Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
EENNVVIIRROONNMMEENNTTAALL IIMMPPAACCTT AASSSSEESSSSMMEENNTT RREEPPOORRTT
FFoorr
PPrrooppoosseedd PPrroojjeecctt
““MMAANNUUFFAACCTTUURRIINNGG OOFF DDYYEESS AANNDD IINNTTEERRMMEEDDIIAATTEESS”” ((TToottaall QQttyy:: 3355 MMTT//MMoonntthh))
Prepared For
M/s. MEGHNAGAR PHARMACHEM PVT. LTD. Plot No 98-A, AKVN Industrial area, Meghnagar,
Dist. Jhabua, Madhya Pradesh.
Conducted & Prepared By
GREEN CIRCLE, INC.
Integrated HSEQR Consulting Engineers, Scientists & Trainers (MoEF Recognized Environment Laboratory)
(An ISO: 9001, 14001, NABL/17025:2005 OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II)
Gujarat High court stay order for QCI NABET No. C/SCA/10311/2012 dated 04.02.2014)
Corp. Office & Environmental Research Laboratory
Green Empire (Anupushpam), Above Axis Bank, Nr. Yash Complex, Gotri Road, Vadodara-390 021 (Gujarat) India |Tel: 0265-2371269
www.greencircleinc.com E: [email protected]
ALSO AT
BENGALURU RUDRAPUR NEW DELHI HYDERABAD PUNE RAIPUR KOLKATA GOA
OVERSEAS
AUSTRALIA OMAN KUWAIT AFRICA VIETNAM
http://www.greencircleinc.com/�
C/SCA/10311/2012 ORDER
IN THE HIGH COURT OF GUJARAT AT AHMEDABAD
SPECIAL CIVIL APPLICATION NO. 10311 of 2012
With
SPECIAL CIVIL APPLICATION NO. 4979 of 2012
With
SPECIAL CIVIL APPLICATION NO. 4974 of 2012
With
SPECIAL CIVIL APPLICATION NO. 9680 of 2013
With
SPECIAL CIVIL APPLICATION NO. 9679 of 2013
With
SPECIAL CIVIL APPLICATION NO. 1782 of 2013
With
SPECIAL CIVIL APPLICATION NO. 12466 of 2013================================================================
C B UPASANI JYOTI OM CHEMICAL RESEARCH & 7....Petitioner(s)
Versus
UNION OF INDIA THRO SECRETARY & 1....Respondent(s)================================================================
Appearance:
DELETED for the Petitioner(s) No. 6
MR NILESH P SHAH, ADVOCATE for the Petitioner(s) No. 1 - 8
MS DHARA H ASLOT, ADVOCATE for the Petitioner(s) No. 1 - 8
MR ANSHIN H DESAI, ADVOCATE for the Respondent(s) No. 1
MR IH SYED, ADVOCATE for the Respondent(s) No. 1 - 2================================================================
CORAM: HONOURABLE THE CHIEF JUSTICE MR. BHASKAR BHATTACHARYAandHONOURABLE MR.JUSTICE J.B.PARDIWALA
Date : 04/02/2014
COMMON ORAL ORDER
(PER : HONOURABLE THE CHIEF JUSTICE MR. BHASKAR
BHATTACHARYA)
Page 1 of 2
C/SCA/10311/2012 ORDER
As prayed for by Mr Desai, let the matters appear on 20th
February 2014 after fresh matters to enable his client to file
appropriate affidavit showing that Dr Rastogi has been vested with
the appropriate authority in terms of the Environment (Protection)
Act, 1986 to issue the Office Memorandum impugned in these
applications. Interim relief granted earlier will continue till further
orders.
(BHASKAR BHATTACHARYA, CJ.)
(J.B.PARDIWALA, J.) zgs
Page 2 of 2
GREEN CIRCLE, INC.
Integrated HSEQR Consulting Engineers, Scientists & Trainers
(MoEF Recognized Environment Laboratory)
(An ISO: 9001, 14001, OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II)
Gujarat High court stay order for QCI NABET No. C/SCA/10311/2012 dated 24.01.2013
EEEIIIAAA CCCEEERRRTTTIIIFFFIIICCCAAATTTEEE
This is to certify that M/s. Green Circle, Inc. Vadodara has conducted EIA
study for “Proposed Manufacturing Of Dyes And Intermediates” (Total Qty:
35 MT/Month) at Plot No 98-A, AKVN Industrial area, Meghnagar,
Dist. Jhabua, Madhya Pradesh, India by M/s. Meghnagar Pharmachem Pvt.
Ltd. for the period of March 2014 to May 2014.
For: Green Circle Inc.
((PPrraaddeeeepp JJoosshhii)) Group President & CEO
www.greencircleinc.com E: [email protected]
http://www.greencircleinc.com/mailto:[email protected]
M/s. Meghnagar Pharama Chem Pvt. Ltd.
EIA Report for Proposed manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
QUALITY CONTROL SHEET
Rev.
No. Date Reason History
Prepared
&
compiled
By
Reviewed
By
Approved
by
Validated
by
00 06/10/2014 EIA Report VB, NT, SP RK, NM PJ PJ
PJ : Pradeep Joshi
RK : Ranjit Kalita
VB : Vikash Bhagat
NT : Nidhi Trivedi
SP : Stuti Patel
NM : Nikunj Makwana
Compiled &
Prepared by Vikash Bhagat Nidhi Trivedi Stuti Patel
Signature
Reviewed by Ranjit Kalita, Deputy Manager-
EIA & EE
Nikunj Makawana, Executive
EIA & EE
Signature & Date
Approved by Pradeep Joshi, Group President & CEO
Signature & Date
Released by Nachiket Joshi, Senior Group Manager - Accounts & Finance
Signature & Date
Project Team
S. No. Name
1 Dr. Sandeep Sohani
2 Mr. Shailendra Singh
3 Ms. Ragav Soni
4 Mr. Bharat Patel
5 Sudhakar Kute
6 Satyavan
M/s. Meghnagar Pharama Chem Pvt. Ltd.
EIA Report for Proposed manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
ACKNOWLEDGEMENT
WE EXPRESS OUR SINCERE THANKS TO MANAGEMENT & EMPLOYEES OF M/s.
MEGHNAGAR PHARMACHEM PVT. LTD., Plot No 98-A, AKVN Industrial area,
Meghnagar, Dist. Jhabua, Madhya Pradesh, INDIA FOR THEIR CO-OPERATION &
UNSTINTED HELP WITHOUT WHICH THE EIA REPORT FOR “PROPOSED MANUFACTURING
OF DYES AND INTERMEDIATES” (Total Qty: 35 MT/Month) COULD NOT HAVE BEEN
POSSIBLE. THE COURTESY EXTENDED TO OUR TEAM IS HIGHLY APPRECIATED.
DISCLAIMER
The consulting services conducted by Green Circle, Inc.(the “Company”) were performed
using generally accepted guidelines, standards, and/or practices, which the Company
considers reliable. Although the Company performed its consulting services pursuant to
reliable and generally accepted practices in the industry, the Company does not guarantee
or provide any representations or warranties with respect to Client’s use, interpretation or
application of the findings, conclusions, and/or suggestions of the consulting services
provided by the Company. Moreover, the findings, conclusions, and the suggestions
resulting from the consulting service are based upon certain assumptions, information,
documents, and procedures provided by the Customer. AS SUCH, IN NO EVENT AND UNDER
NO CIRCUMSTANCE SHALL THE COMPANY BE LIABLE FOR SPECIAL, INDIRECT, PUNITIVE OR
CONSEQUENTIAL DAMAGES OF ANY NATURE WHATSOEVER, INCLUDING WITHOUT LIMITATION,
ANY LOST REVENUE OR PROFITS OF THE CUSTOMER OR ITS CUSTOMERS, AGENTS AND
DISTRIBUTORS, RESULTING FROM, ARISING OUT OF OR IN CONNECTION WITH, THE SERVICES
PROVIDED BY THE COMPANY. The Customer agrees that the Company shall have no liability
for damages, which may result from Client’s use, interpretation or application of the
consulting services provided by the Company. Client’s logo has been used for report
purpose only.
M/s. Meghnagar Pharama Chem Pvt. Ltd.
EIA Report for Proposed manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
ABBREVIATIONS
AAQM : Ambient Air Quality Monitoring
BOD : Biochemical Oxygen Demand
COD : Chemical Oxygen Demand
CPCB : Central Pollution Control Board
DMP : Disaster Management Plan
EIA : Environmental Impact Assessment
EMP : Environmental Management Plan
ETP : Effluent Treatment Plan
IMD : Indian Meteorological Department
KVA : Kilo Volt Ampere
KLD : Kilo Litre per day
MoEF : Ministry of Environment & Forest
PM : Particulate Matter
PPE : Personal Protective Equipment
STP : Sewage Treatment Plant
TDS : Total Dissolved Solids
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS i
TABLE OF CONTENTS
Para No. Title Page No.
