Rehabilitation of Office

Buildings 31,000,000 31,000,000

Department of Trade and Industry 0 17,881,500 17,881,500

Office of the

Secretary RS, RA 10352, C.A

SARO-BMB-A-

14-0018920 21-Nov-14

Realignment of funds from MOOE to

cover the requirements for the Typhoon

Yolanda Rehabilitation projects in DTI-

Regional Office No. VIII and Leyte

Provincial Office:

RS, RA 10352, C.A

SARO-BMB-A-

14-0018920 21-Nov-14

Replacement/Augmentation of

Motor Vehicles 4,000,000 4,000,000

RS, RA 10352, C.A

SARO-BMB-A-

14-0018920 21-Nov-14 DTI Diskwento Product Depot 9,000,000 9,000,000

RS, RA 10352, C.A

SARO-BMB-A-

14-0018920 21-Nov-14 Office Furniture and Fixtures 2,382,000 2,382,000

RS, RA 10352, C.A

SARO-BMB-A-

14-0018920 21-Nov-14

IT equipment for Region 8 and Leyte

Provincial Office 2,499,500 2,499,500

Department of Transportation and Communications 2,100,000,000 214,227,790 658,500,000 2,972,727,790

Office of the

Secretary RS, RA 10352 A-13-01296 26-Dec-13

Redevelopment/reconstruction of

Tacloban Airport 2,100,000,000 2,100,000,000

SA, RA 10634

SARO-BMB-A-

14-0004809 24-Apr-14 Sea lift operations 30,102,222 30,102,222

QRF, RA 10633 letter authority 23-Oct-14

Provision of delivery trucks to DSWD

from Dec. 2013 - June 2014 8,604,000 8,604,000

Ports:

QRF, RA 10633 letter authority 12-Nov-14

1. Rehabilitation of Catbalogan

Municipal Port 15,000,000 15,000,000

QRF, RA 10633 letter authority 12-Nov-14 2.Talalora Port Development Project 15,000,000 15,000,000

Page 34 of 39

Page 35: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

QRF, RA 10633 letter authority 12-Nov-14 3. Talisay, Llorente Port Project 11,000,000 11,000,000

QRF, RA 10633 letter authority 12-Nov-14

4. Amandayhan (Basey) Port

Rehabilitation Project 12,500,000 12,500,000

QRF, RA 10633 letter authority 12-Nov-14

5. Poblacion (Basey) Port Rehabilitation

Project 6,500,000 6,500,000

QRF, RA 10633 letter authority 12-Nov-14

6. San Antonio (Basey) Port

Rehabilitation Project 1,000,000 1,000,000

QRF, RA 10633 letter authority 12-Nov-14

7. Rehabilitation of Balangkayan

Municipal Fishing Port 35,000,000 35,000,000

QRF, RA 10633 letter authority 12-Nov-14 8. Rehabilitation of Dolores Port 12,000,000 12,000,000

QRF, RA 10633 letter authority 12-Nov-14

9. Rehabilitation of Lawaan (Poblacion)

Port 11,000,000 11,000,000

QRF, RA 10633 letter authority 12-Nov-14 10. Rehabilitation of Maslog Port 8,000,000 8,000,000

QRF, RA 10633 letter authority 12-Nov-14

11. Repair/reconstruction of damaged

seawall of Hernani Port 6,000,000 6,000,000

QRF, RA 10633 letter authority 12-Nov-14

12. Lawaan (Bitaog) Port Development

Project 4,500,000 4,500,000

Government Buildings:

QRF, RA 10633 letter authority 12-Nov-14 1. LTFRB Tacloban Regional Office 10,000,000 10,000,000

QRF, RA 10633 letter authority 12-Nov-14

2. Rehabilitation of LTO Palompon

District Office Building 5,500,000 5,500,000

Maritime

Industry

Authority SA, RA 10634

SARO-BMB-A-

14-0004823 24-Apr-14 Sea lift operations/relief operations 22,251,568 22,251,568

SA, RA 10634

SARO-BMB-A-

14-0005932 23-May-14 Sea lift operations/relief operations 270,000 270,000

OSEC

RRP, RA 10633,

C.A.

