+ All Categories
Home > Documents > Renewable Energy Project Development

Renewable Energy Project Development

Date post: 07-Feb-2016
Category:
Upload: chuck
View: 43 times
Download: 0 times
Share this document with a friend
Description:
Renewable Energy Project Development. The last meeting TWG IV Grand Candi the Gallery Hotel Semarang, 09 July 2011. by CASINDO Team West Nusa Tenggara. Outline of Presentation. Executive Summary Market analysis Product description Regulatory setting Project management - PowerPoint PPT Presentation
Popular Tags:
69
Renewable Energy Project Development The last meeting TWG IV Grand Candi the Gallery Hotel Semarang, 09 July 2011 by CASINDO Team West Nusa Tenggara
Transcript
Page 1: Renewable Energy  Project Development

Renewable Energy Project Development

The last meeting TWG IVGrand Candi the Gallery Hotel Semarang, 09 July

2011

by CASINDO Team West Nusa Tenggara

Page 2: Renewable Energy  Project Development

Outline of PresentationExecutive SummaryMarket analysisProduct descriptionRegulatory settingProject managementTechnical feasibilityFinancial analysisRisk analysis and contingency planning

Page 3: Renewable Energy  Project Development

Executive SummaryWhat are you planning to implement?The proposed renewable energy project to be developed under the Casindo TWG IV in WNT is household biogas.

Where are you planning to implement?Jeruk Manis is the name of the target location chosen for the implementation of the renewable energy project in the program Casindo.

Page 4: Renewable Energy  Project Development

Executive Summary (Cont’)Who will conduct the implementation?To implement the project, the Casindo team in WNT has partnered with Hivos and its BIRU program. The biogas digester contruction will be conducted by BIRU Lombok, in collaboration with construction partner organization, namely “Yayasan Mandiri Membangun Masyarakat Sejahtera (YM3S)” and managed by Casindo project Faculty of Engineering University of Mataram.

Page 5: Renewable Energy  Project Development

Executive Summary (Cont’)How will the project be implemented? With what funds or what funds does it need?Project of biogas technology will build in a self funding from people of meet criteria established by the BIRU program. Then the number of households that are eligible to be selected as the target of the program were 63 families; Nowday, BIRU Lombok not yet getting financial institution to provide the credit in biogas digester construction, so that funds originated from vilagers and subsidy from Hivos.

Page 6: Renewable Energy  Project Development

Executive Summary (Cont’)Why is it desirable for the project to be implemented? What benefits will it bring?If the project to be implemented, very desirable many benefits for poor people in location target and its project suistain for the long time;BIRU program will have broad effects of health conditions and job creation as well as the local economy.

Page 7: Renewable Energy  Project Development

Section 2: Market analysis

Page 8: Renewable Energy  Project Development

Map of selected locationSikur District, East Lombok, WNT.

08o 34'21.50''N 116o25'22.17'' E

Page 9: Renewable Energy  Project Development

Natural resources of selected location

Page 10: Renewable Energy  Project Development

Demographic profile

Village/Sub VillagePopulation

No of HouseholdMale Female Total

Jeruk Manis (total) 991 1.042 2.033 761

Barang Panas 303 320 623 237

Kebun Baru 310 315 625 240

Gawah Buak 378 407 785 284

Number of population and household :

Source: Data villages Jeruk Manis in October 2010

Page 11: Renewable Energy  Project Development

Demographic profileSize of household & Age structure:

Size of household Percent (%)1 – 3 person 30

4 – 6 person 62

> 7 person 8Source: Data villages Jeruk Manis in October 2010

Age structure (year) Percent (%)Children & adolescents : < 17 tahun 25Adult : 18 s/d 50 tahunElderly : > 50 tahun

769

Source: Data villages Jeruk Manis in October 2010

Page 12: Renewable Energy  Project Development

Educational profileNumber of educational facilities :

