Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015) Page 1 of 145 S No RFP Page No. RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries 1. 12 2.1.2 Annual turnover of the lead bidder from IT/ITES/Telecom during each of the last three financial years i.e. 2012- 13, 2013-14, 2014-15 (as per the last published audited balance sheets) should be atleast 300 crores. If the bidder is 100% subsidiary of it's parent company, who is also into similar services and if parent is fully supporting the project then can parent's turnover be used to qualify the financial criteria i.e. annual turnover of Rs 300 Cr? Request you to allow touse Parent company turnover to qualify the financial criteria. As per RFP 2. 12 2.1.2 Annual turnover of the lead bidder from IT/ITES/Telecom during each of the last three financial years i.e. 2012- 13, 2013-14, 2014-15 (as per the last published audited balance sheets) should be atleast 300 crores. Since the turnover from IT, ITES, Telecom are acceptable to qualify for this criteria and Telecom revenue can only be earned through telecom arm of business, registered separately as per TRAI guidelines, so can the turnover of IT/ITES and Telecom can be added from two legal entities (i.e. one company as SI and other as Telecom) working under same management? As per modified RFP 3. 12 2.1.4 The lead bidder/ consortium partner must have completed/ partially completed (supplied all items) of atleast one project during financial years i.e. 2012-13, 2013-14, 2014-15 and 2015-16 in India having following scope of work: Building up of centralized command andcontrol. Deployment of video management software and command and control centresoftware to monitor 300 cameras. Request you to accommodate experience of running 100 cameras from command &center, if the same is built by bidder OR Experience of building command & control and implementation of 300 cameras in a surveillance project can be from two different projects As per RFP
Transcript
Page 1: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 1 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

1. 12 2.1.2 Annual turnover of the lead bidder from IT/ITES/Telecom during each of the last three financial years i.e. 2012-13, 2013-14, 2014-15 (as per the last published audited balance sheets) should be atleast 300 crores.

If the bidder is 100% subsidiary of it's parent company, who is also into similar services and if parent is fully supporting the project then can parent's turnover be used to qualify the financial criteria i.e. annual turnover of Rs 300 Cr? Request you to allow touse Parent company turnover to qualify the financial criteria.

As per RFP

2. 12 2.1.2 Annual turnover of the lead bidder from IT/ITES/Telecom during each of the last three financial years i.e. 2012-13, 2013-14, 2014-15 (as per the last published audited balance sheets) should be atleast 300 crores.

Since the turnover from IT, ITES, Telecom are acceptable to qualify for this criteria and Telecom revenue can only be earned through telecom arm of business, registered separately as per TRAI guidelines, so can the turnover of IT/ITES and Telecom can be added from two legal entities (i.e. one company as SI and other as Telecom) working under same management?

As per modified RFP

3. 12 2.1.4 The lead bidder/ consortium partner must have completed/ partially completed (supplied all items) of atleast one project during financial years i.e. 2012-13, 2013-14, 2014-15 and 2015-16 in India having following scope of work: Building up of centralized command andcontrol. Deployment of video management software and command and control centresoftware to monitor 300 cameras.

Request you to accommodate experience of running 100 cameras from command &center, if the same is built by bidder OR Experience of building command & control and implementation of 300 cameras in a surveillance project can be from two different projects

As per RFP

Page 2: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 2 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

4. 13 2.1.5 The lead bidder/consortium partner should have commissioned and installed at least one ISO certified data center from April 2009 in India. An order value(including IT & Non IT but excluding basic building structure cost) of not less than 5 crores. Note: Bidder’s inhouse data centres shall not be considered. Bidders who have build their own Internet Data Centers for commercial use will be considered.

We hope that the following would be acceptable to qualify against this clause - 1. If IDC was set-up before April 2009 but still in operations and 2. IDC is ISO certified consistently ie. Certification is maintained since beginning

The order date for setting up of data center should be on or after April 1, 2009. Please refer modified RFP

5. 83 Bill of Material for Data Center

42U Rack Considered 6 rack for each location. Cat 6 cable 1000mtr, 1 No of jack panel, 100 no. of I/O , 24 patch cord each of 3ft & 7ft only for 24nos of each location. How is it possible to inter connect 6 racks at each location with this BOQ . Please share us the copper & fiber connectivity layout.

As per modified RFP

6. 83 Bill of Material for Video Surveillance room

6U Rack Considered 1 rack for each location, But there is no passive connectivity material in the BOQ. So please clarify how to connect Workstation, CCTV & IP Telephone

As per modified RFP

7. 84 Bill of Material for DIAL 100 Control

considered 15 workstation & 15 IP phone

There is no passive BOQ & rack As per modified RFP

8. 84 Forensic investigation room

considered 5 workstation & 5 IP phone There is no passive BOQ & rack As per modified RFP

9. 84 FMS/NOC Room considered 10 Desktop& 2 IP phone There is no passive BOQ & rack As per modified RFP

10. 9 5.39 no of rack required is not mentioned specifically

no of rack required is not mentioned specifically Refer Annexure-I, Bill of Material,Volume I of RFP

Page 3: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 3 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

11. 45 Volume II

Item NO 32 - D G Set S. No 3 & Sr. No 11

The Diesel Generator and other auxiliary motor shall be of H class with temperature rise limited to Class-F for temperature rise consideration

Since it is mentioned in this condition that the genset should be de-rated for taking care of the ambient conditions and a suitably larger genset should be provided so that it can deliver 180 kVA even under higher temperatures, clubbing the above condition with the temperature rise condition will cause the genset size to become much larger than is optimally required. Hence it is requested that the Generator insulation of Class H be asked for but temperature rise limited to Class F be removed or modified to Class H only.

As per RFP

12. 45 Volume II

Item NO 32 - D G Set S. No 5 a

Diesel engine shall be turbo charged multi cylinder V-type in line type with mechanical fuel injection system.

There should be a "/" between V type and inline as an engine can only be wither V type or inline but not both.

As per modified RFP. May be read as V type/inline

13. 48 Volume II

Item NO 32 - D G Set S No 17

An exhaust fan with louvers shall be installed in the enclosure for temperature control inside the enclosure. The air flow of the exhaust fan shall be from inside to the outside the shelter. The exhaust fan shall be powered from the DG set supply output so that it starts with the starting of the DG set and stops with the stopping of the DG set

No additional Fan will be required. The acoustic enclosure shall be able to meet the required criteria of keeping the enclosure temperature within 58 degree C with the assistance of the radiator fan itself. Hence this item may please be deleted.

As per RFP

14. 49 Volume II

Item NO 32 - D G Set S No 18

High quality rock wool of required density and thickness shall be used with fire retardant thermo-setting resin to make the Enclosure sound proof.

Kindly add High Quality Acoustic foam also as this is being extensively used now instead of Rock wool and is just as effective for noise control.

As per modified RFP. May be read as Acoustic foam/Rock Wool

15. 50 Volume II

Item NO 32 - D G Set S No 22

Preferred Engine make: Cummins Engine /Kirloskar Engine /Volvo/ Sterling Wilson

One of the makes mentioned here is NOT an engine manufacturer but a genset assembler. Addition of Mahindra make of engine is requested as it is a reputed brand.

As per modified RFP

Page 4: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 4 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

16. 64 Vol-I: Clause - 5. GENERAL TERMS AND CONDITIONS OF TENDER & CONTRACT: Clause -29 - Warranty

The bidder must supply all items(hardware as well as software) with comprehensive on-site OEM warranty valid for five years after the goods, or any portion thereof as the case may be, have been delivered to, installed and accepted at the final destination(s) indicated in the bidding document.

As regards 5 years warranty on UPS is acceptable but for batteries it is requested to amend the battery warranty to 2 years, battery being a consumable item. Also, Battery life is a function of no. of charging/ discharging cycles and depth of discharge on each cycle & hence cannot be predicted accurately. Therefore it is requested to amend the battery warranty to 2 years.

As per RFP

17. 50 Vol-II - Technical Specifications: Item No 33 - UPS for data centre: Sl. No.- 2

Standards A. Safety EN/IEC62040-1-1 B. Emissions EN50091-2 / IEC62040-2/ CISPR 22 Class A

It is requested to kindly consider CE certificate, as it suffice the specified certifications and amend the clause as : "A. Safety EN/IEC62040-1-1/ CE Certificate" "B. Emissions EN50091-2 / IEC62040-2/ CISPR 22 Class A/ CE Certificate" As CE certificate suffice both the certifications.

As per modified RFP

18. 52 Vol-II - Technical Specifications: Item No 33 - UPS for data centre: Sl. No - 16

Input Voltage Range - 304-477V It is requested to kindly amend the Input Voltage to "415V ± 15%" as per industry standards.

As per modified RFP

19. 52 Vol-II - Technical Specifications: Item No 33 - UPS for data centre: Sl. No - 23

Output Frequency a. Synchronized to mains over the range of 47-53Hz or 57-63Hz in normal operation

It is requested to kindly amend the clause as " Synchronized to mains over the range of 50 Hz ± 5% in normal operation"

As per modified RFP

Page 5: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 5 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

20. 53 Vol-II - Technical Specifications: Item No 33 - UPS for data centre: Sl. No - 33

Preferred make - APC (Schneider), Emerson, Delta

t is requested to kindly consider other brands also. This will allow wider participation & competition which may be advantageous to the department. Also, as per the recent initiative of Government of India for promoting "Make in India" products, it is highly recommended to allow other indigenous manufacturer such as ours "TRITRONICS brand" which is well known & empaneled vendor with many nationalized organizations. Debarring Indigenous manufacturers from participating will reduce competition

As per RFP

21. 53 Vol-II - Technical Specifications: Item No 34 - UPS for Command and Control Centre: Sl. No.-2

StandardsA. Safety EN/IEC62040-1-1B. Emissions EN50091-2 / IEC62040-2/ CISPR 22 Class A

It is requested to kindly consider CE certificate, as it suffice the specified certifications and amend the clause as:"A. Safety EN/IEC62040-1-1/ CE Certificate""B. Emissions EN50091-2 / IEC62040-2/ CISPR 22 Class A/ CE Certificate"As CE certificate suffice both the certifications.

As per modified RFP

22. 55 Vol-II - Technical Specifications: Item No 34 - UPS for Command and Control Centre: Sl. No.-16

Input Voltage Range - 304-477V It is requested to kindly amend the Input Voltage to "415V ± 15%" as per industry standards.

As per modified RFP

23. 55 Vol-II - Technical Specifications: Item No 34 - UPS for Command and Control Centre: Sl. No.-23

Output Frequency c. Synchronized to mains over the range of 47-53Hz or 57-63Hz in normal operation

It is requested to kindly amend the clause as " Synchronized to mains over the range of 50 Hz ± 5% in normal operation"

As per modified RFP

24. 56 Vol-II - Technical Specifications: Item No 34 - UPS for Command and Control Centre: Sl.

Preferred make - APC (Schneider), Emerson, Delta

It is requested to kindly consider other brands also. This will allow wider participation & competition which may be advantageous to the department. Also, as per the recent initiative of Government of India for promoting "Make in India" products, it is highly recommended to

As per RFP

Page 6: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 6 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

No.-33 allow other indigenous manufacturer such as ours "TRITRONICS brand" which is well known &empaneled vendor with many nationalized organizations. Debarring Indigenous manufacturers from participating will reduce competition.

25. Suggested Certification

ISO 9001, ISO 14001 & OHSAS - 18001 certification

We request to recommend that the UPS Systems to be supplied for this project should be ISO 9001, ISO 14001 & also OHSAS 18001:2007 Certified.

As per RFP

26. Suggested Certification

ROHS & CE Certification We request to recommend that the UPS Systems to be supplied for this project should be CE & ROHS certified with the mention of Make & Model on certificates.

As per RFP

27. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

Since Integration with local emergency numbers to be provisioned like fire station/police station etc then a local PRI gateway should be factored.Please specify volumetric data for such calls to size PSTN trunks

PRI Line is to be connected to EPBAX. The volume of data shall be shared with successful bidder.

28. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

Is any outbound dialer also required in order to make call back to any distress user

As per RFP.

29. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

For how much time Archival data for storing the user calls is required for future reference .

Allcallsreceived/dispatched at Dial 100 control room including calls through radio gateway shall be recorded and retained as per policy of GoR/Police Department. Expected time period for archival of calls is 5 years.

Page 7: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 7 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

30. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

How is the Police Radio network to be connected with Dial 100 setup and made available with the contact center operator

The bidder is expected to study the present Police radio network and ascertain connectivity requirements. However, the despatcher should also be able to make radio calls from his workstation.

31. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

Does this project also includes SIM to be provided to MDT devices.Is Vehicle tracking of all police vehicles is part of the scope, also what is the frequency of sending the coordinates to Police vehicles with MDT from the centralized MAP.

SIM for MDT devices shall be provided by GoR. Recurring charges for MDT shall also to be paid by GoR/Police Department.

32. Vol I , pg 33

Section 9 , point D Functional and operational requirements of Dial 100

What will be the resolution of maps to be provided with contact centre operator for different cities?Will it be provided by Rajasthan state

The GIS mapsof all seven cities shall be provided by Government of Rajasthan of scale 1:1000 or better

33. Vol I , pg 33

Section 9 , point D To receive collaborative videos from different locations (airport, railway stations, roadways, temples, forts, malls, metro stations etc.) and to display the selected videos on video wall and to store them, if required.

Please suggest the complete network connectivity with these different location to the central surveillance room

The selected bidder has to study the location of the collaborative cameras and suggest the possiblealternative methodsfor integration of the video feed from these cameras with CCC. The network connectivity shall be arranged by GoR.

Page 8: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 8 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

34. Vol I ,Pg 16

Section 3 The network bandwidth between cameras and data center shall be arranged by Government of Rajasthan. Uptime of video feed shall be governed through service level agreement with the concerned network bandwidth service provider.

Please share the details of this network connectivity solution if already planned so as to understand the aggregation throughput and video analytics feed (fps) which will be received centrally

As per RFP

35. Vol I ,Pg 65

The aggregate liability of the supplier/ selected bidder to the Purchaser, whether under the Contract, in tort, or otherwise, shall not exceed the the total contract value/amount/charges paid to the Supplier/ selected bidder until the time such claim was brought about, provided that this limitation shall not apply; i) to any obligation of the supplier/ selected bidder to indemnify the Purchaser with respect to patent infringement, and ii) any damages payable due to the Gross Negligence or Wilful Misconduct of the Supplier/selected bidder. For the purpose of this clause, Gross Negligence or Wilful Misconduct shall mean;

The manufacturer of equipment can only be held liable so the MAF of each OEM should have the liability on account of infringement so that the clause can be used effectively and it should be on SI for products produced/developed by SI. Hence we request you to put the liability clause in MAF OR restrict the clause to products manufactured by SI

As per RFP

36. Vol I ,Pg 65

Force Majeure clause The selected bidder should be paid for the supplied products and services till last day before Force Majeure

As per RFP

37. Vol I ,Pg 66

Termination for Convenience The selected bidder should be paid for the supplied products and services till last day of contract

As per RFP

38. 17 of 108 Item No 11 LCD Video wall As the application is 24x7 for at least 5 years. Change Request for DLPCube based Video wall.

As per RFP

Page 9: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 9 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

39. 17 of 108 Item No 11 , ser No 11

RGB, DVI-D, Display Port 1.2, HDMI,USB 2.0

Since the controller will connect to the panels with DVI the other inputs r not required. Change request for DVI inputs only.

As per RFP

40. 17 of 108 Item No 11, ser No 14

Safety- UL,EMC- FCC,Environment- Energy Star 6.0

Applicable in the US- For India it should be BIS . Change request for BIS certification

As per modified RFP.

41. 51 Item No 33 Clause No 13

Noise <58 dBA As per industry Standard it should be <65 dBA As per modified RFP.

42. 54 Item No 34 Clause No 13

Noise <58 dBA As per industry Standard it should be <65 dBA As per modified RFP.

43. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 91 - Volume II

Item No 50 : Help Desk Software - Point 3

3.The Service Desk shall manage all aspects of users service and support requirements from incident capture to problem resolution i.e. receive/ record user calls thru Web Phone/ IVRS, e-mail, SMS etc; provide initial assessment and attempt first line of resolution; monitor incidents and escalate them as needed, provide timely feedback to users, provide various management reports etc.

Within the clause it's been asked to receive/ record calls thru Web Phone/ IVRS, e-mail, SMS etc Please clarify is it "Web phone" or is it Web, Phone. Also please clarify that when it’s been asked to receive/ record calls thru IVRS; do you want an auto call logging using IVRS? Please provide make and model of IVRS if the same already exists. Our submission is to remove SMS as a method to receive / records calls unless it's operator assisted.

As per modified RFP

Page 10: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 10 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

44. RFP_for_City_Survellance_Vol_II_01_10_2015.pdfPage no. 92 - Volume II

Item No 50 : Help Desk Software - Point 7

7.Phone/ IVRS, e-mail, SMS etc; provide initial assessment and attempt first line of resolution; monitor incidents and escalate them as needed, provide timely feedback to users, provide various management reports etc. It shall provide a comprehensive solution that manages all aspects of service and support requirements from incident capture to problem resolution i.e.· Receive and record calls,· provide initial assessment and attempt first line of resolution,· Monitor incidents and escalate them as needed,· Provide timely feedback to users· Provide various management reports.

Within the clause it's been asked to receive/ record calls thru Phone/ IVRS, e-mail, SMS etcAlso please clarify that when it’s been asked to receive/ record calls thru IVRS; do you want an auto call logging using IVRS? Please provide make and model of IVRS if the same already exists.Our submission is to remove SMS as a method to receive / records calls unless it's operator assisted.

As per modified RFP

45. RFP_for_City_Survellance_Vol_I_01_10_2015 Page 8 of 131 - Volume I

Forensic Investigation Room(FR)

Forensic Investigation Room(FR) - To check authenticity of video and photo uploaded by field staff.

This authenticity will only be based on the device that has uploaded the video. It is highly impossible to determine the authenticity of all video and detect if they are forged or not in a short time and it required high-end forensic tools that are not mentioned in the RFP.

As per RFP

Page 11: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 11 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

46. RFP_for_City_Survellance_Vol_I_01_10_2015 Page 20 of 131- Volume I

Point # 2 Collaborative Monitoring - facilitate citizens after authentication (e.g. OTP) to upload video feeds to the CCTV System. VMS shall have provision to ensure that such video feeds are continuously streamed on one of the display of the Video Wall.

In collaborative monitoring, we expect that only IP Camera feeds are provided to the command center. It is also expected that at a particular span of time only limited number if cameras will be included in this scheme. Additional storage, compute and memory resources have to be augmented in the data center. Department to augment server and storage resources in the RFP as per the individual city

Both IP as well as Analog Camera feed would be required to be integrated with command center. Storage capacity has already been planned. Please refer operational specification of the project for details.

47. RFP_for_City_Survellance_Vol_I_01_10_2015 Page 88 of 131- Volume I

Indicative distribution of servers for each city

Indicative distribution of servers for each city

Request you to revisit the recommended server sizing mentioned : As industry norm, If the below recommendations are not followed then the entire investment in this RFP will be wasted and not all bidders will quote for the same Compute powers in the video analysis and forensic search capability. We recommend you to kindly issue the minimum servers and server specs & guidelines for all cities and for all cameras as per the following: For Video Analytics having Forensic Search Capabilities: Video Analytics Server has two components - 1. Image Processing Engine - Not more than 20-24 Channels is supported per Server having 8 cores and 16 GB of RAM 2. Meta Data Engine - This server provides the multi attribute search capabilities - For Every 5 Image processing engines, One Meta Data Search Engine is recommended having 8 Cores and 24 GB of RAM. For VMS: 1. Recording Server : For Every 70 Cameras there should be 1 Recording server having minimum 4 Cores and 16 GB of RAM - This can be extrapolated for N

Please refer Annexure - I (bill of material) mentioned in the RFP. Server breakup has also been provided. Detailed specifications of servers are provided in Volume-II of RFP document.

Page 12: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 12 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

number of servers across all cities 2. Failover Server - At each site there has to be 1 Failover Server 3. Management Server - At each Site there has to be 1 Management Server

48. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 83 - Volume II

Point # 2 Searching Capability Please clarify if the search capability asked in the section is against a particular record of incident?Also, individual systems have search capability within themselves as specialized tool - Is our understanding correct that the operator is expected to initiate the search in the specialized tool from a common UI.

Search would be required on complete stored video.

49. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 83 - Volume II

Point # 3 Audio and Video Encryption Please clarify the level of encryption that is required by the department. Any specific algorithm you want to have here?

As per RFP

50. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 84 - Volume II

Point # 4 Incident and Event Reconstruction - Search Capability

It will be meta data search on the video and audio file. Is our understanding correct?

As per RFP

Page 13: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 13 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

51. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 87 - Volume II

Point # 1,2 Detects digitally edited photos, videos and PDF files Software shall detect following type of video forgery: Source manipulation Splicing Copy Move forgery

Request department to mention the name of the software doing this functionalities in the Surveillance market space. These are specialized software’s that are available to only government bodies . Also, if we are saving the live CCTV footages in the DB securely managed by the department then such forgery level is not expected. Also, Photos, videos and PDF files forgery detection is the job of Law Enforcement departments and Government Forensic Labs. This requirement is not going to solve the real purpose of City Surveillance. Also, The cost factor will make it unviable for the entire project. Requesting department to either remove this functionalities or make it non-mandatory.

As per RFP

52. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 87 - Volume II

Point # 3 Software shall have the capability to match photograph

Please mention the Facial Recognition engine in the BOQ as well.

As per modified RFP

Page 14: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 14 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

53. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 87 - Volume II

Point # 4 Software shall have the capability to determine whether or not JPEG photos have been digitally altered (“photo shopped”) since leaving the camera or mobile device, i.e. determining if the photo has been processed by any photo editing softwareSoftware shall have the capability to Identify a source camera to detect the particular camera or mobile device used to capture a digital photo, proving a particular image was obtained by a particular device. It should be able to differentiate between video and image taken from cameras and smartphones of the same make and model.

The tools are there in the market to do this job but implementation, maintenance and doing day to day work on this tool requires specialized Forensic Experts and not the IT experts.In a surveillance environment, it is expected to match the photo from live CCTV, Recorder footage, images captured only and the tools does this but if you try to do Forensic search of this nature before doing search then each search will take around a day to complete. Not all such algorithms provided by vendors are 100% accurate, even a 1% mistake at the department level may mounts to legal proceedings against the Forensic Expert.It would be optimal to assume that the department is receiving the correct video feeds and images and processing these images and provides the output. We can only provide our opinion here to remove this section or make it non-mandatory or put it as R&D Area. Decision is of the department It is a VERY HIGH RISK TECHNOLOGY from LEGAL point of view.

As per RFP

54. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 15 - Vol II

a. Usable 2 PB Storage Point # 11

Bidder has to ensure complete backup of audio and video recording, snapshot/clone of all virtual machines and application software from all storage appliances and servers installed in datacentre.

Understanding is backup will be done using backup software? Pl clarify does bidder has to factor backup software to meet this requirement

Selected bidder is required to keep a copy of the recordings, Virtual machines configuration, and application software on secondary storage. The selected bidder has to design solution of copying data to secondary storage.

Page 15: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 15 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

55. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 14 -Vol II

Item No 9 Item No 9 : Secondary storage Does the secondary storage will be use to store backed/Archived data? Pl clarify

Secondary storage will be used to store audio and video data, snapshot/clone of configuration of all virtual machines and application software from all servers and storage appliances installed in datacentre.

56. RFP_for_City_Survellance_Vol_II_01_10_2015.pdf Page 16 - Vol II

2. Shared File System Tape Library

The bidder has to consider following licenses. It is the bidder responsibility to make the solution operational as per RFP requirement. 1. Shared File System client licenses for SAN - Jaipur 16 Other Cities - 14 Total - 100 2. Shared file system client licenses for LAN (Workstations) Jaipur - 24 Other Cities - 20 Total - 200

Single vendor specific clause on licensing. Different OEM's has multiple way to do licensing. For other bidders to quote request to amend the clause as " required licenses to be quoted by bidder"

As per modified RFP

Page 16: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 16 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

57. RFP_for_City_Survellance_Vol_I_01_10_2015.pdfPage 32 - Vol II

C. Data Center requirement of City surveillance & Incident Response system.Point # 6

200TB storage shall be used for taking backup of incidents required to be stored for a longer duration or to be used in courts.

Understanding is backup will be done using backup software? Pl clarify does bidder has to factor backup software to meet this requirement

Video of all Incidents is required to be copied on separate storage and is to be retained for longer duration of time using VMS software. The bidders have to work on the solution with the OEM of VMS software.

Page 17: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 17 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

58. 11 Item No 7 : 220 TB Usable Storage-Controllers and Item No 8 : 400 TB Usable Storage-Controllers

· 2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers · The SI shall be responsible for smooth flow of video at CCC for live video, playback and video analytics. In case the complete solution requires higher cache the SI has to provide cache accordingly. · The controllers I Storage nodes should be upgradable seamlessly, without any disruptions I downtime to production workflow for performance, capacity enhancement and software I firmware upgrades.

