40
www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal REQUEST FOR AN EXTENSION REQUEST FOR AN EXTENSION OF THE DEADLINE TO COMPLY OF THE DEADLINE TO COMPLY WITH ARTICLE 5 OBLIGATIONS WITH ARTICLE 5 OBLIGATIONS State Party: Colombia State Party: Colombia Geneva, June 22 Geneva, June 22 nd nd , 2010 , 2010
Transcript
Page 1: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

REQUEST FOR AN REQUEST FOR AN EXTENSION OF THE EXTENSION OF THE

DEADLINE TO COMPLY DEADLINE TO COMPLY WITH ARTICLE 5 WITH ARTICLE 5 OBLIGATIONSOBLIGATIONS

State Party: ColombiaState Party: Colombia

Geneva, June 22Geneva, June 22ndnd, 2010, 2010

Page 2: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Overview

Justification

Technical Basis

Components of the Extension Request

IndexIndex

Page 3: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Overview

Justification

Technical Basis

Components of the Extension Request

IndexIndex

Page 4: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

General Data of ColombiaGeneral Data of Colombia

A Shared Commitment Cartagena / Colombia November 29 - December 4 / 2009

GDP: USD$ 242,268 million

GDP per capita: USD$ 5,440 dollars (mean income according to World Bank figures)

Poverty line: 46%

Homelessness line: 17%

GINI coefficient: 0.59

Inflation (2009): 2%

Unemployment (Dec 09): 12%*

Source: Dane, IMFAll 2008 figures except where is clarified

Page 5: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

General Data of ColombiaGeneral Data of Colombia

A Shared Commitment Cartagena / Colombia November 29 - December 4 / 2009

Colombia is comprised of five clearly defined geographical regions with large social, economic and demographic asymmetries.

RegionArea Km2

Total Region

Population

Number of Depart/

Characteristics

Amazon 403,348 968,255 6

Forest region with low altitude, with high rainfall and low

population density

Andean 220,523 24,037,055 10

Densely populated region characterized by a rough

geography; high peaks and valleys, with a wide vegetation

variety

North Coast 132,296 9,090,413 8

Coastal and flat region, located to the northwestern part of the country, it has a mountainous

side

Orinoco 254,335 1,366,511 4

Low altitude region, with ample plains and low population

density. It has a small mountainous region - Serranía

de la Macarena

Pacific 131,246 7.426.348 4

Coastal and flat region, located to the southwest of the

country, high precipitations, plains and forest region

Total Colombia

1,141,748

42,888,592 32  

Page 6: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Nature of APM affectation in ColombiaNature of APM affectation in Colombia

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - www.cartagenasummit.gov.co - @paicma - No más minas antipersonal

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Irregular contamination (64% of

municipalities with evidences of

contamination)

Irregular contamination (64% of

municipalities with evidences of

contamination)

Two types of contamination in Colombia

Page 7: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Two types of contamination in Colombia

Nature of APM affectation in ColombiaNature of APM affectation in Colombia

Irregular contamination (64% of

municipalities with evidences of

contamination)

Irregular contamination (64% of

municipalities with evidences of

contamination)

Page 8: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonalwww.vicepresidencia.gov.co - www.accioncontraminas.gov.co - www.cartagenasummit.gov.co - @paicma - No más minas antipersonal

35 military bases reported

Mine fields planted by the Colombian Public Forces before 1997

Perimeters marked and signalled according to the II additional CWC protocol

Type of regular contamination, according to defensive military doctrine

Impact-free: Zero civilian victims registered

Regular APM contamination in ColombiaRegular APM contamination in Colombia – Military Bases – Military Bases

Page 9: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Two types of contamination in Colombia

Nature of APM affectation in ColombiaNature of APM affectation in Colombia

Irregular contamination (64% of

municipalities with evidences of

contamination)

Irregular contamination (64% of

municipalities with evidences of

contamination)

Page 10: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Irregular APM contamination in ColombiaIrregular APM contamination in Colombia

64% of municipalities with evidence of contamination between 1990 and May 2010; concentrated in nine subregions

APM use intended to protect areas of strategic military and economic interest for illegal groups (i.e. Coca crops)

Nuisance mining type contamination

Production and planting of Improvised Explosive Devices as APM by Illegal Armed Groups (IAG)

Page 11: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Victims of irregular contamination 1990 – May 2010Victims of irregular contamination 1990 – May 2010

Source: PAICMA

Between January 1990 and May 2010, 8,448 Colombians were victims of these devices. Although during the first five months of 2010 a reduction of 15% in the number of affected people is evidenced (compared to the same period in 2009,) the affectation continues to be considerable.