Table of contents i-ix
Executive Summary (English) i-ix
Executive Summary (Hindi) i-viii
Chapter-I: Introduction
1.0 Introduction 1.1
1.1 Project proponent & their background 1.1
1.2 Project and its importance to the country 1.1
1.3 Purpose and need of EIA 11
1.4 Brief Description of the project 1.2
1.5 Statement of principle 1.2
1.6 Framework of assessment 1.3
1.7 Scope of the work 1.3
1.8 Objectives of the study 1.3
1.9 Methodology adopted for Environmental Impact Assessment 1.4
1.10 Applicable Environmental Regulatory Framework 1.5
1.11 Structure of the report 1.5
Chapter-2: Project Description
2.0 Introduction 2.1
2.1 Type of Project 2.1
2.2 Capital Investment 2.1
2.3 Need of Project 2.1
2.4 Project Justification 2.2
2.5 Location of Project Site 2.2
2.6 Land Requirement Details 2.5
2.7 Raw Material Requirement 2.7
2.8 Product Details 2.8
2.9 Manufacturing Process 2.8
2.10 Utilities & Requirements 2.20
2.11 Green Belt Development 2.26
2.12 Rain Water Harvesting 2.26
2.13 Pollution Control Measures 2.27
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS ii
Chapter-3: Baseline Environment
3.0 Introduction 3.1
3.1 Environmental Setting Of Study Area 3.3
3.2 Methodology 3.4
3.3 Hydro-Geology of The Study Area 3.5
3.4 Climate of The Region 3.5
3.5 Site Specific Micro Meteorological Data 3.6
3.6 Air Environment 3.9
3.7 Noise Environment 3.17
3.8 Water Environment 3.21
3.9 Land Environment 3.27
3.10 Biological Environment 3.31
3.11 Socio-Economic Profile Of Study Area (As Per Census India 2011) 3.35
3.12 Traffic Survey 3.43
Chapter-4: Anticipated Environmental Impacts & Mitigation Measures
4.0 Prelude 4.1
4.1 Identification Of Impacts 4.2
4.2 Impact on Ambient Air Environment 4.2
4.3 Impacts on Noise Environment 4.10
4.4 Impacts on Water quality 4.12
4.5 Impacts Due to Wastewater Generation 4.14
4.6 Impacts on Land Environment 4.14
4.7 Impact Due to solid waste 4.15
4.8 Impact on Terrestrial Ecology 4.16
4.9 Impacts on Socio – Economic Environment 4.17
4.10 Impact Resources 4.19
4.11 Impact Due to Rainfall & Soil Erosion 4.20
4.12 Impact Due to Increase in Traffic Density 4.20
4.13 Overall Impact Analysis 4.21
4.14 Potential Environmental impact Matrix 4.21
Chapter-5: Environmental Monitoring Plan
5.0 Introduction 5.1
5.1 Objectives of Environmental Management Plan 5.1
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS iii
5.2 Implementation schedule of monitoring measures 5.1
5.3 Environmental Monitoring 5.2
5.4 Cost Provision for Environmental Measures 5.4
Chapter-6: Quantitative risk assessment
6.0 Introduction 6.1
6.1 Scope of study 6.1
6.2 System Description 6.1
6.3 Methodology Adopted for QRA 6.7
6.4 Meteorological Condition 6.9
6.5 Hazards & Damage Criteria of Materials 6.10
6.6 Consequence Analysis 6.16
6.7 List & Details of Material 6.18
6.8 QRA Result 6.22
Chapter 7: Disaster Management plan
7.0 Objective 7.1
7.1 Definition and Scope 7.2
7.2 Methodology 7.2
7.3 Introduction 7.3
7.4 Details about Site 7.4
7.5 Plant Layout Details 7.4
7.6 Emergency Organization 7.4
7.7 Role Of Key Personnel 7.5
7.8 Outside Help 7.11
7.9 Information on Risk Evaluation Preliminary Hazard Analysis 7.11
7.10 Hazards/Foreseeable Scenarios 7.12
7.11 Power Supply Interruption 7.15
7.12 Hazard Identification and Risk Summary 7.15
7.13 Safety and Mitigating Measures 7.16
7.14 Other Areas of Hazards and Control 7.16
7.15 Hazard Control and Emergency Shut-Down 7.19
7.16 Emergency Lighting and Power Supply, Isolation Map 7.20
7.17 Alarm and Communication 7.20
7.18 Emergency Control Centre (ECC) 7.22
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS iv
7.19 Plant Assembly Points 7.22
7.20 Transport and Evacuation 7.25
7.21 Training and Rehearsing 7.25
7.22 Accounting for Personel 7.26
7.23 Public Relations 7.26
7.24 Medical Services and First Aid 7.26
7.25 Declaration of Cessation of Emergency 7.27
7.26 Post Emergency Planning 7.27
7.27 Plan Appraisal and Updating 7.27
7.28 Alarm and Declaring Major Emergency 7.28
7.29 Evacuation Plan 7.28
7.30 Traffic Control 7.28
7.31 Procedures for Implementing Plant Modifications 7.28
7.32 Health, Safety and Environmental Protection 7.30
7.33 Social Impact Assessment 7.31
7.34 Details of Occupational Health Programme 7.33
7.35 List of Annexure 7.54
Chapter-8: Environmental Management Plan
8.0 Introduction 8.1
8.1 Environment, Health, Safety (EHS) 8.1
8.2 Environment Management Plan 8.1
8.3 Environmental Objectives 8.2
8.4 Implementation 8.3
8.5 Environmental Management cell 8.4
8.6 EMP for construction phase 8.6
8.7 Completion of construction activity- Restoration 8.12
8.8 EMP for operational phase 8.12
8.9 Additional Mitigation Measures 8.18
8.10 Summary of Environment Management Plan and action 8.24
8.11 Findings 8.30
8.12 Conclusion 8.30
Chapter-9: Project Benefits
9.0 Introduction 9.1
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS v
9.1 Improvement in the social infrastructure 9.1
9.2 Economic Development 9.2
9.3 Employment Potential 9.2
Chapter-10: Conclusion
Chapter-11: Disclosure of the consultant
11.0 General Information 11.1
11.1 Vision 11.1
11.2 Mission 11.1
11.3 Approvals & Accreditations 11.1
11.4 Activities 11.2
11.5 EIA Team 11.3
Chapter-12: ToR Compliance 12.1-12.5
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS vi
LIST OF TABLES
TABLE
NO. TITLE
PAGE
NO.
2.1 Cost Breakup Details 2.1
2.2 Environment Setting for Proposed Project 2.2
2.3 Details of Land use Break-up 2.5
2.4 List of Raw Material Required for Proposed project 2.7
2.5 Production Detail 2.8
2.6 Water Consumption and Waste water generation Details 2.20
2.7 Waste Water Characteristics 2.23
2.8 Details of Power Consumption 2.24
2.9 Fuel requirement details 2.24
2.10 Employment Details 2.25
2.11 Hazardous waste Management 2.26
2.12 Annual Runoff 2.27
3.1 Salient Features of the Project Site 3.3
3.2 Environmental Attributes & Frequency of Monitoring 3.4
3.3 Climatology of Dahod July 2013-June 2014 3.6
3.4 Site specific climatic conditions 3.7
3.5 Ambient Air Quality Monitoring Location Details 3.9
3.6 Ambient Air Quality Monitoring For PM10 at Various Site Locations 3.11
3.7 Ambient Air Quality Monitoring For PM2.5 at Various Site Locations 3.12
3.8 Ambient Air Quality Monitoring for SO2 at Various Site Locations 3.13
3.9 Ambient Air Quality Monitoring For NOx at Various Site Locations 3.14
3.10 Ambient Air Quality Monitoring For CO at Various Site Locations 3.15
3.11 Ambient Air Quality Monitoring For Ozone, Ammonia, Lead, Arsenic,
Benzene, Nickel, & Benzopyrene at Various Site Locations 3.16
3.12 National Ambient Air Quality Standards and Methods of Measurement 3.16
3.13 Details of Noise Monitoring Locations 3.18
3.14 Status of Noise within the study area 3.19
3.15 Applicable Noise Standards 3.19
3.16 Water sampling locations in the study area 3.22
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS vii
3.17 A Analysis Result of Ground Water Samples 3.23
3.17 B Analysis Result of Surface Water Samples 3.25
3.18 Land use classification 3.29
3.19 Details of Soil Sampling Locations 3.30
3.20 Analysis result of soil samples 3.31
3.21 List of Flora in the Study Area 3.32
3.22 List of Mammals in the study area 3.34
3.23 List of Reptiles in the study area 3.34
3.24 Avifauna in the study area 3.34
3.25 List of villages present in the study area 3.36
3.26 Demographic Details 3.37
3.27 Literacy Rate 3.38
3.28 Social Structure 3.39
3.29 Occupational pattern of the Villages in the Study area 3.40
3.30 Traffic Survey conducted on Two Lane Road: SH 39 3.43
3.31 Level of Service 3.45
3.32 Traffic Survey conducted on Two Lane Road: SH 39 3.45
4.1 Ground level Concentration of PM in µg/m3 4.5
4.2 Ground level Concentration of SO2 in µg/m3 4.7
4.3 Ground level Concentration of NOX in µg/m3 4.8
4.4 Increase in Noise Levels during construction phase due to operation of
construction Equipments 4.10
4.5 Potential Environmental Impact Matrix 4.23
5.1 Implementation Pollution Control Measures 5.2
5.2 Environmental Monitoring Plan 5.3
5.3 Budget Allocation for Environmental Management 5.5
6.1 Hazard Identification 6.2
6.2 Risk Rating 6.4
6.3 Fatal Radiation Exposure Level 6.14
6.4 Overpressure Damage Criteria 6.15
8.1 Action plan for proposed trees in tree plantation area 8.22
8.2 Environnemental Management Plan Matrix 8.25
11.1 EIA team members 11.3
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS viii
LIST OF FIGURES
FIGURE
NO. TITLE
PAGE
NO.
