Chapter 1: Objectives & Scope
1.1Objective
Motive of this project is to provide a unique ID to each and every citizen of India while
providing him/her a birth certificate. Citizens after attaining age of 18 must register at RTO
office or Collector office or Tasildar office and get a password to access the site. ID card will
be provided to every user after registration. Later on they can change their password. Once
they enter the site they can pay their electricity bill and telephone bill, book railway tickets
and airline tickets and pay their taxes. During elections people can poll online. Government
officials can verify details about a person from the database for issuing vehicle license,
passport, visa, etc.
1.2Scope
The name of the project is UID Management System. A UID ManagementSystem project is a means for residents to clearly and uniquely verify their identity
anywhere in the country.
UID Management System provides UID which is a universal number. UID Management System can be used in any system which needs to establish the
identity of a resident and/or providesecure accessfor the resident to services/benefits
offered by the system.
Agencies and services can contact the UID Management System database fromanywhere in the country to confirm abeneficiarys identity.
http://computersciencearticle.in/2011/12/a-synopsis-on-uniqueid-management-system-unicus/http://computersciencearticle.in/2011/12/a-synopsis-on-uniqueid-management-system-unicus/http://computersciencearticle.in/2011/12/a-synopsis-on-uniqueid-management-system-unicus/http://computersciencearticle.in/2011/12/a-synopsis-on-uniqueid-management-system-unicus/7/29/2019 report on uid
2/21
2
Chapter 2: Definition of Problem and Problem Description
2.1 Problem Definition
The biggest Limitations in the existing IDs is that they serve different purpose and the levelof cross acceptance of these id is minimal.
The person below 18 (age) do not have unique identification. To find information about any
person, government department such as police department, CBI, need to gather information
manually. For any type of connections such as electric, phone, water supply and for passport /
visa, applicant is required to submit their complete documents at respective department. And
then respective department verify documents then provide respective facilities.
2.2 Problem Description
We have completely studied Aadharproject by government of India, UIDAI, for providing
identification to the citizen of India and to provide Online authentication using demographic
data.
An organization or an entity uses Aadhar authentication as part of its application to provide
services to residents. Examples include government department, bank and other public or
private organization.
Aadhar authentication only responds with a YES/NO and no personal identity information
is returned as part of the response. At the time of generating UID, it is checked with existing
UIDs in Aadhar database. If it is already existing then a new UID is generated automatically
and checked again to avoid duplicity.
7/29/2019 report on uid
3/21
3
Chapter 3: Theoretical Background
A crucial factor that determines an individuals well being in a country is whether their
identity is recognized in the eyes of the government. Weak identity limits the power of thecountrys residents when it comes to claiming basic political and economical rights. The lack
of identity is especially detrimental for the poor and underprivileged.
Aadhar authentication only responds with a YES/NO and no personal identity information
is returned as part of the response. At the time of generating UID, it is checked with existing
UIDs in Aadhar database. If it is already existing then a new UID is generated automatically
and checked again to avoid duplicity.
The person below 18 (age) do not have unique identification. To find information about any
person, government department such as police department, CBI, need to gather information
manually. For any type of connections such as electric, phone, water supply and for passport /
visa, applicant is required to submit their complete documents at respective department. And
then respective department verify documents then provide respective facilities.
7/29/2019 report on uid
4/21
4
Chapter 4: System Analysis and Design
4.1 System Analysis
System Analysis is a term used to describe the process of calculating and analyzing facts in
respect of existing operation of the prevailing situations that an effective computerized
system may be designed and implemented if provided feasible. This is required in order to
understand the problem that has to be solved. The problem may be of any kind like
computerizing an existing system or developing an entirely new system or it can be a
combination of two.
4.2 System Design
System Design is performance levels the technique of creating a system that takes into
notice such factors such as needs, database design, hardware specifications, and data
management. It is the most important part in the development part in the development of the
system, as in the design phase the developer brings into existence the proposed system the
analyst through of in the analysis phase. The Central ID Data Repository will be the central
database of all residents, containing the minimal sets of fields sufficient to confirm identity.
The federated set of databases belonging to the registrars may contain additional information
about the residents, and can use the residents UID as the key.
7/29/2019 report on uid
5/21
5
Figure 5.1. UID SYSTEM DESIGN
7/29/2019 report on uid
6/21
6
Chapter 5: System Planning (PERT Chart)
5.1 Pert Chart:
The project network is the foundation of both PERT and CPM. PERT gained prominenceduring the late 1950s when it proved invaluable in scheduling and controlling the Polaris
missile program. It is particularly useful in research and development projects where the
times to complete the various activities are uncertain. The critical path is the primary
focus of management control, and monitoring the critical events provides an early
warning if estimates are inaccurate. Industry developed CPM (Critical Path Method) to
help solve scheduling problems when the activity times are known more precisely. Only
by shortening the critical path can the project completion time be improved.