Page 12: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Overview

Justification

Technical Basis

Components of the Extension Request

IndexIndex

Page 13: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Arguments for the extension requestArguments for the extension request

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Irregular contamination (64% of

municipalities)

Irregular contamination (64% of

municipalities)

Two types of contamination in Colombia

Two arguments for the extension request

Total commitment with the Convention

over the first 10 years

Total commitment with the Convention

over the first 10 years

Exceptional situation of contamination

Exceptional situation of contamination

Page 14: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Irregular contamination (64% of

municipalities)

Irregular contamination (64% of

municipalities)

Two types of contamination in Colombia

Two arguments for the extension request

Total commitment with the Convention

over the first 10 years

Total commitment with the Convention

over the first 10 years

Exceptional situation of contamination

Exceptional situation of contamination

Arguments for the extension requestArguments for the extension request

Page 15: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

A Shared Commitment Cartagena / Colombia November 29 - December 4 / 2009

Progress in the clearence of regular contaminationProgress in the clearence of regular contamination

Source: PAICMA

Within the 10 years granted for the completion of Article 5 commitments, Colombia will clear ALL the mined fields in the 35 reported military bases.

Page 16: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

A Shared Commitment Cartagena / Colombia November 29 - December 4 / 2009

Increase of national clearance capacityIncrease of national clearance capacity

Source: PAICMA

The implementation of these platoons was possible thanks to the work of the OAS and the support of the USA, Canada, Spain, Italy and Norway. Currently, Colombia is implementing an LIS pilot study with the collaboration of the European Union and, in the near future, the country will be implementing mechanical demining labours thanks to the support provided by Japan.

Page 17: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Regular contamination (35 military bases)

Regular contamination (35 military bases)

Irregular contamination (64% of

municipalities)

Irregular contamination (64% of

municipalities)

Two types of contamination in Colombia

Two arguments for the extension request

Total commitment with the Convention

over the first 10 years

Total commitment with the Convention

over the first 10 years

Exceptional situation of contamination

Exceptional situation of contamination

Arguments for the extension requestArguments for the extension request

Page 18: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Continuation of mining by illegal armed groups and continuation of

violence

Continuation of mining by illegal armed groups and continuation of

violence

Extension and configuration of changing contamination

Extension and configuration of changing contamination

Perverse incentives of illegal armed groups to sabotage actions

Perverse incentives of illegal armed groups to sabotage actions

EXCEPTIONAL SITUATION

UNCERTAINTYUNCERTAINTY

Irregular contamination pattern (Nuisance mining)

Irregular contamination pattern (Nuisance mining)

Ample dispersion of the problem in the national territory

Ample dispersion of the problem in the national territory

Incomplete information about scope and nature of contamination

Incomplete information about scope and nature of contamination

INCOMPLETE INFORMATIONINCOMPLETE

INFORMATION

Exceptional situation of contaminationExceptional situation of contamination

Page 19: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Exceptional situation of contaminationExceptional situation of contamination

Continuation of mining by illegal armed groups and continuation of

violence

Continuation of mining by illegal armed groups and continuation of

violence

Extension and configuration of changing contamination

Extension and configuration of changing contamination

Perverse incentives of illegal armed groups to sabotage actions

Perverse incentives of illegal armed groups to sabotage actions

EXCEPTIONAL SITUATION

UNCERTAINTYUNCERTAINTY

Irregular contamination pattern (Nuisance mining)

Irregular contamination pattern (Nuisance mining)

Ample dispersion of the problem in the national territory

Ample dispersion of the problem in the national territory

Incomplete information about scope and nature of contamination

Incomplete information about scope and nature of contamination

INCOMPLETE INFORMATIONINCOMPLETE

INFORMATION

Page 20: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

LEVEL CHARACTERISTICS SOURCE

% OF DATA OF

REGISTERED EVENTS

2004-2009

1. Georeferenced

There is a georeferenced location of the event, which implies the determination of

a dangerous area

Military Forces 29%

2.Referenced to a location

There is an approximate geographical reference,

commonly related to geographical reference

points (hills, basins, etc.) or places of territorial units

below municipality (settlements, townships,

etc.)