Source: Data villages Jeruk Manis in October 2010

VillageNumber of Educational Facilities

Elementary Junior High School High School

Jeruk Manis 2 1 -

VillageNumber of villagers with completed schooling

High school Bachelor degree University Jeruk Manis 186 4 8

Number of villagers with completed schooling :

Page 13: Renewable Energy  Project Development

Educational profile

Number of students currently enrolled in schools :

Source: Data villages Jeruk Manis in October 2010

VillageNumber of students currently enrolled in schools

Elementary school

Junior high school

High school University

Jeruk Manis 308 158 50 7

Page 14: Renewable Energy  Project Development

Economic profile

Employment sectors and number of employees :

Source: Data villages Jeruk Manis in October 2010

VillageEmployment sectors

Farmer Trade Government CraftsmanJeruk Manis 391 32 5 40

Page 15: Renewable Energy  Project Development

Economic profileThe unemployment rate in this region has reached 20-25%.Households that serve as the target location for Casindo activities are classified as poor.Average household income is IDR 5.291.222, 00 per year or IDR. 440.935,00 per month.There are 189 households receive government subsidies (BLT) is IDR 200.000,00/families per month.

Page 16: Renewable Energy  Project Development

Economic profile

Average household expenditures :Type of expenditures IDR per year IDR per month

Food 4.125525,30 343.793,70Energy 458.391,70 38.199,30

School fees 0,00 0,00Total 4.583.917 381.993

(Source: Need assesment questionnaire carry out for this project)

Page 17: Renewable Energy  Project Development

Energy profile

The main energy source for cooking is firewood, mainly collected free of charge in the surrounding forest area;The main energy source for lighting are kerosene and electricity; The main energy source for vehicles is gasoline.

Energy use pattern emerged :

Page 18: Renewable Energy  Project Development

Energy profileEnergy expenditures per fuel type :

Energy service

Fuel typeAverage monthly

consumption

Average cost(in IDR, at the

time of writing)

Total monthly cost

Cooking wood 55,8 bundle IDR 0,00 IDR 0,00

Lighting kerosene lamp

13,37 litre IDR 6.000 per litre

IDR 80.220

Lighting Electricity(Solar PV)

0,84 kWh IDR 10.000 per month*

IDR 10.000

Lighting Electricity(MHP)

(100W x 12 hour x 30 day) =

IDR 5.000 per month*

IDR 5.000

* Energy prices are fixed per month, it is not per 1 kWh

Page 19: Renewable Energy  Project Development

Current energy provisionEnergy supply and its historical growth rate :

Type of energy Energy supply (bundle/litre/watthour) Remark

Wood 18,6 bundle per month x 761 families

cooking

Kerosene ± 10, 187 litre per month

cooking &lighting

Electricity (solar PV) 650 Wpeak x 8 hour lighting

Electricity (MHP) 18 kW x 12 hour lighting

Page 20: Renewable Energy  Project Development

Estimate of total demand for the proposed technology

The technology proposed to be developed in Casindo TWG IV is household biogas.The total demand for energy comes from 761 households.There are 63 families which have 3 or more cows and 137 families have 1 – 2 cows.So the percentage of people who use firewood and kerosene remains large at 73,72%.

Page 21: Renewable Energy  Project Development

Estimate of total demand for the proposed technology

No. Village/Sub-village

Number of families have cows Total Families3 or more

cows1 - 2 cows Nothing

1 Barang Panas 7 18 212 2372 Kebun Baru 34 65 141 2403 Gawah Buak 22 54 208 284

  Total 63 137 561 761

Page 22: Renewable Energy  Project Development

Section 3: Product description

Page 23: Renewable Energy  Project Development

Introduction of the productThe product proposed under Casindo TWG IV in WNT is household biogas; Household biogas digesters convert animal dung and various other organic materials into combustible methane gas know as biogas;The proposed technology would be implemented in partnership with Hivos (BIRU program)

Page 24: Renewable Energy  Project Development

Introduction of the product (Cont’)The BIRU program promotes the use of biogas to fulfill the daily needs of fuel for cooking. Meeting the family cooking fuel needs with biogas is very satisfying, it can replace the role of firewood or kerosene. Reactors owners are no longer spending time looking for firewood in the forest and not spend money to buy kerosene.In July 2010, the BIRU program started running in WNT. By July 2011, the program has been able to build about 100 biogas reactors on Lombok Island.

