+ All Categories
Home > Documents > Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG...

Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG...

Date post: 31-Dec-2015
Category:
Upload: daniel-wheeler
View: 248 times
Download: 0 times
Share this document with a friend
Popular Tags:
31
Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute Government policy This document forms part of an oral presentation and should not be reproduced or distributed without prior permission Water and Sanitation Sector Working Group Meeting March, 26 th 2015
Transcript
Page 1: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Republic of Rwanda

Ministry of Infrastructure

WATSAN SWG Secretariat Coordinator

© WATSAN SWG Secretariat,: Confidential

This document does not constitute Government policy

This document forms part of an oral presentation and should not be reproduced or distributed without prior permission

Water and Sanitation Sector

Working Group Meeting

March, 26th 2015

Page 2: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Activities Time ResponsibleArrival and registration 08:30-09:00 am WATSAN SWG Secretariat Opening remarks

+ Highlights on the agenda

09:00 – 09:10 am PS/MININFRA (Chair)

JICA Chief Representative (Co- Chair)

PresentationsConfirmation of last SWG meeting minutes and implementation

09:10 – 09:20 am WATSAN SWG Secretariat

Presentation of the Joint Sector Review (working draft)

09:20 – 09:30 am MININFRA -WASAC

Open discussions 09:30-09:10 am All participants

Coffee /Tea Break 10:00- 10:20amLeadership Retreat Resolutions and expectations from DPs & GoR

10:20 – 10:30 am WATSAN SWG Secretariat  

Concept note and Roadmap for providing Water and Electricity to Schools and Health Centres

 10:30- 10:40 am

 Task Force Chairperson Dr Anathalie, MoH, co-chair Dr Murtaza UNICEF 

Open discussions 10:40-11:10 am All Participants Sector Briefs on :- 6 months Secretariat work review ;-WATSAN policy review -Thematic Groups meetings

    

11:10 -12:00 pm

 WATSAN SWG Secretariat   Thematic group Chairpersons

-Benchmarking Systems ;-Water Week/Day ;-African San meeting -Final evaluation of PEPAPS Project ;

  Task Force Chairperson Mr Kabalisa, RNRAMr Bruce-WASACEuropean Union  

Open discussions 12:00 – 12:20 pm All participants Closing Remarks 12:20 - 12:30 pm Co-Chair and Chair

Page 3: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Republic of Rwanda

Ministry of Infrastructure

WATSAN SWG Secretariat Coordinator

© WATSAN SWG Secretariat,: Confidential

This document does not constitute Government policy

This document forms part of an oral presentation and should not be reproduced or distributed without prior permission

IMPLEMENTATION OF PREVIOUS RESOLUTIONS

March, 26th 2015

Page 4: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

JSR Meeting Resolutions implementation status

• Thematic Group meetings kicked off in December 2014;• A letter requesting Institutions to nominate members of the Task Force for Policy

review process was sent out and Institutions nominated their representatives;• A draft law stipulating the responsibility of each and every institution in

implementing the proposed policy action will be drafted along with policy review;• A technical team that will monitor and support the policy review has been

appointed;• A JSR report was fine-tuned and sent to the Ministry of Finance and Economic

Planning;• All sector members agreed that they will send to the secretariat data and

information on their plans and achievements for sector performance report. This was not done despite efforts of the Secretariat to get feedback from stakeholders.

• A period of one week was given to the sector members to provide information on 4W Matrix and areas of interventions but few stakeholders responded to the call

• Going forward, all sector members will submit their plans to the secretariat at the beginning of their financial year and reports at the end of their financial year.

• Two (2) additional staff are being recruited by the Secretariat.• The Task Force for BMS was established and is now active. • Roll out the training of trainers program to all rural areas using modules

developed

Page 5: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Joint Sector Review Report(Working Document)

Page 6: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Open Discussions

Page 7: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Republic of Rwanda

Ministry of Infrastructure

WATSAN SWG Secretariat Coordinator

© WATSAN SWG Secretariat,: Confidential

This document does not constitute Government policy

This document forms part of an oral presentation and should not be reproduced or distributed without prior permission

National Leadership Retreat Resolutions

March, 26th 2015

Page 8: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

5Empower districts to implement management and maintenance of Rural water supply projects.

