Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00 ENVIRONMENTAL IMPACT ASSESSMENT REPORT For Proposed Project “MANUFACTURING OF DYES AND INTERMEDIATES” (Total Qty: 35 MT/Month) Prepared For M/s. MEGHNAGAR PHARMACHEM PVT. LTD. Plot No 98-A, AKVN Industrial area, Meghnagar, Dist. Jhabua, Madhya Pradesh. Conducted & Prepared By GREEN CIRCLE, INC. Integrated HSEQR Consulting Engineers, Scientists & Trainers (MoEF Recognized Environment Laboratory) (An ISO: 9001, 14001, NABL/17025:2005 OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II) Gujarat High court stay order for QCI NABET No. C/SCA/10311/2012 dated 04.02.2014) Corp. Office & Environmental Research Laboratory Green Empire (Anupushpam), Above Axis Bank, Nr. Yash Complex, Gotri Road, Vadodara-390 021 (Gujarat) India |Tel: 0265-2371269 www.greencircleinc.com E: [email protected] ALSO AT BENGALURU RUDRAPUR NEW DELHI HYDERABAD PUNE RAIPUR KOLKATA GOA OVERSEAS AUSTRALIA OMAN KUWAIT AFRICA VIETNAM
Transcript
  • Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    EENNVVIIRROONNMMEENNTTAALL IIMMPPAACCTT AASSSSEESSSSMMEENNTT RREEPPOORRTT

    FFoorr

    PPrrooppoosseedd PPrroojjeecctt

    ““MMAANNUUFFAACCTTUURRIINNGG OOFF DDYYEESS AANNDD IINNTTEERRMMEEDDIIAATTEESS”” ((TToottaall QQttyy:: 3355 MMTT//MMoonntthh))

    Prepared For

    M/s. MEGHNAGAR PHARMACHEM PVT. LTD. Plot No 98-A, AKVN Industrial area, Meghnagar,

    Dist. Jhabua, Madhya Pradesh.

    Conducted & Prepared By

    GREEN CIRCLE, INC.

    Integrated HSEQR Consulting Engineers, Scientists & Trainers (MoEF Recognized Environment Laboratory)

    (An ISO: 9001, 14001, NABL/17025:2005 OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II)

    Gujarat High court stay order for QCI NABET No. C/SCA/10311/2012 dated 04.02.2014)

    Corp. Office & Environmental Research Laboratory

    Green Empire (Anupushpam), Above Axis Bank, Nr. Yash Complex, Gotri Road, Vadodara-390 021 (Gujarat) India |Tel: 0265-2371269

    www.greencircleinc.com E: [email protected]

    ALSO AT

    BENGALURU RUDRAPUR NEW DELHI HYDERABAD PUNE RAIPUR KOLKATA GOA

    OVERSEAS

    AUSTRALIA OMAN KUWAIT AFRICA VIETNAM

    http://www.greencircleinc.com/�

  • C/SCA/10311/2012 ORDER

    IN THE HIGH COURT OF GUJARAT AT AHMEDABAD

    SPECIAL CIVIL APPLICATION NO. 10311 of 2012

    With

    SPECIAL CIVIL APPLICATION NO. 4979 of 2012

    With

    SPECIAL CIVIL APPLICATION NO. 4974 of 2012

    With

    SPECIAL CIVIL APPLICATION NO. 9680 of 2013

    With

    SPECIAL CIVIL APPLICATION NO. 9679 of 2013

    With

    SPECIAL CIVIL APPLICATION NO. 1782 of 2013

    With

    SPECIAL CIVIL APPLICATION NO. 12466 of 2013================================================================

    C B UPASANI JYOTI OM CHEMICAL RESEARCH & 7....Petitioner(s)

    Versus

    UNION OF INDIA THRO SECRETARY & 1....Respondent(s)================================================================

    Appearance:

    DELETED for the Petitioner(s) No. 6

    MR NILESH P SHAH, ADVOCATE for the Petitioner(s) No. 1 - 8

    MS DHARA H ASLOT, ADVOCATE for the Petitioner(s) No. 1 - 8

    MR ANSHIN H DESAI, ADVOCATE for the Respondent(s) No. 1

    MR IH SYED, ADVOCATE for the Respondent(s) No. 1 - 2================================================================

    CORAM: HONOURABLE THE CHIEF JUSTICE MR. BHASKAR BHATTACHARYAandHONOURABLE MR.JUSTICE J.B.PARDIWALA

    Date : 04/02/2014

    COMMON ORAL ORDER

    (PER : HONOURABLE THE CHIEF JUSTICE MR. BHASKAR

    BHATTACHARYA)

    Page 1 of 2

  • C/SCA/10311/2012 ORDER

    As prayed for by Mr Desai, let the matters appear on 20th

    February 2014 after fresh matters to enable his client to file

    appropriate affidavit showing that Dr Rastogi has been vested with

    the appropriate authority in terms of the Environment (Protection)

    Act, 1986 to issue the Office Memorandum impugned in these

    applications. Interim relief granted earlier will continue till further

    orders.

    (BHASKAR BHATTACHARYA, CJ.)

    (J.B.PARDIWALA, J.) zgs

    Page 2 of 2

  • GREEN CIRCLE, INC.

    Integrated HSEQR Consulting Engineers, Scientists & Trainers

    (MoEF Recognized Environment Laboratory)

    (An ISO: 9001, 14001, OHSAS: 18001 Certified Organization & GPCB approved Environment Auditor – Schedule II)

    Gujarat High court stay order for QCI NABET No. C/SCA/10311/2012 dated 24.01.2013

    EEEIIIAAA CCCEEERRRTTTIIIFFFIIICCCAAATTTEEE

    This is to certify that M/s. Green Circle, Inc. Vadodara has conducted EIA

    study for “Proposed Manufacturing Of Dyes And Intermediates” (Total Qty:

    35 MT/Month) at Plot No 98-A, AKVN Industrial area, Meghnagar,

    Dist. Jhabua, Madhya Pradesh, India by M/s. Meghnagar Pharmachem Pvt.

    Ltd. for the period of March 2014 to May 2014.

    For: Green Circle Inc.

    ((PPrraaddeeeepp JJoosshhii)) Group President & CEO

    www.greencircleinc.com E: [email protected]

    http://www.greencircleinc.com/mailto:[email protected]

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    EIA Report for Proposed manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    QUALITY CONTROL SHEET

    Rev.

    No. Date Reason History

    Prepared

    &

    compiled

    By

    Reviewed

    By

    Approved

    by

    Validated

    by

    00 06/10/2014 EIA Report VB, NT, SP RK, NM PJ PJ

    PJ : Pradeep Joshi

    RK : Ranjit Kalita

    VB : Vikash Bhagat

    NT : Nidhi Trivedi

    SP : Stuti Patel

    NM : Nikunj Makwana

    Compiled &

    Prepared by Vikash Bhagat Nidhi Trivedi Stuti Patel

    Signature

    Reviewed by Ranjit Kalita, Deputy Manager-

    EIA & EE

    Nikunj Makawana, Executive

    EIA & EE

    Signature & Date

    Approved by Pradeep Joshi, Group President & CEO

    Signature & Date

    Released by Nachiket Joshi, Senior Group Manager - Accounts & Finance

    Signature & Date

    Project Team

    S. No. Name

    1 Dr. Sandeep Sohani

    2 Mr. Shailendra Singh

    3 Ms. Ragav Soni

    4 Mr. Bharat Patel

    5 Sudhakar Kute

    6 Satyavan

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    EIA Report for Proposed manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    ACKNOWLEDGEMENT

    WE EXPRESS OUR SINCERE THANKS TO MANAGEMENT & EMPLOYEES OF M/s.

    MEGHNAGAR PHARMACHEM PVT. LTD., Plot No 98-A, AKVN Industrial area,

    Meghnagar, Dist. Jhabua, Madhya Pradesh, INDIA FOR THEIR CO-OPERATION &

    UNSTINTED HELP WITHOUT WHICH THE EIA REPORT FOR “PROPOSED MANUFACTURING

    OF DYES AND INTERMEDIATES” (Total Qty: 35 MT/Month) COULD NOT HAVE BEEN

    POSSIBLE. THE COURTESY EXTENDED TO OUR TEAM IS HIGHLY APPRECIATED.

    DISCLAIMER

    The consulting services conducted by Green Circle, Inc.(the “Company”) were performed

    using generally accepted guidelines, standards, and/or practices, which the Company

    considers reliable. Although the Company performed its consulting services pursuant to

    reliable and generally accepted practices in the industry, the Company does not guarantee

    or provide any representations or warranties with respect to Client’s use, interpretation or

    application of the findings, conclusions, and/or suggestions of the consulting services

    provided by the Company. Moreover, the findings, conclusions, and the suggestions

    resulting from the consulting service are based upon certain assumptions, information,

    documents, and procedures provided by the Customer. AS SUCH, IN NO EVENT AND UNDER

    NO CIRCUMSTANCE SHALL THE COMPANY BE LIABLE FOR SPECIAL, INDIRECT, PUNITIVE OR

    CONSEQUENTIAL DAMAGES OF ANY NATURE WHATSOEVER, INCLUDING WITHOUT LIMITATION,

    ANY LOST REVENUE OR PROFITS OF THE CUSTOMER OR ITS CUSTOMERS, AGENTS AND

    DISTRIBUTORS, RESULTING FROM, ARISING OUT OF OR IN CONNECTION WITH, THE SERVICES

    PROVIDED BY THE COMPANY. The Customer agrees that the Company shall have no liability

    for damages, which may result from Client’s use, interpretation or application of the

    consulting services provided by the Company. Client’s logo has been used for report

    purpose only.