Page 25: Renewable Energy  Project Development

Technology descriptionThe reactor components :

Page 26: Renewable Energy  Project Development

Technology descriptionThe installation of a biogas reactors :

Page 27: Renewable Energy  Project Development

Technology descriptionThe technical design of a typical biogas reactor :

Page 28: Renewable Energy  Project Development

Technology description

The model used is based on the model of cement biogas digester used in Nepal (SNI Indonesia). The household size reactors can be of 4, 6, 8, 10, 12 m3.

With proper care, biogas reactors are expected to stay safe for 20 - 30 years

Model, size and lifetime :

Page 29: Renewable Energy  Project Development

Technology descriptionEstimated cost of the biogas reactor :Sizes (m3) 4 6 8 10 12No of Cows 3 4-5 6 7-8 9Total kg of manure per day 30 45 60 75 90Gas produced (m3) 1 1,5 2 2,5 3Duration of use to stove (hour) 4 6 8 10 12Construction cost (IDR million) 5,7 6,3 7 8 8,8Subsidies from Hivos(IDR million) 2 2 2 2 2The cost to be paid by user/household (IDR million) 3,7 4,3 5 6 6,8

Page 30: Renewable Energy  Project Development

Construction processThe construction sequence of a biogas digester :

Page 31: Renewable Energy  Project Development

Construction processThe construction sequence of a biogas digester :

Page 32: Renewable Energy  Project Development

Construction processThe construction sequence of a biogas digester :

Page 33: Renewable Energy  Project Development

• Availability of skilled builders for the construction of the reactor is a key condition of the BIRU program. In every area of work, BIRU carries out training for local builders by a professional trainer. The goal is to have in each work area professional local builders who have ID cards. In Lombok, BIRU has 31professional builders and 9 supervisors.

Page 34: Renewable Energy  Project Development

Economic benefitsThe biogas digesters installed through the BIRU program will have broad effects on health conditions and job creation as well as the local economy, including:

Strengthen the integration of agriculture and cattle breeding for the improvement of agricultural resources

Creating jobs in the biogas construction sector

Strengthen food security by improving agricultural output through the use of biogas slurry

Reducing deforestation

Controlling greenhouse gas emissions from livestock and organic waste disposal

Recycling of nutrients and restore soil fertility

Promoting environmental awareness and link it to economic advantage

Page 35: Renewable Energy  Project Development

Social benefitsReducing the burden of women to collect firewood;Improving sanitation and reducing diseases associated with poor sanitation;Reducing air pollution from smoke generated by burning firewood for cooking;Improving sanitation and hygiene education.

Page 36: Renewable Energy  Project Development

Section 4: Regulatory setting

Page 37: Renewable Energy  Project Development

Relevant policies :Policies / Programs

Policy objectives ImplementationPolicy

objective likely to be achievedMain obj. Secondary obj. To date Future

National level :Substitution of kerosene with LPG;Phase-out subsidy for kerosene & provide (free of charge) LPG system to the poor.

Lower the cost of subsidizing fuel (for the government)

To reserve the kerosene for use in transport (instead of cooking); to support the use of gas, which is the more abundant fuel in Indonesia

In Lombok, this measure should start in 2010 with 500 000 households.(256 households in Jeruk Manis)

Will likely be fully implemented

Yes, in the longer term it will cost the government less to subsidize gas than it would cost to keep subsidizing kerosene.

