20
Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located . The siding is a lap siding product by James Hardie. The siding is deteriorating on its edge that is in the proximity of the roof plane where the roof meets the sided wall. The siding as installed is lacking the necessary clearance from this roof plane as specified in the installation recommendations by James Hardie. At the time this home was constructed, the clearance minimums were 1” to 2”. The siding on the home was installed less than 1” from the roof plane. This lack of clearance has lead to the early demise of the siding in these areas. There are two places on the home where moisture is intruding into the building envelope. Both places where these leaks are occurring have had a sealant applied to the wall /roof junction in an attempt to correct and prevent this leaking. This method should only be used as a temporary stop gap measure until a complete repair can be made. The siding in this area needs to be removed and the flashing corrected. The decks are attached to the home in a deficient manner with joist hangers nailed over the siding. This is a substandard method in attaching a deck. The door in the lower level under the rear deck is having moisture come in at the top side. The window assembly above the rear deck is questionable in its installation detailing as it leaks when there is a wind driven rain from the east. The following captioned picture report covers these items in more detail. Mark Parlee .
Transcript
Page 1: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on

the Residence located .

The siding is a lap siding product by James Hardie. The siding is deteriorating on its edge that is in the proximity of the roof plane where the roof meets the sided wall. The siding as installed is lacking the necessary clearance from this roof plane as specified in the installation recommendations by James Hardie. At the time this home was constructed, the clearance minimums were 1” to 2”. The siding on the home was installed less than 1” from the roof plane. This lack of clearance has lead to the early demise of the siding in these areas.

There are two places on the home where moisture is intruding into the

building envelope. Both places where these leaks are occurring have had a sealant applied to the wall /roof junction in an attempt to correct and prevent this leaking. This method should only be used as a temporary stop gap measure until a complete repair can be made. The siding in this area needs to be removed and the flashing corrected.

The decks are attached to the home in a deficient manner with joist

hangers nailed over the siding. This is a substandard method in attaching a deck. The door in the lower level under the rear deck is having moisture come in

at the top side. The window assembly above the rear deck is questionable in its

installation detailing as it leaks when there is a wind driven rain from the east. The following captioned picture report covers these items in more detail. Mark Parlee

.

Page 2: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [1]_____________________________________________

©Parlee :: The Building Consultant

01.JPG

02.JPG

Page 3: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [2]_____________________________________________

©Parlee :: The Building Consultant

03.JPG

04.JPG

Mark
Text Box
This siding is installed outside of manufacturer's installation guidelines with respect to clearance from the roof plane. James Hardie specifies 2" clearance at this time. At the time this home was built this may have been in the time frame that a 1" clearance was permitted. This application does not conform to the 1" clearance. The siding was installed too close to the roof plane and the edges were not sealed as required by the manufacturer of this product. There is a leak that is causing damage to the ceiling drywall due to an improper flashing detail at the bottom edge. There is a sealant applied to siding edge at the roof plane; this has the potential to further exacerbate moisture intrusion at this point.
Mark
Arrow
Mark
Text Box
Sealant
Mark
Snapshot
Mark
Snapshot
Page 4: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [3]_____________________________________________

©Parlee :: The Building Consultant

05.JPG

06.JPG

Mark
Text Box
This is the leak that is showing up on the ceiling as a result to less than adequate detailing of the flashing on the exterior siding/roof plane junction. A sealant has been added in an attempt to correct this situation. At best a sealant should be used as a temporary stop gap until a correction to the flashing is done. The detail in which the sealant was applied has a high probability in making moisture intrusion more likely.
Mark
Text Box
None of the siding on this house follows manufacturer's minimum clearance guidelines for the siding/ roof plane junction. Many of the siding pieces are suffering damage due to this clearance issue. A kick-out flashing should be installed at the time corrections and repairs are made.
Page 5: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [4]_____________________________________________

©Parlee :: The Building Consultant

07.JPG

08.JPG

Mark
Text Box
Here is another area that is suffering damage due too close of siding proximity to the roof plane. There is no kick-out flashing. This leaks into the wall system below and is creating damage to the drywall.
Mark
Text Box
The sealant shows an attempt to repair the situation; there is a high probability this will exacerbate this situation and create a bigger leak.
Page 6: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [5]_____________________________________________

©Parlee :: The Building Consultant

09.JPG

10.JPG

Mark
Text Box
Owners noted they have had moisture problems at this wall running down the corner and onto the floor. This is the damage resulting from the detail problems noted in the pictures on page four.
Mark
Arrow
Mark
Arrow
Mark
Arrow
Mark
Text Box
This block is intentionally left blank.
Page 7: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [6]_____________________________________________

©Parlee :: The Building Consultant

.JPG

12.JPG

Mark
Text Box
This trim is suffering damage due to wicking moisture at the bottom of the trim. No isolation detailing was followed nor was clearance detail from slab implemented. The clearance between the slab and the bottom edge of the trim should be 1/2" to prevent wicking of moisture. Owner stated the entry trim was originally to be Fypon but a change was made without their approval.
Mark
Text Box
This trim is wicking moisture due to its close proximity to the concrete slab. The siding is too close. A 2" clearance at this juncture is mandated by the manufacturer. This siding does not appear to be suffering damage at this point.
Mark
Snapshot
Page 8: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [7]_____________________________________________