Community mapping workshops, information from local authorities, other State agencies,

citizen claims

3%

3.Referenced to municipal centre

There is no precise geographical reference,

reason why the political.-administrative centre of the municipality is referenced.

Information from the press and other organizations

68%

Available information incompleteAvailable information incomplete

Page 21: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Advances in the clearance of irregular contaminationAdvances in the clearance of irregular contamination

Source: PAICMA

Just in 2009, 1,592 Colombians were benefited by the humanitarian demining operations in communities.

Page 22: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Overview

Justification

Technical Basis

Components of the Extension Request

IndexIndex

Page 23: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Technical ApproachesTechnical Approaches

Calculation of the area to be released

between 2012 - 2020

Calculation of the area to be released

between 2012 - 2020

Technical approaches supporting the 10 year request

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Page 24: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Technical approaches supporting the 10 year request

Calculation of the area to be released

between 2012 - 2020

Calculation of the area to be released

between 2012 - 2020

Technical ApproachesTechnical Approaches

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Page 25: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Calculation of area to liberate between 2012

- 2020

Calculation of area to liberate between 2012

- 2020

Theoretical approaches supporting the 10 year request

Technical approachesTechnical approaches

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Page 26: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Place of Mine Action within the Democratic Security PolicyPlace of Mine Action within the Democratic Security Policy

Phase 1: Areas with illegal

armed groups presence

Phase 2: Areas under

consolidation

Phase 3: Consolidated

areas

Expulsion of IAG– Intensive military effort

Generate stability -Police

effort

Establish institutionalism

–Social effort

Military demining, not according to IMAS

Emergency demining, not according to IMAS

Demining adjusted to IMAS and the Convention

Page 27: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Overview

Justification

Technical Basis

Components of the Extension Request

IndexIndex

Page 28: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Components of 10 year extension requestComponents of 10 year extension request

Calculation of area to be liberated between

2012 - 2020)

Calculation of area to be liberated between

2012 - 2020)

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Theoretical approaches supporting the 10 year request

Two components of extension request

10 year general plan for the strengthening

of capabilities

10 year general plan for the strengthening

of capabilities

Operational plans for the three years in

selected municipalities

Operational plans for the three years in

selected municipalities

Page 29: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Calculation of area to be liberated between

2012 - 2020)

Calculation of area to be liberated between

2012 - 2020)

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Theoretical approaches supporting the 10 year request

Two components of extension request

10 year general plan for the strengthening

of capabilities

10 year general plan for the strengthening

of capabilities

Operational plans for the three years in

selected municipalities

Operational plans for the three years in

selected municipalities

Components of 10 year extension requestComponents of 10 year extension request

Page 30: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

10 y

ear

gen

eral

pla

n f

or

the

stre

ng

then

ing

o

f ca

pab

ilit

ies

Allocation of tasks and resources

Allocation of tasks and resources

Information ManagementInformation

Management

Clearance capacitiesClearance capacities

General Plan Colombia 2011 - 2020General Plan Colombia 2011 - 2020

Page 31: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Consolidation of tools for the analysis of priorities and

