Date post: | 31-Dec-2015 |
Category: |
Documents |
Upload: | russell-wright |
View: | 221 times |
Download: | 6 times |
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ILOILO RIVER
BATIANO RIVER
CALAJUNAN CREEK
DUNGON CREEK
MAMBOG CREEK-JIBAO-
AN RIVER
CABALUAN RIVER
Pavia
Sta. Barbara
San Miguel
Oton
River Systems
Iloilo City
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER ILOILO RIVER
City Proper
Molo
Arevalo
Oton
Carpenter’s BridgeDiversion Bridge
Jalandoni Bridge
Forbes Bridge
Quirino Bridge
Sooc BridgeMohon Bridge
Lambuyao Culvert
ILOILO RIVER
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Upstream of Batiano River Poblacion OtonBrgy. Alegre OtonBrgy. San Nicolas Oton Brgy. Sta Cruz ArevaloBrgy. Sto Nino Sur ArevaloBrgy. Sto Nino Sur Arevalo (near JBLMU)Brgy. Sto Nino Norte Arevalo (downstream Yulo Br.)Brgy. Calaparan Arevalo Brgy. Calumpang MoloBrgy. San Juan MoloBrgy. Boulevard Molo (upstream of Batiano
Brd.)
Brgy. Boulevard Molo (downstream of Batiano Brd.)
BATIANO RIVER
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
City Proper
Molo
Arevalo
Oton
ILOILO RIVER IMPROVEMENT(Dredging and Excavation)
9.33 Km
Quirino Br.
Mohon Br.
Trenas Boulevard
Forbes Br.
Jalandoni Br.
Carpentr’s Br.
Sooc BridgeBr.
LapazMandurriao
(Dredging and Excavation)
IMPROVEMENT / REHABILITATION OF THE ILOILO RIVER BASIN
SECTION 6 (ILOILO BRIDGE - CARPENTER BRIDGE)
Length: 2.26Volume : 76,640 m3
SECTION 4 (FORBES BRIDGE - JALANDONI BRIDGE)
Length: 1.84 kmVolume : 111,420 m3
SECTION 2 (QUIRINO LOPEZ BR. - MUELLE
LONEY BR.)
Length: 1.48 kmVolume : 51,760 m3
SECTION 1(ARROYO TO QUIRINO LOPEZ BR.)
Length: 0.47 KmVolume : 100, 000 m3
ILOILO – ANTIQUE ROAD
GENERAL LUNA STREET
ILOILO – ANTIQUE ROAD
GENERAL LUNA STREET
IZN
AR
T S
TR
EE
T
ARROYO STREET
MU
ELLE
LON
EY
ST
RE
ET
ILOILO
DIV
ER
SIO
N R
OA
D
R. M
APA
STR
EE
T
TREÑAS BOULEVARD
ILOILO RIVER
ILOILO RIVER
ILOILO RIVER
ILOILO RIV
ER
ILOILO
RIV
ER
DU
NG
ON
CR
EE
K
1.
2.
3.
4.
5.6.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION VI – WESTERN VISAYAS
DREDGING USING WATER MASTER
SECTION 5 (JALANDONI BRIDGE - ILOILO BRIDGE)
Length : 0.81Volume : 89,210 m3
With exception Volume : 45,492.5 m3
SECTION 3 (MUELLE LONEY BR. - FORBES BRIDGE)
Length: 0.12 kmVolume: 8,440 m3
SECTION VOLUMEOPERATIONAL COST
TOTAL DURATIONDREDGING HAULING
STATION 1 TO BE DREDGED BY DREDGE VISAYAS II
STATION 2 51,7600 1.55 M 6.21 M 7.76 M 5 mo.
STATION 3 8,440 0.25 M 1.01 M 1.26 M 1 mo.
STATION 4 111,420 3.34 M 13.37 M 16.71 M 10.5 mo.
STATION 5 43,720 1.31 M 5.25 M 6.56 M 4.2 mo.
STATION 6 76,640 2.30 M 9.20 M 11.50 M 7.3 mo.
T O T A L 291,980 8.75 M 35.04 M 43.79 M 28 mo.
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
2.5km
Oton
CONSTRICTED PORTION FROM MOHON TO MAMBUG OTON
Mohon Arevalo
Lambuyao Culvert
Mohon Bridge
San Nicolas OtonSan Antonio Oton
Mambug Oton
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Oton
DUNGON CREEK IMPROVEMENT(Dredging and Excavation)
LAPAZ
MANDURRIAO
JARO
City Proper
Molo
Arevalo
4.59 KmUnworkable AreaDue to presence of Formal and Informal Settlers and Mangrove
Vegetation
Cuartero Jaro
Bolilao Br. Mandurriao
Sta Rosa Mandurriao
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Oton
CALAJUNAN CREEK IMPROVEMENT(Dredging and Excavation)
LAPAZ
MANDURRIAO
JARO
City Proper
Molo
Arevalo
5.40 Km
Calajunan Mandurriao
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION VI – WESTERN VISAYAS
Thank You