Introduction to theIntroduction to the
OrganizationOrganization
The Kot Addu Power Company (KAPCO) runs a 1600 MW
combined cycle Power plant at Kot Addu, a small town, in the
middle of Pakistan. The company came into existence in the June
of 1996 when the Water and Power Development Authority
(WAPDA) the state run power generation utility of Pakistan,
privatized the plant by offering 36 % stake to strategic investor
“National Power” of U.K. along with management control.
Kot Addu site is situated in District Muzaffargah, 100 KM north
east of Multan on the left bank of river INDUS at a distance of 16
Km from TAUNSA BARRAGE. The area is surrounded by
agricultural land stretched on the north and west side of Kot
Addu. There are some adjacent areas covered with wind blown
sand dunes which were formed with the passage of time. These
sand dunes too are being gradually converted into agricultural
land.
Apart from above, there were very little educational facilities
available in the area prior to setting up of this Power Station
which has now almost been doubled and some of the School
have been upgraded. The essential amenities are also now made
available to the residents.
IINTRODUCTIONNTRODUCTION TOTO THETHE P POWEROWER H HOUSEOUSE C COMPLEXOMPLEX
The complex comprises three blocks, 1, 2, and 3. Each block is
independent in it and can be considered a separate power
station. There are 2 combined cycle modules in each block no. 1
and 2 whereas block 3 has only one module. This is the physical
distribution. For the commercial purpose the complex is divided
into three blocks called Energy block 1, 2, and 3. The power
purchase agreement provides different energy charges for the
electricity generated and dispatched from each block. The
energy block 1 (plant block 3) is the latest and was in
commissioning stage when NP took over management in June
1996 whereas other blocks were completed and commissioned
between 1986-1995. The plant block 3, being latest, is the most
efficient plant and provides the cheapest electricity to customer.
Its total capacity is 397 MW. In order of priority, whenever there
is generation demand from the customer, this block is run first.
When the demand exceeds then only other plants are run. The
complex history over past 4 years shows that plant block 3 runs
round the clock throughout the year at maximum capacity. In
case this plant can not run at full capacity due to any fault or
break down of machines, the customer need is made up from
other available plants that are relatively expensive but the
customer pays lowest energy charges (of block 3) for the deficit
generation. This results in significant loss. Therefore this block is
the most valuable asset of the company.
HHEATEAT R RECOVERYECOVERY S STEAMTEAM G GENERATINGENERATING S SYSTEMYSTEM
The gas turbines, despite of their low installation cost, easy and
speedy erection and high loading rate could not win the
deserving popularity over the steam turbines due to the poor
efficiency of the former. In the conventional gas turbine unit,
substantial amount of heat energy was lost through the turbine
exhaust gases which leave the turbine at about 580 Deg.
Centigrade. To make use of this wasteful energy, an innovative
concept of combined cycle plant, now has been introduced by
the gas turbine manufacturers. Under this design, the exhaust of
the gas turbine is made to pass through a conduction type boiler
(commonly called as HEAT RECOVERY STEAM GENERATOR).
High-pressure steam so generated is then used to run the steam
turbine, which thus produces power without any fuel. This raises
the plant efficiency to nearly 49 % against the 28 % of the
conventional gas turbine.
AAGREEMENTSGREEMENTS BETWEENBETWEEN WAPDA & KAPCO WAPDA & KAPCO
WAPDA entered into an agreement with KAPCO for the purchase
of the power for next 25 years from this plant. The tariff covered
two kinds of payments viz. capacity and energy payment. The
capacity payment is made on the available capacity of the plant
and is mainly used by the company to meet the fixed expenses
and 756 million dollar debt liability that it inherited from WAPDA.
The energy payment is done on the actual dispatch from the
plant. It covers the fuel cost and there is hardly and saving from
this part.
The agreement allows 36 complex days for the scheduled
outages and 500 complex hours for the unscheduled / forced
outages. In case the accumulated outage period over the year
exceeds the agreed allowance, the company is liable to pay the
liquidated damages at a rate of 1.6 times of what it gets as
capacity payment.
The first year of the business went very well. WAPDA was prompt
in making payments, but it did not lost very long. WAPDA as well
as Govt. of Pakistan were in financial crises because of corruption
and in efficiencies. Ultimately WAPDA engaged KAPCO and
National Power in a complicated legal battle over the tariff issue
by filing petitions in the high court. The court finally passed an
interim order in October 1998 that restricts KAPCO to receive Rs.
1.98 per KWh of electricity. The objective behind this legal
wrangling was to pressurize KAPCO / National Power to agree and
out of court settlement for deduction of tariff. With the incoming
of present Govt. the matters have been solved to fair extent.
OORGANIZATIONALRGANIZATIONAL S STRUCTURETRUCTURE
The powerhouse complex is spread over 280 acres. As stated
earlier there are three independent blocks and each block is
independent in itself.