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    EIA Report for Proposed manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    ABBREVIATIONS

    AAQM : Ambient Air Quality Monitoring

    BOD : Biochemical Oxygen Demand

    COD : Chemical Oxygen Demand

    CPCB : Central Pollution Control Board

    DMP : Disaster Management Plan

    EIA : Environmental Impact Assessment

    EMP : Environmental Management Plan

    ETP : Effluent Treatment Plan

    IMD : Indian Meteorological Department

    KVA : Kilo Volt Ampere

    KLD : Kilo Litre per day

    MoEF : Ministry of Environment & Forest

    PM : Particulate Matter

    PPE : Personal Protective Equipment

    STP : Sewage Treatment Plant

    TDS : Total Dissolved Solids

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS i

    TABLE OF CONTENTS

    Para No. Title Page No.

    Table of contents i-ix

    Executive Summary (English) i-ix

    Executive Summary (Hindi) i-viii

    Chapter-I: Introduction

    1.0 Introduction 1.1

    1.1 Project proponent & their background 1.1

    1.2 Project and its importance to the country 1.1

    1.3 Purpose and need of EIA 11

    1.4 Brief Description of the project 1.2

    1.5 Statement of principle 1.2

    1.6 Framework of assessment 1.3

    1.7 Scope of the work 1.3

    1.8 Objectives of the study 1.3

    1.9 Methodology adopted for Environmental Impact Assessment 1.4

    1.10 Applicable Environmental Regulatory Framework 1.5

    1.11 Structure of the report 1.5

    Chapter-2: Project Description

    2.0 Introduction 2.1

    2.1 Type of Project 2.1

    2.2 Capital Investment 2.1

    2.3 Need of Project 2.1

    2.4 Project Justification 2.2

    2.5 Location of Project Site 2.2

    2.6 Land Requirement Details 2.5

    2.7 Raw Material Requirement 2.7

    2.8 Product Details 2.8

    2.9 Manufacturing Process 2.8

    2.10 Utilities & Requirements 2.20

    2.11 Green Belt Development 2.26

    2.12 Rain Water Harvesting 2.26

    2.13 Pollution Control Measures 2.27

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS ii

    Chapter-3: Baseline Environment

    3.0 Introduction 3.1

    3.1 Environmental Setting Of Study Area 3.3

    3.2 Methodology 3.4

    3.3 Hydro-Geology of The Study Area 3.5

    3.4 Climate of The Region 3.5

    3.5 Site Specific Micro Meteorological Data 3.6

    3.6 Air Environment 3.9

    3.7 Noise Environment 3.17

    3.8 Water Environment 3.21

    3.9 Land Environment 3.27

    3.10 Biological Environment 3.31

    3.11 Socio-Economic Profile Of Study Area (As Per Census India 2011) 3.35

    3.12 Traffic Survey 3.43

    Chapter-4: Anticipated Environmental Impacts & Mitigation Measures

    4.0 Prelude 4.1

    4.1 Identification Of Impacts 4.2

    4.2 Impact on Ambient Air Environment 4.2

    4.3 Impacts on Noise Environment 4.10

    4.4 Impacts on Water quality 4.12

    4.5 Impacts Due to Wastewater Generation 4.14

    4.6 Impacts on Land Environment 4.14

    4.7 Impact Due to solid waste 4.15

    4.8 Impact on Terrestrial Ecology 4.16

    4.9 Impacts on Socio – Economic Environment 4.17

    4.10 Impact Resources 4.19

    4.11 Impact Due to Rainfall & Soil Erosion 4.20

    4.12 Impact Due to Increase in Traffic Density 4.20

    4.13 Overall Impact Analysis 4.21

    4.14 Potential Environmental impact Matrix 4.21

    Chapter-5: Environmental Monitoring Plan

    5.0 Introduction 5.1

    5.1 Objectives of Environmental Management Plan 5.1

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS iii

    5.2 Implementation schedule of monitoring measures 5.1

    5.3 Environmental Monitoring 5.2

    5.4 Cost Provision for Environmental Measures 5.4

    Chapter-6: Quantitative risk assessment

    6.0 Introduction 6.1

    6.1 Scope of study 6.1

    6.2 System Description 6.1

    6.3 Methodology Adopted for QRA 6.7

    6.4 Meteorological Condition 6.9

    6.5 Hazards & Damage Criteria of Materials 6.10

    6.6 Consequence Analysis 6.16

    6.7 List & Details of Material 6.18

    6.8 QRA Result 6.22

    Chapter 7: Disaster Management plan

    7.0 Objective 7.1

    7.1 Definition and Scope 7.2

    7.2 Methodology 7.2

    7.3 Introduction 7.3

    7.4 Details about Site 7.4

    7.5 Plant Layout Details 7.4

    7.6 Emergency Organization 7.4

    7.7 Role Of Key Personnel 7.5

    7.8 Outside Help 7.11

    7.9 Information on Risk Evaluation Preliminary Hazard Analysis 7.11

    7.10 Hazards/Foreseeable Scenarios 7.12

    7.11 Power Supply Interruption 7.15

    7.12 Hazard Identification and Risk Summary 7.15

    7.13 Safety and Mitigating Measures 7.16

    7.14 Other Areas of Hazards and Control 7.16

    7.15 Hazard Control and Emergency Shut-Down 7.19

    7.16 Emergency Lighting and Power Supply, Isolation Map 7.20

    7.17 Alarm and Communication 7.20

    7.18 Emergency Control Centre (ECC) 7.22

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS iv

    7.19 Plant Assembly Points 7.22

    7.20 Transport and Evacuation 7.25

    7.21 Training and Rehearsing 7.25

    7.22 Accounting for Personel 7.26

    7.23 Public Relations 7.26

    7.24 Medical Services and First Aid 7.26

    7.25 Declaration of Cessation of Emergency 7.27

    7.26 Post Emergency Planning 7.27

    7.27 Plan Appraisal and Updating 7.27

    7.28 Alarm and Declaring Major Emergency 7.28

    7.29 Evacuation Plan 7.28

    7.30 Traffic Control 7.28

    7.31 Procedures for Implementing Plant Modifications 7.28

    7.32 Health, Safety and Environmental Protection 7.30

    7.33 Social Impact Assessment 7.31

    7.34 Details of Occupational Health Programme 7.33

    7.35 List of Annexure 7.54

    Chapter-8: Environmental Management Plan

    8.0 Introduction 8.1

    8.1 Environment, Health, Safety (EHS) 8.1

    8.2 Environment Management Plan 8.1

    8.3 Environmental Objectives 8.2

    8.4 Implementation 8.3

    8.5 Environmental Management cell 8.4

    8.6 EMP for construction phase 8.6

    8.7 Completion of construction activity- Restoration 8.12

    8.8 EMP for operational phase 8.12

    8.9 Additional Mitigation Measures 8.18

    8.10 Summary of Environment Management Plan and action 8.24

    8.11 Findings 8.30

    8.12 Conclusion 8.30

    Chapter-9: Project Benefits

    9.0 Introduction 9.1

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS v

    9.1 Improvement in the social infrastructure 9.1

    9.2 Economic Development 9.2

    9.3 Employment Potential 9.2

    Chapter-10: Conclusion

    Chapter-11: Disclosure of the consultant

    11.0 General Information 11.1

    11.1 Vision 11.1

    11.2 Mission 11.1

    11.3 Approvals & Accreditations 11.1

    11.4 Activities 11.2

    11.5 EIA Team 11.3

    Chapter-12: ToR Compliance 12.1-12.5

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS vi

    LIST OF TABLES

    TABLE

    NO. TITLE

    PAGE

    NO.

