    MINI CASES

    Re-Design - AR2R035

    Student: Sophie Stravens - 4041291

    Supervisor: R. van Warmerdam

    19-05-2014

  • 8/11/2019 Report Mini Cases

    3/10

    This report is part of the Re-Design Course of the Mastertrack Real Estate and Housing of the TU Delft.

    This subject of this course is research to redevelopment projects. During the course a redevelopment

    plan for the BlaCo area (a small area in the business district of Rotterdam) has to be made.

    This report has the aim to provide more insight in redevelopment projects.This will be done by three small analyses of reference cases:

    1. The Bank Amsterdam

    2. Albert Mill Manchester

    3. The Matchworks

    The following questions will be answered for all three cases:

    1. What is remarkable about this project, why was it selected for this report?

    2. What are the main differences between this mini case and the BlaCo Case?

    3. Which lessons can you draw from the mini cases that are applicable to the main case?

    INTRODUCTION

  • 8/11/2019 Report Mini Cases

    4/10

    Address Herengracht 595

    1017 CE

    Amsterdam

    The Netherlands

    Year built 1931

    Year transformed 2010

    Size 42.500 m2

    Old function Ofce

    New function Ofce, multifunctional

    use, retailOwner Kroonenberg Groep

    Key Stakeholders Kroonenberg Groep

    Bouwbedrijf Midreth

    Ingenieursbedrijf Zonnevelld

    This case is chosen as reference case because

    of the new and old function. The Bank is built as

    ofce building and after the redevelopment in

    2010 the building is still used as ofce building, but

    also other functions have moved into The Bank.

    This is similar to the plans for the BlaCo area.

    CASE 1The Bank - Amsterdam

    General information

    Case description

    In the seventies The Bank was converted.

    Several changes have been made (inter alia

    a large extension on the backside and onsome added volumes on the rooftop). These

    changes were not very well received.

    Since ABN-Amro has left The Bank in the

    late nineties, the building was left vacant.

    Redevelopment was needed to transform

    the building into a new ofce building. In

    2010 this redevelopment was nisched.

    On the ground oor, retail is located.

    History

    The most remarkable aspects of the

    new plan are the following:

    Transparent and open ground oor faade:

    To create a vivid and attractive retail area on

    the ground oor, the faade on street level

    needed to be more transparent. Also large

    entrances are build to make the building

    present itself more to the city and make the

    building more attractive to access. It should

    be noted that also the public space (on the

    street) is improved by these changes. Bright spaces: To make the building brighter,

    3000m2 of oor is removed to make an open

    atrium at the entrance of the building.

    Coherence of different styles of architecture:

    New plan

    All information in this chapter is based on information from

    http://www.kennisbankherbestemming.nu/projecten/the-bank-

    amsterdam unless another resource is mentioned.

  • 8/11/2019 Report Mini Cases

    5/10

    There are notable aspects in the process

    of the redevelopment of The Bank: Finance: The whole project was

    nanced by Kroonenberg Groep,

    which is the owner of the building.

    Clear vision and ambition: Kroonenberg Groep

    had a clear vision and ambition. This resulted

    in an efcient and creative process. During the

    process everything could be tested against

    the stated vision and ambition of Kroonenberg

    Groep. This led to a very high qualitative plan.

    Cooperation between different parties: During

    the whole process there was an intensecollaboration between different parties to make

    sure the desired quality of the nal plan would

    be achieved. There was for example very

    close contact with Bureau Monumenten en

    Archeologie and Bouw- en Woningtoezicht.

    Involvement of designers: The architect, former

    Rijksbouwmeester K. Rijnboutt, was involved

    at a very early stage of the process. His skills

    and experience but also the fact RIjnboutt

    know the city of Amsterdam very well (he is an

    inhabitant of Amsterdam) were important factors

    to choose him as architect (Nieuwenhuis, sep

    2008). His early involvement and specic prole

    and experience led to a nice collaboration with

    Kroonenberg Groep for this specic case.

    Branding: The Bank is a majestic, grande

    Process

    Differences:

    Amount of building: this case is about one

    building while Blaak case has ve buildings.

    The Bank is a monumental building. In the BlaCo

    Case only the Schielandhuis is a monument.

    Similarities:

    Same functions: at rst ofce, afterwards

    multifunctional with ofce space and retail

    Location: inner city

    Differences and similarities between The

    Bank Case and the BlaCo Case

    Project:

    An open faade on the ground oor improves the

    accessibility and attractiveness of the building

    Open spaces lift the quality of space.

    Sometimes it is a good thing to decrease

    the LFA in order to create a higher quality of

    space. This will increase prots as well.

    Process:

    A clear vision and ambition contributes

    to a efcient process in which every

    aspect of the new plan can be tested

    Early involvement of the architect with specicskills and prole matching the assignment.

