Report- Disposed of Petitions from 01-01-2016 to 08-02-2021AppNo
ApplicationDate
ApplicationName
Subject division PetitionNo.
113-2016
18-11-2016 MD PTCUL Investment Approval for construction of colony at 132 KV Sub-station Majra campus Dehradun CL 71-2016
15-2017
01-02-2017 Arun Gupta,ManagingDirector, M/s HimUrja Pvt.
Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15 MW) unit of M/sHim Urja Pvt. Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read with Regulation 14 &15 of UERC (Tariff and Other Terms for supply of Electricity from Renewable Energy Sources andNon-fossil fuel based Co- generating Stations) Regulations, 2010, as amended from time to timeseeking revision of tariff.
Finance 13-2017
22-2017
09-03-2017 Naresh Goel,Director, M/s UttarBharat HydroPowe
Petition for determination for Project Specific Tariff in respect of 12.6 MW Sarju-II Small HydroPower Project on Sarju River in Kapkote, Distt. Bageshwar, Uttarakhand.
Finance 18-2017
28-2017
17-04-2017 PTCUL Petition for submission of Draft Metering Communication & Data Acquisition Requirements(MCDAR) for Intra-State Transmission System of Uttarakhand developed in pursuance toRegulation 8.1 of UERC (State Gird Code) Regulations, 2016 and Regulation 10 of UERC(Conduct of Business) Regulations, 2014 for approval of the Commission.
Technical 17-2017
37-2017
02-06-2017 K.V. VikramReddy, ManagingDirector, M/sHimalaya
Petition seeking determination of project specific tariff for Tanga Small Hydro Power Project (5MW) of Himalaya Hydro Pvt. Ltd. located in Pithoragarh, Uttarakhand U/s 62, 86(1)(b) & 86(1)(e)of the Electricity Act, 2003 read with Regulation 10(2) and 13 of UERC (Tariff and Other Terms forSupply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generatingStations) Regulations, 2013.
Finance 31-2017
53-2017
13-11-2017 Mr. K.V. VikramReddy (M.D)Himalaya HydroPvt. lt
Petition seeking approval of Power Purchase Agreement dt. 05.02.2003 & Supplementary PPA dt.07.12.2009 between HHPL & UPCL for sale of Power by Tanga SHP (5MW) of M/s HHPL loctedin PIthoragarh, u/s 86(1)(b) of the Electricity Act, 2003 read with ref. 7(3) of UERC (Tariff & otherTerms for supply of Electricity form RE Sources & non-fossil fuel based co-generating stations)Reg, 2013 & Reg, 39 of UERC (Conduct of Business) Reg, 2014.
Finance 48-2017
54-2017
29-11-2017 Mr. L.M. Verma,Director(Finance), UPCL
Annual Revenue Requirement (ARR) Petition for the Financial Year 2018-19 along with TariffDetermination for FY 2018-19, True up for FY 2016-17 and Annual Performance Review for FY2017.18.
Finance 49-2017
55-2017
30-11-2017 Mr. G.Anjaneyudu,Director (Project),SEPL
Petition u/s 62 and section 86(1)(a) of EA 2003 read with Regulations 1 (3), 11 (1) & 12 of theUERC (Terms & Conditions for Determination of MYT) Regulations 2015 for True-up of Tariff forthe FY 2016-17, Annual Performance Review for FY 2017-18 & Annual Fixed Charges for FY2018-19
Finance 62-2017
56-2017
30-11-2017 Mr. S.K. Sharma,Director (Projects)
Filing of petition for Annual Performance Review (APR) for FY 2017-18 and Revised AggregateRevenue Requirement (APR) for FY 2018-19 of SLDC
CL 50-2017
57-2017
30-11-2017 Mr. Rahul Goyal Petition under Sec. 62 and Sec. 86 of the Electricity act, 2003, read with the UERC (Terms andConditions for Determination of Tariff) Reg. 2015 (in short, UERC MYT Reg, 2015), as FY 2016-17; Annual Performance Review for FY 2017-18 and Revised ARR for FY 2018-19 for supply ofpower to UPCL from 214 MW Gas based Kashipur Combined Cycle Power Plant of GamaInfraprop Pvt. Ltd. (in short Gama Kashipur CCPP or Power Stations or Project atMahukhedaganj, Kashipur, Dist: U.S. Nagar, Uttarakhand
Finance 63-2017
58-2017
30-11-2017 Mr. S.K. Sharma,Director(Projects),PTCUL
Filing of Tariff Petition for approval on True-up for FY 2016-17, Annual Performance Review (APR)for FY 2017-18 and Revised Aggregate Revenue Requirement (ARR) for FY 2018-19 of PTCUL
CL 51-2017
60-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Dhalipur HEPs of UJVN Ltd.
Technical 53-2017
61-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Kulhal HEPs of UJVN Ltd.
Technical 54-2017
62-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Chibro HEPs of UJVN Ltd.
Technical 55-2017
63-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Khodri HEPs of UJVN Ltd.
Technical 56-2017
64-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Ramganga HEPs of UJVN Ltd.
Technical 57-2017
65-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Khatima HEPs of UJVN Ltd.
Technical 58-2017
68-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for MB-II HEPs of UJVN Ltd.
Technical 61-2017
59-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Dhakrani HEPs of UJVN Ltd.
Technical 52-2017
66-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Chilla HEPs of UJVN Ltd.
Technical 59-2017
67-2017
30-11-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition for True-up of Tariff for FY 2016-17, Annual performance review forFY 2017-18 & AnnualFixed Charges for FY 2018-19 for Tiloth (MB-I) HEPs of UJVN Ltd.
Technical 60-2017
69-2017
01-12-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Application seeking approval of Honble UERC for the investment on Implementation of Phase II ofIT enablement projects under Integrated power development project under (IPDS) of Ministry ofPower, Govt. of India
Technical 09-2018
70-2017
15-12-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Filing of Petition for approval of "Additional Capital Works amounting to Rs. 44.05 Crore of 4x76MW Maneri Bhali Stage-II HEP" of UJVN Ltd.
Technical
71-2017
28-12-2017 Mr. A. SrinivasaRao, Add. Dir,M/s GBHPPL
Filing of petition for true-up of tariff for FY 2016-17, Annual Performance Review for FY 2017-18 &Annual fixed charges of FY 2018-19 for Budhil Hydro Station of Greenko Budhil Hydro Power Pvt.Ltd. under Sec. 62 & 84 of the Electricity Act, 2003 read with the relevant Reg, & guidelines of theCommission.
Finance 02-2018
72-2017
28-12-2017 Mr. L.M. Verma,Director(Finance), UJVNLtd.