    2.1 Cost Breakup Details 2.1

    2.2 Environment Setting for Proposed Project 2.2

    2.3 Details of Land use Break-up 2.5

    2.4 List of Raw Material Required for Proposed project 2.7

    2.5 Production Detail 2.8

    2.6 Water Consumption and Waste water generation Details 2.20

    2.7 Waste Water Characteristics 2.23

    2.8 Details of Power Consumption 2.24

    2.9 Fuel requirement details 2.24

    2.10 Employment Details 2.25

    2.11 Hazardous waste Management 2.26

    2.12 Annual Runoff 2.27

    3.1 Salient Features of the Project Site 3.3

    3.2 Environmental Attributes & Frequency of Monitoring 3.4

    3.3 Climatology of Dahod July 2013-June 2014 3.6

    3.4 Site specific climatic conditions 3.7

    3.5 Ambient Air Quality Monitoring Location Details 3.9

    3.6 Ambient Air Quality Monitoring For PM10 at Various Site Locations 3.11

    3.7 Ambient Air Quality Monitoring For PM2.5 at Various Site Locations 3.12

    3.8 Ambient Air Quality Monitoring for SO2 at Various Site Locations 3.13

    3.9 Ambient Air Quality Monitoring For NOx at Various Site Locations 3.14

    3.10 Ambient Air Quality Monitoring For CO at Various Site Locations 3.15

    3.11 Ambient Air Quality Monitoring For Ozone, Ammonia, Lead, Arsenic,

    Benzene, Nickel, & Benzopyrene at Various Site Locations 3.16

    3.12 National Ambient Air Quality Standards and Methods of Measurement 3.16

    3.13 Details of Noise Monitoring Locations 3.18

    3.14 Status of Noise within the study area 3.19

    3.15 Applicable Noise Standards 3.19

    3.16 Water sampling locations in the study area 3.22

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS vii

    3.17 A Analysis Result of Ground Water Samples 3.23

    3.17 B Analysis Result of Surface Water Samples 3.25

    3.18 Land use classification 3.29

    3.19 Details of Soil Sampling Locations 3.30

    3.20 Analysis result of soil samples 3.31

    3.21 List of Flora in the Study Area 3.32

    3.22 List of Mammals in the study area 3.34

    3.23 List of Reptiles in the study area 3.34

    3.24 Avifauna in the study area 3.34

    3.25 List of villages present in the study area 3.36

    3.26 Demographic Details 3.37

    3.27 Literacy Rate 3.38

    3.28 Social Structure 3.39

    3.29 Occupational pattern of the Villages in the Study area 3.40

    3.30 Traffic Survey conducted on Two Lane Road: SH 39 3.43

    3.31 Level of Service 3.45

    3.32 Traffic Survey conducted on Two Lane Road: SH 39 3.45

    4.1 Ground level Concentration of PM in µg/m3 4.5

    4.2 Ground level Concentration of SO2 in µg/m3 4.7

    4.3 Ground level Concentration of NOX in µg/m3 4.8

    4.4 Increase in Noise Levels during construction phase due to operation of

    construction Equipments 4.10

    4.5 Potential Environmental Impact Matrix 4.23

    5.1 Implementation Pollution Control Measures 5.2

    5.2 Environmental Monitoring Plan 5.3

    5.3 Budget Allocation for Environmental Management 5.5

    6.1 Hazard Identification 6.2

    6.2 Risk Rating 6.4

    6.3 Fatal Radiation Exposure Level 6.14

    6.4 Overpressure Damage Criteria 6.15

    8.1 Action plan for proposed trees in tree plantation area 8.22

    8.2 Environnemental Management Plan Matrix 8.25

    11.1 EIA team members 11.3

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS viii

    LIST OF FIGURES

    FIGURE

    NO. TITLE

    PAGE

    NO.

    1.1 Flow Chart of Methodology of EIA 1.4

    2.1 Location Map of Project Site 2.4

    2.2 Google Map of Project Site 2.5

    2.3 Plant Layout of proposed Site 2.6

    3.1 Study Area of 5 & 10 km Radius 3.2

    3.2 Google image showing Vicinity map of Project site 3.2

    3.3 Windrose diagram of the study area 3.8

    3.4 Map Showing Air Monitoring Locations 3.10

    3.5 Graphical representation of PM10 concentration at different locations 3.11

    3.6 PM2.5 concentration at different Site Locations 3.12

    3.7 SO2 concentration at different Site Location 3.13

    3.8 NOx concentration at different Site Locations 3.14

    3.9 CO concentration at different Site Locations 3.15

    3.10 Image showing Noise Monitoring Location 3.18

    3.11 Graphical Representation of Day time Noise Level in the study area 3.20

    3.12 Graphical Representation of Night time Noise Level in the study area 3.20

    3.13 Image showing Surface & Ground Water Sampling Locations 3.22

    3.14 Land use/Land cover Map of the study area 3.27

    3.15 Image Showing Soil sampling locations 3.30

    3.16 List of villages within 10 km radius 3.36

    3.17 Population of the study area 3.41

    3.18 Social Profile of the study area 3.41

    3.19 Population Literacy of the study area 3.42

    3.20 Occupational pattern of the study area 3.42

    3.21 Graph of Vehicular concentration at Peak hour & Lean hour for SH 39

    Ratlam to Jhabua (A to B) 3.44

    3.22 Graph of Vehicular concentration at Peak hour & Lean hour for SH-39

    Jhabua to Ratlam (BtoA) 3.46

    4.1 Ground Level Concentration of PM 4.6

  • M/s. Meghnagar Pharama Chem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. TABLE OF CONTENTS ix

    4.2 Ground Level Concentration of SO2 4.8

    4.3 Ground Level Concentration of NOx 4.9

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary I

    EXECUTIVE SUMMARY

    S. No.

    1.0 PROJECT DESCRIPTION

    1.1 Introduction

    The Meghnagar Pharmachem Pvt. Ltd. is company registered with registrar of Companies,

    Gujarat Dadra & Nagar Haveli as on 25-10-2011. The company wants to enter in the field of

    manufacturing of Dyes intermediate. The unit has already acquired a plot of land at plot No

    98-A, AKVN, Industrial area, Meghnagar, Dist. Jhabua, Madhya Pradesh.

    1.2 Type of Project

    The proposed unit is speciality chemicals manufacturing unit covered under the category of

    5(f) in schedule “Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs

    and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals,

    other synthetic organic chemicals and chemical intermediates)” of EIA Notification-2006. This

    project falls under category ‘B’. In view of the above, legal aspect and monitoring work has

    been carried out for all the environmental attributes by Green circle Inc. Vadodara.

    1.3 Location of the Project

    The Proposed project is located at plot no. Plot no. 98/AKVN Industrial Estate, Near S.R.

    Ferroalloys, Meghnagar Dist. Jhabua, Madhya Pradesh. The coordinates of project site is 22°

    54.83’N & 74° 33.582’E.

    1.4 Capital Investment

    The expected cost of the proposed project will be around Rs.185.85 Lakhs as on date. The

    capital cost for Environmental management services (EMS) and Pollution control measures

    (construction and operation phase) will be Rs.58.25 Lakhs. The annual recurring cost for EMS

    will be Rs.19.0 Lakhs.

    1.5 Size of the project

    The proposed project is for manufacturing of 35 MT/Month of Dyes and intermediates. The

    total plot area for the project is 3924 sq.m.

    Table 1: List of Raw Material Required for Proposed project

    Product Name

    Name of the Raw Materials

    Consumption/Batch (in Kg)

    Consumption/ Day (in Kg) Storage Facility

    1 N-METHYL-J-ACID

    J-Acid 975 325 Bag 2 MMA 495 165 MS Tank 3 Sodium bisulphite 430 143 Bag

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary II

    4 Sulfuric Acid 500 167 MS Tank

    5 Sodium hydroxide (20%) 250 83 MS Tank

    6 HCl 350 117 Syntax 10 KL Tank 7 N-

    BENZOYL-J-ACID

    J-Acid 700.00 233 Bag 8 Benzoyl Chloride 420.00 140 Drum 9 Sodium Acetate 120.00 40 Bag 10 Sodium bicarbonate 245.00 82 Bag 11 Caustic Lye (30%) 250.00 83 MS Tank 12 Sulfamic Acid 50.00 17 Bag 13 Soda Ash 75.00 25 Bag 14 N-ACETYL-

    J-ACID

    J-Acid 850 283 Bag

    15 Sodium Hydroxide (30%) 150 50 MS Tank

    16 Acetic Acid 363 121 Carboys 17 Sodium chloride 120 40 Drum 18 N-PHENYL-

    J-ACID

    J-Acid 760.00 253 Bag 19 Aniline 300.00 100 Drum 20 Sodium bisulphate 330.00 110 Bag 21 Soda Ash 120.00 40 Bag 22 Sulfuric Acid 300.00 100 MS Tank

    1.6 Water Requirement

    The total water requirement for the proposed project is 10.33 KLD, out of which industrial use

    is 3.41 KLD, domestic purpose 0.45 KLD and for Greenbelt is 6.47 KLD. Water will be sourced

    from AKVN supply.

    1.7 The waste water generation and management

    Waste water generated from domestic use is 0.36 KLD and effluent from process is 0.98 KLD.

    Effluent will be treated in ETP followed by RO and MEE. Treated waste water will be used for

    gardening purpose. Sewage will be disposed off through Septic tank and soak pit.

    1.8 Hazardous & Non-Hazardous Waste Generation & Management

    Municipal solid waste will be collected, segregated and handed over to vendors. Hazardous

    wastes like drums, ETP sludge etc. will be disposed off to authorized vendors approved by

    MPPCB.

    1.9 Power requirement

    Power requirement for this project will be met from MPPKVV. During operation phase 125 HP

    power will be required for various industrial activites. DG set of capacity 125 KVA will be used

    as power back.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary III

    1.10 Stack details

    Table 2: Stack Details

    1.11 Manpower Requirements

    The manpower requirement for the proposed project will be around 10. Local people will be

    given preference.

    1.12 Greenbelt Development

    Unit has already developed greenbelt area in 1297 Sq m within plant premises. Suitable plant

    species of local varieties will be planted with adequate spacing and density for their fast

    growth and survival.

    1.13 Rain Water Harvesting

    Rain Water harvesting is proposed in the project site to conserve the storm water, Rain Water

    harvesting structures along the boundary of the project has been proposed. This will result in

    saving water.

    S.No.

    2.0 DESCRIPTION OF THE ENVIRONMENT

    2.1 Study area

    The baseline quality of various components of the environment, viz. air, noise, water, and

    land, biology, meteorological and socio-economic is assessed within the impact zone of

    about 10 km around the proposed site. The present report presents the data collected during

    the sampling period of three months during Pre monsoon Season from March 2014 to May,

    2014. It was observed that Negadi river flows at a distance of 3.95 Km (SSE) from the project

    site.