With tremendous experience on Surveillance solutions in India and worldwide, we can authoritatively claim that 64GB cache is way too high for such a requirement. 32GB cache will be more than enough for this solution. 64GB cache will only escalate the cost, and will favour the OEM's with such inefficient vendors, who needs very high cache due to their internal OS overheads. You can ask for SSD based cache support on the storage array, so that you can use the same array for future analytics as well. The upgradation of storage controllers to a higher model does require a few hours of downtime, and should be allowed. During these few hours, the recorders can be directed to record on space from other array, so that there is no downtime for video recordings. We request you to allow the same. Suggested Changes: · 2 numbers of Controllers in active/active mode – Unified Storage with 32 GB onboard protected DRAM Cache across SAN controllers. Offered storage must be able to support at least 500GB SSD drives based read and write cache for future cache needs. · The SI shall be responsible for smooth flow of video at CCC for live video, playback and video analytics. In case the complete solution requires higher cache the SI has to provide cache accordingly. · The controllers I Storage nodes should be upgradable to a higher model in the same family, without the need of any data migration, for performance, capacity enhancement and software/ firmware upgrades.

As per RFP

Page 18: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 18 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

59. 11 Item No 7 : 220 TB Usable Storage-Ports and Item No 8 : 400 TB Usable Storage-Ports

Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet and 2 replication ports

You have asked for very less ports. Each FC port has a "queue depth", which means the number of I/O's it can queue. This is irrespective of the speed of the port (8Gbps or 16Gbps). Hence you must ask for at least 8 x 16Gbps ports and 8 x 10G Ethernet ports. Suggested Changes: Min. 8 * 16/8 Gbps FC ports, min. 8 * 10G Ethernet and 2 replication ports

As per RFP

60. 13 Item No 8 : 400 TB Usable Storage-Ports

Additional Point If you intend to keep the incident data on this array, it must have regulatory compliance in terms of Encryption and WORM features. The same has not been asked here. We request RISL to consider the same, as this data can be used as evidence in the court. Suggested Changes: Since a large part of this array will host the incidents related data, there must be controller based data encryption support for this array. The storage array must be supplied with a WORM (write once & read many) functionality, so that the incident data cannot be tampered with.

Tamper proofing using digital signature is already part of specification of VMS software for the recorded video. Please refer detailed specification of VMS software in Volume -II of the RFP document.

61. 14 Item No 9 : Secondary storage

Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet

There seems to be no need for FC ports. If the offered solution does not require FC ports, will you allow the bidder to quote the array without FC ports? Suggested Changes:Min. 8 x 10G Ethernet ports

As per RFP

Page 19: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 19 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

62. PRE-QUALIFICATION/ ELIGIBILITY CRITERIA

Technical Capability for proposed original developer of VMS software –I : The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

DVTEL Inc. is one of leading manufacturers of IP based CCTV system including enterprise level software, IP cameras and Encoders. We have successfully deployed more than 1000 cameras and integrated with Command and control Software during financial year 2010-2011. Request you to kindly consider the same.

As per RFP.

63. Item No 44: Video Management Software (ONVIF Profile S Compliant)

S.No. 7 : Language Support - VMS software shall be able to provide Standard Operating Procedures to operators in Hindi Language

We request to accept English as the main Language for operators since English being a universal language. In Hindi, it’s very difficult to translate the technological terms used for CCTV Surveillance.

As per RFP

64. Item No 44: Video Management Software (ONVIF Profile S Compliant)

S.No. 52 : Redundancy - The Video Management System shall support high availability of recording servers. A failover option would provide standby support for recording servers with automatic synchronization to ensure maximum uptime and minimum risk of lost data. Minimum required is N:1 OR N:N Redundancy.

We request you to please clarify here about the exact requirement if it is N: 1 or N: N. Also please confirm the value of N that means how many servers requires for N: 1 or N: N redundancy

Breakup of number of recording servers and spare servers have already been provided in the RFP, Vol I, Annexure I.

65. Item No 46: Video Analytics

S.No. 1 : Features We assume that the required Video Analytics will be applicable for 5 to 10% of the total cameras. Please confirm.

As per RFP. Refer Annexure I,Vol I of RFP

Page 20: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 20 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

66. Page -14 Vol 1

12- Certifications The lead bidder /consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

• We request to relax the CMM Level 3 clause since this project does not require any software development . • Even the customization required can only be done the original software OEM hence the bidders are not required to do any software development exercise.

As per RFP.

67. Page 43-Vol 1

8- Bid Security In lieu of bid security, a bid securing declaration shall be taken from Departments of the State Government, Undertakings, Corporations, Autonomous bodies, Registered Societies and Cooperative Societies which are owned or controlled or managed by the State Government and Government Undertakings of the Central Government.

Please suggest any format As per RFP

68. Page 42- Vol 1

5b-Format and signing of bids

All the documents uploaded should be digitally signed with the DSC of authorized signatory.

Please suggest if bid can be uploaded by any of the one lead bidder or partner bidder

The uploaded RFP has to be digitally signed by authorized signatory from Lead bidder.

69. Page 17- Vol 1

Point 12 The city surveillance and incident response system should support integration of following as and when required :

Need details of Red Light Violation system, Speed violation system and ANPR

As per modified RFP

70. Page 59- Vol 1

Point 9 d-Delivery & Installation

Shifting the place of Installation: The user will be free to shift the place of installation within the same city /town/ district/ division

Additional down time will be required and this need to be out of SLA.

As per RFP

71. Page 9-Vol 1

Point 2-Project Overview

storage of historical video data of minimum 15 days

Any archival solution is required? There is no mention of archival solutions in RFP

As per RFP

Page 21: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 21 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

72. Page No-62

Volume-2, ITEM-38 Preferred Make: Systimax (CommScope), Simon/ Nexan/Corning/ Panduit/ Legrand

Make Corning doesn’t have CAT6a item & Except one brand all other make having very limited availability. Please add molex in approved make.

As per modified RFP

73. Page No-62

Volume-2, ITEM-38, SrNo-1

The Nominal Outer diameter of the cable should not exceed 0.285 in. (7.24 mm)

OEM specification to favoring one brand. As per modified RFP

74. Page No-62

Volume-2, ITEM-38, Sr No-6

The cable should be available in Non-Plenum, Plenum and Low smoke Zero halogen versions to meet the installation and safety requirements

Plenium, Non Plenium& LSZH all three are separate specification. Proposed for LSZH (Low Smoke Zero Halogen) in CAT6A Cable.

The cable should be available in Non-Plenum/Plenum/Low smoke Zero halogen versions to meet the installation and safety requirements. As per modified RFP

75. Page No-62

Volume-2, ITEM-38, Sr No-7

Electrical performance guaranteed to meet or exceed the channel specifications of Amendment 1 to ISO/IEC 1180:2001 Class EA, and ANSI/TIA-568-C.2 Category 6A up to 500 MHz when used as part of a CAT 6 A U/UTP Channel installations

Should be CAT6A U/FTP Shielded. As per RFP

76. Page No-62

Volume-2, ITEM-38, Sr No-9

The cable, patch cords and connecting hardware shall be UTP components that do not include internal or external shields, or drain wires

CAT6A (10G) Shielded Solutions is better than UTP for helpful in EMI (Electrical Magnetic Interference). Proposing all CAT6A Cable with component should be U/FTP with individual Pair separation with shielded foil.

As per RFP

77. Page No-62

Volume-2, ITEM-39, Sr No-2

Electrical performance guaranteed to meet or exceed the channel specifications of Amendment 1 to ISO/IEC 11801: 2002 Class EA and ANSI/TIA-568-C.2 Category 6A when used as part of a CAT 6 A UTP Channel in registered installations

Electrical performance guaranteed to meet or exceed the channel specifications of Amendment 1 to ISO/IEC 11801: 2002 Class EA and ANSI/TIA-568-C.2 Category 6A when used as part of a CAT 6 A Shielded Channel in registered installations

As per RFP

Page 22: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 22 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

78. Page No-62

Volume-2, ITEM-39, Sr No-5

Should be a non-keystone product Should be Shutter Shielded Jack to protect from dust & EMI Protection.

As per RFP

79. Page No-63

Volume-2, ITEM-40, Sr No-1

Listing :ETL/cETL listed UL Listing for Patch Cords (As UL mention in CAT6A, Patch Panel, IO )

As per modified RFP

80. Page No-63

Volume-2, ITEM-40, Sr No-5

Electrical performance guaranteed to meet or exceed the channel specifications of Amendment 1 to ISO/IEC 11 801:2002 Class EA and ANSI/TIA-568-C.2 Category 6A up to 500 MHz when used as part of a CAT 6 A UTP Channel in registered installations

Electrical performance guaranteed to meet or exceed the channel specifications of Amendment 1 to ISO/IEC 11 801:2002 Class EA and ANSI/TIA-568-C.2 Category 6A up to 500 MHz when used as part of a CAT 6 A U/FTP Shielded Channel in registered installations

As per RFP

81. Page No-63

Volume-2, ITEM-41, Sr No-2

The patch panel shall have electrical performance guaranteed to meet or exceed TIA/EIA 568-C.2 Category 6A and ISO/IEC Class EA specifications

The patch panel shall have electrical performance guaranteed to meet or exceed TIA/EIA 568-C.2 Category 6A Shielded and ISO/IEC Class EA specifications

As per RFP

82. Page No-64

Volume-2, ITEM-41, Sr No-5

The Modular panel shall have granularity of single outlets as well a group of 6 outlets

Should be separate individual shutter shielded Jack in patch panel with rear cable manager for easiest installation & removable.

As per RFP

83. Page No-64

Volume-2, ITEM-41, Sr No-6

The Modular panel shall also have a built-in Cable manager in the front

The Patch Panel with CRS (Cold Rold Steel) and rear cable manager.

As per RFP

Page 23: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 23 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

84. 12 PRE-QUALIFICATION/ ELIGIBILITY CRITERIA Point No 6

Technical Capability for proposed VMS Vendor-I The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Please consider revising & relaxing the criteria tosuccessful completion of a project of similar nature i.e.city surveillance/airport/critical infrastructure of atleast two or more projects 500 IP cameras for VideoManagement Software & Video Analytics Softwarewith/without Dial 100 solution software duringfinancial years 2012-2013, 2013-2014, 2014-2015 and2015-2016 in India. Reasoning - As you know there arehardly any large city surveillance project commissionedin India with more than 1000 cameras and that toointegrated with CCR/Dial 100 solution. Therefore it ishumbly requested to relax the criteria as requestedherein above.

As per RFP

85. 12 PRE-QUALIFICATION/ ELIGIBILITY CRITERIA Point No 7

Technical Capability for proposed original developer of VMS or authorized partner -III The VMS OEM or its authorized partner should have customization center in India

The original developer only of VMS & VA software should have his development or customization centre in India from last 3 financial years. The customization centre of authorized representative of the OEM is practically not possible. Reasoning - Software development is intellectual property driven activity and no software OEM would outsource such activity to a 3rd party for customization.

As per modified RFP

Page 24: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 24 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

86. 82 Vol II, Video Analytics

People Search: Searching person based on single and multiple attributes like baldness, hat, glasses, sun glasses, hair color, skin tone and texture etc.

Request – Please withdraw this requirement. Reason – Given the situation of city wide surveillance /open uncontrollable environment, the above video analytics are technically not practical for a VA engine to analyze. The people search with such attributes is possible only when an operator is searching from the recorded footage on manual intervention. Hence kindly update this clause by adding “manual intervention” OR withdraw the clause. It may be possible to perform colour search on recorded video on best effort basis.

As per RFP

87. 62 Vol II, Item No 38 to 47

Preferred Make: Systimax (CommScope), Simon/ Nexan/Corning/ Panduit/ Legrand

Schneider is already serving Rajcomp on multiple projects like Rajnet. As per Vol II- Network Cabling Tender Technical Specification's Brand Name, Schneider is comply with the specification. Hence request to amend the name of schneider to have the right competition in the bid in term of technical and commercial advantage for the institute Schneider electric follows all the standards and complied to all the specifications laid down by global and local bodies of the country of operations

As per RFP

Page 25: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 25 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

88. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

2PB of usable storage capacity for archiving the Video files for at least 30 days.

Query- Kindly Confirm what type of storage is required for Secondary Storage e.g. SAN / Unified Storage, Drive Type , Drive count along with the Cache Size. Query- How many controller is Sized/ Required for 2 PB capacity for data Archiving &retrieval. Suggestion- As per the Latest Guidelines from Home Ministry on 12 Months Retention for City Surveillance data, How do you ensure the cost benefits of Secondary Disk Storage V/s Offered Tape Option. Kindly Consider / Calculate the Costing (TCO) for the period of 12 months for Disk Storage V/s Tape option along with the Power, Colling, Datacenter Rack/ Space Expenses.

As per RFP

89. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Should be able to efficiently store PBs of data, billions of small files and/or large media files and Video Surveillance data.

Suggestion- The offered secondary storage should provide Single name Space for Archiving to allocate the same Drive letter to all Recording servers. Query- Every storage system has a recommendation for a min. no. of drive chassis per pair of controller node, Kindly Confirm the Pair of Controllers are able to provide 2 PB of single name space capacity.

As per RFP

90. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Storage system must have protection mechanism with no single point of failure.

Suggestion- Storage System should be asked with RPS, Dual RAID Controllers for RAID-6, Hot Spare drive per self along with the Data integrity mechanism for the Protection.

As per modified RFP

91. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Solution must be flexible to address a wide range of applications and unstructured data (such as video files, image files, e-mails and documents).

Suggestion- Storage should also have the capability to keep upto 2-3 copies of each files for Archived data on a flexibility perspective. Query- Disk Storage should also have the Vaulting option if need to increase the retention duration.

As per RFP

Page 26: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 26 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

92. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Storage system must support high density disk enclosure of 4 TB to 8TB HDD capacity

Query- Kindly confirm Drive Type i.e. 3.5/ 2.5 inch. Suggestion- All the drives should be Non-returnable drives in case of Faulty Disk Replacement on per disk/ per shelve or chassis likewise tapes, Kindly add the Non-Returnable Drive to the Disk Storage. HDD should be Self Encryption Drives (SED Drives), if Drives are returnable Drives on its failure.

As per RFP

93. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Bidder to provide all the necessary software to configure and manage the storage space, RAID configuration, logical drives allocation etc.

Query- Software should also have the capability to Provide/create the single name space for 2 PB capacity likewise the Filesystem &Tape Option.

As per RFP

94. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Should also include storage performance monitoring and management software.

Query- Management processor speed is not mentioned for data retrieval on its performance parameter.

As per RFP

95. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Should provide the functionality of proactive monitoring of Disk drive and Storage system for all possible disk failures

Query- Disk Storage Solution should also have the option to provide the Reporting / Advanced Reporting to report the issues to Admin's Mail after monitoring it. Suggestion- Kindly confirm on the Colling requirement, Power consumption using with Disk option v/s Tape Option. This should also be considered as a part of the Storage Cost while comparing both options for Secondary Storage option.

As per RFP

Page 27: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 27 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

96. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 1: Usable 2PB Storage

Bidder has to ensure complete backup of audio and video recording, snapshot/clone of all virtual machines and application software from all storage appliances and servers installed in datacentre.

Query- if Audio Video content movement is done thru the VMS application then how the application backup is performed e.g Standard Backup Application. It is it giving the Granular recovery of each data set. Or at the time of recovery of a single file is it restoring the complete image/ snapshot.

As per RFP

97. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Tape library

No. of Active Media Slots -80 Query- Kindly confirm the physical slot availability within the same Tape Library i.e. 400 physical slots capacity, along with Active slots as 80. Cartridges should be moved from Active slots to physical slots on User Action/ Console within the Library using internal Robotics.

As per modified RFP

98. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Tape library

Interface - 8Gb/s Dual Port Fibre Channel (auto-negotiates to 4Gb/s or 2 Gb/s); 6 Gb/s Dual Port SAS (auto-negotiates to 3Gb/s)

Query- Kindly Remove the Dual Port FC drive as Dual Port Drive will not be available on its Launching. And Remove the SAS interface option as a standard Mid-range Tape Library comes with FC Interface Drives only. Suggestion- Kindly change it to " 8Gb/s FC native LTO Drives (auto-negotiates to 4Gb/s) "

As per modified RFP

99. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Tape library

Encryption Capability - 256 bit advanced encryption standard

Suggestion- Kindly Remove the Encryption from Tape library level, as it is managed from Source location i.e. VMS & its File System.

As per modified RFP

100. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Tape library

Advance reporting feature - Yes Query- Reporting Features are by-default added to the Tape Library without Advance Reporting License. Suggestion- Kindly Remove the Advance Reporting option.

As per modified RFP

Page 28: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 28 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

101. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Shared File System Tape Library

The Shared SAN File System shall support large file systems and data archives scaling to Petabytes(PB)

Query- Kindly Change the Specification as " The Shared SAN File System Software shall support large file systems and in-Built data archiving mechanism, scaling to Petabytes(PB)"

As per modified RFP

102. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Shared File System Tape Library

Offered solution shall support in future close integration between the Shared SAN File System and HSM/ILM software. Shall have the HSM functionality for moving the data onto Tape Library along with File System function.

Suggestion- Kindly confirm, the proposed File System should have the Integrated / In-built HSM Functionality within the same GUI console. It should not use the additional HSM/ Backup/ Archive software along with it to move the data on Secondary Storage.

As per modified RFP

103. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Shared File System Tape Library

The Shared SAN File System should present a single global namespace view of all the files and directories in the file system to all the heterogeneous clients.

Query- Kindly Confirm , The Shared file system should support the different/ multiple make Storage under the same single Global name space view for all the users/ files in the same / single file system view to all the Heterogeneous client at the time of Storage Expansions.

As per RFP

104. Page no.14 of Volume-II

Item No 9 : Secondary storage/ Option 2: LTO 7 Shared File System Tape Library

Shared file system client licenses for LAN (Workstations) - 144 ( 24 + 20x6)

Query- Kindly confirm on the no. of LAN Client details for the other Cities.

As per modified RFP

105. New New New Suggestion- Offered solution should be based on the no. of SAN/ LAN Clients not based on the CPU/ Sockets.

As per modified RFP

Page 29: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 29 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

106. 12 Section 2 clause 1 In case of a consortium, a Consortium Agreement must be submitted, duly signed by the consortium members. The Consortium Agreement must clearly specify the stake of each member and outline their roles and responsibilities as per Annexure-18

Central PSUs may be exempted from the requirement of stake while forming consortium by signing an MoU

As per RFP

Page 30: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 30 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

107. Page 11 Clasue No. 2. Pre Qualification Criteria-(1)- Legal Entity

The bidder should be a Proprietorship firm duly registered either under the Rajasthan Shops & Commercial Establishments Act, 1958 or any other Act of State/ Union, as applicable for dealing in the subject matter of procurement(Note: A self-certified declaration regarding the non-applicability of registration to any Act should be submitted by the bidder)ORA company registered under Indian Companies Act, 1956ORA partnership firm registered under Indian Partnership Act, 1932.ORConsortium is also allowed. The consortium shall not consist of more than two companies/ corporations and shall be formed under a duly stamped consortium agreement. (Attach Proof). In a consortium, one of the partners shall be designated as a "Lead Partner". The bidder or Lead partner of the consortium shall be an Information Technology and Communication Company/ Corporation. Every member of the consortium shall be equally responsible and jointly and severally liable for the successful completion of the entire project. In case of any issues, Lead Partner shall be responsible for all the penalties.

Please allow Indian companies (100% subsidiary to foreign company) registered under Indian company’s act 1956 to use parent company technical and financial credentials to suffice legal entity.

As per RFP

Page 31: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 31 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

108. Page 11 2.Turnover from IT/ITES

Annual Turnover of the lead bidder from IT/ ITeS/Telecom during each of the last three financial years, i.e., from 2012-2013, 2013-2014 and 2014-2015 (as per the last published audited balance sheets), should be at least Rs. 300 Crores.

Please consider lead bidder avg. Annual Turnover from last 3 years of Rs.175crore at par with Tender value.

As per modified RFP

109. Page 11 Financial: Net Worth

The net worth of the lead bidder, as on 31st March 2015, should be Positive.

Please allow Indian companies(100% subsidiary to foreign company) registered under Indian companies act 1956 to use parent company financial credentials

As per RFP

110. Page No.12

Technical Capability for proposed original developer of VMS software -I

The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India

Please consider VMS software of India and Global credentials with service support available in India

As per RFP

Page 32: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 32 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

111. Pg 11 & 12

Technical capability-I The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work:· Building up of centralized command and control centre.· Deployment of Video management software and command and control centre software to monitor atleast 300 cameras.orThe lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work for each project:· Building up of centralized command and control centre· Deployment of Video management software and command and control centre software to monitor atleast 200 cameras

Please consider similar foreign credentials. As per RFP

Page 33: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 33 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

112. page 13 Technical Capability for proposed original developer of Dial 100 software

The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Please consider Original developer of Dial 108, Dial 1090,Dial 1099 those have similar feature and application as similar to Dial 100. Please consider Dial 100 or equivalent.

As per RFP

113. Page No 24

S. No 9 Lens Fixed IRIS 2.8-10mm, F1.7, 3x optical zoom,10x digital zoom

Kindly change Fixed IRIS 2.8-10mm, F1.7, 3x optical zoom,10x digital zoom to 2.8 to 12 MM with Digital zoom

As per RFP

114. Page No 25

S.No1,2 Digital Video Recorder for internal surveillance

Please clarify its for DVR or NVR Requirement As per modified RFP

115. Page No 25

S.No 3 ATM/ POS transaction text information recording and search with corresponding video

Please clarify that where we have to install As per modified RFP

116. Page No 25

Certification Kindly add certification Like CE,FCC, NABL accredited govt Lab

As per modified RFP

117. 12 PRE-QUALIFICATION/ ELIGIBILITY CRITERIA Point No 6

Technical Capability for proposed VMS Vendor-I The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 20132014, 2014-2015 and 2015-2016 in India.

Please consider revising & relaxing the criteria to successful completion of a project of similar nature i.e. city surveillance/airport/critical infrastructure of at least two or more projects 500 IP cameras for Video Management Software & Video Analytics Software with/without Dial 100 solution software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

As per RFP

118. 12 PRE-QUALIFICATION/ ELIGIBILITY CRITERIA

Technical Capability for proposed original developer of VMS or authorized partner -III The VMS OEM or its authorized partner should have customizationcentre in

The original developer only of VMS software should have his development or customization centre in India from last 3 financial years.

As per RFP

Page 34: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 34 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

India

119. Volume-I,Pg.-11

1. Legal Entity Consortium is also allowed. The consortium shall not consist of more than two companies/ corporations

Since requirement calls for various specialized solution in terms of Surveillance, Data Center, Facility Management, Emergency Communication system etc. In view of this fact, we request you to consider minimum of 3 consortium members including prime bidder.

As per RFP

120. Volume-I, Pg.-13

12. Certifications The lead bidder /consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

CMMI and other such ISO certifications are meant for IT/ ITeS companies only, whereas as per clauses 1 & 2, Telecom companies are allowed. Request you to make it generic as per industrial practice.

As per RFP

121. Volume-I, Pg.-9

Dial 100 Control Room (DR100)

To be able to attend phone calls from citizens, dispatch calls, use GIS maps and to send instructions to nearest police station, PCR Van, ambulance etc.

Since the call location in terms of coordinates of the person in distress lies with various cellular companies, how it would be linked to CCC and Dial 100. Who shall provide the GIS maps? To be provided by Govt. of Rajasthan or the implementing agency has to procure it.

The GIS maps shall be provided by GoR.

122. Volume-I, Pg.-13

(6) Technical Capability for proposed original developer of VMS software -I

The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Since the tender is for establishing Command and Control center and integrating various services hence the OEM for Command and Control center should have atleast 1 deployment in India for a minimum of 200 cameras running since past 1 year.

As per modified RFP

Page 35: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 35 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

123. Volume-I, Pg.-20

2. Collaborative Monitoring

Bidder has to provide a solution which will have a collaborative framework for receiving video feeds from various systems and sub-systems of public and private establishments like malls, airport, railway stations, bus stands, temples, forts etc.

Please provide the maximum numbers of cameras licenses to be considered in each city for collaborative monitoring so that all bidders are on the same platform while responding.

As per modified RFP

124. Volume-I, Pg.-20

3. Integration of city surveillance system with RAAS

Bidder shall be responsible for integration of complete city surveillance system with Rajasthan Accountability Assurance System (RAAS) Application Software Platform for GPS monitoring.

Kindly confirm that API/SDK shall be provided for the integration.

API/SDK of RAAS application shall be provided for integration to the successful bidder.

125. Volume-I, Pg.-66

34 (c) Termination for Convenience

As on effective date of termination, Tendering Authority may pay all the services delivered by the Bidder and accepted by the purchaser, the consideration payable shall be based on service rate as per agreement.

Kindly amend the clause as: All the balance CAPEX shall be paid in case of termination by convenience apart from the services as on date.

As per modified RFP

126. Volume-I, Pg.-70

24) Audio Support (Two Way Audio communication)

The VMS client software shall be able to view live Video and audio, recorded video and audio, and be able to configure the complete system all from a single application. The Audio shall be broadcasted through loudspeakers from control room to the cameras connected to external speakers. Operator shall be able to select particular camera speaker to enable the public addressing.

Camera specifications do not support Audio. Hence incase the Audio needs to be broadcast using Public Address system then IP based PA system is required.

VMS software should support audio. In future, cameras with audio facility may be installed in the city surveillance system.

Page 36: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 36 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

127. Volume-I, Pg.-71

(27) Monitor support per client

The VMS software shall have the capability to run multiple client applications simultaneously on one workstation with multiple monitors. Up to 4 monitors shall be configured on a single workstation with one (1) client application running on each monitor.

VMS Can run multiple panes and tiles and even multiple users but as a single client at a time. Please clarify how can multiple operators sit simultaneously on a single Workstation.

It should be possible to run multiple instances of client VMS software on multiple monitors attached to single workstation.

128. Vol 1, pg 13 of 131

Technical Capability for proposed original developer of VMS or authorized partner -III

The customization center can be of any authorized partner or the same partner with which the OEM is bidding?