Petition seeking approval on the Surcharge Waiver for the Domestic, Non-domestic, PrivateTubewell & L.T. Industry Category Consumers
Finance -
73-2017
29-12-2017 Mr. Ranvir SinghChauhan, M.D.,PTCUL
Investment Approval for laying of OPGW cable under the Project - "Reliable Communication &Data Acquisition System for 132 kV & above Sub-Stations in PTCUL
CL 1-2018
02-2018
03-01-2018 M/s DistributedSolar PowerAssociation & M/sAmpl
Application under Reg. 50 of the UERC (Tariff and other terms for supply of Electricity fromRenewable Energy Sources & non-fossil fuel based Co-generating stations) Reg, 2013
Finance 05-2018
01-2018
03-01-2018 M/s Amplus SolarPower Plant Pvt.Ltd. & M/s Asahi
Application seeking clarification with regard to the UERC (Tariff & other Terms for Supply ofElectricity from Renewable Energy Sources & non-fossil fuel based co-generating stations) Reg.2013 or in the alternative, a specific order of relaxation or permission for establishment of a gridinteractive roof-top solar plant with installed solar capacity of 36000 kW on captive consumptionbasis by the Applicant No. 1 & Applicant No. 2
Finance 04-2018
03-2018
25-01-2018 Mr. L. M. Verma,Director (F),UPCL
Application seeking approval of the FCA to be charged from the Consumers for the period from01.01.18 to 31.03.18
Finance 03-2018
4-2018
21-02-2018 M/s Acme SolarHoldings Ltd.
Petition u/s 86(1) of the EA 2003 read with Article 23 of the PPAs seeking payment of theoutstanding dues from UPCL for the common evacuation infrastructure constructed for 4x12.5 MWsolar projects of ACME solar holdings P Ltd. In terms of the PPA executed between parties
Finance 16-2018
23-2018
28-02-2018 Suo-moto Suo-moto proceedings initiated by the Commission on the representation of M/s India Glycols Ltd.,regarding illegal demand of Cross Subsidy from Medium Term Open Access (MTOA) consumersby UPCL
CL 08-2018
6-2018
09-03-2018 Mr. L.M. Verma,Dir (F), UPCL
Petition for seeking approval for increase in existing transaction charge per electricity bill, collectedby VLEs ( Village level entrepreneur) through M/s CSC e-governance services India Ltd. &Introduction of incentive scheme to VLEs.
Technical 06-2018
45-2018
15-03-2018 Suo-moto Suo- moto proceedings in the matter of request made by Mr. Dhirendra Singh Rawat for issuanceof appropriate directions for releasing Grant/Subsidy sanctioned by Central Government andpayment in accordance with solar Tariff fixed for FY 2015-16 for supply of solar energy fromallocated grid connected Solar Rooftop power plant.
Finance 27-2018
7-2018
15-03-2018 Mr. SanjayaMittal, Dir(Projects),PTCUL
Filing of petition under the regulation 13 of UERC (DSM) Regulations 2017 for seeking relaxationof one year in regulation 1(2) for implementation of Intra-state ABT & DSM
Technical 07-2018
46-2018
15-03-2018 Suo-moto Suo- moto proceedings in the matter of request made by Mr. Digamber Singh Bisht for issuance ofappropriate directions for releasing Grant/Subsidy sanctioned by Central Government andpayment in accordance with solar Tariff fixed for FY 2015-16 and immediate grid connectivity forallocated solar power plant to Mr. Digamber Singh Bisht.
Finance 28-2018
8-2018
16-03-2018 Mr. L.M. Verma,Dir (F), UPCL
Application seeking approval for the investment on the project covering the construction of 01 No.66/33 kV S/s & its 0.60 km associated 66 kV line
Technical 33-2018
13-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Ms Mudit Garg Finance -
9-2018
22-03-2018 Mr. L.M.Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and the Commandant,SDRF, Doiwala
Finance -
20-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and UREDA (Jakhana) Finance -
21-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and UREDA(Kedarnath 2 & Gangotri 2)
Finance -
19-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and UREDA (Harsil). Finance -
22-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL andUREDA(Pandukeshwar)
Finance -
10-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL, Ms Deep Singh(Eligible Consumer) and Dharmendra Kr. (Third Party Owner)
Finance -
11-2018
22-03-2018 Mr.L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Sh. DigambarSingh Bisht
Finance -
12-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Ms Cdr. KamalShumsher Rana (Retd.)
Finance -
14-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL, Ms Brij Bala (EligibleConsumer) and NBU Energy Park (Third Party Owner)
Finance -
15-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Sh. Pradyot Consul Finance -
16-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL, Ms Puran Chand(Eligible Consumer) & Kanan Arora (Third Party Owner)
Finance -
17-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Sh. Rakesh Kumar,Gram Pradhan, Village Sheeku
Finance -
18-2018
22-03-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Honble UERC on the PPA between UPCL and Ms Sanjay P Garg Finance -
24-2018
01-05-2018 Mr. L.M. Verma,Dir(F). UPCL
Application seeking amendment in UERC (The Electricity Supply Code) Reg, 2007 Technical
37-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Bhikuriyagad).
Finance 26-2018
26-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking prior approval of Hon ble Uttarakhand Electricity Regulatory Commission onthe Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and Ms ManikaranPower Ltd. for procuring Non Solar RE Energy on short term basis
Finance 13-2018
27-2018
14-05-2018 Mr. L.M. Verma,Dir(F). UPCL
Application seeking prior approval of Hon ble Uttarakhand Electricity Regulatory Commission onthe Draft Power Purchase Agreement between Uttarakhand Power Corp. Ltd. and Ms Tata PowerTrading Company Ltd. for procuring Non Solar RE Energy on short term basis
Finance 14-2018
29-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Gulari).
Finance 18-2018
30-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Bursol).
Finance 19-2018
31-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Ramgad).
Finance 20-2018
32-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Toli).
Finance 21-2018
33-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Kanlogad).
Finance 22-2018
34-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Lathi).
Finance 23-2018
35-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Dior).
Finance 24-2018
36-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency (Milkhet).
Finance 25-2018
25-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking prior approval of the Commission on the Draft Power Purchase Agreementbetween Uttarakhand Power Corp. Ltd. and Ms PTC India Ltd. for procuring Non Solar RE Energyon short term basis is submitted
Finance 12-2018
28-2018
14-05-2018 Mr. L.M. Verma,Dir(F), UPCL
Application seeking approval of Hon ble Uttarakhand Electricity Regulatory Commission on thePower Purchase Agreement between Uttarakhand Power Corporation Limited and UttarakhandRenewable Energy Development Agency, Kanwasharam.
