Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.
Transcript
Page 1: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Report from the FieldSeptember 16, 2006

Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Page 2: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

However, 3N5E was quite soggy, so we closed it for the day afterabout an hour of work.

Page 3: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Shane takes final notes from 3N5E before moving to 3N2E

Page 4: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

From 3N2E this pipe bowl was

recovered, the only piece of interest

from this pit

Page 5: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

The most interesting artifacts continued to come out of 6N1E, including historic artifacts from the hermit who lived in the

shelter in the 1970s, and very interesting prehistoric remains.

Page 6: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Including this point, of which Stephen is justifiably proud!

Page 7: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Fox Creek Stemmed Point from 6N1E

Middle Woodland Period, ca. 200-1000 years ago

Page 8: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Lunch was enjoyed on the Veranda above the Shelter

Page 9: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

The rain filled the small stream in front of the site so that Johanna could wash interesting artifacts.

Page 10: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

Including a decorated body sherd and a rim sherd from late in the prehistoric period, plus many plain sherds, also from

6N1E

Page 11: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

1N6E continued to be artifact poor. We thought we found a feature,

Page 12: Report from the Field September 16, 2006 Friday was very wet, so we were hoping we would be able to work. For the most part we could.

But it turned out to be the top of another layer, which does,

however look interesting. . .more next week. . .