THE CITY OF SAN DIEGO REPORT TO THE PLANNING COMMISSION DATE ISSUED: February 25,2010 REPORT NO. PC-IO-017 ATTENTION: SUBJECT: REFERENCE: OWNER! APPLICANT: SUMMARY Planning Commission, Agenda of March 4, 2010 VERIZON - PADRE GOLD - PROJECT NO. 97765, PROCESS 4 Report to the Planning Commission, Report No. PC·08-129 http://www.sandiego.gov!planning-commissionfpcreports!08129.pdf American Legion Post 731 Department of California Verizon Wireless Issuers): Should the Planning Commission approve a Conditional Use Permit (CUP) and a Planned Development Permit (PDP) for a wireless communication facility located at 7245 Linda Vista Road in the CC-I-3 zone of the Linda Vista Community Planning area? Staff Recommendation: 1. Approve Conditional Use Permit No. 590322. 2. Approve Planned Development Permit No. 318510. Community Planning Group Recommendation : The Linda Vista Planning Group has reviewed various iterations of this project over the years and has consistently voted to recommend denial. Two architectural tower designs were developed more recently based on input from a planning group subcommittee, which met several times to address the issues associated with the project. The projects will be reviewed on February 22, 2010 as an action item. The recommendation will be provided verbally to the Planning Commission on March 4, 2010. Environmental Review: The Padre Gold project was determined to be categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Article 19, Section 15302. This project is not pending an appeal of the environmental determination. The environmental exemption determination for this project was made on April 3, 2006,
Transcript
Page 1: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

THE CITY OF SAN DIEGO

REPORT TO THE PLANNING COMMISSION

DATE ISSUED: February 25,2010 REPORT NO. PC-IO-017

ATTENTION:

SUBJECT:

REFERENCE:

OWNER!APPLICANT:

SUMMARY

Planning Commission, Agenda of March 4, 2010

VERIZON - PADRE GOLD - PROJECT NO. 97765, PROCESS 4

Report to the Planning Commission, Report No. PC·08-129http://www.sandiego.gov!planning-commissionfpcreports!08129.pdf

American Legion Post 731 Department of CaliforniaVerizon Wireless

Issuers): Should the Planning Commission approve a Conditional Use Permit (CUP) anda Planned Development Permit (PDP) for a wireless communication facility located at7245 Linda Vista Road in the CC-I-3 zone of the Linda Vista Community Planning area?

Staff Recommendation:

1. Approve Conditional Use Permit No. 590322.

2. Approve Planned Development Permit No. 318510.

Community Planning Group Recommendation: The Linda Vista Planning Group hasreviewed various iterations of this project over the years and has consistently voted torecommend denial. Two architectural tower designs were developed more recently basedon input from a planning group subcommittee, which met several times to address theissues associated with the project. The projects will be reviewed on February 22, 2010 asan action item. The recommendation will be provided verbally to the PlanningCommission on March 4, 2010.

Environmental Review: The Padre Gold project was determined to be categoricallyexempt from the California Environmental Quality Act (CEQA) pursuant to Article 19,Section 15302. This project is not pending an appeal of the environmental determination.The environmental exemption determination for this project was made on April 3, 2006,

Page 2: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

and the opportunity to appeal that determination ended April 24, 2006.

Fiscal Impact Statement: All costs associated with the processing of this project arepaid from a deposit account maintained by the applicant.

Code Enforcement Impact: If this project is denied, the City's Neighborhood CodeCompliance Division of the Development Services Department would take codeenforcement action because the existing permit for the 76 foot high monopole is expired.The code enforcement action would be funded by the City's general fund.

Housing Impact Statement: None associated with this project.

BACKGROUND

The Padre Gold project is located 7245 Linda Vista Road in the Linda Vista CommunityPlanning area. Currently existing on site is a 76-foot tall monopole that was approved previouslyby the Planning Commission on September 28, 1995. The permit expired September 28, 2005and Verizon submitted an application for a new CUP to maintain the existing monopole onMarch 4, 2006. The project has been scheduled for several Planning Commission hearings, butVerizon has requested continuances in order to redesign the facility.

On June 30, 2009, Verizon submitted a redesigned project consisting of a 76-foot tall monopinesupporting 15 panel antennas and a microwave dish along with a planter wall and new shrubs tosoften the visual impact of the equipment enclosure. The Linda Vista Planning group votedunanimously to deny the project. The project did not comply with LDe Section 141.0405(previous Communication Antenna regulations) due to the implausibility of a 76-foot high pinetree in a commercial setting devoid of any similar height trees. Verizon has redesigued theproject again, this time as an architectural tower. Verizon has provided two differentarchitectural designs as a result of ad hoc planning group subcommittee meetings. The heightremains the same: 76-foot, but the antennas are completely concealed within the new tower. Theequipment enclosure will remain, but concrete screening walls will be added along with a planterwall.

The project site is zoned Ce-I-3, which allows a maximum height of45-feet, thus therequirement for a PDP. The site is designated for commercial use in the Linda Vista communityplan. Surrounding uses include residential to the south, west and east and a school to the north.

DISCUSSION

Project Description:

This project was submitted under the previous Communication Antenna regulations (LDCSection 141.0405), and because it does not comply with the development regulations, it isconsidered to be a major telecommunication facility and it requires a PDP for the deviationsdiscussed below.

- 2 -

Page 3: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

The existing tower is 76-feet where the maximum height limit is 45-feet. Section 141.0405 ofthe Land Development Code requires wireless communication facilities to be designed to beminimally visible through the use of architecture, landscape architecture and siting solutions.After several years and many discussions, Verizon has now designed a 76-foot tall architecturaltower that will house all of their antennas. The tower, because of its location at the intersection ofLinda Vista Road and Genesee Avenue will have the appearance of a community landmark.Verizon is requesting to maintain their existing 360 square foot equipment enclosure and torelocate the existing generator. All of these components are proposed to be located behind a 7­foot high concrete wall and a series ofplanter walls. Landscaping will be added to enhance thecompound area and along the street to enhance views of the property.

The height is a concern to staff as well as to the community, but it is a commercial propertylocated at a major intersection, which conld also be called a gateway within Linda Vista. Thelocation is conducive to an architectural tower that would have the appearance of a communitylandmark. Verizon has developed two designs based on input from a community planning groupad hoc subcommittee. The first design picks up on the surrounding architecture in the immediatearea and includes an asymmetrical roofline above decorative columns that transitions to a solidtwo-tone wall below. The second tower design is reminiscent of the architectural style ofUSD,which is also a community landmark. Additionally, Verizon is providing space for AT&T tolocate their antennas and equipment within the tower negating the need for a WCF at KearnyMesa Park, which the community group opposes. There is also room for the T-Mobile facility tobe relocated within the tower once the CUP for their flag pole on the same property expires.

The existing monopole and equipment enclosure encroaches into the rear yard setback. At thetime of the original approval, the deviations were included under the CUP. The proposedproject retains the enclosure in its current location, which is set back six-feet from the rearproperty line. The new tower would be set back approximately 8 ~-feet from the rear propertyline. The required setback is 14-feet. On the side yard setback along the eastern side of theproperty, the existing enclosure is set back 8-feet from the property line and the new generatorenclosure would be set back 10-feet from the property line. The required side yard setback is 19­feet. Since the time that the Verizon facility has been in this location, there have been nocomplaints from the adjacent property owners or tenants and since the project was originallyapproved, a new three-story condominium complex has been built to the east of the project site.The developers of the new condominium complex on the east constructed a 7-foot high concretefence along the property line and Verizon proposes to extend the wall down the side and rearproperty lines to help buffer the facility from the adjacent residential uses. This will help tomitigate potential adjacency issues between the land uses. Also, the addition of landscape infront of the enclosure and along the eastern boundary will provide a buffer as well.

General Plan Analysis:

The City's General Plan requires that wireless facilities be minimally visible by utilizingcamouflage and screening techniques to help blend the facility into the surrounding area. It alsorequires that wireless facilities be aesthetically pleasing and visually respectful and compatiblewith the community. The antennas associated with this facility will be completely concealedwithin the architectural tower. The existing equipment enclosure will remain as is, however,

- 3 -

Page 4: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

planter walls and additional landscape material will be added to help screen and integrate theenclosure into the setting. The design of the tower is reminiscent of the architecture ofUSD, alandmark within Linda Vista, but the colors will be similar to that ofthe buildings in theimmediate vicinity. The tower will be the tallest structure in this part of Linda Vista, but itslocation at the main intersection in the community could be considered a gateway to thecommunity and therefore function as a community landmark. Based on the project's design, it iscompatible with the City's General Plan. The Linda Vista Community Plan does not discusswireless communication facilities.

Conclusion:

Staff supports the project as proposed. The replacement of a monopole with a project thatcomplies with the WCF regulations and the intent of the General Plan is always beneficial to thecommunity in which it is located as well as to the City. The new tower, although tall, will bedesigned in the architectural style ofbuildings on the USD campus, which Linda Vista is knownfor. Because the property is located at a major intersection that could be considered a gateway tothe community, opportunities existed to turn the monopole into a landmark. Verizon with thehelp of a group of interested planning group members was able to come to agreement on a designthat would promote the usn inspiration. With this design, Verizon will be able to maintain theheight of their facility and in exchange, the community will get an architectural landmark inplace of a significant visual impact. In addition to the landscape being added in and around thenew tower and walls, Verizon is also proposing to add landscape along the parkway to helpimprove views from the street.

Verizon is proposing to continue the 7-foot concrete wall currently on a portion of the easternproperty line down the remainder of that part ofthe property as well as along the rear propertyline to help buffer their equipment and tower base from the adjacent properties. They are alsoadding accent landscape material as well as landscape screening to help with views from adjacentstreets and properties. The tower will completely conceal Verizon and AT&T antennas as wellas AT&T equipment and the opportunity for T-Mobile to relocate within the tower is alsoavailable (T-Mobile's CUP expires in the next year or so). The resulting project will not onlyenhance the Padre Gold property, but will also improve aesthetics at this intersection, which actsas a gateway to the Linda Vista community.

This project complies with the Communication Antenna regulations, Council Policy 600-43 andthe General Plan. The encroachment into the setbacks and the increased height of the facility arebeing offset by the improvements Verizon is proposing along the eastern and rear property linesas well as along the street. Therefore, Staff recommends approval of this project.

-4-

Page 5: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

AL TERNATIVES

1. Approve CUP No. 590322 and PDP No. 318510, with modifications.

2. Deny CUP No. 590322 and PDP No. 318510, if the findings required to approve theproject cannot be affirmed.

Respectfully submitted,

Mike WestlakeProgram ManagerDevelopment Services Department

BROUGHTON/KLA

Attachments:

Karen Lynch-AsProject ManagerDevelopment Services Department

I. Aerial Photograph2. Community Plan Land Use Map3. Project Location Map4. Project Data Sheet5. Draft Permit Resolution with Findings6. Draft Permit with Conditions7. Environmental Exemption8. Project Plans - Design I9. Project Plans - Design 210. Photosimulation - Design 1II. Photosimulation - Design 212. Copy of Previous Permit13. Ownership Disclosure Statement14. Project Chronology15. LDC Section 141.040516. Copy of Planning Commission Public Hearing Notice

RevOt-04·07/rh

- 5 -

Page 6: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

Aerial PhotoVERIZON - PADRE GOLD PROJECT NUMBER 97765

7245 LINDA VISTA ROAD

~~(j

~t'j

Z-l-

Page 7: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

LINDA VISTA COMMUNITY PLAN MAP

' ...MC V'!!"l l.o- [)e.o" ly O~ 1lU'l>..

La.~5·'d~'-'"lo"""'" Dwwly ..11 .... ""

_ UtHIIInIo-..lIf I J..!IO....,

•~HoIII O"'. :lO-ol) 6.I' •..~Gn.."_.--.,...,..,"-­.o.-...~D __-----• s.::t.DllE_-.... .hkI>u t<IG"

++ s.- Hogft 6dGOl). lnr\lul ....." Parkr.:I \I_P,,",

,,""s,-.

10-

.By _ ,a...,." ,," _ ,,, .a>lXlSIonce

,..Ith CVf' 9<4Jo8681t'ooI ...... tltl"" ba~l l.. "n,,"""""',. 10 I>k'oIopICal ~(II r.1I_ .......,..;.,. 'tit

Land U$e~pJ 1l ind. \I\Ioc. Camm-.ty I"tanf>ing .... . . I ~

VERIZON - PADERE GOLD - PROJECT NUMBER 97765

7245 LINDA VISTA ROAD

PROJECT SITE

North

~~o~t"'lZ>-lN

Page 8: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

~~o;0-3Vol

•-~

PROJECT SITE

Project Location mapVERIZON - PADRE GOLD - PROJECT NUMBER 97765

7245 Linda Vista Road

Page 9: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 4

PROJECT DATA SHEETPROJECT NAME: Verizon - Padre Gold

PROJECT DESCRIPTION: Existing 76-foot high monopole supporting 15 panelantennas and a microwave dish to be replaced with a 76-foot high architectural tower completely concealing allantennas. An existing 360-square foot enclosure isincluded. Collocation for AT&T antennas and equipment.

COMMUNITY PLAN Linda Vista

AREA:

DISCRETIONARY Conditional Use Permit and Planned Development Permit

ACTIONS:

COMMUNITY PLAN LAND Community Commercial

USE DESIGNATION:

ZONING INFORMATION:

ZONE: CC-I-3

HEIGHT LIMIT: 45-Foot maximum height limit.

SIDE SETBACK: 19-feet (adjacent to residential)

REAR SETBACK: 14- feet (adjacent to residential)

LAND USE EXISTING LAND USEDESIGNATION &

ADJACENT PROPERTIES: ZONE

NORTH: Low-Density Residential; School, ResidentialRS-I-7

SOUTH: Low-Medium Density ResidentialResidential; RM-2-5

EAST: Low-Medium Density ResidentialResidential; RM-2-5

WEST: Low-Medium Density ResidentialResidential; RM-2-5

DEVIATIONS OR Height deviation of 76-feet where 45-feet is permitted.

VARIANCES REQUESTED: Rear yard setback of 6-feet where 14-feet is required.

Side yard setback of8-feet where 19-feet is required.

COMMUNITY PLANNING The project will be reviewed on February 22,2010 by theGROUP Linda Vista Community Planning Committee. TheRECOMMENDATION: recommendation will be provided at the March 4 hearing.

Page 10: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 5

PLANNING COMMISSION RESOLUTION NO.CONDITIONAL USE PERMIT NO. 590322

PLANNED DEVELOPMENT PERMIT NO. 318510VERIZON - PADRE GOLD

PROJECT NO. 97765DRAFT

WHEREAS, American Legion Post 731 Department of California, Permittee and Verizon Wireless,Owner, filed an application with the City of San Diego for a permit for a wireless communication facility(as described in and by reference to the approved Exhibits "A" and corresponding conditions of approvalfor the associated Permit No.'s 590322 and 318510, on portions of a .55 acre site;

WHEREAS, the project site is located at 7245 Linda Vista Road in the CC-1-3 zone ofthe Linda VistaCommunity Planning area;

WHEREAS, the project site is legally described as Lot 9, Block 35, Linda Vista Subdivision Unit No.8,in the City of San Diego, County of San Diego, State of California, according to map thereof No. 3253,filed in the Office of the Recorder of said San Diego County, June 23, 1955;

WHEREAS, on March 4,2010, the Planning Commission of the City of San Diego considered CUP No.590322 and PDP No. 318510 pursuant to the Land Development Code of the City ofSan Diego;

WHEREAS, on April 3, 2006 the City of San Diego, as Lead Agency, through the Development ServicesDepartment, made and issued an Environmental Determination that the project is exempt from theCalifornia Environmental Quality Act (CEQA) (Public Resources Code section 21000 et. seq.) underCEQA Guideline Section 15302; and there was no appeal of the Environmental Determination filedwithin the time period provided by San Diego Municipal Code Section 112.0520;

BE IT RESOLVED by the Planning Commission of the City of San Diego as follows:

That the Planning Commission adopts the following written Findings, dated March 4, 2010.

FINDINGS:

Conditional Use Permit - Section 126.0305

1. The proposed development will not adversely affect the applicable land useplan;

Section A.15 of the Urban Design section of the City of San Diego's General Plan addressesWireless Facilities. The intent is to minimize the visual impact of wireless facilities. The GeneralPlan states that wireless facilities should be concealed in existing structures when possible, orotherwise use camouflage and screening techniques to hide or blend the facilities into the surroundingarea. In this particular case, the existing monopole will be replaced with an architectural tower thatwill conceal all Verizon's and AT&T's antennas, as well as AT&T's equipment. The tower wilt bevery visible, however, because of its design and its location near a major intersection in the

Page 1 of6

Page 11: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 5

community, the architectural tower will act as a community landmark. This meets the intent of theCity's General Plan and the WCF regulations.

The General Plan also states that facilities should be designed to be "aesthetically pleasing andrespectful to the neighborhood context." The architectural tower will be designed reminiscent of thearchitectural style ofthe buildings at USD, which happens to be a landmark in Linda Vista. Thetower will be highly visible to the surrounding community and as must be aesthetically pleasing. Theaddition ofplanter walls and landscape near the tower and also along the street will help to enhanceviews of the facility. All of the antennas and new equipment will be concealed within the tower. Asa result, the design of this WCF will respect the neighborhood context.

The Linda Vista Community Plan does not address WCF as a specific land use. Based on theproject's design, the facility will comply with the City of San Diego's General Plan as it relates toWireless Facilities, and this project would not adversely affect the land use plan.

2. The proposed development will not be detrimental to the public health,safety, and welfare;

The Telecommunication Act of 1996 preempts local governments from regulating the"placement, construction and modification of wireless communication facilities on the basis oftheenvironmental effects of Radio Frequency (RF) emissions to the extent that such facilities complywith the Federal Communication Commission's (FCC) standards for such emissions." The proposedproject would be consistent with the FCC's regulations for wireless facilities. To insure that the FCCstandards are being met, a condition has been added to the permit that requires Verizon Wireless tosubmit an RF study to demonstrate compliance with the applicable FCC regulations prior to buildingpermit issuance. Therefore, based on the above, the project would not result in any significant healthor safety risks to the surrounding area within matters of the City's jurisdiction.

3. The proposed development will comply to the maximum extent feasible withthe regulations of the Land Development Code; and

The original project was a 76-foot high monopole with a 360-square foot equipmentenclosure. The monopole is 31- feet over the maximum height of 45-feet and both the monopoleand equipment enclosure encroach into the side and rear yard setback. The original approvaloccurred under the previous Municipal Code where deviations were analyzed and approved underthe auspices of the CUP. Since the time of the original approval, the Land Development Codehas been adopted, the zone and development regulations have changed on this property and WCFregulations and policies have been adopted. This monopole is considered to be a secondgeneration tower where the design technology had not quite been developed at the time, but thenetwork was more diverse so the tower did not have to be as tall as the first generationmonopoles. As an anchor in Verizon's system, this WCF plays an important role in the overallnetwork and because it is over the height limit, the new design will serve as a landmark to theLinda Vista community. Extending the 7-foot concrete wall from the eastern property line andaround to the rear will help buffer the proximity of the tower and the equipment. The tower willserve as a collocation facility for AT&T and possibly T-Mobile.

The new tower and associated component will comply with the City of San DiegoCommunication Antenna Regulations (Land Development Code Section 141.0405). This section

Page 2 of6

Page 12: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 5

ofthe code requires architectural integration and/or enhancements with the existing buildings orlandscape on the property. Therefore, the project complies to the maximum extent possible withthe applicable regulations of the Land Development Code, while continuing uninterruptedcoverage and service to the Linda Vista community. Based on these considerations, this projectcomplies with the applicable regulations of the Land Development Code.

4. The proposed use is appropriate at the proposed location.

This project will replace an existing wireless communication facility permitted in 1995under previous San Diego Municipal Code regulations. There were no regulations or adoptedguidelines specific to wireless communication facilities at that time. The project was processed asa Conditional Use Permit and was approved by the Planning Commission with a conditionallowing the facility to operate for a period of ten years.

New regulations and policies have been in effect for the last eight years which guide thelocation and aesthetics of these types of facilities. A wireless communication facility proposed ina commercial area is preferred and in this case, the facility has operated for the past 15 years withno complaints from the adjacent properties. Verizon is proposing to replace the monopole withan architectural tower that will serve as a community landmark. A 7-foot high concrete wall willbe extended down the eastern property line and wrap around to the rear and planter walls andadditional landscape will be added to enhance the property and views of the facility. The projectsite is located at a major intersection in Linda Vista on a commercial property and will be highlyvisible to the surrounding Linda Vista community, lending itself as a community landmark.

Planned Development Permit - Section 126.0604

A. Findings for all Planned Development Permits

1. The proposed development will not adversely affect the applicable land use plan;

Section A.15 of the Urban Design section of the City of San Diego's General Plan addressesWireless Facilities. The intent is to minimize the visual impact of wireless facilities. The GeneralPlan states that wireless facilities should be concealed in existing structures when possible, orotherwise use camouflage and screening techniques to hide or blend the facilities into the surroundingarea. In this particular case, the existing monopole will be replaced with an architectural tower thatwill conceal all Verizon's and AT&T's antennas, as well as AT&T's equipment. The tower will bevery visible, however, because of its design and its location near a major intersection in thecommunity, the architectural tower will act as a community landmark. This meets the intent of theCity's General Plan and the WCF regulations.

The General Plan also states that facilities should be designed to be "aesthetically pleasing andrespectful to the neighborhood context." The architectural tower will be designed reminiscent ofthearchitectural style of the buildings at USD, which happens to be a landmark in Linda Vista. Thetower will be highly visible to the surrounding community and as must be aesthetically pleasing. Theaddition ofplanter walls and landscape near the tower and also along the street will help to enhanceviews of the facility. All ofthe antennas and new equipment will be concealed within the tower. Asa result, the design of this WCF will respect the neighborhood context.

Page 3 of6

Page 13: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 5

The Linda Vista Community Plan does not address WCF as a specific land use. Based on theproject's design, the facility will comply with the City of San Diego's General Plan as it relates toWireless Facilities, and this project would not adversely affect the land use plan.

2. The proposed development will not be detrimental to the public health, safety, andwelfare;

The Telecommunication Act of 1996 preempts local governments from regulating the"placement, construction and modification ofwireless communication facilities on the basis of theenvironmental effects of Radio Frequency (RF) emissions to the extent that such facilities complywith the Federal Communication Commission's (FCC) standards for such emissions." The proposedproject would be consistent with the FCC's regulations for wireless facilities. To insure that the FCCstandards are being met, a condition has been added to the permit that requires Verizon Wireless tosubmit an RF study to demonstrate compliance with the applicable FCC regulations prior to buildingpermit issuance. Therefore, based on the above, the project would not result in any significant healthor safety risks to the surrounding area within matters of the City's jurisdiction.

3. The proposed development will comply with the regulations of the Land DevelopmentCode;

The original project was a 76-foot high monopole with a 360-square foot equipmentenclosure. The monopole is 3l-feet over the maximum height of 45-feet and both the monopoleand equipment enclosure encroach into the side and rear yard setback. The original approvaloccurred under the previous Municipal Code where deviations were analyzed and approved underthe auspices of the CUP. Since the time of the original approval, the Land Development Codehas been adopted, the zone and development regulations have changed on this property and WCFregulations and policies have been adopted. This monopole is considered to be a secondgeneration tower where the design technology had not quite been developed at the time, but thenetwork was more diverse so the tower did not have to be as tall as the first generationmonopoles. As an anchor in Verizon's system, this WCF plays an important role in the overallnetwork and because it is over the height limit, the new design will serve as a landmark to theLinda Vista community. Extending the 7-foot concrete wall from the eastern property line andaround to the rear will help buffer the proximity of the tower and the equipment. The tower willserve as a collocation facility for AT&T and possibly T-Mobile.

The new tower and associated component will comply with the City of San DiegoCommunication Antenna Regulations (Land Development Code Section 14L0405). This sectionof the code requires architectural integration and/or enhancements with the existing buildings orlandscape on the property. Therefore, the project complies to the maximum extent possible withthe applicable regulations of the Land Development Code, while continuing uninterruptedcoverage and service to the Linda Vista community. Based on these considerations, this projectcomplies with the applicable regulations of the Land Development Code.

4. The proposed development, when considered as a whole, will be beneficial to thecommunity; and

Page 4 of6

Page 14: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 5

This project will be beneficial to the community by continuing to provide service to Linda Vistaand commuters passing through the community. The facility provides wireless communicationservices including e911 for users of cell phones and other devices. The facility will now providethese wireless services in a way that is integrated with the community. Therefore, this project willbe beneficial to the community.

5. Any proposed deviations pursuant to Section 126.0602(b)(1) are appropriate for thislocation and will result in a more desirable project than would be achieved if designed instrict conformance with the development regulations of the applicable zone.

This project replaces an existing 76-foot high monopole with a 76-foot high architecturaltower. The CC-I-3 zone has a height limit of 45-feet, but the new architectural tower willmaintain the 76-foot height. The location of the tower. which is set back from Genesee Avenueand Linda Vista Road, is conducive to an architectural tower that will lend itself as a communitylandmark. The tower designs were developed based on input from a community planning groupad hoc subcommittee. The design picks up on the surrounding architecture in the immediate areaand has slight hints of similarities to architecture used at USD. Additional landscaping, planterwalls and landscape will help to soften views of the tower and actual create a focal point for thecommunity. Additionally, Verizon is providing space for AT&T to locate their antennas andequipment within the tower negating the need for a WCF at Kearny Mesa Park, which thecommunity group had indicated at one time that they were opposed to. There is also room for theT-Mobile facility to be relocated within the tower once the CUP for their flag pole on the sameproperty expires.