Any authorized partner of VMS

129. Vol 1, pg 13 of 131

Vol.1- Technical Capability for proposed original developer of Dial 100 software

The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 20122013, 2013-2014, 2014-2015 and 2015-2016 in India.

Please clarify if the certificate for integration should be that of a DIAL 100 with Command & Control OR DIAL 100 with Video Management?

As per modified RFP

130. Vol 1, pg 20 of 131

Vol.1- 3. Integration of city surveillance system with RAAS

Bidder shall be responsible for integration of complete city surveillance system with Rajasthan Accountability Assurance System (RAAS) Application Software Platform for GPS monitoring.

Please provide details on this system, look & feed, Make, OEM, Confirmation if SDK/API shall be provided by RISL?

API/SDK of RAAS application shall be provided for integration to the successful bidder.

131. Vol 1, pg 32 of 131

Vol.1- D. Functional and operational requirement of Dial 100 Control Room

D. Functional and operational requirement of Dial 100 Control Room

Please clarify if the call recording system calls, which records the telephony calls, radio gateway calls, and dispatcher calls shall be encrypted

The recorded calls shall be tamper proof and non-editable.

132. Vol 1, pg 33 of 131

All Action Taken data should be available to Call Taker, Dispatcher and Supervisor through logs.

Please clarify, if this action taken data records which are stored can be allowed to tamper? Or it should be non-editable, encrypted data format.

The action taken data is required to be tamper proof and non-editable.

Page 37: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 37 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

133. Vol 1, pg 34 of 131

6. The forensic operators shall also have access to recorded voice communications of dial 100 control room and radio gateway.

For how long should this data be recorded and should it be secure encrypted format?

All calls received/dispatched at Dial 100 control room including calls of radio gateway are to be recorded and retained as per policy of GoR/Police Department. Expected duration of call recording is 5 years. Recorded calls should be tamper proof and non-editable.

134. Vol 2, pg 80 of 108

Clause 94, Social Media monitoring Whatsapp is not a Social media Open source, but a Chat platform. It would not be possible to monitor Whatsapp system from the specifications of the system software defined in this RFP. Please confirm that it should not be recorded and monitored as it is not possible.

As per RFP

135. Vol 2, pg 80 of 108

Clause 94, Social Media monitoring Please advise what should be done if there is a change in the API of Facebook/Twitter etc, should the OEM/bidder factor changes in the API's of the OPEN Social media sites as part of the Maintenance program?As there will be a commercial I pact on this.

The bidder has to factor change in the application program due to change in API of Facebook/twitter etc. as part of maintenance program.

136. Vol 2, pg 96 of 108

All calls should be recorded and tagged withthe concerned event. They should be easilyretrievable. The call should be recorded as itenters the system i.e if a call is transferredfrom console to console the recording shouldcontinue and be stored for the desiredperiod.

Please clarify the duration of the calls to be recorded. Please clarify if this includes calls of the radio gateway and dispatcher calls?. Please clarify if the call recordings should be tamper-proof and encrypted.

All calls received/dispatched at Dial 100 control room including calls of radio gateway are to be recorded and retained as per policy of GoR/Police Department.

Page 38: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 38 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

Expected duration of call recording is 5 years. Recorded calls should be tamper proof and non-editable.

137. Vol 2, pg 96 of 108

the software should have capabilities to set the Standard Operating Procedures (SOP) for Call Taker. The same needs to be invoked during event creation by the Call Taker. It should also be possible to remodel the event, event sub types, priorities and type of service required by using a remodelling tool.

Please clarify if this means DYNAMIC SOP Management?, meaning SOP can change course depending on the flow of the incident & Situation?

As per RFP

138. Vol 2, pg 100 of 108

There should be provision for recording of all vehicle movements on map - date wise, vehicle wise.

Please clarify if this movement recording can be tamperable or it should be tamper-proof?

The recording of vehicle movement shall be tamper-proof.

139. Vol 2, pg 100 of 108

the software should have the capabilities toset the Standard Operating Procedures(SOP's) for Dispatcher. The same needs to beinvoked during creation of event or dispatchthe vehicles.

Please clarify, if the Dispatcher should also support DYNAMIC SOP Management?, meaning SOP can change course depending on the flow of the incident & Situation?

As per RFP

140. Vol 2, pg 108 of 108

3. Continuous listening of Radio Analog voice channel

Please clarify, how many channels would need continuous listening?

The despatcher home channel shall need continuous listening and recording of the channel.

Page 39: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 39 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

141. Vol 2, pg 108 of 108

The system should be equipped with a voice recording system so that all the voice conversations can be recorded

Should the call recording be tamperproof and encrypted?

The call recording is required to be tamper proof and non-editable.

142. Vol 2, pg 108 of 108

RADIO RECORDS The radio communications should be recorded by the system.

Please confirm if this includes the TALKGROUP ID's and other information on radio calls

If police department is using TalkGroup id then it needs to be recorded.

143. Vol 2, pg 108 of 108

Voice recording for full conversation is saved on a shared network path

Should the call recording be redundant, having no single point of failure?

As per RFP

144. Vol I PreQualification Technical Capability for proposed original developer of Dial 100 software The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 2012- 2013, 2013-2014, 2014-2015 and 2015-2016 in India.

The original developer of Dial 100 software should have successfully deployed its Dial 100 or emergency Response Software solution like 911/ 999(proposed in this RFP) in at least three cities within Emergency response Control Room during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 anywhere globally or in India. We wish to confirm that in given constraint only 1 company shall qualify and the Department intent to have maximum competition from best Technologies may be lost.

As per modified RFP

145. New New New The CAD Software must have prior experience of working on at least 2 Police/ Homeland security for installation of Computer Aided Dispatch system for Emergency contact centre (similar to Dial 100/ 911/112/ 999 etc for a statewide / country wide installation

As per RFP

Page 40: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 40 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

146. New New New The proposed CAD solution should be successfully operational in conjunction with Mobile Data Terminals and AVLS in at least 3 cities of population of more than one million. This is very critical as the requirement for MDT has been asked but the integration of application to the same shall be part of PQ to evaluate the performance.

As per RFP

147. New New New CAD software to be listed in top 10 players of Control Room Solution Report published by IMS globally

As per modified RFP

148. VOL I / Page No. 14

S.No. - 9 Technical Capability for proposed original developer of Dial 100 software - The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Requirement of integrated Command & Control (C2) solution with Dial 100 has just begun in India. To our understanding only one such opportunity of a very small scale had emerged in 2015. However, we as Dial 100 software developers have successfully deployed Dial 100 solution in metro and other major cities in India since 2006. It is pertinent to mention that we have seamlessly integrated Dial 100 with our own C2 solution and hence posses the technical capabilities. Since the requirement of an integrated solution has not arisen in the past and is a new phenomenon, most of the Dial-100 solution implemented in India are standalone with its own limited C2 capabilities. In view of aforesaid, it is requested that the pre-qualification criteria of integrating Dial-100 with C2 software may please be waived off. This will encourage participation by other Dial 100 software developers and generate competition. As such the POC for integration of the proposed Dial 100 with the C2 solution has been asked in the Technical evaluation.

As per modified RFP

149. VOL I / Page No. 17

S.No. - 11-e GIS map with GPS system to be provided by Government of Rajasthan

Please provide the projection, format and details of layers in the map being provided by Government of Rajasthan. Also, clarify if any GPS modem need to be integrated with CAD system. If yes, please provide make & model and total quantity .

As per RFP

Page 41: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 41 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

150. VOL II / Page No. 84

S.No. - 12 Semi Rugged Vehicle Mounted Mobile Data Terminal/Tablet - 40 (Jaipur), 40 (Each for Other Cities) - Total -280

There is a mismatch in H/W and S/W client application in quantities of Semi Rugged Vehicle Mounted Mobile Data Terminal/Tablet. Please review.

As per modified RFP

151. VOL II / Page No. 88

S.No. - 19 CAD/CCC/Patrolling Mobile Client application on MDT - 20 (Jaipur), 15 (Each for Other Cities) - Total -110

There is a mismatch in H/W and S/W client application in quantities of Semi Rugged Vehicle Mounted Mobile Data Terminal/Tablet. Please review.

As per modified RFP

152. VOL II / Page No. 102

S.No. - 1 H/W - Work Station with 3 monitors ( Call Taker and Dispatcher) - 105

There is a mismatch in H/W and S/W license quantities for Call taker/Dispatcher/Supervisor. Please review.

As per modified RFP

153. VOL II / Page No. 109

S.No. - 18 Call taker/Dispatcher/Supervisor software -70

There is a mismatch in H/W and S/W license quantities for Call taker/Dispatcher/Supervisor. Please review.

As per modified RFP

154. VOL I / Page No. 33

2nd para of Functional and operational requirement of Dial 100 Control Room

The Computer aided dispatch (CAD) software platform integrates various modules – CAD framework, Call Reception Systems, Call Recording and Logging, GIS (Geographical Information System), AVLS (Automatic Vehicle Location System), Responder Systems (Mobile Data Terminals ), Incident Reporting System, Video Interface (CCTV Video Integration to GIS ) and Converged Communication Platforms [PSTN, Wireless (Cell Phone ), SMS, e-mail ].

We assume that SMS & E-mail gateway will be provided by Rajasthan Police. If not request include in BOQ.

As per RFP

Page 42: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 42 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

155. VOL I / Page No. 34

S.No. - 5 Dial 100 operators shall be able to receive call, Dispatch calls, use GIS maps and can send the alerts to the nearby free Patrolling vehicles on their MDT and also inform the nearest Police Station about the event.

Please provide clarification as to how Police Station will be informed about incident. Hardware, software and connectivity required between police stations and Dial 100 operators. We understand Police station will have web module for this purpose and will be connected through RSWAN.Please confirm

The Dial 100 operator would be able to communicate using telephone, radio and internet leased line (remote feed to Police stations, PCR Van etc. using remote supervisory application software, on web browser and Mobile App.) Internet facility shall also be available at Police stations and on MDTs with field staff.

156. - General CMMi Level certification ensures adhering to processes related to software development cycle while developing any product. It ensures following the complete processes and QA cycle for its product to be robust, scalable and having undergone complete QA/testing process.

It is recommended that the original developer of the Command & Control & Dial 100 software should mandatorily possess atleastCMMi Level 3 or above certification.

As per RFP

157. VOL I / Page No. 7

2) Project Overview City Surveillance system would involve installation of high definition fixed and PTZ IP cameras,

Technical Specifications for PTZ Cameras are not mentioned in RFP. Please provide the same.

As per modified RFP

158. VOL I / Page No. 20

2. Collaborative Monitoring

Bidder has to provide a solution which will have a collaborative framework for receiving video feeds from various systems and sub-systems of public and private establishments like malls, airport, railway stations, bus stands, temples, forts etc.

It is assumed that the camera for collaborative monitoring will be of different make & models with & without VMS. Kindly provide the details of these establishments, camera make & models as well VMS they are using.

The selected bidder has to undertake study of required establishments for integration of camera feed and suggest requirement of hardware, software and

Page 43: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 43 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

network for connectivity.

159. VOL I / Page No. 20

Integration of city surveillance system with RAAS

To ensure that the Government officials get connected to the residents at all times, Biometric, GIS, GPS, Geotagging and connectivity enabled monitoring systems….

Request kindly provide more details as well as functionalities of this application

As per RFP

160. VOL I / Page No. 30

A. Functional Requirement of City Surveillance & Incident Response System :

2. To receive collaborative videos from different locations (airport, railway stations, roadways, temples, forts, malls, metro stations etc.) and to display the selected videos on video wall and to store them, if required.

Request confirm that the necessary SDK's / API's of the various cameras for integration purpose will be provided by Government of Rajasthan.

The SDK/API of the collaborative cameras shall be arranged by GoR.

161. VOL II / Page No. 74

Item No 45 : Central Command and Control Center software / Incident Management Features

13. Application should be able to correlate the extracted message from the social media with existing other events and then should be able to initiate an SOP. This will enable operator to send messages to pre-defined (or defined based on SOP) list of personnel.

It is understood that social media means Twitter, Facebook, Google plus. The extracted message from social media will be from pre-defined dedicated social media accounts created by Government of Rajasthan

As per policy decided by Police department/GoR

162. VOL II / Page No. 75

Item No 45 : Central Command and Control Center software / Incident Management Features

14. Application map should open up the submenu with the option for Create Incident, Live Stream, Recorded Stream, Image and Abandon Incident by clicking on the camera Icon

Requests please explain the expectation of 'Image and Abandon incident'?

As per RFP.

Page 44: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 44 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

163. VOL II / Page No. 75

Item No 45 : Central Command and Control Center software

21. Software shall dynamically update incident handling priority for each user and support incident load balancing as the situation evolves.

Please explain the expectation from 'Dynamically update incident handling priority for each user'? As per our understanding incident priority shouldn’t be changed for each user. Please confirm

As per RFP

164. VOL II / Page No. 75

Item No 45 : Central Command and Control Center software

23. Software shall provide the ability to view and edit multiple forms related to incidents and tasks. The forms with the most updated information shall be saved and accessible at any time.

As per our understanding, opening up multiple forms for alerts creates confusion for the operator who handles emergency operation. Hence form (like Messaging, SOP, Map, Video & SOP Notes) should be displayed for only the alert/incident selected, to give clear view of information. Request the specification may be amended appropriately.

As per RFP

165. VOL II / Page No. 76

Item No 45 : Central Command and Control Center software

30. Software shall be able to discover automatically sensors and cameras closest to the incident source location (GIS feature, Incident location, sensor location) - Impact Area- Software shall allow the operator to draw and update the Impact Area shape and size on the GIS map.- Software shall be able to calculate Impact Area contacts originating from a sensor related to an incident.- Software shall be able to use the contact information for communication purposes (short messages, emails, outbound calls).

Please explain the expectation of 'Impact area contacts originating from sensor'? As per our understanding contacts are fixed and pre-defined in the system which can be pulled by software and can be used for communication of SMS/Emails.

As per RFP

Page 45: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 45 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

166. VOL II / Page No. 77

Item No 45 : Central Command and Control Center software / GIS Map visulisation Features

47. Software shall provide integrated capability with maps from survey of India and ESRI. Software shall provide integrated capability to display high resolution satellite imagery and vector maps. To show the camera location on the map the map scale required is 1:1000 and to be created from high resolution satellite imagery of 0.5m

It is understood that the GIS map required for this project is being provided by Government of Rajasthan. Hence the sentence 'To show the camera location on the map the map scale required is 1:1000 and to be created from high resolution satellite imagery of 0.5m' becomes irrelevant

As per modified RFP

167. VOL II / Page No. 77

Item No 45 : Central Command and Control Center software

48. The GIS view shall provide a common operational picture enabling information sharing in real time between different users filtered according to predefined organization hierarchy. All GIS entities shall be automatically synchronized in the background between all client workstations.

Kindly elaborate this requirement. As per modified RFP

168. VOL II / Page No. 78

Item No 45 : Central Command and Control Center software

56. Software shall support the customization and real time activation of multiple-level drill downs by linking objects placed on map layers to other GIS views.

Kindly elaborate this requirement. What kind of objects are referred here

The objects on the map shall include hospitals, police station, fire station, PCR Vans etc.

169. VOL II / Page No. 78

Item No 45 : Central Command and Control Center software

59. Software shall allow for region of interest areas to be drawn on the map and pull out all the camera views simultaneously along with alerts like boundaries of police stations etc.

Request explain the expectation in case of 'along with alerts like boundaries of police station etc.'

As per RFP

Page 46: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 46 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

170. VOL II / Page No. 79

Item No 45 : Central Command and Control Center software

72. Software shall be provisioned for easy integration with ArcIMS/ArcGIS/ArcGIS/Open Source for WPF (EGIS Runtime) servers and easily import and view ESRI ArcGIS layers (SID, LYR and SHP files) or ArcGIS for WPF layers (service layers, map package layers).

Request elaborate relevance of this feature in Command and Control Application Context. As the map is being provided by Government of Rajasthan and the bidder is responsible to publish the map data into his proposed solution we have not understood the relevance of this specification. Kindly elaborate its purpose.

As per modified RFP

171. VOL II / Page No. 80

Item No 45 : Central Command and Control Center software

93. The system shall support message tracing capabilities

Please elaborate this requirement The operator action and events are being recorded and stored. The message tracing shall be possible by corelating the operator action and the messages sent/received by the operator.

172. VOL II / Page No. 79

Item No 45 : Central Command and Control Center software

80.Software shall support the correlation between two or more asset group elements for the sake of false alarms reduction.

As per our understanding assets mentioned here are sensors which detect threats caused due to nearby incidents and create alerts. Based on the predefined rules, alerts will be correlated from different sensors and displayed as correlated alert to reduce false alarms. Please confirm, is our understanding correct?

As per RFP

173. VOL II / Page No. 81

Item No 45 : Central Command and Control Center software

103. Should be able to leverage and integrate with existing & new CCTV cameras & video management systems, to provide an integrated video surveillance at CCC

We assume that Government of Rajasthan will facilitate the necessary SDK/API along with documentation and support to integrate with existing CCTV systems. Please confirm.

The SDK/API of the collaborative cameras shall be arranged by GoR.

Page 47: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 47 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

174. VOL II / Page No. 81

Item No 45 : Central Command and Control Center software

105. The SI shall be required to provide a customized mobile application to integrate smartphones and tablets such that video can be uploaded by the citizens to the control room. Police Personnel shall use mobile devices to access video from the data center in a secure manner. All the necessary access shall be given to these users to download the video from the video management system The system shall be sized to download and view the video by at least 20 concurrent mobile users over bandwidth of 128Kbps.

1. Please specify the platform support for this mobile application? 2. Will Police personnel download the video uploaded by citizens or only CCTV video cameras video? 3. As per our understanding to stream the video in this bandwidth even with one operator with one camera (H.264, D1, 5 FPS, Medium Quality) would be difficult. Request please clarify the bandwidth requirement

As per RFP

Page 48: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 48 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

175. Vol 1, Page No. 31

9.C.6 3 storage racks shall be configured as follows: · Two racks shall house two Usable 200 TB Storage per rack (total four storage boxes) · One rack shall contain one usable 200 TB storage (for Jaipur city only) and one usable 400 TB storage One usable 400 TB Storage would be utilized as follows: 200TB storage shall be used for taking backup of incidents required to be stored for a longer duration or to be used in courts. 150 TB shall be used for storing video from collaborative cameras. 50 TB shall be used for storing voice communications from dial 100 control room · All other remaining SAN storage shall be viewed as single storage for the purpose of video analytics.

As per clause "The remaining SAN storage shall be viewed as single storage for the purpose of video analytics", bidders can propose a storage with multiple Filesystems/Volume to meet the requirement and there is no requirement of having a single contiguous filesystem/volumes to support Video Analytics.

As per RFP

Page 49: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 49 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

176. Vol 1, Page No. 31

9.C.6 3 storage racks shall be configured as follows :· Two racks shall house two Usable 200 TB Storage per rack (total four storage boxes)· One rack shall contain one usable 200 TB storage (for Jaipur city only) and one usable 400 TB storage· One usable 400 TB Storage would be utilized as follows:200TB storage shall be used for taking backup of incidents required to be stored for a longer duration or to be used in courts.150 TB shall be used for storing video from collaborative cameras.50 TB shall be used for storing voice communications from dial 100 control room· All other remaining SAN storage shall be viewed as single storage for the purpose of video analytics.

The clause specify availability of 3 Racks where 1st and 2nd Rack would house 2x200TB and 3rd Rack would house 1x200TB and 1x400TB (at Jaipur), please clarify if total of this capacity can be offered across 3 racks.

As per modified RFP

Page 50: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 50 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

177. Vol 1, Page No. 31

9.C.6 3 storage racks shall be configured as follows : · Two racks shall house two Usable 200 TB Storage per rack (total four storage boxes) · One rack shall contain one usable 200 TB storage (for Jaipur city only) and one usable 400 TB storage · One usable 400 TB Storage would be utilized as follows: 200TB storage shall be used for taking backup of incidents required to be stored for a longer duration or to be used in courts. 150 TB shall be used for storing video from collaborative cameras. 50 TB shall be used for storing voice communications from dial 100 control room · All other remaining SAN storage shall be viewed as single storage for the purpose of video analytics.

Please clarify if the Rack of more than 42RU would be acceptable.

As per RFP

Page 51: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 51 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

178. Vol 1, Page No. 31

9.C.6 3 storage racks shall be configured as follows :· Two racks shall house two Usable 200 TB Storage per rack (total four storage boxes)· One rack shall contain one usable 200 TB storage (for Jaipur city only) and one usable 400 TB storage· One usable 400 TB Storage would be utilized as follows:200TB storage shall be used for taking backup of incidents required to be stored for a longer duration or to be used in courts.150 TB shall be used for storing video from collaborative cameras.50 TB shall be used for storing voice communications from dial 100 control room· All other remaining SAN storage shall be viewed as single storage for the purpose of video analytics.

As per Vol 2, Item No 7, Page No. 11, (Storage Sizing), it is mentioned that capacity required is 220TB. Please clarify if 220TB per system is the actual requirement and not 200TB per system as mentioned in this clause.

As per modified RFP

179. Vol II, Page No. 11

Item No. 7 (Storage Sizing)

220 TB usable Storage shall be offered (Disks should be preferably of 4 TB or higher capacity dual ported min. 7.2 K RPM 6 Gbps NL-SAS Drives.) under RAID 6 which should be scalable to support 400 TB usable capacity in future. 5 TB usable Storage shall be offered (Disks should be of 600 GB 10K SAS 6 Gbps Drives.) under RAID 5 or equivalent/better.

We understand the total storage required is 225TB including 220TB with 7.2K RPM NL-SAS/SATA drives and 5TB using 600GB 10K RPM SAS drives. Please confirm if our understanding is correct as Clause 9.C.6 on page 31 indicates 5 systems of 200TB.

As per modified RFP.

Page 52: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 52 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

180. Vol II, Page No. 11

Item No. 7 (Storage Sizing)

220 TB usable Storage shall be offered (Disks should be preferably of 4 TB or higher capacity dual ported min. 7.2 K RPM 6 Gbps NL-SAS Drives.) under RAID 6 which should be scalable to support 400 TB usable capacity in future. 5 TB usable Storage shall be offered (Disks should be of 600 GB 10K SAS 6 Gbps Drives.) under RAID 5 or equivalent/better.

We understand the total storage required is 225TB including 220TB with 7.2K RPM NL-SAS/SATA drives and 5TB using 6GB 10K RPM SAS drives. Please confirm if bidder need to propose 225TB against 200TB as specified in clause 9.C.6 page 31

As per modified RFP.

181. Vol II, Page No. 11

Item No. 7 (Hardware Platform)

Rack mounted form-factor Modular design to support disk drives expansion Min. 16 Backend SAS lanes for disk connectivity 2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers

Can bidder propose a Storage System based on General Purpose OS or Open Filesystems Storage Products. Please confirm.

As per RFP

182. Vol II, Page No. 11

Item No. 7 (Hardware Platform)

Rack mounted form-factor Modular design to support disk drives expansion Min. 16 Backend SAS lanes for disk connectivity 2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers

Please confirm if Gateways are proposed should they be configured in HA or NSPOF configuration.

As per RFP

183. Vol II, Page No. 11

Item No. 7 (Protocol Support)

FC, ISCSI, NFS, CIFS, SMB Please confirm if the FC, iSCSI, NFS, CIFS, SMB protocols need to be provided from day one or bidder can supply the required HW or SW including licenses later with

As per RFP

Page 53: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 53 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

additional cost.

184. Vol II, Page No. 12

Item No. 8 (Storage Size)

400 TB usable Storage shall be offered (Disks should be preferably of 4 TB or higher capacity dual ported min. 7.2 K RPM 6 Gbps NL-SAS Drives.) under RAID 6 which should be scalable to support 500 TB usable capacity in future. 5 TB usable Storage shall be offered (Disks should be of 600 GB 10K SAS 6 Gbps Drives.) under RAID 5 or equivalent/better. Should support latest technology SSD, SAS, NL-SAS/SATA Drives and automated policy based tiering between all the types of drives

We understand the total storage required is 405TB including 400TB with 7.2K RPM NL-SAS/SATA drives and 5TB using 600GB 10K RPM SAS drives. Please confirm if our understanding is correct.

As per modified RFP.

185. Vol II, Page No. 12

Item No. 8 (Hardware Platform)

Rack mounted form-factor Modular design to support disk drives expansion Min. 16 Backend SAS lanes for disk connectivity 2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers

Can bidder propose a Storage System based on General Purpose OS or Open Filesystems Storage Products? Please confirm.

As per RFP

Page 54: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 54 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

186. Vol II, Page No. 12

Item No. 8 (Hardware Platform)

Rack mounted form-factor Modular design to support disk drives expansion Min. 16 Backend SAS lanes for disk connectivity 2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers

Please confirm if Gateways are proposed should they be configured in HA or NSPOF configuration.

As per RFP

187. Vol II, Page No. 13

Item No. 8 (Protocol Support)

FC, ISCSI, NFS, CIFS, SMB Please confirm if the FC, iSCSI, NFS, CIFS, SMB protocols need to be provided from day one or bidder can supply the required HW or SW including licenses later with additional cost.

As per RFP

188. Vol II, Page 14

Item No. 9, 1 2PB of usable storage capacity for archiving the Video files for at least 30 days.

We understand that this storage should be proposed with Redundancy at Controller, Disk, PS and interconnect. Please confirm.

As per modified RFP

189. Vol II, Page 14

Item No. 9, 1 2PB of usable storage capacity for archiving the Video files for at least 30 days.