SARO-BMB-A-

14-0024342 23-Dec-15

Implementation of various

rehabilitation projects for Airports and

Ports Projects 658,500,000 658,500,000

National Economic Development Authority 29,538,600 0 29,538,600

Office of the

Secretary RS, RA 10352

SARO-BMB-C-

13-0025830

Rehabilitation of RO VIII facilities

destroyed by super Typhoon Yolanda 29,538,600 29,538,600

GOVERNMENT OWNED AND CONTROLLED CORPORATIONS 11,328,471,784 11,000,000,000 22,551,638,264 44,880,110,048

National Housing Authority 2,438,638,000 11,000,000,000 20,969,018,000 34,407,656,000

RS, RA 10352

SARO-F-13-

0022037 4-Dec-13

Implementation of the FY 2013

Emergency Housing Assistance for

Calamity Victims Programs 238,638,000 238,638,000

OS, RA 10352

SARO-BMB-F-

13-01329 27-Dec-13

Asssistance to households in "no-build"

zones 2,200,000,000 2,200,000,000

Page 35 of 39

Page 36: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

NF, RA 10633

SARO-BMB-F-

14-0016181 20-Oct-14

Construction of additional permanent

housing of Yolanda victims in Regions IV-

B, V, VI, VII and VIII 11,000,000,000 11,000,000,000

SA, RA 10652

SARO-BMB-F-

15-001055 12-Feb-15

Construction of permanent housing for

victims of Typhoon Yolanda 7,999,978,000 7,999,978,000

RRP, RA 10633,

C.A.