The new tower will be set back from the rear property line approximately 9-feet, where theexisting monopole is located approximately I-foot away from the rear property line. The existingequipment enclosure is 6-feet away from the property line and the existing generator is right at therear property line. The required setback is 14-feet. A new 7-foot concrete wall is proposed alongthe rear property line, which will help to buffer the WCF from residential properties to the south.The generator is being relocated to the front of the equipment enclosure in a new split face blockenclosure with planter walls and landscape. On the eastern side of the property, the required sideyard setback is 19-feet. The existing equipment enclosure is located 10-feet away from theproperty line and the new generator enclosure will be aligned with the equipment enclosure. Theexisting 7-foot concrete fence that was installed by the developer of the new condominiumcomplex on the east will be extended by Verizon to provide a buffer between the land uses.

Therefore, the project with deviations results in a project that will continue wirelesscoverage in the community and provide a community landmark with improvements that willenhance this major intersection within the community.

BE IT FURTHER RESOLVED that, hased on the findings hereinbefore adopted by the PlanningCommission, Conditional Use Permit No. 590322 and Planned Development Permit No. 318510 ishereby GRANTED by the Planning Commission to the referenced OwnerlPermittee, in the form,exhibits, terms and conditions as set forth in Permit Nos. 590322 and 318510, a copy ofwhich is attachedhereto and made a part hereof.

Page50f6

Page 15: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

Karen Lynch-AshcraftDevelopment Project ManagerDevelopment Services

Adopted on: March 4, 2010

Internal Order No. 23426162

Page 6 of6

ATTACHMENT 5

Page 16: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

RECORDING REQUESTED BYCITY OF SAN DIEGO

DEVELOPMENT SERVICESPERMIT INTAKE. MAIL STATION 501

PROJECT MANAGEMENTPERMIT CLERK

MAIL STATION 501

SPACE ABOVE THIS LINE FOR RECORDER'S USEINTERNAL ORDER NUMBER: 23426162

CONDITIONAL USE PERMIT NO. 590322PLANNED DEVELOPMENT PERMIT NO. 318510VERlZON - PADRE GOLD PROJECT NO. 97765

PLANNING COMMISSIONDRAFT

This Conditional Use Permit No. 590322 and Planned Development Permit No. 318510 isgranted by the Planning Commission of the City of San Diego to American Legion Post 731Department of California, Owner, and Verizon Wireless, Permittee, pursuant to San DiegoMunicipal Code [SDMC] section 141.0405 and Chapter 14, Article 3, Division 4. The .55-acresite is located at 7245 Linda Vista Road in the CC-I-3 zone of the Linda Vista CommunityPlanning area. The project site is legally described as Lot 9, Block 35, Linda Vista SubdivisionUnit No.8, in the City of San Diego, County of San Diego, State of California, according to mapthereof No. 3253, filed in the Office of the Recorder of said San Diego County, June 23, 1955.

Subject to the terms and conditions set forth in this Permit, permission is granted toOwner and Permittee for a wireless communication facility described and identified by size,dimension, quantity, type, and location on the approved exhibits [Exhibit "A"] dated March 4,2010, on file in the Development Services Department.

The project shall include:

a. Demolition and removal of an existing 76-foot high monopole and replacement with a 76­foot high architectural tower housing Verizon antennas, AT&T antennas and AT&Tequipment. Space for T-Mobile antennas is available for future collocation within thetower. The tower will exceed the maximum height limit of45 feet by 31 feet;

b. Associated equipment for Verizon located in existing 360 square foot enclosure and a 158square foot enclosure for the existing generator. Both enclosures will encroach into therequired rear yard setback of 14-feet or the eastern side yard setback of 19-feet;

Page 1 of7

Page 17: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

c. Landscaping and associated planter walls (planting, irrigation and landscape relatedimprovements);

d. Public and private accessory improvements determined by the Development ServicesDepartment to be consistent with the land use and development standards for this site inaccordance with the adopted community plan, the California Environmental Quality Act[CEQA1and the CEQA Guidelines, the City Engineer's requirements, zoning regulations,conditions of this Permit, and any other applicable regulations of the SDMC.

STANDARD REQUIREMENTS:

1. As this property contains a WCF with an expired permit, upon approval ofthis CUP/PDP,immediate steps must he taken to bring this site into compliance. A timeline has beenestablished to ensure that construction documents are submitted in a timely manner and theexisting facility is removed and new facility installed no later than 10 months from CUPfPDPapproval.

2. This Conditional Use Permit (CUP) and corresponding use ofthis site shall expire onMarch 4, 2020. Upon expiration ofthis Permit, the facilities and improvements describedherein shall be removed from this site and the property shall be restored to its original conditionpreceding approval of this Permit unless the applicant ofrecord files a new application for afacility which will be subject to compliance with all regulations in effect at the time.

3. No later than ninety (90) days prior to the expiration of this permit, the OwnerfPennitteemay submit a new application to the City Manager for consideration with review and a decisionby the appropriate decision maker at that time. Failure to submit prior to the deadline will because for compliance, which may include penalties and fines.

4. Under no circumstances, does approval of this permit authorize (insert applicant name) ortheir tenants to utilize this site for wireless communication purposes beyond the permitexpiration date. hnplicit use of this permit beyond the effective date of this permit is prohibited.

5. No permit for the construction, occupancy, or operation of any facility or improvementdescribed herein shall be granted, nor shall any activity authorized by this Permit be conductedon the premises until:

a. The OwnerlPennittee signs and returns the Permit to the Development ServicesDepartment; and

b. The Permit is recorded in the Office of the San Diego County Recorder.

6. While this Permit is in effect, the subject property shall be used only for the purposes andunder the terms and conditions set forth in this Permit unless otherwise authorized by theappropriate City decision maker.

Page 2 of?

Page 18: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

7. This Permit is a covenant running with the subject property and all of the requirements andconditions of this Permit and related documents shall be binding upon the OwnerlPennittee andany successor(s) in interest.

8. The continued use of this Permit shall be subject to the regulations of this and any otherapplicable governmental agency.

9. Issuance of this Permit by the City of San Diego does not authorize the Owner/Permitteefor this Permit to violate any Federal, State or City laws, ordinances, regulations or policiesincluding, but not limited to, the Endangered Species Act of1973 [ESA] and any amendmentsthereto (16 U.S.C. § 1531 et seq.).

10. The Owner/Permittee shall secure all necessary building permits. The Owner/Permittee isinformed that to secure these permits, substantial building modifications and site improvementsmay be required to comply with applicable building, fire, mechanical, and plumbing codes, andState and Federal disability access laws.

11. Construction plans shall be in substantial conformity to Exhibit "A." Changes,modifications, or alterations to the construction plans are prohibited unless appropriateapplication(s) or amendment(s) to this Permit have been granted.

12. All of the conditions contained in this Permit have been considered and were determined­necessary to make the findings required for approval of this Permit. The Permit holder isrequired to comply with each and every condition in order to maintain the entitlements that aregranted by this Permit.

If any condition of this Permit, on a legal challenge by the Owner/Permittee of this Permit, isfound or held by a court of competent jurisdiction to be invalid, unenforceable, or unreasonable,this Permit shall be void. However, in such an event, the OwnerlPermittee shall have the right,by paying applicable processing fees, to bring a request for a new permit without the "invalid"conditions(s) back to the discretionary body which approved the Permit for a determination bythat body as to whether all of the findings necessary for the issuance of the proposed permit canstill be made in the absence ofthe "invalid" condition(s). Such hearing shall be a hearing denovo, and the discretionary body shall have the absolute right to approve, disapprove, or modifythe proposed permit and the condition(s) contained therein.

13. The OwnerlPennittee shall defend, indemnify, and hold harmless the City, its agents,officers, and employees from any and all claims, actions, proceedings, damages, judgments, orcosts, including attorney's fees, against the City or its agents, officers, or employees, relating tothe issuance of this permit including, but not limited to, any action to attack, set aside, void,challenge, or annul this development approval and any environmental document or decision.The City will promptly notify Owner/Permittee of any claim, action, or proceeding and, if theCity should fail to cooperate fully in the defense, the Owner/Permittee shall not thereafter beresponsible to defend, indemnify, and hold harmless the City or its agents, officers, andemployees. The City may elect to conduct its own defense, participate in its own defense, orobtain independent legal counsel in defense of any claim related to this indemnification. In the

Page 3 of7

Page 19: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

event of such election, Owner/Permittee shall pay all of the costs related thereto, includingwithout limitation reasonable attorney's fees and costs. In the event of a disagreement betweenthe City and Owner/Permittee regarding litigation issues, the City shall have the authority tocontrol the litigation and make litigation related decisions, including, but not limited to,settlement or other disposition of the matter. However, the Owner/Permittee shall not be requiredto payor perform any settlement unless such settlement is approved by Owner/Permittee.

ENGINEERING REQUIREMENTS:

14. Prior to the issuance of any construction permit, the Owner/Permittee shall incorporate anyconstruction Best Management Practices necessary to comply with Chapter 14, Article 2,Division 1 (Grading Regulations) ofthe San Diego Municipal Code, into the construction plansor specifications.

15. Prior to the issuance of any construction permit, the Owner/Permittee shall submit a WaterPollution Control Plan (WPCP). The WPCP shall be prepared in accordance with the guidelinesin Appendix E of the City's Storm Water Standards.

LANDSCAPE REQUIREMENTS:

16. In the event that the Landscape Plan and the Site Plan conflict, the Site Plan shall berevised to be consistent with the Landscape Plan such that landscape areas are consistent with theExhibit 'A' Landscape Development Plan.

11. Prior to issuance of any construction permits for buildings complete landscape andirrigation construction documents consistent with the Land Development Manual: LandscapeStandards shall be submitted to the Development Services Department for approval. Theconstruction documents shall be in substantial conformance with Exhibit 'A,' LandscapeDevelopment Plan, on file in the Office of the Development Services Department. Constructionplans shall take into account a 40 square foot area around each tree which is unencumbered byhardscape and utilities as set forth under LDC 142.0403(b)5.

18. Prior to activation of wireless facility, it shall be the responsibility of the Owner/Permitteeto install all required landscape and obtain all required landscape inspections. A "No Fee" StreetTree Permit shall be obtained for the installation, establishment, and on-going maintenance of allstreet trees.

19. All required landscape shall be maintained in a disease, weed and litter free condition at alltimes. Severe pruning or "topping" of trees is not permitted. The trees shall be maintained in asafe manner to allow each tree to grow to its mature height and spread.

20. Any required planting that dies within 3 years of installation shall be replaced within 30calendar days of plant death with the same size and species ofplant material shown on theapproved plan. Required shrubs or trees that die 3 years or more after installation shall bereplaced with 15 gallon size or 60-inch box size material, respectively. Development Servicesmay authorize adjustment of the size and quantity of replacement material where material

Page 4 of?

Page 20: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

replacement would occur in inaccessible areas or where the existing plant being replaced islarger than a 15 gallon shrub or 60-inch box tree.

PLANNINGIDESIGN REQUIREMENTS:

21. A topographical survey conforming to the provisions of the SDMC may be required if it isdetermined, during construction, that there may be a conflict between the building(s) underconstruction and a condition of this Permit or a regulation of the underlying zone. The cost ofany such survey shall be borne by the Owner/Permittee.

22. The applicant of record is responsible for notifying the city prior to the sale or takeover ofthis site to any other provider.

23. "Dog house" structures are not permitted. Cables shall be routed underground andinternally within the monoeucalyptus.

24. This wireless communication facility shall be removed or replaced if it is determined thatthe facility or components of the facility are obsolete.

25. Prior to the issuance of a construction permit, the telecommunication provider shall providecertification describing evidence that the cumulative field measurements of radio frequencypower densities for all antennas installed on the premises are below the federal standards.

26. All equipment, including transformers, emergency generators and air conditioners shall bedesigned and operated consistent with the City noise ordinance. Ventilation openings shall bebaffled and directed away from residential areas. Vibration resonance of operating equipment inthe equipment enclosures shall be eliminated.

27. Prior to obtaining a Construction Permit the following items must be illustrated on theconstruction drawings; coax cable tray, meters, telco, Ale units, generator receptacles, cableruns, bridges, dog houses and external ports. These appurtenances must be minimized visuallyso as to avoid the effect of changing the outward appearance of the project from what wasapproved on the exhibits.

28. All private outdoor lighting shall be shaded and adjusted to fall on the same premiseswhere such lights are located and in accordance with the applicable regulations in the SOMe.

29. The stamped, approved photo simulations (part of Exhibit "A") shall be printed in color onthe construction document plan set.

30. Within 90 days of CUP/PDP approval, construction documents shall be submitted to theDevelopment Services Department for the implementation of this permit, including the removalof the existing monopole and the installation of the architectural tower and associated landscapeimprovements.

Page 5 of7

Page 21: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

31. Within ten months ofCUPIPDP approval, final planning and building inspection sign-offshall be obtained. Failure to comply with this timeline shall result in fines and penaltiesadministered by the Neighborhood Code Compliance section of the Development ServicesDepartment.

32. As part of the building permit approval, the Permittee may apply for a Temporary UsePermit to allow for a temporary antenna installation while construction is in progress for the newfacility. The temporary antenna installation shall not be permitted to remain in place longer than180 days from CUPIPDP approval. The temporary antenna instaIlation will be subject to reviewand approval by the Development Services Department, may require a bnilding permit, and shallcomply at all times with FCC regulations.

INFORMATION ONLY:

• Any party on whom fees, dedications, reservations, or other exactions have been imposedas conditions of approval ofthis Permit, may protest the imposition within ninety days ofthe approval of this development permit by filing a written protest with the City Clerkpursuant to California Government Code-section 66020 .

• This development may be subject to impact fees at the time of construction permitissuance.

APPROVED by the Planning Commission of the City of San Diego on March 4, 2010 byResolution Number XXXXX.

Page 60f7

Page 22: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 6

Permit Type/PTS Approval No.: CUP No. 590322/PDP No. 318510Date of Approval: March 4, 2010

AUTHENTICATED BY THE CITY OF SAN DIEGO DEVELOPMENT SERVICESDEPARTMENT

Karen Lynch-AshcraftDevelopment Project Manager

NOTE: Notary acknowledgmentmnst be attached per Civil Codesection 1189 et seq.

The undersigned OwnerlPermittee, by execution hereof, agrees to each and every condition ofthis Permit and promises to perform each and every obligation of Owner/Permittee hereunder.

American Legion Post 731 Department ofCaliforniaOwner

By""N""'AM-::-::E=-----------

TITLE

Verizon WirelessOwner/Permittee

By..,-,N:-:AM-=-=E=------------

TITLE

NOTE: Notary acknowledgmentsmust be attached per Civil Codesection 1189 et seq.

Page 7 of?

Page 23: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

NOTICE OF EXEMPTION ATTACHMENT 7

(Check one OJ' both)TO, X RECORDER/COUNTY CLERK

P.O. Box 1750, MS A-331600 PAClFIC Hwv, RoOM 260SAN D'EOO, CA 92101-2422

___OFFICE OF PLANNINO AND RESEARCH1400 TENTH STREET, ROOM 12 [SACRAMENTO, CA 95814

FROM: CITY OF SAN D",OODEVELOPMENT SERVICES DEPARTMENT12?? FIRST AVENUE, MS 501SAN DlEGO, CA92101

PROJECT NO,: 97765 PROJECT TITLE: VERIZON PADRE GOLD

PROJECT LOCAnON-SPEClFIC: 7245 Linda Vista Road, San Diego. CA (Lot 9, Block 35 of Linda Vista Subdivision Unit 8)

PROJECT LGCAnON-CITY/COUNTY: San Diego/Son Diego

DESCRIPTION OFNATURE AND PURPOSE OHHE PROJECT: Conditional Use Permit and Planned Development Permit forreplacement of a previously approved, butexpired wireless communication facilityconsisting ofanexisting 76 foot highmonopole(where 45 feel is permitted) supporting 15 panel antennas and a microwave dish antenna with a 76 foot high Architectural Toweron theAmerican Legion property with an adjacent 360 square-foot equipment shelter and 100square-foot generator enclosure.The project is located at 7245 Linda Vista Road in the CC-I-3 Zone of the Lind. Vista Community Plan Area,

NAME OF PUBLIC AGENCY ApPROVING PROJECT: City of San Diego

NAME OFPERSON ORAGENCY CARRYING OUTPROJECT: Shelly Kilbourn302 Slate PlaceEscondido, CA, 92029619-223-1357

EXEMPT STATUS: (CHECK ONE)() MINISTER1AL(SEC, 21080(b)(l); 15268);() DECLARED EMERGENCY (SEC.2to80(b)(3); 15269(a»;() EMEROENCYPROJECT(SEC.21080(b)(4); 15269(b)(c))(X) CATEGOIllCAL EXEMPTiON: J5302. Replacement ond Reconstruction() STATUTORY ExEMPTIONS:

REASONS WHY PROJECT IS EXEMPT: This isa replacement to anexisting cell tower. No additional impacts wouldoccurwith thisreplacement towerandassociated equipment.

LEAD AGENCY CONTACT PERSON: Lizzi TELEPHONE: (619) 446-5159

IFFILED BY APPliCANT:I, ATTACH CERTIFIED DOCUMENT OF EXEMPTlDN FINDING.2, HASANOTiCE OF EXEMPTION BEEN FILED BY THE PUBliC AGENCY APPROVING THEPROJECT?

( ) YES ( ) NO

IT IS HEREBY CERTIFIED THAT TtlEC'TYOFSAN DrEGO HAS DETERMINED THE ABOVE ACTIViTY TO BE EXEMPTFROM CEQA

CHECK ONE:(X) SIONEDBY LEAD AGENCY( ) SIGNED BY APPLICANT

DATE RECEIVED FORFILINO WlTIl COUNTY CLERIlOR OPR,

Page 24: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

PADRE GOLD TOWER7245 LINDA VISTA ROAD

SAN DIEGO, CA 92111

B~L8-JU.CfiIHt::t!J/I<: :: r~rtiOJm()

;n.:MX II: 1'.:-:;'.U;:J;';':"of':':' 1."1"~';' ~ \;~l~; ."~nTt.~

l ' .• t, ut~. ~~,'Ul_ ~J. II::!U ':1';:) ~J':: ~~~~

':;,,-( :' ''i;''~Jf "r,~- "I "1" "'1'.-<, ','/, .;. L' :1-",s ~~,~~i~!"1 -~lc ~i'~t;;,i'i~ '~:' .:2~;J~

II

PR£PAR<D fOR

~verimnWireless

P.o. BOX Hl7D7IRViNE, ell. 'a2.(ij'2J-9707

{<lAS) 222-700D

-g

APPROVALS

... DA"

ZOlllMO ll'-I[

C:~Isr;lU{;'l'tfI~ OI.I[

SITE ACQumOOtl._~~-- .."

0Wl'1[R A1"PilDYM.. 'AT':-:

PRoJEcT NAME

PADRE GOLDTOWER

PROJECT NUMBER

977657245 UNDA VISTA ROAD

SON O1E"O, CA 921"

SAN: DIEGO COUNTY--'- II

ORAWJNC OATts~/.:z."'/~1l. Zb fll:VlJ';lll (A-Q)t-~/Gl/IIl> F'l..AIitll1.fG $liBiMl....1.- {.lO'IU/01/rJrJ. REY'I!sUl, zll ("n1U/2<JI/1ISl' ~MiIl R(VI-EW (till)

0{t/21'/C.~ PI.'tiNIlil:;" .5UlIloIrn-,U. tt'..,~)

D9/14/C9 Rf>llSoE1l :m (f1:Il)0:1/23/09 fWllllt«i: 1::000Milm; (I:lllo)11/'~/Olli '!AH~5C...t ~tmi~l

I;:

SHEa nTLE

rrns SHEET&

PROJECT DATA

;:

PIKlJE\:l5'\¥4tI;on\ O~01=5'd\QiI/{IUI' 1.~1,lg

"

T-1

Tm.E~ Ata;I PR-a.1tCT ~TA.

mt fLAK wtfti S'I'~fi:IoFW,Il,ltR ""ortSE1iwtml s.n: f't..rofI

11.1"1" [QlI....Dit nece ~ TlWJ:li PJ..,Amil

ANJDIH,t, I'1.U'5

EXTEllIOfl El.EV""1I0~5

o:n;RlDi n£VJ\T1DIIS

l...HI~ I;I~OO f1e..w:LA!'ltt:!l(;.l,t"!: lltVnOP'IlI(ltl" f'l....ol

srtt Sli1lmEH....rro(b :sITE :iVRvt'r

SHEET SCHEDULE

APPLICABLE CODES

ACCESSIBILllY DISCLAIMER

AU. W'!JM'-5H,U-l I:;OUPl.T l'fmt nit flll.UJ1II'II&l u~1lc..au: COOE..S:

c:.uJrDllNl.l sr",,.[. BlllUllHC CODE.. nnr 24. 2007 u;;rm,i~MWQI"I~ pLllwB~" COIi[, 2:!l1l7 tD111C»lCWf'DIIHt.\. luoWllcAL c:otIt- lIDCl1 .E!lmb'H~u.~ 001;1(, ~IH ~D1!itI

I::AuroRf4/\. DlEAa'I' CODE. 1007 EllJl:lD/oI. WKlCtI .l1Im THE"'~:1 usc. .ill~ -Uf"Ic, :1:000~ :l~ t1EC AHIl ::l1l6-(C~I~ tur ,tVOEf er eensucr, nit l.fOST RtsTIll~ (',.flOE­stull. PIIWAIL

T-,A-O

A-'A-2A-3A-AA-5L-lL-2C-IC-2

744 SO. FTi

'12.1,1 UHDA YliTA. ROI.DSAN DI~OO. <:A 92.111

43:l-Il3(l-,U

li so. n.I!lil' S1J. FT,JIQ:!(]. n.

PDP (PfWC£5S -4)

13,~e, ~o. rr.... """'"

IoImIICJlU lIGlON POST 731w.mn.n:m, OF"~~7J"~ UNDA. VIStA ROAn'SAN" DlEOO. eJ. &J n Isrn: CDHTAi:l: J[RII'T Cl]RMJlPHOH£l CUll 277-1I6Jl;1

................11l5Q!I 5.lmJ tiN'rmI ~VENUr

~r;. Q/\':J11~CD2ir1.Cl'~ WZU£T1I WaulPHOIU.l' (I~f) %!I1&-1!I7:$.!1

APPUoAHT:

OWNER:

lltlltl ,lHt~ AM: N¢ ~~~ n~eDi,ll,lU~lCtll11fj

t-AcJlma, (nHllON II: T-WOIlIl..E) 011 ms. SITE

Vl:RIZON PROJ£CT AREA,PAC~ tDffi.D f-WI'PJ.ltIlf 1l.00,101PROPOSED GtUERATOIl: onGSlmtDDSTi1li; '1f(R(lC~ ~JUl

PROJtcr 4DDRtSS:

PROJECT SUMMARY

ASSESSO~S PARCEl WU~BER,

E~ISTI~G lONlN",

PROCESS:

TotAL SITE;: AIiEA~

DEVELOPMENT SU"'t.4MY~ lIl!htfo'.tL (If Wl~

PUWfl ,H0:l'51

• FHo:rostD YDlIlON wtfID.£S5 1.e.·..g'" fII~ CCI-uJaATAtIU1"EU:(;CWWlJmCAfiOUS 1'ClWtR. II~ QlSTINC: MO"~ ~~£1.s)(;'UI~ IHlQ 1'OWER1l0llKD R.F. :ic:RttH$

• PROFo:slD I\T.T KC~1J:ff «rutn4J]'ff kOOM LOCA~ oNGAflUW' F1.OO1I OF' Ilt."fI TpW(R.. ,ltIl'tHtu.! WI1J. !:IE: t,~~ lH'ttJWf.R llaflHO R.r. SQl'£OI5

• E$TIJf(; YttI2.Dl'C 'IitI1IU.DS 3.0°-0'" .>! f1· ..O~ P1ltr~b~'TE.l.UOlIU.lJHlfinQlol tQUi~OO Sl-Itum 1tfS1D( ..ttl 'msn~GDlCUJSVRE (uNcHANml

• PR01'O$UI 11'--4~ 1I ,."-OW SfIUI'.;...r~ (:(ltltllm SUlel([tl:CIJ:lSOflE lmR WOO{) 'II£lJJ!i rm flD.OCAQm Of' DUSlItolG."""""TCI!

• r.u;wvl:: ClSmIli 10'41- ItIQHQOll~ ~(:£ " j8STMJ. Htw'cotK:lIElt: rtJ«:[ W .....n:H ~c J.!hUCarr fINer

• R!-ltDlI!I' IltW C6IiX c.dLE ,DI'rONEWTQWllI

• LJJtD5CN'E 4l IRRIaAliOH IS 1'LAHtltt) R:l'R l~S SirE

LEG4L DESCRIPTION'LJ)T 9. ~Utol: $. UllbJI vmA 1PJ8OMSICl!'l !J!flJIll.. II. 18 Tti[ern' -IlF !S,i.H DIECO, COI:lWt Df ~ 1lI~, STAll' or e.wr00Cl ...",Ct;OfItl~G TO 1M.¥'~r "'Q. ~. IlI,EO IN'nll: QFTlct OflHt flEtDflLI[lI Of S"AlG SlH tJf[QO co.lJKiY, J1JNl: '%.5. 1!J155

ICtAl.