1.1 Flow Chart of Methodology of EIA 1.4
2.1 Location Map of Project Site 2.4
2.2 Google Map of Project Site 2.5
2.3 Plant Layout of proposed Site 2.6
3.1 Study Area of 5 & 10 km Radius 3.2
3.2 Google image showing Vicinity map of Project site 3.2
3.3 Windrose diagram of the study area 3.8
3.4 Map Showing Air Monitoring Locations 3.10
3.5 Graphical representation of PM10 concentration at different locations 3.11
3.6 PM2.5 concentration at different Site Locations 3.12
3.7 SO2 concentration at different Site Location 3.13
3.8 NOx concentration at different Site Locations 3.14
3.9 CO concentration at different Site Locations 3.15
3.10 Image showing Noise Monitoring Location 3.18
3.11 Graphical Representation of Day time Noise Level in the study area 3.20
3.12 Graphical Representation of Night time Noise Level in the study area 3.20
3.13 Image showing Surface & Ground Water Sampling Locations 3.22
3.14 Land use/Land cover Map of the study area 3.27
3.15 Image Showing Soil sampling locations 3.30
3.16 List of villages within 10 km radius 3.36
3.17 Population of the study area 3.41
3.18 Social Profile of the study area 3.41
3.19 Population Literacy of the study area 3.42
3.20 Occupational pattern of the study area 3.42
3.21 Graph of Vehicular concentration at Peak hour & Lean hour for SH 39
Ratlam to Jhabua (A to B) 3.44
3.22 Graph of Vehicular concentration at Peak hour & Lean hour for SH-39
Jhabua to Ratlam (BtoA) 3.46
4.1 Ground Level Concentration of PM 4.6
M/s. Meghnagar Pharama Chem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. TABLE OF CONTENTS ix
4.2 Ground Level Concentration of SO2 4.8
4.3 Ground Level Concentration of NOx 4.9
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary I
EXECUTIVE SUMMARY
S. No.
1.0 PROJECT DESCRIPTION
1.1 Introduction
The Meghnagar Pharmachem Pvt. Ltd. is company registered with registrar of Companies,
Gujarat Dadra & Nagar Haveli as on 25-10-2011. The company wants to enter in the field of
manufacturing of Dyes intermediate. The unit has already acquired a plot of land at plot No
98-A, AKVN, Industrial area, Meghnagar, Dist. Jhabua, Madhya Pradesh.
1.2 Type of Project
The proposed unit is speciality chemicals manufacturing unit covered under the category of
5(f) in schedule “Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs
and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals,
other synthetic organic chemicals and chemical intermediates)” of EIA Notification-2006. This
project falls under category ‘B’. In view of the above, legal aspect and monitoring work has
been carried out for all the environmental attributes by Green circle Inc. Vadodara.
1.3 Location of the Project
The Proposed project is located at plot no. Plot no. 98/AKVN Industrial Estate, Near S.R.
Ferroalloys, Meghnagar Dist. Jhabua, Madhya Pradesh. The coordinates of project site is 22°
54.83’N & 74° 33.582’E.
1.4 Capital Investment
The expected cost of the proposed project will be around Rs.185.85 Lakhs as on date. The
capital cost for Environmental management services (EMS) and Pollution control measures
(construction and operation phase) will be Rs.58.25 Lakhs. The annual recurring cost for EMS
will be Rs.19.0 Lakhs.
1.5 Size of the project
The proposed project is for manufacturing of 35 MT/Month of Dyes and intermediates. The
total plot area for the project is 3924 sq.m.
Table 1: List of Raw Material Required for Proposed project
Product Name
Name of the Raw Materials
Consumption/Batch (in Kg)
Consumption/ Day (in Kg) Storage Facility
1 N-METHYL-J-ACID
J-Acid 975 325 Bag 2 MMA 495 165 MS Tank 3 Sodium bisulphite 430 143 Bag
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary II
4 Sulfuric Acid 500 167 MS Tank
5 Sodium hydroxide (20%) 250 83 MS Tank
6 HCl 350 117 Syntax 10 KL Tank 7 N-
BENZOYL-J-ACID
J-Acid 700.00 233 Bag 8 Benzoyl Chloride 420.00 140 Drum 9 Sodium Acetate 120.00 40 Bag 10 Sodium bicarbonate 245.00 82 Bag 11 Caustic Lye (30%) 250.00 83 MS Tank 12 Sulfamic Acid 50.00 17 Bag 13 Soda Ash 75.00 25 Bag 14 N-ACETYL-
J-ACID
J-Acid 850 283 Bag
15 Sodium Hydroxide (30%) 150 50 MS Tank
16 Acetic Acid 363 121 Carboys 17 Sodium chloride 120 40 Drum 18 N-PHENYL-
J-ACID
J-Acid 760.00 253 Bag 19 Aniline 300.00 100 Drum 20 Sodium bisulphate 330.00 110 Bag 21 Soda Ash 120.00 40 Bag 22 Sulfuric Acid 300.00 100 MS Tank
1.6 Water Requirement
The total water requirement for the proposed project is 10.33 KLD, out of which industrial use
is 3.41 KLD, domestic purpose 0.45 KLD and for Greenbelt is 6.47 KLD. Water will be sourced
from AKVN supply.
1.7 The waste water generation and management
Waste water generated from domestic use is 0.36 KLD and effluent from process is 0.98 KLD.
Effluent will be treated in ETP followed by RO and MEE. Treated waste water will be used for
gardening purpose. Sewage will be disposed off through Septic tank and soak pit.
1.8 Hazardous & Non-Hazardous Waste Generation & Management
Municipal solid waste will be collected, segregated and handed over to vendors. Hazardous
wastes like drums, ETP sludge etc. will be disposed off to authorized vendors approved by
MPPCB.
1.9 Power requirement
Power requirement for this project will be met from MPPKVV. During operation phase 125 HP
power will be required for various industrial activites. DG set of capacity 125 KVA will be used
as power back.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary III
1.10 Stack details
Table 2: Stack Details
1.11 Manpower Requirements
The manpower requirement for the proposed project will be around 10. Local people will be
given preference.
1.12 Greenbelt Development
Unit has already developed greenbelt area in 1297 Sq m within plant premises. Suitable plant
species of local varieties will be planted with adequate spacing and density for their fast
growth and survival.
1.13 Rain Water Harvesting
Rain Water harvesting is proposed in the project site to conserve the storm water, Rain Water
harvesting structures along the boundary of the project has been proposed. This will result in
saving water.
S.No.
2.0 DESCRIPTION OF THE ENVIRONMENT
2.1 Study area
The baseline quality of various components of the environment, viz. air, noise, water, and
land, biology, meteorological and socio-economic is assessed within the impact zone of
about 10 km around the proposed site. The present report presents the data collected during
the sampling period of three months during Pre monsoon Season from March 2014 to May,
2014. It was observed that Negadi river flows at a distance of 3.95 Km (SSE) from the project
site.
Stack Attached to Type of
Fuel Capacity
Stack
Height (in
Mts)
Fuel
Consumption
APCM
1 IBR Steam Boiler Briquette 1.0 TPH 18.0 800 kg/day -
2 Hot Air Generator
(For Tray Dryers) Briquette 500 Kg/Day 5.0 300 kg/day
-
3 Alkali Scrubber -- 750 m3 15.0 /Hr - -
4 DG Set (Stand By) HSD 125 KVA 10 Diesel Stack height as
per CPCB.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary IV
2.2 Climate of the study area
The climate of the study area varies with hot summer, cold winter and rainfall. Annual
maximum temperature is 32.2 ºC in the month of May and minimum temperature is 11.6 ºC in
the month of January. Maximum Relative humidity of this region is 77% and minimum Relative
humidity is 22 %.
2.3 Seismicity
Study area falls in Zone III in seismic zoning map of India, which is classified as moderate
damage risk zone (Institute of Seismological Research (ISR), Govt. of M.P).
2.4 Air Environment
AAQM was carried out in 7 locations on 24 hourly average basis as per guidelines of CPCB
and NAAQS within 10 km radius of the study area. PM10 was found in the range of 49-66
µg/m3 and PM2.5: 21 - 28 µg/m3. SO2 found in the range of 6.2 to 7.9 µg/m3 and NOx 9.2 to
12.4 µg/m3 and CO: 0.44 to 0.59 mg/m3. Other parameters like VOCs, Heavy metals, Benzene
etc. were found BDL.
