Funding Scheme: CP-Collaborative Project
Call identifier: FP7-SST-2010-RTD-1
REPORT / D9.2 –
Web page and document structure and organization
Project Number: SCP0-GA-2010-266126
Project Title: Technologies and Scenarios For Low Emissions Shipping
Document ID: AC-WP9-D9.2-V01-05/2011
Date: 31/05/2011
Dissemination level
PU Public
PP Restricted to other programme participants (including the Commission Services)
RE Restricted to a group specified by the consortium (including the Com. Services)
CO Confidential, only for members of the consortium (including the Com. Services)
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 2 of 21
Document Change Log
Revision Edition date Author Modified sections
Comments
00 20/05/2011 Alberto Casal, Carla Piñeiro
- Creation draft
01 31/05/2011 Alberto Casal Validation
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 3 of 21
REPORT
“D9.2 – Web page and document structure and organization”
Responsible Alberto Casal
Author(s) / Editor(s) Alberto Casal, Carla Piñeiro
Description Document that defines the structure of the public web page of the project and its updates and maintenance throughout the project.
WP 9 DISSEMINATION
Lead beneficiary 3 Type of activity OTHER
Start Month 1 End Month 36
Objectives
• Perform the dissemination of the TEFLES project results and outcomes to stakeholders.
• Promote implementation, dissemination and refinement of the models from the project.
• Raise awareness among interest group(s) for technologies and models (experts, industries and potential end users).
• Creation and maintenance of the project web, with links to essential documents and organizations.
• Organization of three workshops on project results:
- Workshop 1 After treatment technologies for emissions reduction
- Workshop 2 Emission reductions through ship operations in ports
- Workshop 3 Evaluation of cost-effectiveness of emission reduction scenarios
• Provide beta testing seminars for preliminary validation of models and scenarios, and dissemination (to make the models widely applicable and user friendly).
Description of work and role partners
Task 9.1 CREATION AND MAINTENANCE OF A PROJECT WEB PAGE
Task Leader: INOVA
Participants : CIT, VICUS
The public web page will be operative since month 4. The project internal web will be operative on the month 2 and used as base to test the public web in advance.
9.1.1 Specification , contents and access levels
The web page could have an intermediate option open for third parties by registration. (Partners with working area, public open and intermediate for registered third parties and invitations such EC and administrations)
9.1.2 Selection of subcontractor and issue of terms of contract
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 4 of 21
9.1.3 Setting access rights
9.1.4 Launch and collaboration and cross reference agreements
9.1.5 Maintenance along the project
List of deliverables
Number Title Lead beneficiary Date (Month)
D9.1 Detailed dissemination plan 3 3
D9.2 Web page and document structure and organisation
1 4
D9.3 Workshop 1 After treatment technologies for emissions reduction
1 24
D9.4 Workshop 2 Emission reductions through ship operations in ports
1 30
D9.5 Workshop 3 Evaluation of cost-effectiveness of emission reduction scenarios
1 35
D9.6 Manuals for Beta testing and model seminars plan
11 35
D9.7 Final dissemination report 11 36
Milestones
Number Name Lead beneficiary Date (Month)
M9.1 Web page operational and dissemination plan scheme
1 4
M9.2 Workshop 1 After treatment technologies for emissions reduction
1 24
M9.3 Workshop 2 Emission reductions through ship operations in ports
1 30
M9.4 Workshop 3 Evaluation of cost-effectiveness of emission reduction scenarios
1 35
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 5 of 21
TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................................... 6
2. WEB PAGE STRUCTURE .................................................................................................................... 7
2.1. Home ........................................................................................................................................... 7
2.2. Project ......................................................................................................................................... 9
2.3. Project Dissemination ................................................................................................................11
2.4. Team Members .........................................................................................................................13
2.5. News ..........................................................................................................................................16
2.6. Links ...........................................................................................................................................17
2.7. Contact ......................................................................................................................................18
3. PROGRAMMING AND MAINTENANCE .......................................................................................... 19
4. CONTENT UPDATE ......................................................................................................................... 20
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 6 of 21
1. INTRODUCTION
The project web page is accessible through the following web address: www.tefles.eu
Through this website:
Public can access to the description of the project (objectives, strategy, work packages,
management board), of the project partners and the third parties, news and links related,
and promotional material (public project documents, events, logos, posters, flyers and
images).