Finance 17-2018
40-2018
17-05-2018 Suo-Moto In the matter of applicability of TAriff for the purpose of incentive on account of revised O&Mnorms in UERC (Tariff) and other terms for supply of Electricity from RE sources & non-fossil fuelbased Co-generating stations, Reg, 2013 and UERC (Tariff and other terms for supply ofElectricity from RE Sources and non-fossil fuel based Co-generating Stations, Reg, 2010
Finance 15-2018
38-2018
18-05-2018 Mr. Meg Bahadur,GM (Comm.),UJVNL
Petition for Review of the Hon ble UERC order dt. 21.03.18 in petition for true-up of FY 2016-17,APR of FY 2017-18 and AFC for FY 2018-19
Technical 10-2018
39-2018
21-05-2018 Mr. L.M. Verma,Director (F),UPCL
Application seeking review of the Tariff Order issued by Hon ble Commission on 21.03.18 on theAnnual Revenue Requirement and Tariff Petition of UPCL for FY 2018-19
Finance 11-2018
41-2018
01-06-2018 L.M. Verma,Director(Finance), UPCL
"Application seeking approval of the Commission on the Power Purchase Agreement betweenUttarakhand Power Corp. Ltd. and M/s Aglar Power Ltd. (Rayat Plant).
Finance 34-2018
42-2018
01-06-2018 L.M. Verma,Director(Finance), UPCL
"Application seeking approval of the Commission on the Power Purchase Agreement betweenUttarakhand Power Corp. Ltd. and M/s Aglar Power Ltd. (Lagrasu).
Finance 35-2018
43-2018
04-06-2018 L.M. Verma,Director(Finance), UPCL
Application seeking relaxation in UERC (The Electricity Supply Code) Regulations, 2007 and inUERC (Release of New LT Connections, Enhancement and Reduction of Loads) Regulations,2013.
Technical 32-2018
44-2018
15-06-2018 L.M. Verma,Director(Finance), UPCL
Application seeking prior approval of Hon’ble Uttarakhand Electricity Regulatory Commission onthe Draft Power Purchase Agreement between Uttarakhand Power Corporation Limited and M/sTata Power Trading Company Ltd. for procuring Non-Solar RE Energy on short term basis
Finance 31-2018
48-2018
28-06-2018 Suo-moto Suo-moto proceedings in the matter of Show-cause Notice issued to PTCUL under the provisionsof Section 142 read with Section 149 of the Electricity Act, 2003 relating to construction of 132 kVline of M/s Gold Plus Industries Ltd. Roorkee.
CL 30-2018
50-2018
02-07-2018 L.M. Verma,Director(Finance), UPCL
Petition seeking approval of the Commission for advance banking of power to M/s PTC India Ltd.directly under a banking arrangement with the Uttarakhand Power Corporation Ltd.
Finance 37-2018
51-2018
02-07-2018 L.M. Verma,Director(Finance), UPCL
Petition seeking approval of the Commission for advance banking of power to M/s ArunachalPradesh Power Corporaton Ltd. directly under a banking arrangement with the Uttarakhand PowerCorporation Ltd.
Finance 38-2018
52-2018
02-07-2018 L.M. Verma,Director(Finance), UPCL
Petition seeking approval of the Commission for advance banking of power to M/s MittalProcessors (P) Ltd. directly under a banking arrangement with the Uttarakhand Power CorporationLtd.
Finance 39-2018
49-2018
02-07-2018 L.M. Verma,Director(Finance), UPCL
Application seeking approval for the investment on the project covering laying of 3250 Km LT ABcable in theft prone and other areas of District Dehradun, Uttarkhashi, Pauri, Haridwar, Nainital,U.S. Nagar and Almora.
Technical
53-2018
07-07-2018 L.M. Verma,Director(Finance), UPCL
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement forshort term between Uttarakhand Power Corporation Limited and M/s PTC India Ltd.
Finance 40-2018
54-2018
07-07-2018 L.M. Verma,Director(Finance), UPCL
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement forshort term between Uttarakhand Power Corporation Limited and M/s NTPC Vidyut Vyapar NigamLtd.
Finance 41-2018
55-2018
07-07-2018 L.M. Verma,Director(Finance), UPCL
Application seeking prior approval of the Commission on the Draft Power Purchase Agreement forshort term between Uttarakhand Power Corporation Limited and M/s Tata Power TradingCompany Ltd.
Finance 42-2018
56-2018
13-07-2018 Him Urja Pvt. Ltd Petition under Sec 94 (1) (f) of the Electricity Act, 2003 read with Regulation 54 of the UERC(Conduct of Business) Regulation 2014 for review of the Order dated 17.05.2018 passed by theCommission in the Petition filed by M/s Him Urja Pvt. Ltd. seeking adjustment of tariff.
Finance -
57-2018
18-07-2018 IrrigationDepartment,Govt. ofUttarakhand
Petition seeking permission to setup Solar Power Plant of capacity 40 MW at Haripura Dam (27.34MW) and Tumaria Dam (13.50 MW) in District Udham Singh Nagar, Uttarakhand on Net Meteringbasis for captive consumption by Department of Irrigation, Government of Uttarakhand throughSuperintending Engineer, Tubewell Circle Dehradun
Finance -
58-2018
24-07-2018 Suo-moto Suo-Moto proceedings initiated by the Commission against non-compliance by UPCL of theprovisions of UERC (Compliance of Renewable Purchase Obligation) Regulations, 2010 anddirections issued by the Commission vide Order dated 15.09.2017 regarding procurement ofunmet Solar and Non-Solar RPO for FY 2016-17 alongwith the RPO for FY 2017-18 latest byMarch, 2018.
Finance 36-2018
59-2018
31-07-2018 L.M. Verma,Director (Finance)UPCL
Application seeking approval of the fuel charge Adjustment (FCA) to be charged from theconsumers for the period from 01.07.2018 to 30.09.2018
Finance 43-2018
60-2018
02-08-2018 M/s BhilanganaHydro Power Ltd
Dispute between M/s Bhilangana Hydro Power Ltd. and Power Transmission Corporation ofUttarakhand Ltd, regarding late Payment Surcharge against payment of transmission charges forthe alleged dedicated transmission network.
CL 45-2018
61-2018
25-09-2018 L.M Verma,Director (Finance)
Application seeking approval of the Commission on the Draft Power Purchase Agreement for shortterm power purchase between Uttarakhand Power Corporation Limited and M/s GMR EnergyTrading Ltd.
Finance 47-2018
62-2018
25-09-2018 L.M Verma,Director (Finance)
Application seeking approval of the Commission on the Draft Power Purchase Agreement for shortterm power purchase between Uttarakhand Power Corporation Limited and M/s Sembcorp GayatriPower Ltd.