2.5 Noise Environment
Noise can be defined as an unwanted sound. A total of 7 locations were identified for
ambient noise monitoring in the study area. The daytime varied from 41.5 dB(A)Leq to 65.4 dB
(A) Leq and night time noise variedof 38.4 dB (A) Leq to 60.8 dB (A) Leq. Both daytime noise
and night time noise was within the limit.
2.6 Water Environment
In order to establish the baseline water quality, 8 ground water and 2 surface water samples
were collected and analyzed in the study area. The analysis result for ground water samples
were within drinking water limit as per IS 10500: 2012. The surface water quality is within class
C as per IS 2296: 1982. Details of analysis result are given in the EIA report.
2.7 Soil Quality
Soil samples were collected from 8 locations in the study area and analyzed for physic
chemical characteristics. Soil quality was found to be normal. Details of analysis result are
given in the EIA report.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary V
2.8 Land Use/Land Cover of the Study Area
Land use pattern of the study area covering 10 km radius includes water bodies, agricultural
land, Fallow land, degraded land, Forest, Degraded forest and Settlements. Details of land
use /land cover classification are given in the EIA report.
2.9 Biological Environment
Biological environment includes flora and fauna including aquatic species found in the study
area of 10 km radius.
Flora: The floral composition of the study area is mostly tropical deciduous type. Species
include trees, shrubs and herbs. Some common trees include Babul, Khair, Haldu, Bel,
Maharukh, Kala-siris, Neem, Mahua, Semal, Salai, Kasai, Palas, Bhirra, Garari etc. Some
common shtrubs are Apamarg, Adusa, Akol, Sitaphal, Khatua etc.
Fauna: Fauna includes mammals, reptiles, and birds. Common mammals found in the study
area are cow, buffaloes, monkey; reptiles include Common garden lizard, Common rat
snake etc. Avifauna includes kite, Sparrow, Rock Pigeon, Crow etc. Details of flora and fauna
found in the study area are given in the EIA report.
2.10 Socio-economic Environment:
Socio-economic data were collected from within 10 km radius of the Project site. These
include 30 villages as per census of India 2011. Total population was 47883, out of which male
population is 24154 and female population is 23729 with Sex ratio is 982.4. The total no. of
household was 8830. The total literate population was 42877, male literacy was 21569 and
female literacy was 21308 and literacy rate was 89.55%. SC population is about 10116 and ST
population 1192. Villages in the study area have good educational facilities, health, transport
and communication, water supply and electricity are collected from the secondary sources.
3.0 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
The potential impacts on different environmental components due to the construction and
operation of the proposed project has been assessed.
3.1 Impact on Air Environment
Ground Level Concentrations (GLC) of PM10, SO2 and NOx due to proposed plant activity
has been studied using ISCST-3 model version ISC v 2.9.222. The incremental value of
pollutants due to proposed project is negligible and air quality parameters will be within the
CPCB limit. Hence no impact on air environment is envisaged. Adequate stack height will be
provided for proper dispersion of pollutants.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary VI
3.2 Impact on Noise Environment
The major source of noise includes various operation machines, pumps, motors, DG sets and
movement vehicles. Noise suppression equipment and baffling will be employed on
ventilating machinery, compressors and generators. Periodic maintenance of machinery will
be undertaken to reduce the noise impact. Noise level will be within 75 dB(A) during
operation phase of the project.
3.3 Impact on Water Environment
Around 0.98 KLD of waste water shall be generated during operation phase, shall be treated
in ETP followed by RO & MEE and ZLD will be achieved. The treated water will be reused.
Sewage will be disposed through septic tank and soak pit. Hence no impact on water
environment is envisaged.
3.4 Impact on Land Environment
The present land use pattern of the project site is industrial. Waste water will be treated and
reused. Hazardous waste will be handed over to authorized vendor. Greenbelt will be
developed around the boundary of project site to attenuate air and noise pollution. Thus
impact on land environment is not envisaged.
3.5 Impact on Biological Environment
Ambient air quality and stack emissions will be maintained within the CPCB limit. Waste water
will be treated and ZLD will be achieved. Hazardous waste will be disposed off to MPPCB
authorized vendors. Hence no impact on flora and fauna is envisaged. Moreover there are
no reserve forest and protected areas within 10 km radius. Greenbelt will be developed
which will serve as ecosystem.
3.6 Impact on Socio-economic Environment
The construction of the proposed project is expected to provide temporary employment to a
good number of skilled and unskilled workers directly and indirectly, thus indirectly
constituting a moderate positive impact. The project will contribute to the socio-economic
development of the area at the local level. Hence the proposed project will have positive
impact on the socio-economic environment.
4.0 ENVIRONMENTAL MONITORING PROGRAM
Environmental Monitoring Network is designed for construction & operation phase of the
project for monitoring of various environmental quality parameters of air, water, noise, soil etc.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary VII
4.1 Implementation Schedule of Monitoring Measures
Monitoring should be done as periodically to understand the environmental condition of the
site. The mitigation measures and EMP suggested in the EIA report should be implemented so
as to reduce the impact on environment due to the operations of the proposed project. The
detailed monitoring programme is given in the EIA report.
I. Environmental management strategies
5.0 ENVIRONMENTAL MANAGEMENT PLAN
Environmental Management is basically resource management and environmental planning
is similar to development planning. An Environmental Management Plan (EMP) is prepared to
mitigate and manage various environmental impacts identified. The EMP presents the
project specific guidelines on:
II. Specialized engineering construction procedures in relation to environmental
guidelines of the country
III. Spill prevention and control
IV. Management of wastes and hazardous chemicals
V. Air, water and soil quality protection
VI. Noise control
VII. Soil erosion control and slope stabilization
VIII. Vegetation, wildlife and habitat protection
IX. Socio-economic and welfare considerations
X. Risk and disaster management plan
XI. To prepare a checklist for statutory compliance
XII. Budget allocation for Environment management Plan
5.1. Environmental Objectives
i. To adopt construction and operational methods that will limit environmental
degradation.
ii. To protect physical environmental components such as air, water and soil.
iii. To conserve terrestrial and aquatic flora and fauna.
iv. To protect historic and cultural sites.
v. To incorporate the views and perceptions of the local inhabitants in the project.
vi. To generate employment opportunities wherever possible and feasible.
vii. To provide environmental guidelines and stipulations to the construction
contractors to minimize the impact of those activities around the proposed site.
viii. To provide advanced sophisticated safety system to ensure safety of the public at
large.
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary VIII
ix. To establish a long term program to monitor effects of the project on the
environment.
School uniforms, notebooks and scholarship will be provided to poor students.
6.0 PROJECT BENEFITS
The operation of the project will have benefits in the physical infrastructure, social
infrastructure, Employment potential in the region. It will create avenues for new
opportunities for employment and can also help diversify the economy.
6.1 Improvement in Social Infrastructure
From the very initial stage of the inception of the project, infrastructure development in and
around the project site has kept in consideration. Infrastructure development will be done
based on actual requirement socio-economic development of the region. The infrastructure
development will be rolled out as part of company’s CSR activity.
6.2 CSR Activities
Special Health awareness camp and medical camps for primary check up will be arranged
at least once in a year in nearby villages for health check-ups.
Roads passing nearby the proposed plant will be maintained.
Funds will be provided to arrange extracurricular activities for nearby school and colleges.
Health camps & medical checkup for villagers.
Blood donation camp.
7.0 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN
Quantitative Risk Study has been done to determine the potential risks of major disasters
having damage potential to life and property and provide a scientific basis using phast
software. Disaster Management Plan is prepared for identification of various hazards
addressed qualitatively and included onsite-and off-site emergency plan. Details of risk
assessment and disaster management plan are given in the EIA report.
8.0 PUBLIC HEARING
As per the EIA notification 2006 and OM dated 16th May 2014, Public Hearing will conducted
by MPPCB for this project. Public views and opinions will be incorporated the Final EIA report.
9.0 CONCLUSION
M/s. Meghnagar Pharamachem Pvt. Ltd.
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. Executive Summary IX
I. The project proponent will follow all the statutory norms and guidelines as per EPA,
1986 to safeguard environment.
II. Wastewater generated from the proposed project will be treated in to ETP followed
by RO and MEE. Zero Liquid Discharge will be achieved.
III. Stack emission will be within the CPCB limit.
IV. Noise shall be within 75 dB (A) in the industrial premises.
V. No impact on flora and fauna has been envisaged. There are no reserve forest and
eco-sensitive zones are present within 10 km radius.
VI. The project will generate employment opportunities during construction stage and
also at operational stage. The standard of living of local people due to employment
is likely to be better. The region will get economic boost.
VII. Overall the project will have positive impact for socio-economic and cultural
development.