Each block has machines of different make where different
technology is used. Production department operates the plant
and maintenance departments are responsible for up keep of the
plant through preventive maintenance, trouble shooting, and
major / minor overhauling after predetermined period. At the
face, it is a functional structure. The specialist functions like
finance, IT, Personnel, Legal / Administration are common and
provide service which Production and maintenance departments
need to carry out their work. The production department has it
own centralized structure.
Each block has its separate maintenance department that is
further subdivided into three sections with respect to functions
Viz. electrical, mechanical, and ‘instrument and control’. A senior
engineer head each function. Resident Engineer 1 heads block 1
maintenance department whereas resident engineer 2 is
responsible for block 2 and 3 maintenance teams. However there
is an additional position of Assistant Resident Engineer at block 3
who is responsible to resident Engineer. The senior engineer of
this block report to both resident engineer and assistant resident
engineer.
PPERFORMANCEERFORMANCE H HISTORYISTORY
The project has performed well thought the period ever since it
has been privatized i.e. June 1996. The contribution of block 3 in
overall generation of the complex has been much beyond the
satisfactory levels.
OBJECTIVESOBJECTIVES
The project has been completed to achieve the following
objectives:
a) To reduce mass scale load shedding.
b) To firm up Hydel Power Generation during water
shortage period.
c) To facilitate operation and maintenance of other
power stations.
d) To cover emergencies and power shortages with quick
generation of power supply from this power station
which is the salient feature of gas turbines.
OPERATIONAL STRATEGYOPERATIONAL STRATEGY
CCORPORATEORPORATE S STRATEGYTRATEGY
Whatever the type of firm, top management’s responsibility is to
plan the organization’s long-term future. Corporate strategy
defines the business (es) that the company will pursue, new
opportunities and threats in the environment. Also addressed is
business strategy, or how a firm can differentiate itself from the
competitors. Choices could include producing standardized
products versus customized products or competing on the basis
of cost advantage versus responsive delivery. Corporate strategy
provides an overall direction that serves as the framework for
carrying out all the organization’s functions.
Strategic Choices
Corporate strategy defines the direction of the organization over
the long term and determines the goals that must be achieved
for the firm to be successful. Management sets corporate
strategy by making three strategic choices: determining the
firm’s mission, monitoring and adjusting to changes in the
environment, and identifying and developing the firm’s core
competencies.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
Before the privatization the organization was working under
WAPDA like a typical Govt. Organization and had no formal
corporate strategy. However, after privatization in June 1996, the
organization is working on the subject and a draft corporate
strategy has been finalized. The strategy is being kept secrete at
the moment and no further details are available.
MISSIONMISSION
A firm’s mission statement answers several fundamental
questions. An understanding of the firm’s mission helps
managers enter ideas and design new products and services. If
its mission is too broadly defined, the firm could enter areas in
which it has no experience. If the mission is to narrowly defined,
the firms could miss growth opportunities. This should also
include the aspects like environment and core competencies. The
management should be able to identify and deal with
environmental changes when formulating mission statements.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
The organization does not have any formal MISSION or VISION
statement ever since its privatization. The employees in the
organization just know that they have to work and produce
electricity / power with minimum possible expenditure.
In the process of the organization development an in formal
Mission Statement has been devised which is kept forth for
achieving the organizational goals. The proposed Mission
Statement is as under:
“KAPCO is an independent power
produces that provides electricity
for WAPDA distribution network. It
will continue to contribute in the
developing economy of Pakistan by
maintaining its capacity and
maximizing availabilities.”
CORE COMPETENCIES ANDCORE COMPETENCIES AND
COMPETITIVE PRIORITIESCOMPETITIVE PRIORITIES
CCOREORE C COMPETENCIESOMPETENCIES
Core competencies are organizational unique resources and
strengths which management considers formulating strategy.
These core competencies include:
1. Workforce
2. Facilities
3. Market and financial know how
4. System and technology
CCOMPETITIVEOMPETITIVE P PRIORITIESRIORITIES
A firm gains an advantage with its operating system by
outperforming competitors in terms of one or more of these
capabilities. There are eight possible competitive priorities for
operations, which fall into four groups.
CCOSTOST
1. Low cost operations
QQUALITYUALITY
2. High performance design
3. Consistent quality
TTIMEIME
1. Fast delivery
2. On time delivery
3. Development speed
FFLEXIBILITYLEXIBILITY
1. Customization
2. Volume flexibility
A firm may organize itself into one or more operating systems,
each designed to support a particular set of competitive priorities
for a particular set of products or services.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
CCOREORE COMPETENCIESCOMPETENCIES
WWORKORK FORCEFORCE
A work force of approximately 800 to 900 hundred people is
working in the organization in 4 technical shifts and 1 general
shift as following:
Technical shifts 3 x shifts work 8 hourly daily on rotational
basis
1 x shifts remains at rest
General Shift for 8 hours on daily basis (from 0800 to
1600 hrs)
MMARKETARKET ANDAND F FINANCIALINANCIAL KNOWKNOW H HOWOW
There is no marketing department nor are there any competitor.
The organization do not carry out any marketing function.
However, a commercial and financial department exists. For the
billing purpose formal financial procedures are adopted.