Project partners can access the internal Project Management Platform, EMDESK, through a
link on the top right corner of the web, which requires a username and password.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 7 of 21
2. WEB PAGE STRUCTURE
The general structure of the web page is the following:
Home
Project
Project Dissemination
Team Members
News
Links
Contact
2.1. Home
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 8 of 21
The home contains a flash object with three images that represents the three scenarios to analyze in
TEFLES project:
At sea:
Approach and maneuvering:
At port:
At the top of the flash object is the menu for web browsing.
In the bottom of the flash object are:
- The tittles of the three latest news and their links to the news.
- A summary of project objectives.
- A summary of the execution strategy (methodology).
- General information to contact with the Project Coordinator (INOVA) and a link to the
Contact menu.
Footer highlights that the project is funded by the European Union within FP7. This message remains
visible throughout the web:
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 9 of 21
2.2. Project
The structure and contents of the section “Project” are the following:
- Introduction.
A page explaining the background of the project.
- Objectives.
A page explaining the objectives of the project and illustrated with the scheme of the project
concept.
- Strategy.
A page explaining the strategy of the project and illustrated with the scheme of the project
work flow.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 10 of 21
- Work Packages.
List of Work Packages of the project and link to a page with the description of each one: work
package leader, objectives and activities.
o WP1 Administrative Coordination
o WP2 After Treatment and Thermal Energy
o WP3 Propulsion and maneuvering
o WP4 Power generation and propulsion
o WP5 Scenario 1 emission reduction model: al sea
o WP6 Scenario 2 emission reduction model: port approach and maneuvering
o WP7 Scenario 3 aiming at zero emissions at port
o WP8 Implementation Strategy and Economical Aspects
o WP9 Dissemination
- Management Board
A page explaining the management board of the project and illustrated with the scheme of
the project team structure.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 11 of 21
2.3. Project Dissemination
The structure and contents of the section “Project Dissemination” are the following:
- Documents.
A page with the public documents generated along the execution of the project (public
deliverables) and related documents from other sources.
o Project documents (Public).
o Related documents.
- Project Events.
A page with a list of internal meetings, workshops, seminars and other events, sorted by date
of event. Each one will link to a page with the description of the event, related documents or
photos, and in the case of workshops and seminars, the option of registration.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 12 of 21
- Brochure.
A page with the promotional material: logos, flyers, posters, etc.
o Logos:
o Flyers:
o Posters:
- Images.
A page with images, photos, schemes, etc of the project.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 13 of 21
2.4. Team Members
The structure and contents of the section “Team Members” are the following:
- Project Partners.
List of partners of the project and link to a page with the description of each one: description,
presentation (documents, catalogues, images, videos, etc.), web, contact persons (contact
details and short description) and other team members (short description).
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 14 of 21
o I NOVA, Consultores en Excelencia e Innovación Estratégica, S.L. (INOVA)
o Vicus Desarrollos Tecnológicos S.L. (VICUS)
o Consultores Investigación Tecnológica S.L. (CIT)
o Couple Systems GmbH (COUPLE)
o Hamburgische Schiffban Versuchsanstalt GmbH (HSVA)
o Hijos de J. Barreras S.A (BARRERAS)
o Istanbul Technical University (ITU)
o Autoridad Portuaria de Vigo (APV)
o Saft Batteries S.A. (SAFT)
o Heatmaster B.V. (HEATMASTER)
o Newcastle University (UNEW)
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 15 of 21
- Third parties and End Users
A page with a list of third parties of the project with their names, logos, countries, links to
webs and contacts.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 16 of 21
2.5. News
A page with a list of the relevant news related the project. Each new has a link to the source of
information, where read the new in full.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 17 of 21
2.6. Links
A page with a list of relevant links related the project.
These links are sorted by geographical scope: International / European or National / Local.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 18 of 21
2.7. Contact
A page with the contact details of the Project Coordinator (INOVA) and the contact person appointed
to manage the information.
