Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development Refining & Marketing - Eni S.p.A CIS Downstream Summit Vienna, 28 th - 30 th November, 2016
Transcript
Page 1: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Removing High Sulphur Bunker from the Refineries:

Eni’s case study

Raffaele Fronteddu

Proposal Manager

Licensing Commercial Development

Refining & Marketing - Eni S.p.A

CIS Downstream SummitVienna, 28th- 30th November, 2016

Page 2: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

IMO new regulation for Bunker and impact on Refineries 1

Bottom of the Barrel conversion: Eni’s novel approach2

3 Case Study: EST Project in Sannazzaro Refinery

Content

2

IMO new regulation for Bunker and impact on Refineries 1

Page 3: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

In all Emission Controlled Areas the limit on sulphur content in Bunker is 0.1%wt

Starting from 2020, the global sulphur content in Bunker will be limited to 0.5%wt

International Maritime Organization: new regulation for Bunker

3

Page 4: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Why a new Bunker specification?

4

About 1/3 of the world’s total shipping traffic either trades to seaports or passes

through the Mediterranean (less than 1% world water surface)

Low sulphur Bunker will have significant impact

on SO2 emission reduction in all coastal areas

Page 5: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Impact on Bunker market

According to a CE Delft study, in 2020 (base case projection):

Global marine fuel demand will be 320 Mt/y

The use of HSFO for ships equipped with scrubbers will be limited to 36 Mt/y

The demand of LNG as alternative fuel will be limited to 12 Mt/y

»The shift to low sulphur marine bunker in 2020 will result in thesubstitution of up to 233 Mt/y of heavy high sulphur fuel oils

Shipping Industry alternatives:

Scrubbing technology (Exhaust Gas Cleaning Systems) on board to limit SOx

Adapt to alternative fuels (LNG, methanol, biofuels, LPG, DME, etc.)

» expensive retrofitting of existing fleets + need for new port infrastructure

5

Page 6: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Refinery side alternatives:

Change in crude diet for ultra low sulphur crudes processing (North Sea, Africans, Siberian Light, Azery, CPC Blend)

» ULS crudes price (sweet/sour spread increasing) = lower margin

Destroy (Gasification)

» economically sustainable?

Upgradation:

Coking

» Petcoke issue (moreover after COP21)

Fixed bed hydroconversion

» limited in feed flexibility, low conversion

LC Fining

» low conversion with high S residue (problem reduced but not solved)

Slurry Hydrocracking

» Eni’s novel approach

6

Impact on Refineries

Page 7: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

7

Ebullating Bed LC-Finer by CLG25,000 BPSD - since 1998Residue unstable at high conversionUnconverted bottom disposal

Tar Gasification by Shell G.S.400,000 TPY - 200 MWesince 2005

Product is electric energy

Delayed Coking by Kellogg 4,600 TPD - since 1963

Delayed Coking by Conoco3,300 TPD - since 1990Loss of liquid yield Coke disposal

Fixed Bed RHU by Shell 25,000 BPSD - since 1995 Low bottom conversionLow feed flexibilityLimited run length

Eni’s experience

Page 8: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

IMO new regulation for Bunker and impact on Refineries1

Bottom of the Barrel conversion: Eni’s novel approach 2

3 Case Study: EST Project in Sannazzaro Refinery

Content

8

Page 9: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Demo Plant activities

2000 2010

Start of R&D activities

1990

Pilot Plantstart-up

Commercial Demonstration Plant start-up

First CommercialPlant Start-up

Commercial Unit in Operation

1995 2005 2015

Pilot Plant activities

Research and Development activities

First License

Agreement

9

Eni’s novel approach: E.S.T. Development Road

Page 10: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Nanometric Catalyst

Slurry bubble column reactors

homogeneous and isothermal

No risk of runaway (intrinsically safe)