SSYSTEMYSTEM T TECHNOLOGYECHNOLOGY
In the recent past the organization has installed new technology
plant for power production. There are combinations of hybrid
technology plants i.e. Gas and Furnace Oil combination, Gas and
High Speed Diesel combination and Steam Operated Turbines.
The company is also shifting their information system on the
modern lines gradually.
CCOMPETITIVEOMPETITIVE P PRIORITIESRIORITIES
CCOSTOST All efforts at every level are directed to reduce the production
cost. This is being achieved by the very extensive use of Gas
Turbine plant i.e. block 3.
QQUALITYUALITY High performance quality in the organization is referred as
efficient use of plant i.e. with minimum cost maximum output.
TTIMEIME
The aspect is of utmost importance. Priorities like Fast Delivery
and On Time Delivery are applicable as the company is
producing required amount of voltage at prescribed timing with
complete accuracy.
FFLEXIBILITYLEXIBILITY
There is no concept of flexibility, which is being implemented.
The company is rather tied up with the strict schedules of using
various plants.
SSTRATEGYTRATEGY B BASEDASED O ONN F FLOWSLOWS
These are five fundamental manufacturing and service strategies based on flows are:
1. Make-to-Stock Strategy
2. Standardized service strategy
3. Assemble-to-order strategy
4. Make-to-order strategy
5. Customized service strategy
AAPPLICATIONPPLICATION ATAT KAPCO KAPCONo concept of strategy based on flows is being followed /
observed in the organization. However, all production is being
done on the orders / demand received from WAPDA. One may
say that make to order strategy is being follows for production of
electricity.
DECISION MAKING INDECISION MAKING IN
OPERATIONSOPERATIONS
Operations managers make many choices as they deal with
various decision areas. Although the basic steps includes:
1. Recognize and clearly defined the problem.
2. Collect the information needed to analyze possible
alternatives.
3. Choose and implement the most feasible alternative.
Sometimes hard thinking in a quiet room is sufficient. At other
times reliance on more formal procedures is needed. Various
methods used are break-even, preference matrix, decision theory
and decision tray.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
None of the above method is being implemented by the company
for estimating demand. The demand is received directly from
WAPDA (The only customer of the company) and company
produces power / electricity accordingly.
WORKFORCE MANAGEMENTWORKFORCE MANAGEMENT
TTEAMEAM
Employee involvement, also called worker participation or labor-
management joint-ness, is a key tactic for improving
competitiveness. One way to achieve employee involvement is
by the use of teams, which are small groups of people who have
a common purpose, set their own performance goals and
approaches, and hold themselves accountable for success.
Teams differ from their more typical “working group” because:
The members have a common commitment to an
overarching purpose that all believe in and that transcends
individual priorities.
The leadership roles are shared rather than held by a
single, strong leader.
Performance is judged not only by individual contributions,
but also by collective “work products” that reflect the joint
efforts of all the members.
Open-ended discussion, rather than a managerially defined
agenda, is prized at meetings.
The members of the team do real work together, rather
than delegating to subordinates.
EEMPLOYEEMPLOYEE E EMPOWERMENTMPOWERMENT
The three approaches to teamwork most often used are problem
solving teams, special purpose teams, and self-managing teams.
All three use some amount of employee empowerment, which
moves responsibility for decision farther down the organizational
chart – to the level of the employee actually doing the job.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
Generally the concept of problem solving team or special
purpose team exist in the organization culture. This is more
evident when major overhauls of the plants are done. Individuals
are made responsible in different teams (each selected from
respective shift) for specific jobs. However, the culture needs
definite improvement.
TRAININGTRAININGIn a global marketplace, firms face changing market conditions
brought on by new competitors and changing customer
preferences. Firms must rely on their employees to anticipate
possible problems, develop new products and services, and
increase productivity to remain competitive. The emphasis on
efficient process requires the employees have a broader base of
skills so that they can take on greater variety of assignments and
communicate with employees in other areas. Firms engage in a
variety of training programs, including the following:
Global training
Administrative training
Technical training
AAPPLICATIONPPLICATION ATAT KAPCO KAPCOAlthough the company does not have any competitors yet the
company face a grate a most of electricity demand from WAPDA.
To this demand a highly skilled personal, (specially Engineer) are
required. As the project kept on developing in phases i.e. from
1984 (1st phase) to 1992 (last phase), To improve the skill and
update the technical know how of the working staff for the new
machinery, a training program was launched right from the
beginning of the project. As a result of this a number of station
engineers received foreign training in different fields. Entire
program of training to different categories of staff was out in five
Phases.
PPHASEHASE I IAs per contract agreement 7 engineers were trained in Germany
and 9 in Italy. The training was conducted at the training center /
factories of the machine manufacturers. Besides the above one
months local training was also imparted to the staff at site.
PPHASEHASE II IIUnder this phase 30 engineers received training in the field of
operation and maintenance of plant. The training was arranged
in France.
A local training was also arranged at site for the staff where operation and
maintenance of the gas turbines unit 5-8 was taught for a month.