Finance 48-2018
63-2018
25-09-2018 L.M Verma,Director (Finance)
Application seeking approval of the Commission on the Draft Power Purchase Agreement for shortterm power purchase between Uttarakhand Power Corporation Limited and M/s Tata PowerTrading Company Ltd.
Finance 49-2018
64-2018
25-09-2018 L.M Verma,Director (Finance)
Application seeking approval of the Commission on the Draft Power Purchase Agreement for shortterm power purchase between Uttarakhand Power Corporation Limited and M/s PTC India Ltd.
Finance 50-2018
65-2018
25-09-2018 L.M Verma,Director (Finance)
Application seeking approval of the Commission on the Draft Power Purchase Agreement for shortterm power purchase between Uttarakhand Power Corporation Limited and M/s Mittal ProcessorsPvt. Ltd.
Finance 51-2018
66-2018
23-10-2018 L.M. Verma,Director (Finance)UPCL
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from theconsumers for the period from 01.10.2018 to 31.12.2018
Finance 46-2018
67-2018
05-11-2018 A.K. Tyagi, CPO,UREDA
Petition seeking approval of one time registration fee to be collected from obligated entities forregistration under Renewable Purchase Obligation Compliance system (RPOCS) in Uttarakhand
Finance 71-2018
68-2018
12-11-2018 Sanjay Mittal,Director (Projects)PTCUL
Petition filed under Regulation 7,9, 59, 60 & 62 of the UERC (Conduct of Business Regulations),2014, read with relevant provisions of the MYT Regulation & Electricity Act , 2003 for initiation ofappropriate proceedings for determining the ROE on Equity provided by Govt. of Uttarakhand outof Power Development fund and review/reconsideration/modification of earlier orders in this regard
Finance -
69-2018
15-11-2018 L.M. Verma,Director (Finance)UPCL
Application seeking approval for the investment on the project covering the construction of 03 No.33/11kV Sub-station & their associated 33 kV line.
Technical 13-2019
70-2018
26-11-2018 ManagingDirector, Him UrjaPvt. Ltd.
Supplementary Petition seeking adjustment of tariff for Vanala Small Hydro Power Project (15MW) unit of M/s Him Urja Pvt, Ltd. as per Section 61 and 62 of the Electricity Act, 2003 read withRegulation 14 & 15 of UERC (Tariff and Other Terms for Supply of Electricity from RenewableEnergy Sources and non-fossil fuel based Co-generating stations) Regulations, 2010 as amendedfrom time to time seeking revision of tariff.
Finance 70-2018
71-2018
26-11-2018 Naresh Goel,Director, UttarBharat Hydro Pvt.Ltd
Petition under Section 86(1)(e) and 86(1)(f) in respect of 10.5 MW Sarju III Small Hydro PowerProject of Uttar Bharat Hydro Power Private Ltd.
CL 09-2019
74-2018
30-11-2018 Sanjay Mittal,Director (Projects)PTCUL
Filing of Business Plan for SLDC for the Control Period FY 2019-20 to FY 2021-22 CL 53-2018
75-2018
30-11-2018 Sanjay Mittal,Director (Projects)PTCUL
Filing of Business Plan for PTCUL for the MYT control period FY 2019-20 to FY 2021-22 CL 54-2018
76-2018
30-11-2018 Sanjay Mittal,Director (Projects)PTCUL
Application of Multi Year Tariff petition for Control Period FY 2019-20 to FY 2021-22 determinationof tariff for FY 2019-20 and annual performance review for FY 2018-19 for SLDC
CL 55-2018
77-2018
30-11-2018 Sanjay Mittal,Director (Projects)PTCUL
Application for approval of True up for FY 2017-18, Annual Performance Review (APR) for the FY2018-19 and Aggregate Revenue Requirement (ARR) for control Period from 2019-20 to FY 2021-22 of PTCUL
CL 56-2018
78-2018
30-11-2018 L.M. Verma,Director (Finance)UPCL
Application of Multi Year Tariff Petition for the Control Period of Three Financial Year from FY2019-20 to FY 2021-22 alongwith tariff determination for FY 2019-20 True-up for FY 2017-18 andAnnual Performance Review for FY 2018-19
Finance 57-2018
79-2018
30-11-2018 L.M. Verma,Director (Finance)UPCL
Application seeking approval of Business Plan of UPCL for the Control Period of three financialyear from FY 2019-20 to 2021-22
Finance 58-2018
84-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forKhodri
Technical 61-2018
85-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forDhakrani SHP
Technical 62-2018
86-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forDhalipur SHP
Technical 63-2018
88-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forKhatima SHP
Technical 65-2018
89-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 for Chilla
Technical 66-2018
91-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 for Tiloth(MB-I)
Technical 68-2018
92-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 for MB-IISHP
Technical 69-2018
80-2018
30-11-2018 Rahul Goyal, MD,Gama Infra Prop.Pvt.Ltd.
Application for seeking approval of Business Plan for 3 years of the Control Period from FY 2019-20 to FY 2021-22 for 214 MW Gas based Kashipur Combined Cycle Power Plant of GamaInfraprop Private Ltd. (in short Gama Kashipur CCPP of Power Station or Project) atMahukhedaganj, Kashipur, District Udhamsingh Nagar, Uttarakhand
Finance 72-2018
81-2018
30-11-2018 Rahul Goyal, MD,Gama Infra Prop.Pvt.Ltd.
Application for seeking approval of Multi Year Tariff for 3 years of the Control Period from FY 2019-20 to FY 2021-22 alongwith truing up for FY 2017-18, APR for FY 2018-19 and ARR for FY 2019-20 for 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama Infraprop Private Ltd.(in short Gama Kashipur CCPP of Power Station or Project) at Mahukhedaganj, Kashipur, DistrictUdhamsingh Nagar, Uttarakhand
Finance 73-2018
72-2018
30-11-2018 G.A. Naidu, M/sSravanthi EnergyPvt. Ltd.
Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with Regulation1(3), 11(1) and 12 of the Uttarakhand Electricity Regulatory Commission (Terms and Conditionsfor Determination of Multi Year Tariff) Regulations, 2015 for True-Up of Tariff for the FY 2017-18,Annual Performance Review for FY 2018-19 and Annual Fixed Charges for FY 2019-20.
Finance 74-2018
73-2018
30-11-2018 G.A. Naidu, M/sSravanthi EnergyPvt. Ltd.