    Stack Attached to Type of

    Fuel Capacity

    Stack

    Height (in

    Mts)

    Fuel

    Consumption

    APCM

    1 IBR Steam Boiler Briquette 1.0 TPH 18.0 800 kg/day -

    2 Hot Air Generator

    (For Tray Dryers) Briquette 500 Kg/Day 5.0 300 kg/day

    -

    3 Alkali Scrubber -- 750 m3 15.0 /Hr - -

    4 DG Set (Stand By) HSD 125 KVA 10 Diesel Stack height as

    per CPCB.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary IV

    2.2 Climate of the study area

    The climate of the study area varies with hot summer, cold winter and rainfall. Annual

    maximum temperature is 32.2 ºC in the month of May and minimum temperature is 11.6 ºC in

    the month of January. Maximum Relative humidity of this region is 77% and minimum Relative

    humidity is 22 %.

    2.3 Seismicity

    Study area falls in Zone III in seismic zoning map of India, which is classified as moderate

    damage risk zone (Institute of Seismological Research (ISR), Govt. of M.P).

    2.4 Air Environment

    AAQM was carried out in 7 locations on 24 hourly average basis as per guidelines of CPCB

    and NAAQS within 10 km radius of the study area. PM10 was found in the range of 49-66

    µg/m3 and PM2.5: 21 - 28 µg/m3. SO2 found in the range of 6.2 to 7.9 µg/m3 and NOx 9.2 to

    12.4 µg/m3 and CO: 0.44 to 0.59 mg/m3. Other parameters like VOCs, Heavy metals, Benzene

    etc. were found BDL.

    2.5 Noise Environment

    Noise can be defined as an unwanted sound. A total of 7 locations were identified for

    ambient noise monitoring in the study area. The daytime varied from 41.5 dB(A)Leq to 65.4 dB

    (A) Leq and night time noise variedof 38.4 dB (A) Leq to 60.8 dB (A) Leq. Both daytime noise

    and night time noise was within the limit.

    2.6 Water Environment

    In order to establish the baseline water quality, 8 ground water and 2 surface water samples

    were collected and analyzed in the study area. The analysis result for ground water samples

    were within drinking water limit as per IS 10500: 2012. The surface water quality is within class

    C as per IS 2296: 1982. Details of analysis result are given in the EIA report.

    2.7 Soil Quality

    Soil samples were collected from 8 locations in the study area and analyzed for physic

    chemical characteristics. Soil quality was found to be normal. Details of analysis result are

    given in the EIA report.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary V

    2.8 Land Use/Land Cover of the Study Area

    Land use pattern of the study area covering 10 km radius includes water bodies, agricultural

    land, Fallow land, degraded land, Forest, Degraded forest and Settlements. Details of land

    use /land cover classification are given in the EIA report.

    2.9 Biological Environment

    Biological environment includes flora and fauna including aquatic species found in the study

    area of 10 km radius.

    Flora: The floral composition of the study area is mostly tropical deciduous type. Species

    include trees, shrubs and herbs. Some common trees include Babul, Khair, Haldu, Bel,

    Maharukh, Kala-siris, Neem, Mahua, Semal, Salai, Kasai, Palas, Bhirra, Garari etc. Some

    common shtrubs are Apamarg, Adusa, Akol, Sitaphal, Khatua etc.

    Fauna: Fauna includes mammals, reptiles, and birds. Common mammals found in the study

    area are cow, buffaloes, monkey; reptiles include Common garden lizard, Common rat

    snake etc. Avifauna includes kite, Sparrow, Rock Pigeon, Crow etc. Details of flora and fauna

    found in the study area are given in the EIA report.

    2.10 Socio-economic Environment:

    Socio-economic data were collected from within 10 km radius of the Project site. These

    include 30 villages as per census of India 2011. Total population was 47883, out of which male

    population is 24154 and female population is 23729 with Sex ratio is 982.4. The total no. of

    household was 8830. The total literate population was 42877, male literacy was 21569 and

    female literacy was 21308 and literacy rate was 89.55%. SC population is about 10116 and ST

    population 1192. Villages in the study area have good educational facilities, health, transport

    and communication, water supply and electricity are collected from the secondary sources.

    3.0 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES

    The potential impacts on different environmental components due to the construction and

    operation of the proposed project has been assessed.

    3.1 Impact on Air Environment

    Ground Level Concentrations (GLC) of PM10, SO2 and NOx due to proposed plant activity

    has been studied using ISCST-3 model version ISC v 2.9.222. The incremental value of

    pollutants due to proposed project is negligible and air quality parameters will be within the

    CPCB limit. Hence no impact on air environment is envisaged. Adequate stack height will be

    provided for proper dispersion of pollutants.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary VI

    3.2 Impact on Noise Environment

    The major source of noise includes various operation machines, pumps, motors, DG sets and

    movement vehicles. Noise suppression equipment and baffling will be employed on

    ventilating machinery, compressors and generators. Periodic maintenance of machinery will

    be undertaken to reduce the noise impact. Noise level will be within 75 dB(A) during

    operation phase of the project.

    3.3 Impact on Water Environment

    Around 0.98 KLD of waste water shall be generated during operation phase, shall be treated

    in ETP followed by RO & MEE and ZLD will be achieved. The treated water will be reused.

    Sewage will be disposed through septic tank and soak pit. Hence no impact on water

    environment is envisaged.

    3.4 Impact on Land Environment

    The present land use pattern of the project site is industrial. Waste water will be treated and

    reused. Hazardous waste will be handed over to authorized vendor. Greenbelt will be

    developed around the boundary of project site to attenuate air and noise pollution. Thus

    impact on land environment is not envisaged.

    3.5 Impact on Biological Environment

    Ambient air quality and stack emissions will be maintained within the CPCB limit. Waste water

    will be treated and ZLD will be achieved. Hazardous waste will be disposed off to MPPCB

    authorized vendors. Hence no impact on flora and fauna is envisaged. Moreover there are

    no reserve forest and protected areas within 10 km radius. Greenbelt will be developed

    which will serve as ecosystem.

    3.6 Impact on Socio-economic Environment

    The construction of the proposed project is expected to provide temporary employment to a

    good number of skilled and unskilled workers directly and indirectly, thus indirectly

    constituting a moderate positive impact. The project will contribute to the socio-economic

    development of the area at the local level. Hence the proposed project will have positive

    impact on the socio-economic environment.

    4.0 ENVIRONMENTAL MONITORING PROGRAM

    Environmental Monitoring Network is designed for construction & operation phase of the

    project for monitoring of various environmental quality parameters of air, water, noise, soil etc.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary VII

    4.1 Implementation Schedule of Monitoring Measures

    Monitoring should be done as periodically to understand the environmental condition of the

    site. The mitigation measures and EMP suggested in the EIA report should be implemented so

    as to reduce the impact on environment due to the operations of the proposed project. The

    detailed monitoring programme is given in the EIA report.

    I. Environmental management strategies

    5.0 ENVIRONMENTAL MANAGEMENT PLAN

    Environmental Management is basically resource management and environmental planning

    is similar to development planning. An Environmental Management Plan (EMP) is prepared to

    mitigate and manage various environmental impacts identified. The EMP presents the

    project specific guidelines on:

    II. Specialized engineering construction procedures in relation to environmental

    guidelines of the country

    III. Spill prevention and control

    IV. Management of wastes and hazardous chemicals

    V. Air, water and soil quality protection

    VI. Noise control

    VII. Soil erosion control and slope stabilization

    VIII. Vegetation, wildlife and habitat protection

    IX. Socio-economic and welfare considerations

    X. Risk and disaster management plan

    XI. To prepare a checklist for statutory compliance

    XII. Budget allocation for Environment management Plan

    5.1. Environmental Objectives

    i. To adopt construction and operational methods that will limit environmental

    degradation.

    ii. To protect physical environmental components such as air, water and soil.

    iii. To conserve terrestrial and aquatic flora and fauna.

    iv. To protect historic and cultural sites.

    v. To incorporate the views and perceptions of the local inhabitants in the project.

    vi. To generate employment opportunities wherever possible and feasible.

    vii. To provide environmental guidelines and stipulations to the construction

    contractors to minimize the impact of those activities around the proposed site.

    viii. To provide advanced sophisticated safety system to ensure safety of the public at

    large.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary VIII

    ix. To establish a long term program to monitor effects of the project on the

    environment.

    School uniforms, notebooks and scholarship will be provided to poor students.

    6.0 PROJECT BENEFITS

    The operation of the project will have benefits in the physical infrastructure, social

    infrastructure, Employment potential in the region. It will create avenues for new

    opportunities for employment and can also help diversify the economy.

    6.1 Improvement in Social Infrastructure

    From the very initial stage of the inception of the project, infrastructure development in and

    around the project site has kept in consideration. Infrastructure development will be done

    based on actual requirement socio-economic development of the region. The infrastructure

    development will be rolled out as part of company’s CSR activity.

    6.2 CSR Activities

    Special Health awareness camp and medical camps for primary check up will be arranged

    at least once in a year in nearby villages for health check-ups.

    Roads passing nearby the proposed plant will be maintained.

    Funds will be provided to arrange extracurricular activities for nearby school and colleges.

    Health camps & medical checkup for villagers.

    Blood donation camp.

    7.0 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

    Quantitative Risk Study has been done to determine the potential risks of major disasters

    having damage potential to life and property and provide a scientific basis using phast

    software. Disaster Management Plan is prepared for identification of various hazards

    addressed qualitatively and included onsite-and off-site emergency plan. Details of risk

    assessment and disaster management plan are given in the EIA report.

    8.0 PUBLIC HEARING

    As per the EIA notification 2006 and OM dated 16th May 2014, Public Hearing will conducted

    by MPPCB for this project. Public views and opinions will be incorporated the Final EIA report.