I
कायर्कार� सारांश
1.0 प�रयोजना �ववरण
1.1 प�रचय मेघनगर फामार्केम प्रा. �ल�मटेड, गुजरात दादरा एवं नगर हवेल� के कंप�नय� के पंजीयक के साथ 25-10-2011 को पंजीकृत कंपनी है I कंपनी फामार् और रंजक मध्यवत� के �नमार्ण के �ेत्र म� प्रवेश करना चाहता ह ैI इकाई पहले से जमीन का एक भूखंड सं 98 -A, AKVN, औद्यो�गक �ेत्र, मेघनगर, िजला. झाबुआ, मध्यप्रदेश म� अ�धग्रहण कर �लया है I 1.2 प�रयोजना के प्रकार प्रस्ता�वत इकाई �वशेषता रसायन� क� �व�नमार्ण इकाई है जो क� अनुसूची 5 (F) क� श्रेणी के तहत " �संथे�टक काबर्�नक रसायन उद्योग (रंग� और मध्यवत� रंग�, बल्क दवाओं और दवा फामूर्ल� को छोड़कर मध्यवत� , �संथे�टक �घसने , बु�नयाद� काबर्�नक रसायन , अन्य �संथे�टक काबर्�नक रसायन और मध्यवत� रासाय�नक) " ईआईए अ�धसूचना -2006 म� आती है I यह प�रयोजना श्रेणी 'बी' के अंतगर्त आती है I ऊपर , कानूनी पहलू और �नगरानी के काम को देखते हुए ग्रीन सकर्ल इंक, वडोदरा को पयार्वरणीय �वशेषताओं के �लए �नयुक्त�कया गया I 1.3 प�रयोजना का स्थान प्रस्ता�वत प�रयोजना भूखंड. प्लॉट नं. 98A / AKVN औद्यो�गक �ेत्र, S.R. Ferroalloys के पास, मेघनगर, िजला झाबुआ, मध्यप्रदेश म� िस्थत है I 1.4 पूंजी �नवेश प्रस्ता�वत प�रयोजना क� अपे��त लागत आज के तार�ख म� 185.85 लाख रुपये के आसपास होगी I पयार्वरण प्रबंधन सेवा (ईए.म.एस) और प्रदूषण �नयंत्रण के उपाय� ( �नमार्ण और संचालन चरण) के �लए पूंजी लागत अनुमान Rs.58.25 लाख होगा I ईएमएस के �लए वा�षर्क आवत� लागत Rs.19.0 रुपए होगा I 1.5 प�रयोजना का आकार
प्रस्ता�वत प�रयोजना रंग� और मध्यवत� के 35 टन / मह�ना के �नमार्ण के �लए ह ै I प�रयोजना के �लए कुल भूखंड �ेत्र 3924 sq.m. ह ैI �व�नमार्ण �मता और भू�म �ेत्र का �ववरण नीचे ता�लका 1 3म� �दया गया है I
टेबल 1: कच्चे माल और मात्रा के साथ उत्पादन �ववरण
क्र.सं. उत्पाद मात्रा मी�ट्रक टन / मह�ना
कच्चे माल के नाम उपभोग खेप (�क.ग्रा. म�)
उपभोग प्र�त�दन (�क.ग्रा. म�)
भंडारण सु�वधा
1 N-METHYL-J-ACID
20.0 J-Acid 975 325 Bag MMA 495 165 MS Tank Sodium 430 143 Bag
II
क्र.सं. उत्पाद मात्रा मी�ट्रक टन / मह�ना
कच्चे माल के नाम उपभोग खेप (�क.ग्रा. म�)
उपभोग प्र�त�दन (�क.ग्रा. म�)
भंडारण सु�वधा
bisulphite Sulfuric Acid 500 167 MS Tank Sodium hydroxide (20%) 250 83 MS Tank
HCl 350 117 Syntax 10 KL Tank
2
N-BENZOYL-J-ACID
5.0
J-Acid 700.00 233 Bag Benzoyl Chloride 420.00 140 Drum Sodium Acetate 120.00 40 Bag Sodium bicarbonate 245.00 82 Bag
Caustic Lye (30%) 250.00 83 MS Tank
Sulfamic Acid 50.00 17 Bag Soda Ash 75.00 25 Bag
3 N-ACETYL-J-ACID
5.0
J-Acid 850 283 Bag Sodium Hydroxide (30%) 150 50 MS Tank
Acetic Acid 363 121 Carboys Sodium chloride 120 40 Drum
4 N-PHENYL-J-ACID
5.0
J-Acid 760.00 253 Bag Aniline 300.00 100 Drum Sodium bisulphate 330.00 110 Bag
Soda Ash 120.00 40 Bag Sulfuric Acid 300.00 100 MS Tank
1.6 जल आवश्यकता प्रस्ता�वत प�रयोजना के �लए कुल 10.33 KLD पानी क� आवश्यकता ह ैI िजसमे से 3.41 KLD औद्यो�गक उपयोग के �लए, घरेलू उपयोग के �लए 0.45 KLD और ह�रत �ेत्र के �लए 6.47 KLD ह ैI आवश्यक पानी AKVN के द्धारा आपू�तर्त क� जाएगी I 1.7 अप�शष्ट जल उत्पादन और प्रबंधन घरेलू उपयोग से 0.36 KLD और औद्यो�गक उपयोग से 0.98 KLD अप�शष्ट जल उत्पन्न होगा I अप�शष्ट जल का RO और M.E.E. द्धारा ई.ट�.पी. म� इलाज �कया जाएगा और जीरो �लिक्वड �डस्चाजर् हा�सल �कया जाएगा I सीवेज सेिप्टक ट�क के माध्यम से �नपटाए और गड्ढे सोख �कया जाएगा I 1.8 खतरनाक और गैर खतरनाक अप�शष्ट उत्पादन एवं प्रबंधन नगरपा�लका ठोस अप�शष्ट, अलग से एकत्र �कया जायेगा और �वक्रेताओं को स�प �दया जाएगा I खतरनाक कचर े जैस ेड्रम, ईट�पी क�चड़ आ�द MPPCB अनुमो�दत अ�धकृत �वक्रेताओं के द्धारा �नपटारा �कया जाएगा I
III
1.9 �बजल� क� आवश्यकता इस प�रयोजना के �लए �बजल� क� आवश्यकता MPPKVV से आपूर�तत क� जाएगी I आपरेशन चरण के दौरान 125 HP अश्वशिक्त �बजल� �व�भन्न औद्यो�गक ग�त�व�धय� के �लए अवशक्यता होगी I �मता 125KVA DG सेट शिक्त पीठ के रूप म� इस्तेमाल �कया जाएगा I
1.10 �चमनी �ववरण
टेबल 2: �चमनी �ववरण
क्र.सं. �चमनी संलग्न ह ै �मता �चमनी क� ऊंचाई (मीटरम� )
�धन और इसक� आवश्यकता
वायु प्रदूषण �नयंत्रण के उपाय
1. IBR Steam Boiler 1.0 TPH 18.0 Briquette; 800
kg/day -
2. Hot Air Generator (For Tray Dryers) 500 Kg/Day 5.0
Briquette; 300
kg/day -
2. D.G Set (Stand By) 125 KVA 10 डीजल सी.पी.सी.बी के अनुसार ऊंचाई
1.11 जनशिक्त क� आवश्यकता इस प�रयोजना से स्थानीय आबाद� के �लए प्रत्य� / अप्रत्य� रोजगार के अवसर और सहायक व्यवसाय �वकास म� वृ�द्ध होगी I इस प�रयोजना के �लए 10 जनशिक्त क� आवश्यकता होगी I आसपास स्थानीय लोग� को प्राथ�मकता द� जाएगी I
1.12 ह�रत पेट� �वकास इस यू�नट म� पहले से ह� संयंत्र प�रसर के भीतर 1297 वगर् मीटर म� ह�रतपेट� �ेत्र �वक�सत है I स्थानीय �कस्म� के उपयुक्त प्रजा�तय� के पौधे को अपने तेजी से �वकास और अिस्तत्व के �लए पयार्प्त अंतर और घनत्व के साथ लगाया जाएगा I 1.13 वषार् जल संचयन प�रयोजना स्थल म� वषार् जल संचयन संरचनाओं का प्रस्ताव �कया गया है इस पानी क� बचत म� सकारात्मक प�रणाम होगा I
IV
2.0 पयार्वरण का वणर्न