PPHASEHASE-III-IIIFor the combined cycle plant unit Forty engineers were trained in
Germany.
Locally the operation and maintenance staff for these units was trained at
site by the foreign expertise for a period of 24 weeks.
PPHASEHASE-IV-IVFor operation and maintenance of steam turbine units 11&12,
Twenty engineers received foreign training in the relevant field.
Training was imparted at France.
In addition to the foreign training, a local training was also
imparted by foreign experts to the operation and maintenance
staff. A batch of 20 officials attended the course.
PPHASEHASE-V-V15 engineers were sent to Germany under this phase. The
participants of this course received training in the field of
Electrical, Mechanical and I&C maintenance of power plant.
A multi field training course, covering a span of 13 weeks was
arranged at the plant for local training of staff. About 50 persons
availed this training to get acquaintance with the new machinery.
CapacityCapacity
Capacity is the maximum rate of output for a facility. The facility
can be a workstation or an entire organization. The operations
manager must provide the capacity to meet current and future
demand; otherwise, the organization will miss opportunities for
growth and profits.
Capacity plans are made at two levels. Long-term capacity plans.
These plans cover at least two years into the future. Whereas,
short-term capacity plans focus on work-force size, overtime
budgets, inventories, and other types of decisions.
CCAPACITYAPACITY P PLANNINGLANNING
Capacity planning is central to the long-term success of an
organization. Too much capacity can be as agonizing as too little.
When choosing a capacity strategy, managers have to consider
questions such as the following. How much of a cushion is
needed to handle variable, uncertain demand? Should we expand
capacity before the demand is there or wait until demand is more
certain?
MMEASURESEASURES OFOF C CAPACITYAPACITY
No single capacity measure is applicable to all types of
situations. Output measures are the usual choice for line flow
processes. Input measures are the usual choice for flexible flow
processes.
PPEAKEAK C CAPACITYAPACITY
The maximum output that a process or facility can achieve under
ideal conditions is called peak capacity. Peak capacity can be
sustained for only a short time, such as a few hours in a day or a
few days in a month. A firm reaches it by using marginal
methods of production, such as excessive overtime, extra shifts,
temporarily reduced maintenance activities, overstaffing, and
subcontracting.
EEFFECTIVEFFECTIVE C CAPACITYAPACITY
The maximum output that a process or firm can economically
sustain under normal conditions is its effective capacity. In some
organizations, effective capacity implies a one-shift operation; in
others it implies a three-shift operation.
SSTEPSTEPS D DETERMININGETERMINING C CAPACITYAPACITY C CUSHIONSUSHIONS
Businesses find large cushions appropriate when demand varies.
Large cushions also are necessary when future demand is uncertain.
Another type of demand uncertainty.
Supply uncertainty also favors large capacity cushions.
Small cushions have other advantages; they reveal inefficiencies
that may be masked by capacity excesses-problems with
absenteeism, for example, or unreliable suppliers. Once
managers and workers have identified such problems, they often
can find ways to correct them.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
PPOWEROWER G GENERATIONENERATION
PPEAKEAK C CAPACITYAPACITY
Peak capacity of the project is 1600 MW which is achieved
through combined cycle power plants.
EEFFECTIVEFFECTIVE C CAPACITYAPACITY
Effective capacity of the plant is 1340 MW at any instance during
the entire year.
According to the contract the company is bound to provide
same amount of power i.e. 1340 MW (equal to effective
capacity for the next 25 years to WAPDA)
Although the demand for power supply is received from
WAPDA is any instance during the year. However as a
process 95 days before the commencement of the next
year, average ten ta demand is received in giga watts / hrs
from WAPDA. Basing on this forecast capacity planning by
the company is done.
Brief calculations for generation of capacity is as
following:
1340 MW x 365 days x 24 hrs = 11738400 MW hrs
11738400 / 1000 = 11738.400 giga watts
hrs
Thus total generation capacity per year is = 11738400 Giga
watts hrs
CCAPACITYAPACITY CUSHIONCUSHION
Keeping in view the unscheduled break downs, prolonged
scheduled shut down for maintenance / overhauls WAPDA has
given a cushion of 670 Giga watts hrs to the company. The
calculations are as under:
Cushion in terms of time = 500 complex hrs
= 500 hrs x 1340 MW hrs = 670000 MW hrs
By dividing with 1000 = 670000 / 1000 = 67 Giga watts hrs
Company must try and maintain the unscheduled breakdowns
and forced outages within this specified capacity cushion of 67
gigal watts hrs. Contrary the company has to pay liquidation
charges to WAPDA.
In case company maintain and efficient work standard and
provide required capacity of power to WAPDA those grace has
(670 MW hrs) are kept in reserve for the company which it can
utilize during major overhauls which normally exceeds the
prescribed time limit for one or the other reason.
LLIQUIDATIONIQUIDATION D DAMAGESAMAGES
In case company is unable to provide required capacity of power
to its customer WAPDA and over utilizes the grace capacity of
670 MW hrs. then the company is bound to pay liquidation
damages to WAPDA at a rate of 160% or 1.6 times.