    9.0 CONCLUSION

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    ENVIRONMENTAL IMPACT ASSESSMENT REPORT

    REPORT NO.:- GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. Executive Summary IX

    I. The project proponent will follow all the statutory norms and guidelines as per EPA,

    1986 to safeguard environment.

    II. Wastewater generated from the proposed project will be treated in to ETP followed

    by RO and MEE. Zero Liquid Discharge will be achieved.

    III. Stack emission will be within the CPCB limit.

    IV. Noise shall be within 75 dB (A) in the industrial premises.

    V. No impact on flora and fauna has been envisaged. There are no reserve forest and

    eco-sensitive zones are present within 10 km radius.

    VI. The project will generate employment opportunities during construction stage and

    also at operational stage. The standard of living of local people due to employment

    is likely to be better. The region will get economic boost.

    VII. Overall the project will have positive impact for socio-economic and cultural

    development.

  • I

    कायर्कार� सारांश

    1.0 प�रयोजना �ववरण

    1.1 प�रचय मेघनगर फामार्केम प्रा. �ल�मटेड, गुजरात दादरा एवं नगर हवेल� के कंप�नय� के पंजीयक के साथ 25-10-2011 को पंजीकृत कंपनी है I कंपनी फामार् और रंजक मध्यवत� के �नमार्ण के �ेत्र म� प्रवेश करना चाहता ह ैI इकाई पहले से जमीन का एक भूखंड सं 98 -A, AKVN, औद्यो�गक �ेत्र, मेघनगर, िजला. झाबुआ, मध्यप्रदेश म� अ�धग्रहण कर �लया है I 1.2 प�रयोजना के प्रकार प्रस्ता�वत इकाई �वशेषता रसायन� क� �व�नमार्ण इकाई है जो क� अनुसूची 5 (F) क� श्रेणी के तहत " �संथे�टक काबर्�नक रसायन उद्योग (रंग� और मध्यवत� रंग�, बल्क दवाओं और दवा फामूर्ल� को छोड़कर मध्यवत� , �संथे�टक �घसने , बु�नयाद� काबर्�नक रसायन , अन्य �संथे�टक काबर्�नक रसायन और मध्यवत� रासाय�नक) " ईआईए अ�धसूचना -2006 म� आती है I यह प�रयोजना श्रेणी 'बी' के अंतगर्त आती है I ऊपर , कानूनी पहलू और �नगरानी के काम को देखते हुए ग्रीन सकर्ल इंक, वडोदरा को पयार्वरणीय �वशेषताओं के �लए �नयुक्त�कया गया I 1.3 प�रयोजना का स्थान प्रस्ता�वत प�रयोजना भूखंड. प्लॉट नं. 98A / AKVN औद्यो�गक �ेत्र, S.R. Ferroalloys के पास, मेघनगर, िजला झाबुआ, मध्यप्रदेश म� िस्थत है I 1.4 पूंजी �नवेश प्रस्ता�वत प�रयोजना क� अपे��त लागत आज के तार�ख म� 185.85 लाख रुपये के आसपास होगी I पयार्वरण प्रबंधन सेवा (ईए.म.एस) और प्रदूषण �नयंत्रण के उपाय� ( �नमार्ण और संचालन चरण) के �लए पूंजी लागत अनुमान Rs.58.25 लाख होगा I ईएमएस के �लए वा�षर्क आवत� लागत Rs.19.0 रुपए होगा I 1.5 प�रयोजना का आकार

    प्रस्ता�वत प�रयोजना रंग� और मध्यवत� के 35 टन / मह�ना के �नमार्ण के �लए ह ै I प�रयोजना के �लए कुल भूखंड �ेत्र 3924 sq.m. ह ैI �व�नमार्ण �मता और भू�म �ेत्र का �ववरण नीचे ता�लका 1 3म� �दया गया है I

    टेबल 1: कच्चे माल और मात्रा के साथ उत्पादन �ववरण

    क्र.सं. उत्पाद मात्रा मी�ट्रक टन / मह�ना

    कच्चे माल के नाम उपभोग खेप (�क.ग्रा. म�)

    उपभोग प्र�त�दन (�क.ग्रा. म�)

    भंडारण सु�वधा

    1 N-METHYL-J-ACID

    20.0 J-Acid 975 325 Bag MMA 495 165 MS Tank Sodium 430 143 Bag

  • II

    क्र.सं. उत्पाद मात्रा मी�ट्रक टन / मह�ना

    कच्चे माल के नाम उपभोग खेप (�क.ग्रा. म�)

    उपभोग प्र�त�दन (�क.ग्रा. म�)

    भंडारण सु�वधा

    bisulphite Sulfuric Acid 500 167 MS Tank Sodium hydroxide (20%) 250 83 MS Tank

    HCl 350 117 Syntax 10 KL Tank

    2

    N-BENZOYL-J-ACID

    5.0

    J-Acid 700.00 233 Bag Benzoyl Chloride 420.00 140 Drum Sodium Acetate 120.00 40 Bag Sodium bicarbonate 245.00 82 Bag

    Caustic Lye (30%) 250.00 83 MS Tank

    Sulfamic Acid 50.00 17 Bag Soda Ash 75.00 25 Bag

    3 N-ACETYL-J-ACID

    5.0

    J-Acid 850 283 Bag Sodium Hydroxide (30%) 150 50 MS Tank

    Acetic Acid 363 121 Carboys Sodium chloride 120 40 Drum

    4 N-PHENYL-J-ACID

    5.0

    J-Acid 760.00 253 Bag Aniline 300.00 100 Drum Sodium bisulphate 330.00 110 Bag

    Soda Ash 120.00 40 Bag Sulfuric Acid 300.00 100 MS Tank

    1.6 जल आवश्यकता प्रस्ता�वत प�रयोजना के �लए कुल 10.33 KLD पानी क� आवश्यकता ह ैI िजसमे से 3.41 KLD औद्यो�गक उपयोग के �लए, घरेलू उपयोग के �लए 0.45 KLD और ह�रत �ेत्र के �लए 6.47 KLD ह ैI आवश्यक पानी AKVN के द्धारा आपू�तर्त क� जाएगी I 1.7 अप�शष्ट जल उत्पादन और प्रबंधन घरेलू उपयोग से 0.36 KLD और औद्यो�गक उपयोग से 0.98 KLD अप�शष्ट जल उत्पन्न होगा I अप�शष्ट जल का RO और M.E.E. द्धारा ई.ट�.पी. म� इलाज �कया जाएगा और जीरो �लिक्वड �डस्चाजर् हा�सल �कया जाएगा I सीवेज सेिप्टक ट�क के माध्यम से �नपटाए और गड्ढे सोख �कया जाएगा I 1.8 खतरनाक और गैर खतरनाक अप�शष्ट उत्पादन एवं प्रबंधन नगरपा�लका ठोस अप�शष्ट, अलग से एकत्र �कया जायेगा और �वक्रेताओं को स�प �दया जाएगा I खतरनाक कचर े जैस ेड्रम, ईट�पी क�चड़ आ�द MPPCB अनुमो�दत अ�धकृत �वक्रेताओं के द्धारा �नपटारा �कया जाएगा I

  • III

    1.9 �बजल� क� आवश्यकता इस प�रयोजना के �लए �बजल� क� आवश्यकता MPPKVV से आपूर�तत क� जाएगी I आपरेशन चरण के दौरान 125 HP अश्वशिक्त �बजल� �व�भन्न औद्यो�गक ग�त�व�धय� के �लए अवशक्यता होगी I �मता 125KVA DG सेट शिक्त पीठ के रूप म� इस्तेमाल �कया जाएगा I

    1.10 �चमनी �ववरण

    टेबल 2: �चमनी �ववरण

    क्र.सं. �चमनी संलग्न ह ै �मता �चमनी क� ऊंचाई (मीटरम� )

    �धन और इसक� आवश्यकता

    वायु प्रदूषण �नयंत्रण के उपाय

    1. IBR Steam Boiler 1.0 TPH 18.0 Briquette; 800

    kg/day -

    2. Hot Air Generator (For Tray Dryers) 500 Kg/Day 5.0

    Briquette; 300

    kg/day -

    2. D.G Set (Stand By) 125 KVA 10 डीजल सी.पी.सी.बी के अनुसार ऊंचाई

    1.11 जनशिक्त क� आवश्यकता इस प�रयोजना से स्थानीय आबाद� के �लए प्रत्य� / अप्रत्य� रोजगार के अवसर और सहायक व्यवसाय �वकास म� वृ�द्ध होगी I इस प�रयोजना के �लए 10 जनशिक्त क� आवश्यकता होगी I आसपास स्थानीय लोग� को प्राथ�मकता द� जाएगी I

    1.12 ह�रत पेट� �वकास इस यू�नट म� पहले से ह� संयंत्र प�रसर के भीतर 1297 वगर् मीटर म� ह�रतपेट� �ेत्र �वक�सत है I स्थानीय �कस्म� के उपयुक्त प्रजा�तय� के पौधे को अपने तेजी से �वकास और अिस्तत्व के �लए पयार्प्त अंतर और घनत्व के साथ लगाया जाएगा I 1.13 वषार् जल संचयन प�रयोजना स्थल म� वषार् जल संचयन संरचनाओं का प्रस्ताव �कया गया है इस पानी क� बचत म� सकारात्मक प�रणाम होगा I