16 Resolutions :No 5, 6 and 9 are related to water

9

6Complete comprehensive preparations for water supplyProjects to facilitate investment in the sector, review thecost of water, taking into consideration the actual productioncost and the beneficiaries’ purchasing power, and allocateenough funding for water supply projects.

Facilitate investors in low cost housing through the provisionof basic infrastructure such as water, roads and electricity.

Page 9: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

What will GoR do to implement the resolutions ?

In addition to this WATSAN budget given to WASAC, there is also earmarked money

Page 10: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Major activities under ceiling Main Projects and Activities: Water Supply Budget 2015/2016

GoR internal External

1. Improvement of Urban Water Supply: (1) Culligan , (2) Rehabilitation and Construction of Nzove filters and Mageragere WTP, (3) Kigali bulk water supply from Kanzenze (WTP, Transmission and Distribution)(4) Rehabilitation, reinforcement and extension of water supply distribution network for Kigali city and(5) Rehabilitation, reinforcement and extension of water supply distribution network in 6 satellites cities

10,057,292,356 300,000,000

3.Increase Water access above 70% rural areas:Construction of rural Large scale water supply projects to increase access above 70% in critical Districts (Nyagatare, Gatsibo, kayonza, Bugesera, Ngororero, Rutsiro, Rusizi, Nyanza, Ruhango, Nyaruguru, Kamonyi, Gicumbi , Muhanga and Gakenke)

11,059,187,866 0

4. Water , Sanitation and Hygiene (WASH) Project 975,600,000 1,016,148,084

5. LVWATSAN 30,000,000 1,357,544,127

6. Rulindo Challenge Project 715,000,000 1,694,069,674

7. Rural Water Sustainability Support Project 380,000,000 875,000,000

Page 11: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Major activities under ceiling

Main Projects and Activities: Sanitation projects

Budget

GoR internal External Budget

1. Sanitation master plan for 6 secondary cities towns (Musanze, Rubavu, Muhanga, Nyagatare, Huye and Rusizi) and Rwamagana

300,000,000 0

2. Construction of Kigali Septic Tank sludge management

250,000,000 0

3. Kigali Central Sewerage Project phase I – Expropriation

1,500,000,000 0

TOTAL BUDGET UNDER CEILINGS (Water and Sanitation Development)

25,467,080,222 4,467,761,885

Page 12: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Remaining Strategic Gaps

Main Projects and Activities: Sanitation projects Budget 2015/2016

72,174,904,2001. Mutobo Water Supply Project ( Kigali, Muhanga, Kamonyi and Bugesera)

34,700,000,000

2. Optimization of Nyabarongo: Rehabilitation , construction and protection of wells with prior feasibility Nyabarongo (25,000 m3)

4,200,000,000

3. Kigali Central Sewerage Project phase I – Expropriation

1,000,000,000

4. Rural Water Supply Project (Increase access to 70%) 15,520, 568,700

5. Construction for rehabilitation, reinforcement and extension of water supply distribution network in Kigali City, 265 Km)

6,500,000,000

6. Construction for rehabilitation, reinforcement and extension of water supply distribution network in six satellite cities (300km)

5,568,079,000

7. Connecting all “National Schools and Health Centers to WASH infrastructure”

4,686,256,500

Page 13: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Expectations from Development Partners

Donor mapping of financing gaps:Minecofin was requested to revise the Division of labour policy for giving more priority to WATSAN and hence remind the Development Partners that WATSAN remains an important sector . The PPPs must be also encouraged.

Development Partners Fund Mobilization to bridge the gapsThe achievement of EDPRS II targets will be subjected to the implementation of Mutobo Water supply Project is mandatory to improve water services in Musanze, Muhanga, Kigali City and Bugesera and to bridge the water access gaps across regions and Districts, more emphasis should be given to 70% water supply projects to increase access in 13 critical Districts. The total estimated budget to cover the gap for 2015/16 is 72,174,904,200 Rwf.