As this is an options against Shared File system which has a capability of offering a Single Filesystem/Namespace agnostic to application, please confirm if the 2PB Storage Solution should also offer Single Filesystem/Namespace.

As per RFP

190. Vol II, Page 14

Item No. 9, 2 Should be able to efficiently store PBs of data, billions of small files and/or large media files and Video Surveillance data.

Please confirm if FC, NFS/CIFS protocol is required to meet the requirement of storing PB of data, billions of small files and/or large media files and video surveillance data with single mount point.

As per RFP

191. Vol II, Page 14

Item No. 9, 5 Storage system must support high density disk enclosure of 4 TB to 8TB HDD capacity

We understand that 4TB or 8TB HDDs should be dual-ported, 7.2K RPM standard HDDs.

As per RFP

Page 55: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 55 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

192. Vol II, Page 14

Item No. 9, 5 Storage system must support high density disk enclosure of 4 TB to 8TB HDD capacity

4TB or 8TB HDD are available as NL-SAS/SATA drives. These are 7.2K RPM drives offering high density. Failure of such drives can take hours to rebuild. To ensure data protection it is industry standard to configure these kind of High density drives in RAID 6 or equivalent configuration. Please confirm if said capacity of 2PB should be offered in RAID 6 or equivalent.

As per RFP

193. Vol II, Page 14

Item No. 9, 10 Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet

As FC and Ethernet ports are required, storage should be capable to supporting FC, iSCSI, CIFS and NFS also storage should be based on Specialized Storage OS. Please confirm

As per RFP

194. Vol II, Page 14

Item No. 9, 1 Option 1: 2PB Storage We request you to maintain the "Quality" clause of Item no. 7 and Item No. 8 for secondary Storage.

As per modified RFP

195. Vol II, Page 14

Item No. 9, 1 Option 1: 2PB Storage Please confirm if the Storage OEM preferably should be in the Gartner Leader Quadrant or should be in top 5 OEM as per IDC for secondary storage.

As per modified RFP

196. 12 Item No 7,220 TB Usable Storage

Hardware Platform- Min. 16 Backend SAS lanes for disk connectivity

Request RISL to please confirm if latest 12Gbps SAS shall be offered or storage can be offered with old 6Gbps SAS SAS lanes.

As per RFP

197. 12 Item No 7,220 TB Usable Storage

Protocol Support- FC, ISCSI, NFS, CIFS, SMB

As per our understanding RISL is looking recording storage which should integrate with the blade servers on FC via asked SAN switches in RFP. Please confirm.

As per RFP

198. 12 Item No 8, 400 TB Usable Storage

Hardware Platform- Min. 16 Backend SAS lanes for disk connectivity

Request RISL to please confirm if latest 12Gbps SAS shall be offered or storage can be offered with old 6Gbps SAS SAS lanes.

As per RFP

199. 13 Item No 8, 400 TB Usable Storage

Protocol Support- FC, ISCSI, NFS, CIFS, SMB

As per our understanding RISL is looking recording storage which should integrate with the blade servers on FC via asked SAN switches in RFP. Please confirm.

As per RFP

Page 56: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 56 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

200. 14 Item No 9, Secondary Storage

Option No 1 - 2PB of usable storage capacity for archiving the Video files for at least 30 days.

As per our understanding RISL is looking for a secondary storage for long term archival , same can be provided using 4-8 TB Drives in the said option with combination of blocks of multiple storage blocks as allowed for the Online storage ranging from 500 TB to 1 PB. Separate Rack space will be provisioned for this 2 PB Storage. Please confirm.

As per RFP

201. 14 Item No 9, Secondary Storage

Bidder has to ensure complete backup of audio and video recording, snapshot/clone of all virtual machines and application software from all storage appliances and servers installed in datacenter.

As per our understanding RISL is looking for the backup software for backup of the VM's to the secondary storage for both Option 1 & 2. Please confirm.

Selected bidder is required to keep a copy of the recordings, VMs and application software on secondary storage. The solution is to be designed by the selected bidder.

202. 14 Item No 9, Option 2, LTO Tape Library

Interface- 8Gb/s Dual Port Fibre Channel (auto-negotiates to 4Gb/s or 2 Gb/s); 6 Gb/s Dual Port SAS (auto-negotiates to 3Gb/s)

We request RISL to please modify the clause " 8Gb/s Dual Port Fibre Channel (auto-negotiates to 4Gb/s or 2 Gb/s)".

As per modified RFP

203. 14 Item No 9, Option 2, LTO Tape Library

We request RISL to please confirm if the solution based on Option no 2 shall designed with "No Single Point of Failure ". Please confirm.

As per RFP

204. 14 Item No 9, Option 2, LTO Tape Library

We Request RISL to please define the SLA for the data retrieval from the secondary storage as defined for the other storage ( video Storage ).

As per RFP

205. 15 Item No 9, Option 2, Shared file system

Offered solution shall be installable on to the Servers for the metadata Controller configuration. For the best performance of the Metadata Server configuration shall support to run on an industry standard servers with a Good configuration.

We request RISL to please confirm if MDS servers needs to be configured in HA. Please also share the min specifications of the meta data servers so that all the bidders are at same page. Secondly Please also let us know the Min specifications for the Storage required for the SAN File System Data base with the required RAID level. We would request this to be added to the dedicated Shared Storage and SAN switches with

Refer Annexure-I, Bill of Material,Volume I of RFP

Page 57: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 57 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

dedicated MDS.

206. 15 Item No 9, Option 2, Shared file system

Request RISL to please confirm if a bidder choose to opt Option No1 - they don’t need to provide any tape library.

As per RFP

207. 15 Item No 9, Option 2, Shared file system

Fire Safe Vault for media Storage Request RISL to please confirm if a bidder choose to opt Option No1 - they don’t need to provide any fire vault for media storage.

As per modified RFP

208. 40 Item No 29 : Access Switch 3

The switch should have dedicated stacking port separate from uplink ports with 50 Gbps of stacking bandwidth.

Stacking technology differs between the OEM, kindly consider 48Gbps Stacking to leading OEM to participate in the RFP. Requested amendments: The switch should have dedicated stacking port separate from uplink ports with 48 Gbps of stacking bandwidth.

As per RFP

209. 40 Item No 30 : Core Switch-Data Center 1.

Layer-3 Switch. 19” Rack Mountable with minimum 20 no of 10G SFP (SX based) & 4 no of 1GE ports.

"SX based" is 1G standard request to kindly clarify requirement is 1G or 10G module need to consider.

As per RFP

210. 41 Item No 30 : Core Switch-Data Center 5.

The switch should support 48K IPv4 and IPv6 unicast routes, 24K multicast routes, 48K MAC address and 20k ACL

Request to kindly consider 2k Multicast entries and 2k ACL entries which is sufficient for standard equivalent CCTV project deployment requirement and leading OEM to perticipate in the RFP.Requested amendments : The switch should support 48K IPv4 and IPv6 unicast routes, 2K multicast routes, 48K MAC address and 2k ACL

As per RFP

Page 58: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 58 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

211. 43 Item No 31 : Core Router-Data Center 8.

Certification:: Router should be EAL4 or NDPP certified

EAL Certification not ensures same security feature standard across all OEM, request to kindly consider minimum EAL2 standard to leading OEM participate in the RFP. Requested amendments : Certification:: Router should be minimum EAL2 or NDPP certified

As per RFP

212. New Addition request Networking OEM qualification criteria: OEM should be in Leader in Gartner’s Magic Quadrant for Wired/Wireless LAN, or IDC Top 3.

As per RFP

213. 24 VI. Network Management Services

Besides internal network, RSWAN and internet leased line shall also be integrated with CCC network enabling access to various services being provided using these networks.

Under the Government of Rajasthan initiatives, Rajnet has already been envisaged as a Centralized Integrated Network Operating Center ( CINOC ) which spreads across RajSWAN, SECLAN, GRAMSET, RSDC & proposed VSAT solution or any other mode of connectivity in Rajasthan state; for the centralized monitoring & management of all IT infrastructure components. Thus, to establish a platform in line with the state initiatives, please rephrase the same as " Besides internal network, CINOC and internet leased line shall also be integrated with CCC network enabling access to various services being provided using these networks." This will give a holistic picture of all the IT components being managed by the state to report desired SLA’s for availability & performance.

As per RFP

Page 59: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 59 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

214. 25 VI. Network Management Services

The SI shall coordinate with RSWAN Team for integration of RSWAN network with CCC Network.

Under the Government of Rajasthan initiatives, Rajnet has already been envisaged as a Centralized Integrated Network Operating Center ( CINOC ) which spreads across RajSWAN, SECLAN, GRAMSET, RSDC & proposed VSAT solution or any other mode of connectivity in Rajasthan state; for the centralized monitoring & management of all IT infrastructure components. Thus, to establish a platform in line with the state initiatives, please rephrase the same as " The SI shall coordinate with CINOC Team for integration of CINOC network with CCC Network." This will give a holistic picture of all the IT components being managed by the state to report desired SLA’s for availability & performance.

As per RFP

215. Vol II Servers Addition Vendors must submit supporting documents stating RoHS compliance.

As per RFP

216. Vol II Servers Addition Manufacturer should be listed in any quadrant of independent technology and market research companies such as Gartner and Forrester Research in last 3 years

As per modified RFP

217. Vol II Servers Addition Management/controlling softwares have to be from the OEM.

As per RFP

Page 60: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 60 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

218. Vol II Servers New Addition, Server Management Software should support dashboard view to quickly scan the managed resources to assess the overall health of the data center. It should provide an at-a-glance visual health summary of the resources user is authorized to view.The Dashboard minimum should display a health summary of the following:• Server Profiles• Server Hardware• Enclosures• Logical Interconnects• Appliance alertsThe Systems Management software should provide Role-based security Software should support serach for resource-specific information such as specific instances of resource names, serial numbers, WWNs, IP and MAC addresses to help manage infrastructure betterShould help provide proactive notification of actual or impending component failure alerts on critical components like CPU, Memory and HDD.Should provide an online portal that can be accessible from anywhere. The portal should provide one stop, online access to the product, support information and provide information to track warranties, support contracts and status. The Portal should also provide a Personalizeddaskboard to monitor device heath, hardware events, contract and warranty status. Should provide a visual status of individual devices and device groups. The Portal should be available on premise (at our location - console based) or off premise (in the cloud).Should help to proactively identify out-of-date BIOS, drivers, and Server Management agents and enable the remote update of system software/firmware components

As per RFP

Page 61: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 61 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

219. 11 Volume I – Point No. 2

Annual Turnover of the lead bidder from IT/ ITeS/Telecom during each of the last three financial years, i.e., from 2012-2013, 2013-2014 and 2014-2015 (as per the last published audited balance sheets), should be at least Rs. 300 Crores

Request consider Parent company turnover for only 100 % subsidiary/ division/sub-division/ branch/ business unit to satisfy this financial qualification criteria

As per RFP

220. 11 Volume I – Point No. 2

Technical Capability I The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work: Building up of centralized command and control centre. Deployment of Video management software and command and control centre software to monitor atleast 300 cameras.

This is a city surveillance project and experience should also be related to city surveillance projects and not to general cameras & VMS implementation. Request to reduce the number of cameras to 250 outdoor for city surveillance application or critical infrastructure.

As per RFP

221. 13 Volume I – Point No. 12

The lead bidder /consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

Request kindly consider any of one/two Certification instead of the requirement of all.

As per RFP

222. 122 Volume I – Point No. 1

Quality of Video feeds at following frames per second (Bad feeds due to Video Jitter, dim, blurred, unfocused, obstructed, non-aligned feeds) · 10fps/15 fps/25 fps/45 fps/60 fps

Video Quality depends on Camera which is not in Bidder Scope. Request you to kindly remove this clause.

As per modified RFP

Page 62: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 62 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

223. 122 Volume I – Point No. 2

Bandwidth Consumption by each camera at following frames per second · 15 fps/30 fps/45 fps/60 fps

Bandwidth Consumption depends on camera. Request you to kindly remove this clause

As per modified RFP

224. 122 Volume I – Point No. 3

Video Stream Latency-Latency refers to the average time required for transmission of video feed from one point to another i.e. remote location like tablet, mobile, PCR VAN etc.

Latency depends on network which is in ISP scope. Request you to kindly remove this clause.

As per modified RFP

225. 5,Vol II Item No 2 : BLADE Server

Management Features Two Virtual machine per server shall be created from day 1. In case of any virtualized host failure virtual machine should automatically restart on the redundant virtualized host

As per the statement, we understand that you are looking high availability at the host level for unplanned downtimes and adhere to the SLA. I understand that you are also considering the high availability at VM & OS level. Also confirm if planned downtime scenario where running VMs are moved to other host across virtual switches and clusters are also considered.

As per RFP

226. 3,Vol II Item No 3 : Management Server

Management Features Two Virtual machine per server shall be created from day 1. In case of any virtualized host failure virtual machine should automatically restart on the redundant virtualized host

As per the statement, we understand that you are looking high availability at the host level for unplanned downtimes and adhere to the SLA. I understand that you are also considering the high availability at VM & OS level. Also confirm if planned downtime scenario where running VMs are moved to other host across virtual switches and clusters are also considered.

As per RFP

227. 11,Vol II Item No 7 : 220 TB Usable Storage (using NL-SAS disks) for Video and 5 TB usable using SAS disks AND Item No 8 : 400 TB Usable Storage

Operating System and Virtualization Support Windows, Linux and Virtualization Platform like VMware, RHEL, Xenserver and HyperV

We understand that you are considering best of virtualization technology available in the industry for this project. However to have clear expectation from the virtualization solution, we request you to confirm if you are looking on following functional requirement of virtualization software: a. Positioned as Leaders in the Gartner's Magic Quadrant or Forrester for at least last 4 years in a row. b. Zero downtime, Zero data loss and continuous

As per RFP

Page 63: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 63 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

(using NL-SAS disks) for Video and 5 TB usable using SAS disks

availability for the applications running in virtual machines in the event of physical host failure, without the cost and complexity of traditional hardware or software clustering solutions. c. Live migration of VMs and virtual disk without any downtime from one physical host and storage to another with or without shared storage between clusters and across virtual switches.E12 d. High Availability capabilities for the VMs in the sense if in case one server fails all the Virtual machines running on that server shall be able to migrate to another physical server running same virtualization software. e. Integration of 3rd party endpoint security to secure the virtual machines with offloaded antivirus, antimalware, firewall and hips e. solutions without the need for agents inside the virtual machines. f. Hot Add (CPU, Memory & devices) to virtual machines when needed, without disruption or downtime in working for both windows and Linux based VMs g. Capable of improving performance, reliability and scalability by leveraging efficient array-based operations as well as third-party storage vendor multi-path software capabilities.

Page 64: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 64 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

228. 79 D. Help desk service levels(Volume I)

a. Severity Level-1 : Denial of services /Standard compliance causing outage that impacts more than one user department or application services shall come under severity level 1, however denial of services impacting critical applications or users like Hon’ble CM, the Ministers, Secretaries and other senior officials then the incident will also come under Severity level 1.The indicative list of such incidents/ request is as given below:· Virtualization system software failure· OS failure of machine hosting multiple applications· Active directory failure· Any problems related to router, switch, SAN and security components to virtualizations· Managing the performance of the database· WAN/LAN Links down· Failure of proper backup schedule· Issues related to storage solution· Chassis down· Defacing of website· Data compromised· Vendor Management

We understand that Rajasthan CCTV Surveillance project is the most prestigious and critical project. We also understand that to meet the requirement and achieve maximum uptime/ SLA of the infrastructure and solutions, functionalities like availability, performance, reliability, stability, zero dataloss and zero downtime, elasticity, recovery from failure in short time etc are very essential and critical to be considered. Kindly confirm if you are considering above requirement from virtualization software also.In case of hardware failure, restoration of virtualization infrastructure to be considered between 15-30min.

As per RFP

229. 89 Indicative distribution of servers for each city

2. Spare Server for Recording Purpose As you have already considered high availability (Item 2 & 3 above statement) for virtual machines, the spare server for recording could be also considered for other critical applications such as Analytics/ VMS etc. as per the demand/ requirement of the resource.

As per RFP

Page 65: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 65 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

230. Volume 1-Page 15

8 The video cameras shall be supplied by GoR and would be under warranty for one year. Detailed technical specification of cameras for video surveillance are at Annexure 20. The selected bidder is expected to take the cameras under maintenance from second year of installation of cameras. The start date of AMC shall be provided by RISL

As per RFP, Bidder's scope is limited to Command Control center /Data Center portion only. Hence the AMC of camera and other field equipment service is under the respective supplier scope. Kindly confirm.

As per RFP

231. Volume 1-Page 61

23 Samples :When notified by the Purchaser to the supplier/ bidder/ selected bidder, Bids for articles/ goods marked in the BoM shall be accompanied by four sets of samples of the articles quoted properly packed. Such samples if submitted personally will be received in the office. A receipt will be given for each sample by the officer receiving the samples. Samples if sent by train, etc., should be despatched freight paid and the R/R or G.R. should be sent under a separate registered cover. Samples for catering/ food items should be given in a plastic box or in polythene bags at the cost of the bidder.

We understand that this clause applicable to camera and accessories and not for any CCC and Datacenter hardware &Software’s. please clarify

Sample of all items may not be required. The successful bidder shall be separately intimated for requirement of samples of items e.g. tables, chairs etc.

Page 66: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 66 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

232. Volume 1-Page 71

1 & 2 Kick off meeting with complete project plan.Deployment of Team with Detailed Final Layout of Command and Control Centre and data center approved from tendering authority· Supply and Installation of DG set and UPS System· Electrical and Local Area Network cabling in video surveillance room, dial 100 control room, forensic investigation room , data center & FMS/NOC room, OIC Room and power room· Supply and Installation of furniture20% of CAPEX

Kindly Consider 30% of CAPEX As per RFP

233. Volume 1-Page 71

3 & 4 · Supply and installation of Video wall · Supply and Installation of racks, servers and storage in data center · Supply and installation of VMS, CCC, video analytics and other software as per BOM alongwith perpetual licences Setting up & implementation of Control Center, Helpdesk Centre & data center 20% of CAPEX

Kindly Consider 30% of CAPEX As per RFP

Page 67: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 67 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

234. Volume 1-Page 71

5 & 6 On Delivery, Inspection and successful installation of remaining equipment’s/items as mentioned in bill of material of RFP document On successful training, Documentation, FAT and Go-Live · 40% of CAPEX

Kindly Consider 30% of CAPEX As per RFP

235. Volume 1-Page 71

7 Operations and Maintenance of Command and control center and data center for 5 years from FAT Note : In case of termination of the contract the remaining OPEX alongwith remaining CAPEX shall not be paid to the SI from date of termination as penalty towards non-performance by SI. Remaining 20% CAPEX will be equally spread over 5 years payable quarterly and O&M will be paid quarterly after making adjustments for penalties as per SLA/Performance

Pls amend the clause "Remaining 10% CAPEX will be equally spread over 5 years payable quarterly and O&M (OPEX) will be paid quarterly after making adjustments for penalties as per SLA/Performance".

As per RFP

236. Volume 1-Page 72

d Due payments shall be made promptly by the purchaser, generally within sixty (60) days after submission of an invoice or request for payment by the supplier/ selected bidder, and the purchaser has accepted it.

Pls amend the clause "Due payments shall be made promptly by the purchaser, generally within thirty (30) days after submission of an invoice or request for payment by the supplier/ selected bidder, and the purchaser has accepted it.

As per RFP

Page 68: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 68 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

237. Volume 1-Page 8

2 The CCTV Project should be equipped to access selected 200 camera feeds of about 30 important institutions within city area.

Kindly provide the institution wise existing system like Camera Make & Model, VMS Make & Model & Total Number of camera details of Collaborative Monitoring. And clarify any extra hardware / equipment is required to integrate the same in CCC .

The successful bidder shall be required to study and prepare a report in this regard for each city and suggest for items required for integration.

238. Volume 1-Page 15

9 The network bandwidth between cameras and data center shall be arranged by Government of Rajasthan. Uptime of video feed shall be governed through service level agreement with the concerned network bandwidth service provider.

We understand that the connectivity from the cameras to Data Center shall arrange by GoR. Hence no ROW/RI charges will be in the scope of bidder. KindlyConfirm

As per RFP

239. Volume 1-Page 10

3 Supply of cameras and Video feed of camera to data center/CCC shall be responsibility of Government of Rajasthan.

We understand that the fiber connectivity from junction to Data Center/CCC and cameras will be in GoR scope. Kindly clarify the scope of Junction level components like L2 Switches, UPS, Junction boxes.. Etc.

As per RFP

240. Volume 1-Page 15

9 The network bandwidth between cameras and data center shall be arranged by Government of Rajasthan. Uptime of video feed shall be governed through service level agreement with the concerned network bandwidth service provider

We understand that network SLA borne by Network Service provider. Similarly CCTV camera SLA will be in the scope of Camera provider (GoR). Kindly amend the clause as mentioned below: The network bandwidth between cameras and data center shall be arranged by Government of Rajasthan. Uptime of video feed shall be governed through service level agreement with the concerned network bandwidth service provider and CCTV camera provider.

As per RFP

241. Volume 1-Page 73

A IT and Non IT Infrastructure service levels

We understand that SLA is applicable only for IT and Non-IT components of CCC/Data Center. Kindly confirm

SLA is applicable on all IT and non-IT components to be supplied by successful bidder.

Page 69: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 69 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

242. Volume 1-Page 83-88

Annxure-1 BILL OF MATERIAL (BoM) In RFP we are not finding Junction level BOQ, hence we have not considered any field level equipments in bidder's scope. Kindly confirm the same.

As per RFP

243. Volume 1-Page 121

Annexure-16 : POC S.No 1 to S.No 5 We understand that S.No 1 to S.No 5 are related with camera & Network connectivity. As per RFP this is not applicable for Bidder. Kindly clarify & revise the evaluation parameters accordingly.

As per modified RFP

244. Volume 1-Page 8

2 Initially 1000 cameras in Jaipur and 800 cameras each in remaining six cities shall be required to be deployed at designated areas running 24x7 and effectively monitored at Command & Control Center with storage of historical video data of minimum 15 days.

We understand that 1000 cameras in Jaipur and 800 cameras each in remaining six cities are fixed type. kindly confirm the same and Please share the model number of Hikvision fixed camera.

Cameras shall be combination of PTZ and fixed type. Technical Specification of fixed type cameras are already available in RFP. Please refer modified RFP for technical specification of PTZ camera.

245. Volume 1-Page 16

11 11. The city surveillance system should integrate with a. PCR Vans fitted with cameras,

We understand that the PCR vans, cameras & all hardware will be provided by GoR. Kindly confirm.

As per RFP.

246. Volume 1-Page 16

11 11. The city surveillance system should integrate with a. PCR Vans fitted with cameras,

We understand that the connectivity from PCR Vans to CCC/DC will be in GoR scope. Kindly clarify

As per RFP.

247. Volume-2 Page 11 & 12

Item 7 & 8 Licenses and Software- Auto-tiering, Thin Provisioning, Remote Replication, Quality of Service Software for IOPS, Response Time and bandwidth.

As per our understanding RSIL wants the bidders to propose the said licenses. Please confirm

The software licences as mentioned in the RFP are to supplied with the storage.

Page 70: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 70 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

248. Volume 1, Page 18 of 131

1b He would be able to send messages to Fire, PCR Van, police station, ambulance etc. as per requirement at the site of incident. The field staff would be able to send action taken report about the incident through their MDTs.

We understand that, Government of rajasthan provided MDT Device , Capital and recurringexpenses of sim in given MDT, Driver with Mobile phone, SLA for Field to MDT to control center under Client Scope. Is it our understanding is right?

The successful bidder shall have to supply MDT as per requirement of GoR. However, the charges for SIM for the MDTs and the recurring charges shall be in scope of GoR.

249. Volume 1, Page 20 of 131

2 Bidder has to provide a solution which will have a collaborative framework for receiving video feeds from various systems and sub-systems of public and private establishments like malls, airport, railway stations, bus stands, temples, forts etc.

We understand that, all camera feed from field to contol center including collaborative monitoring under the scope government of Rajasthan. The proposed VMS solution has the integration capability of collaborative monitoring of other cameras. Please clarify. Please share the camera quantity for the VMS requirement of collaborative monitoring system.

The selected bidder has to extend all possible support to integrate the video feed of collaborative cameras in CCC. The network connectivity shall be provided by GoR.

250. Volume 1, Page 35 of 131

Roles & Responsibility of stakeholder

Provisioning of Connectivity between Cameras, Control Center, Viewing Centers Preparation of the Guideline Documents for allowing CCTV Feed of Public / Private Organisations to Police CCTV System

We request you to kindly modify this clause to responsibility of Government of Rajasthan.

As per modified RFP

251. Volume 1, Page 37 of 131

5) Project Deliverables, Milestones & Time Schedule

F=T+16 weeks we request you kindly extend the project time line from 16 weeks to 24 weeks. Please clarify

As per modified RFP

Page 71: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 71 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

252. Volume 1, Page 46of 131

16) Dividing quantities among more than one bidder at the time of award

a) Up to three bidders shall be selected for the award of contract . After determination of overall lowest value bid (L1) for all cities, all the responsive and eligible bidder(s) shall be asked to match the (L1) bid in ascending order of quoted bid value (L2,L3,L4….). The purchaser shall issue the work order(s) as follows · Best Value Bidder (L1) – 3 cities · Second Bidder (After Matching L1 )- 2 cities · Third Bidder (After Matching L1 )- 2 cities b) In case only two eligible and responsive bidders match the best value (L1) bid ,work order shall be issued as follows · Best Value Bidder (L1) – Minimum 4 cities · Second Bidder (After Matching L1 )-Maximum 3 cities c) In case no other eligible and responsive bidder matches the best value (L1) bid , work order shall be awarded to the best value (L1) bidder only.