  • IV

    2.0 पयार्वरण का वणर्न

    2.1 अध्ययन के �ेत्र म� पयार्वरण क� स्थापना म� शा�मल अध्ययन मौसम �व�ान, वनस्प�त, जीव, भू�म, भू�व�ान, हाइड्रोज्योलोजी और �ेत्र के सामािजक अथर्शास्त्र के संबंध म� स्थल से लगभग 10 �कलोमीटर क� प�र�ध �ेत्र म� �कया गया I इसके अलावा, वायु गुणवत्ता, जल गुणवत्ता, शोर स्तर और �मट्टी क� गुणवत्ता नमूना और �वश्लेषण �कया गया I अध्ययन �ेत्र म� हवा क� गुणवत्ता, पानी क� गुणवत्ता , शोर स्तर और �मट्टी क� गुणवत्ता इस भौ�तक नमूना और �वश्लेषण के आधार पर मूल्यांकन �कया गया है Iबेस लाइन डाटा अध्ययन क� अव�ध माचर् 2014 से मई 2014 के बीच ह� I नेगार� नद� प�रयोजना स्थल से 3.95 �कमी ( हवाई दूर� ) , द��ण द��ण पूवर् म� बहती ह ैऐसा पाया गया I 2.2 अध्ययन �ेत्र क� जलवायु अध्ययन �ेत्र क� जलवायु गमर् गम�, ठंड स�दर्य� और बा�रश के साथ बदलता रहता है I ग�मर्य� के मौसम म� अध्ययन �ेत्र क� जलवायु मध्य माचर् स ेजून के दौरान सूखा और गमर् होता है I बरसात के मौसम (मध्य जून से �सतंबर) के दौरान जलवायु नम और सुखद होता है और �दसंबर से फरवर� तक जलवायु ठंड रहती ह ैI वा�षर्क अ�धकतम तापमान मई म� 32.2 �डग्री सेिल्सयस और न्यूनतम जनवर� म� 11.6 �डग्री सेिल्सयस ह ैतापमान पाया गया. इस �ेत्र क� अ�धकतम आद्रर्ता नमी 77 % ह ैऔर न्यूनतम आद्रर्ता 22 % है I 2.3 भूकंपी अध्ययन के �ेत्र म� मध्यम ��त जो�खम �ेत्र के रूप म� वग�कृत �कया गया है , जो भारत क� भूकंपीय �ेत्रीकरण मान�चत्र म� जोन III म� आता है (भूकंप अनुसंधान संस्थान ( ISR ), भारत सरकार) 2.4 प�रवेश वायु गुणवत्ता प्रस्ता�वत प�रयोजना के 10 �कलोमीटर क� प�र�ध के भीतर 7 चय�नत स्थान� पर प�रवेशी वायु गुणवत्ता क� �नगरानी �कया गया ह ैI प�रवेशी वायु गुणवत्ता का 7 स्थान� पर �नगरानी �कया गया ह ैI a. PM10 क� सांद्रता 49-66 µg/m3 और PM2.5 क� सांद्रता 21-28 µg/m3

    b. SO

    पाया गया है I

    2 क� सांद्रता 5-8 µg/m3 , NOx क� सांद्रता 9-13 µg/m3 और CO क� सांद्रता 0.44 स े0.59 mg/m3

    c. सभी मापदंड� क� उपिस्थ�त CPCB सीमा के भीतर पाया गया है I

    पाया गया है I

    2.5 शोर पयार्वरण

    शोर एक अवां�छत ध्व�न के रूप म� प�रभा�षत �कया जा सकता है I शोर का स्तर सात अलग अलग स्थान� पर �दन के समय और रात के समय म� मापा गया ह ै I �दन के समय शोर का स्तर 41.5 dB(A)Leq स े65.4 dB(A)Leq और रात के समय 38.4 dB(A)Leq से60.8 dB(A)Leq पाया गया I शोर का स्तर CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया है I

  • V

    2.6 जल पयार्वरण आधारभूत पानी क� गुणवत्ता, 8 भूजल और 2 सतह के पानी के नमून� क� स्थापना के �लए एकत्र �कए गए थे और अध्ययन के �ेत्र से �वश्लेषण �कया I भूजल के नमून� �वश्लेषण प�रणाम के अनुसार पीने के पानी क� सीमा के भीतर थ े(IS 10500:2012). IS 2296: 1982 के अनुसार सतह पानी क� गुणवत्ता वगर् Cके भीतर ह.ै �वश्लेषण प�रणाम का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I 2.7 �मट्टी क� गुणवत्ता �मट्टी के नमूने अध्ययन के �ेत्र म� 8 स्थान� स ेएकत्र क� है और भौ�तक रासाय�नक गुण� के �लए �वश्लेषण �कया गया I �मट्टी क� गुणवत्ता सामान्य पाया गया ह ैI �वश्लेषण प�रणाम का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I 2.8 भू�म उपयोग / भू�म कवर 10 �कलोमीटर क� प�र�ध को कवर अध्ययन �ेत्र क� भू�म उपयोग पैटनर् जल �नकाय�, कृ�ष भू�म, बंजर भू�म, अपमा�नत भू�म, वन, �वकृत वन और बिस्तय� म� शा�मल ह� I भू�म उपयोग / भू�म कवर वग�करण का �ववरण ईआईए �रपोटर् म� �दए गए ह� I

    2.9 जै�वक पयार्वरण जै�वक वातावरण म� 10 �कलोमीटर क� प�र�ध के अध्ययन के �ेत्र म� पाया जल�य प्रजा�तय� स�हत वनस्प�तय� और जीव शा�मल थे I पैड पौधे

    : अध्ययन �ेत्र के पुष्प रचना ज्यादातर उष्णक�टबंधीय पणर्पाती प्रकार है. पेड़ , श्रब्स और जड़ी बू�टय� के प्रजा�त शा�मल ह� पेड़ - अपामागर् , अडूसा , अकोल , सीताफल , खटुआ ह� बाबुल , खैर , हल्दु , बेल , माहरुख , काला Siris , नीम , महुआ , बेल , सेमल , महुआ , नीम , बाबुल , खैर , जामुन , आम , इमल� , बबूल आ�द पाए गए ह ैI

    जीवजंतु:

    जीवजंतु स्तनधार�, सर�सृप , और प��य� म� शा�मल ह�. अध्ययन �ेत्र म� पाया आम स्तनधा�रय� गाय , भ�स , बंदर आ�द ह� ; सर�सृप आ�द आम बगीचा �छपकल� , आम चूहा, सपर् आ�द शा�मल ह� प��य�: पतंग , गौरैया , कबूतर, कौआ आ�द शा�मल ह� I अध्ययन �ेत्र म� पाया वनस्प�त और जीव का �ववरण ई.आई.ए �रपोटर् म� �दए गए ह� I

    2.10 जनसांिख्यक�य और सामािजक आ�थर्क रूपरेखा अध्ययन �ेत्र क� सामािजक, आ�थर्क िस्थ�त भारत क� 2011 जनगणना पर आधा�रत है I ह� क� कुल अध्ययन �ेत्र के 10 �कलोमीटर क� प�र�ध के अंतगर्त 30 गांव सं�म�लत ह ैI अध्ययन �ेत्र क� कुल जनसंख्या 47883, पुरुष आबाद�- 24154 और म�हलाओं क� जनसंख्या अध्ययन �ेत्र म�

    23729 है I �लंग अनुपात 1000 पुरुष� पर 982.4 म�हलाओं के आसपास है और घर लगभग 8830 है I अध्ययन �ेत्र म� कुल सा�र जनसंख्या 42,877 और औसत सा�रता दर 89.5 % ह ैI अध्ययन �ेत्र म� अनुसू�चत जा�त क� जनसंख्या 10116 और अनुसू�चत जनजा�त क� जनसंख्या 1192 है I अध्ययन �ेत्र के गांव� म� पीने का पानी, �बजल�, काफ� अच्छा ढांचागत स्वास्थ्य और संचार सु�वधाएं उपलब्ध है I

  • VI

    3.0 प्रत्या�शत पयार्वरणीय प्रभाव और शमन के उपाय

    3.1 वायु पयार्वरण पर प्रभाव हवा प्र�तरूपण ISCST3 संस्करण2.9.222 के उपयोग द्धारा �कया गया है I बु�नयाद� स्तर सांद्रता PM10 , SO2 , NOX

    क ेसमग्र प�रदृश्य स्तर CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया ह ैI वायु प्रदूषण को �नयं�त्रत करने के �लए पयार्प्त शमन उपाय प्रस्ता�वत �कया जाएगा I इस�लए वायु पयार्वरण पर कोई नकारात्मक प्रभाव प�रकल्पना क� गई ह ैI