Page 14: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Concept note and Roadmap for providing Water and Electricity to Schools and Health Centres

Page 15: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Open Discussions

Page 16: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Republic of Rwanda

Ministry of Infrastructure

WATSAN SWG Secretariat Coordinator

© WATSAN SWG Secretariat,: Confidential

This document does not constitute Government policy

This document forms part of an oral presentation and should not be reproduced or distributed without prior permission

WATSAN SWG SECRETARIAT WORK PLAN

Mid Year Implementation Status

March, 26th 2015

Page 17: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

We had agreed to use Phased Approach, …

17

Long term (July 2015 onwards)•Coordination of key sector event & meetings •Development of WATSAN SWAp roadmap•Support in the development of sector investment plan and partnership principles•Publish and dissemination of the WATSAN Sector Strategic Plan (SSP)•Establishment of a Rwanda WASH web portal•Coordination of documentation and dissemination of WASH best practises and lessons learnt•Support resource mobilisation for the sector

Medium term (Jan 2015-June 2015)• Coordination of key sector events & meetings • Organisation of quarterly SWG meeting • Organisation of Joint Sector Review (JSR) meetings• Preparation and dissemination of annual sector performance report • Coordination of sector assessment, monitoring and evaluation• Follow on key regional and international commitments • Secretariat fully staffed, equipped & operational• Support resource mobilisation for the sector

Short term (Sept 2014 - Dec

2014)• Coordination of key sector events & meetings •Thorough analysis of sector documents and previous WATSAN SWG decisionsWATSAN policy review • MoU on coordinated approach • Bank account for WATSAN Secretariat• Secretariat systems and processes• Mapping of on-going and planned intervention by government and sector partners (3W matrix)•Support resource mobilisation for the sector

WATSAN SWG Secretariat establishment

Sector reviews, monitoring and coordination

Moving towards SWAP!

Page 18: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Strategic Management

• Better Sector Coordination and Communications o Developed and maintained relationships internally between

SWG members and externally with relevant actors;o Representation and communication of SWG programme

initiatives to relevant stakeholders and monitoring the impact of the strategy;

o Coordination, monitoring, review and sharing lessons learnt from the activities of members to support the achievement of outcomes;

o Coordinating advocacy initiatives and innovations derived from learning and research according to the advocacy and communication strategy of the SWG.

• Fund Mobilization o Identified opportunities for increasing impact of the SWG

approach, influencing sectorial actors based on evidence and identifying funding sources to fund the strategy;

o Secretariat Bank Account opened ( Rwf127Millions), o Water and Sanitation Sector has tripled its budget during

Budget negotiation

Page 19: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Management of the Secretariat

The Secretariat is now established and operational:

o Coordinator recruited and in office. Two additional positions have been advertised and more than 50 candidates applied. Written test scheduled next week.

o MoU on coordinated approach signed by JICA, SDC, MININFRA and MINECOFIN.

o WATSAN SWG Secretariat bank account opened. More than 127 Millions Rwandan francs were raised and deposited on account.

o The review of National Policy and Strategy for Water Supply and Sanitation Services is on going. We are at financial offer evaluation stage

o Supported in the coordination of national events. Eg : Global Hand washing, World Water Week & Water day

o Establishment Secretariat Systems and Processes – eg WATSAN SWG meetings preparations, Presentations templates, Thematic group meetings, Stakeholders mapping Matrix, Sector Events Calendar, etc.

Page 20: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Provided Secretariat support to the SWG; Reported and made presentations to the SWG activities and on

opportunities to increase the added value of the SWG approach; Ensured effective communication and information sharing between

members of the SWG, other relevant actors and stakeholders according to the strategy of the SWG;

Developed proposals, activity plans, reports and other relevant SWG Programme documents for SWG members that meet the requirements of external funding agencies funding the SWG Programme; Eg : WATSAN activity plan. Policy review work plan,

Attended appropriate coordination meetings and reported back to the relevant SWG groups on the outcomes of such meetings: Eg: Africa-India Workshop on sustainable rural water management and Rainwater Harvesting

Conducted regular programme visits to SWG members ensure thorough understanding of all aspects of programmes SWG members to ensure accurate representation of the WATSAN working groups. Eg : Gicumbi, Gakenke, Musanze, Nyabihu, Rubavu, Rulindo.

Page 21: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Advocacy, Communications and Visibility

Two additional positions have been advertised and more than 50 candidates applied. 36 candidates shortlisted for written test next week.

MoU on coordinated approach signed by JICA, SDC, MININFRA and MINECOFIN.

WATSAN SWG Secretariat bank account opened. More than 127 Millions Rwandan francs were raised and deposited on account.