Page 38: Renewable Energy  Project Development

Relevant policies (Cont’) :Policies / Programs

Policy objectives ImplementationPolicy

objective likely to be achievedMain obj. Secondary obj. To date Future

Regional or local level :Self-sustain energy village (Desa Mandiri Energi): 60% of the community energy needs is provided by local resources

To provide energy supply for underdevelop communities , to diversify energy source, to introduce productive activity, increase job opportunities.

To reduce fuel oil

20 target location of DME until 2013

Will be implemented

Mixed result

Page 39: Renewable Energy  Project Development

Relevant policies (Cont’) :

Policies / Programs

Policy objectives ImplementationPolicy

objective likely to

be achieved

Main obj. Secondary obj. To date Future

Regional or local level :A million cows ( BSS)

Program acceleration the development of animal farms with more priority to the empowerment of local resources with the aim that as soon as possible to achieve the optimum population in accordance with the carrying capacity of the region.

o Rural income, meet the needs of national meat.

o Meets the demand for cows for other regions.

o Meet the needs of meat consumption in the region

One million cows population in 2012

Will be implemented

Page 40: Renewable Energy  Project Development

Section 5: Project management

Page 41: Renewable Energy  Project Development

Description of the project champion

Mr. Umar is Coordinator of the BIRU program in Lombok, WNT;The BIRU program are managed and implemented by Hivos and SNV Netherlands Development Organisation;The BIRU program is run by a small team of professionals consisting of a Coordinator, Quality Auditor, Promoter, as well as administration and finance staff.

Page 42: Renewable Energy  Project Development

Mr. Umar has experience working in Care Indonesia from 1992 until 2010. His experience in the field of renewable energy is to build the biogas in East Nusa Tenggara province;Since July 2010 up to now join with Hivos in BIRU Lombok.

His experience :

Page 43: Renewable Energy  Project Development

BIRU program Lombok targets 256 unit digester in 2011.Additional of a new CPO and training professional builder and supervisor.Extending the work area in North Lombok regency, also new district in previous regency.

His motivation in BIRU program :

Page 44: Renewable Energy  Project Development

Description of the project teamBIRU representatives in Lombok consist of a Coordinator, Quality Auditor, Promoter as well as administration and finance staff;Construction partner organisation (CPO), in East Lombok, Hivos cooperates with an NGO named YM3S (has 3 supervisor and 10 professional builders);Casindo team from University of Mataram provided support to the program by conducting pre-preparation and socialization in Jeruk Manis village.

Page 45: Renewable Energy  Project Development

Organization of the projectBIRU

(Biogas Rumah)Construction Partner Organisation (YM3S)

TURMUZISupervisor

Mr. UMARCoordinator BIRU

Lombok

CASINDO Project

M. ALI IKHSANPromotion Staff

USER

ABDUL NATSIRPIC TWG IV

Page 46: Renewable Energy  Project Development

Section 6: Technical feasibility

Page 47: Renewable Energy  Project Development

Technical requirements of the technology

Cattle dung 20-30 kg per day (at least 3 cows) for a biogas reactor of 4 m3 and 6 m3 and the availability of adequate water for manure and water ratio (1: 1)

Sizes (M3) 4 6 8 10 12

Space requirement (M x M) (3 x 6) (3,5 x 7) 4 x 8 4,5 x 9 5 x 10

Input requirements

Space requirements

Page 48: Renewable Energy  Project Development

Technical requirements of the technology

Maximum allowed distance is 200 meters between biogas reactor with a kitchen. Closest distance ever is 12 meters, but in the implementation of the reactor can be done under the kitchen.Biogas reactor can work at ambient temperature, best at a temperature of 35oC.

Other requirements

Page 49: Renewable Energy  Project Development

Availability of input requirements in the selected location

There are 63 households which have 3 or more cows.Water availability in the selected location is also sufficient. The households have sufficient space to install the digesters

Page 50: Renewable Energy  Project Development

OutputUnder normal conditions, a BIRU biogas reactor will produce gas that has a gas pressure of 50 - 80 cm of water (measure unit of biogas pressure). 2 days after full charging has begun to burn, and cook with blue flame and faster than kerosene stove.

