Request for Proposal Breitung Township Schools Page 1 RFP Network Upgrades 2017 (eRate), Rev. 1 with FCC 470 Number.docx January 23, 2017 Rev. 1 FCC 470 #170062033 BREITUNG TOWNSHIP SCHOOL DISTRICT 2000 Pyle Drive Kingsford, MI 49802 906-779-2650 Wifi and Network Upgrades NOTICE OF BIDDERS ________________________ Jean M. Constantini Technology Director [email protected] 906-779-2680 x 2211 The Breitung Township School District is accepting bids on Wifi and Network Upgrades in order to increase wireless capacity and improve Internet connectivity to devices in our classrooms. Bids must be received on or before Tuesday, February 28 at 10 a.m. local time (10 a.m. CST). Bids may be submitted by mail at the above address or E-mail to [email protected]. Bid Specifications are available on our website at www.kingsford.org/techbids or can be obtained from Jean Constantini, Technology Director, Breitung Township Schools, 2000 Pyle Drive, Kingsford, MI 49802.
Transcript

RequestforProposal

BreitungTownshipSchools Page1 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

January23,2017Rev.1

FCC470#170062033

BREITUNGTOWNSHIPSCHOOLDISTRICT2000PyleDrive

Kingsford,MI49802906-779-2650

WifiandNetworkUpgrades

NOTICEOFBIDDERS

________________________

JeanM.Constantini

TechnologyDirector

[email protected]

906-779-2680x2211

The Breitung Township School District is accepting bids on Wifi and Network

UpgradesinordertoincreasewirelesscapacityandimproveInternetconnectivity

todevicesinourclassrooms.Bidsmustbereceivedonorbefore

Tuesday,February28at10a.m.localtime(10a.m.CST).Bidsmaybesubmittedby

[email protected].

BidSpecificationsareavailableonourwebsiteatwww.kingsford.org/techbidsor

can be obtained from Jean Constantini, Technology Director, Breitung Township

Schools,2000PyleDrive,Kingsford,MI49802.

RequestforProposal

BreitungTownshipSchools Page2 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

Requirements

Thepurposeofthisprojectistoprovidehigh-speed,high-densitywirelessaccesstoeveryclassroomin

thedistrictincludingthehighschoolauditoriumandthethreegymnasiums.In2015,weexpandedour

Wifito147accesspoints.Inthisbid,wewouldliketofurtherincreaseourwirelesscapacity,replace

olderaccesspoints,makenetworkrepairswhereneededandimproveInternetconnectivityto

classrooms.

Ourcurrentinfrastructureincludes147MerakiAccessPointsinstalledthroughoutthedistrict.

Theprojectisbrokendownintothreeseparatesections:

Section1–MerakiWirelessAccessPointsand5-yearenterpriselicenses Section2–NetworkSwitches(HPProcurve)

Section3– FurnishandinstallCategory6WiringfromtheDataCentertoeachlocationlistedin

thissectionandprovideMulti-ModeFiberbetweendataclosets.closets.

Section4- BatteriesforAPCUninterruptablePowerSupplies

Vendorsmaybidononeormoresections.Eachsectionwillbeawardedindividually.Actualquantitiespurchasedmayvaryfromthebid,dependingupontheoverallbudget.

Section1–MerakiAccessPointsandLicensing

• Maximumoffifty-nine59Meraki1MR42AccessPoints,equivalentorbetter

• Maximumoffifty-nine59MerakiEnterpriseCloudControllerfiveyearlicenses

Section2–EthernetSwitchesandOptionalProgramming

ThissectionincludestheEthernetswitchestoprovidegigabitPoEconnectivity.

• Maximumoftwelve(12)48PortPoE+GBSwitchesHP2530-48G-PoE+switchesorequivalent2

• Six(6)MultiModefibertransceiver,HPX1201GSFPLCSXGigabit(orEquiv.)

1TheBTSSchoolDistricthasstandardizedonMerakiandthatisthepreferredmanufacturer.2TheBTSSchoolDistricthasstandardizedonHPProcurveswitchesandthatisthepreferredmanufacturer.

RequestforProposal

BreitungTownshipSchools Page3 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

Section3–Category6DataCablingandInstallation(Ref.attacheddrawings)

Maximumofonehundred(100)newCategory6datarunsfromtheheadendclosetstotheclassrooms.