The review of National Policy and Strategy for Water Supply and Sanitation Services is on going. We are at financial offer evaluation stage

Supported in the coordination of national events. Eg : Global Hand washing, World Water Week & Water day

Establishment Secretariat Systems and Processes – eg WATSAN SWG meetings preparations, Presentations templates, Thematic group meetings, Stakeholders mapping Matrix, Sector Events Calendar, etc.

WATSAN Web portal was created within www.mininfra.gov.rw

Page 22: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Current & ongoing Secretariat Activities Continued resources mobilization to support Secretariat

activities and sector projects/programmes National WATSAN Policy Review Support in the preparation of Global hand washing and

hygiene campaign scheduled in October WATSAN SWG Stakeholders and Sector Interventions

Mapping Matrix Annual Sector Performance Report Sector Thematic Groups meetings WATSAN Web Portal for sector documentation &

knowledge management Recruitment of additional staff and technical advisors

through MoUs Development of training materials for orientation of new

staff Databank for Sector good practices and experiences

sharing.

Page 23: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

WATSAN SWG: Annual Action Plan (2014/15)

Coordination of key sector events

August September October November

December

Organisation of Joint Sector Review (JSR) meetingsEstablishment and coordination of meetings of thematic working groupsCoordination of sector assessment, monitoring and evaluationFollow on key regional and international commitments e.g. HLM and AfricaSan

Organisation of quarterly SWG meeting

Page 24: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

WATSAN SWG: Annual Action Plan (2014/15)

Support development of the national sanitation and hygiene strategy/plan

January February March April May

Final review process of WATSAN policy

… Sanitation marketing and low cost sanitation and hygiene options

Advocacy paper detailing the current district WASHPreparation and dissemination of annual sector performance report Working with MIDMAR on emergency preparedness and WASH

Page 25: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

WATSAN SWG: Annual Action Plan (2014/15)

Establishment of a Rwanda WASH web portal

January February March April May

Coordination on WASH best practises and lessons learnt

Support resource mobilisation for the sector

Publish and dissemination of the WATSAN Sector Strategic Plan (SSP)Sector investment plan and partnership principles

Final report on stakeholders mapping ( 3W matrix)

Page 26: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Republic of Rwanda

Ministry of Infrastructure

WATSAN SWG Secretariat Coordinator

© WATSAN SWG Secretariat,: Confidential

This document does not constitute Government policy

This document forms part of an oral presentation and should not be reproduced or distributed without prior permission

WATSAN Policy Review Process

March, 26th 2015

Page 27: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Updates

• A call for Expression Of Interest (EOI) was sent to local and international newspapers. All Sector Stakeholders ( more than 160) received the communication and were requested to widely spread the word;

• We received 12 submissions in total : 11 International Companies and 1 Individual Consultant;

• Four (4) International Companies qualified after technical evaluation;

• Request For Proposal (RFP) was sent to the qualified companies. An extension was accorded to all companies to prepare their technical proposals;

• Three (3) Companies submitted their technical proposal

• Two (2) qualified and have been requested to submit their Financial Proposal

• One (1) Best Offer will qualify for the tender.

Page 28: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Task Force members who will work with the Cie

# Names Institution Tel number

1. Nkurunziza Theoneste WORLD VISION 0788389905

2. Nsengiyumva Jacques REMA 0786624431

3. Nzitonda Jacques RURA 0788430046

4. Ntalindwa Patrick MINECOFIN 0788799128

5. Yaramba Albert WASAC 0788622647

6. Karuranga Dismas MINERENA 0788779208

7. Murtaza Malik UNICEF 0788305394

8. Kanyangira Ignace MINALOC 0788872616

9. Umubyeyi Christine WATER FOR PEOPLE

0788443330

10.

Mutabaruka Anne WATERAID 0788300703

11.

Ntagengerwa Theoneste PSF 0788306138

12.

Hategekimana Emmanuel MININFRA 0788620930

13.

Ndutiye Wellars SDC 0788383009

Page 29: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Open Discussions

Page 30: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Thematic Group Meetings Brief

Page 31: Republic of Rwanda Ministry of Infrastructure WATSAN SWG Secretariat Coordinator © WATSAN SWG Secretariat,: Confidential This document does not constitute.

Other Sector briefs :

- Benchmarking Systems ;- Water Week/Day ;- African San meeting - Final evaluation of PEPAPS Project