From this page anyone can contact the project team and ask questions or make comments.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 19 of 21
3. PROGRAMMING AND MAINTENANCE
For the creation of the web page of the project and its maintenance along
the project execution, INOVA has subcontracting an IT service. After
scanning several possibilities, the company chosen to provide this service is
Hacce Soluciones TIC S.L, specializing in digital media and web design user-
centered. (More information of Hacce: http://hacce.com/)
The web page of TEFLES has been developed on the WordPress Content Management
System (CMS).
WordPress is a Content Management System (CMS) developed in PHP and distributed under GPL
licenses. That is, the code is open, modifiable, and requires no license fees for its use.
Wordpress Highlights:
Content management: the editing of articles by the administrator is simple and accessible to
any medium user via Internet, because it follows the philosophy WYSIWYG "What You See Is
What You Get".
Search Engine Optimization (SEO): WordPress has numerous tools to improve SEO.
Installation scalable: among the main advantages of WordPress, as in any other open source
manager is the fact that any facility can be expanded, ie, new components can be added to
increase functionality.
Consolidated Developer Community: There is a vast global community of programmers to
develop extensions for WordPress, it licensed under GPL or commercial license, which can be
used and customized in any web page.
Automatic System Update.
Distribution of articles through RDF, RSS 0.92, RSS 2.0 and Atom 1.0.
Integration of other web services:
TEFLES website allows the integration of web services and improve the dissemination of information
about the project:
- Youtube: store-and video broadcasting.
- Issuu: service storage and distribution of PDF documents.
- Slideshare: storage and distribution service presentations.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 20 of 21
4. CONTENT UPDATE
The defined process for updating web page content is as follows:
1. Identification of the contents to update.
2. Development or collection of new contents.
3. Validation of the new content by the project team.
4. Update the TEFLES web.
Updating and management of web page contents will be centralized in INOVA, that will collect the
information (both from partners such as from other sources of information) and updating the TEFLES
website.
The rest of partners will be responsible for identifying and developing new content or updates them,
as well as validating that content before making these changes on the website.
Updates will be made attending to the following schedule, based on the page web structure and the
characteristics of the web contents:
Home.
o News. Updates made in "News" will be automatically displayed in this section of the
Home.
o Project objectives. Static contents, no updating required.
o Strategy. Static contents, no updating required.
o Contact. Static contents, no updating required.
Project.
o Introduction. Static contents, no updating required.
o Objectives. Static contents, no updating required.
o Strategy. Static contents, no updating required.
o Work Packages. Static contents, no updating required.
o Management Board. Static contents, no updating required.
Project Dissemination.
o Documents.
Project documents (Public). Updates will be made following the schedule of
the delivery date of the deliverables classified with Public dissemination
level.
Date: 31/05/2011
Document ID: AC-WP9-D9.2-V01-05/2011
Page 21 of 21
Related documents. Along the project execution, project partners will search
and identificate documents of interest related to the project. Updates will be
made at the end of each month.
o Project Events. Along the project execution there are planning events as internal
meetings, workshops or seminars. Updates in each event will be held in the following
way:
In case of internal meeting, the update of information will be made after the
event, taking as deadline the end of the month. The information to update
will be: short description of the event, images and documents of public
character.
In case of workshops and seminars, the update of information will be made:
- Two months before the event, with the aim of reaching the widest
dissemination. The information to update will be: short description
of the event, option of registration.
- After the event, taking as deadline the end of the month. The
information to update will be: description of the event, images,
documents, videos, etc of public character.
o Brochure. Along the project execution, project partners will develop promotional
material: flyers, posters, etc. Updates will be made at the end of each month.
o Images. Along the project execution, project partners will take pictures. Updates will
be made at the end of each month.
Team Members.
o Project Partners. Static contents, no updating required.
o Third parties and End Users. Updating will be made in the case of collaboration of
other entities that were not originally foreseen in the project execution.
News. Along the project execution, project partners will search and identificate news of
interest related to the project. Updates will be made at the end of each month.
Links. Along the project execution, project partners will search and identificate links of
interest related to the project. Updates will be made at the end of each month.
Contact. Static contents, no updating required.