    Lessons learned

    building in the city centre of Amsterdam.

    This requiered a special marketing plan.

    The name The Bank stands for solid

    as a rock which should be the image of

    the building (Nieuwenhuis, nov 2008).

    Marketing campaign: A nice brochure, a good

    website but also the marketing during the

    redevelopment (in the form a large scaffolding

    banner on which the nal design) contributed tothe promotion of The Bank (Nieuwenhuis, 2008).

    A main challenge during the redevelopment

    was to bring all the different architecture

    styles together into one coherent building.

    Details and materials were very important.

    Sustainability: There are several aspects

    which show sustainability was an important

    aspect of the redevelopment. Firstly, it is a

    redevelopment of an existing building which

    is a sustainable aspect on itself. Secondly,there was focus on maximal exibility within

    the new building. Because of the public

    facilities in the neighbourhood the location

    was really good. Also, in the new building

    sustainable materials and installations are

    being used. At last, the building now has an

    A+ label (www.thebankamsterdam.nl).

  • 8/11/2019 Report Mini Cases

    6/10

    Address Ellesmere Street Castleelds

    Manchester M15 4LY

    Greater Manchester

    United Kingdom

    Year built 1869

    Year transformed 2008

    Old function Mill

    New function Business copmlex, Housing

    Owner Urban Splash (Tom Bloxham)

    Key Stakeholders Urban Splash (Tom Bloxham)Regional Building

    Control (RBC)

    CASE 2Albert Mill - Manchester

    General information

    Case description

    The most remarkable aspects of the

    new plan are the following:

    Function: Most mills in the United Kingdom

    are transformed to retail of industrial functions.

    Because of the location of the Albert Mill

    (near lots of public facilities) it was possible totransform it into a work- live combination.On

    the ground oor the ofce space is realised,

    on the next oor 21 dwellings are build.

    Type of dwellings: To react on the increasing

    demand for special dwellings, so called shell

    spaces are realised. These are spaces

    which can be hired in which the resident has

    the freedom to design their own dwelling.

    New plan

    Albert Mill is one of the few original mills in

    the centre of Manchester. The new function is

    one of the main reasons this case is chosen

    as reference case for the Blaak area.

    Albert Mill was a cotton spinning mill.

    Because of the increasing (cheap) export

    from abroad, the mill lost its function.Because of the vacancy there was a need for

    redevelopment. Because of the monumental

    character it also needed to be renovated.

    HistoryAll information in this chapter is based on information fromhttp://www.kennisbankherbestemming.nu/projecten/albert-mill

    unless another resource is mentioned.

  • 8/11/2019 Report Mini Cases

    7/10

    The following aspects are remarkable for the

    process of the redevelopment of Albert Mill:

    Controlling: The Regional Building Control

    (RBC) is an independent party who is approved

    to carry out all the full function of buiding

    control. For the Albert Mill project they were

    appointed for the Shell Spaces. During theprocess they focussed on the on the extend

    to which the monumental characteristics were

    taken care of. They also checked if the nal

    plan met the requirements of the Building

    Decree. This way the RBC was a intermediary

    between Urban Splash and the residents of

    the shell spaces in order to create the buyers

    dreams of a space unique to them (http://

    www.e-architect.co.uk/manchester/albert-mill).

    Use of Buyers pack: In cooperation with

    Urban Splash, the RBC set up a so called

    Buyers pack which includes all the restrictions

    regarding the design of the shell spaces by the

    residents. This way the possibilities with the

    shell spaces were very clear for the residents.

    Special demands for the shell spaces: One

    resident had the demand to make an apartment

    with an open lay-out; the bedroom in an

    open space. This was not possible within

    the normal re safety requirements. The

    RBC became involved in this specic case

    and advised the resident to build a sprinkler

    system. This way the resident could keep thedesired exibility in his apartment within the

    restrictions of the re safety requirements.

    Process

    Differences:

    Amount of building: this case is about one

    building while Blaak case has ve buildings

    Similarities:

    Location: inner city

    Differences and similarities between the

    Albert Mill Case and the BlaCo Case

    Project:

    Freedom in design for individual users: The

    shell spaces can be seen a huge success

    factor. All the residents were able to build

    their perfect apartment within the monumentalbuilding. However, improvements regarding

    the freedom for the design can be made.

    In Albert Mill the installations and tubes for

    sanitary etc were already build so the decision

    where for example the kitchen or the bathroom

    should be located was already made.

    Project:

    Freedom in design for individual

    users: This also has invlfuence on the

    process; involvement of future users willincrease the feasibiity of the project.

    Lessons learned

  • 8/11/2019 Report Mini Cases

    8/10

    CASE 3The Matchworks - Liverpool (as a part of Speke Garston

    area redevelopment)

    General information

    Case description

    The most remarkable aspects of the

    new plan are the following:

    Demolition versus renovation: The

    Matchworks is because of its monumental

    status not demolished but renovated.