2.1 अध्ययन के �ेत्र म� पयार्वरण क� स्थापना म� शा�मल अध्ययन मौसम �व�ान, वनस्प�त, जीव, भू�म, भू�व�ान, हाइड्रोज्योलोजी और �ेत्र के सामािजक अथर्शास्त्र के संबंध म� स्थल से लगभग 10 �कलोमीटर क� प�र�ध �ेत्र म� �कया गया I इसके अलावा, वायु गुणवत्ता, जल गुणवत्ता, शोर स्तर और �मट्टी क� गुणवत्ता नमूना और �वश्लेषण �कया गया I अध्ययन �ेत्र म� हवा क� गुणवत्ता, पानी क� गुणवत्ता , शोर स्तर और �मट्टी क� गुणवत्ता इस भौ�तक नमूना और �वश्लेषण के आधार पर मूल्यांकन �कया गया है Iबेस लाइन डाटा अध्ययन क� अव�ध माचर् 2014 से मई 2014 के बीच ह� I नेगार� नद� प�रयोजना स्थल से 3.95 �कमी ( हवाई दूर� ) , द��ण द��ण पूवर् म� बहती ह ैऐसा पाया गया I 2.2 अध्ययन �ेत्र क� जलवायु अध्ययन �ेत्र क� जलवायु गमर् गम�, ठंड स�दर्य� और बा�रश के साथ बदलता रहता है I ग�मर्य� के मौसम म� अध्ययन �ेत्र क� जलवायु मध्य माचर् स ेजून के दौरान सूखा और गमर् होता है I बरसात के मौसम (मध्य जून से �सतंबर) के दौरान जलवायु नम और सुखद होता है और �दसंबर से फरवर� तक जलवायु ठंड रहती ह ैI वा�षर्क अ�धकतम तापमान मई म� 32.2 �डग्री सेिल्सयस और न्यूनतम जनवर� म� 11.6 �डग्री सेिल्सयस ह ैतापमान पाया गया. इस �ेत्र क� अ�धकतम आद्रर्ता नमी 77 % ह ैऔर न्यूनतम आद्रर्ता 22 % है I 2.3 भूकंपी अध्ययन के �ेत्र म� मध्यम ��त जो�खम �ेत्र के रूप म� वग�कृत �कया गया है , जो भारत क� भूकंपीय �ेत्रीकरण मान�चत्र म� जोन III म� आता है (भूकंप अनुसंधान संस्थान ( ISR ), भारत सरकार) 2.4 प�रवेश वायु गुणवत्ता प्रस्ता�वत प�रयोजना के 10 �कलोमीटर क� प�र�ध के भीतर 7 चय�नत स्थान� पर प�रवेशी वायु गुणवत्ता क� �नगरानी �कया गया ह ैI प�रवेशी वायु गुणवत्ता का 7 स्थान� पर �नगरानी �कया गया ह ैI a. PM10 क� सांद्रता 49-66 µg/m3 और PM2.5 क� सांद्रता 21-28 µg/m3
b. SO
पाया गया है I
2 क� सांद्रता 5-8 µg/m3 , NOx क� सांद्रता 9-13 µg/m3 और CO क� सांद्रता 0.44 स े0.59 mg/m3
c. सभी मापदंड� क� उपिस्थ�त CPCB सीमा के भीतर पाया गया है I
पाया गया है I
2.5 शोर पयार्वरण
शोर एक अवां�छत ध्व�न के रूप म� प�रभा�षत �कया जा सकता है I शोर का स्तर सात अलग अलग स्थान� पर �दन के समय और रात के समय म� मापा गया ह ै I �दन के समय शोर का स्तर 41.5 dB(A)Leq स े65.4 dB(A)Leq और रात के समय 38.4 dB(A)Leq से60.8 dB(A)Leq पाया गया I शोर का स्तर CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया है I
V
2.6 जल पयार्वरण आधारभूत पानी क� गुणवत्ता, 8 भूजल और 2 सतह के पानी के नमून� क� स्थापना के �लए एकत्र �कए गए थे और अध्ययन के �ेत्र से �वश्लेषण �कया I भूजल के नमून� �वश्लेषण प�रणाम के अनुसार पीने के पानी क� सीमा के भीतर थ े(IS 10500:2012). IS 2296: 1982 के अनुसार सतह पानी क� गुणवत्ता वगर् Cके भीतर ह.ै �वश्लेषण प�रणाम का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I 2.7 �मट्टी क� गुणवत्ता �मट्टी के नमूने अध्ययन के �ेत्र म� 8 स्थान� स ेएकत्र क� है और भौ�तक रासाय�नक गुण� के �लए �वश्लेषण �कया गया I �मट्टी क� गुणवत्ता सामान्य पाया गया ह ैI �वश्लेषण प�रणाम का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I 2.8 भू�म उपयोग / भू�म कवर 10 �कलोमीटर क� प�र�ध को कवर अध्ययन �ेत्र क� भू�म उपयोग पैटनर् जल �नकाय�, कृ�ष भू�म, बंजर भू�म, अपमा�नत भू�म, वन, �वकृत वन और बिस्तय� म� शा�मल ह� I भू�म उपयोग / भू�म कवर वग�करण का �ववरण ईआईए �रपोटर् म� �दए गए ह� I
2.9 जै�वक पयार्वरण जै�वक वातावरण म� 10 �कलोमीटर क� प�र�ध के अध्ययन के �ेत्र म� पाया जल�य प्रजा�तय� स�हत वनस्प�तय� और जीव शा�मल थे I पैड पौधे
: अध्ययन �ेत्र के पुष्प रचना ज्यादातर उष्णक�टबंधीय पणर्पाती प्रकार है. पेड़ , श्रब्स और जड़ी बू�टय� के प्रजा�त शा�मल ह� पेड़ - अपामागर् , अडूसा , अकोल , सीताफल , खटुआ ह� बाबुल , खैर , हल्दु , बेल , माहरुख , काला Siris , नीम , महुआ , बेल , सेमल , महुआ , नीम , बाबुल , खैर , जामुन , आम , इमल� , बबूल आ�द पाए गए ह ैI
जीवजंतु:
जीवजंतु स्तनधार�, सर�सृप , और प��य� म� शा�मल ह�. अध्ययन �ेत्र म� पाया आम स्तनधा�रय� गाय , भ�स , बंदर आ�द ह� ; सर�सृप आ�द आम बगीचा �छपकल� , आम चूहा, सपर् आ�द शा�मल ह� प��य�: पतंग , गौरैया , कबूतर, कौआ आ�द शा�मल ह� I अध्ययन �ेत्र म� पाया वनस्प�त और जीव का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I
2.10 जनसांिख्यक�य और सामािजक आ�थर्क रूपरेखा अध्ययन �ेत्र क� सामािजक, आ�थर्क िस्थ�त भारत क� 2011 जनगणना पर आधा�रत है I ह� क� कुल अध्ययन �ेत्र के 10 �कलोमीटर क� प�र�ध के अंतगर्त 30 गांव सं�म�लत ह ैI अध्ययन �ेत्र क� कुल जनसंख्या 47883, पुरुष आबाद�- 24154 और म�हलाओं क� जनसंख्या अध्ययन �ेत्र म�
23729 है I �लंग अनुपात 1000 पुरुष� पर 982.4 म�हलाओं के आसपास है और घर लगभग 8830 है I अध्ययन �ेत्र म� कुल सा�र जनसंख्या 42,877 और औसत सा�रता दर 89.5 % ह ैI अध्ययन �ेत्र म� अनुसू�चत जा�त क� जनसंख्या 10116 और अनुसू�चत जनजा�त क� जनसंख्या 1192 है I अध्ययन �ेत्र के गांव� म� पीने का पानी, �बजल�, काफ� अच्छा ढांचागत स्वास्थ्य और संचार सु�वधाएं उपलब्ध है I
VI
3.0 प्रत्या�शत पयार्वरणीय प्रभाव और शमन के उपाय
3.1 वायु पयार्वरण पर प्रभाव हवा प्र�तरूपण ISCST3 संस्करण2.9.222 के उपयोग द्धारा �कया गया है I बु�नयाद� स्तर सांद्रता PM10 , SO2 , NOX
क ेसमग्र प�रदृश्य स्तर CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया ह ैI वायु प्रदूषण को �नयं�त्रत करने के �लए पयार्प्त शमन उपाय प्रस्ता�वत �कया जाएगा I इस�लए वायु पयार्वरण पर कोई नकारात्मक प्रभाव प�रकल्पना क� गई ह ैI