Petition under Section 62 and Section 86 (1) (a) of the Electricity Act, 2003, read with theUttarakhand Electricity Regulatory Commission (Terms and Conditions for Determination of MultiYear Tariff) Regulations, 2018, as amended till date (in short, UERC MYT Regulations, 2018) fordetermination of tariff for the control period from FY 2019-20 till FY 2021-22 for supply of power toUttarakhand Power Corporation Limited (UPCL) from 428 MW Gas based Kashipur CombinedCycle Power Plant of Sravanthi Energy Private Limited (in short Sravanthi Kashipur CCPP orPower Station or Project) at Village Khaikhera, Kashipur, District Udhamsinghnagar, Uttarakhand.
Finance 75-2018
83-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forChibro SHP
Technical 60-2018
90-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forRamganga SHP
Technical 67-2018
82-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval of Business Plan for Third Control period from FY 2019-20 to FY2021-22 for 10 Hydro Power Station of UJVN Ltd. namely Chibro, Khodri, Dhakrani, Dhalipur,Kulhal, Khatima, Chilla, Ramganga, MB-I, MB-II
Technical 59-2018
87-2018
30-11-2018 PurushottamSingh, Director(Operations)UJVN Ltd.
Application for seeking approval True up of Tariff for FY 2017-18, Annual Performance Review forFY 2018-19 Annual Fixed Charges for the control period from FY 2019-20 to FY 2021-22 forKulhaal SHP
Technical 64-2018
94-2018
04-12-2018 Sandeep Singhal,MD, PTCUL
Application for Investment approval of Increasing Capacity of 132 kV Sub-station Manglore forprocurement, installation and Commissioning of 132/33 kV, 80 MVA Transformers
CL 06-2019
95-2018
05-12-2018 L.M. Verma,Director (Finance)UPCL
Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of BusinessRegulations), 2014 for review of the order dated 21.08.2018 passed by Hon’ble UERC in thematter of determination of Project specific Tariff for 12.6 MW SHP on Sarju river at Kapkote,Bageshwar district, Uttarakhand u/s 62 & 86 (1)(b) and 86(1)(e)of the Electricity Act, 2003 readwith Regulation 13 of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy Sources) Regulations, 2013.
Finance -
96-2018
05-12-2018 L.M. Verma,Director (Finance)UPCL
Reconsider/Review petition filed under Regulation 54 of the UERC (Conduct of BusinessRegulations), 2014 for review of the order dated 16.03.2017 passed by Hon’ble UERC in thematter of determination of Project specific Tariff for 10.5 MW SHP on Sarju river at Kapkote,Bageshwar district, Uttarakhand u/s 62 & 86 (1)(b) and 86(1)(e)of the Electricity Act, 2003 readwith Regulation 13 of UERC (Tariff and other Terms for Supply of Electricity from Non-Conventional and Renewable Energy Sources) Regulations, 2013.
Finance -
97-2018
07-12-2018 Suo-moto Review of the Benchmark Capital Cost for Solar PV, Solar Thermal and Grid Interactive Rooftop &Small Solar PV plants to be applicable for FY 2019-20 and onwards till reviewed/ revised by theCommission
Finance 18-2019
98-2018
10-12-2018 A.K. Tyagi, CPO,UREDA
Miscellaneous Application seeking approval to extend the control period of the Benchmark Capitalcost & generic tariff as declared by the Commission vide its order dated 06-09-2018, up to March2020 for upcoming Solar PV Power Plants (cumulative capacity of 200 MW)
Finance 04-2019
99-2018
14-12-2018 Sou-moto Deployment of customized Renewable Purchase Obligation Compliance system (RPOCS) webtool in Uttarakhand.
Finance 177-2018
101-2018
14-12-2018 M/s GreenkoBudhil HydroPower Pvt. Ltd.
Filing of Petition for True-up of tariff for FY 2017-18 Annual Performance Report for FY 2018-19and Annual Fixed charges of FY 2019-20 for Greenko Budhil Hydro Power Station of M/s GreenkoBudhil Hydro Power Pvt . Ltd. under Section 62 and 84 of the Electricity Act 2003 read with therelevant Regulations and guidelines of the UERC
Finance 3-2019
100-2018
14-12-2018 M/s GreenkoBudhil HydroPower Pvt. Ltd.
MYT of M/s Greenko Budhil Hydro electric Power project Finance 02-2019
102-2018
17-12-2018 M/s BhilanganaHydro Power Ltd.
Filing a petition in the matter of Dispute between M/s Bhilangana Hydro Power Ltd. and PowerTransmission Corporation Ltd. seeking review of the order dated 22.11.2018 passed by theCommission in Petition No. 45 of 2018 in the matter of Late payment Surcharge against paymentof Transmission charges for the alleged dedicated Transmission network.
CL
1-2019
04-01-2019 Sanjay Mittal,Director (Projects)PTCUL
Miscellaneous Application for Investment approval for construction of 220/33 kV GIS Substation,Selaqui (Dehradun) and LILO of 220 kV Khodri-Jhajra Line at 220 kV Substation Selaqui.
CL 07-2019
3-2019
28-01-2019 Mr. PurushottamSingh, Director(Operations),UJVN
Filing of Petition for review of the Honble UERCs Order dt. 19.06.2018 read with letter no. 1144 dt.06.11.2018 on Suo moto proceeding regarding handing over of distribution business to UPCL
Technical
4-2019
29-01-2019 Mr. L.M Verma,Director (F),UPCL
Application seeking approval of the FCA to be charged from the consumers for the period from01.01.2019 to 31.03.2019
Finance 5-2019
5-2019
01-03-2019 L.M. Verma,Director (Finance)UPCL
Miscellaneous Application seeking prior approval of the Commission on the Draft Power PurchaseAgreement beetween Uttarakhand Power Corporation Ltd and M/s Tata Power Trading CompanyLtd. for procuring Non-Solar RE Energy on short Term basis
Finance 08-2019
6-2019
07-03-2019 Sarpanch, VanPanchayat adharmafi, Govt. ofUttar
Petition seeking permission to setup Solar Power Plant of capacity 50 MW at village Adhar Mafi,Kujyadi, Delhi in district of Almora, Uttarakhand, for sale of electricity by Van Panchayat AdharMafi/Adhar Mafi Prbandhan Samiti, Government of Uttarakhand
Finance -
7-2019
07-03-2019 NA Suo-moto proceedings initiated by the Commission in the matter of transfer of 66kV Substationand lines from UPCL to PTCUL
Technical 10-2019
9-2019
12-03-2019 ManagingDirector, Him UrjaPvt. Ltd.
Petition seeking implementation of Order passed on 10.04.2014 by UERC for Vanala Small HydroPower Generating Station (15 MW) unit of M/s Him Urja Pvt. Ltd.
Finance 11-2019
8-2019
12-03-2019 ManagingDirector, M/s HimUrja Pvt. Ltd.
Petition seeking implementation of Order passed on 17.03.2016 by the Commission for RajwaktiSmall Hydro Power Project (4.4 MW) unit of M/s Him Urja Pvt. Ltd.