Consequently, the critical path defines those activities into which additional resources
might be poured to accelerate the schedule.
5.2 Key Terms used during PERT Chart:
Activity A task to be completed.
CPM (Critical Path Method) A project management technique based on a project
network; the focus of CPM is project planning, with the critical path defining thoseactivities into which additional resources might be poured to accelerate the schedule.
Critical path The path through a project network that links the critical events that
must begin on time and the critical activities that must require no more than their
estimated duration if the project is to be completed on time.
Diverge To split a single input path into multiple paths.
Dummy activity An activity that links parallel events, but consumes neither time nor
resources.DurationThe elapsed time required to complete an activity.
Earliest event time (EET) The earliest time the event can possibly begin.
EventThe beginning or end of an activity.
Latest event time (LET) The latest time an event can occur without impacting the
project schedule.
Merge To combine two or more input paths into a single output path.
7/29/2019 report on uid
7/21
7
PERT (Program Evaluation and Review Technique) A project management
technique based on a project network; with PERT, the critical path is the primary focus
of management control and monitoring the critical events provides an early warning if
estimates are inaccurate.
Project network A bubble chart that graphically depicts activities, their starting and
completion times, and their interrelationships.
Slack The maximum time an activity can slip without affecting the project schedule.
5.3 Steps in the PERT Planning Process
PERT planning involves the following steps:
1. Identify the specific activities and milestones.2. Determine the proper sequence of the activities.3. Construct a network diagram.4. Estimate the time required for each activity.5. Determine the critical path.6. Update the PERT chart as the project progresses.
7/29/2019 report on uid
8/21
8
5.3 PERT Chart:
Figure 5.1
JOB DESCRIPTION TIME
(in
days)
Start 00
Talk to user representatives 05
Develop initial project scenarios 10
Visit sites 03
Present feasibility study 06
Conduct systems analysis
activities
05
Present result of system analysis 04
Documentation 02
Figure 5.2
7/29/2019 report on uid
9/21
9
Chapter 6: DFD Diagram, ERD Diagram and Sequence
Diagram
6.1Data Flow Diagrams
Figure 6.1
7/29/2019 report on uid
10/21
10
6.2ER Diagram
Figure 6.2
7/29/2019 report on uid
11/21
11
Chapter 7: Life-Cycle of Project
It mainly comprises of 4 phases:
1. Project Initiation
2. Project Planning3. Project Execution
4. Project Closure
Fig.: Life Cycle of Project
For this purpose Software Development Life Cycle has followed.
7.1 Software Development Life Cycle
Since the inception of this project all software engineering principles have been followed.
This project has passed through all the stages of software development life cycle (SDLC).A
development process consist of various phases, each phase ending with a defined output. The
main reason for following the SDLC process is that it breaks the problem of developing
software into successfully performing a set of phases, each phase handling a different concern
of software development. Object technologies lead to reuse and reuse (of program
components) lead to faster software development and higher quality programs. Object-
oriented software is easy to maintain because its structure is inherently decoupled. In
addition, object oriented systems are easier to adopt and easier to scale. The Object-oriented
process moves through an evolutionary spiral that starts with customer satisfaction. It is here
7/29/2019 report on uid
12/21
12
that the problem domain is defined and that basic problem classes are identified. Planning
establishes a foundation for the Object Oriented Project Plan.
7.2 Feasibility Study
This involves study of system and to look whether the system does the kind of job expected
from it. The objective of feasibility study is not to solve problem but to predict that if does
kind of work expected from it, in a reasonable period of elapsed time & consistent with the
financial & processing objective and needs of organization. Feasibility study analysis is done
in respect of following:
1. Technical feasibility study2. Economic feasibility study3. Legal feasibility study4. Time feasibility study5. Operational feasibility study6. Social/Behavioural feasibility study
7.2.1 Technical Feasibility Study
The project can be developed simply by using two platforms i.e. HTML/PHP as front end andMySQL server and J2EE as back end. All the functionality can be implemented in the new
system. Hence it is technically feasible.
7.2.2 Economic Feasibility Study
This Project is worth making. Software which can keep all details of the citizen of India, will
give remarkable benefits to both citizens and government. Project is economically feasible in
every sense it takes less effort, less time and nominal cost of tools for developing software.
