Renovation of Building 4950 Fort Stewart, GA
CorridorsNew HVAC system, drop ceiling, lighting, and textured walls.
Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor
StairwellsNew stairwells, railings, and finishes
Professional signage and way-finding plan
BeforeAfter
Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.
Before After
Newly Renovated Breakfast and Lobby
New automatic entry doors and passenger elevator provide easy
access for guests to the 3-story facility.
Project Team
• FMWRC Project Manager – Patti Richardson• FMWRC Contracting Officer – Del Dreano• FMWRC Interior Design – Mary Ann Miller• Ft Stewart Lodging Manager – Connie Parks• Contractor – Stellar Construction, Jacksonville, FL