LOCATIONLOCATION
Facility Location is the process of determining a geographic site
of a firm’s managers must keep in minds various factors.
Desirability of a particular site including proximity to customers,
suppliers and transportation cost are important.
Managers can divide location factors into dominant and
secondary factors. Dominant factors are those derived from
competitive priorities (cost, quality, time, and flexibility) and
have a particularly strong impact on sales or costs.
Other factors may need to be considered, including room for
expansion, construction costs, accessibility to multiple modes of
transportation, the cost of shuffling people and materials
between plants, insurance costs, competition from other firms for
the work force, local ordinances (such as pollution or noise
control regulations), community attitudes, and many others.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
In site selection following factors were kept in view.
Existing PARCO facility for transportation of HSD from
Karachi to Mehmood Kot, which is about 35 km from Kot
Addu. From Mehmood Kot, a 10 inches diameter pipeline
has been to laid this power station and HSD pumping was
commissioned in June 1989. (Later on it has been switched
over to furnace oil since 2nd Feb. 1991.).
Sweet under ground water
Future load center of north west areas
Possible use of gas from nearby Dhodak Field
Near to Kot Addu junction Railway Station
To provide job opportunity to the Location
General uplift and development of area.
LayoutsLayouts
Layouts’ planning involves decisions about the physical
arrangement of economic activity centers within a facility. An
economic activity center can be anything that consumes space.
The goal of layout planning is to allow workers and equipment to
operate most effectively. Before a manager can make decisions
regarding physical arrangement, four questions must be
addressed.
1. What centers should the layout include?
2. How much space and capacity does each center need?
3. How should each center’s space be configured?
4. Where should each center be located?
The location of a center has two dimensions: (1) relative location,
or the placement of a center relative to other centers, and (2)
absolute location, or the particular space that the center
occupies within the facility.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
Layout of the company was although initially planned by WAPDA
but basic considerations of expansion and keeping the various
block and storage locations well within the reach of each other
were kept insight. Initial location of the plant which were
constructed in 1985 facilitated the gradual development of the
site till project completed in 1992.
FFORECASTINGORECASTING
A forecast is a prediction of future events used for planning
purposes. Forecasts are needed to aid in determining what
resources are needed, scheduling existing resources, and
acquiring additional recourses. Accurate forecasts allow
schedulers to use machine capacity efficiently, reduce production
times, and cut inventories. One of the biggest challenges in
business is forecasting customer demands. It is a difficult task
because the demand for good, and services can very greatly.
Forecasting demand requires uncovering underlying patterns
from available information.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
PPOWEROWER D DEMANDEMAND F FORECASTINGORECASTING
KAPCO does not carryout any forecasting for the demand from its
customer WAPDA. It is rather customer by itself forward the
demand. The demand from WAPDA is received five yearly,
yearly, monthly, weekly and even daily i.e. A day ahead.
As regard demand from WAPDA is concerned at times it is
received right when required that even the demand received it is
always unpredictable and tentative because of the typical
requirement and technology involvement.
FFORECASTINGORECASTING FORFOR M MAJORAJOR / M / MINORINOR O OVERHAULSVERHAULS ANDAND
MMAINTENANCEAINTENANCE
Basing on WAPDA’s demand and running records of the various
plants and personnel experience of the engineers forecasting for
the overhaul minor maintenance and schedule outages is done
by the company. A very comprehensive procedure is being
adopted for scheduled outages which are the major events for
the company ( as these outages has direct bearing on the overall
efficiency of the company).
INVENTORY MANAGEMENTINVENTORY MANAGEMENT
Inventory Management is an important concern for managers in
all types of businesses. For companies which operate on
relatively low profit margins, poor inventory management can
seriously undermine the business. The challenge isn’t to reduce
costs or to have plenty around to satisfy all demands, but to
have the right amount to achieve the competitive priorities for
the business most efficiently.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
IINVENTORYNVENTORY OFOF O OUTPUTSUTPUTS
There is no inventory for the power which is being produced by
the company. Whatever power / electricity is generated
transmitted simultaneously to its customers.
IINVENTORYNVENTORY OFOF I INPUTSNPUTS
A huge inventory is maintain for various inputs i.e. Furnace Oil,
High Speed Diesel and Spears.
NNATIONALATIONAL G GASAS
No inventory of the natural gas is maintained. The gas is coming
directly from SNGPL company and is used in the plants. There
are no storage of the gas at location SNGPL daily provide 70
million cubic feet of gas to the company for 8 months i.e. from 15
March to 15 November. If this amount of gas is not received
KAPCO charges liquidation damages from SNGPL Ltd.
FFURNACEURNACE O OILIL ANDAND H HIGHIGH S SPEEDPEED D DIESELIESEL I INVENTORYNVENTORY
An inventory of 21 days requirement of Furnace Oil and High
Speed Diesel is maintain always in the company. Quarterly
demand is sent to Pakistan State Oil (PSO) 44 days in advance.