TOW(~ OCCUP4NCY:

(.,sTItIC SH!:LlER OCCUPANCY:

TYPE OF CONsTRUCTIONPROPOS£!):

FUrl'D SlJRVrnNCi. 1!'fC;ii;&QIt nl RWaLDiOI.II.S":iKl'" vttJllI, a 'Ji~i,

(J-'~) .3.'51-2&12("U) .3"31-:2.61% (rn)

SURVEYOR:

LANDSCAPE ENGINEER:

flJJlCOW 1ttC.SIULl.'I' N1lJ1QutlfllW m1t.Lt.UEScOHOIDO. CA 82~

(&1'11) JO! u~

(nUl) :m. :zUo (fAX)

SCALE

PERMITS REQUIRED

W'tI.1.i.&t.l 800JH '" l'owrr !i I.JAW~i:P~KO

,J:U~ ltIU..MO[ DR. $1,lm: Oip.~Ct, !iI;!D11IOlD) ~7~(7l\O}~~(f~

.. CUi> -!: pOP iPR!ltlSS 4)

PLANNING:

ARCHITECT:

AOL PLAll~!Ii~

WtDSCIJIE~~ SlJ.l£ SUl£1T, 'SI1f9't lro. 'CCARl.SiWl. Col. DlQ05(710) 72!1-1B11(7&0) '72.11---8324. (tAX)

CONSULTANT TEAM

111t DftMtlll;i~ :!IHQ'IlIl' IN iHJ$ So I\Erl1tn101f Ill!CilRIitd suL£ ONLY~J£H 1l1ttt, IlRttm4liS ARE f'DUiTtb III ..24"" • 35" ~W.l. lr 1lI1~ DR./I,WlUG S£T 15 nor H· :r. , ..", nilssn ~ ;hOr10 :S~L.!.

•ver'Ztlnwireless

ADDRESSne. l1H~ :¥I5l'A ROAD~~.t..Io.9:zt11

VICINITY MAP

COORDINATES (NAD 1lJ)

unruee .52."<17' 2.7.....• HDIlhl"'D1I~C1[" 1~1" "!I' ee.ee- \I;'t$T

lHOM~S "~IOE PA"E 124a. J7 ~HD

Page 25: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

PREPARED FOR

...."""" "'OOTH.neHlHeT ro"OT ~ 'H...... l."I"""'I'~~'

r,O-,o.o. ~oj.fl, C~~LU~l',(C~. nll-u (/iO) <~~-C'7~

~verJZ2Pwireless

P.O. BOX ,.7071RV1~E, CA g262~-'707

C.,g) 222-7000

ENLARGED SITE PLAN

A-1

S~EET TITLE

cotI5TRIJCT10H

SITE ACQUI!ITOI

ZCNIH~

PROJECT NUMBER

O'WH~R APPRO'IlAL

PRO JECT NAM E

PADRE GOLDTOWER

===11===

7245 LINDA VISTA ROADSAN DIEOO, CA n",

SAN DIEGO COUNTY

====1.====ORAWING DATES

W/24/1)Ilo ZD REVlEW ("0)OJ/01/06 fIU.M~lMC 'SUI!IWn-rAL (A.O)fJ4/fJ1/ri6 LIltV1Sm Zi:1 (01)OS/21/0& fIt.J.M~'IH~ WI!IMI1TAL (TOWER)0'J/14/O'J REV1:5m ZD (railOfm/O& 'fl'LAMHlMl'o <:CltllIil£M'iS (1:10)11/13/lN L.,Ir,'NOSCAp[ REYISIOH1Z/I1/0!l' l.ANOSCAPE ftEY1510N :z Qob)12/14/r:N UNOSCJ,Pt ~EV1SIOH 3 (ClO)01/11/10 -REVlSEO 2D (JII]

=== ..===

====1===

====11====APPROVALS

===:1===

=== .. ===

::15 CU, 'YRtJ'Se (:U. YR:D'S

.:l3 CV 'l1'U)'SNON'

TOWER F'OOl0AllON:SITE Woli4.1.S:TOTAL ExPoRT,TOTAL I""PORT:

GMDlIGTIIBl£

_NOlES1. PRto~ TO ISSl..INtICE OF mt OONSTROClIIJt.l PE:Jl:NIT. THE

OWNE:~/P£fI"mu ~ SUNT II 1'M1EIl: POW1TICHCONTROL PLAN cwPcP}. THE wpcp 9WJ. BE PRfPARED to~1:NoU: WITH T11E GlJIOEUNES IN AIlPOIoo: E OF ll-lEcll'fS WATER STMLlI'lRtJ

2. PRfOR Ttl ~a;: DF' 1M( OONSTFiUCllON p~rr. TH.E(.JJItj~/PER .. rrnr SH.tll. IIIOORPORATt Nf'( QJlmRUmll:lhloc:sr ~E~ENT PAACTlCES NECESSAia' TO COUPLY WI'1l4CI-Pl"TEft 1+. AIfIlClL 2,. DMSKIN 1 (~ REnUlJ,TJONS)Of lHE ~ DIEGO MUNICFAI. COOE, fN1(l 1M!;:OOHSTFlUCT1ON PL..NG OR SPECIACA.llON'S

EXISTlNG DRII/EW"".,..

EXIS1Utci 6' -0· ~lGtt CIi'lHL»IK ffNC~ ID fiE R[MOVED

REMtJ'IIE EXI511NC: PA\I'lr«;: ~OR 'NEW I..AHDSCo'IP£ .-ftEA

//(/

kEilO'YE EXIST1HQ WDNOPOl..£ (:QhICR£I"E ~NG AND APRON TOBELOW GRAll£ (SHowN DIialECI

EXIS11NG DOOR a. CONCREl"E LAHDING

EnSl1~ 1WO S10ftY BuIUlING

'EXI51I"I; STAIRS MID rw.MG

ElOSlI~ BOUNl:DS

REl..D(;ATE EJQSONC GfPD..'.1()ft: INTONEW COHCfl£re: FENCE ENClOSURE

D:lSTJ.IG. WIIlL MOUNlED MiC1W«'.AL UNITS

D:ISJ'WC '"lrfooDcRE"lE" CONCRETE: F"ENCE AfIPRC1lCl......f£l.v 7'-tl~ HtGiH

D:IS1'1t«I 10'-0· SOBN::K

E)lISTl'«i e--0" LITUTY~

D:l5TJ!IG IYMNG; A: Mtm.STOPS TO BE REfIK7.IEO

PftOPDSEO WolDSC..V'£ N!(.l. sa SHEEr L-I FOR~~E 00IEl...0PI.IEN PI.AH

PROF'D5ED 7'-0" I-lIGtI "WOOOCRETE'" CONCRE1"EFINC~ re W,1CH IOOSlING

PRl:FCISED Jtrllr MaIr' CONCI£NSING UHn5 011I2'-.-0- ~ 4·-0~ COHCA£rE P.IVS (1YPICAL Of' 2)

PROVIl£ "ONE WIlY"' DRI't.D'Ilt.'1'~

PROPOS[[) ODNCRET[ <:URB

EXlsmG .-.sPWllT~ ltl RE:-MAlN

EXlsrtIG AD.W:£NT .tPAflT)4EN'T BUILDINGS

F'R0P05EC~ "'m.!SS '7(;'--0. HIGH ~ 15'-11· SQUARECO--LOCIITlW.:E TELECCt.lt.lU~TIONS 1tJlfI(R

RELOCATE:~ WIAElI!S AN'T!HNAS II6lDE UPPER TOWE:Iil B£HIN[)R.F'. 'lfWlSpAl9l'T SCR£EN

PROPOSED -.1..1 MOBIUlY~ INSIOE lflPER TOWERB£Hr-4) ReF, TJW6PNl:Eh'f SC1iI££N (BELOIfI' YERIZON NlIEN"""5)

fIlIEWC.II'E EX5TING Ci'-o· HI~ OHAJr'I...J"II: FENCE • 1NS1'A.lL NEW 7'--0"HIQHI '"wooDc:R~ CONCRETE FENCE TO WLTCIi E:xIs1lNG Jlt'l.lH::ENTF'tNC£. (SHOwN ~EO)

1tEUCM: EXISI1HQ 76'-0" ...c11 NONOFOL..E: ~HDWN :;t-W1EO)

D~G; vatIZON. WIRElESS PREF'NIiIICATtOT'8.£Clj~t.lUr«:ATJOtIs: BUILDING TO ~N

~0Yt w::JIImN W1A£U!1S ~'""5 FROM ~NG MONOPOLE~D MO\'E 1'0 PROf'CSED TOWER (SU NOl£ <v~EXISTINC KL'C:IICAP SIQMol« ON EXISTIM; DClOfl TO REIWN,AT AR'5T fLOOR

E;'OSrTl\I(l roN~ETE. WH££L sroe 10 REMAJN

Ra.DJ£ WJIUlN WIEI.ESS MICROwAvE ANTENNA FROW ExlsTIN('t.IDNQPQLE ~D "lOVE TO PROPOSm TOWER

PROPOSED lJIItIVSCJlf'ING S£E SHrfi l-2

EDGE Of' EXrsTJNG PA'!'1NG

EXl5IlNG PAINTED PARKING 5TRIP~

DCIS'l'.IG Vm.liY 'mtNCH

PROP£RT'r LJ"I[: ~)

Db~~RGED SITE PLAN gKEYED NOTES:

<1>

~

~

~~--------------------------

Page 26: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

"AT<

<I~'.I""" -'! ~*::';'·~1';;Em·;r t..-";I.lf: ,=;:.,/;L::l:~+~

I~,I:' ~Ut ~~lJr.~L t1'~11 ~:.:;~ H .. t"~:~

~VerlZlJnwireless

97765

PADRE GOLDTOWER

PROJECT NA"r

Il,F.

PROJECT NUMBER

PREPARED FDR

P,O. BOX 137.(17IR\'mE. CA '262,>-'707

('4S) 222-7000

zcrUtIli

===~~===APPROVALS

==="===

====1:===5'-2"

15'-0-

AT&T EQUIPMENT FLOOR PLAN'"""' ...........

KEY NOTES:

<i> pADf'D5m Iir..T t.eIJ9I,IN fif tQ\IlF't.IDrr~2j. 1/2" W11J£ JI 'J~ )/4" \ImP ll. ra- taQol 0'J'P\I':Al CF' 2>wnt;Hf !:iIQ Ut$. D01', ttm'ALi..1.l1 S'f~

c.'i> f'fttl1i0'5W A'fltl voeurr +24V Ra:11F'IER ANtl B4.TTmy R.i.cMwm-t '+UY 'Ttl -4sY tJ:l'INDrml~ 12 f1ATmII£S)j!,~. YlIDE • 2:1- -DEEP "- eA· ftlGHWElGHr~ "lUG lDS. .

<.» ~SED jlJ~T IolCIBIl.JT'(. (6) RRU'S UQUtmIl TO A a.u.V.:.H1ZttI51aL I.P.sr fm'u.. OF j,l, IIj5THllO IrI' totmlACTOR

<9 AAOfIQSim ...T",T M()BVI'Y. ,,"fA IW:.k­~~~'1m, 1~· pElf'~ OF 1')

i:AAlS'I'IOflW!: .f'lMf IMteSi ~5D5).-..-1.M PROVlIlED6:.irlIS1AUEDB1'~

<b ~OPOSED ArikT UUh1l'T +"4V E»W1lSlDrI~rmr1 f\lICIIl. (~ 1"2. BA,TIml~2.~- 1l'i:l!i: lC ZJ 1/2~ naP • JiI" tootl1tEJmiT: I5~ 1.3S

@ F"IroPOS£D W.-u.. "'wnm 1:00 ~ t:U:-r1l'tloo. PMS. 'era'0- Nl'1.lR£ WN.J. W'ON'TEtJ. e~AL C:;~k, f''lola

i PUS~ OISeO~ECT ~l

.

' I"ADf'OS'E.O FAA! «IlL urers l'lm-I Q1..LmOOR C'Cl~R" !,»llf::l

J· ...et J: v-c- SlID. DOOR ""p fP,AI.tE;.lI'mm ...T*:l MtJmt.rrr~

~~~~~~1. PRO'.ti A ~R9lO!J.

<0> I:lIU»"D5m WJIU MDlJIOiD IoUM.,lI.l :nwwm~4) S..o",I; 1'-D- sten,~ AND f1W,lE. l$1AU.

~l,HCAMtl SJG!/ACE.

~AWUlI.l!,JLl~

«)- PMPMm (tlOuaLl) Jo" I 1\" WOOD lREl.I..5.. IUlf1Ul. JoT1fj;'l!= c.c, IUIP\1't :f'ROPOSa)COM~ fJL.DCIl tHcUlso~

{p ~~1l~'l:3/4al'tM.l.NDumttl

~ ~~ SIi'd.L PRCMbE~, 11.tSL~m, ~,,l,j0Ul'f11D CUSS o-lSfo·m.&:EJrnIlQJl!iHfJI~O~ oor tI-Iu.ut.l.!. FlRt: 001t~~ FM

~ ~~J:=1~~~5TAU~ ND !lJ'f "lUH ElDOD ~RHf

l(JT~~ settr tm \'Iffi1MWASH STiQlDN

~ PrlOt'OtiiD KrI:.T II.IOeILrr COODOt"SING UNITS Ofl:1'"_1)4 It oil'-I}. roacflcn; ~. (tlPDl or :Zl

~ PROPosED ''lIm'2DN ¥Il:JIl!.J3I ·Ui'",:"ilO- I~ 'C U'-il~ $~r::o--L.-c:¢.tA!R.£ TELtcm.lWlJlllCA~~ <oVIEfl

4P PrIQP.OIiro JUSS' l),OOm TO mt~ ,l.1lOV£

9) ~,.osm Slm. lIJBt COUlt41S &.~ 1/Ud.L

q} fiO<ltN"E' bi:rs'nr.w li'-(}· HIGH ClWH~ m~l:E Ai: 1I1~A!.l~ 0lMtfttT'E rn!Cf:, 10 u,t,'tOl fX!St1r«o~ fl').ICI';

4» PR<IP<RTY u"'~~yW~:~~~~~ RQ.lCf.lE.-E:lQS'Tl:NQ.C:'Clfi~~smP4P- EX3STING 6' -c- Hl>tl QfJoI:loDJNK F""VlC( TQ~I~ EJJ.GE. 0,: ExtsllNG ,.,r,iIml::

ID:ssnNC P.YHm1frJ,P:k1l~ sri!1~E

Oil~ ltn1.I'il' "I'IlDlO-l

..".~o 'IIj';l,lJ.·l.IOU1fItD 1JEew.tl.1CN.. Lrlm-s -ro ~al.o\Il-l

~G10'-o·~lt

EDCEOf' D:1!Jf!l«; anurr EA5Ul£UT

PROf'OSOl lNi~ MEA:. sa 'SHEn t..-1 roo~ DE1laCp...OO PL.J.t.

~ ~POSm Hi· KIti.lt g=uf"-FJ.CE DL,lXII: F'Wff<',JI; WAI.I.

~ R[lOC;.\l't -Del5'llt-IG 0'ieM:W c.E1..£ llRI;pG['

~ PROPOSED 3'~!I~ ~E 'S:DtJI) -c,l,li:

~ ~POOm~ CURSi1-~ -maUS I-UYr C\1('( el:N.l ~t:T. ('h'PJ[W, or G)

~ fI'P;(l~ tr'" ~ 3- WOOD lA-ULLs 8tAM

@- ~POsm a'-~" $l1Gl-{ SF'UT-FK:C c.ollatnt to1J)Ck' WrW­

~ PJ=tCf'ostU ~ ~-wlIl4.£R$ klnw N«IW ~lJm; AScNl:

72.45 llllDA VISTA RDA.OSM~ OoIEGO, CAo 921 i,1

S,II,N oucc COUNlY

====11====DRAWING DATES

Dl/ll-/ll!! PUIWU~!l SUO~Al ~tOVltfi)Mjt"/09 RtVISW~ (n:.I}ClSi(23{WI Pl.&UrUNr,jj ec...~~.-r!l. (....)I !j13ItI'J I,J;",DSCAF· Rr\IIl>lOl~

===u===S"E8 nTLE

AT&T EQUIPMENT FlOOR&

TRELLIS PLANS

===01===

===1:===

A-2

Page 27: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

..."

..."

PADRE GOLDTOwtR

97765

Its.

P.O_ BOX "/07IRVINE, CA 92623-!l707

("9) 222-7000

~verlZOnwireless

Sift ACOUI5tT1OH

PREPARED FOR

'=;'fKtlTTECHIM ;; ~LMmlt1G

>:.:..!:.uf IfI. :l.c~a ~l~i.~< ,':; il,.:,l." ~ "~~':_-4l-"'f1''''"'

I.~ ,~,' UI!. ~AC<I~~,~, Il~tl t'li;~ ~J~'Je.J;

7245 UNO,&, VISTA ROADSAN DIEGO, CA 92111

SAN DIEGO <QOHTY

====11====ORAWIHG OATES

(J1/2-4/0f0i Ul ru..'If£tf (.0)"Vc./06 'l'/.MoIIn]tG S\IIl"lrTJU. (f.O)~'/CI" /t18 fftVlUll zn {cl}1)6/~tl/9\il Jl'~~li sl'lilolm..... (~OYiiJl)

C9jUfOSl Il£VIS£D an {I"Il,IJ1!S1/25/oM ~1..,mIitHQ ~t.MolUI'S ltl~}, 1/'!5/'O9 WI[l-5CAE1E RE.V1St.Qu

===1:===PROJECl NAME

====r.=====APPROV,6,'lS

====1:====

~N4. Al-".t;AZ&o1TH ~

~~.-.~ .rr-c-«:I . ' J',•••

, I , 'I / I 'i i ;' I

/

Of~"AT&T MOBILlTV" ~H

bP.YfER ANTENNA PLAN NfY

"AT&T ~061i.l1:Y· ANIDlHA ANI) COAJAAL CABLE SCHE ULE

"""" "'..... ,.."" ~ I4Cfl. M..IIlm ""''''' .... "".- ~R~...... "'" .,...... .... "'....(... /- 5',) (+ / ... )")

~~~OII

_7lWIO .". ~ II· ~ ~

~ ,,""'" .. -""... • N/' 'IWfr. 9,~ WS, e"-Q· 6'-(1" 'Ie"

1-4-M -_..~ _"!I1.lII~ ,,. _=OI

~ "t; 71"~ u- • " <-0-""""'" -""... ~,6"l,4l.b1, ~' .. D· '/~'+ ........""'"

....g!.- ..........= ..-""..." "" c- "'A 11" • II' • S· • 1.!j'·D" ,'.,,-0" ""r/f>•

+ .........",... 'II'I;DD', ~U!.Jll;.. -_..

\\

\

"VERIZON WIRElESS"

UPPER ANTENNA PLAN......,"""..,.

"VERI10N ViIR~utsS' ANTENNA AND COAXIAL CABLE 5CREllULE..... _....... _..- ...... -.u .... ......- .......-~ = ""''''''...... ANGlI:

~= {+ / --51 {< I ~."

~......,.........

~................

~ """""'" ". ......,........ .. "'A D ...,.,,' 6'-0· 'IE"

~.....,............... .....,........

,gl -,..-...~

.....,.......ecsr ". 1IIa')o..11l~ " "'A D ./lll'-O· (j.· ••-I:r "'If!:

~ ~t.~

C;ffi:;"

~." .......W ""...

~ """''''''' ,r~'1-GlP'I..2. • NlA D "".-e- ./i,'~!t' "fIra'"' ......"' ........

KEYED NOTES:<$ PRQoPo!i:f.EIo~ WlHEl£SS n'-c.· Hl&t-l .. IS'-+O~ SQU4R!;: TDWa':

4> fJ.t.l.Dt,f;l'[ wieOfi WIil'ELis:s A1~ lt~'51;:lE No.' l'mfOl DDfltl,OA.f_ ~rnr ~fi£U1

1> :=~~t~ ~11lS 1I1SlD£~ rowER~ R.F'.

<9~ lJERQ'o:tI WIRB..m ~'GW;"VF. itUlWw.. FImLl D.tSl1~Ct.lCIHOPOI.E:. »ID J.KJYE' TQ PROllO~ rowm

o@- eeeosco 51m. CQI.1W1#.1

<Y PflOf>OS!b ~Emi -.weH<:t> ~t3s OODrn TD u~,prn ml'EH~ ~* .sccess ooo.iJl.' TO~ npoR m.ow<V PflOPOSOO SN(ty GUNIl) PlM.

<@:- f1JU.Jiat1il Wo'U. CS!"IOMN ,St1ADfl))

.c& ofe;" l«>1-f wAIJ, ('!iHnWlj ~I1.DWJ

===..===SHEET uru

ANTENNA PlANS

===::===FROJECTS\....fl:nm\Dii02J:d'\OE02.ldJ.d .. i/

===..===

Page 28: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

===u===

EXTERIOR ElEVATlONS

SHEEr mu

====11====

9nesPROJECT ~U"BE.

PADRE GOLDTOWER

sat Acour-smott "i....rrrr--

.p.o. SOX '9707I~VI~E< ~~ ~2'B-9107

(...) "'-;000

===~I===P~OJE~T ~Al.IE

A-4

,-'.c~''''1 It I=~~~ ~:l:::t;:':";~ t.:Ol..~ ~ ,'.;.II.,'J .n'-'!''''l'=;­

~~.,:,.- ~U:. ~oII..l-~r~:_~..:- 1~"'\. (,'t~.' "1~'1~.~

===,,===

APPROVALS

~ve"Zf!I1wirelf3ss

PREPARED FOR

====10====

72.4.5 LlHDA VISTA ROADSIltN OIEGo. CA &2n 1

SAN mrco COUl-IT'Y

====11====DRAWIHG DATES

02!14/lM 10 REVJtW {Ao)OVt)l/V1 PLoUI~G :suN!rrJt.1. {AO)C4jfJ7/M RM';E:~, :ro, t.:Q[Jllj29~ PWll$l~ ~~,Ir,l ()O'W[I\)O!l/1..f/ot R£'.'lsm 111 (~C9/:uJ* PIJ.tlI"IH& ~I,I~ (oCr\»

t ~ 113ft9 lAHIlSCAP£ IlEVlSl~tf

====11====

KEYED NOTES

! TOP OF~ IiMWiHGEX!'STII'iO CONCAJ:It F'EHc:E

J -!'Ql~ f)cI$nNc, 6'-D· I-It"H OWl1UI« l=tNr:~ 01< 1lltf"'U- tlEwl:(»ll;:flEll:f'O'Itt-mlol.CTOl~~~

'0 f'ltrj}l{J!ittl verzoK'dUI!L£SS "/6'...(j" H~ 11 ~5·:...u'SQ~ CQ-I,.QCA,TAB,,[ T!J,.ft0l&tlJl.!l1':K0'i Tcr.rrm

€> 'fW.Ol:,Ir,1'["lfElm(DI YtIROJiSS mJDLl<A5 5NWlE HL'W 1'OWDtbDiMl ~F. TJlAmiPAHUIT

4> ~ro sr~ '5£',l.I1.I1rr1ol-~<!> RSIOY£. ~mHG 76"-Q~ HICH ),IOIIOPOI.£ oil. REl..OCA'li: NllDIWS

(sHOWN llASflEn)

iflfl l;lf'QSW t;u.l;lR ~

. An,OCA.~~ Wlr,ROOA'l(~

EXI5ntKl ~Il. Wttn.q) fX~ WOOp 5l~[j

4J>~ S'T\ICCO f'lMlSHED WML

4} ~~lm~~:~~~c...notl~E>:J""j(;"",,"

~ =~.\'l'fhti"""ot1ILE~l~cnJNOER ~E: TO RElWI.l

cO>~ ij'JI~Ki SiCtw:;,E 1'0 P.f::W..Idj,I

cl) iXISTItolG I...t.UDSCAPf iHEDG£ 10 Rf:W4H

4} EXiSlJNG CGHcREtE Btd..I.J,9O

~ £XjS'llJl«> l-IUeu: PmWlotEhT ENCLOSIiAl:::

0& """""" '"""" EN<UlSlllI£(P msl1~ ~5. WIDltW )I/O (jl,M,Clt'llUa

0& <:0"''''' .""'"~ o.1STI'o't' \'I'OOtl FtHC£ to ~Nq)~ [;'-[1" HIGH Cw..tIUIlll Ftm'E m flEM.'Jti

~ p~ J'_&R WlOF 5,OUtl -GliTE

qp ~Orosa- 'le· HlOli sPlJf......r,t,C£ Bl..Ott: PtJ.l1m't~

q)i I'R'GPOStD 2.'-lJ" WIn£: L&UIl.SCAf£.ll'lTJ. ,II).J.l;/ErT' TO Wi\!.L:51:( ~[EI' l...1 _fOR Wt'bSU.PE~ PlNI

~ P~iW05m 10001> f-'SCIA hi:~

4-~~-~~~~~ ctHro1OR

OJ ~:W/it:1~~rr ~El~ JtI5Hl~ r'Efl lQlll!Jl

sI

~ I~ ~

b ~~ ~ !,;y;

EAST ELEVATION~I· ...ar.q

NORTH ELEVATION1l:Al.!::1""_1a'oV

Page 29: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

..,~.~ '" jC;.;:-:z.dJ~:=;.:':" ~~II~~: !::-~t';_ •• >2JH,r

'.;:'.l~' ~':'1, <.:.o.:.\U!'_!:L .•~":I ~~~:l .t14.\ ..~~

o"n::

blr.1t

APPROVALS

R.F.