7.2.3 Legal Feasibility Study
Since this project needs no copyrighting, patenting, and does not have any relation with
anybody elses property rights, it can be considered as a legally feasible project.
7/29/2019 report on uid
13/21
13
7.2.4 Time Feasibility Study
As it has been more probable that the project can be completed within the given timeframe, it
is completed within given time frame; it is considered that the undertaking project is feasible
in context of time.
7.2.5 Operational Feasibility Study
The system is completely operational and can be successfully implemented by those who are
registered users or want to register or apply for the UID. It can also be used by the
administrator for verification of the UID card holder anywhere in the country.
7.2.6 Social / Behavioural Feasibility Study
Unique IDManagement system is easy to understand not only for any sophisticated users but
for the native users as well. It provides a simple way in which user can feel free to apply
faster, easier and more efficiently. Therefore, it can be socially and behaviourally accepted
and is feasible too.
7/29/2019 report on uid
14/21
14
Chapter 8: System Implementation and Details of Hardware and Software
Used
8.1 Post Implementation review-
After the system is implemented, a review should be conducted to determine whether the
system is meeting expectations and where improvements are needed. System quality, user
confidence and operating systems statistics are accessed through such technique event
logging, impact evaluation and attitude surveys. The review not only assesses how well the
proposed system is designed and implemented, but also is a valuable source of information
that can be applied to a critical evaluation of the system.
The reviews are conducted by the operating personals as well as the software developers in
order to determine how well the system is working, how it has been accepted and whether
adjustments are needed. The review of the system is highly essential to determine the future
enhancements required by the system. The system can be considered successful only if
information system has met its objectives. The review analyses the opinion of the employees
and identifies the attitudes towards the new computerized system. Only when the merits and
demerits of the implemented system are known, one can determine what all additional
features it requires are.
8.2 SYSTEM TESTING
System testing is a critical aspect of Software Quality Assurance and represents the ultimate
review of specification, design and coding. Testing is a process of executing a program with
the intent of finding an error. A good test is one that has a probability of finding an as yet
undiscovered error. The purpose of testing is to identify and correct bugs in the developed
system. Nothing is complete without testing. Testing is the vital to the success of the system.
In the code testing the logic of the developed system is tested. For this every module of the
program is executed to find an error. To perform specification test, the examination of the
specifications stating what the program should do and how it should perform under various
conditions.
Unit testing focuses first on the modules in the proposed system to locate errors. This enables
to detect errors in the coding and logic that are contained within that module alone. Those
7/29/2019 report on uid
15/21
15
resulting from the interaction between modules are initially avoided. In unit testing step each
module has to be checked separately.
8.3 HARDWARE AND SOFTWARE USED
Software Requirements
Server side:Operating System : Windows
User Interface : HTML, CSS
Client-side Scripting : JavaScript
Programming Language : JAVA
IDE/Workbench : Dreamweaver
Database : Oracle 10g Database
Server Deployment : Apache TOMCAT web Server
Client Side:
Operating System : Windows/linux/mac
Browser : IE/ Chrome/ Firefox etc
Hardware Requirements
Server side:Processor : Intel core i3 or equivalent
Hard Disk : 3GB
RAM : 512 MB
7/29/2019 report on uid
16/21
16
Chapter 9: SRS (Use-Cases)
A software requirements specification (SRS), a requirements specification for a software
system, is a complete description of the behaviour of a system to be developed and may
include a set of use cases that describe interactions the users will have with the software. Inaddition it also contains non-functional requirements. The software requirements
specification document enlists all necessary requirements that is required for the project
development. To derive the requirements we need to have clear and thorough understanding
of the products to be developed. This is prepared after detailed communications with project
team and the customer.
9.1 Use Case Diagrams
1.)
Use-case: - System Admin Page
_Admin Page Use Cases
1. Access to Admin
Page
Administrator
a. Link for the
Create new UID
1b. Link for Updating
isting UID
7/29/2019 report on uid
17/21
17
2.)
Use-case: User Page
_User Page Use Cases
1. Access to User
Page
User
1b. Info of User UID
Ex
7/29/2019 report on uid
18/21
18
Chapter 10: Snapshots & Work Done
1. Home Page
2. Administrator Login Page
7/29/2019 report on uid
19/21
19
3. User Page
4. Create UID
7/29/2019 report on uid
20/21
20
5. Inner Admin Page
6. Contact Us
7/29/2019 report on uid
21/21
21
Chapter 11: References
[1]Pressman "Software Engineer", Pearson, 5th Edition, 2001
[2]Robert G.Fuller HTML in 10 Simple Steps or Less,John Wiley & Sons,2003