Finance 20-2019
10-2019
12-03-2019 ManagingDirector, Him UrjaPvt. Ltd.
Petition seeking implementation of Order passed on 21.12.2012 by the Commission for VanalaSmall Hydro Power Electric Generating Station (15 MW) a unit of M/s Him Urja Pvt Ltd.
Finance 21-2019
11-2019
12-03-2019 Shri PramodKumar Rajput,ExecutiveDirector, M/s
Submission of Petition for refund of Additional Surcharge paid to UPCL on Power Purchasethrough Open Access during July/Aug 2013 to March 2017 by M/s Alps Industries Ltd.
CL 16-2019
13-2019
27-03-2019 L.M. Verma,Director (Finance)UPCL
Application for determination of Additional Surcharge in accordance with the provisions of UERC(Terms and Conditions of Intra State Open Access) Regulations, 2015 to meet the Fixed Cost ofUPCL arising out of his obligation to supply electricity to the open access consumers
CL 15-2019
12-2019
27-03-2019 M/s Amplus SolarPower Pvt. Ltd. &M/s Asahi India
Petition seeking review of Impugned Order dt. 20.06.18 in Petition NO. 4 of 2018 passed byUERC us 94(1)(f) of the Electricity Act, 2003
Finance 12-2019
16-2019
22-05-2019 M/s BetaInfratech Pvt. Ltd.
Miscellaneous Application under Section 86 (1) (f) of the Electricity Act, 2003 read with Regulation9, read with Regulation 10, read with Regulation 20 (1 ) of Uttarakhand Regulatory Commission(Conduct of Business) Regulation, 2014 for adjudication of dispute between M/s BIPL and UPCLin respect of termination of PPA dated 01.03.2017 signed between parties for procurement of 107MW of power on long term basis from 225 MW (ISO) gas based CCPP located at Kashipur,Uttarakhand is submitted.
Finance 02-2020
17-2019
03-06-2019 Mr. L.M Verma,Dir(F), UPCL
Misc Application seeking approval of the FCA to be charged from the consumers for the period01.04.19 to 30.06.19
Finance 19-2019
18-2019
07-06-2019 Mr. K V VikramReddy
Petition seeking review of the order of the Commission dt 10.04.19 in petition no 31 of 2017seeking determination of project specific tariff for Tanga Hydro Power Project, 5MW unit of MsHHPL, under sec 94(1)(f) of the Electricity Act, 2003 and Reg 54 of the UERC (conduct ofBusiness) Reg 2014
Finance 24-2019
19-2019
11-06-2019 M/s KashiVishwanathTextile (P) Ltd.
Additional surcharge levied by Uttarakhand Power Corporation Ltd. during the period 1st ofDecember 2014 to 31st of March 2017 on Open access power purchase
CL 34-2019
20-2019
02-07-2019 L.M. Verma,Director (Finance)UPCL
Application seeking approval of the Commission on the Model Power Purchase Agreementbetween Uttarakhand Power Corporation Ltd. and Selected bidders for setting of Pine Needlebased power plants.
Finance 22-2019
21-2019
10-07-2019 Sou-moto Suo moto proceedings in the matter of APTEL judgement dated 23.04.2019 in appeal no 287 of2015
Finance 23-2019
22-2019
12-07-2019 M/s Akshay UrjaAssociation
Miscellaneous Application seeking approval of Tariff rate revision from 70% CFA to Non CFA tariffrates for small solar plants, which already have 25 years PPA with UPCL under the “scheme fordevelopment of Grid Interactive Rooftop and Small Solar PV Power Projects- 2016” forResidential/Institutional/ Social Sector, published on 29.09.2016, under Jawaharlal Nehru NationalSolar Mission
Finance 25-2019
23-2019
16-07-2019 N.K. Gupta,Director (Finance)UPCL
Petition seeking approval of the Commission for advance & return Energy Banking to M/s GMREnergy Trading Ltd. under an Energy Banking agreement with the UPCL
Finance 26-2019
24-2019
16-07-2019 N.K. Gupta,Director (Finance)UPCL
Petition seeking approval of the Commission for advance & return Energy Banking to M/sArunachal Pradesh Power Corporation Pvt. Ltd. under an Energy Banking Agreement with theUPCL.
Finance 27-2019
25-2019
16-07-2019 N.K. Gupta,Director (Finance)UPCL
Petition seeking approval of the Commission for advance & return Energy Banking to M/s KreateEnergy (I) Pvt. Ltd. under on Energy Baking agreement with the UPCL.
Finance 28-2019
26-2019
16-07-2019 N.K. Gupta,Director (Finance)UPCL
Petition seeking carry forward of 139 MV (Non-Solar) Renewable Purchase obligation of FY 2018-19 as per the provisions of Uerc ( compliance of renewable Purchase obligation) Regulation 2010
Finance 21-2019
28-2019
22-07-2019 A.K. Tyagi, ChiefProject Officer,UREDA
Petition to extend the control period of the benchmark capital cost & generic tariff as declared byUERC vide its order dated 07.06.2019, upto October 2020 for upcoming Solar PV Power Plants(cumulative capacity of 52 MW)
Finance 30-2019
27-2019
22-07-2019 B.C.K Mishra,M.D. UPCL
Application seeking review of Commissions Order 27.02.2019 on the MYT Petition for the controlperiod from FY 2019-20 to FY 2021-22 alongwith tariff determination for FY 2019-20, True-up forFY 2017-18 and APR for FY 2018-19 of UPCL is submitted.
Finance
29-2019
26-07-2019 N.K. Gupta,Director Finance,UPCL
Application seeking approval of the FCA to be charged from the consumers for the period01.07.2019 to 30.09.2019
Finance 31-2019
30-2019
29-07-2019 B.C.K Mishra(M.D. UPCL)
Application seeking approval of UERC on Model PPA between UPCL & selected bidders forsetting of grid connected solar PV power projects.
Finance 33-2019
31-2019
31-07-2019 Suo-moto Suo moto proceedings in the matter of compliant file of Sh. Parshuram Jagjeetpur, Haridwar. Technical 208-2019
32-2019
04-09-2019 Naveen KumarGupta, Director(Finance) UPCL
Petition seeking approval for recovery of power purchase cost incurred in excess of the approvedpower purchase cost for FY 2018-19
Finance 36-2019
34-2019
26-09-2019 Amit Kumar, M/sKumarEnterprises
Selection of Developer(s) for Setting of 200 MW Aggregate Capacity Grid Connect Solar PVPower Projects in the Hilly region of Uttarakhand for Procurement of Power on Long Term Basisby Uttarakhand Power Corporation Ltd. (UPCL) through Type-I project Uttarakhand Solar EnergyPolicy-2013 (Amended-2018)
Finance -
36-2019
03-10-2019 M/s Hero RealityPvt. Ltd.