ZDtllJiG

==== ..===

~verlZODwireless

===::===

SOUTH ELEVATION1CH.e1"'.. tIJ!.CI'

"'It

.,'"

.u"

KEYED NOTES====== I: ===

PHOJEcT NAME

i TO" gF EXJSl'Itt:i elm.Dllro

EXlS'ilNG ooNt.'ftEtt f£Nal:

, ~ ECIS1I"" E'-o~ Hlm-l CIW.I4..IHI( ml(E: &t. .lImAll- tEWCl~ ftNC.E Ttl w..'!'CH ~c;~ FtlItf

<Y~~~~~~~.<$> ~~,~~~IHSl[)~ I-IJ;W~

! F'IimlDSW 51NfD1.lC ssw t.l£1A.L floorD:1snNe 5'-(1" HlCi+I~K tEN.etTO" RO.IItIH

"RQPOS£D C1JIJlR IJNt

~ l'llS!l"ll;: 11UO BOX ('JB.!:Q SERvY"..f CONIID;'flOU)!:.===4} £miII.l[i. etoeee FHSHi!l WoW-

() =~~lm~~~~"F~~w~notf0& ""mHO IlOOR

'@r ~15fll:lli~

(; ~~~rO~iKlaU~1W;i m4) mSWG D.EClRJt.I,L~~O IolETEJrS TO R£.i,Wu

~ ~ i."Ifi'-SCAP~ HmGE:'1D R!w"'U

~ ~ CONCRtJ't UOUAR.D

~ ~ t-t.lOfInl: ttiUl.....ENT ~CloSlJilr:

~ =~~~~CLJJSUft£q} EXiSl1t{G Sf~RS. ~ IlfD~l

4> Em11t~ CR.UlE

~ E>',l~ ~ ftr:lC£ nl RD.tAJII

~ P'NQ~ WOOD rASCIol. I: TftlU

i9 =:;:iPl~~:S WSlD£~ TOwEii

PADRE GOLDTOWER

P~OJECT NUMBER

9776512<15 UNDA VlSTA ROAD

SAN DIEGO. CA 921 ~ I

SAN D1E~O COUNTY

====1'====DRAWIN~ DATES

o:2./:u./~ Ib 1fEV1EW (AO)QJ./oCIl/Q~ ,f'WIlIINIJ suawtTT...... {AG)0-4-101/011. ~l\'I!!itll:w (el)Dej19/'" ,~..e stIB~m....':. (10WEJl.)liil-/,.va~ llmsrolD (rll.l)ot/l:!i/O~ I'LAIlHltlCi c:~ (r:I~)11/'Vll~ LAIIDSCAf't tt£VISlQll

===I~===

SHEET TrrLE

EXTERIOR ELEVATIONS

===:;===

WEST ELEVATIONIColI..E:l·~Ia.v

====.~====

A..5

Page 30: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

1

1

!IJ

...n

PWO~~ $IIE1l.4f17oll< ''''0)fWtl'~ 21) (d)pW~tltlli 5UBIoImAL nowr:lI')Rt\IISt.cJ,.ZD (nat)f'W\lUtlll COl.II.IDrrs (ca)IJ.tIDS~n llE.YlSlo,.

DRAWING DA>£S

{J~/qi/(le.

{)4/tJ7{r;e.-oG/zt/ll9BB/loifllll'08/2S/W11/U/MJ

L-1

~Ver'mnWireless

P.O. ROX 19'07IRVINE., ell '92623-9707

(949)222-7000

PRE.PARro fOR

APPROVALS

7245 UNDA V~STA ROADSAN PIEG.O, CA 92111

SAN DIEGO COUNTY

SHEET TITLE

97765

.,tt

PROJE:cl Nuu9ER

PADRE GOLDTOWER

PROJECT NAIolE

lANDSC.APEDEVaOPMENT

PLAN

====:====

..= ..... t'i • .:0.= ,,"-,,!np-, '-""":-1 '~"'''-",J'-'_\I~'~

I.~ .•"'" ~UI, ~\:lH;,~", ''''''\' ~.~; ~;"'-f~--'I

..,.

===..===

===n===

===Jl===

===~:===

===::===

==="===

"

J-'-O" HBGm

J'-6~ 'I'lEIGllr~·~o~ SPfI(ffi

WATER CONSERVATION NOTES

, lJE'ltRI.IIUE TIt£: LOCAIlJl'~ of AU ~lJtm I,;I;mm~ f'~lOR TC 1lI1:: Ill!l'Uo.llr;Jllor Ml!'~ ...u. WOfl!l 51WJ, I!~ "mrnRl.lffi m 101' ~....tR-W11101 WlI,L~POUII'tl£~ 10 Lml..rnES I~O ElCCI;'Alt AS ll!OUIRED,

,_ TIftES $IW.I., at- ~'C)CATED A ilMMIil.IUW Dr fflE fUT R'IOM .....lY onAlNtG.E: n.cw lftfE.£iEWER UIlE" 1fIArm wl£. l;.I,$ ut£ 't'l1'c EL£t1RtC,I.L OOrlll\J\'T

:1-. ROOf aNtft:tERS Sl-W.L ae: 1I.tS'J,Iol,J.E!l ~M:EHl" tn "'-! P,l,V1ti~ ~iUl'fAeES. ~ A AAiWG SUF!rAC[ lOSI.QIC.I\;Ttn I'l'lrnll-l S', er A TR£tS. nn.tliC, ROOT~r:ns SKrUL flCiEll1) FOlft f'EE"I' III VwCI1 mfl~~,

fROtl mE CO<1E:R' lJN[ or nt: l1lllWi. fOrt ~ roT.z.l: .nJN~C( QF' Il f"EO', 1I151'AUJllC ncor aJml:l~

,ll\OOJ.lO lH€ Rf)(lT eAlJ. 1'3 l,lfU(:l::lPTAeLL

~. TIIt£l!; "'Rl OK: l.IKAl'£n ,. :LIlteM\.l~ DlSTN<cr OF ~ FEET J'R(A.t Alrr PAVJ~I\> '!'iI./RFltCt.Cl.lRP; WAU. OR COJIc.REl'[ l.MJW STm'.

!!. .AU, flv.unl-Kl ...m'A5. SllofU. RittNi A s- l},~fl or ll.lJLO-/:

0. PL;lmllG 1I.:sT~tl C,.JJm1JI.:,IoU.~ mJ;.B SWoU. et 5EU-SLlf'PCIfiTI'IIG, 'WOOCY rUomS 'I'iITH XI !.!JIST 'O\t":: WELL~lmJ~jt( ~m sw.u. ~lomw.iT I.Tlm A IAAME: tBm- MID 'SPllOO oF AT~ :'3 rEET

"l, PtJ-'i'lll1:t> ~i/IttAAC[ tRm;IM:All. LNiO'5o;pi~,qu,TIOrI'$t1.&ti. ee w.;rl'/,&,iNttr I~ ACCOS'(WICE I'.1T/i 113~ cr.ror ~ DIl:OO'5 !.ANCl (lEVELO~ I.liIR.tAl. 1.J.rft)st:w:E :!i1~~~.

l :ffi~!rt':cI~~,~r~S=Il~HiO~~~~~=~~~~l)su 0ilit!N ""'PLtOo8lE' CII"l' ,I,iJIl Il'~w. 'JTi.!.EWID5 R1!1 V/It)~ JI"iTIoU-JIOOIl N~E1 ~c:;:

;0:: Pwil /.WUiw.. :;n~m roR 'H1~ PROJ!!tT IM,J,.. Dr Of' ,., TYPi: I'l~l~ 10 &1: 5UCCE&?FUL·111 nn,; ;JJ!I!A QR IN 5IY!..AA cusenc lIND SOIL DJi.tDTOOlI$

l.!.wPSCAFE nllLSH !;:AAOIHG 0iJtCT'I'IIiS WILL mcuior posmvE 5U~Al::£ D/tIJI'....c:e: Of' Pk.,4I-./tiUoIJID.S: ti«lJIJQ4M ne P~ECf ...~tJ>

0$ ),U ~rn.'( LA"jD5C!'J'Ul~ WlIJ. tl:t :li~ tlT 1'ER104mEl'i1', .wn::II.4O\:llC, utll)fffl:~~.I,",I(:J,OOII~ usnc LOW 1IRfOPlT,oI,lIDU Ri<Et} AlID iPOF lIP 'SPMr HEJ..DS

5 AlLSOI1.S l'llI..l aE- J=EilfIL.QI;D. AJ'OtO£il. MlD TlW1l -to dmi1JRlI W RECOLlUrNw"llot.r5 "w,[al J., 5Ql- TI:SttNt ~CfN: Alm!OR IA'~DSCAi'£ ;t.RCHm::CT U'l. ORC/[i;' 10 PFUJIJOTE HUl.THV~ 'dGOl'loos. f'Utl'1i' GR(J'Iff"H

e. ,lll. pkJ,t.mr~ WIoS illlltl er w..rtT~Et'I 0.1 J,. \litEr! ~C DEBRlS FREE ((lNOOJ(itl

7. su, -Q,t~-51l£ l.IIImlj,l,i1OI~ iMPROVUlElf1"5 '51~ HE fiN'll' OF M ~lST'1tl~ PQ1''';'\£ "'Altll~i13!J1t(1l~ 'S'm"B.t FDR lHf linJi

e 'Sf"Ju-lKlD ll~.~ m: AClJUS1£D ron OPTIuW ~fOFtl.WtCE. 'llI~ SH.I.lJ.. uJQ.lJl;tT}ffiIJrn,tt11;i l:HE F1D'l'lI t:OUTItOL AT EJo,Cfl WJ..Vf 10 CfJiN.!l 1l£ wnWI.l [email protected]./lJ~ESS.lJ,([ ~otI E&Cli SYST~, ~DrootlS ~l (;AlJ5[ 'O'iUHiiPMY. P:tl,mIlIG, OJTR\.I'I-'OFF' SWU.DE ~lED. JDJIJ5T ':iYStI1l 10 ,!,VOI! -ntt:sE COtItlrt10l!i-

I. &£S1 trIRIGA'QOI1 IIW~~ ='i'Wl. ee us,e:n TO f;l.J1.l1tlAif.' r;iI -etIrflOOL, 10lJol[ BEST U1'ER1 RlSSlBLE p[)l~III1tC, RUrl-QFr. ti\Iifl:~SflllJ,l MolD I.tIS11pjr;.

10. 1111'1:1(;,11,1""· H~· stW.!. '!'!E UX:Att1l O!l' i\tl.j1JStfil, TO- UU"UlU.. 011' [Ul,!J1'I,I..1'(IMlHiNlJ.m<(i 0tI s.1It'JIj:~, SlREOS Atl~ Uotl~E:S~lm U~t ~tAS

8 ~U!~ lJ~ mu: '5~>UUl ~rsrNct.E

1UP~/MWl,jlA.l blSfAUC,E to 5"I'Rffi 1tiCt:'TJWflC: ~~F' ~~m -, 1~ n:n MiOV( ~~ I,fflLll'Y ~~i:NlI~ ~ fa r"..t'I~~(lIfItFl~"~rNa £W!\IIO~ (~~- ID-~W

s l~no«: M 1R~l\i.lmOr& ,'S"f;5l'Eh1 SI:lAU- Be: mc'\llO'ED /t..5 t'ltQllliit:b ro~ Pl'icPE::-FI' ~;r;It:,.I.T'Irn~.~n' ,IoIlIf uq-lti)wtCE DT "&IE nw,o,Hlm, ll-f( Il~ lJt K $T5:tnl S~ F;F1~~

HJ[OOt.tt' SlJPPOR-. FDA" Tt£ VEGCl'AlJI:III sn,.rom,

U). mai:\lN WIfIi;J,..£SS -IS Rf:SF'Ut,lSJDI,E 1-'00- 'fIi!' LD~lCi 'lVlIol UAlti10UloliCE (ll" '"IfpFlQ",l[tT AIlF,A CQHtIiltt: f',Q, OO~ Ill107

I'l'!l'IN~ CAlJfQ~l,l, -g.2B:!~-~101

(9.$9) 22.i.-700D

.A~~E. ~~l!;:E AGfI~ ""1 E¢ ~[Q1.,IlRpl ~ TH£: o\ti£,I.!j WI"nli, 'THE. 'l1ClM.,.Or----.w~r

.Ill"~[) .NIY LMG£ ~",ltD Nl"JS w:.eLE TO lHE'f"UIIUC wma. SlX:H 'NUt.-ti #1~ £HTlTftAN ~I.I[ w.smo~ ~,~

'II WNPIfElWK:E,..u.. Il£~ ~~E: ..m;,IS SHAu.. BE hWHWlO ~~ WIRtI..EZ. lI-IE lJ;J'iD~(41:00 Sl-W.\.. U( tJAINT"-IHEQ ·DI J. rRe: Dr :P(eR1S AHD AU. M.MO lolI\.1tfllAL SJ'.Il,U BE: .y,aa-rr,t,lt<ED fir h.MElIolllfr GiiOWlI.c. callonlt!h. DlSEI'SfL' oCft IJi!')lD PLltlt Wo1EfllH. '5;HIIU. IJ( 5411:lir~ 'mf.':tf(J -QRRt:f"U.Cm m M '~~ (If' 'n'IE 1'a'l'.lI1T.

PLANTING NOTES

LDlIG lVi'r£U'OW llrooDPotlOCAAPUs

0i!1r('5[: f'LAi;t£

"'''

Mm. flRuStI C}tEiifl'r W'!GE E\IfJlGfI[IJ1 ....!lYFTlF"OlJ" ~IlEDlUlG Sl-tmJfl.

StRWiZiA _.FOC!;nr-""1lVO': .""'-~f(;JtM.! pAfW)l!l£; Clll,J)/l

flH1'Pt~[n.ff1S IlJO~"Mllil.lUJ;!1 ""LmDlCJI Mr!mHOflIt~ 1;1I;:~~Tl'Vi;

""'<IIIlHO

CUF"RB-SU5- Ir~: C~~S5 l;;OI.U"'l-J,o.R 50"-!it:~~!:rt; [nk=1 mI"

OSTrosprfiVUIJ r~£'i'M; f.Y'~"'Fla:tl rl<Tn;l1ilcosulol D'"'' .G~OOt.;o ('{1\/{~

IJt,tJtjloj/io OWI.dl.'i" U'ltJIOAJ!" EV1JIGFlrw.IJ(lllTtVlVfJiS~

L/oll,,lotJl'i t::fIt1IU~1tl t:.MA >lA''llw.YIr~~~

GIOlo'oNP-

""""EV~ctl£t:tt nnT

lItlC&f!1S (;r.:;,u"D COVtll

o

o

PROPOSED PLANTING LEGEND

o

I(

I

/I,

...............""-. - I'-'-.- ........,-- -'--'_,-,J

LANDSCAPE DEVELOPMENT PLAN~tLT""

Page 31: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

DUE.

.~.iI.+'-~' >\ ,~~~ ~'::I:I~_-:- t.."~~; ~ ~!~!'!:.~~.:3I::i;l

'.';,11:' :.I!. t;.n~'.u~.~,:, 1.-::,1 (1.';': JI' .• ~~~

PROJECT NAME

P.O. BOX 19707IRYlt~E. C.- gZ623-9707

(. <lj 21,-1000

~venm.nwireless

sn65PROJECT NUMBER

PADRE GOLDTOWER

S~[ET nTLE

LANDSCAPE

DEVELOPMENTPLAN

PR~P'REO rOR

APPROVALS

.... '.","..---

L-2

===..===

====:===

========

7245 LINDA VISTA R.QA~

SAN DIEGO, CA 92111

SAN DlEGO COUKn'

====11====ORAWI~G PATts

===r.===

====11====

===u===

r-r- D:tsnliG I\OaROJTO';1... 'i'ti'rn 10/ tl:DA.utl (tY?l;:::At Dr Ill)

/-:

PROPOSED PLANTING LEGEND

l

f;tLlll(lI. B01l\NiC'\l CONM(lN FOI\Iol • l'tAHTING IAAl'UJIE HElG1(1'ClUAHTl1YN.\ME NA.M6 RJNOT1Q/I SIZE & lIPREAD

0 CHll.ern?: /l..U!1!:lO'-~.r ~OQtiT"""""""," .,.'" 36· ecx >tit'"ltll""r.-, rass "'''' ,2I)'-I;!J' Sl"'lUllJ

0 ml' ~ISWIOSUPPO;1,1" 5u'-70' ~rr

t.VEil'GrJWI" ~~. 'eO~ "CAI~iJj::r!; ,.nll:;;.cREi:lltIl'Cl~

so- .... -«lo·!tI.R~

® )'-0· HElem:

SI"""""-9lfla !JF' m.:1:~l1Vt

5 """,F.EQl'W. ilk1,l,QlU:: r:;c~r.:IP.

B'-Q' S'R~

8 P~j(Uoll:i~-o' HEIGHi

A~t1nNI,.L ilU'!lt:fU flWtR'l=t>~L '"""""II' ~(;rottrj

5(R.,C'ttilJlG a'-o" SF'1I00

m> I,Nff/;l.l.'. I'-r,- HDGR'T

§~< §? .y1,l}1Tf\ll[JD~5l!;; ,""" ~~m "', --- ~~:: C.flOIJlI~ covtl!~V,··~ ~.

~'-g- SPF!(J.£I

II/

nu. III ta:1~G tift.OONO CDVEl'!A1. COA~ ','I11'B L.Arrl"....~ AN~

5AfI'K tiU.CH

LANDSCAPE DEVELOPMENT PLANBC.ILE:.1'-HI-Il"

Page 32: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

....,,_, CO",_ '~."c' <.; ...-, -,"'1 ...... U,."" -.11 ,.... ,,,.... "." ".";,..,,,.

DATE; g/~3/~009

SURVEYOR:; DAVID_A..--!!:O...!~_

DRAWN BV,;, DAr.•.., ~_

CI¢CK ~; D....

__ TQF CiF' ANTENNA'S)oQ.,....n-

___ toP Of NlCli.O'NA\l!.

ACi~-63'

___ BOT'TOl.l or ~~CFlOWAVE

AG!.4"::S'!r'

~~__,--,-OR=OlJ="P~ln'£L lito 362.4'

---P1l'£T\)F' Qf ...QNOPou; --- AlA..n.5'

AQ....7ij

AIR C\l~DrtlDNtil .. FARCtl IJAP

\Etl AS~tiAl.l 8 PARKlN-::l !olE1ER.. sorrow Of CURB.,

PO'I'iER POLE

II1JlC eU1Ui1NG RECORO (If S~

~FLOYD..,. """,,"" 0 ROOF OR.tJN

r:a CON"","", """" cuarr

• e«mroL POINT ..... ~OOF lOP

SURVEYING,INC... OOOR 0 ROOF \oS'rr

.. f.'LEI:fli:lC BOX • ~R'AA't 5~U-5Ji WAOOH ,¥fttI:El 1i0AD

NQ~. b. u1ll10:..........omCE/fAX (lloS') 11l'-71l1oft---....... ro<l:E EMJ.ILf i.l:Otlo'tlblolrrt)'ll'lljl.,cum

" S£'WtR' tl..t.'ll~ our

" FIfl£ "YlllWIT , SlCJ.I msf• F'QUfID -UOIfJUEm

..~:o S,POT £I..E'<IA'OOH• C... """""- ''''''''''LEI!• CAS \IAI.:I,lE0 S1CR/.l DRAIN WJ,fH05.E

• elF'S. POOlT .. T.8.1PHEUfi. BOX-'--"- """'" "'" @ ID.£PHOffE WJlt\OtJ:

GUY ~CIiOOfWPtIONE 1'E!)JSTIoL..

""'" HEATEiI~I"ORARY BtNcrIMMl<" SITE NAUE~.. IIW

@ lrn.£ R£!J'0Rl 0I'CEJ'T\Gl PADRE GOLD... 11l£OOJ.0I:JrN OOXrc lOP OF ClJREJ SIT( NUMQ(~,

'" lJt~n~"fJ..vE

'" TilM'FIC S1GNPl. BOXUGtIT mJllOtm::

0 1R.IImC SICiWt!. POiE SIT( lOCATioN:

" l£HT GROLtm7245 UNOA VISTA ~OAD0 TlO:i:

<;> """.., """" IJT1UN Pl:ILE:SAN OIEGO. CA 9211'...I' NEt.5\JRro "CISl,.ncr TlTLE;

WAlDi: IImR SITE SURVEY0 ).I,ONTORUiG \Vat

SHEET N1JIABER:-

LEGEND C-1

A5'SI:::SSOR"S PARCEL MUMam(SI 4:i'1-iBD--GC-oOO~)2-1:lJll-.2-e-0(l

SITE DATA

.FEMA FLOOD ZONE INFORMATION

Sin; l'IJ,IPOIlAAr BEN<:H>;AP,K:ElfHCHIoI.Afijr; ):5 A Ptl ijJ;~SU ~lH A I"' OlSC l.ot:Alt'tJ U-M~OF' L£"''5E" AREA ...1 PMKtt-m LOt. ELE.vIl,1J.Qf.I .. ~tl.l1'·. AS StIl:!i'ffi

ADD.

(NAO B3: Epoell 2002)LAlilUClE (.ONG1TU[](

MONOPau:~ ;302:-4T2~:~· Hcrth HiIIS'~ OS· w~~~

GROUNb £l,.EV..moff"''''TCH u:uurv II~OUt1DPAOO SlidP!HC

""""""""""'"ooor """""""",E'oi>1l<TOP oF CI.fflBTOP -of' .ltm:NN,I!;

TREE "'"BCiuNllAAl' U,m:WISt. f>fI'OPErm LiN(

t.4I$. 'IE UH'f.

IUl:iHT~WATLJt,E'

fASWfJIl' UN!;:

FtNCE LI~

ROCr O\IU!fWo1G:

~.~s Of .BEAIlflGS:THE.~.5H~ KEilEQIi AAE..BMiEn ON 111LJ(.1i~lH: J{i.~ 'Dr (i,P,i. OBSERV-;,llC'tS, llSil~G 1RUIBlE 51W/5UOOR£CD\OS wo TalIGLE G£OIlEliC: tlrnt:E 1.!iO sonwAAE.

lJAS5 Of £t£\IIAlJOIJS: N(;W T9l9R...'"\'AllClNS ~R'E QA.SW Ott $AU D1EW f1OfiCN!otAAK 1oW_ IlBD7,F'Ol.I'I1D AT 'rHr;- N~~ OF UNf>A VISTA ROAD A:010 Q"l'IESS£ A.W£~!S

a£VIl'ilat .. J5u5J'.

fFM... fI oon 2M -Q!:SfCHAD(Jj· JtMr~·OI'IClI Rood lonutc:rru;'!i! Program:County: Son DIIit9" EffecU..-& O"l.q" 6/19!1f)97Pdn~l; Hili ,Commoj1ity-Punel NUr;lM/": 06.073t:1131(; F'

llll!! FJoo.d 2'1)f'I~ Desrgr1~fuJ1 {Dr lhi':l sill! is: lotlE;--:(

---IlIT !

lJilllr!.; ;n

~ --~ - ---- - ----.... ~

TITLE REPORT NOTES

IHT II~'Jlct; ;l!Jt:g'lil,.'~;;r

"t'r'- -l~'h!·Il'JO~ll-t uu

#~~.

.~~"'-.-~, 1,•.-~ ,

fIo.,~/

;

/(

/I

\,

VICINITY MAP

""...,

GENERAL NOTES

t) 1hIt It l\Crt,~- boUn_ :IIU"-q'. Thil WI II tpellhrla:d

=:n~a:;::::'~~~~dD"~~~~,. tee. -tI-olnllhlllml '\hI t~raphtc .urw;:t to 1'll'r;:onI

~~m~rttI~:. ~:,:~~ ~~~/II1lan. ~

2) ~ ~hClrt;<ltt nlljd. -b:I th~ fnfDlI"IIl:IlIm 0l"I Ihis Idan, wMotl'l

~~I:~.,,:n~-fl~~lI~'Inc. ~QI ~

~ TM~S=.~~~I~~r;,~~:t1>let!~~ .",emIM1 .jIh I,tI1l -SurvOytl .... WrltlrP'l cfI~:FllIm, •.lul~~Ol~=:d~~ =.~~~ :r~~'pI'lCP' 1:0~1Wmm1 llI:I Olt)' walk.

"') A~d Il.lr'R)' l'U:IlrI·~~d on I.lo~ 11. 2£l!j5.

PROPERTY LEGAL DESCRIPTION

OVERALL SITE PLAN

Page 33: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 8

j

Il

LEGENDOOJiOM OF" CUll:9ID:;E. or- PA'W'EMmTFiJl\'fl.Jti£: cuae '& G\JTT£RFVO lOPCiEner,.;TOFlCiROl)ND ~....nol1PAltK I.nlUi'P' UNoaU;t~OuJll)

PfIoDlTS"mIPU,'t1

ROOF ""'""'""RClOF ........".SIll<W"'"TOP 01 CURSTOP OF~~1REE lOPBOUtiON!Y U>I£

l.IS-C. PaOPotrt UN£wsc. tl~ UNE'RlGfIT-OF-W$,T l.!t'lE.rJ,!iEIl<NT .....

F"EN~ UNE

(.IOOr~

ADD,Be..n.!lAG.EN'"••.ATl'"PS

""'"I'fP'...TOlOA

"""

Up~ ~~ bTI:d:zp:~th ~1:li~~t~~ftIl"'~",n 'I;'IRl ~~ In~l.ilJll Qa nlllail ~UFn_ F¥

=~~~~~~~II~~~~~~:.::. NQliUCl r'lUlll1:b 'III'Ilti pvrfG~ il)' f1Q)'d ~"" IM:.

