    S.NO S ite TASK DESCRIPTION Complet ion Da te

    1 WFP BAMBOO 20-09-11

    2 WFP GRILLS

    3 UNESCO

    4 FINLAND RCC WALL

    FINLAND RES-CANOPY 17-09-11

    NADRA-civil 18-09-11

    NADRA-blocker

    GERMAN 18-09-11

    EU 27-09-11

    IOM-Shower fixing, complaints 20-09-11

    UNDP

    OLD OFFICE

    FINLAND-COMPLAINTS 16-09-11

    Golra Store 18-09-11

    UNHCR censors not working properly

  • 8/4/2019 Report 15 Sep

    2/20

  • 8/4/2019 Report 15 Sep

    3/20

  • 8/4/2019 Report 15 Sep

    4/20

  • 8/4/2019 Report 15 Sep

    5/20

  • 8/4/2019 Report 15 Sep

    6/20

  • 8/4/2019 Report 15 Sep

    7/20

  • 8/4/2019 Report 15 Sep

    8/20

  • 8/4/2019 Report 15 Sep

    9/20

    S.NO TA SK D ES CR IPT IO N S TATU S/R EM AR KS

    1 golra building handover

    2 chakshehzad store setting

    chakshehzad store inventory

    office store inventory

    access control

    kitchen exhaust fan

    reception stairs wood

    wall paper samples

    partitions paint

    vehicle plan

    vehicle repairing

    smoking area development

    pec letter

    printing

    abbas new phone linesheater connections in rooms

    carpenter workstation demand

    guardpost glass

    phone+fan in shed store

    insurance list-health

    amended contract copy-G-6 building

    legal cases

    Software developer

    AC troubleshooting kit

    Blue generator repairing

  • 8/4/2019 Report 15 Sep

    10/20

    JULY / AUGUST

    S.# Job Description1) UNDER GROUND ROAD BLOCKERInstallation of metal frameinstallation of blocker machineryinstallation of light posts

    1 Placement of 10 K Mail scanner

    1construction of fixed concrete Bollards by using 3'Dia.height 3feetabove

    FINLAND EMBASSY (arshad awan)

    RCC wall constructionguard post constructionNizampur- Boundary Wall

    Construction of Boundary wallUNMOGIP

    Construction of 50 Twalls

    WFP-Residence-Fixing of Grills1 fixing of grillsFINLAND EMBASSY (arshad awan)

    IRAQ Embassy-Supervisor Kashan

    2) ELECTRICAL MAIL SCANNER

    3) RAZOR WIRE WITHOUT THE V SHAPE FRAME (American standa4) FIXED CONCRETE BOLLARDS

  • 8/4/2019 Report 15 Sep

    11/20

    Anti shatter film- 1100 sq ft

    Troubleshooting1 Norway motor2

    3 IOM: Tub installation-shower set pending, polish and paint work

    4 NADRA - HANDOVER 5 GermanIOM: door locks, door closer

    WFP-Karachi Road blocker and UVSS

  • 8/4/2019 Report 15 Sep

    12/20

    START ON FINISH ON

    7th sep

  • 8/4/2019 Report 15 Sep

    13/20

  • 8/4/2019 Report 15 Sep

    14/20

    Remarks

    complain received not rectified yet

  • 8/4/2019 Report 15 Sep

    15/20

    delay from client

    paint complain, grill and 1' by 1' sheets pending

    snags-work in progress

  • 8/4/2019 Report 15 Sep

    16/20

    NO TASK DESCRIPTION STATUS/REMARKS

    1 Closing report received

    2 vendors develpoped in process3 UNODC payment client not responding

    4 Tax returns, instructed acc dept to complete papers by 12 sep

    5 A/c Payables

    6 A/c Receivables

    7 invoices

    8

    9

    10

    1112

    13

    14

    15

    16

  • 8/4/2019 Report 15 Sep

    17/20

    S.NO TASK DESCRIPTION STATUS/REMARKS1 daily report2 store inventory3456789

    101112

    13

  • 8/4/2019 Report 15 Sep

    18/20

    S.NO TASKS TASK DESCRIPTION STATUS/REMARKSclient list

    1 daily report2 quote status

    3 PO status

    4 building management division change in presentations, printing etc

    5

  • 8/4/2019 Report 15 Sep

    19/20

    S.NO TASKS TASK DESCRIPTION STATUS/REMARKS1 Interview

    2

  • 8/4/2019 Report 15 Sep

    20/20

    S.NO TIME CONCERNED PERSON STATUS/REMARKS