1. We request you to consider the QCBS Model for evaluation to this tender. Please confirm. 2. we request to implement the Proof of Concept (POC) procedure before proceeding the award of contract. Please confirm.

As per RFP. POC shall be conducted at the time of technical evaluation.

Page 72: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 72 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

253. Volume 1, Page 47 of 131

18) Comparison of rates of firms outside and those in Rajasthan

While tabulating the financial Bids of those firms which are not entitled to price preference, the element of Rajasthan Value Added Tax (RVAT) shall be excluded from the rates quoted by the firms of Rajasthan and the element of Central Sales Tax (CST) shall be included in the rates of firms from outside Rajasthan for financial bid evaluation purpose.

1. is there in any C-form providing by clinet? 2. is there sale in transit and high sea sale applicable in the tender. Please confirm.

No C-form is provided. Sale in transit is not applicable

254. Volume 1, Page 63 of 131

27) Extension in Delivery Period and Liquidated Damages (LD)

In case of extension in the delivery and/ or installation/ completion/ commissioning period is granted with full liquidated damages, the recovery shall be made on the basis of following percentages of value of CAPEX : -

We request you consider the Min Liquidated damages from 0.5% per week and maximum 10% of Capex contract value of the Unfinished work. Please confirm.

As per RFP

Page 73: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 73 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

255. Volume 1, Page 71 of 131

1) Payment Terms and Schedule

Kick off meeting with complete project plan. Deployment of Team with Detailed Final Layout of Command and Control Centre and data center approved from tendering authority-20% of Capex Supply and installation of Video wall · Supply and Installation of racks, servers and storage in data center · Supply and installation of VMS, CCC, video analytics and other software as per BOM alongwith perpetual licenses - 20% of Capex On Delivery, Inspection and successful installation of remaining equipment’s/items as mentioned in bill of material of RFP document - 40% of Capex

Request you Kindly kindly consider the bellowed payment terms for the completion of major milestones. Kick off meeting with complete project plan. Deployment of Team with Detailed Final Layout of Command and Control Centre and data center approved from tendering authority-30% of Capex Supply and installation of Video wall · Supply and Installation of racks, servers and storage in data center · Supply and installation of VMS, CCC, video analytics and other software as per BOM alongwith perpetual licenses - 30% of Capex On Delivery, Inspection and successful installation of remaining equipment’s/items as mentioned in bill of material of RFP document - 35% of Capex Reminaing 5% of Capex During the Opex period of 5 years. Please confirm

As per RFP

256. Volume 1, Page 72 of 131

1) Payment Terms and Schedule

Due payments shall be made promptly by the purchaser, generally within sixty (60) days after submission of an invoice or request for payment by the supplier/ selected bidder, and the purchaser has accepted it.

we request you to kindly change the Due payments within sixty (15) days after submission of an invoice or request for payment by the supplier/ selected bidder. Please confirm.

As per RFP

257. Vol II, Page 14

Item No. 9, Option2 Option 2: LTO 7 Tape library and Shared file system table library software.

Please confirm whether Hardware required to deploy the file system has been provisioned in the BOQ or Bidder has to provision over and above the BOQ. Also please provide the hardware configuration.

Refer Annexure-I, Bill of Material,Volume I of RFP

Page 74: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 74 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

258. Vol II, Page 14

Item No. 9, Option2 Option 2: LTO 7 Tape library and Shared file system table library software.

Please confirm whether latest version of the file system needs to be provided or older version is acceptable.

Latest version of the shared file system software need to be provided.

259. Vol II, Page 14

Item No. 9, Option2 Option 2: LTO 7 Tape library and Shared file system table library software.

The Tape Media Cartridges are sensitive in nature and can be failed. The warranty on Media cartridges limited to certain parameters baring these; failure of the Product resulting from misuse, abuse, accident, neglect or mishandling, improperly adjusted or maintained tape drives, incorrect environments, or wear from ordinary use. Keeping this in mind the Media Cartridges are considered as consumable and they are bound to fail and we hope that sufficient buffer has been kept in the BOQ otherwise. Since it is recurring cost hence please clarify whether RSIL or Bidder has to bear the recurring cost during the contract period.

All items are to be supplied by successful bidder with 5 years warranty.

260. Vol II, Page 14

Item No. 9, Option2 Option 2: LTO 7 Tape library. Since the primary storage is catering 15 days recoding and subsequently the remaining 15 days would be kept on the secondary storage. Keeping this in Mind, high availability architecture has been asked in the Primary Storage whereas in the Secondary storage-Tape Library only one Robotic Arm provision has been kept. Incase of Robotic Arm failure all Read and Write operations will be halted which can have impact on Data loss due to non-movement of data from primary storage to secondary storage alongwith impacting on the SLA.

As per RFP

261. Vol II, Page 14

Item No. 9, Option2 Option 2: LTO 7 Tape library. Please confirm whether testing for Share File Systems has been done by RISL, as we have not seen the similar deployment anywhere in India.

The bidder has to ensure that VMS vendor has tested its solution with Shared File system and the requisite certificate has been enclosed with the RFP.

Page 75: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 75 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

262. Vol1 & Page no 8

Dial 100 Control Room (DR100)

To be able to attend phone calls from citizens, dispatch calls, use GIS maps and to send instructions to nearest police station, PCR Van, ambulance etc

Please confirm GIS MAP would be Provided by Rajasthan Police, Si need to integrate the same

- The GIS Maps (Raster and Vector Data) shall follow projection system UTM / WGS 84 Datum. - GIS Maps (Raster and Vector data) shall be provided by GoR as Service (in WMS/WFS) from the local GIS server to be installed at each City.

263. Vol1 & Page no 8

Storage of feeds Min. 15 days storage of video feeds please confirm , Video which is more than 15 days old would be purged

As per RFP

264. Vol1 & Page no 10

Note- Supply of cameras and Video feed of camera to data center/CCC shall be responsibility of Government of Rajasthan.

Si do not need to supply Camera and Bandwidth and otherequipment’s for camera feed at CCC & DC, Gov Rajasthan will provide the same please confirm . Who will be responsible for O&M for Camera and bandwidth?

As per RFP

265. Vol1 & Page no 10

Note- Civil work related with establishment of Command and control Center shall be done by Police Department of concerned divisional head quarter.

Please provide the building plan and Diagram Indicative layout design of CCC has been included in volume - I of the modified RFP document.

266. Vol1 & Page no 13

Technical Capability for proposed original developer of VMS or authorized partner -III

The VMS OEM or its authorized partner should havecustomizationcentre in India

Please allow VMS OEM who have customization & development center abroad too but sales and support center in india

As per RFP

Page 76: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 76 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

267. Vol1 & Page no 18

The dial 100 control room shall be provided with one PRI line inline hunting-single telephone number (100) to a group of 30 lines. Number of incoming and outgoing calls can be defined as per requirement for each city. The Dial 100 control system aims to ensure that

Please confirm - Hunting line would be provided by GoR As per RFP

268. Vol1 & Page no 18

50 TB storage capacity shall be allocated for recording voice communication through telephone line and radio gateway

is it shared storage with DC or separate storage need to configure as this is not reflecting in Bill of material?

Shared Storage

269. Vol1 & Page no 19

3. Integration of city surveillance system with RAAS

Bidder shall be responsible for integration of complete city surveillance system with Rajasthan Accountability Assurance System (RAAS) Application Software Platform for GPS monitoring.

Please provide RAAS application details like Plateform and architecture

RAAS application details shall be provided to the selected bidder.

270. Vol1 & Page no 22

Asset Management Services

The SI shall be required to perform software license management. The software shall remain under technical support from OEMs for a period of five years.

is SI need to provide only technical support of supplied software’s or Upgrades and updates also required for Project duration of 5 years

The successful bidder has to provide technical support along with upgrade, updates and patches on the supplied software for complete O&M period of five years.

Page 77: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 77 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

271. Vol1 & Page no 24

point g The SI shall also be responsible for integration, management, maintenance configuration/reconfiguration of any additional Internet Bandwidth/networks which needs to be integrated with Data Center network during entire contract period.

Since Bandwidth would be provided by ISP directly to Department so maintenance and management should be the scope of ISP and not the SI

SI is required to do vendor management for ensuring uptime of internet bandwidth and RSWAN connectivity.

272. Vol1 & Page no 28

Payment of diesel filled in the tanks during the quarter shall be made alongwith agreed quarterly payment.

Please confirm payment for Diesel would be provided by Rajasthan Police

The successful bidder has to ensure uptime of the command and control center. The diesel of DG set if required is to be arranged by the successful bidder after permission from Police department. Payment shall be reimbursed by RISL on quarterly basis.

273. Vol1 & Page no 37

Poin no 7 Provisioning of Connectivity between Cameras, Control Center, ViewingCenters

This is contradictory with sr. no3 of query, Please clarify Who will be responsible for Bandwidth/Network from Camera to DC and CCC

GoR to arrange bandwidth between camera to CCC

274. Vol1 & Page no 63

Point 27 Delay exceeding three fourth of the prescribed period of delivery, successful installation and completion of work i.e. FAT

please reduce penalty CAP by 5% maximum As per RFP

275. Vol1 & Page no 83

ANNEXURE-1: BILL OF MATERIAL (BoM)

Perpetual Software licenses there is no mention about Servers OS required and Database required , please provide the details for the same

The operating system and database has to be supplied by the successful bidder as per the solution proposed by

Page 78: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 78 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

it.

276. Vol 1 & Page no 11

Legal Entity ( Eligibility Criteria)

Consortium is also allowed. The consortium shall not consist of more than two companies/

Since Several competencies & experience are required for smooth functioning of project e.g. Data Centre Experience, Surveillance & Monitoring, Forensic Investigation, Dial 100 etc, Hence requesting to allow at least “three companies to form consortium in place of two only. Other big project RFP in the state like: Smartraj, CCTNS, Modernization of Board of Revenue having provision of three companies to form a consortium. This will help SI to execute the project with more competencies& efficiency.

As per RFP

277. Vol 1 & Page no 11

Financial: Net Worth The net worth of the lead bidder, as on 31st March 2015, should be Positive.

Just Positive cannot decide the financial capability of bidder, requesting the committee to ask for 100 Cr. Positive Net worth.

As per RFP

278. Vol1 & Page no 83

Annexure-1, Data Center

Qty of the Servers mentioned As this is a solution oriented BID and quantity of the servers required will be dependent on the solution being provided by the SI, hence removal of the 'qty of the servers' is requested. Also the Processor asked in the RFP is 10 Core whereas processors with higher core and in latest technology are available which can help achieve required performance with the lesser no of servers, basis this; request you to mention only 'minimum specifications' of the Blade Server so that SI can themselves chose higher specification or required quantity of servers as per their solution.

As per RFP

279. Vol 1 & Page no 131

ANNEXURE-20: Technical Specification for Fixed IP Camera

Make and Model: Hikvision (Custom built model)

As per RFP Camera will be provided by GOR with 1 Yr. Warranty & latter SI has to maintain for 4 Year. Since Make & Model has been already mentioned in RFP i.e. "Hikvision". How GOR will ensure Camera OEM is extending similar price for maintenance with all prospective SI. Therefore Pls. remove the 4 Yr. maintenance cost for camera from the RFP. GOR should

As per RFP

Page 79: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 79 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

take 4 Yr. maintenance price from Hikvision & share with SI after opening of Financial Bid opening.

280. Vol 2 & Page No. 22

Laser Network Duplex Printer

Processor Speed: 750 MHz or higher Request to Change processor from 750MHz to 400MHz as it is generic specification and will allow most of the OEM's to participate thereby benefiting department by offering low &competitive price. Every OEM having their own print engine & use processor as per requirement, here requirement is 35PPM in A4 & 18 PPM in A3. Requesting the committee to either remove the Processor speed or make it generic specification i.e. 400 MHz or higher else only one OEM will get qualified& does not allow other printer OEM to offer their best price.

As per RFP

281. Vol 2 & Page No. 22

Laser Network Multifunction Duplex Printer

Processor Speed: 500 MHz or higher Request to Change processor from 750MHz to 400MHz as it is generic specification and will allow most of the OEM's to participate thereby benefiting department by offering low &competitive price. Every OEM having their own print engine & use processor as per requirement, here requirement is 35PPM in A4 & 18 PPM in A3. Requesting the committee to either remove the Processor speed or make it generic specification i.e. 400 MHz or higher else only one OEM will get qualified& does not allow other printer OEM to offer their best price.

As per RFP

282. Vol 2 & Page No. 22

Fax Resolution 203 x 196 dpi Fax Resolution of 203x196 dpi is not correct. Request to change Fax resolution to 200x200 dpi as it is generic specification.

As per RFP

283. Vol 1 Page 5 of 131

Date for submission of Bid

End Date 05-11-2015 Request you to provide extension of 2 months to submit the bid.

As per RFP

Page 80: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 80 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

284. Vol 1 Page 11 of 131

2.4 The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work:· Building up of centralized command and control centre.· Deployment of Video management software and command and control centre software to monitor atleast 300 cameras.ORThe lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work for each project:· Building up of centralized command and control centre· Deployment of Video management software and command and control centre software to monitor atleast 200 cameras

Kindly amend the same to " The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work:· Building up of centralized command and control centre.· Deployment of Video management software and operational command and control centre to monitor atleast 300 cameras.ORThe lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work for each project:· Building up of centralized command and control centre· Deployment of Video management software and operational command and control centre to monitor atleast 200 cameras"

As per RFP

Page 81: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 81 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

285. Vol 1 Page 12 of 131

2.5 The lead bidder/consortium partner should have commissioned and installed at least one ISO certified data center from April 2009 in India. An order value (including IT and Non-IT but excluding basic building structure cost) of not less than 5 crores. Note: · Bidder’s in house data centres shall not be considered. · Bidders who have built their own Internet Data Centre (IDC) for commercial use will be considered.

Kindly allow if bidder has installed & commissioned IT and Non-IT systems as sub contractor of minimum 5 crores for any ISO certified datacenter.

As per RFP

286. Vol 1 Page 12 of 131

2.6 The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Request to amend the same to VMS software should have been deployed for more than 1000 cameras for centralized monitoring in a single or multiple command and control room.

As per RFP

287. Vol 1 Page 13 of 131

2.12 The lead bidder /consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

Kindly allow if the group company of the lead bidder is having the mentioned certifications.

As per RFP

288. Vol 1 Page 16 of 131

3. SCOPE OF WORK, DELIVERABLES & TIMELINES

Pls provide floor layouts, ceiling details and false floor details for all rooms.

Indicative layout design of CCC has been included in volume - I of the modified RFP document.

Page 82: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 82 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

289. Vol 2 Page 11 of 108

Item No 7 and 8Hardware Platform

Min. 16 Backend SAS lanes for disk connectivity

Backend Lanes are PHY lanes within a SAS port. Thus 16 Lanes equates to just 2 SAS ports per controller. For performance, scalability and fault tolerance more ports are required on the backend from day one as these can not be changed in most vendors arrays. Tender should ask for minimum 8 SAS wide ports of 4 SAS lanes each at minimum, per array.

As per RFP

290. Vol 2 Page 11 of 108

Item No 7 and 8 Controllers

2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard protected DRAM Cache across SAN controllers

Since Vendors have multi controller architecture for SAN+NAS unified, please change clause to read - Minimum 2 no. of controllers or more as per Vendor proposed model. Total cache memory across dual or more controllers to be minimum 64GB

As per RFP

291. Vol 2 Page 11 ,13of 108

Item No 7 and 8 Ports

Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet and 2 replication ports

Tender should Only ask for frontend ports specifically required by CCTV solution, this will keep costs down. Replication ports can be asked for in addition. Suggest change clause to " Min 4 * 16Gbps FC Ports OR 4 * 10G Eth with 2 x Replication ports must be provided.

As per RFP

292. Vol 2 Page 11,13 of 108

Item No 7 and 8 Protocol Support

FC, ISCSI, NFS, CIFS, SMB Tender should Only ask for specific protocols required by the CCTV solution. Adding protocols will add on cost. For eg: Tender should ask for 'FC and iSCSI' OR 'CIFS and SMB'

As per RFP

293. Vol 2 Page 11,13 of 108

Item No 7 and 8 RAID support

Should support various hardware industry standard RAID levels ( 0,1,5,6,10 )or equivalent

Please remove RAID 0 - As this RAID provides zero data protection and is not industry standard.

As per modified RFP

294. Vol 2 Page 12 of 108

Item No 8 400 TB usable Storage shall be offered (Disks should be preferably of 4 TB or higher capacity dual ported min. 7.2 K RPM 6 Gbps NL-SAS Drives.) under RAID 6 which should be scalable to support 500 TB usable capacity in future.

Since storage will be configured for 400TB from day one, please change clause to ask for minimum scalability of proposed storage to 800TB usable capacity in future. This will reduce risk of array replacement while ensuring room to grow.

As per RFP

Page 83: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 83 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

295. Vol 2 Page 12,13 of 108

Item No 7 and 8 Licenses and Software

Auto-tiering, Thin Provisioning, Remote Replication, Quality of Service Software for IOPS, Response Time and bandwidth.

Please mention if licenses need to be provided from day one. Tender should also only ask for actual licenses that are going to be utilied by the CCTV solution as this will add cost and complexity to the solution

As per RFP

296. Vol 2 Page 12,13 of 108

Item No 7 and 8 Retrieval Time

Retrieval time for any data stored should be maximum 4 hours for critical data and 8 hours for other data. This would be taken care in to account for SLA calculation.

This is CCTV Solution dependent. As per RFP

297. Vol 2 Page 12 ,13of 108

Item No 7 and 8 Warranty and Support

5 years onsite hardware support warranty including Next Business Day part replacement / repairs and remote software support for updates, upgrades, patches and bug fixes for supplied Software for 24*7*365 days.

Tender is asking for NBD support. This will lead to violation of 'Retrieval Time' clause. As service calls will have one business day lead time. Suggest change clause to 24x7x365 with 4Hrs response or at minimum Same business day response.

As per modified RFP

298. Vol 2 Page 25 of 108

Item No 21 Stand Alone Digital Video Recorder Required camera in Item No. 20 is IP camera but the specifications in Item no. 21 specifications are for Analog DVR. Request you to change the complete specifications to VMS or NVR based solution.

As per modified RFP

299. Vol 2 Page 34 of 108

Item No 26 Finger Print Template- 10 per user In normal access control implementation, only 2 finger templates per user are sufficient and same are stored inside the card or reader. For 10 finger enrollment, a special SLAP scanner is required which is very expensive. Moreover in case of 10 fingers per user enrollment and authentication process becomes more time consuming. Request you to allow 2 fingers per user.

As per RFP

300. Vol 2 Page 34 of 108

Item No 26 User Capacity- 50000 We understand that reader shall have capacity to store 50000 fingerprint templates. Kindly Confirm.

As per RFP

Page 84: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 84 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

301. Vol 2 Page 36 of 108

Item No 27.6 Addressable Detector Bases: The bases shall be easy to install and mount and shall be of standard type.

Since detectors are addressable, Base need not to be an addressable type. Kindly change the same.

As per RFP

302. Vol 2 Page 40 of 108

Item No 29.10 The switch should support IPv6 RA-Guard, DHCP-Guard, Source-Guard features and IPv6 fast-hop security or equivalent

Request you to Remove IPv6 fast-hop Security as this not standard for all OEM and available with only few OEM's

As per RFP

303. Vol 2 Page 40,41 of 108

Item No 29.13 and Item No 30.13

Switch should be EAL3 or NDPP & IPv6 ready logo certified from day one

These certificates are specific to a particular Image, and when future upgrade are available, there is no assurance for the next release to be EAL3/NDPP certified. Hence request you to remove this clause.

As per RFP

304. Vol 2 Page 40 ,41 of 108

Item No 29.14 and Item No 30.14

Router and Switch OEM should be in Gartner Magic leaders quadrant or IDC top 3 vendors for networking for last 3 yrs

To Allow more vendor to participate for this Bid, present on the Gartner, this clause to be modified.

As per RFP

305. Vol 2 Page 41 of 108

Item No 30.5 The switch should support 48K IPv4 and IPv6 unicast routes, 24K multicast routes, 48K MAC address and 20k ACL

Kindly clarify why such an high level of multicast and ACL entries required? Is this Hardware or software based support required. Software based support will drop the overall switch performance, request to change this to minimum 8K for multicast and minimum 2K for ACL

As per RFP

306. Vol 2 Page 41 of 108

Item No 30.7 The Switch Should support MLD Snooping for IPv6 in hardware, Unicast Reverse Path Forwarding for IPv6 in hardware

Request to Remove Unicast Reverse Path Forwarding as this not standard for all OEM and available with only few OEM's

As per RFP

307. Vol 2 Page 41 of 108

Item No 30.10 The Switch Should support Unicast Reverse Path Forwarding (Unicast RPF, support distributed and customized approach to event detection and recover, Dynamic Host Control Protocol server (DHCP)

Kindly remove Unicast Reverse Path Forwarding as this not standard for all OEM and available with only few OEM's

As per RFP

Page 85: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 85 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

308. Vol 2 Page 68 of 108

Item No 44.4 Support for number of concurrent cameras for recording & monitoring

Software in distributed video architecture doesn't have any limitation on concurrent cameras. Required no. of camera licenses & servers needed to support the cameras. Kindly confirm if our understanding is correct.

As per RFP

309. Vol 2 Page 68 of 108

Item No 44.5 Maximum number of simultaneously connected users

Software doesn't have any limitation on concurrent users. However required no. of user licenses required. Kindly confirm if our understanding is correct.

As per RFP

310. Vol 2 Page 68 of 108

Item No 44.9 Open Architecture VMS supports ONVIF profile S for open architecture. Kindly confirm if our understanding is correct.

As per RFP

311. Vol 2 Page 69 of 108

Item No 44.16 VMS Hardware- The VMS system shall utilize commercial-off-the shelf(COTS) computer workstations, servers, networking devices and storage equipment. VMS shall already support IP cameras from at least fifty (50) major vendors. Bidders shall clearly list in their proposal the brands and models already integrated into VMS.

Kindly remove support for 50 vendors because this is not required if VMS software is ONVIF Profile S compatible.

As per RFP

312. Vol 2 Page 71 of 108

Item No 44.29 Browser Support- All of the following should be supported– 1)Internet Explorer 7 and later versions 2)Firefox 2 and later 3)Safari2 and later 4) Chrome (latest version) 5 )The web client interface shall also connect with non-Java Script browsers and shall be compliant with HTML4.0(www.w3.org).

Kindly change like- "any of these browsers should be supported"

As per RFP

Page 86: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 86 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

313. Vol 2 Page 71 of 108

Item No 44.31 Mobile client- The VMS software shall provide a purpose-built mobile application capable Of viewing multiple simultaneous live video streams and playing a recorded video stream. Application shall be provided for windows, IOS and Android operating systems. Mobile application to provide alerts to field staff as per requirement.

Kindly change as Application shall support Windows/iOS/Android.

As per RFP

314. Vol 2 Page 71 of 108

Item No 44.34 Advanced Video Search- · Software shall have a feature to control object attributes (e.g. size, direction, color, speed) so that hours of video can be reviewed in minutes · 1-click event selection indexes back to original video · Bookmark and annotate objects for team collaboration

Kindly confirm if search based on motion is accepted. As per RFP

315. Vol 2 Page 72 of 108

Item No. 44.35 Camera Licenses- The VMS license shall be perpetual and shall be for unlimited number of cameras to be used in the system.

Kindly define the no. of camera licenses for VMS. As per modified RFP

Page 87: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 87 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

316. Vol 2 Page 72 of 108

Item No. 44.42 Video Play Back- The VMS client software shall be used to search for and playback recorded video, audio and events from VMS servers. All recorded video shall be played back and displayed in a synchronized multi- camera layout. It shall be possible to playback simultaneously 64 cameras on server of the surveillance system, with a selection of advanced navigation tools, including an intuitive timeline browser.

we understand that 64 cameras should be supported by a single server in the system and not on a single Monitor. Kindly confirm if this is correct.

Yes, As per RFP

317. Vol 2 Page 72 of 108

Item No. 44.45 Export- 2)AVI File (*.avi)–a multi media container format 3) MKV File(*.mkv)–a format to play HD video files./ WMV

Kindly remove AVI file support because same can be taken care by WMV video export.

As per RFP

318. Vol 2 Page 73 of 108

Item No. 44.51 Map Function- The Video Management System shall incorporate Intuitive map functions allowing for multi layered map environment. The map functionality shall allow for the interactive control of the complete surveillance system, at-a-glance overview of system integrity, and seamless drag-and-drop integration with video wall module option. The activation of the VMD or Camera disconnected alarm shall display the alarm location with animated camera’s icon shown in the location map, and the pre- defined alarm documents.

Since GIS Map is the part of CCC software, kindly clarify why map function is required in VMS separately.

Though GIS is part of CCC application, VMS should support the same look and feel of the map an static geo-referenced maps/images.

Page 88: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 88 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

319. Vol 2 Page 77 of 108

GIS Map Visualization Features 47

Software shall provide integrated capability with maps from survey of India and ESRI. Software shall provide integrated capability to display high resolution satellite imagery and vector maps. To show the camera location on the map the map scale required is 1:1000 and to be created from high resolution satellite imagery of 0.5m

We understand that the maps will be provided by Rajasthan Police. Does it contain raster (satellite image) along with the vector data

GIS maps (vector and raster data) shall be provided by GoR.