2) My '=Illm!il" rnoft, Lp Ull Wgrmgt/Qrl 011 ~h'\;. ",k1n. Iri-lhQ~

~=~~n~r;' ~r~~~' ~II:. ~ ~

~~=S'::=. ~~I~=ct~ot ~: :J:~~~ .~~::~n(,;-.p' ~ 1I!l111l~ IIJf.h 'd'tI' s.",~. W1Rtfill .d'mPII'~M IhaII

:'~IT Jj:.c~c~ =1 ~~~~~tl~ ~G~~: :~ :e~ l:~~-~r te cClmlMn~~enl c;f ~ "urk.

" IJR 'COt/llTtiGNtR ... PAAa:L LW'

EB ASP....T & .... _1oI£t£R

DO !larTO"" OF CURB ..."""'" l'tll£

"'" l!i'JiLDI",g "'" ~EcORD OF" SlJRVE'r

""'FLOYD

"""-,,,D 0 /lOCF ORAIN

[2] COI<CllEf< ~OCr oUJ'L(T

• COflTROL PO!UT .... llOOF TO•

..l. 000II • ""'" """ SURVEYING,INC.Ii EUClRIC eo~ • S¥I!T,6Jt( Sf.'lIEJ! 2.55! W"'tiOH WHt£L, ROAb

"",,"OLE "4CRCD. -tA lI:a'lilD-<l-*- "",cr orncr::/r.A:Ji: (951) 73t-''':'9-49

• stwat tl£'.H 0',Jl' E1oUI1L:. hl~~urv.,.lnD.l;Om

• "'" INOIWlT • """ POST• FOOND ~OHU~E:HT,.~Q SPOT p£y,/InoN.. .... """'"" Sl'RlHMLER

G4S VALVf.

• Slttfltu QAAj"l 1bJ'l:tti:lll::

• 'F'S POINT .. ~r.:80X~ Vl.iAAO MI-

a> 1EL..E?HOti£ '-W4HOUi:~ t;uy NlCHOR .. TEl.fJl~ P£tlISTAl

""" "on"" .. 1WPOAARY lsEiiCHl.W'IJI: SITE HAWE,.. IIiill@ 11TlE F!"Ef"O"RT EIlC:EPl1ClN PADRE coin.. lflliU~nON 00;;r. 1UP OF' CURS SlTE NIIMOER,... 1~I~OI\llj'l\LvE

TRAr"TtC 'Sf(';NAt. acl'

• UGIlT """'""" a llWllC SLGN.Io.l. f"Ot..E SITE LO~TION'a ur.HT GRC~

0 1"'" n~5 UNDA VISTA ROAD<) UCIil STREET SA" DIEGO. CA 921"... umrrr pOlE'

, I WEA'ii!,Jlil1m EJjST.ANCE T1T1£,m.T"tR I.lOq! SITE SURVEY• J.tOtiI!OOINS WElL

SHEET NuMOER,

LE.GEND C-2

J./f~/~

,\ PtHI.TIQI'; t»-rxacr ~tAI' t.;.rl. :.>o~,~

LnT HHU.l(i'\: ~~

tltlri,'t.,RT:l.f'I;· ,lj~-n:ltJ--(JoA ·011

._­-~-

._----~

'---"~~

----

1:.It'P'; \·,:'::;7" t:HDllI\'I';;!{JI~

HaT su (J

11~,\r.-T uM' 1'L't. :'f..'=i:J

In1' ';"BlOt''' ;1:'­TAUi-:~

M>'~ ·~'~,,·,rn(),·Lq -uu

".. ceeoenc COOOOlNA't;;:ua~~(jlo(~

I~;::; _.~r",..f

,\lr::f~.CAt~ 1.f.~IO,'" I!Q:iT.~I'l!: 4'~-()JlI-~,~'-IJ~

lo-l:!,'" ~-UHl- ro-l-(lll

VAftll: lfi~

DETAILSITEPLAN

Page 34: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

•verI onwireless

ATIACHMENT9

-~8-r1'\'~HiTc:::TU\f ;; tl.I1I1"-II:,j

....""". ~ J!;,"~H ~~~HI;EC" IcOIH1! ~U'111 'I~HIT"l

<H'_ o;~~_I1~"- C~ n01~ (7.0) H.-H~~

===,,===PREPARED FOR

PADRE GOLD TOWER7245 LINDA VISTA ROAD

SAN DIEGO, CA 92111

~V8nz211wireless

P.O. BOX 19707IR"INE, CA 92623-9707

(949) 222-7000

===11===

VICINllY MAPCONSULTANT TEAM PROJECT SUMMARY SHEET SCHEDULE

APPROVALS

R.F. om

LEGAL OESCRIPnON,

LQT !l', IlLOCK -'S, UJrlN VI$'IA 5UIEIOIYlStoN UNIT Na. III, IN THECITY (F $AN DIEGO. WUNTT 0..- SAN DIEGO,. SU,Tt Of CAUf<JflNlA,ACCOIlDlMG TO YIP lHEftlEOF !lie.~ nL[[]I IH T~~ 0fl!X:[ OFntE fllCORDER OF SAID SA"I I'ltf'CO eoUNl'r, -'JNE 23. 19:55

DEVELOPMENT SU~t.lARY: .~EWIlL OF EJ(f11lE:D

,EMf "5D.251

• PKJPClIIi;tl VIIIlDN W111EJ"E$$ 7'·-0"" HIGH CO-LOC.\TAB.ETEU;GOIllIllU"IICATlOHs TOWER. IID10VE msnNO "O~OPOl£ a:RELOCATE .ANTENN"-S INTO fOW£II ElE..ND Ilof', ~NS

• f'lIlIOPOfJEO AT..,. "'UIY EQOIPVEtIT Il00M LOC.tTED ONGRCI~D h..ODR DF NEW Towr'l. AN'T[NJrI"-S Wu'.L II&:: LOCA;rm INTOWER 9EHIND It.r. SCREDCS

• EXISTlHO VUIImtl WIELDS 30'-0"" X 12'-0"" PIIl[FAElliilCAttDTELECOiIWUNICA1OON OOtllPMUfT SHElTER INSlCf: AN E:t:ISTIN~ENCLOSURE (UNCHANlil[I))

• PftUI"alIiED 11'-4- 'J[ 1.'-1]· -S:PUT-F~ CONCRETE BLOCkENI;:LOSURE lrrnt WOOD TRELUS fOR -flfLOCA-UON OF' £XI~GGENEItLTDII:

• REWOVE: EXISTJMG &'-O~ HIGH t.H,ldHUNK FENCE I: INSTALL NEWCOItCRETE rE~ TO .....rc... mSTlI1lG AliJaNT rENCE

• R[-1l0~ Mtw CWJC CABLE lITO NEW I'OWf:R

• lAN[]ISCAf'E I:: IRRlIi",-noo IS if't.NOIEb t"UR 1100115 511[

PROJECT ADDRESS:

DATE

DATE

"'''

PROJECT NAME..===

7245 L1~DA VISTA ROADSAN DIEGO, CA 92111

SAN DIEGO cousrr

0.2/2~/06

IJVIl1/O&0.4/1J7/01!l04/20/09(18/251/01M/101109M/23/0Sl11/1J/0912/11/091.2/1"/09{I1/11/10

PADRE GOlDTOWER

PROJECT NU~BER

97765

OWNE1iI "F'PIOY.....

cossrsuenes

SITE ACOUISITION

-ZOr.""".~------

===,,===

nnr SliEE'T ANO MOJtcr DATA

SIT[ PLAIol WITH STORMWAiER NOTES

ENI.M:'G£D SITE PL.&J11

Ar• t EQUIPWENT fl.OOlI I;: TREWS F.... MS

.wrENN" PlANS

ElI:TEROR ELnATICWS

EXTEMIOR ELEYATIOHS

LJ.N[tSCj,PE DEVElOf'\lEHT PLAr.I

LANDSCAPE DEVEl..OPN'ENf Pl..A"I

SITE SURVEY

ENLUlGEIl SlU S:UR\ItY

T~l

A-OA-IA-2A-3A-4A-5L-TL-2C-IC-Z

TZ4:I UNIlA YlIT"- ROAD,SM.l OIEoo, ~ li2111

VER~~H WIRELESS'~95 SANI) CNffOH AVEHlJElR¥~tlE, CA t2118CONTACT: r~ ItQDUL

'HOHr~ 'i4i) 2BII5-&7~

AWEIl:lC»l LEaKIN FOST 731DEPARTMENT or CJ,UFORtIIJ.7104.5 Ultl». V1STjl, Flo.t.OSAN DIEGO, CA ~11 terr CQNTA¢Tl J~ CORIlERPlfONE= (aM) '77-1681

APPLICANT:

OWNER:

ADL PLANNING ASSOCU,rrsLAHDSCAPi: A~HlTECTuRe:

2Sln STArr STREET. SUrrE 00. CCoi~, CA 92(x)1!I(760) i'211-BSJ7(7ll0) 7D-e324 (fAX)

tLoTD SLIIfYEY1NG, INC.26081 YlA. REWOUNDWIS5IClN VIEJO, GA \1211591(31!:i) 3.51-2&12(1115) ;U1-211~ (FAX)

ARCHITECT:

SURVEYOR:

LANDSCAPE ENGINEER:

PLANNING:

WIWAW 1ilc0T11 fI ROIE:RT SUAREZAACHlfECTlJI![ .a: PI.AiII"I~C

.515 Co\RLSeAD "'IUM~ 011. sum: 02CARL3BAD,. e.t.. '20UI(710) ~"-S474

(71(1.) 4:54-Mle (rAil:)

PUlMCOM INC-!l~EU.'l' Kll80Ufttlm STAn PlACEE:ScotlIlIOO. CJ. 5111:121(6i 9) z.aB-.4fiMo(Ili_) 222-.11410 (FAX)

THOIoIAS GUIDE PAGE 12"ll, J7 ~

ADDRESSi'24S UNJA VISTA ROACSAN D1tQO. Cj, S112i 11

CODROINATES (NAD 83)

LAmUDE:: .JT 47' 27.U ~ NORTHLONCITUDE: 11r 09' 61.06- wm

PERMITS REQUIRED• CUP a: PuP (PROC~ ...)

ASSESSORS PARCEL NUI.iIBER:

EXISTING ZONING:

PMOCESS:

TOTAL SITE AREA:

VERJZON PROJ£CT AREA:PROPO'liEti TOWER EQlIIPWEHT IIOOWF'llQPOS!D -G£Nl:RATOR DlCL.OSlJlIi£EXISTING Y£R1ZOI'1 5l1ELuR

1X-1-3

l!3,9~1!1 so. FT'" .:5:5 .lC1l:~

225 SQ. FT.1M SQ.. FT.5flO SQ. FT.

7..... So. FT.

APPLICABLE CODESAU WORl:: ::AtALl. CC..PLr WITH THE' FOlLOWING ..,.,.UCAOLI: CO~[5:

CAUrDRNu.. SUTE IUIUlNQ CCDE, TITLE 24" 2OC1T EDIllONC,t,L1to.Nu.. PWM • .,o. ecce. 200'1 EDmaNc:AuroRNIA WECHA"-'lc:::.r.L CODE, M07 EOlTl0f4CAUrDKNu.. ElLCTJllCAL CODE,. 2007 EDITIONCAUF'ORto1IA El€RG'I' OOD[, 2001 EllnlON, WHICH ADOPT THE1M7 UBC, :lI'ClOO UWC, .2000 UPC, 200~ NEe AtID :Z004 Cl:CI'" TIlE EYtNT OF CONFUCT. THE l«l5T A£S11lICTJllE COtiEstIA11 Pft£VAlL

SHEET TITLE

TIlLE SHEET&

F'ROJECT DATA

===..===

TYPE' OF' COHSTRUCTIO~

PROPoSED: V-BUNSPRINI(LEREO

IICTEI THUE: NlE TWO EXlSTtlG TElECONIiIUhllCATIONtACIunES (V£AlZDN II: T-MOBllE) ON THIS SI'TE

SCALETHE bAAWING SCALES SI«IWI'I IN THS ~ET RU'ft£StNT "HtOOftRECf Sc.u.E ONlY WHEH THESE OM-WINGS ARE PIllllTl:D IN "u- x ,,- FORW.l. IT tHIS DRAWlt.lG sn IS NOT 24- x :58-, THISSET 15 1'101 TO :!IiCALI'.

TOWER OCCUPANCY:

EXISTI NG SHELT[R OCCUPANCy: I - TELEcot.l SHrrln

ACCESSIBILIlY DISCLAIMERTHIS PRD.ECT IS ~ UNOCCUPED W1REL..!SS I'~!!I

T[ILOOIIl......ICATIOHS f'AaUTY ANo. 1tCCOfl0lHC TO W'UTTt.N1~"T1[)N FlIOU TIiE ~AUroIlHU. DEf~ or THE STAT(AJlCHlITCT, 15 EXD.l~ JlIOM DlSAIIL!D ACCESS REQUIREWENTS..

=========

T-1

Page 35: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATIACHMENT9

OAlE

OAlE

DAlE

APPROVALS

A-1

ENLARGED SITE PLAN

SHEET TITLE

en65

1:===

72.S LINDA VISTA ROAOSAN Cl'IEGO. CA 9211'

SAN DIEGO COUNTY

DRAWING OATESil2/24/'01 ZO 'lEVIEW (A.O)03/0' /01 Pl...AHtltlCi- SUeWITTAL (AO)04/07J-D6 REmEO ID {dJ015/28/09 PI..A'4NtlQ SUBIolITTAl- (raw~)

05I/14/D5I REVlS£O ZD (rCll)09/23/09 P1.A~N~Q COtolW£H1'S (....)11/13/01 lJ,~l)$C.i,PE REVI~ON

12/11{09 LANDSCAPE REVISION .2 (J..l»12/1.4/01 "-"'~D$t.i.PE REYlaOI'l ., (ao'Oi!H/IC R~5[tl 2D (jb)

PREPARED ;OR

~venmnwirelessfl.o. 90X 19707

IRIIINE, CA n~23-9707

(•••) 222-7000

PROJECT Nut.UJER

PADRE GOLDTOWER

PROJECT NAWE

1,I111I~H "~tlOfH A~~hlnO::T ~e-~!~T" .u~~••. ""~HIH~'

"i1. C,fILLIIAb, c. 1101> (1.(>] ~l'.HI'

SITE IoCQtJlsnKlH

1II.F.

===..===

===11===

===..===

===..===

===:1===

====1:====

25 CU_ 'fAD'SB CU. 'r'flD"S

:S~ cu. YFlO"S

"""".............1. PRIOft To r55UNK:E OF ANY CO~cmN FlERWI1', 1'H£.~WITIi£ stWJ. SU8M1l A IlIAIlR I"'OU-lJTI:lN

~~.~~~ ~~~D~~£~l:ClfY's 'W!\'Il;;R sr...t1llIRCi

2. F'fdOR TO tSSuNtGt [)F AN'( CC"IimJCT1ON P£FU1. 11£~"lrTTtE: StW.L INC~POIOO"E IWY CONSTRUC'11ONBEST M,t,NAG[/,IE:NT PRICIl(::l;S~ TO COWP.L¥ W1THCI-W'T!R 1'" ,t,RTlCL£ 1. OMSION I (QW)ING REGULATIONS)Of TH[ SAN OlooD YLa'lICIPAL CODE, MO THECON5TRlJ~N PLANS OR SP€QF'ICA'OONS

0.:lSTl1tG DRIVEWA.'I'

DJ511HG 6'-0- HIGtl CHAJ""-J"IC: FtNCE TO BE: ftENou'ED

RElIIt:M: EXISTING PAVfNG; FOR NEW LANDSC-i.f'E~

//

~Et,O,'E tx5TWII(; WOOOPOL£ CCNC~ FOO11Nr:iJH) APftOO TO88.176' GMDE: (S~ twiHEO)

EXIS1N;; oooR .I:; COi'tCRETE I.ANDrNG

EJlISTtiG TWO sroR'r' BUlLllIHG

[)(ISTI«i STAl~ NI) MLM::

ElUSTlNG BOU..ARIl5

~1E EXISTING GENERATOR INTO NEW CO~RETE FElllCE EltClOSURE

EXl5TlNG WALL. MOUNl[O MECIoWICAl IJNIT5

EXISllNG "WOOOCREt"E" CDNCR£TE FENCE: APPRO)(jWA.TELy 7'-0" HIQH

~Nl;: 10'-0" S£11IAOI:

£oSlING e'-'-0" unurr .FAS~E:lQSTWC F'IW1NG &: wttm STOfl5 TO BE R£liOVED

PROf'OSEI) 1..NIl5CAPE: MEA. sa: '51-tEET' l-t FORI..AN09CN'£D~ PlAN

PriOPOSEC r---o- HG'"~. CONI::F<DEFDtCE TO IMATCH ExISTING

PItllPC5EC lJaT~ eoNDE:)ISlN!:i U~ ON2"-()- :I[ 4'-0"' co~ PADS (TYP1CAL. OF 2)

!>RO\IIOE ~NE WAr O~..... ARROw

~~ CONCRFT£ aJ"8

EXISTING ASPWLT i=AVlNG 10~

IOOSTIftlC> ADJ,eCENT APArffijE:NT 6VIl.D1NGS

PROPOSED IJPUON 'fllAE:1.EB8 trt-0· HIGH~ 1~'-8' SQl..lAI\lE C:O-LOCAtR:lLEm.ECQtdWNICATION TDWER WIlH AT&T.-oBILIT't' £QUIPhilENT RQOU Kr lillWlf: WJEL

f'ROI"OSEO \ImZDN W11tEl.a5 7'1-0· HIGH " ~~'-.!I. SQUARE'CO-LOCATASL.E TEI.1COMhIIUNICATlONS 1"OW£R

fUDCATE~ ....... ANTEN..-s lNSll;l[ UPPER rowER B£HINDFlF. ~rwDiT SCREEN

PROPOSED ...T,tl WoelUlY ANTDI~ INSiID£ UPPER TOWERB£IoIf!I) U. TJMNSFlARENT SCAm.. (tEUlW VERIZON ANT£NNAS)

FlEWCM: ExJ!mNG 8'-0" H1GlH ~L.l'jK fDlCE &: INSTALL NEW 7'-4)"HIGH "IwOOcRE'TE"' COHCI'lDE: F'ENC£ TO WlTCtI EXlSTI\ili ADJ,I.CENTFENOC, (St4OWN CASHm)

R~ OlISOOG 75'-0'" Hlf;1i .uQN0l"QLf (SHOWN SHAOED~

EXmlNr; I,UlIZON WIRELESS PREi'ABRK"JITEDm..£C(IIAIUNlCA11ONS 9JIIOINQ10 REt.IMj

RfWO\I£ '«IIIZOM IIRLESS AA"1'EItlN.'lS FRQIiI ~IS1lNG WOtIOF'OlENnJ UC'IIE TO PROPOSED rowER ('SEE: NOTE <.V..atwE)EXIS'T1ltC; twfllCAP S1GHAGE ON ElaSTING DOOR TO RDWN.AT FlftSf flOOR

DaSITNO CONCFlETt ~EEL STOP TO~N.

REMO'lIE~ llIIIELEBS IIoIICROWA\l'£ ANTENPU, FROhiI DISTlNC>lIOttOPQU; AND hilM TO PRcPosED TO'WBt

PROPOSlD lNi)S~INCO SEE SHEET L-2

iEPGE Of 00STl1iG PAYI'olG

£lI:tsIlNc. lWtmD FlAA':ING STRl~

DlISING; unLITY TJl:EI'K:H

PROP£RTr' UN£:~

ENLARGED SITE PLAN-.,-....KEYED NOTES:

<1>

o<P

Page 36: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

1lA"

1lA,.

1lA,.

llA"

PROJECT NUMBER

... 'l'l.... '! '('.;>TH, ~~tHm;tT '"l!!ll.L l""~,' _"'~Hm~TOUt C"~U~dr.. C~. NOj~ {lIO) "4'~4H

PADRE GOlDTOWER

PRoJECT NA~E

szzes

F.0. BOX 19707IRVINE, CA 92623-9707

(.49) 222-7000

~verrmPwireless

PREPARED FOR

APPROVALS

ATIACHMENT 9

~uL&-

5fT[ iIICQLlISIllON

OWNER N'PRO'tIAL.

20NING

.....-------

==='"===

========

====11====

, OF"loLL

, OFWIol.L

°liLR,SLLlS PLAN~

AT&T EQUIPMENT FLOOR PLAN-.._....7245 LINDA VISTA ROAO

SAN OI£GO. CA 92111

SAN DIEGO COUNTY

KEY NOTES:

0- PROPOSUI /fIti WI*.nY RF' ECl~rv:NT ~I<.

~~OPOSED W1Il..L. NOUNTE.c 1oW\IUiL- lRANSfE.R SWrR:H

~Pf'OPElm" L.»lE2.3 1/2- WIDE: ill 15 3/4-· 0ttP II' 72- HIGH (TYPI:';AL OF Z)

3"-0· ;II: 7'-0· snn DOOR AND F'JW,lE. ~STAU EXISilNG WRIZDN RlfllS5 ~A8R1C111tDWEI[1HT -510 L.ElS. £N>i, INSf-'U.ED fJ'f~OR

1nroOUUJNICA-TlOfIl SIG~~ TEl..lCOUYJNIr;ATlONS BUILDING "R) REWolN1> PROPOSOO ...1&1 hIOBIUTY +24\1 Fi£ITIlflEl': ANtl M.T1'£R'f ~K

~Al.UlrUNIJ~ THRESHOLD

ROICJI,'[ El(ISIIfG OONCRUr "'HEEL STOPWITH +201J\1 m -~ COtI\ltRTER. (W.)l:IMlJM 12 BATTERIES)2.6. MIX )I 21~ CEEP 1I I!~. HIGH

~SED (lXkJ8L.E) 3- I( 6- ¥lOCO lREWS. R.&FTtR AT ExI~1;l. f/ -0· l-iIGH CI-WNUNK FENCE TO REJ.&4JNwaGioIT: 1I1IiIS LB5. Ui-:t c.c, ABOVE PRQPO:iUJ CO~ETE BLOCK OfCL.OSURE

4} EnG£: OF EXtSnNG PAV1I'fJ0 PI'lOF'OSfD AT6T MOBIIUTY ~8) RRU'S MOUNT£Q. TO A GoiIi.V.-NIZED PROPOSED 4fj- II .fI4- X 3/.- WAll ~NTEDEXISJ"IIG PAlN1ro PN'1KING: SiRIP~sne, MAST ('TrPIC'.AL OF -5• INSTAI...L£D BY CCIN'TRACTOR PL"\'WDOD mcc ElOAAO

4> 1} CiDIERAl CON1RACfOFI stw..L mQIACE: oW:) INSl/IU. EXl5IM~ UT1UTY 1'R£N)HPROPOSED ATIlT UCIIlIJTY 0.-.,... MeK.~-J,4B;1~~ 1~· DEO' {r\"F'~ OF .2) ~~ MOlINTID ClASS -ABC- F1R£ £lm.100ISHER tlasnNG WAU. loIQUN'ltO MH:1>Wl1CAl UNITS TO REt.WN, CO2 DR DFf( CtEJr.IC.'I. FIRE £lmNGIJISHER rnRCIiATSwDrnH, PA:I'lJ MJMElER: ~70;:l Pfl:(}'IIlD[D es OOSTlMi lC'-(I- SE'TBACf(~ l~~ ~ ~R

~ GEl£M. OJIf1'RICI'OR ,sHfol.l. PRaI'lD£: ..wi) If!lSTAIJ. EDGE OF" I;XISTlN'l vrJUTY EASBtEHr~ ~ RI:T ..-.m' +.2-4V D:PA.NSION "GIWHGEfi- t.lODELS 5W!5&2 }IItID o$Ti01 WAU.

F'lOPOSm l.ANDSI;'.APE~ SEE SHIT L-1 FORBATl'Ul'Y' MiCI<. (WiXIYUM 12 BIl.~~ MOl.I>ITID FlRST AID I<rr WI'h-I BLOOD BORH£LNll:lSCN'E CElJEl.OPIIIIEN'T PlAN:;:..- W1D£ Il 23 1/2.- OEEP lC 39- HIGH PATHOGE'" l<ITNo/D Pl.ASfJC SN'£I'Y BIN WITH

~WEIGHT; 150/13 LaS. EME~GENC'I'~ sr~TION

PROPOSED 1e~ HIGH 5PUT-FIIC[ BlOCK PI.JlfflER 'WJU

<€> PROPOSED WJU l,ilOOr.rTUl 200 A/oIp EL£C1ll1CIIL P~EL 'ers' 4} PROPOSED ATict IIIDILlV COl\IOENSING OlmSi ON~ RWJCAlT EXISTlNG CMJiHfA,C CAIIt.E. BRIDCt2<-0- " 4'-0" CONCRtTt" f'.tDS (TYP1CAt. OF il)

iFJJT1JR£ WAI...1.. UOUNTED ENYIIiONhI£NTAL CONTROL. PNIEl.

~ ~E.C \oSIID:IN 1IIIEI.DS 78'-0" HIGH • 15'-a~ SQUARE" ~ PROPOSa) 3'-IIl- WIOE $CUD GATEFUSED -OISCONNECT !l\IlI1'CH OO-LOCATAHLE TELEcc..W~ICl'llONS row£!f ~ PROPOSED COHCRETE: CURBPROPOSED FA.N COIL U~ Wm-t outDooR COND€NSOR UNITS il> F'ROPOSED 1IOCf$$; iI.ADDE:fI TO .IlHTENHAS NJ(N[ ~ PROPOSED Tm.us tiEAV'l" DUTY I£AU B~. (TTflICAL OF" 6),,'-0" I( ,'-(J" S'JEEl OOO~ .-ND- FRN.I~

~ "PROPOSED STE£L 1lJBE COlUWNS 8: RW.ED W.l.. ~ PROPOSED ,- :II 8~ WOOO TPlELJ.JS B£rWI\ISTAI...L "'T,aT MRJTY S1GIW3E.4} f;:ENc."JE OOSTlKG e'-d" i-II;li C~litIK A;)ICE .at IfIISTAl...L ~~ GetEfW..~ SHAll PRfNIDe it BftOOhI. PRoPo'5W 8'-0" HIGH SPUT-F~ CONC~ET£ BLOCK WALL.