    3.2 ध्व�न प�रवेश पर प्रभाव प्रमुख शोर स्रोत म� �व�भन्न मशीन, पंप, मोटसर्, डी.जी. सेट और यातायात के वाहन भी शा�मल ह ै I शोर का स्तर आवासीय और औद्यो�गक �ेत्र� के �लए CPCB द्धारा �न�दर्ष्ट मानक� के �नधार्�रत सीमा से कम पाया गया है I मशीनर� के रखरखाव के साथ उपकरण� के प्रच�लत ओढ़ना का प्रयोग अ�नवायर्, बाड़� , बफ़सर् , ह�रत पट्टी �वकास आ�द जैसे शोर दमन के उपाय� का शोर के स्तर को कम करन ेहर संभव प्रयास �कया जायेगा I 3.3 जल पयार्वरण प�रवेश पर प्रभाव घरेलू उपयोग से 0.36 KLD और औद्यो�गक उपयोग स े0.98 KLD अप�शष्ट जल उत्पन्न होगा I अप�शष्ट जल का RO और M.E.E. द्धारा ई.ट�.पी. म� इलाज �कया जाएगा और जीरो �लिक्वड �डस्चाजर् हा�सल �कया जाएगा I सीवेज सेिप्टक ट�क के माध्यम से �नपटाए और गड्ढे सोख �कया जाएगा I पानी पयार्वरण पर कोई प्रभाव नह�ं पाया गया ह ैI 3.4 भू�म पयार्वरण पर प्रभाव प�रयोजना स्थल क� वतर्मान भू�म उपयोग पैटनर् औद्यो�गक है I ह�रत �ेत्र और अन्य प�रदृश्य के �वकास से मौजूदा �ेत्र पर दृश्य स�दयर् म� वृ�द्ध होगी I खुल� भू�म म� ठोस और तरल प्रवाह का कोई मुिक्त नह� ं�कया जायेगा I इस प्रकार कोई प्र�तकूल प्रभाव भू�म पयार्वरण पर प�रकल्पना नह�ं क� गई I 3.5 जै�वक पयार्वरण अजैव कारक प�रवेशी वायु और ताजा पानी क� गुणवत्ता पर व्यावहा�रक रूप से अप्रभा�वत रहेगा I इस प्रकार वनस्प�तय� पर अप्रत्य� प्र�तकूल प्रभाव क� संभावना से इनकार �कया जाता है I इसके अलावा 10 �कलोमीटर क� प�र�ध के भीतर कोई आर��त वन और संर��त �ेत्र नेह� ह� I ग्रीनबेल्ट पा�रिस्थ�तक� तंत्र के रूप म� काम करेगा I

    3.6 सामािजक - आ�थर्क प�रवेश

    प�रयोजना स्थानीय स्तर पर �ेत्र के सामािजक आ�थर्क �वकास के �लए योगदान देगा I प�रयोजना के संचालन के दौरान स्थानीय आबाद� के �लए प्रत्य� और अप्रत्य� रोजगार I य ेसभी स्थानीय अथर्व्यवस्था के �लए लाभप्रद होगा I �रयोजना स्थानीय स्तर पर �ेत्र के सामािजक आ�थर्क �वकास के �लए योगदान देगा . इस�लए प्रस्ता�वत प�रयोजना सामािजक आ�थर्क वातावरण पर सकारात्मक प्रभाव पड़ेगा I

  • VII

    4.0 पयार्वरण �नगरानी कायर्क्रम

    पयार्वरण �नगरानी तंत्र हवा, पानी, शोर, �मट्टी और पा�रिस्थ�तक� आ�द जैसे �व�भन्न पयार्वरणीय मानक� क� �नगरानी के �लए प�रयोजना के संचालन चरण के �लए बनाया गया है I 4.1 लागू �नगरानी उपाय� क� अनुसूची वायु प्रदूषण �नयंत्रण के उपाय� को सीपीसीबी मानदंड� के अनुसार स्था�पत �कया जाएगा I �नमार्ण चरण के दौरान मा�सक �नगरानी �कया जाएगा और आपरेशन चरण के दौरान �तमाह� �नगरानी पयार्वरण एवं वन मंत्रालय के �दशा�नद�श के आधार पर �कया जाएगा I

    5.0 पयार्वरण प्रबंधन योजना

    प�रयोजना �व�शष्ट पयार्वरण प्रबंधन योजना का �दशा �नद�श प्रस्तुत: पयार्वरण प्रबंधन रणनी�त देश के पयार्वरण के �दशा �नद�श� के संबंध म� इंजी�नय�रंग �नमार्ण प्र�क्रयाओं �वशेष�ता¬ �बखेर रोकथाम और �नयंत्रण कचरे और खतरनाक रसायन का प्रबंधन हवा, पानी और �मट्टी क� गुणवत्ता सुर�ा शोर �नयंत्रण मृदा �रण पर �नयंत्रण और ढलान िस्थर�करण वनस्प�त , वन्य जीवन और वास संर�ण सामािजक, आ�थर्क और कल्याण �वचार जो�खम और आपदा प्रबंधन योजना सां�व�धक अनुपालन के �लए एक सूची तैयार करन ेके �लए बजट आवंटन पयार्वरण प्रबंधन योजना के �लए

    5.1 पयार्वरण उद्देश्य�

    प�रचालन के तर�क� को अपना कर पयार्वरण �रण को सी�मत कर देना भौ�तक पयार्वरण के घटक� जैसे हवा , पानी और �मट्टी क� र�ा के �लए स्थल�य और जल�य वनस्प�त और जीव संर�ण के �लए ऐ�तहा�सक और सांस्कृ�तक स्थल� क� सुर�ा के �लए प�रयोजना म� स्थानीय �नवा�सय� के �वचार� और धारणाओं को शा�मल करन ेके �लए जहां भी संभव हो और संभव रोजगार के अवसर पैदा करने के �लए पयार्वरण पर इस प�रयोजना के प्रभाव क� �नगरानी के �लए एक द�घर्का�लक कायर्क्रम क� स्थापना

    6.0 प�रयोजना के लाभ

    औद्यो�गक �ेत्र म� �वकास रोजगार के नए अवसर पैदा करता ह ैऔर अथर्व्यवस्था म� �व�वधता लाने म� मदद कर सकते ह�

  • VIII

    6.1 सामािजक आधा�रक संरचना म� सुधार प�रयोजना स्थल के आसपास बु�नयाद� ढांचे के �वकास को ध्यान म� रखा जायेगा I �ेत्र म� सामािजक आ�थर्क �वकास क� वास्त�वक आवश्यकता के आधार पर बु�नयाद� ढांचे का �वकास �कया जाएगा I बु�नयाद� ढांचे का �वकास कंपनी के सीएसआर ग�त�व�ध के �हस्से के रूप म� शुरू हो जाएगा I 6.2 सीएसआर ग�त�व�धय�

    �नमार्ण और संचालन चरण के दौरान आवश्यक श्रम बल पास के गांव से �लया जाएगा I स्कूल क� वद� , नोटबुक और छात्रवृित्त गर�ब छात्र� के �लए उपलब्ध कराया जाएगा I �च�कत्सा �श�वर� म� प्राथ�मक जांच के �लए और स्वास्थ्य चेक अप के �लए आसपास के गांव� म� एक वषर् म� कम

    से कम एक बार �वशेष स्वास्थ्य जागरूकता �श�वर आयोिजत �कया जाएगा I प्रस्ता�वत संयंत्र के पास से गुजर रह� सड़क को बनाए रखा जाएगा I पास के स्कूल और कॉलेज� म� पाठयक्रम क� व्यवस्था करने के �लए पूंजी प्रदान �कया जाएगा I

    7.0 जो�खम मूल्यांकन और आपदा प्रबंधन योजना

    मात्रात्मक जो�खम अध्ययन जीवन और संपित्त को नुकसान �मता वाले प्रमुख आपदाओं के संभा�वत जो�खम का �नधार्रण और फास्ट सॉफ्टवेयर का उपयोग कर एक वै�ा�नक आधार प्रदान करन ेके �लए �कया और अध्याय 6 म� ई.आई.ए �रपोटर् म� शा�मल �कया गया है I आपदा प्रबंधन योजना से �व�भन्न गुणात्मक खतर� को संबो�धत �कया जाता है I और प्रत्य� और परो� आपात योजना शा�मल �कया है I इस ेई.आई.ए. �रपोटर् म� अध्याय 7 म� शा�मल �कया गया है I

    8.0 लोक सुनवाई

    ई.आई.ए अ�धसूचना 2006 और MoEF OM �दनांक 16 मई 2014 के अनुसार को सावर्ज�नक सुनवाई इस प�रयोजना के �लए MPPCB स ेआयोिजत क� जाएगी I इस प�रयोजना के �लए पयार्वरण और सामािजक आ�थर्क पहलुओं के बारे म� सावर्ज�नक �वचार और राय ई.आई.ए. �रपोटर् म� शा�मल �कया जाएगा I

    9.0 �नष्कषर्

    प�रयोजना प्रस्तावक EPA , पयार्वरण क� र�ा 1986 के अनुसार सभी वैधा�नक मानदंड� और �दशा �नद�श� का पालन कर�गे I

    प्रस्ता�वत प�रयोजना से उत्पन्न अप�शष्ट जल ई.ट�.पी. प�रसर म� प्रदान �कया जाएगा और आरओ और MEE द्धारा इलाज �कया जाएगा I

    �चमनी का उत्सजर्न सीपीसीबी सीमा के भीतर होगा I प�रचालन चरण म� शोर 75 डी.बी. (ए) से अ�धक नह�ं होगा I कोई महत्वपूणर् प्रभाव वनस्प�तय� और जीव पर नह�ं पड़ेगा क्यूं�क कोई आर��त वन और पयार्वरण के प्र�त

    संवेदनशील �ेत्र 10 �कमी के भीतर मौजूद नह�ं है I प�रयोजना के �नमार्ण चरण के दौरान और प�रचालन स्तर पर रोजगार के अवसर पैदा कर�गे I रोजगार से

    स्थानीय लोग� का जीवन स्तर बेहतर होने क� संभावना है I कुल �मलाकर प�रयोजना से सामािजक, आ�थर्क और सांस्कृ�तक �वकास म� सकारात्मक प्रभाव पड़ेगा I

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    EIA Report for Proposed Manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. CHAPTER 1: INTRODUCTION 1.1

    CHAPTER 1 INTRODUCTION

    1.0 INTRODUCTION

    The Meghnagar Pharmachem Pvt. Ltd. is company registered with registrar of Companies,

    Gujarat Dadra & Nagar Haveli as on 25-10-2011. The company wants to enter in the field of

    manufacturing of Pharma and Dyes intermediate. The unit has already acquired a plot of land at plot No 98-A, AKVN, Industrial area, Meghnagar, Dist. Jhabua, Madhya Pradesh.