3.2 ध्व�न प�रवेश पर प्रभाव प्रमुख शोर स्रोत म� �व�भन्न मशीन, पंप, मोटसर्, डी.जी. सेट और यातायात के वाहन भी शा�मल ह ै I शोर का स्तर आवासीय और औद्यो�गक �ेत्र� के �लए CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया है I मशीनर� के रखरखाव के साथ उपकरण� के प्रच�लत ओढ़ना का प्रयोग अ�नवायर्, बाड़� , बफ़सर् , ह�रत पट्टी �वकास आ�द जैसे शोर दमन के उपाय� का शोर के स्तर को कम करन ेहर संभव प्रयास �कया जायेगा I 3.3 जल पयार्वरण प�रवेश पर प्रभाव घरेलू उपयोग से 0.36 KLD और औद्यो�गक उपयोग स े0.98 KLD अप�शष्ट जल उत्पन्न होगा I अप�शष्ट जल का RO और M.E.E. द्धारा ई.ट�.पी. म� इलाज �कया जाएगा और जीरो �लिक्वड �डस्चाजर् हा�सल �कया जाएगा I सीवेज सेिप्टक ट�क के माध्यम से �नपटाए और गड्ढे सोख �कया जाएगा I पानी पयार्वरण पर कोई प्रभाव नह�ं पाया गया ह ैI 3.4 भू�म पयार्वरण पर प्रभाव प�रयोजना स्थल क� वतर्मान भू�म उपयोग पैटनर् औद्यो�गक है I ह�रत �ेत्र और अन्य प�रदृश्य के �वकास से मौजूदा �ेत्र पर दृश्य स�दयर् म� वृ�द्ध होगी I खुल� भू�म म� ठोस और तरल प्रवाह का कोई मुिक्त नह� ं�कया जायेगा I इस प्रकार कोई प्र�तकूल प्रभाव भू�म पयार्वरण पर प�रकल्पना नह�ं क� गई I 3.5 जै�वक पयार्वरण अजैव कारक प�रवेशी वायु और ताजा पानी क� गुणवत्ता पर व्यावहा�रक रूप से अप्रभा�वत रहेगा I इस प्रकार वनस्प�तय� पर अप्रत्य� प्र�तकूल प्रभाव क� संभावना से इनकार �कया जाता है I इसके अलावा 10 �कलोमीटर क� प�र�ध के भीतर कोई आर��त वन और संर��त �ेत्र नेह� ह� I ग्रीनबेल्ट पा�रिस्थ�तक� तंत्र के रूप म� काम करेगा I
3.6 सामािजक - आ�थर्क प�रवेश
प�रयोजना स्थानीय स्तर पर �ेत्र के सामािजक आ�थर्क �वकास के �लए योगदान देगा I प�रयोजना के संचालन के दौरान स्थानीय आबाद� के �लए प्रत्य� और अप्रत्य� रोजगार I य ेसभी स्थानीय अथर्व्यवस्था के �लए लाभप्रद होगा I �रयोजना स्थानीय स्तर पर �ेत्र के सामािजक आ�थर्क �वकास के �लए योगदान देगा . इस�लए प्रस्ता�वत प�रयोजना सामािजक आ�थर्क वातावरण पर सकारात्मक प्रभाव पड़ेगा I
VII
4.0 पयार्वरण �नगरानी कायर्क्रम
पयार्वरण �नगरानी तंत्र हवा, पानी, शोर, �मट्टी और पा�रिस्थ�तक� आ�द जैसे �व�भन्न पयार्वरणीय मानक� क� �नगरानी के �लए प�रयोजना के संचालन चरण के �लए बनाया गया है I 4.1 लागू �नगरानी उपाय� क� अनुसूची वायु प्रदूषण �नयंत्रण के उपाय� को सीपीसीबी मानदंड� के अनुसार स्था�पत �कया जाएगा I �नमार्ण चरण के दौरान मा�सक �नगरानी �कया जाएगा और आपरेशन चरण के दौरान �तमाह� �नगरानी पयार्वरण एवं वन मंत्रालय के �दशा�नद�श के आधार पर �कया जाएगा I
5.0 पयार्वरण प्रबंधन योजना
प�रयोजना �व�शष्ट पयार्वरण प्रबंधन योजना का �दशा �नद�श प्रस्तुत: पयार्वरण प्रबंधन रणनी�त देश के पयार्वरण के �दशा �नद�श� के संबंध म� इंजी�नय�रंग �नमार्ण प्र�क्रयाओं �वशेष�ता¬ �बखेर रोकथाम और �नयंत्रण कचरे और खतरनाक रसायन का प्रबंधन हवा, पानी और �मट्टी क� गुणवत्ता सुर�ा शोर �नयंत्रण मृदा �रण पर �नयंत्रण और ढलान िस्थर�करण वनस्प�त , वन्य जीवन और वास संर�ण सामािजक, आ�थर्क और कल्याण �वचार जो�खम और आपदा प्रबंधन योजना सां�व�धक अनुपालन के �लए एक सूची तैयार करन ेके �लए बजट आवंटन पयार्वरण प्रबंधन योजना के �लए
5.1 पयार्वरण उद्देश्य�
प�रचालन के तर�क� को अपना कर पयार्वरण �रण को सी�मत कर देना भौ�तक पयार्वरण के घटक� जैसे हवा , पानी और �मट्टी क� र�ा के �लए स्थल�य और जल�य वनस्प�त और जीव संर�ण के �लए ऐ�तहा�सक और सांस्कृ�तक स्थल� क� सुर�ा के �लए प�रयोजना म� स्थानीय �नवा�सय� के �वचार� और धारणाओं को शा�मल करन ेके �लए जहां भी संभव हो और संभव रोजगार के अवसर पैदा करने के �लए पयार्वरण पर इस प�रयोजना के प्रभाव क� �नगरानी के �लए एक द�घर्का�लक कायर्क्रम क� स्थापना
6.0 प�रयोजना के लाभ
औद्यो�गक �ेत्र म� �वकास रोजगार के नए अवसर पैदा करता ह ैऔर अथर्व्यवस्था म� �व�वधता लाने म� मदद कर सकते ह�
VIII
6.1 सामािजक आधा�रक संरचना म� सुधार प�रयोजना स्थल के आसपास बु�नयाद� ढांचे के �वकास को ध्यान म� रखा जायेगा I �ेत्र म� सामािजक आ�थर्क �वकास क� वास्त�वक आवश्यकता के आधार पर बु�नयाद� ढांचे का �वकास �कया जाएगा I बु�नयाद� ढांचे का �वकास कंपनी के सीएसआर ग�त�व�ध के �हस्से के रूप म� शुरू हो जाएगा I 6.2 सीएसआर ग�त�व�धय�
�नमार्ण और संचालन चरण के दौरान आवश्यक श्रम बल पास के गांव से �लया जाएगा I स्कूल क� वद� , नोटबुक और छात्रवृित्त गर�ब छात्र� के �लए उपलब्ध कराया जाएगा I �च�कत्सा �श�वर� म� प्राथ�मक जांच के �लए और स्वास्थ्य चेक अप के �लए आसपास के गांव� म� एक वषर् म� कम
से कम एक बार �वशेष स्वास्थ्य जागरूकता �श�वर आयोिजत �कया जाएगा I प्रस्ता�वत संयंत्र के पास से गुजर रह� सड़क को बनाए रखा जाएगा I पास के स्कूल और कॉलेज� म� पाठयक्रम क� व्यवस्था करने के �लए पूंजी प्रदान �कया जाएगा I
7.0 जो�खम मूल्यांकन और आपदा प्रबंधन योजना
मात्रात्मक जो�खम अध्ययन जीवन और संपित्त को नुकसान �मता वाले प्रमुख आपदाओं के संभा�वत जो�खम का �नधार्रण और फास्ट सॉफ्टवेयर का उपयोग कर एक वै�ा�नक आधार प्रदान करन ेके �लए �कया और अध्याय 6 म� ई.आई.ए �रपोटर् म� शा�मल �कया गया है I आपदा प्रबंधन योजना से �व�भन्न गुणात्मक खतर� को संबो�धत �कया जाता है I और प्रत्य� और परो� आपात योजना शा�मल �कया है I इस ेई.आई.ए. �रपोटर् म� अध्याय 7 म� शा�मल �कया गया है I
8.0 लोक सुनवाई
ई.आई.ए अ�धसूचना 2006 और MoEF OM �दनांक 16 मई 2014 के अनुसार को सावर्ज�नक सुनवाई इस प�रयोजना के �लए MPPCB स ेआयोिजत क� जाएगी I इस प�रयोजना के �लए पयार्वरण और सामािजक आ�थर्क पहलुओं के बारे म� सावर्ज�नक �वचार और राय ई.आई.ए. �रपोटर् म� शा�मल �कया जाएगा I
9.0 �नष्कषर्
प�रयोजना प्रस्तावक EPA , पयार्वरण क� र�ा 1986 के अनुसार सभी वैधा�नक मानदंड� और �दशा �नद�श� का पालन कर�गे I
प्रस्ता�वत प�रयोजना से उत्पन्न अप�शष्ट जल ई.ट�.पी. प�रसर म� प्रदान �कया जाएगा और आरओ और MEE द्धारा इलाज �कया जाएगा I
�चमनी का उत्सजर्न सीपीसीबी सीमा के भीतर होगा I प�रचालन चरण म� शोर 75 डी.बी. (ए) से अ�धक नह�ं होगा I कोई महत्वपूणर् प्रभाव वनस्प�तय� और जीव पर नह�ं पड़ेगा क्यूं�क कोई आर��त वन और पयार्वरण के प्र�त
संवेदनशील �ेत्र 10 �कमी के भीतर मौजूद नह�ं है I प�रयोजना के �नमार्ण चरण के दौरान और प�रचालन स्तर पर रोजगार के अवसर पैदा कर�गे I रोजगार से
स्थानीय लोग� का जीवन स्तर बेहतर होने क� संभावना है I कुल �मलाकर प�रयोजना से सामािजक, आ�थर्क और सांस्कृ�तक �वकास म� सकारात्मक प्रभाव पड़ेगा I
M/s. Meghnagar Pharamachem Pvt. Ltd.