DtISTPAN N4D WALL jeces "lEW OONCI'i£TE 'I'ttlCE TO ~TCH D;lsmC~ F'ENt:E4P flRClPOSED lit:! """IOLE~ HIJr«i Fl'fC* CEIUNQ nDI£

===1'===DRAWI~G DATES

oe/1~/Q'SI PLAN~llIIG !SuewITT...L (TOwt-R')OIl/14jO'il R[YISED 2D (rell)09/2.3/0'SI PLAN~llIIQ (:Olol~l:HlS (lIOJ11/13jO'il LAHDSCAPE R~lSIOlll

12/11/0'SI I.ANDSCAF'E Rt'\I'lSlOH 20(111)12/14jO'il l.ANDSCAPE R~IOH 3 (",,)111/11/10 RrYlSED m (jb)

===..===SHeET TITLE

AT&T EQUIPMENT FLOOR&

TR8..LIS PLANS

===..===

====11====

A-2

Page 37: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

OATE

OATE

DRAWING DATES{J2/U/06 ZD REVIEW (1.0)0'/01/06 f'LAttNIHG 51A:lW11TTAI. (iUJ)\I4/U7/08 RE'li'lSED m (el)CllIi/2'!I/0!iI PLAttNINQ 5UBliliTTAL ('fO'lllER)~1iI/14/0liI REVISED 'ZD (roil09/'5109 ~HIND OOWNENfS (all)n/13/0I LAl'tDSCAPE REVISION12/1 '/'09 lANDSCAPE REVISION 2 Qllb)'2/1 4j~ LAl'tDSt'A~E REVISION 3 (00)C11/1,jIO R£VISW IC (Jb)

97765PROJECT NU~.ER

PADRE GOLDTOWER

PROJECT NAME

7245 LINDA VISIA ROADSAN DIEGO. CA 921"

SAN DIEGO COUNTY

SITE ACQIJtslTION

ATTACHMENT 9

~~

PREPARED FoR

~veftZ2Pwireless

P.o. BOX 19707IRVINE. CA ~2623-9707

(9<6) 222-7000

APPROVA.LS

e.r,

....IlLJ..... ,onu AILUIIT"'-' ~"'I"T ~ ~~!~H, ~~~HIT~<:"

'.D.IO~ 4Ui1. C~~l.IUlC~ HQlI (rUll '~l-.'H

===..===

===,,===

===--===

====11===

"AT&T MOBIJTV" ~!I~~ER ANTENNA PLAN NC/

-AT&T 1oI0EIIUl'l'" ANrrNNA AND COAXIAL CABLE SCHEDULE

=. """"'" ~.'" Ntm.IA 1IKl~ t«JlliD _T .... "" ...... "",=- """..=' ...... "'" ""...... """'""''''''''. (+1- 5') (+ I - '!t

~_77S2.00

~_77S2.00 w~ W~,. • ,,'..0- ... Tf'""""'" e: _77S2.00 • _/A 1lEJlIIJ: ~4 UIS.

~" ......... 77S2.00

~_77S2.00

~""""'77S2.00 v _/A w. 11~ ~ f' • ,,'-0" c'-o· 7f"SOOTl£AST "v _77S2.00 IEDfI: !IIl,4l.8S.I--&-.. _77S2.00

f-.El- _77S2.00

'"_77S2.00

~ IVA W.l1·~f/' e 05'..0- E'-C" 7/4"

~ '''' _77S2.00 \lllEUmM.4-1!1S... _77S2.00

~MlENN.I, G~-G~

IIZI~IB'

~:.&. ../ 'D,

, ~-e-~/ j' e-, '../ / / '>-",/ ' , /. / / '

"VEFlIZON W1RaE88"

UPPER ANTENNA PLAN-.......""

NfTDIHA Bl-E!5...ZII..LJl1oI ~!I"

'VERIZDN WIREl.£SS- ANrrNNA AND COAXIAL CABLE SCHEDULE

"""" -..."""'" M'fEIIlI, MODEL llUt.lElElt -", ..... .........ER ....... ~~ ..."" ""'SIlt..- ..... "''''''''' """"'" """'" [+ I - S1 C+ I - 3-1!>!!!!! .....,'""'"'"~ """'""""'"~ soon"'" ". RlIlI&-ll-lmlFU V IVA • OO'~rj" ,'..0- 7f'"

""'" ""'IO-WU'ii:PiiOO .....""""'"~

.....,...,....g -,........,~

WEST zo. IIIM-l.a--G:21:1fl2 rr IVA , "'"..0- fi'..jj" 7f'".....,........,~ """-,

~"" ....~"" ......,; """,,,fAST ,. .....,........, • _I, , 80'-(1" S'-C" 7/3~

"" ......."" ......

ANTENNA PLANS

SHEn TITLE

===11===

====11===

===,,===PROPOSED \9IZtlN IIREl.ESS 76'-0" HICiH II 1"-3" SQUARE TOw'E:R

PlEI..£JCAT£ YUl!DN 'IrIIEI.P$~INS~E ~ 1O¥IER ElEHINCFl.~. 1JWtSPNl£M'I SCI'fEDI

FROPOSEV ATM IIKBJ1Y NITDlNi\S INSIDE. NEW~ !lEHtND R.F.~""....RaKM: WNBIN~ ..~ AHTENNiII FROio! EXI51'1HCPNC»IOPOL.E AND t.iM 10 f'ROPOSfD lO'IrEnPROPOS£1l sna, COl..U"~

PROPOS£!l JICC[S5 ""~

"CCESS I.AOOBI TO LPPER ANT'ENNII lML

ACC£SS I.AOD£fI: 10 GROL,t.lD FtOOR 6El.OW

"flOPOSED SAfUY I;i\IMO RAIL

FUl.L HEIGHT WAlL CS~ SI-b'DED)

~. HIGl1 WALL ~OWN 5Hf«D)

KEYED NOTES:<l><p

~

o

iA-3

Page 38: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

CATE

[lATE

A..4

EXTERIOR ELEVATIONS

SHEET TITLE

....,ll"~ "."'''~" A""~I""i<:T l'9'IRT I ~~~HI,~ ..tH,T~CT

r.1).U~~ ~~Sl <:'"l'~~Il..<:-~ 'l'I<;II! CUO) .~~-~07'

7245 UNDA VISTA ROADSAN DIEGO, CA 92111

SAN t>1~GO COUNTY

DRAWING DATES112/204/06 Ie REVIEW (Ae)03/01 j06 PLANNt~a 5UElMInAL (.MIlIM/D7JOB REVISED ZO (c.I)OEIj2!ijOi PLANNING 5iJElNITTAL (T<lWER)09/104./09 REVISED ZO (To:It)09/2/l/0g P'-AN~ING COlil~EHl$ (11(l}11/13/0S LAHCSC,I,PE REYISIOK12/11/051 LANCSCoIIPE REVI'510~ 2 QiClb)12/14/OS L»ICSC,I,PE REVISION! (GG)01/11/Hl RrYlSEIJ. zn Ob)

~.F.

PREPAREO FOR

~venzRllwire/ess

SITE A(:!;lI,JISl1l0N

97765

P.O. :BOX 19707IRVINE, CA i262~-i707

(949) 222-7000

PROJECT N\JNBER

APPROVAlS-

PADRE GOLDTOWER

QWHEIi AF'f'ROVAL

ATTACHMENT 9

-!IUS-

lOJollJo'G . - ------

PROJECT NAMt

CONSlr<UClI<lN

===..===

========

===11===

==="===

===;;===

===.. ===

===;;===

EXIS1lNG CONCFlrn FnlCE

R£WOVE EXISTING e'-~ "~H CHAlNUI'fI( FDlCE 6: INST""-l.. NEWOO~RETt fWCE TO WITCH EJ(ISllNG A&JACOO FENCE

PROPOSED \IERIZlJIlif WIRElESS 76'-0· HIGH l( W-a"50UAAE (:r,)-LOGIIITABL.£ lll£CO~~UNIe,t,TIOtI!i TOWER

~E.l.OQIr,TE YEJaZ(»,I IfIIREl.ES$ANTINWS INSIDE NEW TOWER~IND R.F'. TftMISPAFlENT SCREENS

PROPOSED R.F', lRa*.NSPAAOO SCREEN TO SJWUI.Jir£ CERWtC TIll FlNSIH

REIfOVE EXISTING 71)'-0· ...IQ-l WOOPOtl 6: enocce ANTENNAS(SHewN DASHED)

NOT USED

RlLOCATE EXISTING ~ICROWAVE ANTHIW,

DUSTING ElRICI( VEN(:EJj:

ElCIS11NC WOOD SIDING

ElCIS1lNC sneco Flr-llSHED WALl.

£)(1S'nNC~ WUiIEI.ESS PREF'AiRK:ATED TB.£C(lhU,J~CAnO"lEQUIPMENT SHELT£R TO RElAAf.l (UIotCI-WlGEO)[)lISTING DOOR

EXISTING W1NDOWS

[)lISTIHG FU.G POU: WITH T-1ll0BIL£ ANlENNiIS INC'rl..INDER RADOt.IE TO REWlN

[XISTING Bl,ILOINC ~~e: TO Rt:~

EJlISTlNG I.AND5c:APE HEDGE TO RE~

EXI5TlNG CONCRETE EIOI..lJ\RD-

EXISTlHG T-NOBILE. EQUIPUENT ENCLOSURE

EXlSTlHG TlWlH OIClDSURE

E1.ISTlNG SfAIRS, lANDING M£J GI..IARDRAJL

EXISTING GlWI£

EXISTING WOOD FENCE TO 1l:£MAI~

OiJSTlNCi 8'-C· HIGI1 Cl-WNUHK F'E~t: 10 RaIAJ~

PROPOSOO 3'-G" 1M!)[ 'SOlJU GATt:

PROPOSED HI'" I-IIGH SPUT-FAC£ BLOCI': Pl.MITER WM.1.

PMlPOSrn z--e' 'f/lDE lo'NOS~E AA~ ~ENT TO W/IlLSEE StilET L-1 f'OR lNIosc,..pE DE\IElOP"lENT ~LAH

PItDPDSW WOOD FASCUt. II TRIh!

PROPOSED SPUT-FJlCE(:ONCfl:EfE BlOC!< CiEN£ftArnRDfCI,.OSl,J~~ Wmi WOOD~~

P1UlPOSm "'f'" MDIlIUTY NflENNAS INSIDE NEW TDWtRBEHIND R.F'. TlW9>AR£NT SCREEN

KEYED NOTES! TIl, OF EXlSllNO BUIlDING

iI

fs,b

b ~

.. ~ Iii~

, ~

~b i,

? il'1;

PROPOSED \UI2DN WIRElESS n'-o· oHtcH )(1.5'-g~ SOl.lAR( CO-LOCAllU.E TELroOWUUNlCAnONTOWER. REwavE: EJlST1~ NONOPOl..E Ill: RaocA'TEAHTrNtwi INTI) TOWER BEHIND R.F, S~S

-1I

+------

III

:UIII

EAST ELEVATION1QJItJ!::1·.1cr-r

PR(F(JSED \'EJIZON WN1.ESS- 7E'-(/' f«:iH ~

1~'-Ilo· SQUARE c;o-LOCATil.Blf mn:olol~UNIc.\TlONTOWER.. RE..-ovr EXISffiG MONoPoLE 01: RELOCAT£RlTENNAS INTO TOWER 8(1-1"10 R.F'. SCIlEENS

NORTH ELEVATIONIDME:t· • ...,.

Page 39: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

PROFOSED \UlIlON WIIEI.ESS n'-o~ HIGH x1S'-B' S~ CO-l.OCoI\TAElL.t: Tll.EO()"',",UKlCAilOHlOWER. ~OVE: [)lISTING- Ul:lNQP(lL-E: ~ ~1E~ INro TOWER Ell:H1ND Il.F. S'CRED\I!'

ATTACHMENT 9

~uliu&-\J·lll~.. 1\ '~O"-H_U<:H.T'<:T "".,~~ J. 'lJ,O"I.r1P';HI~~';;

~o.i¢~ ~4~1 ~~~I~~~I),<:A i~t;;.~1 (JtOl ,1'-~<1~

PREPARED FOR

=== ..===

[lATE

lJAtE

APPROVALS

~venz2ft wireless

P.O. BOX 19707IRVINE, CA 926"-9707

(9") 222-7000

u.

20NIN'I

===.. ===

EXISlING "TIM M08IJ1Y E{JIJIF'UDfT RODu.l..DC:A.ltD INSICE flflOPDSED TOIUI';R AT ClaDE• ANTENN.15 BEI1IHO R,F. m.tHSFlAROOSCREENSABOVE

·; ,~. -.:

SOUTH ELEVATION1C\IIIlE;1·• ......,.

CCNSTRucnON

SITE ACOUISlTION

llATE

DATE

DATE

DClSTIhiG CRADE

EJlISTING WOOLl FtNCE to RD.IAJN

PFlOP05e> 'I'\lOOD- f4SW, til: TRIIIl

FlROFlOSfD A.l;a' I«lElUfY ANJalPW: INSIDE NEW TO'II'£R138-lINP R.f_ lRANSPAAOIT SC~N

DRAWING DATESZ[) FltvlEW (M)PLA~KI"(; SL.lElI.IITTAL (,IJ))RE"'5ED ZD (cOPLA~"I'I'o1C SLJBt.lITTAt. (TOWEJl)RE1I1SED ZD {ral)PLANrtlrolC COoIIIIlilENTS (ao)LANDSCJlr.""E REVISIONLAf\lDSCJ\PE REVI~ON 2 Ol:l~)

LANDSC.I,;oE REVISION 5 (Ia)Fl!:VIs[O ZO (M

C12/204/¢1Il03/D1/06C~/O,loeOl!l/29/0'!l1l!ll/104/o~

119/23/0an/13/oi12/11/oa~2/1.j./CSl

1l1/oe/10

PROJECT NAME

EXTERIOR ELEVATIONS

PADRE GOLDTOWER

7245 UNOA VISTA ROADSAN DIEGO, CA 921 1,

SAN DIEGO COUNlY

PROJECT NU".EO

97765

SHEET TITLE

===1.===

===..===

===..===

===1.===

Il:El.OCi.TE VEIIZCH WREl.ESS ANl'[NNAS INSIDE MEW TOWfRBEHIND RF, TJWtl5Pl1oRENT 5CREENS

PROfI'I)S[D itF'. TfW4SPAREI'iT SCREDI TO SIMIJI.ATE Ci:RNAIC Tll£ F1"1SlH

EXlsnNI:: 113'-0· I1lctl CKAlNLlijl< F!Nct: TO REMAIN

NOTesrnEXIS'nNI:l TEL..Co BOX (TELco SERVICE CONNECTI~)

£l(1ST1NG eAlCK YENEEfi!

EXI6T1tfG WOOD SIDINll

EXISTI"fG SfUCL::o ANrsI1ED WAl...\..

EXI5T1tfG \'EJlIl(III W1RfUSS PR[FABRiCl\TtI) TELECOMMuNICAllON(QlJIPfe(l' SHEllER ro ROAAIN (UNCIWIGW)

EKISTlHG 0000

EXISTlHG WINDOW'S

Elt:ISTlfIG fL.AC; POlE WI1l'1 T-MOl3f1L.E ANTENNAS It!CYUNDE:R RIoDOIilE TO l":~

ExfS'Tjoo ElECTRICAl. CABINE1S ANC UErrRS m RElAAlN"

~I~r-IG I...ANDSQIIPE HEDGE TO REIMIN

EXlsnoo COI'ICRETE BOUARD

ElOSTl~ T-~LE ~lf'I.4oo ENClDSURE

8OST1r.lG T-WElILE EQuiPMENt ENCLDSURE(SHOwN ~EJ;l FOR C~1lY)

EllIST1NG STAIRS, LNllDiNG AND G\JAFIDRAIL

KEYED NOTES

%TOP OF' E:lOSTiN"G IlUILClr-IG

EXISTlHC> OCNt;:RtTE FENC~

::. R~ ExISilNG 1)'-0" HIGH Ci'WN~1< F'VfCE &: IhiSTAl.L NEWCONCHaE FHlcr TO WATCH o.'tSTlliC AOJActl'iT FOICE

<9 ~~~~~~~~~~N5'~r~

~nli~

:, ~~,

kItI

i

PItoPOSED VERIZON WRQ.E$$ 76'~ I-IGH xre'-e- SQUME C:O-l.O(:AT~LE m..£Cl)"'MUNICATlONTOwER. RD.IOYE EXISTIIIG MONOPOLE it RElOCAtEANTENWS lNTO 1"OW£R BEHIND R.F'. stREf}IS

WEST ELEVATION===== II =====

A-5

Page 40: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

"1£

,,1£

f'LANNING 'SUSJ,IlrTAL (110)IUvrsED 20 (.ell)f'I..ANNING SUBtoII1"TAL (T(IW~Ii:)

~EYlSECI 20 (ml)f'I..ANNING C:OhilW[~T$ (Gil)lJINOSCAPE: flrvlS:IO~

UlNDSCAPE IlrvI510~'5 2 Olllh)LANDSCAPE JltvlSIOIoi :5 (....)~~SE:D 10 (jb)

DRAWING DATEs

0:5/C11/Q604/~1105

oe/~9/o,

09/14/011l9/::l:5/C9IJ/13/011:2/''10911/14/011I01/11/ID

L-1

zmntlc

P"'OJECTS\'m'TZOfT\IlIlC23zd\050:a.3zL\.dW9

Sf-iEET TITLE

P.O. BOX 1~707

IRVINE, CA 92623-9707(949) 222-7000

~VerJZ2dwireless

PADRE GOLDTOWER

ATIACHMENT9

H~8-

LANDSCAPEDEVELOPMENT

PLAN

PROJECT N.A~[

7245 LINDA VISTA ROADSAN DIEGO, CA 921 i 1

SAN OI[GO COU'NTY

PROJECT NU~BER

PREPARED FOR

APPROVALS

===..===

",.F.

===11===

WIlLIA" ~_ IOCTH oM:""'I;T ",,''',1 m,m, , ARCHITEC-

,~.1. ~A"I5R"~.<;1 .~~'I oeco 1J~·~'H

=== ..===

===11===

=== .. ===

===11===

=== ..===

ia~. -0· I1EIGKT

ec.o' SPFlEAQ

Ei" HEIGHT

r-e- HEl~HT

4'-0· SPREAD

6'-0" S~FlEAD

1'-113· HE:J(ilHT6'-0· SPtlifAtl

1'-0· SPREAD

5'-D" SPRU.(]

15'-0· I'fEiGHT

1;5'-3D' H8Gfil

:20'-40' HEIGHT20'-4(l' SF'liUriD

JO'-40' HEIGHt:oZS'-jll' SPf'EAD

PLANTING NOTES

1, All. l..AMlSCAFE: /tND IFlRIGATION DESIGN. lNSTAuATIOrto1 Af\ID t.l1llN1EN./INCE, SHAU.. CONFORM 10 lANDSCAPEREC'JI-ATlONS mD ,l,LL OlHER cnv or SAN DIEGO LAND D£IlELOFl~ENT ~UIIL LAND5~E ST,I,HOARDS N'lDALL OTHER ,6PPLlCABtE CIT"1' AHD ~EGIONAL SfN.IDAI'iDs FO~ LAN~lO lNSTAL~110H MiD MMNiENANCE

2 PI-ANT M,lt,TERw.. SElEClED FOR nus PROJECT WIll. BE OF A T'rF'E I(NCWN 1-'(1 BE SUCCESSflJlrN THE AREA DR IN SIMILAR CLIMATIC AND SOIL c:oNDmONS

a L,ANOSCAPE: F1NI'SH GRAVING OBJECTIVES WILL~NCWDE POSITI'IIE S1JRF'II.CE: DRI\INAGE OF PLANTEDAREAS THROlJ'GI-IOliT Tl1E PROJE:CI~

4. ALL FlERI.\III'IIE:NTLY L»lOSCAJ'l::D AREAS '\II1LI, SIi: SERvfiJ BY PfFU~ANENT, NJTO~ATJC, UNDERGROUND,IRRIGATION S'l"'$TEMS uSIUG LOW PRECIf'rrATlON FlXED AND PaP UP SPRAY HEADS

5 .N..l S(l1.LS Will ElE: rrfl"T1I1ZEIJ, /\MENDED, ANO TILLED ro CONFOR"! TO Fl:E"OO~ .. ENOJ\iKINS MADEBY A SOIL TESTING LAI3ORATORY mD/oR LAND5CAP!:: ARCHITECT I~ ORDER TO PROt.tOT£ HEALTHYNolO VIGOROUS PWIT GFlOWTl-J

6. ,Iil Pl..ANTIHG AREAS WIll BE WJntAJNED IN A WEED AND DEBRIS FREE CONDITION

7'. Al.J. Orool-SITE lRFlIGATlON IMPRO\IEMENTS SH-'U. 8E P!IRi or- THE D'JSTI~ FOTABLE WATE:F1DISTRIBUTlOh' sYSTEM f(ll': THE: STTE

8. SFlFlINKU:Fi HEW SHALL ElE ADJUSTEtl FOR OPTIMUM PE:RFURMANCE. rae 5HA1..l INCLUDETHROlilif'lGl THE F'lQW '!XlNTROL I\.T EACH VN.VE TO 08TAJN THE {JPTlLlUI.I OP~"ON(JPRESSURE F{JR EACH SYSTEIJ. CONDITIONS THAf CMJSE O"o'ER-S~RAY, POr-.lOING. ORRUN-OfF SHAI.l. E:1E: ElJMINA1UJ. ADJUST SYSTE:~ TO AVOID THESE CONOITIONS

"9 BEST IRf:!JGAllON t.4ANAl;:E!'Jf;NT P~TlCES SHALL BE USED TO ELI'dINATE OR CQHTRrll TOTHE ElE:Si txTENT ~SSISL[ PONDING, RtlN-OFF, OVER:-SPRAY AND ~ISTlNG

'0. IRRlGAllON HEAD~ !;HMJ. eE lOGATED OR AOJUSTEC TO MINIMIZE OR ElJMINATEOVER-SPRAYING (IN SIDEWAlKS. STREETS AHD NON-DESIGNATED LISE ./lJi!EA5

WATER CONSERVATION NOTES

1. DETER~INE lHE: lOC,l,TIOO OF ALLIJND~ROUND utnmrs PRIOR TO T'rtE INITIATIONor Mly WORK. AlL WQRI< SHAL..l Bt: PffiFORt.lED IN AN: ~NER WHICH WILL AWIDPOSSIet..E DMMC!; TO unmes. HAND D:CAVATE AS RfOUIRED

2. TRE~S :SH./llL et LOOIlID $I MI"NI~UItl OF FIVE: FEET me+<. ~y Dt:<;,I~GE: how UHE.SEWER UNE, WAlEI' UNE:. G,;,S LINE. OR ELECTRICAL CONDUIT

J. ROOT ilAFlRlffiS SHALL Ell; INSTALLED ADJACENT TO AJJ, F'AVIN~ SUAfACE:S. WHERE A PAVING SURFACE: 1$LOCATED WtTHIJII 5" OF II TREES TRUNK. Root BoIIlRIERS sHI'.Ll EXTEND F'OUR F"EEr IN EACH OlRECTION,FRO~ ll1E: CENTER UNE Of TtlE: TRUNK, FOR A TOTA/- flISTAAC~ CF a FEET. lNSTALuN':;: ROQT EiARRIEf<SA'RDUND THE ROOT BALL IS UNAI::f.::EPTAElI-f,

4. TREES WIU BE LOc,o,TED A MIHI~UM OISTAt"CE: OF z FEET FROM Noff PAVING; SURFACE"CURB, W,olU,. OR C(JN(;flETI: MOW STRIP.

o AU. Pl..NIITlNG AREAS, SH/Ill. Rf::CElVE 1\ J~ LA'l'ER OF ~ULCK

06. Pl..AHiIIoIG IN'ST#lUATIQN CftlfER.IA:Al..L PFlCPlJSED lFIE£S SH.II1.L BE SELf-SUPPORTING, WOOD'f PLANrS WrTH AT lEAS1 ONE YlELhIJEFlNE;D fRl,INtI AND SHI'tlL f'fI)R~N..L'I' ATTA!H A MATURE: HEIGHT AND SFlRDlD OF AT L~ 1~ fEIT.