Representation/Petition under section 67(4) of the Electricity Act, 2003 has been submitted by M/sHero Reality Pvt. Ltd. The Petitioner prayers has made the following prayers before theCommission: a) Direct the Respondent No. 1 to stop the initiation of service line and erection ofpoles on the aforementioned land owned and developed by the Petitioner; b) Direct theRespondent No. 1 to not carry out any work in relation to supply of electricity to the RespondentNo. 3 without seeking prior consent of the Petitioner; c) Direct the Respondent No. 1 to not alter ormodify any structure on the aforementioned land of the Petitioner without seeking prior consentfrom the Petitioner and/or; d) Pass any such other or further orders as this Hon’ble Commissiondeems fit in the interest of justice, equity and law.
Technical 37-2019
37-2019
22-10-2019 Naveen KumarGupta, Director(Finance) UPCL
Application seeking approval of the Fuel Charges Adjustment (FCA) to be charged from theconsumers for the period from 01.10.2019 to 31.12.2019
Finance 35-2019
40-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Dhakrani LHP
Technical 40-2019
41-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Dhalipur LHP
Technical 41-2019
42-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Kulhaal
Technical 42-2019
43-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Khatima LHP
Technical 43-2019
44-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Chilla
Technical 44-2019
45-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Ramganga LHP
Technical 45-2019
46-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Tiloth (MB-I)
Technical 46-2019
47-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for MB-II
Technical 47-2019
39-2019
29-11-2019 PurushottamSingh, Director(Operations)UJVN Ltd.
Petition for true-up for the FY 2018-19, Annual Performance Review for FY 2019-20 Anddetermination of tariff for the FY 2020-21 for Khodri LHP
Technical 39-2019
50-2019
30-11-2019 Naveen KumarGupta, Director(Finance) UPCL
Annual Revenue Requirement (ARR) petition for the FY 2020-21, alongwith tariff determination forFY 2020-21, True-up for FY 2018-19 and Annual Performance review for FY 2019-20
Finance 50-2019
51-2019
02-12-2019 G. AnjaneyuluNaidu, Director(Projects), M/sSrav
Petition under section 62 and 86 (1) of the Electricity Act, 2003 read with regulation 1(3) , 11(1)and 12 of the UERC (Terms and Conditions for determination of MYT Regulation, 2015 for True-upof Tariff for the FY 2018-19 and Petition under Section 62 and Section 86(1) (a) of the ElectricityAct, 2003 read with Regulations 1(3) 11(1) and 12 of the UERC (Terms and Conditions fordetermination of MYT Regulation, 2018 for Annual Performance Review for FY 2019-20 andAnnual Fixed Charges for FY 2020-21
Finance 51-2019
52-2019
03-12-2019 Rahul Goel,ManagingDirector, M/sGama Infraprop
Miscellaneous Application for True-up for FY 2018-19, APR for FY 2019-20 and ARR for FY 2020-21 for 107 MW of 214 MW Gas based Kashipur Combined Cycle Power Plant of Gama InfrapropPvt. Ltd. (in short Gama Kashipur CCPP of Power Station of Projects) at Mahukhedaganj,Kashipur, District Udhamsingh Nagar, Uttarakhand.
Finance 52-2019
53-2019
05-12-2019 N.K. Gupta,Director (Finance)UPCL
Application seeking approval of the Commission for investment on Implementation of EnterpriseResource Planning (ERP) under Integrated Power Development Scheme (IPDS) of Ministry ofPower, Govt. of India
Technical 06-2020
54-2019
13-12-2019 T. VeerabhadraRao, Director(M/s Greenkobudhil H
Filing of petition for true-up of tariff for FY 2018-19 APR for FY 2019-20 and AFC of FY 2020-21for Budhil Hydro Station of Greenko Budhil Hydro Power Pvt. Ltd. under Section 62 and 84 ofElectricity Act 2003 read with the relevant Regulation and guidelines of the Commission
Finance 54-2019
1-2020
03-01-2020 N.K. Gupta,Director(Finance),UPCL
Application seeking approval for the investment on the project covering the construction of 02 No.33/11 kV substations & their associated 33 kV line
Technical 18-2020
2-2020
23-01-2020 A.K. Tyagi, ChiefProject Officer,UREDA
Miscellaneous application extend the settlement of Net Energy from billing period to yearly basisof captive use Rooftop Solar PV generator (Govt. Institutions/Organization, Private Institutions andCommercial and Industrials) who is getting the NOC from UPCL for Grid connectivity and Netmetering by UERC vide its order UERC/6/TF-338/17-18/2017/1241 dated 01/11/2017 Applicationseeking approval of the Commission for the approval of investment on the project covering theconstruction of 2 No. 33/11 KV Substations & their associated 33 kV line is submitted by UPCL
Finance
3-2020
24-01-2020 N.K. Gupta,Director(Finance),UPCL
Application seeking approval of the Fuel Charge Adjustment (FCA) to be charged from theconsumers for the period from 01.01.2020 to 31.03.2020
Finance 1-2020
9-2020
25-02-2020 Manish Yadav,IDSE, EE (SG)GarrisonEngineer, MES
Garrison Engineer, Military Engineer Services Dehradun is developing a 2MW Solar Projectlocated at Birpur which is under progress and to be connected at 33/11 kV Anarwala (MRS)Dehradun Cantt, Permission for connecting 2 MW Plant output to the 33/11 kV Grid of UPCL atAnarwala may be granted on Net Metering basis under Regulation 51 and 52 of RE Regulation2018
Finance 17-2020
7-2020
02-03-2020 Naveen KumarGupta, Director(Finance) UPCL
Application for determination of additional surcharge in accordance with the provisions of UERC(Terms and conditions of Intra - State open Access) Regulation 2015 to meet the fixed cost ofUPCL arising out of its obligation to supply electricity to the open access consumers.
CL 04-2020
6-2020
03-03-2020 Naveen KumarGupta, Director(Finance) UPCL
Application seeking approval for inclusion of soft drink concentrate in seasonal industries productlist.
Finance 05-2020
8-2020
04-03-2020 Praveen Kumar,AE E/M, GarisonEngineer MES,Roork
Petition for enhancement of Solar capacity from 1MW to 2 MW for Grid connectivity Finance 16-2020
11-2020
04-06-2020 Naveen KumarGupta, Director(Finance) UPCL
Miscellaneous Application seeking approval of the Commission for Advance & Return Energybanking to M/s GMR Energy Trading Ltd. under an Energy Banking Agreement with theUttarakhand Power Corporation Ltd. is submitted by UPCL.