Page 51: Renewable Energy  Project Development

Section 7:Financial analyses

Page 52: Renewable Energy  Project Development

Capital costs (are Planning and Construction or Pre-operation costs)

BIRU program is covering the planning and pre-operational cost including final enginering design and also worker training.There are no additional planning costs related to the installation of biogas digesters

Page 53: Renewable Energy  Project Development

Operating costs

Estimated number of digesters to be installed each year :

Year 1 Year 2 Year 3 Year 4 TotalNumber of digester (unit)

25 25 10 3 63

Page 54: Renewable Energy  Project Development

Operating costs  OPERATING COSTS Year 1 Year 2 Year 3 Year 4

1 General and Administrative Costs 17,650,000

17,500,000

7,000,000

2,100,000

2 Labor costs27,060,000

26,625,000

10,650,000

3,195,000

3 Material costs87,842,000

86,675,000

34,670,000

10,401,000

           

  TOTAL 132,552,000

130,800,000

52,320,000

15,696,000

Page 55: Renewable Energy  Project Development

Grants and subsidiesGrants and Subsidies Year 0 Year 1 Year 2 Year 3 Year 4

1 Casindo pre-operation support            

2 Hivos subsidies   

50,000,000

50,000,000

-

-

  Subtotal 

-

50,000,000

50,000,000

-

-

  TOTAL all years 100,000,000          

Page 56: Renewable Energy  Project Development

Revenues  Revenues Year 1 Year 2 Year 3 Year 4

R1 Revenue from 4 m3 71,104,000 80,800,000

52,320,000

15,696,000

  Units 22 25 10

3

  Revenue per Unit 3,232,000 3,232,000 5,232,000

5,232,000

R2 Revenue from 6 m3 11,448,000 - -

-

  Units 3 - -

-

  Revenue per Unit 3,816,000 3,816,000 5,816,000

5,816,000

  REVENUES 82,552,000 80,800,000

52,320,000

15,696,000

Page 57: Renewable Energy  Project Development

Cash flow      TOTALS Year 0 Year 1 Year 2 Year 3 Year 4

COSTS (& GRANTS/SUBSIDIES)       2010 2011 2012 2013 2014

Capital Cost Cc     0.0 0.0 0.0 0.0 0.0

Capital / pre-operation grants Gc     0.0 0.0 0.0 0.0 0.0

Operating costs Co     0.0 132,552,000.0 130,800,000.0 52,320,000.0 15,696,000.0

Operating grants Go     0.0 50,000,000.0 50,000,000.0 0.0 0.0

TOTAL COSTS TC = (Cc-Gc)+(Co-Go)     0.0 82,552,000.0 80,800,000.0 52,320,000.0 15,696,000.0

NPV TOTAL COSTS (discount rate = 12%)

NPV TC = TC / (1+disc rate)t; t = year of operation 12% 185,335,842.5 0.0 73,707,142.9 64,413,265.3 37,240,342.6 9,975,091.8

                 

BENEFITS                

Revenues R     0.0 82,552,000.0 80,800,000.0 52,320,000.0 15,696,000.0

NPV revenuesNPV R = R / (1+disc rate)t; t = year of operation 12% 185,335,842.5 0.0 73,707,142.9 64,413,265.3 37,240,342.6 9,975,091.8

                 

Interest                

Taxes                

Depreciation                

                 

NET INCOME NIt = Rt -TCt     0.0 0.0 0.0 0.0 0.0

Accumulated Income* AIt = AIt-1 + NIt     0.0 0.0 0.0 0.0 0.0

NPV NET INCOMENPV NI = NI / (1+disc rate)t; t = year of operation 12% 0.0 0.0 0.0 0.0 0.0 0.0

                 