    1.1 PROJECT PROPONENT & THEIR BACKGROUND

    Proposed unit has been promoted by Mr. Ajitsinh. S. Rathod (Promoter & Director) of the

    company. Mr. Ajitsinh S. Rathod, aged 46 years, is a Science Graduate with Chemistry and

    possesses 10 year of experience in Chemical Industry. This Company has been established since

    1July 2012, Mr. Ajitsinh & Sanjay P. Patel has taken over it and managing the entire affairs of the

    company. Another company M/s Gangotri farm & Nursary situated at Nandesari is family

    concern of Mr. Ajitsinh and Sanjaybhai. This Company has been manufacturing specialized

    Dyes and Intermediates and promoters wish to diversify in his activities based on his experience

    in Chemical Industries. Further his education will also help him in future development.

    1.2 PROJECT AND ITS IMPORTANCE TO THE COUNTRY

    This unit is doing development, manufacturing and marketing of Dyes & Pharma Intermediate.

    The products are used for reactive and synthetic dyes like Orange M2R, Orange H2R, Orange

    HE4G and Black HFGR. There are number of small manufacturers in unorganized sector of this

    segment. However, the development and manufacturing of good quality dye is limited to only

    organize sector where only few well know companies exist. Company has developed formula

    for Dyes & Intermediate, Which has already established in the market. There is regular use of the

    products and has demand in local market.

    The firm has designed a ‘Market Penetration’ strategy and it is being implemented in four state

    viz. Gujarat, Rajasthan, and Maharashtra, Distribution network is already set-up of the unit taken

    over. Thus, any further penetration in these states will lead to the increase in demand. This is

    main rationale behind the marketing strategy. This will meet the local demand and generate

    employment.

    1.3 PURPOSE AND NEED OF EIA

    The EIA is anticipated to make available for the protection, conservation and wise

    management of environment through planning and informed decision making. Environmental

    Impact Assessment (EIA) is requisite to be carried out only for those categories of projects that

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    EIA Report for Proposed Manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. CHAPTER 1: INTRODUCTION 1.2

    are covered under EIA notification, 2006 (amended time to time) and the criteria for screening

    have been provided in the notification. Thus, EIA is fundamentally made applicable to industrial

    and developmental projects, which are more likely to have significant environmental impacts.

    M/s. Meghnagar Pharmachem Pvt. Ltd. falls under schedule 5(f) - Synthetic Organic Chemicals.

    Hence the proposed project requires Environmental Clearance from SEIAA, Govt. of Madhya

    Pradesh as per capacity defined for Category ‘B’. Since SEAC/SEIAA committee was not formed

    at the time of EC application, the application was submitted at MoEF for approval of Terms of

    Reference (ToR). According received ToR from MoEF and prepared EIA report complying all the

    ToR points.

    EIA Consultant

    In view of the above, legal aspect and monitoring work has been carried out for all the

    environmental attributes by Green circle Inc. Vadodara.

    The draft Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP)

    has been prepared based on approved Terms of References (ToRs) by MoEF.

    1.4 BRIEF DESCRIPTION OF PROJECT

    1.4.1 Location of the Project

    The Proposed project is located at plot no. Plot no. 98/AKVN Industrial Estate, Near S.R.

    Ferroalloys, Meghnagar, Dist. Jhabua, Madhya Pradesh.

    1.4.2 Size of the project

    The proposed project is for manufacturing of 35 MT/Month of Dyes and intermediates. The total

    plot area for the project is 3924 sq.m.

    1.5 STATEMENT OF PRINCIPLES

    The EIA is intended to provide for the protection, conservation and wise management of

    environment through planning and informed decision making.

    Following are the guiding principles:

    To help decision-makers to protect, conserve and manage environment according to

    the principles of sustainable development, thereby achieving or monitoring human well

    being, a healthy environment and a sound economy.

    To ensure that the industries consider the effect on the health, economy and culture of

    the surrounding communities as well as its impacts on the air, land and water.

    To ensure communication of information to Public.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    EIA Report for Proposed Manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. CHAPTER 1: INTRODUCTION 1.3

    1.6 FRAMEWORK OF ASSESSMENT

    Based on the scope of work and general guidelines, study area of 10 km around the site has

    been taken as the spatial frame for the impact assessment. Temporal frame of assessment has

    been chosen to reflect the impacts in two distinct phases of the project namely:

    Construction phase

    Operation phase

    1.7 SCOPE OF THE STUDY

    EIA study involves three basic components, viz. identification, prediction and evaluation of

    impacts. The scope of the EIA study incorporating the ToR obtained from the SEAC; Government

    of Madhya Pradesh is as under:

    An intensive reconnaissance and preliminary collection of environmental information to

    plan field study.

    Field studies to collect preliminary information, particularly on the quality of the physical

    environment. Experienced scientists and engineers will collect the data.

    Base line data generation and characterization of air, water, soil, noise and vegetation

    in the ten kilometer radius area (impact zone) over a period of Three months.

    A thorough study of the process including provisions for pollution control, and

    environmental management that includes prediction of impacts and relevant

    mathematical modeling.

    Preparation of Environmental monitoring program.

    Preparation of Environmental Management plan suggesting suitable methods for

    mitigating and controlling the pollution levels. Environmental monitoring plan is

    suggested for monitoring the pollution loads at various facilities in the premises and to

    ensure compliance with the statutory requirements

    1.8 OBJECTIVES OF THE STUDY

    The EIA study shall be aimed to cover the following aspects:

    To study Baseline environmental conditions of the study area for air, water, soil, noise,

    meteorology.

    Evaluation of present environmental status through analysis of generated and collected

    baseline data for post-monsoon season.

    Assess the probable impact on the environmental factors due to implementation of the

    project with respect to the existing scenario.

    Analyze the predicted impact with respect to the regulatory environmental standards.

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    EIA Report for Proposed Manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. CHAPTER 1: INTRODUCTION 1.4

    Develop an Environmental Management Plan and Disaster Management Plan for the

    proposed project to mitigate the negative significant impacts that would arise from the

    proposed project.

    Obtain necessary clearance from the regulatory authorities.

    1.9 METHODOLOGY ADOPTED FOR ENVIRONMENTAL IMPACT ASSESSMENT

    The scope of the study would include a detailed characteristic of environment in the study area

    associated with the development of Special Economic Zone for various environmental

    components. For the purpose of environmental assessment, areas within 10 km radius of the

    project have been studied and the following methodology will be adopted. Monitoring and

    analysis done as per CPCB /APHA /MPCB guidelines /relevant I

    Figure 1.1: Flow Chart of Methodology of EIA

    PROJECT INITIATION

    PRELIMINARY SCAN OF EXISTING ENVIRONMENT

    PRELIMINARY SCAN OF PROPOSED PROJECT

    SELECT ENVIRONMENTAL INDICATORS

    DESCRIBE ENVIRONMENTAL SETTING

    IMPACT EVALUATION (MODELLING)

    ENVIRONMENTAL IMPACT ASSESSMENT

    ENVIRONMENTAL MANAGEMENT PLAN

    FIELD SURVEYS AND SAMPLING

    PRELIMINARY SCAN OF EXISTING ENVIRONMENT

  • M/s. Meghnagar Pharamachem Pvt. Ltd.

    EIA Report for Proposed Manufacturing of Dyes & Intermediates

    Report No. GCI/V/MPPL/EIA/2014-2015/Sept/R00

    Green Circle Inc. CHAPTER 1: INTRODUCTION 1.5

    1.10 APPLICABLE ENVIRONMENTAL REGULATORY FRAMEWORK

    The proposed project will abide and function under the purview of the following Rules, Acts &

    Regulations which are formulated by the government by govt. of India to protect the

    environment and development in a sustainable way.

    • The Water (prevention & Control of Pollution) Act, 1974

    • The Water (Prevention & Control of Pollution) Cess, Act, 1977

    • The Air (Prevention & Control of Pollution) Act, 1981

    • The Environmental (Protection) Act, 1986

    • Environmental Impact Assessment Notification dated 14th September 2006 and

    subsequent amendments.

    • The Hazardous Waste (Management, Handling and Transboundary Movement) Rules,

    2008.

    • The MSIHC (Manufacture, Storage and Import of Hazardous Chemicals) rules 1989 and

    amendment in 2000

    • Chemical Accident (Emergency Planning, Preparedness and Response) Rules, 1996

    • Noise Pollution (Regulation and Control) Rules, 2000 and its amendments

    • The public Liability Insurance Act, 1991

    • The Batteries (Management and Handling) Rules 2001 and amendment in 2010

    Accordingly, the project has to comply with the following requirements for establishing the

    industry.

    i) Environmental Clearance from SEIAA, Madhya Pradesh as per EIA notification 2006. ii) Comply with MPCB / CPCB guidelines for establishing and operating the project.

    1.12 STRUCTURE OF THE REPORT

    This EIA report has been prepared on the basis of available on-site primary data

    (survey/monitoring) and secondary/literature data. The structure of the EIA Report with

    necessary tables, drawings a