©Parlee :: The Building Consultant

13.JPG

14.JPG

Mark
Text Box
This fungal growth is likely caused by moisture getting in at the edges of this trim board. This is not necessarily a defect in application but is a maintenance item.
Mark
Arrow
Mark
Arrow
Mark
Text Box
This is a likely access point for moisture to get behind the trim. The trim should be installed 1/4" away from the window frame, a 3/8" backer rod inserted, and a highly flexible sealant used to fill this gap. This allows for proper movement between materials that have different expansion/ contraction coefficients while maintaining a good performing sealant detail.
Mark
Arrow
Page 9: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [8]_____________________________________________

©Parlee :: The Building Consultant

15.JPG

16.JPG

Mark
Text Box
This block is intentionally left blank.
Mark
Text Box
This siding is in need of replacement.
Mark
Arrow
Mark
Text Box
Page 10: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Waukee/7.8.09/ page [9]_____________________________________________

©Parlee :: The Building Consultant

17.JPG

18.JPG

Mark
Text Box
These windows experience some very heavy moisture intrusion when a wind driven rain is driving against them. This is a typical scenario given the details of installation. We have witnessed this many times. The trim is installed tightly to the window cladding and no relief is given to trapped moisture as the sealant fails with age. This makes the trim a reservoir cladding of sorts and the moisture seeks its release to the inside to some degree as evidenced in the photo below.
Mark
Text Box
Owner provided picture verifies claim of extreme moisture intrusion.
Page 11: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [10]_____________________________________________

©Parlee :: The Building Consultant

19.JPG

20.JPG

Mark
Text Box
Outside view of windows that have moisture intrusion issues. All trim is installed in a barrier style installation and allows no release detail for moisture to escape. All of this trim needs to be removed and replaced with new in a detail comprehensive manner that will allow drainage. All of the windows need to be sealed in with weather resistant butyl tape properly integrated with the WRB(weather resistant barrier).
Mark
Text Box
This trim board has a microbial growth and is most likely due to the trim being wet from moisture saturating it from the back side.
Page 12: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

/7.8.09/ page [11]_____________________________________________

©Parlee :: The Building Consultant

21.JPG

22.JPG

Mark
Text Box
Mark
Text Box
Mark
Text Box
This is a potential moisture intrusion point on the door. This door should be checked by Pella Service Center; it may be a warrantable claim.
Mark
Text Box
This damage is characteristic of damage I have observed when the metal cladding gets wet behind it and freezing occurs.
Page 13: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [12]_____________________________________________

©Parlee :: The Building Consultant

23.JPG

24.JPG

Mark
Text Box
There is moisture getting behind this siding and showing up on the inside of the drywall. To correct this the trim will have to be removed and a sealant tape added to the perimeter of this door. Some of this moisture could be coming from the threshold of the door above as well as the deck joist connection.
Mark
Text Box
Mark
Text Box
Moisture staining on the drywall. The assessment of this will require the outside trim to be removed so the detail in which the door was installed can be viewed.
Page 14: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [13]_____________________________________________

©Parlee :: The Building Consultant

25.JPG

26.JPG

Mark
Text Box
This is the OSB rim board the deck joists are fastened to. The slight discoloration is due to a water leak either in the detail of the deck joist connection or from the door sill above.
Mark
Text Box
Owner provided picture shows water collecting on the inside of the door threshold.
Page 15: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.8.09/ page [14]_____________________________________________

©Parlee :: The Building Consultant

27.JPG

28.JPG

Mark
Text Box
The joist connection to the structure needs to be reviewed. This is not a very good detail and leaves room for early failure. This is not an approved connection detail in any documentation I have available. The joist hangers are applied over the face of the siding and nailed into the OSB rim board. There is no ledger board.
Mark
Snapshot
Mark
Snapshot
Page 16: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

Ct. Waukee/7.8.09/ page [15]_____________________________________________

©Parlee :: The Building Consultant

29.JPG

Mark
Text Box
The floor in the basement is exhibiting cracking that is out of the normal range in my opinion. This condition should be monitored and if there are any increased movements an engineer should be consulted.
Page 17: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.17.09 page [1]_______________________________________________

©Parlee :: The Building Consultant

P101 7.JPG

P1010188.JPG

Mark
Text Box
This photo is of the door from the garage into the house. Water leaking from improper detailing at the roof.
Mark
Text Box
This drywall needs to be removed and replaced. This repair needs to proceed as if this were mold and necessary precaution taken to ensure proper remediation.
Page 18: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.17.09 page [2]_______________________________________________

©Parlee :: The Building Consultant

P1010190.JPG

P1010669.JPG

Mark
Text Box
Water running on garage floor from leak above.
Mark
Text Box
This is a better picture of the sun-room ceiling where the moisture is leaking from an incorrectly detailed wall flashing and destroying this ceiling finish. This repair needs to proceed as if this were mold and necessary precaution taken to ensure proper remediation.
Page 19: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.22.09/ page [1]___________________________________________________________

©Parlee :: The Building Consultant

DSC_0003.JPG

DSC_0005.JPG

Mark
Text Box
This is the side deck. The deck is mounted to the home in the same fashion as the rear deck. this also has no deck ledger board and is connected to the structure in a detail that will prove problematic over time. The connection details used are not approved in any current version of the building code.
Page 20: Report prepared for 7/08/09dickseibert.com/mark_8_28.pdf · Report prepared for 7/08/09 Parlee Projects, Inc., dba The Building Consultant was hired to consult on the Residence located

. Waukee/7.22.09/ page [2]___________________________________________________________

©Parlee :: The Building Consultant

DSC_0006.JPG

DSC_0007.JPG

Mark
Text Box
Joist hangers nailed on over siding.

Recommended