320. Vol 2 Page 78 of 108

GIS Map Visualization Features64

Users’ (responders) map context menus shall include the capability to send other users messages, assign tasks and initiate phone calls. It shall also be possible to view the tasks presently assigned to selected users.

We understand that here 'selected users' refer to 'field respondents'

The selected users would refer to any user as finalized by GoR including field staff as well as staff working in command and control center.

321. Vol 2 Page 79 of 108

GIS Map Visualization Features 72

Software shall be provisioned for easy integration with ArcIMS/ArcGIS/Open Source for WPF (EGIS Runtime) servers and easily import and view ESRI ArcGIS layers (SID, LYR and SHP files) or ArcGIS for WPF layers (service layers, map package layers).

As we are using open source platform, request to provide the available vector map data in shape file format in WGS 84 datum and units DD

- The bidder needs to undertake GIS application development work in ArcGIS software (both Server side and client side software) product-suite to be provided by GoR. - The GIS Maps (Raster and Vector Data) shall follow projection system UTM / WGS 84 Datum.

Page 89: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 89 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

322. Vol 2 Page 79 of 108

GIS Map Visualization Features 71

Software shall support the calculation and map representation of the nearest geographical route between two locations. The calculation shall be capable of including factors such as street directionality.

As the map data is going to be provided by the Department we assume that all the required attributes for e.g one way, length etc will be made available

GIS maps (raster and vector data) shall be provided by GoR.

323. Vol 2 Page 80 of 108

Social Media Integration 94

The software should provide a social listening without getting detected that can periodically query web sites, extract content from them, and store them in an easily retrievable way. Sources may include: · Twitter · Facebook · Google+ · Whatsapp · Google search · Scraping any publicly accessible website

Social Listening through Keywords, Location, Social Network accounts/handles/pages and web URLs of websites will be done. Is any other method expected?

As per RFP

324. Vol 2 Page 81 of 108

Social Media Integration 101

Should provide notifications to multiple agencies and departments (on mobile) that a new intelligence has been gathered through open source/social media.

Notifications can be initiated to the registered Social accounts and/or Email accounts.

As per RFP

325. Vol 2 Page 98 of 108

Request to close event

The Call Taker software should be able to send request to close event.

Instead of Call Taker Software, Dispatcher software should be able to request Supervisor software for Event close

As per modified RFP

326. Vol 2 Page 106 of 108

Item No 52 : EPABX System and Configuration

7. Run Distance - Not less than 800mtrs.on0.5mmdia.Cable and 8. Max. Loop resistance for analog Extensions - 2500 ohms including

For point 7. Loop resistance of 2500 ohms is very high and should be changed to 1200/1800 ohms. Long line card used for short distance may create humming noise in speech.

As per RFP

Page 90: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 90 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

telephone

327. Vol 2 Page 107 of 108

Item No 53 : IP Telephone

5. Interoperability with existing setup - Interoperability with Cisco Call Manager 8.5 or Higher

Please confirm whether Cisco call manager supports SIP protocol.

As per RFP

328. Vol 1 General Commercial Kindly confirm if any exemption against Customs Duty is available.

No, As per RFP

329. Vol 1 General Commercial Kindly confirm if any exemption against Excise duty etc.is available.

No, As per RFP

330. Vol 1 General Commercial Kindly confirm if C form will be issued against CST transaction.

No, As per RFP

331. Vol 1 General Commercial Kindly confirm if Road Permit will be issued for CST transaction. Being job in Rajasthan Road Permit is required.

Road permit would be issued on request from successful bidder

332. Vol 1 General Commercial Kindly confirm if separate PO in foreign currency can be issued for imported material.

No, As per RFP

333. Vol 1 General Commercial Kindly confirm if separate Purchase order for supply and another work order for Installation Testing & commissioning can be issued.

No, As per RFP

334. Vol 1 Page 100-111 of 131

Item No. A to J BOQ Kindly confirm that the base unit cost in INR in column B is for supply of the item only. There is no column for installation & commissioning of all items in BOM, kindly include the same.

As per RFP

335. Vol 1 Page 100-111 of 131

Item No. H,I, & J BOQ Unit of cables (Meters or KMs) is not given in the unit column for item no. H, I & J. Kindly provide the same.

As per modified RFP

336. Vol 1 Page 100-111 of 131

Item No. A to J BOQ Kindly clarify the meaning of "JOB" in unit column in some of the items.

The job has been clarified in the detailed technical specification of the concerned item. It differs from item to

Page 91: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 91 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

item.

337. Vol 1 Page 108 of 131

Item No. K BOQ For item K, software license tax breakup is not given. Do we need to provide the cost including all taxes?

As per modified RFP

338. Vol 1 General General Kindly clarify whether supply, installation, testing & commissioning of all systems will be done simultaneously for all cities or it will be done one by one for all seven cities.

It will be done simultaneously

339. Vol 1 General General We understand that handover and site acceptance will be done for each city separately.

As per RFP.

340. Vol 1 General General Kindly clarify if we need to deliver material for all cities at one place or it will be delivered in all cities individually.

The material is required to be delivered at each site respectively.

341. Vol 1 Page 46 of 131

16 Dividing quantities among more than one bidder at the time of award

Since the Financial Bid Format doesn't have the city wise breakup of all systems how the distribution of cities would be done to L1, L2 and L3 bidder? Kindly clarify.

As per modified RFP. BOM has been given at Annexure I,Vol I of RFP

342. Vol 1 Page 11 of 131

2. PRE-QUALIFICATION/ ELIGIBILITY CRITERIA 4 & 5

Technical Capability -I & II Kindly clarify if Bidder need to meet both Technical Capabilities or any of the one.

Both technical capabilities are to be met.

343. Vol 1 Page 12 of 131

8 Technical Capability for proposed original developer of VMS or authorized partner -III-The VMS OEM or its authorized partner should have customisationcentre in India

The VMS OEM only of VMS & VA software should have his development or customization centre in India. Kindly remove “Authorized partner” from this clause.

As per RFP

Page 92: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 92 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

344. Vol 1 Page 55 to 70 of 131 and Vol 1 Page 71 to 82 of 131

Financial Bid Format and 6

General Terms and Conditions of Tender & Contract and Special Terms and Conditions of Tender & Contract

We would like to submit deviations and negotiate the terms and conditions of the contract which will be signed between the Successful Bidder and the Purchaser at the bidding stage. Kindly confirm.

Conditional bid are liable to be rejected. Any request for change in terms and conditions is to be submitted during pre bid meeting.

345. Vol 1 Page 99 to 104 of 131

Financial Bid Format Data Center Quantity of Access control system, Fire alarm,Rodent &etc are mentioned as Job, please specify quantity of systems.

The job has been clarified in the detailed technical specification of the concerned item. It differs from item to item.

346. 10 2 User: City Police Department and citizens

Pls share the city police personnel count. Approx. 150 police personnel (in three shifts) shall be deputed at each Command and control center.

347. 24 3 Various policies like Security policies, Access policy, IP Policy, routing policy, firewall policies etc.

We understand that specific policies as per RISL will be shared with prime bidder during implementation phase. Please confirm

The policies shall be formulated in consultation with Successful bidder.

348. 25 3 SI shall deploy and upload/configure/host and manage web sites, application software

Since the operations team will be technical on Infra front, we might need additional team for application hosting, changes. We understand that this will only coordination with the application vendor and supporting them from Infra point during the upload/ hosting stage.Please confirm

As per RFP

349. 27 3 The SI shall educate the users about the latest virus through emails, trainings etc

We understand that training here will be given by the bidder's onsite team only and not special trainers. Please confirm

As per RFP

Page 93: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 93 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

350. 27 3 Helpdesk: The SI shall provide 24 x 7 help desk support to CCC

Will this be centralized helpdesk or different helpdesk for different district ? Who is going to provide infra for helpdesk e.g. Systems/ACD/ IVR/ Toll free etc. How many users would be expected to contact helpdesk during the tenure.

The CCC in each district shall have separate helpdesk for local issues. Separate help desk operators have been provisioned in the RFP.

351. 27 3 Helpdesk: The SI shall provide 24 x 7 help desk support to CCC

We understand RISL will provide the basic Infra(Desktop/ Laptops, Internet connectivity) and facilties (seating space, etc) to onsite helpdesk team. Please confirm

As per RFP

352. 27 3 Helpdesk: The SI shall provide 24 x 7 help desk support. IP Phone facility shall be provided for Help Desk Services.

IP Phone would provide within state calling facility. Who will provide the telecom connectivity for outside calls required for vendor coordination/ OEM support/ AMC breakfix ?

As per RFP

353. 73 NA It is acknowledged that service levels may change as service needs evolves over the course of the contract.

We understand in case if there ia any change in SLAs, same will be mutually discussed and agreed between Wipro and RISL. Please confirm.

As per RFP

354. 75 SLA DoS attacks: Rs. 100000 per DoS attack Penalty for DoS and Data Loss attack is quite high. We request you to please reduce this to maximum Rs. 20000 per DoS attack

As per RFP

355. 75 SLA There shall be no Data theft or loss or compromise of any data hosted at SDC of CCC

Please suggest what will be considered under Data Loss definition?

As per RFP

356. 76 Manpower Time table mentioned for each category: 6:00 AM to 2:00 PM, 9:30 AM to 5:30 PM, 2:00 PM to 10:00 PM

Please mention the working days against each shift mentioned in the table. Will this be Monday to Friday/ Monday to Saturday or all 7 days

The CCC shall be functional for 24x7x365 days. Leave reserve to be arranged by the successful bidder as per its policy

357. 76 Manpower Manpower We understand that for 24X7 working, we need to have minimum 4 resources for covering all the service windows with manpower. Please request you to please consider the same for manpower requirement.

The CCC shall be functional for 24x7x365 days. Leave reserve to be arranged by the

Page 94: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 94 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

successful bidder as per its policy

358. 77 Manpower Minimum Manpower Resource Table for CCC

We understand manpower specified in "table for CCC" is same for all district and will be required in each separately. Please confirm

As per modified RFP

359. 77 Manpower Minimum Manpower Resource Table for CCC

Since the asked number of resources are for particular volume of incidents/calls. However in case if there is any increase in volume of incidents, please suggest how the manpower increase for the same will be considered?

As per RFP

360. 78 Manpower Applicable Penalty when resource is leaving: After 1 year of DOJ

5 yrs for a resource in same role is too long time period for his growth. Requested to cap the resource leaving the project to 2 years from the date of joining. Penalty may be imposed within the that period and there should not be penalty if resource removed after 2 year of joining

As per RFP

361. 79 a. Severity Level - 1 Data compromised Please define "Data Compromised". What all will be covered under the same

As per RFP

362. 79 a. Severity Level - 1 Vendor Management Vendor management should be considered under Severity 3 or 2. Request to consider the same

As per RFP

363. 79 a. Severity Level - 1 Any problems related to router, switch, SAN and security components to virtualizations

We understand any problem under severity 1 will include on major issues which will impact more than 80% of the users. Please confirm

As per RFP

364. 82 Penalty Capping Total penalties except those defined in (C): “Manpower availability service levels” shall not be higher than 20% of Agreed Quarterly Payment

We request to reduce the maximum penalty capping to 10% instead of 20%.

As per RFP

Page 95: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 95 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

365. 87 Vol 2 The software shall have capability to repair and recover videos and provide forensic video enhancement of video evidence for identifying suspects

Video enhancement application, are converting the inputs video to their proprietary templets and then enhance output as an image, so enhancement of video will be in form of still images. Instead of video.

As per RFP

366. 87 Vol 2 Detects digitally edited photos, videos and PDF files

detecting PDF file does not fall under video enhancement., request to please remove PDF files

As per RFP

367. 87 Vol 2 Software shall have the capability to match photograph

licensing of photo matching algorithm are dependent on database sizes, request to please indicate database size to be matches

As per RFP

368. VOL-I Page:11, 22

PROJECT PROFILE & BACKGROUND INFORMATION5. Civil works:

2. Civil work related with establishment of Command and conctrol Center shall be done by Police Department of concerned divisional head quarter.The successful bidder shall report the same to Police Department so that the Transformer and electric cable from transformer till electric meter of the building can be got changed. Police Department shall ensure timely completion of necessary civil, electrical and interior works.

1. As per the understanding, transformer and power till Building electrical panel shall be provided by police department. Does Building electrical Panel mentioned is for Command and control Centre? Please confirm. If Yes, Does the power cabling and distribution for Police Department (other than CCC rooms) shall be carried part of Police department? Please confirm.2. Does interior work mentioned includes furniture, painting, false ceiling work Etc? We understood that all the necessary interior work also provided by Police department. Please confirm the bidders scope as page 36 Mention about the scope of electrification work and interior work are part of SI scope.

As per RFP

369. VOL-I Page:29

XVII. Management of electrical systems, Air conditioning, safety & security systems and passive networking systems

In case NOVEC1230 gas is consumed due to any reason (other then mock tests/ trials) it has to be refilled by the SI at its own cost as per standards (certified by OEM) within 2 weeks from the date of release of gas.

The clause specified are mentioning about the incident other than mock test/ trials like fire incident also held responsible bidder for refilling the gas. In case of fire incident it is inherent that Gas shall be released. In such case it should not be bidder responsibility to refill the Gas.

As per RFP

370. VOL-II Page:50

Item No 33 : UPS for data center

The UPS battery shall be sized for 50KVA at a power factor of 0.8 for 60 minutes.C22

Referring to page no 33 of Volume-1 Backuptime mentioned is 30 Mins whereas technical specification is asking about 60 Mins. Please confirm the backuptime expected on full load of each UPS capacity.

As per modified RFP

Page 96: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 96 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

371. 42 Item No 31 : Core Router-Data Center

The router should support the IPv4 and IPv6 DUAL-stack in hardware and software. The router should support minimum 1.5 MN IPv4 & 1.5 MN ipv6 routes from day one.

The router should support the IPv4 and IPv6 DUAL-stack in hardware and software. The router should support minimum 1.5 MN IPv4 & 1.5 MN ipv6 active FIB (Forwarding Information Base) routes from day one so that these routes can be utilized for traffic forwarding. Justification: Routing capacity should always be considered as no of routes represent in router forwarding information base database. There are vendor in this segment who might position nonstandard router without the presence of FIB word.

As per modified RFP

372. 43 Item No 31 : Core Router-Data Center

The router shall support firewall service in hardware on all interfaces with builtin firewall capacity of 10 Gbps for enhanced security to protect the backbone network from malicious activities without impacting the overall performance of the router.

The router should have firewall service in hardware on all interfaces with builtin firewall capacity of 10 Gbps for enhanced security to protect the backbone network from malicious activities without impacting the overall performance of the router. Justification: As these routers would be used to terminate direct internet & MPLS links, FW must be enabled from day one so that any external traffic destined towards the CCTV network can be blocked at router itself.

As per modified RFP

Page 97: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 97 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

373. 43 Item No 31 : Core Router-Data Center

The router shall perform traffic Classification using various parameters like source physical interfaces, source/destination IP subnet, protocol types (IP/TCP/UDP), source/destination ports, IP Precedence, 802.1p, MPLS EXP, DSCP and by some well-known application types through Application Recognition techniques.

The router shall perform traffic Classification using various parameters like source physical interfaces, source/destination IP subnet, protocol types (IP/TCP/UDP), source/destination ports, IP Precedence, 802.1p, MPLS EXP, DSCP and by some well-known application types through Application Recognition techniques. Router should support upto 128K queues with 3 level of hierarchical queues from day one. Justification:Hierarchical QoS with support for minimum 3 levels must be available with very high amount of queues (128k or above) in the Core router so that proper quality of service can be implemented & traffic can be prioritized on the WAN side for CCTV traffic. As video is a time sensitive traffic, without higher levels of queues support by the WAN router, packets might get dropped at core router side.

As per modified RFP

374. 43 Item No 31 : Core Router-Data Center

Addition Requested Router should have minimum 1 free I/O line card slot (full slot) for future expansion. Justification: For futute expansion purpose, 1 or more main slots should be available on the router so that any kind of expansion can be done on the router chassis by simply adding more interfaces rather than completely changing the router hardware.

As per modified RFP

Page 98: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 98 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

375. New Clause

Server loadbalancer Addition Requested Please include Server loadbalancer and its specification to load share the servers. Justification: Server load balancing and SSL ofloading ensures efficient utilization of server resources and enhances the application availability and accessibility by improving the resiliency

As per RFP

376. 16 Volume 1. 3. SCOPE OF WORK, DELIVERABLES & TIMELINES.

4. To liaison with ISP for getting internet leased line and PRI line established in the data center and will coordinate with RSWAN Project Team for integration of RSWAN Network with Command and Control center. All Payments for internet leased line and PRI line shall be made by bidder and will be reimbursed by the purchaser on actuals to the bidder at the time of quarterly payment.

Please include Internet routers and specifications. Justification: Suggest to include Internet router specification as it will give better manageability and control over internet links.

As per RFP

377. New Clause

link loadbalancer Addition Requested Please include link loadbalancer and its specification to load share internet links. Justification: In Multihomed internet architecture, need a linkliadbalancer to load share the link.

As per RFP

Page 99: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 99 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

378. 4 Item No 1 : BLADE CHASSIS

Min Four high-speed switch bays capable of supporting I/O architectures in Ethernet, FiberChannel and FCoE. IO modules/ Switches should be scalable.

Min Dual high-speed switch/IO bays capable of supporting I/O architectures in Ethernet/Fiber Channel / FCoE. IO modules/ Switches should be scalable. Justification: Latest generation blade architectures support dual converged modules for IO connectivity for carry LAN and SAN traffic. This helps in simplification, lower cabling, power & cooling without compromising throughput. There are technologies available to carry both LAN & SAN traffic on a single cable. Hence, request for this change.

As per RFP

379. 4 Item No 1 : BLADE CHASSIS

The chassis should have 2 Nos. of 10 Gbps redundant network switches/ interconnect modules with sufficient number of 10 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and at least 8 x 10 GB SR SFP+ uplink ports per switch for connecting to the data center switch. It should also include all the required cables and SFP connectors for all the ports.

The chassis should have 2 Nos. of 10 Gbps redundant network switches/ interconnect modules (but no passthrough) with sufficient number of 10 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and sufficient number of 10 GB SR SFP+ uplink ports per switch to provide 5 Gbps of uplink throughput per server for connecting to the datacenter or TOR switch. It should also include all the required cables/connectors. It should include all required no of SFP for all the ports. The same bandwidth may be provided over dual redundant 10 Gbpsconverged modules as well.Justification:We provide converged external switches to provide LAN & SAN uplink and FCOE downlink connectivity to provide better uplink bandwidth per server. This helps in simplification, lower cabling, power & cooling without compromising throughput. There are technologies available to carry both LAN & SAN traffic on a single cable. Hence, request for this change.

As per RFP

Page 100: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 100 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

380. 4 Item No 1 : BLADE CHASSIS

The chassis should have 2 Nos. of Fiber Channel SAN switches/ modules with at least 6 * 16 Gbps auto-negotiating FC uplinks and also at least 16 Gbps auto-negotiating downlinks to all server bays. It should also include all the required cables and SFP connectors for all the ports.

The chassis should have 2 Nos. of 8 gbps based Fiber Channel SAN switches/modules (no pass through) with sufficient number of 8 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and sufficient number of 8/16 GB SR SFP+ uplink ports per switch to provide 3 Gbps of uplink SAN throughput per server for connecting to the datacenter or TOR SAN switch. It should also include all the required cables/connectors. The same bandwidth may be provided over same dual redundant 10 Gbpsconverged modules using FCOE. Justification: We provide converged external switches to provide LAN & SAN uplink and FCOE downlink connectivity to provide similar better uplink bandwidth. This helps in simplification, lowe cabling, power & cooling without compromising throughput. There are technologies available to carry both LAN & SAN traffic on a single cable. Hence, request for this change.

As per RFP

Page 101: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 101 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

381. 4 Item No 1 : BLADE CHASSIS

Integrated two redundant chassis Management Modules providing IP based management of the compute nodes and vital elements like FC and Ethernet Switches. Should also provide for controlling Power, Fan management, Chassis and compute node initialization, Switch management, Resource discovery and inventory management, Resource alerts and monitoring management, Chassis and compute node power management and diagnostics for elements including Chassis, I/O options and compute nodes.

Dual redundant chassis Management Modules/solution with HA providing IP based management of the compute nodes and vital elements like servers,FC/FCOE and Ethernet Switches. Should also provide for controlling Power, Fan management, Chassis and compute node initialization, Switch management, Resource discovery and inventory management, Resource alerts and monitoring management, Chassis and compute node power management and diagnostics for elements including Chassis, I/O options and compute nodes. Single management console for managing all the chassis in the data center should be provided. Justification: Different vendors have different technical architecture to provide redundant management solution which in case of some vendors internal to blade chassis and in some cases it is external to blade chassis. External chassis management module helps in managing multiple the blade chassis from single console and thus simplifies the architecture and eliminates multiple management points. Hence, request for this change.

As per RFP

Page 102: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 102 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

382. 4 Item No 1 : BLADE CHASSIS

Addition Requested Additional Management solution should be provided to manage multiple blade chassis across geographical locations from a single console.Justification:Managing so many blade chassis is not a easy task for the server admin team. For simple configuration in one of the blades & allocating it to proper storage LUN, login into multiple device is required as the server admin needs to login to blade chassis, SAN switch & Storage simultaneously, this leads to wrong/error's in configuration. Hence we request you to ask for a management software that would ease device configuration by providing a holistic picture of the entire DC infra intoa single window.

As per RFP

383. 4 Item No 1 : BLADE CHASSIS

Addition Requested Should provide feature for movement of server identity from one slot to another in the event of server failure within chassis as well as across chassis. Justification: Managing so many blade chassis is not a easy task for the server admin team. For simple configuration in one of the blades & allocating it to proper storage LUN, login into multiple device is required as the server admin needs to login to blade chassis, SAN switch & Storage simultaneously, this leads to wrong/error's in configuration. Hence we request you to ask for a management software that would ease device configuration by providing a holistic picture of the entire DC infra intoa single window.

As per RFP

Page 103: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 103 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

384. 5 Item No 2 : BLADE Server

64 GB DDR4 ECC 1866Mhz RDIMM with Memory Mirroring/ Online Sparing

64 GB DDR4 ECC 1600Mhz RDIMM with support for upto 24 DIMM slots with Memory Mirroring/ Online Sparing Justification: Memory scalability should definitely be asked. As from day one you are asking memory with 64 GB, it is highly recommended to ask memory scalability so that in near future you simply can add more memory to increase the performance based upon the need.

As per modified RFP

385. 5 Item No 2 : BLADE Server

Min. 2 x 300GB hot plug SFF 12 Gbps 10K RPM SAS drives or higher

Min. 2 x 300GB hot plug SFF 6 Gbps 10K RPM SAS drives or higher Justification: To allow maximum participation, 10K RPM SAS drive may be accepted.

As per RFP

386. 5 Item No 2 : BLADE Server

Min. 1 x USB 2.0 Port Min. 1 x USB 2.0 Port/Console Port Justification: USB port is not required in blade servers as everything is being managed by the blade chassis itself. To allow maximum participation, USB port/console port may be accepted.

As per RFP

387. 5 Item No 2 : BLADE Server

Min. 2 x 16 Gbps Fiber Channel HBA Dual Port 8Gbps Fiber Channel HBA or same bandwidth may be provided over redundant 10g based FCOE ports. Justification: Being a blade server, all connections would be going from the blade server. As no of FC port's with capacity is already asked in the blade chassis, this point is not required.

As per RFP

Page 104: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 104 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

388. 6 Item No 3 : Management Server

64 GB DDR4 ECC 1866Mhz RDIMM with Memory Mirroring/ Online Sparing

64 GB DDR4 ECC 1600Mhz RDIMM with support for upto 24 DIMM slots with Memory Mirroring/ Online Sparing Justification: Memory scalability should definitely be asked. As from day one you are asking memory with 64 GB, it is highly recommended to ask memory scalability so that in near future you simply can add more memory to increase the performance based upon the need.

As per modified RFP

389. 6 Item No 3 : Management Server

Min. 2 x 300GB hot plug SFF 12 Gbps 10K RPM SAS drives or higher

Min. 2 x 300GB hot plug SFF 6 Gbps 10K RPM SAS drives or higherJustification:To allow maximum participation, 10K RPM SAS drive may be accepted.

As per RFP

390. 6 Item No 3 : Management Server

Min. 1 x USB 2.0 Port Min. 1 x USB 2.0 Port/Console Port Justification: USB port is not required in blade servers as everything is being managed by the blade chassis itself. To allow maximum participation, USB port/console port may be accepted.

As per RFP

Page 105: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 105 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

391. 12 (Vol I) PRE-QUALIFICATION/ ELIGIBILITY CRITERIA: Point no. 4

The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work: - Building up of centralized command and control centre. - Deployment of Video management software and command and control centre software to monitor atleast 300 cameras. OR The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work for each project: - Building up of centralized command and control centre - Deployment of Video management software and command and control centre software to monitor atleast 200 cameras

We request the department to consider the below points: 1. Surveillance system installed inhouse as a past experience. 2. Multiple PO's in a Same Project should be considered as a Single PO. 3. The project which are executed on rental model. Request to amend the Clause as per above.

As per RFP

Page 106: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 106 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

392. New Clause

Clause to be added Site Not Ready Request the department to kindly consider the below request In case, if the site is not made available for delivery & installation of procured items during the period of delivery and installation as given in the bidding document, then the bidder would request purchaser in writing, accompanied by 'Site Not Ready' certificate duly sealed & signed from the User department, for extension of delivery & installation period as the case may be. If the site is not made ready by the User department even after one month of scheduled date/actual date of delivery whichever is later, then 85% of the due amount for CAPEX shall be made to the successful bidder, remaining payment shall be made after successful installation of hardware and allied items as per the bidding document. This clause was accepted by RISL finance team and department in many older RFP's (like Arogya, SMS etc...) after multiple deliberations. Request you to kindly add the above clause in this rfp.