Alldatadropsmustbetestedandcertified.Vendorisrequiredtoprovideallpunchdownblocks,cable,jacks,etc.onbothends.Cat6DataLocationsasfollows:

• KMSDataCenterAto:

o 24dropsintheKMSMediaCenter[118]

o 2dropstoKMSCafeteria/GymnasiumCommonsArea

o 2dropstothehallwayceilingoutsidecornerofMediaCenter(towardcommons)

o 1droptothehallwayceilingoutsideroom104

o 2dropstothehallwayceilingoutsideroom105&108(Similarto204/208on2ndfloor)

o 1droptothehallwayceilingoutsideroom107

o 1droptothehallwayceilingoutsideroom204&208(Similartofirstfloor)

o 1droptothehallwayceilingoutsideroom205

o 2dropstothehallwayceilingoutsideroom210

o 1droptothehallwayceilingoutsideroom217

• KHSDataCenterCto:

o 2dropstoKHSAuditorium(1StageLeft,1Stageright)

o 2dropstoKHSMediaCenterCirculationDesk

§ Requiresrelocatingoranewracewayfromtheceilingtothedesktop

o 2dropstotheKHSMediaCenter(nearwindows)

o 5dropstotheKHSOffice

o 30dropstoKHSroom200(81strow,8,2ndrow,73rdrow,74throw)

§ Utilizeexistingracewaysorprovidenewraceways

• WESDataCenterAto:

o 1droptotheWoodlandEntrance

o Totalofthree(3)newdropsoutsidethedoorsofeachpod(K,1,2)

o 1dropstoroom[210]

o 3dropstoWoodlandOffice

o 4dropstoComputerlab–1inceiling,3inbackraceway

o 2dropstocornertheWoodlandlibrarynearthewindows–aboveceilingtileincorner

• WESDataCenterBto:

o Totalofthree(3)newdropsoutsidethedoorsofeachpod(3,4,5)

• WESDataCenterCto:

o 2dropstoBoardRoom

o 1droptoshippingandreceivingarea

• Multi-ModefiberbetweenKMSDataClosetAandDataClosetB&(2)LC-LC50PatchCables

• Multi-ModefiberbetweenWoodlandDataClosetAandDataClosetB&(2)LC-LC50PatchCables

• Multi-ModefiberbetweenWoodlandDataClosetAandDataClosetC&(2)LC-LC50PatchCables

RequestforProposal

BreitungTownshipSchools Page4 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

• Vendormustprovideas-builtdocumentsthatshowthenewdatadrop,itslocationanditsport

numberinthepatchpanel.

Itishighlyrecommendedthatthevendorscheduleawalk-throughofthebuildingpriortobiddingonSection3ofthisproject.

Section4-UninterruptablePowerSupplies(UPS)andBatteriesforAPCUPS

• Four(4)RackMountedAPC1500VAUPS(orequivalent)• Three(3)replacementbatterypacksforexistingAPCSUA1500RM2UUPS(RBC24)• Five(5)replacementbatterypacksforexistingAPCSMX750UPS

UniversalServiceFund(eRate):

TheBreitungTownshipSchoolDistrictwillapplyforUniversalServiceFundmoniestocover

approximately70%ofthisproject.ThisprojectiscontingentonreceivingeRatefunding.Biddersmust

beanapprovedserviceproviderandincludetheirSPINnumberwiththeirbid.TheUSACwebsitecanbe

foundathttp://www.usac.org/sl/TheeRateCentralwebsite,http://e-ratecentral.com/default.asp,is

alsoanexcellentresourcetofindmoreinformationabouttheeRateprogram.

ProjectTiming:

VendorswillbenotifiedonorbeforeMay15,2017iftheyarethesuccessfulbidder.Theprojectstart

dateiscontingentonreceivingourFundingCommitmentDecisionLetter(FCDL)fromUSAC.Theearliest

possiblestartdateisJuly1,2017.Iftheprojectcannotbecompletedinitsentiretybeforethefirstday

ofschool(9/5/2017),thentheprojectinstallationmustbedoneduringnon-schoolhoursorpostpone

thestartdateChristmasvacation(12/21/17–12/31/2017).Vendorsshallincludeacontingencyofprice

increasesthatwillaccountforprojectdelays.

StagingandOtherfactors:

Dependinguponthetotalcostoftheprojectandtheoverallbudget,theBreitungTownshipSchoolsmay

choosetoscaletheprojectscope.Ifthatisthecase,vendorsshallbeabletoscaletheirproposaland

provideitemizedpricing.Vendorswillbeselectedbasedontheiroverallbidontheentireproject.

