3
Remote Isolations Increase Production & Improve Safety Increase production rates by reducing downtime waiting for isolations Reduce exposure to the potential of arc flash Quick, reliable and easy to operate Fail safe and conforms to AS1755-2000 Safety Requirements Rated SIL3/CAT4 No need for an Isolation Officer/Electrician Operates multiple isolators for conveyors and other plant in one simple action Ideal for tramp metal removal, belt drift adjustments, idler replacement , belt trimming, belt weigher calibrations, rip line replacement, tracking etc… For selection and pricing please contact Mike Lane - Office +61 8 9311 5311, Mobile +61 488 488 886 Email: [email protected] or visit: www.remsafe.com.au Patent Pending
Transcript

PowerPoint Presentation

Remote Isolations Increase Production & Improve Safety Increase production rates by reducing downtime waiting for isolationsReduce exposure to the potential of arc flashQuick, reliable and easy to operateFail safe and conforms to AS1755-2000 Safety RequirementsRated SIL3/CAT4No need for an Isolation Officer/ElectricianOperates multiple isolators for conveyors and other plant in one simple actionIdeal for tramp metal removal, belt drift adjustments, idler replacement , belt trimming, belt weigher calibrations, rip line replacement, tracking etcFor selection and pricing please contact Mike Lane - Office +61 8 9311 5311, Mobile +61 488 488 886Email: [email protected] or visit: www.remsafe.com.au

Patent Pending

1

Standard Isolation for Conveyor

ProblemOre Handler & ElectricianIsolation

Ore Handler & ElectricianDe-IsolationStart Conveyor

25mins

25mins

Total Isolation50 minsWork Fixing Problem:Remove Tramp Metal Trim Belt Replace Idler

Standard isolation of fixed plant is time consuming hence significant production hours are lost through isolation personnel travelling to the sub station, dressing into the arc flash rated clothing and carrying out the isolation or de-isolation of each isolator. In addition to the isolation personnel travelling time, the person(s) carrying out the work on the plant will also need to travel to the sub station to place or remove their personal locks. The total isolation time to isolate and de-isolate is essentially lost production time.

2

REMSAFE Isolation for Conveyor

Problem

Field Isolation byOre HandlerWork Fixing Problem:Remove Tramp Metal Trim Belt Replace IdlerStart Conveyor

3mins

3mins

Total Isolation6 mins

Field De-Isolation byOre Handler

When a REMSAFE isolation system is installed for plant, the person doing the work carries out the isolation at the fixed plant, does the work, de-isolates then hands the plant back to production. There is no need to travel to the sub station and no need to involve the valuable resource of isolation personnel subjecting them to the potential of arc flash when switching. The most time that a REMSAFE isolation or de-isolation will take is less than 3 minutes, providing additional time for production, hence the term; It is a production tool that ticks all the safety boxes3