This demand is based on WAPDA’s requirement of power which is
received 46 days before the start of the quarter. These supplies
are kept in storage tanks at location. The company has 27 tanks
each having capacity of 8,000 metric cubic oil. PSO is the only
supplier and there are no problems on supply.
SSPARESPARES I INVENTORYNVENTORY
Minor maintenance scheduled outages for major overhauls,
unscheduled outages and washing outages requires availability
of huge amount of spares round the clock at location.
All the spare parts are imported. Therefore, to meet emergent
needs spare parts are kept in stock for worth Rs. 2 billion. In
addition a huge numbers of spare part are imported keeping JIT
system in vogue.
IINVENTORYNVENTORY R REVIEWEVIEW
Periodic inventory review (monthly basis) is conducted in the
company.
QUALITY MANAGEMENTQUALITY MANAGEMENT
Quality can be defined in a various ways. In a general sense,
quality may be defined as meeting or exceeding the expectations
of the customer. For practical purposes, it is necessary to be
more specific. Quality has multiple dimensions in the mind of the
customer, and one or more of the following definitions may apply
at any one time. Quality can be defined in terms of:
Conformance and specification
Value
Fitness for use
Support
Psychological impressions
One of the important element of quality (TQM) is employees
involvement in totality. Good quality or total quality can pay off
in terms of high profits. The new and latest concept of quality is
continuous improvement or exceeding the level of customer’s
satisfaction.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
In KAPCO the concept of the quality is followed but in slightly
different form. Instead achieving customer satisfaction or
exceeding the level of customer satisfaction the organization
measure quality in following terms:
Display of best efficiency in running the Furnace Oil / HSD
plants, Gas Turbine Station, Heat Recovery Steam
Generators and Boilers.
Least utilization of raw material i.e. Furnace Oil, HSD. Their
priority remains to use gas and steams.
Excellent maintenance mechanism.
No line losses
No unscheduled outages
No extra tripping out
Maintenance of regular operations
Quality is also measured in terms of:
Preventive Maintenance
Break down maintenance
Condition based Maintenance
Pro-active maintenance
ISO 9000 CISO 9000 CERTIFICATIONERTIFICATION
The company, does not have any certification from international
standard organization.
MMONITORINGONITORING Q QUALITYUALITY
Quality is monitored through National Power central station
at Islamabad. The company has direct Hot Line
(electronically controlled) as well as a special monitoring
system called SCADA. Any break down, fluctuation and
tripping is monitored at National Power Central Station
Islamabad. This contributes to the overall quality /
efficiency of the organization.
It is from this station that various demands are placed and
in-turn plants are operated.
The best measure of the company’s quality is to have the
least or No liquidated damages during the year.
Since there are no threats to the company from the market,
other competitors, threats of raw material, gas or HSD the
company maintains high standard of efficiency. Thus
achieve required quality.
Another important quality measure is to maintain 1340 MW
hrs output throughout the year. This standard is expected
to last for the duration of contract of 25 years ever since its
privatization.
QQUALITYUALITY P POLICYOLICY
An explicit quality policy does not exist. In last three years many
procedures, local management instructions have been issued
and operational procedures defined from time to time
The quality policy for KAPCO is defined as:
The company business is to generate and sell
electricity to its only customer “WAPDA” as and
when it demands. Therefore quality for KAPCO
means, “Meeting agreed WAPDA’s
requirements”. This is possible by
maintaining the reliability and
performance of the plant at minimum cost
but with care for people, plant and
environment.
SCHEDULINGSCHEDULING
Scheduling allocates resources over time to accomplish specific
tasks. Normally, scheduling is done after many other managerial
decisions have been made. Sound scheduling can help an
organization achieve its strategic goals. Operational scheduling
focuses on how best to use existing capacity, taking into account
technical production constraints.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
WWORKORK FORCEFORCE S SCHEDULINGCHEDULING
There are two types of workforces:
1. Direct Employees.
Those who work in the energy blocks and on plants and
boilers.
2. Indirect Employees
Those who work for general duties other than the energy
blocks.
The organization has 3 x shifts of 8 hours working daily, whereas
1 x shift remains on rest for 6 days. General shift works for 8
hours daily.
OOPERATIONALPERATIONAL S SCHEDULINGCHEDULING
This is one of the best application being applied in the company.
In operational scheduling major outage plans for the next 5 years
are scheduled. Basing on this 5 year planning annual plan is
made and approved from WAPDA. Normally outages are
scheduled from July to November which is low period for the
Thermal Power Stations. This scheduling process includes:
Scheduling for outage starts 18 months before when a
particular plant is indicated for major overhaul.
15 months before the commencement of the project the
purchase requisitions are sent to the purchase department.
It takes 3 months to receive the quotations.
12 months before the start of the project of the overhaul or
scheduled outages the final demand is placed to the
suppliers by the purchase department.
1 to 2 months before the start of the project spares are
received at location. (Since the spares are imported from
abroad therefore a cushion of 1 to 2 months is kept for
negotiating the hurdles of the process).
Many major items are received just in-time (JIT) as well.