    Flexibility: On the advice of Urban Splash,

    small ofce spaces are realised in The

    Matchworks. These small ofces can be

    combined to larger space. At this moment

    the Matchwork is the ofce location for

    varied organisations and businesses. Increase lettable oor space: To increase the

    lettable oor area, mezzanines are build in the

    high spaces on the ground oor. In this design

    the original structure of the building is used.

    New plan

    Address Garston 140 A56

    Liverpool L19 2RF

    Merseyside

    United Kingdom

    Year built 1919 - 1921

    Year transformed 2001 - 2008

    Old function Match Factory

    New function Ofce

    Owner Urban Splash (Tom Bloxham)

    Key Stakeholders Urban Splash (Tom Bloxham)Municipality of Liverpool

    Northwest Development

    Agency

    The Matchwork is part of an area redevelopment

    project of the Speke Garston area in Liverpool. The

    Matchworks also consists of different buildings.

    1. Former match factory with water tower

    2. Former repository3. The Matchbox

    The fact there are multiple buildings is similar

    to the Blaak Case. This is one of the reasons

    The Matchworks, build as a match factory,

    was closed in 1994. The Speke Garston area

    was a very poor area which needed to be

    redeveloped. The goal of the redevelopment

    was to attract foreign investments and

    improve the employment possibilities.

    History

    All information in this chapter is based on information from

    http://www.kennisbankherbestemming.nu/projecten/the-

    matchworks unless another resource is mentioned.

    this case is chosen to be studied. However,

    in The Matchworks the buildings are build

    by the same owner for the same function

    which is not the case in the BlaCo area.

    The other reason this case is chosen isthe similar new function; ofce space.

  • 8/11/2019 Report Mini Cases

    9/10

    A few aspects of the process

    should be further explained:

    Finance: The redevelopment was for more

    than 50% paid by the government.

    Partnership Investment Programme (PIP):

    Also external parties invested in this

    redevelopment project. Because of the PIP,the private investors were strongly involved

    in important aspects of the redevelopment.

    Joint venture (SGDC): Before the redevelopment

    process started, in 1996 a joint venture

    between the municipality of Liverpool and

    the Northwest Development Agency was

    established: the Speke-Garston Development

    Company (SGDC). The SGDC did make a

    business plan for the whole Speke Garston

    area. In 1998 the SGDC contracted the Urban

    Splash and the architect Shed KM to renovate

    en transform the monumental buildings.

    Catalyst function: The former factory (with

    the water tower) was the rst project to

    be delivered. This was done in 2001. This

    building has functioned as a catalyst for the

    redevelopment of the other buildings.

    Part of area development: The Matchworks

    has won multiple prices and according to

    Urban Splash it offers some of the best

    designed ofce space in Liverpool. Because

    of this image it helped to transfom the Speke

    Garston area into one of Liverpools leadingbusiness districts (http://www.urbansplash.

    co.uk/commercial/matchworks).

    Improvement of infrastructure: The rst step

    in improving the image of the Speke Garston

    area was an upgrade of the infrastructure

    (Gigler, Ttzer and Knoaucher, 2004).

    Infrastructure is a very important factor in

    measurements of the quality of an area.

    Housing: New housing development was

    added to the programme in the Speke Garston

    area redevelopment during negotiations withthe private developers (Gigles ea, 2004).

    Process

    Differences:

    Old function

    Part of industrial

    The Matchworks is not in the city

    centre while the BlaCo area is

    Similarities:

    Ensemble of buildings

    New function: both ofce

    Differences and similarities between The

    Matchworks Case and the BlaCo Case

    Catalyst: When a part of the project is nished

    earlier, this can function as catalyst for the

    redevelopment of the rest of the area.

    Branding: When one of the buildings is very

    well functioning it can help to improve theimage of surrounding buildings as well. This

    is similar to the catalyst function, but slightly

    different because the aspect of time is not

    taken into account. Also, the other buildings

    do not necessarily have to be redeveloped if

    they are already meeting the standards. The

    fact that a well-known and well-functioning

    building is in the near surrounding helps

    to improve the image of the building.

    Lessons learned

  • 8/11/2019 Report Mini Cases

    10/10

    www.kennisbankherbestemming.nu

    www.thebankamsterdam.nl

    http://www.thebankamsterdam.nl/downloads/6.pdf (Nieuwenhuis, nov 2008)

    http://www.thebankamsterdam.nl/downloads/5.pdf (Nieuwenhuis, sep 2008)

    http://www.e-architect.co.uk/manchester/albert-millhttp://www.urbansplash.co.uk/commercial/matchworks

    Examples of Revitalised Urban Industrial Sites Across Europe, Final Report

    Ute Gigler

    Tanja Ttzer

    Markus Knoacher

    December 2004