As per RFP

Page 107: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 107 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

393. 43 8. Bid Security. i) The Bid security taken from a bidder shall be forfeited, including the interest, if any, in the following cases, namely: -a. when the bidder withdraws or modifies its bid after opening of bids;b. when the bidder does not execute the agreement, if any, after placement of supply/ work order within the specified period;c. when the bidder fails to commence the supply of the goods or service or execute work as per supply/ work order within the time specified;d. when the bidder does not deposit the performance security within specified period after the supply/ work order is placed; ande. if the bidder breaches any provision of code of integrity, prescribed for bidders, specified in the bidding document.

Request you to amend the clause as below:i) The Bid security taken from a bidder shall be forfeited, including the interest, if any, in the following cases, namely: -a. when the bidder withdraws or modifies its bid after opening of bids;b. when the bidder does not execute the agreement, if any, after placement of supply/ work order within the specified period;c. when the bidder fails to commence the supply of the goods or service or execute work as per supply/ work order within the time specified;d. when the bidder does not deposit the performance security within specified period after the supply/ work order is placed; ande. if the bidder breaches any provision of code of integrity, prescribed for bidders, specified in the bidding document.

As per RFP

Page 108: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 108 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

394. 48 21) Exclusion of Bids/ Disqualification

21) Exclusion of Bids/ Disqualification a) A procuring entity shall exclude/ disqualify a Bid, if: - a. the information submitted, concerning the qualifications of the bidder, was false or constituted a misrepresentation; or b. the information submitted, concerning the qualifications of the bidder, was materially inaccurate or incomplete; and c. the bidder is not qualified as per pre-qualification/ eligibility criteria mentioned in the bidding document; d. the Bid materially departs from the requirements specified in the bidding document or it contains false information;

Request you to amend the clasue as below: 21) Exclusion of Bids/ Disqualification a) A procuring entity shall exclude/ disqualify a Bid, if: - a. the information submitted, concerning the qualifications of the bidder, was false or constituted a misrepresentation; or b. the information submitted, concerning the qualifications of the bidder, was materially inaccurate or incomplete; and c. the bidder is not qualified as per pre-qualification/ eligibility criteria mentioned in the bidding document; d. the Bid materially departs from the requirements specified in the bidding document or it contains false information;

As per RFP

395. 50 23 h) If the issuance of formal letter of acceptance is likely to take time, in the meanwhile a Letter of Intent (LOI) may be sent to the bidder. The acceptance of an offer is complete as soon as the letter of acceptance or letter of intent is posted and/ or sent by email (if available) to the address of the bidder given in the bidding document. Until a formal contract is executed, the letter of acceptance or LOI shall constitute a binding contract.

Request you to amend the clause as below: h) If the issuance of formal letter of acceptance is likely to take time, in the meanwhile a Letter of Intent (LOI) may be sent to the bidder. The acceptance of an offer is complete as soon as the contract is executed. letter of acceptance or letter of intent is posted and/ or sent by email (if available) to the address of the bidder given in the bidding document. Until a formal contract is executed, the letter of acceptance or LOI shall constitute a binding contract.

As per RFP

Page 109: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 109 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

396. 50 26) Right to vary quantity

26) Right to vary quantity .......Repeat orders for extra items or additional quantities may be placed on the rates and conditions given in the contract provided that the period is not more than six month from the date of agreement. Delivery or completion period may also be proportionately increased. The limits of repeat order shall be as under: - 1) 50% of the quantity of the individual items and 50% of the value of original contract in case of works; and 2) 50% of the value of goods or services of the original contract.

We request the department to cap the change in quantity to 25%.

As per RFP

Page 110: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 110 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

397. 53 32) Interference with Procurement Process

A bidder, who: - a) withdraws from the procurement process after opening of financial bids; b) withdraws from the procurement process after being declared the successful bidder; c) fails to enter into procurement contract after being declared the successful bidder; d) fails to provide performance security or any other document or security required in terms of the bidding documents after being declared the successful bidder, without valid grounds, shall, in addition to the recourse available in the bidding document or the contract, be punished with fine which may extend to fifty lakh rupees or ten per cent of the assessed value of procurement, whichever is less.

Request deletion of the clause. Failure to execute a contract may be for reasons other than for alleged interferencewith the Procurement Process.

As per RFP

398. 55 37) Debarment from Bidding

d) Where the entire bid security or the entire performance security or any substitute thereof, as the case may be, of a bidder has been forfeited by a procuring entity in respect of any procurement process or procurement contract, the bidder may be debarred from participating in any procurement process undertaken by the procuring entity for a period not exceeding three years.

d) Where the entire bid security or the entire performance security or any substitute thereof, as the case may be, of a bidder has been forfeited by a procuring entity in respect of any procurement process or procurement contract, the bidder may be debarred from participating in any procurement process undertaken by the procuring entity for a period not exceeding three years.

As per RFP

Page 111: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 111 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

399. 58 8) Scope of Supply b) Unless otherwise stipulated in the Contract, the scope of supply shall include all such items not specifically mentioned in the Contract but that can be reasonably inferred from the Contract as being required for attaining delivery and completion of the goods and related services as if such items were expressly mentioned in the Contract.

Request deletion. The clause makes the scope unlimited.

As per RFP

400. 63 27) Extension in Delivery Period and Liquidated Damages (LD)

c) Delivery and installation/ completion period may be extended with or without liquidated damages, if the delay in the supply of goods or service is on account of hindrances beyond the control of the supplier/ selected bidder.

Request modification in the clause as below: c) Delivery and installation/ completion period may be extended with or without liquidated damages, if the delay in the supply of goods or service is on account of hindrances beyond the control of the supplier/ selected bidder.

As per RFP

401. 63 27) Extension in Delivery Period and Liquidated Damages (LD)

iii. Normally, extension in delivery period of goods and service in following circumstances may be considered without liquidated damages:a. When delay has occurred due to delay in supply of drawings, designs, plans etc. if the tendering authority was required to supply them to the supplier of goods or service provider as per terms of the contract.b. When delay has occurred in supply of materials etc. if these were required to be supplied to the supplier or service provider by the tendering authority as per terms of the contract.

iii. Normally, extension in delivery period of goods and service in following circumstances may be considered without liquidated damages:a. When delay has occurred due to delay in supply of drawings, designs, plans etc. if the tendering authority was required to supply them to the supplier of goods or service provider as per terms of the contract.b. When delay has occurred in supply of materials etc. if these were required to be supplied to the supplier or service provider by the tendering authority as per terms of the contract.c. When service providers performance is effected, delayed or causes non-performance due to Purchaser's omissions or actions whatsoever.

As per RFP

Page 112: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 112 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

402. 66 33) Change Orders and Contract Amendments

c) Prices to be charged by the supplier/ selected bidder for any related services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the supplier/ selected bidder for similar services.

We request the department to kindly amend the clause as below: c) Prices to be charged by the supplier/ selected bidder for any related services that might be needed but which were not included in the Contract shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other parties by the supplier/ selected bidder for similar services. Similar services and T&C's need to be mentioned.

As per RFP

403. 67 34) Termination iv. As on effective date of termination, Tendering Authority may pay: a. the unpaid value of all the assets supplied by the Bidder and accepted by the purchaser in accordance with the RFP specifications in order to take over the possession of the assets / application. b. all the services delivered by the Bidder and accepted by the purchaser, the consideration payable shall be based on service rate as per agreement.

iv. As on effective date of termination, Tendering Authority shall may pay: a. the unpaid value of all the assets supplied by the Bidder and accepted by the purchaser in accordance with the RFP specifications in order to take over the possession of the assets / application. b. all the services delivered by the Bidder and accepted by the purchaser, the consideration payable shall be based on service rate as per agreement.

As per RFP

404. 67 c) Termination for Convenience (Applicable for O & M period Only)

Refer RFP. Request that the "notice period" to be extended to 60 days.

As per RFP

Page 113: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 113 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

405. 67 c) Termination for Convenience (Applicable for O & M period Only)

ii. As on effective date of termination, Tendering Authority may pay all the services delivered by the Bidder and accepted by the purchaser, the consideration payable shall be based on service rate as per agreement.

ii. As on effective date of termination, Tendering Authority shall maypay all the services delivered by the Bidder and accepted by the purchaser, the consideration payable shall be based on service rate as per agreement.

As per modified RFP

406. 69 e) Transfer of certain agreements

i. On request by Procuring entity or its nominated agencies, the selected bidder shall effect such assignments, transfers, innovations, licenses and sub-licenses as Procuring entity or its nominated agencies may require in favour of procuring entity or its nominated agencies, or its replacement operator in relation to any equipment lease, maintenance or service provision agreement between selected bidder and third party leasers, operators, or operator, and which are related to the services and reasonably necessary for carrying out of the replacement services by RISL or its nominated agencies, or its replacement operator.

Request deletion of this clause. As per RFP

Page 114: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 114 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

407. 72 1) Payment Terms and Schedule

Refer RFP. Request to modify the payment terms as below: 1. · Supply and Installation of DG set and UPS System · Electrical and Local Area Network cabling in video surveillance room, dial 100 control room, forensic investigation room , data center & FMS/NOC room, OIC Room and power room · Supply and Installation of furniture 30% of Capex 2. · Supply and installation of Video wall · Supply and Installation of racks, servers and storage in data center · Supply and installation of VMS, CCC, video analytics and other software as per BOM alongwith perpetual licences Setting up & implementation of Control Center, Helpdesk Centre & data center 30% of Capex 3. On Delivery, Inspection and successful installation of remaining equipment’s/items as mentioned in bill of material of RFP document 30% of Capex 4. · On successful training, Documentation, FAT and Go-Live 10% of Capex 5. O&M : Over a period of 5 years quarterly in arrears

As per RFP

Page 115: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 115 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

408. 82 Penalty capping Penalty Capping: Total penalties except those defined in (C): “Manpower availability service levels” shall not be higher than 20% of Agreed Quarterly Payment for respective quarter whereas total penalty including penalties towards “Manpower availability service levels” shall not be higher that the Agreed Quarterly Payment for respective quarter.

Penalty Capping: Total penalties except those defined in (C): “Manpower availability service levels” shall not be higher than 20% 10% (ten percent) of Agreed Quarterly Payment for respective quarter whereas total penalty including penalties towards “Manpower availability service levels” shall not be higher that the Agreed Quarterly Payment for respective quarter.

As per RFP

409. NA To be added Deemed Acceptance Services and/or deliverables shall be deemed to be fully and finally accepted by Customer in the event when Customer has not submitted its acceptance or rejection response in writing to Bidder within 15 days from the date of installation/commissioning or when Customer uses the Deliverable in its business, whichever occurs earlier. Parties agree that Bidder shall have 15 days time to correct in case of any rejection by Client.

As per RFP

Page 116: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 116 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

410. NA To be added Assignment/Discounting of receivables Assignment/Discounting of receivables (1) Customer hereby agrees and provides consent to Wipro to have unhindered right to assign the receivables under this Contract to a financial or banking institution or any other institution/organization engaged in the business of funding. For avoidance of doubt, such assignment may include but is not limited to sale of receivables. (2) Notwithstanding anything contained or expressed to the contrary in the Agreement or elsewhere, Customer is obligated to provide full support and cooperation to Wipro to enable Wipro to assign and discount the receivables by furnishing all data, documents, reports, future projections etc. including last three years financials, latest progress report, financial model etc. to the reasonable possible extent if so required by such financial or banking institution in order to enable them to ascertain the credit worthiness for lending money against the assignment of receivables.(3) In the event if RFP/Contract provides for takeover of ownership of Customer asset, it shall be conditioned upon successfully securing the finances from a financial or banking institution or any other institution/organization engaged in the business of funding under a factoring arrangement

As per RFP

Page 117: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 117 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

411. 57 4) Joint Venture, Consortium or Association

a) Unless otherwise specified in the special conditions of the contract, if the Supplier/ Bidder is a joint venture, consortium, or association, all of the parties shall be jointly and severally liable to the Purchaser for the fulfilment of the provisions of the contract and shall designate one party to act as a leader with authority to bind the joint venture, consortium, or association.

We request the department to remove consortium clause from the RFP considering the size and complexity of project. Consortium bidding will have issue during implementation. Kindly remove consortium from rfp.

As per RFP

412. Vol 1, 12 2, (1) - 1 Pre Qualification / Eligibility Criteria: Consortium is allowed. The consortium shall not consist of more than two companies / corporations……

This is a large tender which requires a huge financial exposure by the SI and diverse technical competence in the areas of Data center, Surveillance, Dial 100, Forensic security, Network, Analytics, Training and Manpower deployment. We suggest that the number of consortium partners should be amended to not more than 3. Almost all the tenders in past issued for State Data centers had allowed max 3 partners and the same was as per DIETY guidelines even though the SDC projects were of much less value as compared to this tender. Moreover this tender involves many more competencies in addition to the requirement of SDC. Further many other big (100 Cr plus) recent tenders of rajathan state also allowed 3 or more consortium partners like CCTNS, Smart Raj, Board Of Revenue etc.

As per RFP

413. Vol 1, 12 2, (1) - 2 Financial: Turnover from IT/ITeS: Annual turnover of Rs. 300 Crores in each of the last three years.

We request that please amend this to Rs. 250 Crores average annual turnover in last 3 years.

As per modified RFP

Page 118: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 118 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

414. Vol I -12 Pre Qualification Criteria Since the tender is for establishing Command and Control center and integrating various services hence the OEM for Command and Control center should have atleast 1 deployment in India for a minimum of 1000 or 500 cameras running since past 1 year. Many VMS OEM's are not OEM's for Command and Control application hence there has to be a previous experience which Command and control OEM should provide.

As per RFP

415. 27 Vol.-1 XII. Help Desk Support

a. The SI shall provide 24 x 7 help desk support to CCC (including video surveillance room, data center, dial 100 control room, power room and forensic investigation room).

Please clarify that SI need to manage manpower for the Call Handling of DIAL-100

The call handling at Dial 100 control room shall be done by Police Department.

416. 27 Vol-1 XVII. Management of electrical systems, Air conditioning, safety & security systems and passive networking systems

All the devices installed in the Data Center as part of the physical infrastructure are SNMP enabled and can be centrally and remotely monitored and managed on a 24x7x365 basis. Infrastructure management solution is available to facilitate monitoring and management of the Data Center Infrastructure on one integrated console.

Please provide the IT/NoN IT infrastructure Management parameters details.

As per RFP

417. 16 Vol-1 3. SCOPE OF WORK, DELIVERABLES & TIMELINES

6. To store 24 x 7 video feed from all cameras installed in the system for at least 15 days on primary storage. Important incidents would be required to be stored for longer duration as per requirement.

Will the video feeds be archived after 15 days or deleted/destroyed? If Need to archive the Important feed, Please provide the estimated to store the video for storage calculation

As per modified RFP

Page 119: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 119 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

418. 31 Vol.-1 9. Workflow : A. Functional Requirement of City Surveillance system

1. To coordinate with external agencies like Traffic police, Dial 100, Ambulance Service-108 and Fire Services-101 as per requirement of incident.

Does the bidder need to provide complete call management and issue tracking with these agencies or only escalate incidents through relevant software?

As per RFP

419. 32 Vol-1. B. Operational Requirement of City Surveillance System

7. Collaborative section: Provision has been kept for monitoring up to 200 Cameras which are located in important malls in the city, famous temples, fort, airport, railway station, bus stand and metro stations.

Is this over and above the number of camera feeds to be monitored in each city viz. Jaipur - 1000 and other cities - 800? If yes, kindly provide total additional cameras to be monitored over and above the existing quantity. Are these Cameras are Onvif 2.0 or above? And these 200 CCTV need to record in the DC.

Collaborative cameras are over and above the specified cameras viz. Jaipur - 1000 and other cities - 800. The collaborative cameras may be analog or digital, onvif compliant or not .

420. 37 Vol-1. 3) Roles & Responsibilities of Command and Control Center operator

· Monitor and operate the CCTV cameras and associated equipment in the command and control Room as per Policy and SOP laid down by police department.

Who will provide the Operator? As per RFP.

421. 38 Vol.1- 5) Project Deliverables, Milestones & Time Schedule

Project Deliverables, Milestones & Time Schedule are very aggressive.

Project Deliverables, Milestones & Time Schedule are very aggressive. Kindly make it realistic and project shall go live by 42 weeks.

As per modified RFP

422. 39 Vol.-1 Table for O & M reports:

XII.BMS Service EMS/BMS Software Details and specifications of BMS and EMS software has not been provided. Request to provide details of BMS and EMS software. Kindly provide details of Enterprise Management System required. What all modules of EMS will be required i.e. Network fault management and monitoring, system monitoring, application monitoring, storage monitoring, etc.?

As per RFP

Page 120: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 120 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

423. - General Access Control System (Proximity based, Cards for All the Staff)

Who shall provide for the proximity cards? How many proximity cards are required per location?

As per RFP

424. 20 Vol.1- c. Forensic Investigation room :

The suite of software modules would be required to be scaled up to support any number of cameras, NVRs, control rooms and client operators and would have multiple redundancy and security level options.

a. What is the percentage increase in cameras expected over the project duration? b. We assume that any additional software licenses required to meet the increased requirements will be paid on actual. Please clarifyc. Additional increase in cameras will have impact on hardware requirements. Any additional hardware required for monitoring cameras over and above those mentioned in the RFP will be procured separately and be chargeable accordingly. Please clarify

a) More than 100% increase in cameras is expected over the project period.b) Additional software licenses, if required shall be procured as per procurement rules of the State.c) Additional hardware, if required shall be procured as per procurement rules of the State

425. 20 Vol.1- c. Forensic Investigation room :

The suite of software modules would be required to be scaled up to support any number of cameras, NVRs, control rooms and client operators and would have multiple redundancy and security level options.

Please clarify whether Video Management Servers are to be placed in HA.

As per RFP. Refer Annexure I,Vol I of RFP

426. Page-20 and 110

Vol.1- 5. Training and capacity building

4. Training and capacity building Bidder has to provide application and role based training to the CCC operators and supervisors of different applications like VMS,CCC,Video Analytics, forensic software, dial 100, radio gateway software etc.

a. Please clarify that Page 20 shows 190 person per city per year. Whereas the page 110 shows 6650 person per city per year

As per modified RFP

427. 36 Vol.1- 2) Roles & Responsibilities of Stakeholders/ SI

8 Preparing and implementing the Surveillance system information security policy, including policies on backup

Kindly provide backup policies to be followed in Data Center. This will have impact on number of tapes.

The policies shall be prepared in consultation with successful bidder.

Page 121: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 121 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

428. 28 Vol.-1 XV. Security Administration and Management Services

f. Ensuring that the security policy is maintained and updates to the same are made regularly as per ISO 27001, BS 7799 and BS 15000 guidelines. g. Compliance of security regulations defined by GoI or any other Govt. Authorized agency such as CERT-IN etc.

Who shall bear the cost of certification? Would SI bear the cost?

Certification’s is not required. However, FMS team is required to follow the guidelines.

429. 20 Vol.-1 6. Civil works:

Police Department shall provide requisite space for Command and Control Rooms at all locations. The Successful Bidder shall visit each of seven divisional control rooms along with officers of the Rajasthan Police Department. A joint report will be prepared which would provide Civil, Electrical and Interior Work requirements. Due to implementation of the CCC project, the electric load shall be enhanced in the building where the CCC is to be setup. The successful bidder shall report the same to Police Department so that the Transformer and electric cable from transformer till electric meter of the building can be got changed. Police Department shall ensure timely completion of necessary civil, electrical and interior works. Police Department shall hand over the ready site to successful bidder’s representative.

Please confirm whether department will provide the following at the CCC and Data Center a. False ceiling and raised flooring b. vitrified tiling c. partitioning d. interiors including plastering and painting e. complete electrification and lighting f. earthing

The civil work shall be got done by Police department

Page 122: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 122 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

430. 20 6. Civil works: The Successful Bidder shall have to undertake the work of electric and LAN cabling/erection of mast /fixing of poles/towers, if required as per requirement.

Kindly clarify what is the scope of bidder with respect to erection of mast and fixing of poles/towers. Please provide details of all such locations where fixing and erection of masts, poles and towers are required.

As per modified RFP

431. 38 5) Project Deliverables, Milestones & Time Schedule

16 weeks for FAT and Go-Live & Training and Documentation

Is the timeline applicable for all seven locations together? We request to increase the timelines to at least 42 weeks.

As per modified RFP

432. 74 Vol.-1 A. IT and Non IT Infrastructure service levels

Equipment/Services Downtime is the time in hours that the equipment/ Services is not available and excludes planned downtime, which are approved by the tendering authority and the link failures that are taken from third party. The downtime shall be calculated from the EMS or BMS, as may be applicable. In case, downtime of any equipment/ Services is not available on EMS/BMS, it shall be calculated from the helpdesk.

Any downtime due to failure of cameras/ links or switches connecting the cameras at the remote locations should not be liable on bidder. Please clarify.

As per RFP, Refer Chapter 3 of RFP

433. 74 Vol.-1 C. Manpower availability service levels

SI shall appoint as many team members, as deemed fit by them, subject to the minimum manpower specified below to meet the SLA requirements. The tendering authority would not be liable to pay any additional cost for this.

a. We assume that the minimum manpower mentioned under this section is on a per location basis. Please clarify. B. Does the bidder need to provide security guards at each location. If yes, how many? C. Is the bidder responsible for providing CCC operators at each CCC for daily operations of the CCC?

a) Yes b) No c) No

Page 123: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 123 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

434. 56 Vol.1- A. IT and Non IT Infrastructure service levels

Uptime of an equipment = {1 -[(Equipment downtime)*(Severity factor) / (Total Time )]} * 100 Target- 1. >=99% 2. <99 and >=97% 3. <97%

Downtime mentioned in SLA is very aggressive, kindly amend the clause like: 1. >=98% --------------------- NA 2. <98 and >=96%----------- For every 0.5% degradation in the uptime there will be a penalty of 1% of Agreed Quarterly Payment 3. <96%---------------------- For every 0.5% degradation in the uptime there will be a penalty of 1.5% of the Agreed Quarterly Payment

As per RFP

435. Preventive Maintenance No. of days In last 15 days of the quarter Rs. 1,000/- per day per equipment subject to maximum of Rs.3,000/- per equipment

Kindly amend the clause like: Rs. 500/- per day per equipment subject to maximum of Rs.15,00/- per equipment

As per RFP

436. 78 Vol.1- Manpower Change

Manpower resources for specialized services

Kindly Remove the Applicable Penalty when resource is leaving. As we are maintaining SLA of required Scope of Work

As per RFP

437. 78 Vol.-1 A. IT and Non IT Infrastructure service levels & D. Help desk service levels

Uptime of an equipment = {1 -[(Equipment downtime)*(Severity factor) / (Total Time )]} * 100 Target- 1. >=99% 2. <99 and >=97% 3. <97%

Kindly remove sub clause D of Page78, because it is already cover in Clause No A & B Page No:- 74.

Clause A is related with SLA on uptime of IT & Non-IT infrastructure while clause D is related with SLA on services being provided by manpower of successful bidder.

438. 78 Vol.-1 D. Help desk service levels

General Kindly Clarify the Help Desk module. It Centralized or each CCC should have separate Helpdesk

Bidder to provide separate Helpdesk module for each CCC.

Page 124: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 124 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

439. 75 Vol.-1 C. Manpower availability service levels

The manpower deployed by SI for carrying out and providing FMS services shall necessarily be on direct payroll of the bidder organization and should not be outsourced / subcontracted in any circumstances except for the following manpower category: 1. Help Desk Support Staff2. Electrical Assistant 3. BMS Operator 4. Physical Security 5. Housekeeping 6. CCC Support Staff Only the above mentioned six categories may be outsourced / subcontracted by the bidder organization.

Kindly Clarify that SI should consider the Physical Security Staff for the CCC? If yes than each CCC will have need one Physical Security Staff?

Physical security staff is not required to be provided by SI.

440. 33 Vol.1- Indicative Workflow of Dial 100 Control Room

7. Dial 100 operator shall also be able to use police radio network for emergency handling and for communication with PCR Vans etc..

Who will provide Radio Communication? What type (ROIP/Tetra/Analog) of radio communication will be there? How Many Radio channels need to integrate with CCC? Who will provide the physical connectivity b/w PRI and EPABX for Dial 100

As per RFP

Page 125: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 125 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

441. 62 Vol.-1 23) Samples a) When notified by the Purchaser to the supplier/ bidder/ selected bidder, Bids for articles/ goods marked in the BoM shall be accompanied by four sets of samples of the articles quoted properly packed. Such samples if submitted personally will be received in the office. A receipt will be given for each sample by the officer receiving the samples. Samples if sent by train, etc., should be dispatched freight paid and the R/R or G.R. should be sent under a separate registered cover. Samples for catering/ food items should be given in a plastic box or in polythene bags at the cost of the bidder.

Request to modify the number of samples to one set . The purchaser shall separately specify items for which samples are required. The SI shall not be required to bring sample of all items.

442. 34 Vol.1- A. Functional Requirement of City Surveillance & Incident Response System :

To integrate the incident management with social media like twitter, Facebook, google+,WhatsApp etc. The engine should have capability to be used to extract data using API or as general purpose web crawler and to analyze messages from social media during investigation.

OSINT or social media integration is a full blown solution based on big data analytics. To be more accurate in our understanding, kindly share functional requirements for social media integration requirement.