Walk-ThroughandProjectManagement/Coordination:

Ifyouwouldliketoscheduleawalk-throughofourbuildingpriortosubmittingproposals,please

contactJeanConstantiniat906-779-2680x2211ore-mailjconstantini@kingsford.org.Itishighly

recommendedthatvendorsbiddingonsection3scheduleawalk-throughsothattheyarefamiliarwith

theconstructionconditions.Overallmanagementandcoordinationoftheprojectwillbehandledby

JeanConstantinioramemberoftheTechCo(TechnologyConsortium)oftheDickinsonIron

IntermediateSchoolDistrict.

RequestforProposal

BreitungTownshipSchools Page5 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

BIDFORM

SECTION1-MerakiAccessPointsand5yearenterpriselicenses.

ITEM Description Qty Cost/Each Total

1 MerakiMR42AccessPoints,equivalentorbetter• SpecifyModel:_____________________

59

2 MerakiEnterpriseCloudControllerLicense(5yr)

59

3 AdditionalProjectCostsorContingency• Providedetail

Lot

4 ShippingCosts(to445HamiltonAvenue,Kingsford,MI49802)

Lot

TOTAL $

Estimateddeliverytimeaftertheorderisplaced_____________weeks

SECTION2–EthernetSwitchesandGigabitTransceivers

ITEM Description Qty Cost/Each Total

1 Twelve(12)48PortPoE+GBSwitchesHP2530-48G-PoE+switchesorequivalent

12

2 Six(6)MultiModefibertransceiver,HPProcurveGigabitSX-LC-Mini-GBICorEquivalent

6

3 AdditionalProjectCostsorContingency• Providedetail

Lot

4 ShippingCosts(to445HamiltonAvenue,Kingsford,MI49802)

Lot

Estimateddeliverytimeaftertheorderisplaced_____________weeks

RequestforProposal

BreitungTownshipSchools Page6 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

BIDFORM

SECTION3–Cat6DataCabling,MultimodeFiberandInstallation(Ref.attachedFloorplans)

ITEM Description Qty Cost/Each Total

1 OnelotCat6DataCablingperenclosedfloorplans

2 Multi-ModeFiberRuninKMSbetweenDataAandDataB&(2)LC-LC50PatchCables

3 Multi-ModeFiberRuninWoodlandbetweenDataAandDataB&(2)LC-LC50PatchCables

4 Multi-ModeFiberRuninWoodlandbetweenDataAandDataC&(2)LC-LC50PatchCables

5 ShippingCosts(to445HamiltonAvenue,Kingsford,MI49802)

Lot

Estimateddeliverytimeaftertheorderisplaced_____________weeks

SECTION4–APCUPSBatteries

ITEM Description Qty Cost/Each Total

1 Four(4)APCSMX750UPS(orequivalent)

4

2 Three(3)replacementbatterypacksAPCSUA1500RM2UUPS(RBC24)

3

3 Five(5)replacementbatterypacksforAPCSMX750UPS

5

4 ShippingCosts(to445HamiltonAvenue,Kingsford,MI49802)

Lot

TOTAL $

Estimatedcompletiontimeaftertheorderisplaced_____________weeks

Floorplans/WiFiLocation

BreitungTownshipSchools Page7 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

KITCHEN

High School Media Center

AUDITORIUM

DATAC

C C

W

C

C

C

C

C

CCC

C

C

C

C

C

C

C

W

C C

C

C

C

C

C

W W W

WW

W

W

W

W

W

W

W

WW

W W

C

1

1

2

5

2

30

Floorplans/WiFiLocation

BreitungTownshipSchools Page8 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

CAD/DRAFTING

COMP. LAB

TEACHER'SLOUNGE

BOYS' LOCKER RM.

GIRLS' LOCKER RM.

DATAA

DATABC

C

C

C

C

C

C

C C C

C

C

C

C

C

C C C C

C

C

C

C

C

COMP. LAB

W

W

W

W

W

W

W

W

W

W W

C

C

C

C

C C

W

C

C

C C

NEW MM FIBERDATA A TO DATA B

24 NEW DROPSFROM DATA A

2

24

1c1c

2c

1c

1c1c

2c

1c

Floorplans/WiFiLocation

BreitungTownshipSchools Page9 RFPNetworkUpgrades2017(eRate),Rev.1withFCC470Number.docx

Woodland Elementary SchoolScale: None

UP. ELCOPY RM.

WOODLANDOFFICE

C C

CC

C CC

C C CC

C

CCC

C

C

C

C

C

C C

C

C C C

C

CC C C

CC

CC

C

C

C

C CC

C

CC

C

C

CC

C

C

C

C

C

C

C

C

W

C

C


Recommended