7 PLANTING ~AI~T£f'WlCE GRrTERl1IJU lA/IIOSC'H: lNSlNJ..J\TltlH SHAll BE ~NTA'NED IN ACCORDANCE:; WIn-l THE CllYOr SAN DIEGo'S ~D DEVELOPUENTS ~AI'lU1lt I..AND$(;,I,Pf STAACl.olP:DS

MIIIlIMUM TF!EE SEPARATION OI'$TAHCt::It,jPFlCNElIrnrJ~INIMU~ DIS1~E: TO STREET I~EE

TRAf'F1C SIGNALS (Sf()P SIQN) - 2{] FEET AaO"fE: <;F!OUNtl lIrlLITY srnUCTURE$ - 1\1 FE:ET

~~~~~~ w~n;r5~tn~~ -(;JRBFE~ES OF TWO O~~ff!tl> <:J'l~?tn- 10 FEET

Ifl~GATlON: }IN IRRIGATION S'rSTEM SHALL BE PR(lVIDEI:> Jo!, f;:~UIRED FOR PROPER IRRIGATION,DE:VELOPMEr-lT AA1tl I.IAlNTENANCE Of THE VE(;E'\"....non. Tl'iE DESIGN (If THE S'rSTEM SHM..L PRffilIOE...o~Q\JAlE SUPPORT FOR THE \"EGETAllON SELECTED

10 YERl2DI 'IIIAEI...ESS IS RESPONSIBLE FOF!: THE L.-OOG TER~ ~-'\INTt:NANCE. (JF" Tl1EPROJECTAR~. CONTACT: P.O. BOX 19707

IRVINE.. c..LJfOONIA 92623-9707(949) 2'22-7'000

A LANDSCAPE; IoWI"TtNANCE AGREEMENT M/lY BE Rf:OUlftED FOR rue AREAS wrn-jIN THf: RI~-Or-WAYA/IID mr LARGE R£\oEGET~JED AAE.lS \'1SlElL£ TO THE PUElLIC UNTIL SUCH TIME M AN APPf;1CJ\1ED EJ.lT1TYCAN ASSUME M10JNTENANCE R£SPONSI8IUTIES

11 IdAiN'TiNAAlCE:: ALL REQVIREO LANOSC#'f: IIflE1lS srv.u. BE t.lAlNfAINED BY~ WlmESS. ru£ l,/IoNOSC'PEAFi:EAS SHALL BE" WtlNT,oIJI'lED IN A ""REI; OF DEBRIS AND AI..L PLNfr ~ATEtiI,IJ. 5HAl...l BE ~A1NTAINED IN: IIHWTHY GROWI~(; CONDmON. DI5l:ASED OR 000 Fll..ANT ~~IAl. SHALL BE 5,l..TISr,t,GTORV rnEATED DR"REPlAcED 'PER n'H; CONOOIDNS CtF D-IE PE~Mrr

ACCENTmer

L~G LEArYELLOW l,\IOOOPODOC.I\R'PI,J$

GHINESE F1.N.lEmE

I'OODCARPUSHENt<LEII

KOELR~I'"

BIPINfIl,I"TA

E:UG£Nl.". BRUSH CHERRY L'''JmE EVERGFlEEN , ""-Ml'RllFOLIA 5CREJ;:NIt'loG SHFi:lIB

STOEllTZIA BI~D Or C1ECORAllVE s ""-REGIWlE" F'ARA(JISE COLOR

f;1HAPl-JIOLEPIS INDIAN EVERGREEN5 GAL

INDICA HAWll10RN DI;CORA11liE~REE}.IltoiG

CllFlRESSlJS rTALIAN CYl"RESS C(lW~NAR 1.5 GA.l.SEMPE~Re:N:O (Tim to'fIER) ,,"'.

OST£OSPEFlMUM FREEW-'\Y E\lE:Fi:Gfi:Et:J'l FLAtFFi:UllCOSUM DAISY GlO1..lND OOVEA

lANt_DWAAF LJ\VENOAR E'VERCOREIN

~ONTUlJDEHSI5 fLAt"DWAFlF CARNflfAl" ""'".. (;R<JUNO COVER

"z."" G'lZANIAE\fER(lREEN

FLATL111~~ GROUND CO'r'ER

o

PROPOSED PLANTING LEGEND

oo

LANDSCAPE DEVELOPMENT PLAN~N.T.e.

Page 41: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

'ATE

'A"

cm---

lANDSCAfI'E: ~EVISlOflL.ANDSCj,'"E RE....ISlOMS 2. (ttlb)lJ,NDS-Cj, ...E ~tvISlOJII (_)RiVlsm ~ (,Ill)

11/13/0912/11jOSl12/14}ag01/11/10

OWNER APflROV....L

20NING

COtISTRlJcnoN

•.F.·~------

===1:===

LANDSCAPEDEVELOPMENT

PLAN

ATTACHMENT 9

B~&-A-'.r::1IT~C;Ji\i:: 11 PL/N['I_;~:C

Io!OLI,"'" "''''OTH ,"CHn'CT "".'OT' 'u ..., ~~I;H'~o;T

,0,'';'_ ~Hl. CHL1B~9, C~ ¥Q(lU (1.<:>\ 'H-"70

P.O. BOX '9707IRVINE, CA 92~~-9707

(949) 222-7000

v--venz2!lwireless

L-2

PROJeCT NUNSE.

PADRE GOLDTOWER

PROJECT NAM,

PRePARED FOR

SHEET TITl£

===..===

====11====APPROVALS

====;:===

724~ LINDA VISTA ROADSAN DIEGO, CA 9211 \

SAN DIEGO COUNTY

====1:===ORAWING DATES

===11===

===11===

EXISllNCl KoOE:I-RE:UlERIA TREES TOREJ.lAIN (TYPICAL OF HI)

PROPOSED PLANTING LEGEND

I

BClTANICIol. OOIIMON fORM .. f'I.NmIIG ""'lUll! HEDIT llt.wmTYlMIBOL!WE - I'UNllT1CJN 8IZE .. II-.uI

0 :/0'-40' HOOHTKO£l...ftEUTERIA C~INE5E ~E 511"" 35" BOX ,BIPINNI'ITA TOEE TO'"ZO'- ...O' SPRE'JtD

0 SUPPORT M" - zo' HEIGHTPINUS CAN1'RY ISI.i"I'4DMACRE:!:N ::<,... " ern:: "CANAF!IDIIsls PINE

SCREENING THEE~O'-.40' sPROO

(f; 03'-0· HEICIfTSTRElJTZIA 81RD OF' OECOAAT1VE , ""'- 7RE\illrolAE ,- C;:OI-OR:s'-o" SPFlEM

8 PAClQlG :5'--0" HEIGHTmAS'" ,..... esP~OTINIA ~ERI PHOTIMLII EVERGREEN

:SCREENING&'-0" SPREAD

• '-'INTANA

"'''''' ,'-e- tlEIGHT"ONT£V1DOlSISLJ.YENDN< £vE:flt;;ffEIN fUT -'DwARFLJ.NT"" GROOf'!lD CO\'ER

~IVAL" 4"-{)" SPREAI)

I/A/

posmON SCREENING PINES BETWEENSTflEET TREES, (KOELRELrtE1UAS)

POSITION SCREENING PINES BETWE:EI'IS11lEET TH~S, (KOEI..RElIT':::Fl~)

FIll IN E)l:I$TINCi CF;:OUN[l CO'llrRAT CORNER WITH LANTAN/\ NlDB'J'iIK MULCH

ADO ACCENT SHFlUes: toEXISTlI+G

LANDSCAPE DEVELOPMENT PLAN1IQIlIL!:1........-v

REIiIO\o'E lIND REPlJICEEXISTING fjEOG:E:

:I NEW STREET TREETS TOIOE:PlJ,CE 'mOSE ~ISSrNG

£XISTlNG: KOEU,'EUTE-Il'III lREES TORfJAAIN (Tl'PICAl.. OF 10)

Page 42: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 9

'IIIIIIIIIIIIII~IIIIIII

12/31/08

SITE lOCATiON:7245 UloiD'" VISlA ROAD

SAN DIEGO, CA 92111

TITLE: SITE SURVEY

C-1S"EET NUMBER,

SITE NUMDER:

SITE NAME:

PADRE GOLD

SURVEYOR: OAVIO A. FLOYD

QRAWN BY'--"OA...Fc- _

CHECK BY: DArR~ONS

DATE: 9/23/2009

-- TOP OF" AN1'ENNASACL.-i1·

--- TOP' Of MICROWAVEI\GI.==63'

--- Bonw OF' NICROWA\IEAGl=5Q'

..."'" SF'OT [lBil\lIOf'!!

.. SMI~I<J....E:R

• STORM DRNN ...."0lE.. lElEPHot-lE BO)(

e lEI.l::P'HONE l.V.N~ot..E

~ lD..[PfiONe: i'EDtSiA.L.. lD.IPOAARY BENtHlM.R1(

@l T1TL£: REPORT EXCEPTI~

TO TClP OF" CURti... llVfflC S1~tw. eox

" lRAFflC SIGNi!ll POlE

0 TR",. UilL..J'TY POL.£

WATER ~UE~

"" P-'RCEL t.W"

• PARKING I,1ETER'.,.POw£R POLE

"'" RI;;CO~l) Of SURVEY

~FLOYD0 ROOF DRAJt.I

ROOF' ounzr

""" ROOF' TOP

• ROOF VE~ SURVEYING,INC.

• SA,NI'T,II,Rf SEWER 2553 WAGO'" WHEEL ROADNOROO. CA SIo2880

~HOlE OFflC:E/FAX (SI51) 739-7904-9

• S~ CLEAN our ENAlt.: r.IOfloyd.u.....II)'TnIl.cDm

SIG'" POST

-- JOINT AGI...=40'

UGI-IT GflDllND

LI~HT S'l'RUT

UEASLJRED OtSTAJ.lCE

UONITOO:IIiG WELL.

L1GI-fT BUILDlN~

t;lJ'l' ANCHOR

H~lER

INLET

I~Fl~G.'.TIOIII 00)1;

IFl'R~;IOt.l V,6,L\IE

BOl.1A~m

CONCRETE

CONTROL POINT

DOOR

EL..£CmlC BOX

BUILDING

LEGEND

AJR coeomcsre

ASPHALT

~

-lI( 1

o

ec BOTTO" OF CURB

"rn..

...,

.. FOUNO MO~U'-lENT

• G.'S IotmR:

GAS I,IALVE

• GPS POlm-

~ GUARD RAJ.\.

~ FENCE

'tl FIRE KYDIU,NT

-o=

LEGENDBOTTOM OF CURBma;E OF PAVE1IE:NTfLO'I'iUNE CURE! & GUlrntflAG TOPGENERATORGROUND n.CllATIOf.lPATC!-j UTltlTY UtllJERCROU~D

PAINT STRIPINGROOf' 0\IE;RI-lANt;RlXJf' F'AAAPETSIDF:\ll'ALK:TOP OF CURSTOP OF ANTENNATRU: TOPOOUIllDAR'r' UNE

~usc. PROPERTY UNE

MISC. TIE UNE

Rl~HT-OF-WAY Ul'lE.

EAS£~ENT UME

FDlCE: LJNE

~(JOF" IJtIERI-I'.NG

4-2;-;xIo--04-00m-OJO-24-00

ADD.B"EPFeFl.J<lOEN"NOPATCHPS

"'0"RFPAs.rcTOATRTF

---,

IISSESSOR'S PARCH NUM8ER(S)

SITE DATA

(NAD 83; Epoch 20021l,\~1\JDE LDIIGI1\JOE

MONOPOLE: JT4n7.604· NOrth 117'09'5&.06" 'WBst.

FEMA FLOOD Z ONE INFORMATION

OWl\lER'S NAME: .n.~EmCAH t.E:G1CN rosr NO. 7.51

BASiS or ELEVAllONS; NG\II) 192'G1ElE\lATlONS ARE EI",srn 0111 SAN DIEGO BE~a1MARK NO. 11007.fOUr.tD AT THE NEBP OF UIIIDIL VISTA RQ,i,O AN'[} CENESSE AVENUE­EL£VATlON = ~4..45S.

SITE lH4POft'.R'f SEr.lCH~AAK:

BENCl-iUARl( IS A PI( NAIL SET W1lH A 1- OISC l.OCA1ED NORTHWESTOF L.EA~ .AREA IN P#t,RKl~G LOT: ELEv~ TJON = .l5B..1"'. AS SHOI'*l"EO

BASiS OF BEARINGS;mE ElEARINGS SHOWN HEREDN ARE BASED ON TRtJ£ NORTH ...5:DETER""INE[) BY G.P.s. oas~~vAnoNs, USlNQ rnlMII3L.f: 5700/5800RECEIVERS AND lRlMBtE GEODEllC OFFlCE 1.60 5OfliI'ARE:.

HUJI DOOn ZONE DE$lQNAI1rtJ· Notional ~locd" !rrSLtrllnCe Program:County. Scm Dill!l'(lc Efh::ctNe Date: ti/1 Y;1g5il7

Pnnel: 16113 Cllmrnul"ITty-Pcnel Number. 060i':5CiBI6 FThe Flood ZOne Designation for ttlill site is: lON5: - X

-----~-

tor 1BLOCK 31

-~----

TITLE REPORT NOTES

(DEED; WAniNG F'OR tlTI.E)

icr '!JBLOCK 3;)NEwvtS'T

I\Plfc432-031)-04-0CJ

VICINITY MAP

GEOOEllC COORDlfIIATEEXIST1NG ~ONOPOlE

GENERAL NOTES

1} 1I,i, 1!lIl not a bgul'llJClf)' SlJrYIW, This ill g :r;J~edaliZJlldlopl:lg~phic map. 1ft. prolJBl"l)' nnee C1l'1d lIMemlllrrtB mOlm

~=-~~ I::'~ra~:~edln:~rm:~r::h~o~n:rr:n~~~inftllmutlcH'l u8i~9 lhoe two fol.ll'Kl mon~mo&n.u. lI'haown Mnltlll. Notill'!l ~Iearch -;(lJIl performed by Floyd SIJ~n'il, Inc.

:il) My I'Jol'tQro",eIiI mode te 1~ inforrngtron on this: plan. wN:t1out

~lI~~nl~:~';f <:l~rci~~~~' 1M:. ~11~Et9 AO)'d

:3) "l1-u!se dmwi~g!l &: s~iflctl,rons c..... in" pmpcrty at COptJ"rioahtQf Floyd SL.lr¥J,I)'tfl'\l, Inc. & lII10jr not bill \l~ tin Orly Qther WClI1:OJ(CClpt b)I Q9~ent with t~ SU~_ Written dim..rru~M lItielltoke ~f'*fll!ll1!lnce ever S(iDh.d &: 'lh-all be verified 00 the joe. sU...Arfj d'18CI"I!!IPOf)C)' lItlall be brouljjil1t to tile mrtlci cf the Sul'Wl\lOf"prior to C~l'Jlmene.milllM of any work...

//

/

/

OVERALL SITE PLAN

PROPERTY LEGAL DESCRIPTION

/

Page 43: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 9

REVISIONS

DATE

C-2SHE£T NU~BER,

TITLE:SITE SURVEY

SITE HU~BER:

2553 WAGON WHEEL ROADMCRCO. CA 1lI288()

OFFICE/FAX (951) 739-794!!E.....lb f.lotlaycl.u .....r(ing.oam

SITE LOCATION:

72.45 LINDA VISTA. ROADSAN DIEGD, CA 92111

~FLOYDSURVEYING,INC.

SfTE NA~E,

PADRE GOLD

...,,~•••"'~" '''''''''~' """" ,..........,,,I,..,'-'''0'.... ~"'.~.b. <~ .,.". c,..,l <1'-""

1111111111111111111

11

" "'IIIIIIIIIIIII~IIIII

CHECK BY: DAr

SURVEYOR; DAVID A. FLOYD

DRAWll BY: DAF

DATE: '/2~/2DO'

TRAFTIC SlG~ POLE

,....UTll.1TY POU:

w,,~ METER

TRAFTIC 51G~ sox

SPRlf\lKtER

SToRM DRA!N MANHOLE

TEl..EPHONf sox

m..EPHONE WNl-101.£

m..e:PH~E PEDISTIIL

PARCEL MAP

PARKIN(; MmR

PQWER POLE

RECOIl:[) OF SUR\IE'(

ROOF" DRAlftl

ROOF" OUTl.ET

ROOF TOP

soor VENT

oo

III TnlPORARY BE~w.RK

@ TITl.E REPORT EXCEPTION

It TOf' OF CURB

o

o

"

.. SoMIITAfl'f SEWF::R.....HOI..<

• S~ Cl...EAN OIJT

~ SIGN POST

• El_oo.o SPOT EL~AOON

er;rrroM OF CURBEDGE OF P",\iD,lENTfWWUNE CURB &: GlITTERFl.AlllOPGENERATORGROUND ElFIfATIONPATCH UTlLITY UHOERGROUI\I[JPAIN'T STRIPINGROOF' 0V£IiiI1'WtfCROOF PMU.PETSIDEw~

TOP or CUREI'101" OF IUt(fElllNATREE TOPBOUNDAR'( UI'IE

MISC. PROPEfnY UiIIE

UISC. TIE: LINE

RIGHT-Of-WAY UIIIE

EASEWENi L.ft!l£

fENCE LINE

ROOF OVERHANG

B"'"FL'lAGGt:N~

NGPATCHPSRFUHRfPA

""TCTOATR1P

"'A: CONomONER

ASPoHALT

SOTTOM OF CURS

BlJIl.DfNG

80lliRD

DONCREll'

OONTRQLPolNT

t100A

ElECTRIC BOX

""C,F'lR£ KYD~T

roUNO h'!OIIIl,H.IEIIIT

GAS uETUl

GAs VALVE:

CPS POlrfr

GUARD RAIL

GlN N>lCHOR

"EAID<

INlET

1.,A:IGATlON BOX

IRRIGATION I,/JLVF.

LIGHT BUILDING

;g L..JGHT GROUND

LEGEND

ADD. LEGEND

••

-0- UGtiT smEET

I ) ~E:ASURED DtsTANCE

o UONITO'!ING WElL

--, -

..

..

..,

A PORTION OFTR!\.CT MAP.t;o ~G62

...

JJ)TBBUlCK 35NEl'lI'E!3'!'

4F"; 432-030-- D4·00

IDDA VISTA SUBDIV!SIUl'iIJN]T :NO, 8

TRACT YAP NO_ 325':l

, --, ---x --x __

illT 7mocx ae

tAJ.J...EYAPN: 432 - O:;JO-O;}-O(l

2~STClA:Y BUILDING

AMERICAN lJocj.lON P05TAPN: 432-030-24-00

&. 42"1-S~O-a4-00

DETAIL SITE PLAN

Page 44: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

....zC)-V'IWC

ATTACHMENT 10

Page 45: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

DESIGN 2

'OW

=,..s~o;;""~ =u::.

Photosimulation ofproposed telecOmmunications site

P2dre Gold7245 Linda Vista ReI.San Diego, CA 9211 1

,----

~PJ'OPOted ..,tenM:l withorooosed tower

~»n::ts:mZ-I........

Page 46: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

RBCORDING RBQUESTED BYCITY OF SAN DIEGO

DEVELOPMENT SERVICES DEPARTMENT

AND WHEN RECORDED HAIL TOPERMIT INTAKE

MAIL STATION 501

1625

ATTACHMENT 12

t ~ f i09S-IJ~Sl)360I",A, J ~/. _ i:09-NOV-1995 02-27 Pn

OFFICIP.L RECORDSS~H DIEGO COUNTY RECORDER'S UFFICE

GREGORY SMITH, COUNTY RECORDERRF: 12.00 FEES: iG.00AF: 15.00MF: 1.00

SPACE ABOVE THIS LINE fOR RECORDER'S USE

CONDITIONAL USE PERMIT NO. 95-0~5l

PLANNING COMMISSION

This Conditional Use Permit is granted by the Planning Commissionof the City of San Diego to American Legion Linda Vista Post 731,Owner, AIRTOUCH, Permittee, pursuant to Section 101.0510 of theMunicipal Code of the city of San Diego.

1. Subject to the terms and conditions set forth in thispermit, permission is granted to owner/Permittee to construct a390-square-foot unmanned cellular communication facility at 7245Linda Vista Road located at the intersection of Linda Vista Roadand Genesee Avenue, also described as Lot 9, Block 35, LindaVista Subdivision, Map No. 3253 in the City of San Diego, Countyof San Diego, State of California, in the CA Zone.

2. The facility shall consist of the following:

a. A 390-square-foot equipment building and a 75-foot-highmonopole (90 feet high inclUding 30 panels, 6 Whips andup to 4 digital dish antennas);

b. A six-foot-high chainlink fence surrounding the1,100-square-foot lease area;

c. Off-street parking to be located outside the fence inthe existing parking lot;

d. Additional street trees as identified onExhibit "A"; and

e. Accessory uses as may be determined incidental andapproved by the Planning Commission.

3. One parking space shall be provided in the existing parkinglot of the American Legion facility.

Page 1 of B

ORIGiNAL

Page 47: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 12

116

4. No permit for construction of any facility shall be grantednor shall any activity authorized by this permit be conducted onthe premises until:

a. The Permittee signs and returns the permit to theDevelopment Services Department, DEP Division;

b. The Conditional Use Permit is recorded by theDevelopment Services Department in the office of theCounty Recorder.

5. Before issuance of any building permits, complete gradingand building plans shall be submitted to the Development ServicesDirector for approval. Plans shall be in substantial conformanceto Exhibit "A," dated September 28, 1995, on file in the officeof the Development Services Department, DEP Division. No change,modifications or alterations shall be made unless substantialconformance review Dr amendment of this permit shall havebeen granted.

6. Prior to the issuance of any building permits, theapplicant shall:

a. Ensure that building address numbers are visible andlegible from the street (UFC 10.208).

b. Show the location of all fire hydrants on the plot plan(UFC 10.301).

7. Before issuance of any grading or building permits, acomplete landscape plan, including a temporary irrigation system,shall be submitted to the Development Services Director forapproval •. The plans shall be in substantial oonformance toExhibit "A," dated September 28, 1995, on file in the office ofthe Development Services Department. Approved planting shall beinstalled before issuance of any occupancy permit on anybuilding. Such planting shall not be modified or altered unlessthis permit has been amended and is to be maintained in adisease-, weed- and litter-free condition at all times.

8. The trees shall be permanently irrigated in accordance withthe city of San Diego Landscape Technical Manual.

9. Prior to the issuance of any building permits, the applicantshall assure by permit and bond the installation of a five-footwide sidewalk, with minimum four-foot width around obstructionsand 4:1 transitions, adjacent to this site on Linda Vista Roadand Genesee Avenue in a manner satisfactory to the City Engineer.

Page 2 of 8

I ORIGINAL I

Page 48: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 12

1627

10. Prior to the issuance of any building permits, the applicantshall obtain an Encroachment Removal Agreement from the cityEngineer for the proposed landscaping to be located within thepUblic right-of-way.

11. This Conditional Use Permit must be used within 36 monthsafter the date of City approval or the permit shall be void.An Extension of Time may be granted as set forth insection 111.1122 of the Municipal Code. Any extension of timeshall be SUbject to all standards and criteria in effect at thetime the extension is applied for.

12. Construction and operation of the approved use shall complyat all times with the regulations of this or any othergovernmental agencies.

13. This Conditional Use Permit is granted for a period of ten(10) years from September 28, 1995, at which time it will becomenull and void unless a new application for a Conditional UsePermit is applied for an approved under the procedures in effectat that time. At such time as the Conditional Use Permit expiresor ceases to be utilized, all antennas and equipment will beremoved from the site by the last operator of the use.

14. The applicant/lessee shall have the option to SUblease aportion of the monopole for the purpose of co-location of acellular communications facility. Plan submittal and review ofthe co-location option shall be made available through theSubstantial Conformance Review Process, of the Development andEnvironmental Planning Division. The purpose and intent ingranting this option is to reduce the need for additionalmonopole facilities within the surrounding community.

15. This Conditional Use Permit may be revoked by the city ifthere is a material breach or default in any of the conditions ofthis permit.

16. This Conditional Use Permit is a covenant running with theSUbject property and shall be binding upon the Permittee and anysuccessor or successors, and the interests of any successor shallbe SUbject to each and every condition set out in this permit andall referenced documents.

17. All of the conditions contained in this Permit have beenconsidered and have been determined to be necessary in order tomake the findings required for this discretionary permit. It isthe intent of the city that the holder of this permit be required

Page 3 of 8

ORIGINAL I

Page 49: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 12

~628

to comply with each and every condition in order to be affordedspecial rights which the holder of the Permit is obtaining as aresult of this permit. It is the intent of the City that theowner of the property which is the sUbject of this permit eitherutilize the property for any use allowed under the zoning andother restrictions which apply to the property or, in thealternative, that the owner of the property be allowed thespecial and extraordinary rights conveyed by this permit,but only if the owner complies with all the conditions ofthis permit.

In the event that any condition of this permit, on a legalchallenge gy the Owner/Permittee of this permit, is found or heldby a court of competent jurisdiction to be invalid, unenforceableor unreasonable, this permit shall be void. However, in suchevent, the owner/Permittee shall have the right, by payingapplicable processing fees, to bring a request for a new permitwithout the "invalid" condition back to the discretionary bodywhich approved the permit for a determination by that body as toWhether all of the findings necessary for the issuance of thepermit can still be made in the absence of the "invalid"condition(s). such hearing shall be a hearing de novo and thediscretionary body shall have the absolute right to approve,disapprove or modify the proposed permit and the condition(s)contained therein.

18. The issuance of this permit by the city of San Diego doesnot authorize the applicant for said permit to violate anyFederal, state or City laws, ordinances, regulations or policiesinclUding, but not limited to, the Federal Endangered Species Actof 1973 and any amendments thereto (16 U.S.C. Section 1531et seq.).

Passed and adopted by the Planning commission of the city ofSan Diego on September 28, 1995.

PERMITS[AVLJ7458

Page 4 of 8

ORIGINAL I

Page 50: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 12

1..,29

PLANNING COMMISSION RESOLUTION NO. 2212-PCGRANTING CONDITIONAL USE PERMIT NO. 95-0251

WHEREAS, on September 28, 1995, American Legion post, Owner,AIRTOUCH, Permittee, filed an application for a Conditional UsePermit to construct and operate a 390-square-foot (unmannedCellular Facility) Equipment Building and a 75-foot high antennasupport monopole (90-feet including the whip antennae ~ocated at7245 Linda Vista Road also described as Lot 9, Block 35, Lindavista Subdivision, Map No. 3253 in the City of San Diego, Countyof San Diego, state of california, in the CA Zone in the Lindavista Community; and

WHEREAS, on September 28, 1995, the Planning Commission of thecity of San Diego considered Conditional Use Permit No. 95-0251,pursuant to Section 101.0510 of the Municipal Code of the City ofSan Diego; and NOW, THEREFORE,

BE IT RESOLVED by the Planning Commission of the City ofSan Diego as follows:

1. That the Planning commission adopted the following writtenFindings, dated September 28, 1995:

A. THE PROPOSED USE WILL FULFILL AN INDIVIDUAL ANDCOMMUNITY NEED AND WILL NOT ADVERSELY AFFECT THEGENERAL PLAN OR THB COI!IHUNITY PLAN.

The project site is designated for CA (Area Shoppingcenter) by the General Plan and the Linda Vistacommunity Plan. Nevertheless, particular uses Whichfulfill individual and community needs are permitted inresidential and other zones by conditional use permit.This project will not adversely impact the General Plannor the Linda Vista community Plan. street trees andneutral colors on exterior surfaces will effectivelyscreen the facility and allow the fence, equipmentbuilding to blend with surrounding vistas.

B. THE PROPOSED USE, BBCAUSE OF CONDITIONS THAT HAVE BEENAPPLIED TO IT, WILL NOT BE DETRIMENTAL TO THE HEALTH,SAFETY AND GENERAL WELFARE OF PERSONS RESIDING ORWORKING IN THE AREA AND WILL NOT ADVERSELY AFFECT OTHERPROPERTX IN THE VICINITY.

Radio frequency energy transmission from the proposedantenna system would not result in significant healthand safety risks to the surrounding area. Thetransmissions would have a maximum of 5.8 microwattsper square centimeter, well below the acceptedsafety standard of 580 microwatts per square

Page 5 of 8

I ORIGINAL I

Page 51: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

· . ATtACHMENT 12'-30 .

centimeter established by the American NationalStandards Institute and the National council onRadiation Protection.

C. THE PROPOSED USE WILL COMPLY WITH THE RELEVANTREGULATIONS IN THB HUNICIPAL CODE.

The proposed facility complies with the relevantregulations in the Municipal Code. Landscape screeningof the equipment building will be provided. Oneparking space will be designated for use by Airtouchand will meet the parking requirement for this project.

2. That said Findings are supported by maps and eXhibits, allof Which are herein incorporated by reference.

Linda LuqanoLegislative Reco er tothe Planning Commission

BE IT FURTHER RESOLVED that, based on the Findings hereinbeforeadopted by the Planning Commission, Conditional Use PermitNo. 95-0251 is hereby GRANTED to owner/Permittee in the form andwith the terms and conditions set forth in Conditional Use PermitNo. 95-0251, a copy of which is attached hereto and made apart hereof.

PERMITS[AVL]7458

Page 6 of 8

I ORIGINAL]

Page 52: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ALL-PURPOSE CERTIFICATEAI6~HMENT12

Type/Number of Document CUP 95-0251

Date of Approval september 28. 1995

PlannerCOUNTY OF SAN DIEGO

onCQ.e4-4 '1:.>41 19'1S before me, BARBARA J. HUBBARD (Notary PUblic), personallyappeared Karen Lynch Ashcraft, Senior Planner of the Development servicesDepartment of the City of san Diego, personally known to me to be the person(s)whose name(s) is/are subscribed to the within instrument and acknowledged to methat he/she/they executed the same in his/her/their capacity(ies), and that byhis/her/their signature(s) on the instrument the person(s), or the entity uponbehalf of which the person(s) acted, executedJbir iIwtrWllept.. 0 ••• ,

