+ All Categories
Home > Documents > Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland

Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland

Date post: 19-Mar-2016
Category:
Upload: zalman
View: 61 times
Download: 3 times
Share this document with a friend
Description:
Division. Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland. Dr. Bernhard Hammer ---------------------------------------------------------- NATO/CCMS Pilot Study Meeting Athens, 5 -7 June 2006. Agenda. Bernhard Hammer: Introduction Principles of sustainable remediation - PowerPoint PPT Presentation
8
Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Remediation of the Hazardous Waste Landfill in Kölliken, Switzerland Dr. Bernhard Hammer -------------------------------- -------------------------- NATO/CCMS Pilot Study Meeting Athens, 5 -7 June 2006 Division
Transcript

Federal department of environment, transport, energy and communications ETEC

Federal Office for the Environment FOEN

Remediation of the Hazardous Waste Landfill in Kölliken, SwitzerlandDr. Bernhard Hammer----------------------------------------------------------NATO/CCMS Pilot Study MeetingAthens, 5 -7 June 2006

Division

2 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

AgendaBernhard Hammer:• Introduction• Principles of sustainable remediation• The Kölliken landfill site – general informations

Jean-Louis Tardent:• Remediation - Technical aspects • Introduction to the film

Film

3 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

What is Switzerland?

like that?

4 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

What is Switzerland?C

hrom

ium

VI-E

mis

sion

s!

Brownfields!

it’s also like that!

hundred thousands of tons of chemical waste!

5 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

Contaminated land in Switzerland• no significant mining activities• hardly any heavy industries• few extended industrial areas• no war-related contamination• long tradition of waste incineration

• high population densities• little construction land available, expensive land• intensively farmed soil, high quality requirements• intensively used groundwater (80% of drinking water)• most contaminated sites lie on groundwater deposits• few large sites - many small sites

but...

6 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

Kölliken landfill - General Situation

Landfill

Landfill

drinking water well

1978 – 1985:250’000 m3 of hazardous wastes

area: 40‘000m2

7 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

Persistant polluted site / PEPSI

Kölliken Landfill site = PEPSI siteHigh percentage of persistant pollutants• Persistant pollutants well dispersed, not extractable (in-situ measures not applicable)• Degradation & lixiviation of pollutants >>> 50 years• Substantial danger exists over long periods (up to x00 years)

8 Remediation Kölliken landfill, SwitzerlandDr. B. Hammer

Remediation strategy

• For the Kölliken site decontamination is indicated• Decontamination is the only solution for a

long-term successfully and economically remediation• In 2003 the authorities decreed the complete excavation

of the landfill by 2012.• Decontamination costs: 350 Mio. $ (excavation and off-site treatment)• Containment methods would have very high consumer costs for the long-term operation over hundreds of years: - Containment costs to date: 100 Mio. $ - Annual treatment/monitoring costs: 4 Mio. $


Recommended