As per RFP

Page 126: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 126 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

443. 62 Vol.-1 23) Samples

c) Approved samples would be retained free of cost up to the period of six months after the expiry of the contract. RISL shall not be responsible for any damage, wear and tear or loss during testing, examination, etc., during the period these samples are retained.The Samples shall be collected by the supplier/ bidder/ selected bidder on the expiry of stipulated period. RISL shall in no way make arrangements to return the samples. The samples uncollected within 9 months after expiry of contract shall be forfeited by RISL and no claim for their cost, etc., shall be entertained.

Request to modify the clause to return the sample after testing.

As per RFP

444. 4 Vol.2- Item No 1 : BLADE CHASSIS

IO Modules :- Min Four high-speed switch bays capable of supporting I/O architectures in Ethernet, Fiber Channel and FCoE. IO modules/ Switches should be scalable.

Request to modify clause as :- "Min Two high-speed switch bays capable of supporting I/O architectures in Ethernet, Fiber Channel and FCoE. IO modules/ Switches should be scalable. Justification: - Every OEM follows theirown architecture to provide optimal performance. Hence we request to make this clause modified as above so that all leading players can participate in this project.

As per RFP

Page 127: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 127 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

445. 4 Vol.2- Item No 1 : BLADE CHASSIS

Ethernet IO Module (10GBps) :- The chassis should have 2 Nos. of 10 Gbps redundant network switches/ interconnect modules with sufficient number of 10 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and at least 8 x 10 GB SR SFP+ uplink ports per switch for connecting to the data center switch. It should also include all the required cables and SFP connectors for all the ports.

Request to modify the clause as " The chassis should have 2 Nos. of 10 Gbps redundant network switches/ interconnect modules with sufficient number of 10 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and at least 4 x 10 GB SR SFP+ uplink ports per switch for connecting to the data center switch. It should also include all the required cables and SFP connectors with modules for all the ports. Justification :- Every OEM follows their own architecture to provide optimal performance. Hence we request to make this clause modified as above so that all leading players can participate in this project.

As per RFP

446. 4 Vol.2- Item No 1 : BLADE CHASSIS

Fiber Channel IO Module :- The chassis should have 2 Nos. of Fiber Channel SAN switches/ modules with at least 6 * 16 Gbps auto-negotiating FC uplinks and also at least 16 Gb auto-negotiating downlinks to all server bays. It should also include all the required cables and SFP connectors for all the ports.

Request to modify the clause as "The chassis should have 2 Nos. of Fiber Channel SAN switches/ modules with at least 4 * 8 Gbps auto-negotiating FC uplinks and also at least 8 Gb auto-negotiating downlinks to all server bays. It should also include all the required cables and SFP connectors for all the ports." Justification :- Every OEM follows their own architecture to provide optimal performance. Hence we request to make this clause modified as above so that all leading players can participate in this project.

As per RFP

447. 61 Vol.2- Item No 36 : Comfort Air Conditioning

Preferred Make :- Daikin/ Toshiba/ O General/ Mitsubishi

Request to also add equivalent in the make list so that other OEMs can participate

As per RFP

448. 6 Vol.2- Item No 5 : RACK with Cooling Solution & Fire Detection/Supp.

Item No 5: RACK with Cooling Solution & Fire Detection/Suppression

Does the department expect a comprehensive rack solution with in-built cooling, fire suppression and IP CCTV system?

As per RFP

Page 128: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 128 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

449. 12 Vol.1- Technical Capability -I

The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work:· Building up of centralized command and control centre.· Deployment of Video management software and command and control centre software to monitor atleast 300 cameras. ORThe lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India having following scope of work for each project:· Building up of centralized command and control centre· Deployment of Video management software and command and control centre software to monitor atleast 200 cameras

Kindly amend the clause like:The lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least one project during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India/Abroad having following scope of work:· Building up of centralized command and control centre.· Deployment of Video management software and command and control centre software to monitor atleast 300 cameras. ORThe lead bidder/Consortium partner must have completed/partially completed (supplied all items) of at least two projects during financial years i.e., 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India/Abroad having following scope of work for each project:· Building up of centralized command and control centre· Deployment of Video management software and command and control centre software to monitor atleast 200 cameras

As per RFP

Page 129: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 129 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

450. 13 Vol.1 Technical Capability -II

The lead bidder/consortium partner should have commissioned and installed at least one ISO certified data center from April 2009 in India. An order value (including IT and Non-IT but excluding basic building structure cost) of not less than 5 Crores. Note: · Bidder’s in house data centers shall not be considered. · Bidders who have built their own Internet Data Centre (IDC) for commercial use will be considered.

Kindly amend the clause like: The lead bidder/consortium partner should have commissioned and installed at least one ISO certified/Tier - III Certified data center from April 2009 in India as on bid submission date. An order value (including IT and Non-IT but excluding basic building structure cost) of not less than 5 Crores. Note: · Bidder’s in house data centers shall not be considered. · Bidders who have built their own Internet Data Centre (IDC) for commercial use will be considered.

As per modified RFP

451. 13 Vol.1- Technical Capability for proposed original developer of VMS software -I

The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 1000 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Kindly amend the clause like: The original developer of VMS software should have successfully deployed its VMS software in a project comprising of minimum of 500 cameras and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India/Abroad.

As per RFP

452. 14 Technical Capability for proposed original developer of Dial 100 software

The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India.

Kindly amend the clause like: The original developer of Dial 100 software should have successfully deployed its Dial 100 solution in atleast one city and integrated with command and control center software during financial years 2012-2013, 2013-2014, 2014-2015 and 2015-2016 in India/Abroad.

As per modified RFP

Page 130: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 130 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

453. 73 Vol.2- Item No 44 : Video Management Software (ONVIF Profile S Compliant)Localization & Customization

The OEM is expected to study the requirement with Police Department and customize the VMS software product to suit their requirements.The VMS OEM or its authorized partner should have customization centre in India so that customization as per user requirement can be done as and when required.

Kindly amend the clause like:The OEM is expected to study the requirement with Police Department and customize the VMS software product to suit their requirements.The VMS OEM or its authorized partner/bidder should have customization centre in India so that customization as per user requirement can be done as and when required.

As per RFP

454. Vol1 & Page no 83

Annexure-1, Data Center

Qty of the Servers mentioned As this is a solution oriented BID and quantity of the servers required will be dependent on the solution being provided by the SI, hence removal of the 'quantity of the servers' is requested. Also the Processor asked in the RFP is 10 Core whereas processors with higher core and in latest technology are available which can help achieve required performance with the lesser no of servers, basis this; request you to mention only 'minimum specifications' of the Blade Server so that SI can themselves chose higher specification or required quantity of servers as per their solution.

As per RFP

455. Item No 9 : Secondary storage in RFP_for_City_Survellance_Vol_II_01_10_2015.pdf

Item No 9 : Secondary storage

There are two options provide to bidder for providing secondary storage. Bidder has to propose any one option in the technical bid and quote the financial bid only for any one option.

We would like to know what is the division between online and archival storage?2 Pb is requested as secondary storage and in other storage requirement Rajcomp has also mentioned about archival volumes in 220 and 400 TB storage boxes

As per RFP

Page 131: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 131 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

456. Item No 9 : Secondary storage in RFP_for_City_Survellance_Vol_II_01_10_2015.pdf

Item No 9 : Secondary storage

There are two options provide to bidder for providing secondary storage. Bidder has to propose any one option in the technical bid and quote the financial bid only for any one option.

Will there be any replication happening between secondary storages?

As per RFP

457. Item No 7 : 220 TB Usable Storage (using NL-SAS disks) for Video and 5 TB usable using SAS disksin RFP_for_City_Survellance_Vol_II_01_10_2015.pdf

Item No 7 : 220 TB Usable Storage (using NL-SAS disks) for Video and 5 TB usable using SAS disks

Item No 7 : 220 TB Usable Storage (using NL-SAS disks) for Video and 5 TB usable using SAS disks

What is the replication architecture for 220 Tb and 400 TB across DC's?

As per RFP

Page 132: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 132 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

458. General CCTV AMC Hikvision Cameras (Customised for GoR) are procured under different project by GoR with approximate quantity of 5800 spread across 7 cities as mentioned in RFP. These cameras will be integrated with proposed command and control canter under this RFP. There are various other parameters associated with camera such as Power Supply of CCTV, Surge Protection ,Earthing, Local JB on Pole, LAN Cabling, Heater and Blower for the long life of CCTV, and Field switches etc. Please provide complete details of the CCTV accessories along with make and Model to confirm to the RFP requirement of camera AMC. Further, this is OEM specific and AMC charges quoted by the OEM will not have competitive price discovery, therefore, we request GoR/RISL to confirm on AMC rate with the OEM directly and share the same with all the prospective bidders to keep transparency.

As per modified RFP

459. General Radio Integration Please provide details of existing Radio System Make model and PRI Integration port details.

As per RFP

460. General As a part of the collaborative monitoring effort, the system shall also facilitate citizens after authentication (e.g. OTP) to upload video feeds to the CCTV System.

Kindly define concurrency for collaborative monitoring and video upload so that system shall be designed to meet the performance parameters.

As per RFP

461. 122/Vol1 Point 8 ……….. / Facial recognition system Please provide functional requirement of facial recognition system

As per modified RFP

Page 133: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 133 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

462. 12 4 Consortium is also allowed. The consortium shall not consist of more than two companies/ corporations and shall be formed under a duly stamped consortium agreement. (Attach Proof). In a consortium, one of the partners shall be designated as a "Lead Partner". The bidder or Lead partner of the consortium shall be an Information Technology and Communication Company/ Corporation. Every member of the consortium shall be equally responsible and jointly and severally liable for the successful completion of the entire project. In case of any issues, Lead Partner shall be responsible for all the penalties.

We request authority to allow consortium of 3 companies

As per RFP

463. 12 2 Financial: Turnover from IT/ ITeS Annual Turnover of the lead bidder from IT/ ITeS/Telecom during each of the last three financial years, i.e., from 2012-2013, 2013-2014 and 2014-2015 (as per the last published audited balance sheets), should be at least Rs. 300 Crores.

Annual Turnover of the lead bidder from IT/ ITeS/Telecom for an average of the last three financial years, i.e., from 2012-2013, 2013-2014 and 2014-2015 (as per the last published audited balance sheets), should be at least Rs. 300 Crores.

As per modified RFP

Page 134: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 134 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

464. 14 12 Certifications: The lead bidder /consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

The lead bidder (or any of the group companies registered in India)/ consortium partner must possess at the time of bidding, a valid a. ISO 9001:2008 b. CMM/CMMI Level 3 c. ISO 20000 d. ISO 27001

As per RFP

465. 16 10 10. The selected bidder shall supply, install and implement following software as per features mentioned in the tender:c. Forensic Investigation softwared. Digital Evidence Management for forensic investigatione. Video Analytics Software

We request authorities to include Facial Recognition based analytics also. Based on our experience in city surveillance projects in India, we suggest to create a new entity called PIU (Picture Intelligence Unit) which includes the advanced analytics like Facial Recognition for Live CCTV Surveillance and Forensic Investigation. This is also a basic requirement in all such projects globally and now in India also. Mumbai City Surveillance, MP Police City Surveillance, CIDCO Navi Mumbai City Surveillance projects have Face Recognition Analytics as an integral part of analytics component.

As per modified RFP

Page 135: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 135 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

466. 16 10 10. The selected bidder shall supply, install and implement following software as per features mentioned in the tender: c. Forensic Investigation software d. Digital Evidence Management for forensic investigation e. Video Analytics Software

We request authority to include Face Recognition system for real time alerts if any blacklisted/criminal face is detected by any of the camera at crtical/strategic locations mainly the entry and exit points of city like Railway station/Bus stand etc. This will make the entire surveillance system proactive rather than reactive. Safe city projects in Surat and MP have included this in video analytics and are getting benefitted with this world class tecnology. Now technology has matured and affordable also. Over a period of last 2 years NEC has also proved that it works in live indian scenarios, crowded public places in real time conditions. We request authority to include Face Recognition system with 10 camera licenses in 1 city i.e. Jaipur on a trial basis. Based on performance and real time experience by end user department this can be replicated in other cities and more locations also. We request to change the video analytics software BOQ accordingly to make it at part for all the bidders.

As per modified RFP

467. 8 Viewing and Recording frames will be 10fps/20fps during movement or non movement period

Please state the image resolution as well.

This is required for Storage calculation. Image resolution shall be as per requirement of police department. However, the bidder may assume image recording at 720p.(HD recording)

Page 136: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 136 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

468. 12 Pre-Qualification Criteria

1) Since the tender is for establishing Command and Control center and integrating various services hence the OEM for Command and Control center should have atleast 1 deployment in India for a minimum of 1000 or 500 cameras running since past 1 year. 2) The owner of Incident Management System software or C4I application should have a deployment in India with minimum 500 cameras. 3) The owner of incident management system software and Video Management Software should be of the same make.

Many VMS OEM's are not OEM's for Command and Control application hence there has to be a previous experience which Command and control OEM should provide.

As per modified RFP

469. 130 Outdoor High Resolution Camera Specifications

Camera is a non PoE camera. The type of ONVIF profile is missing.

This information should be provided to facilitate seamless integration.

As per RFP

470. 25 DVR for Internal surveillance

Cameras asked are IP but still Analog cameras are asked.

It should be integrated to the VMS installed at CCC As per RFP

471. 70 Audio recording Camera specifications do not support Audio. Hence incase the Audio needs to be broadcast using Public Address system then IP based PA system is required, VMS will not do the job.

In future audio enabled camera may be installed. Hence the VMS should have support for audio.

Page 137: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 137 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

472. 71 VMS must run multiple Clients simultaneously on one WS.

VMS Can run multiple panes and tiles and even multiple users but as a single client at a time. Please clarify how can multiple operators sit simultaneously on a single WS.

It should be possible to run multiple instances of client VMS software on one workstation.

473. 80 Social Media Monitoring

The entire operations should be covert operations during investigations so that the target is unaware about the source of analysis. This is critical so that the identity is protected as far as possible.

As per RFP

474. 7 5.8 8 Alongside the compressor, the cooling circuit of the Cooling Units should comprise a collecting tank, liquid separator, electronic expansion valve, optimised heat exchanger, high and low-pressure sensors, Schrader valves, filter dryer, non-return valve, high-pressure switch and shut-off devices

Liquid separator is not present, rest of the things are present. Emerson's cooling unit heat exchangers are designed in such that these separators are not required. Further inclusion of these components increases the joint and no. of failure points in cooling circuit.

As per modified RFP

475. 6 5.2 As a direct condenser, the integrated air/refrigerant heat exchanger should guarantee a cooling output of up to 12 kW with standard server enclosure dimensions, the lowest possible weight, and comprehensive possibilities for monitoring

12kW cooling unit is specific to Rittal, bidder should be capable to give overall 28kW of cooling, there should be no limitation/criterion over the capacity of single unit like 12 kW in this case. Maximum points should be given to that bidder which uses least possible no. of cooling circuits to achieve the required cooling.

As per modified RFP

Page 138: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 138 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

476. 6 5.4 The Cooling Units should be equipped with four EC fans, for maximum efficiency and minimum power consumption. The flow characteristics of the heat exchanger are optimised for the lowest possible pressure losses on the air side. This should minimise the energy consumption of the fans

There should be no criterion over no. of fans, bidder should be capable to just provide the required CFM(400-600) as per ASHRAE norms,

As per modified RFP

477. 8 5.36 Fire detection and suppression master system must be compact enough to occupy only 1U space in each IT rack. 1U Rack Mountable device should have built-in high sensitivity smoke detection with active air-sampling. Also the NOVEC 1230 suppression system cylinders must be built-in within the 1U detection device with sufficient quantity. The 1U Fire detection and suppression system should be equipped with fire panel, with actuator, discharge nozzle, piping complete with accessories. The system should include a manual abort option. This device should be monitored using potential free contacts. It should have possibility to expand up to 6 nos. of IT Rack using master & slave configuration

Fire panels are not housed inside the racks instead these are housed in a separate rack. This gives more U space inside the server racks plus in case of fire inside the server racks, these panels do not get damaged. Rest of the points are complied

As per modified RFP

Page 139: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 139 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

478. 8 5.37 Fire detection and suppression Slave unit must be compact enough to occupy only 1U space in each IT rack. 1U Rack Mountable Slave device should have the NOVEC 1230 suppression system cylinders, must be built-in within the 1U device with sufficient quantity. The 1U Fire suppression Slave unit should be communicating with master units for activation and suppression system

Fire cylinders are not housed inside the racks instead these are housed in a separate rack. This gives more U space inside the server racks plus in case of fire inside the server racks, the setup dosen'tget damaged. Rest of the points are complied

As per modified RFP

Page 140: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 140 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

479. 9 5.39 Remote Monitoring system with Graphical user interface with e-mail alerts. The following devices to be monitored: Temperature/Humidity, Water Leakage, Fire Detection & Extinguishing, Air-condition Units, Door access sensor. It should also monitor & control Automatic Door Opening of 6 Doors. It should provide a single TCP IP interface for remote monitoring of all components and generate email alerts and warnings. The central monitoring device should also be connected to Signal Pillar with Audio & Visual alarm extension. It should be able to operate with Protocols: TCP/IPv4, TCP/IPv6, SNMPv1, SNMPv2c, SNMPv3, Telnet, SSH, FTP, SFTP, HTTP, HTTPS, NTP, DHCP, DNS, SMTP, XML, Syslog, LDAP. The system should have feature to generate SMS alerts as well.

SMS alerts are not present, rest of the points/ functionality arecompiled but are present on a different protocol but will still give the similar user experience.

As per RFP

480. Page 6 of 108

2 and 3 " Supported servers – Min. 48" and "16 x 10/100 Mbps-RJ45 server ports"

Are all 48 Servers in same location? Is it ok if we provide 2 x 32 port KVM switches which supports upto 64 server connections

Yes, All servers are at same location. Please refer modified RFP.

481. Page 6 of 108

Not Available Generic What is the warranty period required for KVM? All items supplied by successful bidder would be with 5 years warranty

Page 141: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 141 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

482. Page 6 of 108

7 It should have 21 inch TFT monitor and a movable front panel

Emerson provides 18.5" LCD console movable tray. It is fully compatible with proposed KVM. Is there any specific reason for 21" monitor mentioned? If yes, please specify.

As per modified RFP

483. Page 6 of 108

9 It should have serial device switching capabilities

if there is serial devices to be connected to proposed KVM switches, what is the total number of serial devices? What kind of serial interfaces do they have? Specify quantity wise.

As per modified RFP

484. Page 6 of 108

Not Available Generic What is the quantity of LCD console tray? Can we consider it per KVM switch?

Yes

485. Annual Turnover of the lead bidder from IT/ ITeS/Telecom during each of the last three financial years, i.e., from 2012‐2013, 2013‐2014 and 2014‐ 2015 (as per the last published audited balance sheets), should be at least Rs. 300 Crores.

Annual Turnover of the lead bidder from IT/ ITeS/Telecomduring each of the last three financial years,i.e.,from2012‐2013, 2013‐2014 and 2014‐ 2015 (as per the lastpublished audited balance sheets), should be at least Rs.200 Crores. As the project is of the value 175 Crores, aturnover of 200 Crores is sufficient. In addition,there is no benchmark of 300 Crores.Financial turnover to be calculated jointly ratherthan for only lead bidder

As per modified RFP

486. Technical Capability Centralized command controlcentre and similar activities.

Centralized command control centre is a veryspecific activity. It may not be specifically mentioned.

As per RFP

487. Certifications CMM/CMMI Level 3

May be removed/ equivalent certification may be considered.

Majority of work does not comprise of software development. CMMi 3 is not justified. Also, CMMi is in multiple sectors.

As per RFP

488. Not Mentioned Not Mentioned Who shall be responsible for hardware integration issues

SI has to take care of integration for successful implementation of project

Page 142: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 142 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

489. Not Mentioned Not Mentioned It is mentioned that The selected bidder has to maintain telephone numbers of hospitals, fire stations, police stations, PHED, Electric sub‐station, Ambulances etc. as part of the system to be used by the operators working in the command and control room. What if these phone numbers change? Who shall be responsible for updating the same?

FMS team of successful bidder has to keep the telephone database up to date.

490. Not Mentioned Not Mentioned Perpetual licenses – would Software subscription support and upgrades be inclusive or exclusive

All hardware and software provided by successful bidder shall be with 5 years warranty. The software support and upgrades for 5 years is to be provided by successful bidder.

491. Not Mentioned Not Mentioned Video Surveillance Room and other approx. area – what shall be the design map and are there any specifications for the same

Indicative layout design of CCC has been included in volume - I of the modified RFP document.

492. Not Mentioned Not Mentioned This power room shall accommodate power panel, 40 KVA UPS, 50 KVS UPS and batteries. \What is the meaning of different 40 KVA UPS, 50 KVS UPS

As per RFP

493. Not Mentioned Not Mentioned Collaborative monitoring – who shall provide the dashboard

As per RFP

494. Not Mentioned Not Mentioned Who shall be responsible for the integration with other state application

The successful bidder shall be responsible for integration with other state application

Page 143: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 143 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

495. 12 6 Technical Capability for proposed original developer of VMS software -I

Should be rephrased as: The original developer of VMS software should have successfully deployed its VMS software in the projects comprising of minimum of 500 cameras and integrated with command and control center software during financial years 2012-2013, 2013- 2014, 2014-2015 and 2015-2016 in India

As per RFP

496. 12 7 The original developer of VMS software should have Sales & support office in India

The VMS should be make in India, should have sales, support and development support in India

As per RFP

497. 20 3 Integration with RASS Would need interface details. For this and for all other third party supplied systems/ component.

Details of the Project shall be provided to successful bidder

498. 25 Vol II Item no.: 21 -1: for Stand Alone Digital Video Recorder

Entire project is based on IP surveillance, but for internal surveillance project need analogue cameras with DVR. That means the project is a hybrid solution. Project further need integration of IP and analogue system for which we would need SDK/API of the DVR proposed for Internal surveillance

As per modified RFP

499. 68 Vol II Item No 3,4 and 5 Support for UNLIMITED numbers of cameras, servers and connected users are dependent on bandwidth and associated hardware availability. Software however complies it.

As per RFP

500. 71 Vol II Monitor Support per client Project need 4 Monitors to be supported by one client. As per previous RFP meeting it was discussed that project need 1st Monitor for general surveillance, 2nd monitor for PTZ cameras, 3rd Monitor for Map and 4th Monitor for alerts. In our case Map and alerts can be displayed in one monitor, this way we propose 3 Monitor support per client.

As per RFP

501. 73 Vol II Recording Triggers This may not require if we put the motion recording on. As per RFP

502. 78 Vol II Item No.: 56, 57 and 58 Please let us know use case for this feature As per RFP

Page 144: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 144 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

503. 79 Vol II Asset Tracking During RFP meeting it was agreed to remove this as the DG and other stuff will remain in same building. Our software however allows to place the devices on the map as per their location.

As per RFP

504. NA NA NA Cameras are separated from the video surveillance software, usually the software also controls the cameras for pan, tilt and zoom - without knowing what cameras it usually becomes difficult to guarantee that we can interoperate with all cameras and give what they want. Please specify minimum standards for cameras.

The cameras shall be ONVIF compliant.

505. NA NA NA Qualification norms in 2.2 are clearly tilted towards big players which may result in leaving out the new research done in the recent past and all the innovation in startup companies. In our view, this is against the “startup India” campaign.

As per RFP

506. NA NA NA In point 2.4 the period of financial years starting from 2013-2013 is OLD, many CCTV projects were not even being done in India at that time

As per RFP

507. NA NA NA Warranty support starts from date of commissioning - what if commissioning is delayed due to the government themselves.

As per RFP

508. NA NA NA The RFP mentions that the photos from field agents will be sent to the control room. What will be the medium? Are they already using an application/ whatsapp/ email, etc…

The photo and video shall be sent using application/mobile app to be provided by selected bidder

509. NA NA NA There is mention of forensic analysis. This is for both Vehicular and Facial? If yes, is there is an existing system or that has to be proposed to the department?

Vahan system for Vehicular and CCTNS for Facial.

Page 145: Replies to the Pre-Bid Queries for RFP for Establishment ...risl.rajasthan.gov.in/wp-content/uploads/2015/11/Final...location with this BOQ . Please share us the copper & fiber connectivity

Replies to the Pre-Bid Queries for RFP for Establishment and Commissioning of Command & Control Centre under Surveillance & Incident Response Project at seven cities of the State of Rajasthan (NIT No. F4.3(152)/RISL/Tech/15/4433 dated 29-09-2015)

Page 145 of 145

S No

RFP Page No.

RFP Rule No. Rule Details Query/Suggestion/Clarification Reply to Pre-bid queries

510. NA NA NA Digital alteration of images and videos needs to be detected. The govt has software that only they have access to to carry out this. Is this going to be something we need to integrate to or do we need to propose a solution for the same? What is the tolerance for failure of solution to detect tamper as no solution in market can give a 100% accuracy in tamper detection.

As per RFP

511. NA NA NA Does the IVRS already have call log feature and the same needs to be managed by system proposed or an entirely new system is to be proposed. If so what is the current IVRS tool being used.

As per modified RFP

512. NA NA NA IP telephone is to be used for communication. Is the same available or a solution needs to be proposed.

As per RFP

513. NA NA NA What is the resolution at which the camera is to record and stream?

Image resolution shall be as per requirement of police department. However, the bidder may assume image recording at 720p.(HD recording)

514. NA NA NA Data retrieval has been talked about. The retrieval will be from remote location located on a different geographical location?

Usually the retrieval shall be inside CCC. But in exceptional circumstances, the retrieval may be required remotely as well