EIA Report for Proposed Manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. CHAPTER 1: INTRODUCTION 1.1
CHAPTER 1 INTRODUCTION
1.0 INTRODUCTION
The Meghnagar Pharmachem Pvt. Ltd. is company registered with registrar of Companies,
Gujarat Dadra & Nagar Haveli as on 25-10-2011. The company wants to enter in the field of
manufacturing of Pharma and Dyes intermediate. The unit has already acquired a plot of land at plot No 98-A, AKVN, Industrial area, Meghnagar, Dist. Jhabua, Madhya Pradesh.
1.1 PROJECT PROPONENT & THEIR BACKGROUND
Proposed unit has been promoted by Mr. Ajitsinh. S. Rathod (Promoter & Director) of the
company. Mr. Ajitsinh S. Rathod, aged 46 years, is a Science Graduate with Chemistry and
possesses 10 year of experience in Chemical Industry. This Company has been established since
1July 2012, Mr. Ajitsinh & Sanjay P. Patel has taken over it and managing the entire affairs of the
company. Another company M/s Gangotri farm & Nursary situated at Nandesari is family
concern of Mr. Ajitsinh and Sanjaybhai. This Company has been manufacturing specialized
Dyes and Intermediates and promoters wish to diversify in his activities based on his experience
in Chemical Industries. Further his education will also help him in future development.
1.2 PROJECT AND ITS IMPORTANCE TO THE COUNTRY
This unit is doing development, manufacturing and marketing of Dyes & Pharma Intermediate.
The products are used for reactive and synthetic dyes like Orange M2R, Orange H2R, Orange
HE4G and Black HFGR. There are number of small manufacturers in unorganized sector of this
segment. However, the development and manufacturing of good quality dye is limited to only
organize sector where only few well know companies exist. Company has developed formula
for Dyes & Intermediate, Which has already established in the market. There is regular use of the
products and has demand in local market.
The firm has designed a ‘Market Penetration’ strategy and it is being implemented in four state
viz. Gujarat, Rajasthan, and Maharashtra, Distribution network is already set-up of the unit taken
over. Thus, any further penetration in these states will lead to the increase in demand. This is
main rationale behind the marketing strategy. This will meet the local demand and generate
employment.
1.3 PURPOSE AND NEED OF EIA
The EIA is anticipated to make available for the protection, conservation and wise
management of environment through planning and informed decision making. Environmental
Impact Assessment (EIA) is requisite to be carried out only for those categories of projects that
M/s. Meghnagar Pharamachem Pvt. Ltd.
EIA Report for Proposed Manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. CHAPTER 1: INTRODUCTION 1.2
are covered under EIA notification, 2006 (amended time to time) and the criteria for screening
have been provided in the notification. Thus, EIA is fundamentally made applicable to industrial
and developmental projects, which are more likely to have significant environmental impacts.
M/s. Meghnagar Pharmachem Pvt. Ltd. falls under schedule 5(f) - Synthetic Organic Chemicals.
Hence the proposed project requires Environmental Clearance from SEIAA, Govt. of Madhya
Pradesh as per capacity defined for Category ‘B’. Since SEAC/SEIAA committee was not formed
at the time of EC application, the application was submitted at MoEF for approval of Terms of
Reference (ToR). According received ToR from MoEF and prepared EIA report complying all the
ToR points.
EIA Consultant
In view of the above, legal aspect and monitoring work has been carried out for all the
environmental attributes by Green circle Inc. Vadodara.
The draft Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP)
has been prepared based on approved Terms of References (ToRs) by MoEF.
1.4 BRIEF DESCRIPTION OF PROJECT
1.4.1 Location of the Project
The Proposed project is located at plot no. Plot no. 98/AKVN Industrial Estate, Near S.R.
Ferroalloys, Meghnagar, Dist. Jhabua, Madhya Pradesh.
1.4.2 Size of the project
The proposed project is for manufacturing of 35 MT/Month of Dyes and intermediates. The total
plot area for the project is 3924 sq.m.
1.5 STATEMENT OF PRINCIPLES
The EIA is intended to provide for the protection, conservation and wise management of
environment through planning and informed decision making.
Following are the guiding principles:
To help decision-makers to protect, conserve and manage environment according to
the principles of sustainable development, thereby achieving or monitoring human well
being, a healthy environment and a sound economy.
To ensure that the industries consider the effect on the health, economy and culture of
the surrounding communities as well as its impacts on the air, land and water.
To ensure communication of information to Public.
M/s. Meghnagar Pharamachem Pvt. Ltd.
EIA Report for Proposed Manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. CHAPTER 1: INTRODUCTION 1.3
1.6 FRAMEWORK OF ASSESSMENT
Based on the scope of work and general guidelines, study area of 10 km around the site has
been taken as the spatial frame for the impact assessment. Temporal frame of assessment has
been chosen to reflect the impacts in two distinct phases of the project namely:
Construction phase
Operation phase
1.7 SCOPE OF THE STUDY
EIA study involves three basic components, viz. identification, prediction and evaluation of
impacts. The scope of the EIA study incorporating the ToR obtained from the SEAC; Government
of Madhya Pradesh is as under:
An intensive reconnaissance and preliminary collection of environmental information to
plan field study.
Field studies to collect preliminary information, particularly on the quality of the physical
environment. Experienced scientists and engineers will collect the data.
Base line data generation and characterization of air, water, soil, noise and vegetation
in the ten kilometer radius area (impact zone) over a period of Three months.
A thorough study of the process including provisions for pollution control, and
environmental management that includes prediction of impacts and relevant
mathematical modeling.
Preparation of Environmental monitoring program.
Preparation of Environmental Management plan suggesting suitable methods for
mitigating and controlling the pollution levels. Environmental monitoring plan is
suggested for monitoring the pollution loads at various facilities in the premises and to
ensure compliance with the statutory requirements
1.8 OBJECTIVES OF THE STUDY
The EIA study shall be aimed to cover the following aspects:
To study Baseline environmental conditions of the study area for air, water, soil, noise,
meteorology.
Evaluation of present environmental status through analysis of generated and collected
baseline data for post-monsoon season.
Assess the probable impact on the environmental factors due to implementation of the
project with respect to the existing scenario.
Analyze the predicted impact with respect to the regulatory environmental standards.
M/s. Meghnagar Pharamachem Pvt. Ltd.
EIA Report for Proposed Manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. CHAPTER 1: INTRODUCTION 1.4
Develop an Environmental Management Plan and Disaster Management Plan for the
proposed project to mitigate the negative significant impacts that would arise from the
proposed project.
Obtain necessary clearance from the regulatory authorities.
1.9 METHODOLOGY ADOPTED FOR ENVIRONMENTAL IMPACT ASSESSMENT
The scope of the study would include a detailed characteristic of environment in the study area
associated with the development of Special Economic Zone for various environmental
components. For the purpose of environmental assessment, areas within 10 km radius of the
project have been studied and the following methodology will be adopted. Monitoring and
analysis done as per CPCB /APHA /MPCB guidelines /relevant I
Figure 1.1: Flow Chart of Methodology of EIA
PROJECT INITIATION
PRELIMINARY SCAN OF EXISTING ENVIRONMENT
PRELIMINARY SCAN OF PROPOSED PROJECT
SELECT ENVIRONMENTAL INDICATORS
DESCRIBE ENVIRONMENTAL SETTING
IMPACT EVALUATION (MODELLING)
ENVIRONMENTAL IMPACT ASSESSMENT
ENVIRONMENTAL MANAGEMENT PLAN
FIELD SURVEYS AND SAMPLING
PRELIMINARY SCAN OF EXISTING ENVIRONMENT
M/s. Meghnagar Pharamachem Pvt. Ltd.
EIA Report for Proposed Manufacturing of Dyes & Intermediates
Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00
Green Circle Inc. CHAPTER 1: INTRODUCTION 1.5
1.10 APPLICABLE ENVIRONMENTAL REGULATORY FRAMEWORK
The proposed project will abide and function under the purview of the following Rules, Acts &
Regulations which are formulated by the government by govt. of India to protect the
environment and development in a sustainable way.
• The Water (prevention & Control of Pollution) Act, 1974
• The Water (Prevention & Control of Pollution) Cess, Act, 1977
• The Air (Prevention & Control of Pollution) Act, 1981
• The Environmental (Protection) Act, 1986
• Environmental Impact Assessment Notification dated 14th September 2006 and
subsequent amendments.
• The Hazardous Waste (Management, Handling and Transboundary Movement) Rules,
2008.
• The MSIHC (Manufacture, Storage and Import of Hazardous Chemicals) rules 1989 and
amendment in 2000
• Chemical Accident (Emergency Planning, Preparedness and Response) Rules, 1996
• Noise Pollution (Regulation and Control) Rules, 2000 and its amendments
• The public Liability Insurance Act, 1991
• The Batteries (Management and Handling) Rules 2001 and amendment in 2010
Accordingly, the project has to comply with the following requirements for establishing the
industry.
i) Environmental Clearance from SEIAA, Madhya Pradesh as per EIA notification 2006. ii) Comply with MPCB / CPCB guidelines for establishing and operating the project.
1.12 STRUCTURE OF THE REPORT
This EIA report has been prepared on the basis of available on-site primary data
(survey/monitoring) and secondary/literature data. The structure of the EIA Report with
necessary tables, drawings a