opportunities

Consolidation of tools for the analysis of priorities and

opportunities

Consolidation of consultation spaces for decision making strategies

Consolidation of consultation spaces for decision making strategies

10 y

ear

gen

eral

pla

n f

or

the

stre

ng

then

ing

o

f ca

pab

ilit

ies

Allocation of tasks and resources

Allocation of tasks and resources

Information ManagementInformation

Management

Clearance capacitiesClearance capacities

US 0.11 million

General Plan Colombia 2011 - 2020General Plan Colombia 2011 - 2020

Page 32: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

10 y

ear

gen

eral

pla

n f

or

the

stre

ng

then

ing

o

f ca

pab

ilit

ies

Allocation of tasks and resources

Allocation of tasks and resources

Qualification of the information collection tools with operational aims

Qualification of the information collection tools with operational aims

Qualification of the IMSMA administration and synchronization

with other systems

Qualification of the IMSMA administration and synchronization

with other systems

Qualification of the operational registration procedures

Qualification of the operational registration procedures

Information ManagementInformation

Management

Clearance capacitiesClearance capacities

US 1.3 million

General Plan Colombia 2011 - 2020General Plan Colombia 2011 - 2020

Page 33: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

10 y

ear

gen

eral

pla

n f

or

the

stre

ng

then

ing

o

f ca

pab

ilit

ies

Allocation of tasks and resources

Allocation of tasks and resources

Information ManagementInformation

Management

Increase of demining capacity by the State

Increase of demining capacity by the State

Increase of demining capacity of NGOs

Increase of demining capacity of NGOs

Increase of non-technical release capability

Increase of non-technical release capability

Clearance capacitiesClearance capacities

US 227.6 million

General Plan Colombia 2011 - 2020General Plan Colombia 2011 - 2020

Page 34: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Plan to increase clearance capacity 2011-2020Plan to increase clearance capacity 2011-2020

Source: PAICMA

The financial calculations of the State platoons is included in the operation and activation of the new platoons and mechanical demining equipment.

Page 35: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Expected results 2011-2020 (Accumulated)Expected results 2011-2020 (Accumulated)

Along with the Colombian State and civil Organizations, 72 km2 are expected to be released by 2020 through non-technical mechanisms and 48 km2 through technical mechanisms.

Page 36: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Calculation of area to be liberated between

2012 - 2020)

Calculation of area to be liberated between

2012 - 2020)

Progressive model for the fulfillment of

obligations

Progressive model for the fulfillment of

obligations

Theoretical approaches supporting the 10 year request

Two components of extension request

10 year general plan for the strengthening

of capabilities

10 year general plan for the strengthening

of capabilities

Operational plans for the three years in

selected municipalities

Operational plans for the three years in

selected municipalities

Components of 10 year extension requestComponents of 10 year extension request

Page 37: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Includes 14 municipalities that comply with safety conditionsIncludes 14 municipalities that comply with safety conditions

The selected municipalities concentrate 17% of the estimated

contamination

The selected municipalities concentrate 17% of the estimated

contamination

Resources contemplated in the national planning mechanism

(CONPES)

Resources contemplated in the national planning mechanism

(CONPES)

Only considers operations implemented by Army demining

units

Only considers operations implemented by Army demining

units

Must be updated by the end of 2013Must be updated by the end of 2013

Violence dynamics can vary safety conditions

Violence dynamics can vary safety conditions

Characteristics of the operational plan 2011-2013Characteristics of the operational plan 2011-2013

Page 38: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Results 14 municipalities in 2011-2013 (Km2)Results 14 municipalities in 2011-2013 (Km2)

No MunicipalitySuspicion

2011

Release through

NTSClearence

Remaining for 2014

1 Chaparral 0.44 0.23 0.15 0.052

2 El Carmen de Bolívar 2.21 0.98 0.66 0.573

3 El Carmen de Chucurí 0.03 0.05 0.04 0.000

4 El Dorado 0.28 0.17 0.11 0

5 Granada 0.46 0.23 0.15 0.074

6 Samaná 0.91 0.52 0.35 0.050

7 Samaniego 0.70 0.40 0.27 0.031

8 San Carlos 1.35 0.64 0.43 0.278

9 San Francisco 1.13 0.63 0.42 0.076

10 San Jacinto 0.29 0.16 0.11 0.028

11 San Juan de Arama 0.41 0.22 0.15 0.034

12San Vicente de

Chucurí 0.04 0.05 0.04 0

13 Vistahermosa 2.47 0.82 0.55 1.094

14 Zambrano 0.66 0.39 0.26 0.003

TOTAL 11.38 5.52 3.68 2.292

Page 39: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

Results of 14 municipalities in 2011-2013 (Mts2)Results of 14 municipalities in 2011-2013 (Mts2)

For the implementation of the release and clearance works in these 14 municipalities, an investment of US 22 million is calculated.

Page 40: Request for an Extension of the Deadline to Comply with Article 5 obligations

www.vicepresidencia.gov.co - www.accioncontraminas.gov.co - Follow us on Twitter: @paicma - Facebook: No más minas antipersonal

THANK YOU!THANK YOU!


Recommended