All prose and cons of the shipment of material either by air
or by sea are considered and efforts are made to have the
least possible cost with best possible delivery means at due
time.
SSHUTHUT DOWNDOWN S SCHEDULINGCHEDULING
There are three types of scheduling for shut down as following:
1. Scheduled outage or planned outages.
2. Unscheduled outages or forced outages.
3. Washing outages for gas turbines
Following parameters are kept in view for scheduling of various
types of outages discussed above.
1. For scheduled outages WAPDA gives 36 complex days for
each machine.
2. For major overhauling 50 to 60 days at average are
preempted by WAPDA for each machine.
3. For hot gas path inspection 30 days are given.
Basing on above parameters formal scheduling of shut down is
made on annual basis. This scheduled plan is approved by
WAPDA and the maintenance are under taking accordingly.
SSCHEDULECHEDULE F FOROR C CRANESRANES A ANDND L LIFTINGIFTING E EQUIPMENTSQUIPMENTS
Schedules for cranes and lifting equipment have been developed
very recently for the first time. Inspection of these items is in
progress nowadays through an independent agency.
Identification no is being punched on each equipment. In addition
red color market is also being put on tested equipments.
DISTRIBUTION OF POWERDISTRIBUTION OF POWER
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
PPOWEROWER T TRANSMISSIONRANSMISSION
For export of electric energy, this station is equipped with a two
level (132 KV & 220 KV) switchyard. Six machines (Unit No. 1, 2,
3, 4, 9 to 10) of the plant are connected with the National Grid
through 132 KV swithcyard whereas the remaining nine
machines (Unit No. 5, 6, 7, 8, 11, 12, 13, 14 & 15) terminate at
220 KV Switchyard. Four auto transformers further provides an
interlink between the two switchyards thus the system flexibility
for power transmission of all the machines is enhanced. The
power generated by this station is transmitted to the National
Grid through network of ten lines as detailed below:
Line 1: KAP 4 ---- 132 KV, 100 MW. Industrial State, Multan
Line 2: KAP 5 ---- 132 KV, 100 MW. Muzaffar Garh I
Line 3: KAP 6 ---- 132 KV, 100 MW. Muzaffar Garh II
Line 4: KAP 7 ---- 132 KV, 100 MW. D. I. Khan I
Line 5: KAP 8 ---- 132 KV, 100 MW. D. I. Khan II
Line 6: KAP 9 ---- 132 KV, 100 MW. Kot Addu
Line 7: Multan I ---- 220 KV, 250 MW. New Multan I
Line 8: Multan II ---- 220 KV, 250 MW. New Multan II
Line 9: Multan III ---- 220 KV, 250 MW. New Multan III
Line 10: Multan IV ---- 220 KV, 250 MW. New Multan IV
SUPPLY CHAIN MANAGEMENTSUPPLY CHAIN MANAGEMENT
Supply chain management seeks to synchronize a firm’s
functions and those of its suppliers to match the flow of
materials, services and information with customer demand. a
basic purpose of supply chain management is to control
inventory by managing the flows of materials.
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
The KAPCO has an efficient supply chain management
system for provision of Natural Gas, Furnace Oil, HSD and
Spares.
As regard gas it is directly coming from the SNGPL Ltd. to
the plant on daily requirement basis. A minimum and
maximum requirement levels have been finalized with
SNGPL Ltd. by the Government on permanent basis. In case
SNGPL Ltd. does not meet the requirement liquidated
damages are charges by KAPCO.
For Furnace Oil and HSD the contractor is PSO. The demand
is placed 44 days in advance of the requirement on
quarterly basis as the oil had to be transported from Kamari
to Lal Pir and then to KAPCO location.
A special 59 Km long pipeline has exclusively been laid
from DHODAK to KAPCO for provision of Furnace Oil. This
meets the major supply for the company’s requirements.
Aggregate PlanningAggregate Planning
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
As such no formal aggregate planning is done in the
company. However the company has a performance
section, which maintain all records on day to day basis.
Physical coordination of various executives is done very
frequently. Meeting are held quite often.
Commercial and performance manager, 2 engineers,
Computer qualified staff, billing staff and HR staff monitor
aggregate operations and insure followings:
1. Liquidated damages (if any) are reduced to minimum.
2. company must generate power to its requires capacity
and demand, with minimum possible cost.
FINANCIAL IMPLICATIONSFINANCIAL IMPLICATIONS
AAPPLICATIONPPLICATION ATAT KAPCO KAPCO
A formal finance / billing section exists in the company. It
ensures the billing is done to the customer (WAPDS) on monthly
basis according to the contract and power provided. At the same
time it maintain all bills received from suppliers and make
necessary arrangements and adjustments of payments. In this
connection following parameters are kept in view by the
department:
Prices of the Furnace Oil, Gas and HSD were kept as the
base and energy charges were decided. The bills are made
accordingly.
With the increase or decrease in prices the rates are
automatically adjusted with the same ratio.
This work is efficiently being performed by finance
department.
Bills for the raw material are also prepared and paid
according to the contracts deeds.