Finance 07-2020
12-2020
04-06-2020 Naveen KumarGupta, Director(Finance) UPCL
Miscellaneous Application seeking approval of the Commission for Advance & Return Energybanking to M/s Kreate Energy Trading Ltd. under an Energy Banking Agreement with theUttarakhand Power Corporation Ltd. is submitted by UPCL.
Finance 08-2020
13-2020
04-06-2020 Naveen KumarGupta, Director(Finance) UPCL
Miscellaneous Application seeking approval of the Commission for Advance & Return Energybanking to M/s PTC Energy Ltd. under an Energy Banking Agreement with the Uttarakhand PowerCorporation Ltd. is submitted by UPCL.
Finance 09-2020
14-2020
04-06-2020 Naveen KumarGupta, Director(Finance) UPCL
Miscellaneous Application seeking approval of the Commission for Advance & Return Energybanking to M/s Arunachal Pradesh power Corporation Pvt. Ltd. under an Energy BankingAgreement with the Uttarakhand Power Corporation Ltd. is submitted by UPCL.
Finance 10-2020
15-2020
04-06-2020 Naveen KumarGupta, Director(Finance) UPCL
Miscellaneous Application seeking approval of the Commission for Draft Power PurchaseAgreement between Uttarakhand Powr Corporation Ltd. and M/s Bhilangana Hydro Power Ltd. forprocuring Non-Solar RE Energy on short term basis is submitted by UPCL.
Finance 11-2020
16-2020
23-06-2020 NA Suo-moto order in Deployment of customised Renewable Purchase Obligation Compliancesystem (RPOCS) web tool in Uttarakhand.
Finance 12-2020
17-2020
23-06-2020 NA Suo moto proceedings in TIme extension in scheduled commissioning date of Solar PV Plants tobe developed by various developers in the State of Uttarakhand considering disruption due tolockdown on account of coronavirus (COVID-19) pandemic
Finance 13-2020
18-2020
02-07-2020 H.P. StateElectricity BoardLtd. & H.P PowerTran
Miscellaneous Application for determination of Term of use for Utilization of 220kV S/c DedicatedTransmission Line of M/s Greenko Budhil Hydro Electrical Project for evacuating power fromGenerating Station operating in Ravi Basin, Himachal Pradesh viz. Small Hydro Electric Project ofup to 26 MW by connecting 2x315 MVA 400/220/33kV GIP Pooling Station at Lahal, HimachalPradesh to 220kV side of S/S at Budhil HEP through a 220 kV S/C transmission line (1.8 km) fromLahal to Budhil is submitted jointly by Himachal Pradesh State Electricity Board Ltd. & HimachalPradesh Power Transmission Corporation Ltd.
Finance 31-2020
19-2020
24-07-2020 Naveen KumarGupta, Director(Fin.) UPCL
Miscellaneous Application for determination Additional Surcharge in accordance with theprovisions of UERC (Terms & Conditions of Intra-State Open Access) Regulation 2015 to meet thefixed cost of UPCL arising out of its obligation to supply electricity to the Open Access consumersis submitted by UPCL.
CL 15-2020
20-2020
27-07-2020 A.K. Tyagi, ChiefProject Officer(UREDA)
Miscellaneous Application to extend the control period of the benchmark capital cost & generictariff as declared by the Commission vide its order dated 11.05.2020, upto March 2022 forupcoming 10,000 nos Solar PV Power Plants of capacity 25KWp each (cumulative capacity of 250MW) is submitted by UREDA.
Finance 14-2020
23-2020
10-08-2020 Naveen KumarGupta, Director(Fin.) UPCL
Application seeking amendment in UERC Tariff Regulations 2018 Finance -
24-2020
10-08-2020 Anil Kumar,Dir(Projects)PTCUL
Miscellaneous review application filed by PTCUL under Regulation 54 of the UERC (Conduct ofBusiness Regulation), 2014 read with relevant provisions of the Electricity Act, 2003 for review ofthe Order dated 18.04.2020 passed by the Commission in the matter of Petition for approval ofRevised Aggregate Revenue Requirement (ARR) for FY 2020-21 alongwith True-up of FY 2018-19 and Annual Performance Review (APR) for FY 2019-20 of PTCUL.
CL
25-2020
07-09-2020 Naveen KumarGupta, Director(Finance)
Application seeking approval on the Draft plan to pass on the benefit in electricity tariff to the endconsumers of the State.
Finance 28-2020
26-2020
22-09-2020 Sh. Hitler Saini &Others
Miscellaneous Application filing Under Section 3A of works of licensees Rules for setting a sideorder passed by DM, Haridwar, in the matter of Sh. Hitler Saini & others vs Power TransmissionCorporation Ltd
CL 25-2020
27-2020
22-09-2020 Sh. ChandraKiran & Others
Miscellaneous Application filing Under Section 3A of works of licensees Rules for setting a sideorder passed by DM, Haridwar, in the matter of Sh. Chandra Kiran & others vs PowerTransmission Corporation Ltd.
CL 26-2020
28-2020
23-09-2020 Naveen KumarGupta, Director(Finance)
Miscellaneous Application seeking approval of the Commission on the draft PPA to be executedbetween Uttarakhand Power Corporation Limited and Uttarakhand Power Development andConstruction Corporation Limited (UPDCC Ltd.) has been filed by UPCL.
Finance 22-2020
29-2020
12-10-2020 N.K. Gupta,Director (F),UPCL
Application seeking review of the UERC’s Tariff Order on the Annual Revenue RequirementPetition for FY 2020-21 alongwith Tariff determination for FY 2020-21, True up for FY 2018-19 andAnnual Performance Review for FY 2019-20.
Finance
32-2020
16-10-2020 Rahul Goyal , M/sGama Infra ProLtd
Petition for permanent connectivity of 107 MW from 214 MW gas based CCPP of GIPL atMahukhedaganj, kashipur
CL 24-2020
33-2020
20-10-2020 J.M.S. Rauthan,Director (Projects)UPCL
Application seeking approval for the investment on the project covering the Construction of 02Nos. 33/11 kV Sub-stations along with their associated 33kV underground line at Laltaro &Jagjeetpur, Haridwar
Technical 32-2020
34-2020
13-11-2020 G.A. Naidu, M/sSravanthi EnergyPvt. Ltd
Review Petition under Section 94 of the Electricity Act, 2003 read with Regulation 54 of the UERC(Conduct of Business) Regulations, 2014 for the Tariff Order dated 18.04.2020 issued by theCommission with respect to the truing up of Non-Tariff Income for the FY 2018-19.
Finance 34-2020
Total 198 Petitions