. J " IlAI18ARA J. HU811A1lD Ei COMM. It 1066585 ~I· . Notary Public - Cclllcm/o $

Signature ~~~~4-~~~~~~~±~~.-I J. ..•~C;;°F:~:~qh999j (Seal)

STATE OF CALIFORNIA

PERMITTEE(S) SIGNATURE/NOTARIZATION:

Signed &Q;-~Typed NameAMEll.ICAN LEGION LINDA VISTA POST 731

FRED FAUrnER

THE UNDERSIGNED PERMITTEE(S), BY EXECUTION THEREOF, AGREES TO EACH AND EVERYCONDITION OF THIS PERMIT AND PROMISES TO PERFORM EACH AND EVERY OBLIGATION OFPERMITTEE(S) THEREUNDER.

Signed~~Typed Name AIR'I'ODClI' CELLULAR

KEVllJ MCGEE

STATE OF C41;jUrni",-'-''-------'------

COUNTY OF ....S1~(l-->.I\_O""'('-'-·~....f ~

On No~e"'~fr gI Iqqf befol'"e me, kevi" [awlt~te (Name of Notary Public)personally appeared reV!" 1'1~(jee r

personally known to me (or proved to me on the basis of satisfactory evidence)to be the person~ whose namevwr is/~ subscribed to the within instrumentand acknowledged to me that hef.sRe~ executed the same in hislherJthe~

authorized capacity~, and that by his/~/~~signature~on theinstrument the person~ or the entity upon behalf of which the person~acted, executed the instrument.

(Seal)

Page 7 of 8

seal.hand and official

~~--WITNESS my

Signature

I ORIGINAL I

Page 53: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

CALIFORNIA ALL·PURPOSE ACKNOWLEDGMENT

ATTACHMENT 121632

No. 51107

State of C~(t4tlll~County of -Sa11 Di~ 0

On Novel"lber 51/ (qqs before me, Kevill ~allJretJ Ce , Noh'J f"'fl',DATE NAME.TITLeOFOFFICER - E,G.,MJAHE DOE,NOTARY PUBLIC-

personally appeared F,.eJ. (/AU c.nqy ,NAI.4E(S) OF SIBNeRlSI

ra personally known to me ~ OR • 0 proved to me on the basis of satisfactory evidenceto be the person(,lrj whose nameW) is/ll-f'El'

~~<> "KEviN IAWREtlct 0 t subscribed to the within instrument and ac-knowledged to me that he/~JAe1 executed

$I,~ '<i~ • Comm. Rl034561 :: the same in hisIJ,I.er1!!J.eif authorized'! ·eo :: ' NOTARY PUBUc -CAUFORNIA~ san 0;'10 CoUllb' :tJ capacity~ and that by h isJ,b.e-r1~). ~~ 'y ..htJcOJ;:<;~f:S:U&;,3,~9:..r

signature~on the instrument the person~

or the entity upon behalf of which thepersorusf' acted, executed the instrument.

WITNESS my hand and official seal.

-~ ~IG""TU.E OF""TAAY

OPTIONAL

Though the data below is not required by law, it may prove valuable to persons relying on the document and could preventfraudulent reattachment of this torm.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

o iNOIVIDUALo CORPORATE OFFICER

TITLE OR TYPE OF DOCUMENTTlRE(5)

o PARTNER(S) o LIMITEDo GENERAL

o ATTORNEY-iN-FACT NUMBER OF PAGESo TRUSTEE(S)o GUARDIAN/CONSERVATORo OTHER:

DATEOF DOCUMENT

SIGNER IS REPRESENTING:NAME OFFfFlSONlS)ClR ENTI1'Y(IESI

SIGNER(S) OTHERTHAN NAMED ABOVE

~1993 NATIONAL NOTARY ASSOCIATION· 9236 Ael'nmelAve., P.O. Box7194- CElnoga Park, ell, 91309-7184

Page 8 of 8

Page 54: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

City of Sail DiegoDevelopment Services1222 First Ave., MS-.302San Diego, CA 92t01(619) 44S-5000

ATTACHMENT 13

Ownership DisclosureStatement

Approval Type: enstk spproprjat~ box for iype atapprovllf (5) r-equested.- o NeighborhODd Use Permit 0 Coaslal Development Permito Neighborhood Deva~Ptn€ntPermit 0 Site Development Permit 0 Planned Develccment Permit 0 Conditional Use Pannilo Variance 0 Tentative Map o Vesting Tfll'1lali ... ~ Map o Map Waiver Olan.d use Pien Amendment ~ 0 Othll'r

Project Title Pc[)ject 1110. For Cily Use OnlY

Padre GoldPr.QJect Address;

7245 Linda vtsra Road

Part 1- Tobe"<>l11pJei.dwhMpropeny Ie held by Indlvldual(s) . I

8y signjng the Qwomsbjp Disclosyre Statement .Ihe QwnertSI a-gkngwledpn vwan ilj:lplicaljon fur i3 permit man gr nther- matter all. id~ll1ifif;dabove wfJI he filed w!1h 'be CUy or San Diego 90 the sybjec! Property With the inleD' tQ record an encumbranr;1! against Ihe property. Pleaselis! below the Owtl~((l» and 1enanl{s) {if applicable) of the above referenced property. The llsf must include the names and addresses at ;allpersons who have an lnteres! in lhe properly, recorded or otherwise, and state the tyPE of property interest (e.g., tenants who will beneflt fromthe permit, all indivldu:els wnc own tile properly). A skrnanrre is requjred pf al I€!I§! OGe aFthe property QWners, Attaeh addilional pages"needed. A signature ITOm the Assistant Executive- Dlreclor of the San ~ego R~dBvelopmel"lt Ageney shall be required IOf all project parcels forwhich -a Disposition and Development Agreement (DDA) has bean approved I executed by the City Council, Note: The applicant is responsiblefor no1ifying the Project Manager of any changes in ownership duringlhe tim£! Ctle applicatian is being processed or considered. Ohanges inawner:ship are to be given to the Project Man~ge, at least lIIirly days prier to any public hearing en the SLJbj13rJ properly Failure 10 provide ac-curate and Cl.lne-nl cwnershfp infnrmBtion courd result in a deja~ in the hearing precess.

AddltfonaJ pages attached 0 Ves 0 No

Name oJ IndiVidual 'rype or pnni): Name 01 IndlvldlJai {tYpe or pnnij:

[j Owner 0 Tenantlle.!l$~6 0 Redeltelopmsnl Agency 0 Owner 0 TenanULessee 0 Redavelopmenll\gency

Slieet Address; Stree! Address:

City/Stale/Zip; CllyfStatClf.Zip:

Phone No: Fax No: Phone No: Fax No'

Signalurt! : Dale: Signature: Dale:

Nameof indiVIdual {typeor pnnii: Name of lodlvtdual (type or pr!nn~

0 Owner (j Tenerarl.eesee 0 Redevelopment Agency 0 Owner 0 'renant'tessee 0 Redevelopment' AgElncy

Street Address: Street Address:

CilyfState/Zip: CilylStatelZip:

Pl1on& ND:-

Fax No: Phone No; Fax No:

Sigflalure ~ Dale: Signalure : Dale:

This information is available in alternative formats for persona with disabilities.Be sure to see Us on the WQrld Wide Web at www.sandle o.gov/develo ment-servlces

S-31 (5-05

P",n" 1 nf?

Page 55: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 13

-f#lh~";;T~W~~:~~~~". ,', ", :···::... ·:;:i'~...·~:-;·~,.'~;;.,,·"~i~·,~r'-.)~.- ;1Ug;ol~ """"'"' ",,,....,,

IIfq~n \t:ILlmiIBdUBbI~_ DC"""",,) WI>ot Sl8lo? _ Co<polole1_No. _1:11'__

tlT~

...-.,

u '&nlii

".11"

P~nA? nf?

Page 56: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 14DEVELOPMENT SERVICES

Project ChronologyVERIZON - PADRE GOLD

CONDITIONAL USE/PLANNED DEVELOPMENT PERMIT- PROJECT NO. 97765

City ApplicantDate Action Description Review Response

Time Time

3/4/06 First Submittal Project Deemed Complete - Existingmonopole

4/3/06 CEQA Exemption 30 days

4/11/06 First Submittal Assessment Initial Review completed 1 month,Letter 7 davs

4/4/08 Second Submittal Application for existing monopole 1 year,11 months,24days

4/28108 Second Submittal 24 daysAssessment Letter

10/16108 Agree to disagree, project Verizon requested continuance to 5 months,scheduled for Planning redesign 18 daysCommission

7/1109 Third Submittal Project submitted as a monopine 8 months,15 davs

7/30109 Third Assessment Letter 29 days

9/16109 Fourth Submittal Project submitted as an architectural 1 month,tower 17 davs

IOIJ 109 Fourth Assessment Letter 15 days

2111110 Fifth Submittal Second architectural tower submitted 4 months,as alternative 10 days

2/17/10 Issues Resolved 6 day.

3/4110 Planning Commission 15 daysHearing

TOTAL CITY TIME 9 months,8 days

TOTAL APPLICANT TIME" 3 years,2 months, 2

davs

TOTAL PROJECT RUNNING TIME" From Deemed Complete to Planning 4 yearsCommission Hearing

**Based on 30 days equals to one month,

Page 57: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT ]5

San Diego Municipal Code Chapter 14: General Regulations(12-2001)

§141.0405 Communication Antennas

(a) Section ]41.0405 regulates the following communication antennas. Amateur(HAM) radio facilities or temporary telecommunication facilities necessitatedby natural or man-made disasters are not regulated as communicationantennas. Section 141.0405 does not apply to single dish antennas smallerthan 24 inches in diameter or to remote panel antennas less than 24 inches inlength and in width, except when associated with another telecommunicationfacility.

(1) Minor telecommunication facilities: Antenna facilities used in wirelesstelephone services, paging systems, or similar services that complywith all development regulations of the underlying zone and overlay(s)and that meet the criteria in Section 141.0405(e)(l) or (2).

(2) Major telecommunication facilities: Antenna facilities that do notmeet the criteria for minor telecommunication facilities in Section141.0405(e)(I) or (2).

(3) Satellite antennas: Antennas capable of transmitting or receivingsignals to or from a transmitter or a transmitter relay located in aplanetary orbit. Satellite antermas include satellite earth stations,television-reception-only satellite antennas, and satellite microwaveantermas.

(b) General Rules for Telecommunication FacilitiesAll telecommunication facilities must comply with the followingrequirements:

(1) All approved telecommunication facilities must comply with theFederal standards for RF radiation in accordance with theTelecommunication Act of 1996 or any subsequent amendment to theAct pertaining to RF radiation. Documentation shall be submitted tothe City providing evidence that the cumulative field measurements ofradiofrequency power densities for all antennas installed on thepremises are below the Federal standards.

(2) Except in the event of an emergency, routine maintenance andinspection of telecommunication facilities located on residentiallyzoned premises, including all of the system components, shall occurduring normal business hours between 8:00 a.m. and 5:00 p.m.Monday through Friday.

Page I of6

Page 58: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 15

(3) Antenna facilities or associated equipment proposed for installation inthe public right-of-way are subject to the following regulations:

(A) Antennas or associated equipment located in public right-ofwaywhich is adjacent to a residentially zoned premises may bepermitted with a Neighborhood Use Permit.

(B) Antennas and associated equipment located in the public right-of­way adjacent to non-residentially zoned premises are subjectto review and approval by the City Manager.

(C) All equipment associated with antenna facilities shall beundergrounded, except for small services connection boxes oras permitted in Section l41.0405(b)(4).

(D) A construction plan must be submitted to and is subject toreview and approval by the City Engineer in accordance withChapter 6, Article 2.

(4) Antennas and associated equipment located in the public right-of-waymay be placed above ground only if the equipment is integrated intothe architecture or surrounding environment through architecturalenhancement (enhancements that complement the scale, texture, color,and style), unique design solutions, enhanced landscape architecture,or complementary siting solutions to minimize visual or pedestrianimpacts. These facilities may be permitted with a Conditional UsePermit decided in accordance with Process Three.

(c) Temporary facilities that provide services to public events and are limited to aone-time maximum duration of 90 calendar days are subject to the temporaryuse permit procedures in Chapter 12, Article 3, Division 4.

(d) All telecommunication facilities that are reqnired to obtain encroachmentauthorization to locate on city-owned dedicated or designated parkland oropen space areas shall comply with the following:

(I) The City Manager shall determine that the proposed facility would notbe detrimental to the City's property interest; would not preclude otherappropriate uses; would not change or interfere with the use orpurpose of the parkland or open space; and would not violate any deedrestrictions related to City property, map requirements or other landuse regulations.

(2) The proposed facility shall be integrated with existing park facilities oropen space; shall not disturb the environmental integrity of theparkland or open space; and shall be disguised such that it does not

Page 2 of6

Page 59: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 15

detract from the recreational or natural character of the parkland oropen space.

(3) The proposed facility shall be consistent with The City ofSan DiegoProgress Guide and General Plan.

(e) Minor Telecommunication Facilities

Minor telecommunication facilities are permitted as a limited use Ormay bepermitted with a Neighborhood Use Permit in the zones indicated with an "L"or an "N", respectively, in the Use Regulations Tables in Chapter 13, Article I(Base Zones) subject to the following regulations.

(l) An antenna facility will be considered a minor telecommunicationfacility ifthe facility, including equipment and structures, is concealedfrom public view or integrated into the architecture or surroundingenvironment through architectural enhancement (enhancements thatcomplement the scale, texture, color, and style), unique designsolutions, or accessory use structures.

(2) In an effort to encourage collocation and to recognize that sometelecommunication facilities are minimally visible, the following shallbe considered minor telecommunication facilities:

(A) Additions or modifications to telecommunication facilities thatdo not increase the area occupied by the antennas or theexisting antenna enclosure by more than 100 percent of theoriginally approved facility and do not increase the areaoccupied by an outdoor equipment unit more than 150 feetbeyond the originally approved facility, if the additions andmodifications are designed to minimize visibility.

(B) Panel-shaped antennas that are flush-mounted to an existingbuildingfacade on at least one edge, extend a maximum of 18inches from the buildingfacade at any edge, do not exceed theheight of the building, and are designed to blend with the colorand texture of the existing building.

(C) Whip antennas if the number of antennas that are visible fromthe public right-of-way does not exceed six, if the antennasmeasure 4 inches or less in diameter, and if they have amounting apparatus that is concealed from public view.

(3) Minor telecommunication facilities are not permitted in the followinglocations:

Page 3 of6

Page 60: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 15

(A) On premises that are developed with residential uses inresidential zones;

(B) On vacant premises zoned for residential development;

(C) On premises that have been designated as historical resources;

(D) On premises that have been designated or mapped ascontaining sensitive resources;

(E) On premises within the MHPA; or

(F) On premises that are leased for billboard use.

(4) The installation of a minor telecommunication facility shall not resultin the elimination of required parkiug spaces.

(5) Minor telecommunication facilities that terminate operation shall beremoved by the operator within 90 calendar days of termination.

(f) Major Telecommunication Facilities

Major telecommunication facilities may be permitted with a Conditional UsePermit decided in accordance with Process Three, except that majortelecommunication facilities on dedicated or designated parkland and openspace may be permitted with a Conditional Use Permit decided in accordancewith Process Five, in the zones indicated with a "C" in the Use RegulationsTables in Chapter 13, Article I (Base Zones) subject to the followingregulations.

(I) Major telecommunication facilities are not permitted in the followinglocations:

(A) On premises containing designated historical resources;

(B) Within viewsheds of designated and recommended StateScenic Highways and City Scenic Routes; or

(C) Within Y, mile of another major telecommunication facility,unless the proposed facility will be concealed from public viewor integrated into the architecture or surrounding environmentthrough architectural enhancement (enhancements thatcomplement the scale, texture, color, and style), unique designsolutions, and accessory use structures.

(D) Within the Coastal Overlay Zone, on premises within the

Page 4 of6

Page 61: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 15

MHPA and/or containing steep hillsides with sensitivebiological resources, or within pubic view corridors or viewsheds identified in applicable land use plans.

(2) Major telecommunication facilities shall be designed to be minimallyvisible through the use of architecture, landscape architecture, andsiting solutions.

(3) Major telecommunication facilities shall use the smallest and leastvisually intrusive antennas and components that meet the requirementsof the facility.

(g) Satellite Antennas

Satellite antennas are permitted as a limited use subject to Section141.0405(g)(2), and may be permitted with a Neighborhood Use Permitsubject to Section l41.0405(g)(3), or with a Conditional Use Permit decidedin accordance with Process Three subject to Section ]4] .0405(g)(4).

(1) Exemption. Satellite antennas that are 5 feet in diameter or smaller arepermitted in all zones and are exempt from this section.

(2) Limited Use Regulations. Satellite antennas that exceed 5 feet indiameter are permitted as a limited use in the zones indicated with an"L" in the Use Regulations Tables in Chapter 13, Article I (BaseZones) subject to the following regulations.

(A) Satellite antennas are not permitted within the MHPA.

(B) Satellite antennas are not permitted on premises that have beendesignated as historical resources.

(C) Satellite antennas shall not exceed 10 feet in diameter.

(D) Ground-mounted satellite antennas shall not exceed 15 feet instructure height.

(E) Ground-mounted satellite antennas shall not be located in thestreet yard, front yard, or street side yard of a premises.

(F) Satellite antennas shall not be light-reflective.

(G) Satellite antennas shall not have any sign copy on them norshall they be illuminated.

(H) Ground-, roof-, and pole-mounted satellite antennas shall be

Page 5 of6

Page 62: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 15

screened by fencing, buildings, or parapets that appear to be anintegral part of the building, or by landscaping so that not morethan 25 percent of the antenna height is visible from the gradelevel of adjacent premises and adjacent public rights-of-way.

(3) Neighborhood Use Permit Regulations. Proposed satellite antennasthat do not comply with Section l41.0405(b)(2) may be permitted witha Neighborhood Use Permit subject to the following regulations.

(A) Satellite antennas are not permitted within the MHPA.

(B) Satellite antennas are not permitted on premises that have beendesignated as historical resources.

(C) Satellite antennas shall not exceed 10 feet in diameter.

(D) Satellite antennas shall not be light-reflective.

(E) Satellite antennas shall not have allY sign copy on them norshall they be illuminated.

(F) The visual impacts of the antenna to adjacent premises andadjacent public rights-of-way shall be minimized by thepositioning of the antenna on the site and the use of landscapeor other screening.

(4) Conditional Use Permit Regulations. Except for proposed satelliteantennas which are accessory uses in industrial zones, proposedsatellite antennas that exceed 10 feet in diameter may be permittedonly with a Conditional Use Permit decided in accordance withProcess Three subject to the following regulations.

(A) Satellite antennas are not permitted within the MHPA.

(B) Satellite antennas are not permitted on premises or itsappurtenances that have been designated as historicalresources.

(C) The visual impacts of the antenna to adjacent premises andadjacent public rights-of-way shall be minimized by thepositioning of the antenna on the site and the use oflandscaping or other screening.(Amended 1-9-2001 by 0-18910 NS.; effective 8-8-2001)

Page 60f6

Page 63: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 16THE CITY OF SAN DIEGO

DATE OF NOTICE: February 18, 2010

NOTICE OF PUBLIC HEARINGPLANNING COMMISSION

DATE OF HEARING:TIME OF HEARING:LOCATION OF HEARING:

PROJECT TYPE:

PROJECT NUMBER:PROJECT NAME:APPLICANT:

COMMUNITY PLAN AREA:COUNCIL DISTRICT:

CITY PROJECT MANAGER:PHONE NUMBER:

March 4, 20109:00A.M.Council Chambers, 12th Floor, City Administration Building,202 C Street, San Diego, California 92101

Conditional Use PermitIPlanned Development Permit/CEQAExempt, Process 497765VERIWN -PADRE GOLDShelly Kilbourn, PlanCom, Inc.

Linda VistaDistrict 6

Karen Lynch-Ashcraft, Development Project Manager(619) 446-5351

As a property owner, tenant or person who has requested notice, you should know that the PlanningCommission will hold a public hearing to approve, conditionally approve, or deny an application for anew 76-foot high architectural tower to replace an existing 76-foot high monopole. All antennas willbe housed within the tower. Associated Verizon equipment will be located in an existing enclosure.New planter walls and landscaping are also proposed to enhance the new facility located at 7245 LindaVista Road between Genesee Avenue and Fulton Street

The decision of the Planning Conunission is final unless the project is appealed 10 the City Council. Inorder to appeal the decision of the Planning Commission you must be present at the public hearing andfile a speaker slip concerning the application or have expressed interest by writing to the PlanningCommission before the close of the public hearing. See Information Bulletin 505 "Appeal Procedure",available at www.sandiego.gov/development-servicesorinpersonatthe office of the City Clerk,202 "C" Street, Second Floor. The appeal must be made within 10 working days of the PlanningCommission decision. If you wish to challenge the City's action on the above proceedings in court,

Page 1 of 2

Page 64: REPORT TO THE PLANNING COMMISSION - San Diego · 2015-11-15 · unanimously to deny the project. The project did not complywith LDeSection 141.0405 (previous Communication Antenna

ATTACHMENT 16

you may be limited to addressing only those issues you or someone else have raised at the publichearing described in this notice, or written in correspondence to the City at or before the publichearing.

This project was determined to be categorically exempt from the California Environmental Quality Acton April 3, 2006 and the opportunity to appeal that determination ended April 24, 2006.

If you have any questions after reviewing this information, you can contact the City Project Managerlisted above.

This information will be made available in alternative formats upon request. To request an agenda inalternative format or to request a sign language or oral interpreter for the meeting, call SupportServices at (619) 321-3208 at least five working days prior to the meeting to insure availability.Assistive Listening Devices (ALD's) are also available for the meeting upon request.

Internal Order No. 23426162

Revised 12/5/08 RH

Page 2 of2


Recommended