INFORMATION SYSTEMINFORMATION SYSTEM
Information is one of the most important corporate assets but, to
unlock real value you need to ensure that it can be easily
retrieved, managed and shared. The IT system recently installed
at KAPCO fulfils the requirements. More than 120 officers /
engineers have been provided with the network computers and
are connected with each other through a server installed at a
central place. The most modern computer aided maintenance
management and stock control system has also been installed
and made accessible for all the users. The documents and other
forms of information can be scanned and converted to electronic
form. From any workstation, user can retrieve documents rapidly,
review or annotate them, communicate to other people for
comments or approval and incorporate the information into other
popular business applications.
EXECUTIVE SUMMARYEXECUTIVE SUMMARY
Until 1996, Government of Pakistan had monopoly over power
generation and transmission all over the country. Government
ran this business through State owned “Water and Power
Development Authority” (WAPDA). In 1996, the then Government
decided to privatize WAPDA in different stages. because of
excessive in-efficiencies in the operation of WAPDA’s and to
encourage in-ward investment into Pakistan.
Kot Addu Power Company came into existence in June 1996
when the Government privatize its 26 % shares to National
Power England through open bidding with an option to purchase
another 10 %. This 10 % was purchased by National Power
England. Therefore, in June 1996 a new company named “Kot
Addu Power Company” came into existence.
The power complex is spread over 280 acres of land. It has three
independent blocks and each block has machines of different
make where different technology is used. Production department
operates the plant and maintenance department is responsible
for up keep of the plant through preventive maintenance, trouble
shooting and major / minor overhauling after predetermined
period.
Forecasting of the company is entirely dependent upon the
forecasting received from WAPDA. Mainly forecasting is done for
various maintenance operations. Forecasting is also done for the
provision of raw material supplies i.e. Furnace Oil, High Speed
Diesel and Spare Parts for the plant machinery.
The company maintains an inventory of 21 days for Furnace Oil
and High Speed Diesel. It also maintain a huge inventory of spare
parts. A fairly good Supply Chain Management System exists
within the organization.
The company’s basic business is to produce required amount of
power according to the customer demand with No liquidated
damages. The company believes in quality by maintaining high
efficiency level of its operations. There are no ISO 9000
certification obtained by the company.
The company is shifting its existing manual information system
to modernized information technology based system in which
approximately 120 new computers along with a server had
already been installed.
In this report a detailed analysis of various operations
management procedures has been carried out. This analysis
provides an opportunity to look into the organizational
functioning of KAPCO deeply.
ACKNOWLEDGEMENTACKNOWLEDGEMENT
To start with, I with my all humility convey, my sincere thanks to
GOD the ALMIGHTY for having granting me the Wisdom and
energies to complete this assignments with in the stipulated
time.
In the process of the preparation of report I required lot of
guidance and directions. I could receive these from highly
learned, experienced and most elegant personality Dr. Hayat
M. Awan. Let me admit openly that without his dedicated
guidance, most useful advises and wholehearted assistance the
task was uphill. I have learnt a lot and added to my experience
during this process. I extend my deep gratitude and most sincere
thanks to him.
I also extend very sincere thanks to the following executives of
KAPCO who have really provided me with the most useful
information about the project.
Mr. Nisar Asim Ex. General Manager
Mr. Amjad Ali Sheikh Resident Engineer (Opeartions)
Mr. Muhammad Yasin Manager Human Resources
I am also thankful to all others who assisted me in completion of
this report.
Author
PrefacePreface
To become an expert in any field, only theoretical
knowledge does not provide a concrete base. This is a unique
approach of business education that provides an opportunity to
the students to observe daily life business practices and
problems. Operations Management is one of the core subject of
MBA Program that gives us an idea as to how the various aspect
of operations are dealt in the different organizations. Therefore,
the study of this subject is incomplete without observing the
applications in the real working environment.
During the process of study, I made a couple of visits to
meet with the executives of KAPCO. A formal questionnaire was
prepared before the discussions were made with the General
Manager of the Organization and Resident Engineer (Operations).
A very informative, exhaustive and valuable material has been
collected during the discussion with experts. All this prove to be
an effective source of learning.
Contents Contents
INTRODUCTION TO THE ORGANIZATION________________________________1
OBJECTIVES___________________________________________________________5
OPERATIONAL STRATEGY______________________________________________6
MISSION_______________________________________________________________7
CORE COMPETENCIES AND COMPETITIVE PRIORITIES___________________8
DECISION MAKING IN OPERATIONS____________________________________11
CAPACITY____________________________________________________________15
LOCATION____________________________________________________________18
LAYOUTS_____________________________________________________________19
INVENTORY MANAGEMENT____________________________________________21
QUALITY MANAGEMENT______________________________________________23
SCHEDULING_________________________________________________________26
DISTRIBUTION OF POWER_____________________________________________29
SUPPLY CHAIN MANAGEMENT_________________________________________30
AGGREGATE PLANNING_______________________________________________31
FINANCIAL IMPLICATIONS____________________________________________32
INFORMATION SYSTEM________________________________________________33