Benefit/cost Ratio B/C ratio = NPV R / NPV TC   1.000          

Page 58: Renewable Energy  Project Development

Section 8: Risk analysis & contingency

planning

Page 59: Renewable Energy  Project Development

Completion riskThere are several things that can cause delays in the construction of the biogas digesters although funds were available, including:

The cost of cement: cement is a very significant material in the construction of a biogas digester, and if cement prices increase by the run cause delayed biogas digester construction. Some of the professional mason (trained for this job) might go after another job that is more promising (where cost of labour is higher) compared with standard from HIVOS.CPO or Hivos could be late in responding to users who are interested to build a biogas digester.

Page 60: Renewable Energy  Project Development

Technology riskThe biogas digester technology used in the BIRU program gets a warranty for 3 years. The BIRU program is almost 100% successful in building biogas digesters which are operating properly on the Lombok island. Thus the risk of the technology not performing well is negligible. So far, the BIRU program in Lombok only had problems with 1 user, where the inserted cow manure did not produce gas for 7 days. That means that the only plausible technology risk is possible wrong mixing of manure. This risk can be eliminated with a proper socialization process and a user manual.

Page 61: Renewable Energy  Project Development

Supply riskThe materials needed to build a biogas digester are available in adequate quantity around the location, so there is no risk of supply shortage of construction material.A more possible risk is delay of delivery of components for biogas stoves. Biogas stoves are imported from outside the area (Bandung).

Page 62: Renewable Energy  Project Development

Economic riskThere is a real risk that people in the village can not the pay for the biogas digester, because the price to build a biogas digester is 3 million IDR and more (after the subsidy). Average income per month of the villagers is very low, so most households cannot afford it. The Hivos subsidy is not sufficient to build a biogas digester.Economic risk would be smaller if there are support from the government, cooperatives, banks, other financial institutions to build a biogas digester through soft loans or credit.

Page 63: Renewable Energy  Project Development

Financial riskChanges in interest rates would cause financial risk to occur. Historical growth shows that interest rates in Indonesia are relatively stable (constant) so that the financial risk is very small.

Page 64: Renewable Energy  Project Development

Political riskThe political framework at the regional level in WNT did not change rules and regulations relevant for the implementation of the BIRU program in Lombok. Instead the local government is supporting the implementation of the biogas digester program, because the government's main priority now is the utilization of renewable energy.In addition, local governments have a program which aims to achieve one million cows population (BSS) in WNT, which fits well with the BIRU program.

Page 65: Renewable Energy  Project Development

Environmental riskBiogas digesters have no negative environmental impact on the community or a user, but several positive impacts, including:

dirty cages and cows that used to disturb the environment, are now clean, tidy and do not represent a health hazard.The smoke from wood stoves and fuel oil which can harm the health, is now replaced by a clean and safe cooking fuel.Less pressure on forests around the village which are harvested by residents looking for firewood.

Page 66: Renewable Energy  Project Development

Social riskImplementation of biogas can be burdened by possible social risks for some people, namely:

Residents who have not obtained the education and socialization of the benefits of biogas still think of it as a taboo / unclean use of cow dung. So that important to carry out more socialization.The implementation schedule can create jealousy with those that cannot afford a digester, or towards those that get it first to etc.

Page 67: Renewable Energy  Project Development

Force majeure riskForce majeure risk that may occur is the occurrence of earthquakes, volcanic eruption, or landslide. Generally, often occurrence of earthquakes in Lombok island, but the scale under 5.0 SR and the occurrence of volcanic eruption or landslide not occur in last 10 year.

Page 68: Renewable Energy  Project Development

The next activityMany efforts to find credits institution to build biogas digester.Communicate with our government related funds to build biogas digester, especially with Regional Development Bank (WNT Bank).Communicate with Newmont Nusa Tenggara (NNT) related their CSR in renewable energy.Etc…

Page 69: Renewable Energy  Project Development

Thank you for your attention


Recommended