Recycling scheme for stability and

high conversion

10

Eni’s novel approach: catalyst, reactor and scheme

6 nm

EST Catalyst EST Reactor

EST Scheme

Page 11: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

EST vs. Other Processes – volumetric yields comparison

Coke(as wt.%)

Ebullated bed ESTDelayed coking

• Higherconversion to desideredproducts(>95%wt FF)

• 35% productsyields (in volume) higherthan DC and EB

11

LC BottomPitch

Page 12: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

IMO new regulation for Bunker and impact on Refineries1

Bottom of the Barrel conversion: Eni’s novel approach2

3 Case Study: EST Project in Sannazzaro Refinery

Content

12

Page 13: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Case Study: EST Project in Sannazzaro Refinery

13

Page 14: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

14

Diesel

LPG

Gasoline

Kero

P

R

O

D

U

C

T

L

O

G

I

S

T

I

C

S

HDS1/2

HDS3

Reformer

1/2/3

TIP

ALKMTBE

Fuel Oil

Bitumen

Pitch

Sannazzaro Refinery - flow scheme before EST

HDC1/2

VACUUM

FCC

VSB

IGAS

Syngas

DEASP

C

D

U

Page 15: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

15

Sannazzaro Refinery - flow scheme with EST integration

C

D

U

DEASPEST Bitumen

P

R

O

D

U

C

T

L

O

G

I

S

T

I

C

S

LPG

Page 16: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

EST Complex Timeline and Lay-out

Auxiliaries:- Steam Reforming- Sulphur Recovery- Amine Treatment- Cooling Water- Flare

Bunkerized control room

Slurry section

Diesel and VGO

Hydrotreating section

Pitch Storage and loading station

16

Jan 2009

SiteActivities

ESTOil-in

Nov 2010

Jan 2013

Jul 2013

Oct2013

FEEDstart

Steam ReformerStart-up

ESTCommissioning

Page 17: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

EST product yields and quality

Naphtha Sulfur <5 wtppm Nitrogen <5 wtppm

Diesel (Euro V spec) Sulfur < 5 wtppm Nitrogen <5 wtppm Cetane Index min 51 Polyaromatics < 8.0 wt%

VGO (new IMO Bunker spec or to HDC/FCC) Sulfur <500 wtppm Nitrogen <500 wtppm Metals <1 wtppm

Vacuum Residue

+FCC Oil

Hydrogen make-up

Catalyst make-up

EST

Hydrotreating

LPG

Purge

VGO

17

Naphtha

AGO

Page 18: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

EST feed flexibility: SNZ Experience

Vacuum Residue from 19 different crudes

18

Page 19: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

19

Eni’s approach to fuel quality evolution

Eni policy approach on product quality is to anticipate environmental legislation

Specification Eni commitment(year)

Legislation Endorsement(year)

Zero Lead Gasoline 1987 2000

1%vol max Benzene 1997 2000

10 wtppm S Diesel 2002 2009

10 wtppm S Gasoline 2004 2009

2%wt PNA Diesel 2010 locally, 2016 To be defined

10% renewable Diesel 2016 2020

0,1%wt S Bunker 2016 2020

Thanks to the implementation of EST, Eni has achieved the sulfur specifications in

all fuels responsible for large amounts of SO2 emissions

Page 20: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

Conclusion

A new product specification will impact on oil refining business.

The new sulphur specification completes the sulphur removal in allfuels, with very beneficial effects on the environment

Eni has heavily invested in R&D of new deep conversiontechnologies. This has originated EST technology, suitable for theproduction of light distillates and low sulfur bunker fuel <0.5%and/or <0.1%.

Eni is already capable of producing today from its SannazzaroRefinery over 400 kt/year of Bunker with sulfur less than 0.5% S(0.1% for ECAs areas).

20

Page 21: Removing High Sulphur Bunker from the Refineries · Removing High Sulphur Bunker from the Refineries: Eni’s case study Raffaele Fronteddu Proposal Manager Licensing Commercial Development

21

Raffaele Fronteddu