SARO-BMB-F-

15-0008237 18-Jun-15

Construction of permanent housing for

victims of Typhoon Yolanda 1,300,000,000 1,300,000,000

UF, (RRP), RA

10651

SARO-BMB-F-

15-0013924 24-Sep-15

Comprehensive Rehabilitation and

Reconstruction Program (CRRP) 4,314,000,000 4,314,000,000

UF, (RRP), RA

10651

SARO-BMB-C-

15-0024366 23-Dec-15

Funding requirements of the National

Housing Authoruty for the construction

of permanent housing units and

community 5,227,000,000 5,227,000,000

OS, FY2014

DPWH

SARO-BMB-C-

15-002881729-Dec-15

Yolanda Resettlement (unfunded

balance of the P6,386,040,000 for

permanent housing units) 1,159,040,000 1,159,040,000

OS, FY2014

DPWHSARO-BMB-C-

15-0028818 29-Dec-15

Yolanda resettlement (construction of

3,424 additional housing units) 969,000,000 969,000,000

Phil. Coconut Authority 2,868,690,000 2,868,690,000

OS, RA 10352

SARO-BMB-F-

13-01327 27-Dec-13 Coconut Tree Disposal and Utilization 186,520,000 186,520,000

OS, RA 10352

SARO-BMB-F-

13-01327 27-Dec-13 Coconut Fertilization 2,682,170,000 2,682,170,000

National Food Authority 111,205,000 111,205,000

OS, RA 10352

SARO-BMB-F-

13-01331 27-Dec-13

Repair/rehabilitation/reconstruction of

Infrastructure facilities & Post harvest

facilities 111,205,000 111,205,000

National Electrification Administration 3,929,360,000 922,620,264 4,851,980,264

UF (RRP), RA

10651 (FY 2015)SARO-BMB-C-

15-0024367 23-Dec-13

Requirements of the NEA for the power

supply provision in the Ntional Housing

Authority (NHA) "Yolanda" permanent

resettlement sites 394,400,000 394,400,000

OS, RA 10352

SARO-BMB-F-

13-01330 27-Dec-13

Rehabilitation of damaged distribution

facilities of Electric Cooperatives affcted

by Typhoon Yolanda 3,929,360,000 3,929,360,000

OS, FY2014

DPWH SARO-BMB-C-

15-0028820 29-Dec-15

Sitio Electrification Program (for

Yolanda-affected communities) 528,220,264 528,220,264

Page 36 of 39

Page 37: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

National Power Corporation 101,480,000 101,480,000

OS, RA 10352

SARO-BMB-F-

13-01332 27-Dec-13

Restoration of power generation

facilities in missionary affected areas by

Typhoon Yolanda 101,480,000 101,480,000

Transco 1,500,000,000 1,500,000,000

OS, RA 10352

SARO-BMB-F-

13-01333 27-Dec-13

Restoration of transmission and sub-

transmission lines in areas affected by

Typhoon Yolanda 1,500,000,000 1,500,000,000

Local Water Utilities Adm. 334,098,784 660,000,000 994,098,784

OS, RA 10352

SARO-BMB-F-

13-01317 27-Dec-13

Calamity related

rehabilitation/restoration projects 257,088,784 257,088,784

OS, RA 10352

SARO-BMB-F-

13-01328 27-Dec-13

Generator sets and treatment facilities

and pumping equipment in areas

affected by Typhoon Yolanda 77,010,000 77,010,000

OS, FY2014

DPWH SARO-BMB-C-

15-0022219 29-Dec-15

Water Supply provision in NHA-

resettlement areas 660,000,000 660,000,000

National Irrigation Administration 45,000,000 0 45,000,000

OS, RA 10352

SARO-BMB-F-

13-01319 27-Dec-13

Repair/Rehabilitation of Andanan RIS

(Bayugan City, Agusan del Sur) 45,000,000 45,000,000

LOCAL GOVERNMENT UNITS 36,831,947 0 36,831,947

Palo, Leyte OS, RA 10352

SARO-BMB-G-

13-01300 27-Dec-13

Repair of the second floor of Palo

Municipal Building, which has been

destroyed by the recent Super Typhoon

Yolanda 6,713,392 6,713,392

Javier, Leyte OS, RA 10352

SARO-BMB-G-

13-01352 27-Dec-13

Rehabilitation/repair of Municipal

Building 3,639,035 3,639,035

Municipalities in

Iloilo: OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13

Repair/rehabilitation/construction of

the Municipal hall/Building destroyed

by Super Typhoon Yolanda in the

following municipalities in Iloilo:

Carles OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 Carles 5,000,000 5,000,000

Estancia OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 Estancia 3,000,000 3,000,000

Concepcion OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 Concepcion 1,500,000 1,500,000

San Rafael OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 San Rafael 2,000,000 2,000,000

Balasan OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 Balasan 1,500,000 1,500,000

Page 37 of 39

Page 38: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

San Dionisio OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 San Dionisio 2,000,000 2,000,000

Sara OS, RA 10352

SARO-BMB-G-

13-01301 27-Dec-13 Sara 3,000,000 3,000,000

Lemery, Iloilo OS, RA 10352

SARO-BMB-G-

13-01350 27-Dec-13

Repair/rehabilitation of Municipal

Building which was damaged by

Typhoon Yolanda 1,000,000 1,000,000

Mayorga, Leyte OS, RA 10352

SARO-BMB-G-

13-01351 27-Dec-13

Rehabilitation/repair of the Municipal

building which was damaged by

Typhoon Yolanda 3,000,000 3,000,000

Santa Fe, Cebu OS, RA 10352

SARO-BMB-G-

13-01349 27-Dec-13

Rehabilitation/repair of Santa Fe

Municipal Building which was damaged

by Typhoon Yolanda 4,479,520 4,479,520

Grand Total 26,736,345,622 36,724,423,763 41,905,165,281 55,386,342 105,421,321,008

Page 38 of 39

Page 39: RELEASES FOR TYPHOON YOLANDA - FYs 2013, … of...after onslaught of Typhoon "Yolanda" 6,115,500 6,115,500 By Year/Implementing Agency/Fund Source/SARO/Purpose Implementing Agency/LGU

No. Date FY 2013 FY 2014 FY 2015 FY 2016

Implementing

Agency/LGU

FUND SOURCE

1/

SARO/ABM

Purpose Y E A R

TOTAL RELEASES

Page 39 of 39


Recommended