1 | Page CUYAHOGA COMMUNITY COLLEGE Office of Supplier Managed Services (SMS) 700 Carnegie Ave. Cleveland, OH 44115 Request for Proposal ISSUED: September 29, 2017 Air Handling Unit Replacement Manufacturing Technologies Center (MTC) Metro Campus Tri-C Project No. C20187060 PRE-BID MEETING DATE: October 6, 2017 BID DUE DATE: October 20, 2017
Transcript

1 | P a g e

CUYAHOGA COMMUNITY COLLEGE

Office of Supplier Managed Services (SMS)

700 Carnegie Ave.

Cleveland, OH 44115

Request for Proposal

ISSUED: September 29, 2017

Air Handling Unit Replacement

Manufacturing Technologies Center (MTC)

Metro Campus Tri-C Project No. C20187060

PRE-BID MEETING DATE: October 6, 2017

BID DUE DATE: October 20, 2017

2 | P a g e

=Table of Contents

1 Introduction

1.1 Project Overview

2 Submitting Your Proposal

2.1 Contacts

2.2 Preparation of Proposal

2.3 Supplier Diversity

3 Administrative and Contractual Information

3.1 Award of Contract

3.2 Pricing

3.3 Delivery of Products and Services

3.4 Billing

3.5 Contract and License Agreements

4 Terms and Conditions

4.1 Entire Agreement

4.2 Time of Performance

4.3 Contract Amendments

4.4 Insurance

4.5 Indemnification

4.6 Other Benefits

4.7 Non-Disclosure

4.8 Publicity

4.9 Severability

4.10 Assignment

4.11 Observance of College Rules and Regulations

5 Additional Information & Requirements

Appendix A: Proposal Form – 1 page

Appendix B: Bidder’s Certification and Authorization to Execute – 3 pages

Appendix C: Scope of Work Document – 1 pages

Appendix D: Close-out Checklist – 1 page

Appendix E: Delinquent Personal Property Tax Affidavit – 1 page

3 | P a g e

1 INTRODUCTION

Cuyahoga Community College District (Tri-C) is issuing this Request for Proposal (RFP) and inviting

responses for the goods and services described in the accompanying specifications according to the

terms, conditions, and requirements herein.

Vendors responding to this RFP shall be herein called the “Bidder.”

1.1 Project Overview

This project is to replace existing air handling unit M-108 in the MTC building. This air handling unit

will also require integration into the building automation system. Please refer to the following

drawings created by R.E. Warner.

Dwg. No. G001 – Cover sheet

Dwg. No. M001 – Mechanical Legend & Abbreviations

Dwg. No. M101 – Mechanical Demo Plan & Section

Dwg. No. M201 – Mechanical Plan & Section

Dwg. No. M501 – Mechanical Schedule & Details

Dwg. No. M701 – Mechanical Controls Diagram

Dwg. No. E001 – Electrical General Notes

Dwg. No. E101 – Electrical Demo Plan

Dwg. No. E201 – Electrical Power Plan

Specific information about Cuyahoga Community College can be obtained at www.tri-c.edu .

2 SUBMITTING YOUR PROPOSAL

Bidders are cautioned to read the information contained in this RFP carefully. Bidders must submit

complete responses to all requirements and questions, in the order listed, and in accordance with the

instructions specified in this RFP.

A pre-bid review meeting will be held on October 6, 2017 at 2:00 PM. The location of the meeting will

be at the MTC Lobby.

The Bid Due Date is October 20, 2017, by 2:00 PM. Proposals must be received at the location set forth

below. Late proposals will not be accepted. Tri-C will confirm receipt of hard copies with a date and

time stamp. No public opening is planned.

See Appendix A: Proposal Form

See Appendix B: Bidder’s Certification and Authorization to Execute

Two hard-copy proposals (one electronic copy to [email protected]) are to be submitted to:

4 | P a g e

Cuyahoga Community College

Supplier Managed Services (SMS)

700 Carnegie Avenue, Cleveland, OH 44115

Attn: Rob Ruppe

2.1 Contacts

Bidders must direct all technical questions regarding this RFP to Farres Sarrouh at RE Warner.

Procurement-related questions should be directed to Rob Ruppe.

Buyer Technical

Name: Rob Ruppe

Title: Buyer

Phone: 216-987-4719

Fax: 216-987-3495

Email: [email protected]

Name: Farres Sarrouh

Title: Project Manager

Phone: 440-835-9400

Fax: 440-835-9474

Email: [email protected]

2.2 Preparation of Proposal

In submitting a proposal or in its performance under an award by Tri-C, the successful Bidder warrants

and represents that it is not suspended or debarred by the Federal Government or the State of Ohio.

Bidders must notify Tri-C promptly of any ambiguity, inconsistency, or errors.

Tri-C will not provide compensation for any expenses incurred by the Bidder for preparation of the

proposal or for product or service demonstrations.

Tri-C will not assume responsibility for errors or misinterpretations resulting from the use of

incomplete documents.

Tri-C may not consider proposals that require or request changes to the terms of this RFP.

Proposals and any other information submitted in response to this proposal are the property of the

Tri-C, and will not be returned.

2.3 Supplier Diversity Tri-C is committed to diversity and to supporting Greater Cleveland’s economy. All suppliers are

encouraged to do business with Tri-C. Tri-C encourages all Bidders to exceed the following

expectations:

a. Supplier Participation: 15% minority, 5% female, and 3% veteran.

b. Workforce Diversity: 20%

3 ADMINISTRATIVE AND CONTRACTUAL INFORMATION

Tri-C reserves the right to reject any or all proposals received as a result of this RFP, modify

specifications proposed, waive any formalities or technicalities, or negotiate separately with any source and in any manner whatsoever.

5 | P a g e

Tri-C does not discriminate in admission, access, or treatment in programs and activities,

employment policies or practices based on race, creed, sex, color, national or ethnic origin, religion,

marital status, age, sexual orientation, Vietnam-era or qualified disabled veteran status, or qualified

disability.

3.1 Award of Contract

Tri-C, at its sole discretion, shall decide if an award will result from this RFP.

Proposals must be fully responsive to all requirements stated in the RFP to obtain consideration. Tri-C

may not consider any proposal not prepared and submitted in accordance with the provisions outlined

herein.

In the event a contract is awarded, this RFP and the proposal of the successful Bidder will be included as an addendum to the contractual obligations. Therefore, no information should be submitted which cannot be incorporated into that agreement.

Price alone will not be the sole determining factor in the selection process.

Tri-C reserves the right to award based on various selection criteria.

Tri-C is not bound to accept the lowest cost proposal, if in its judgment the lowest cost proposal

does not provide the best overall value.

Portions of the RFP may be awarded separately.

Tri-C reserves the right to negotiate the final details of the Contract with the successful Bidder.

Pricing

Labor Requirements:

o The Bidder shall base its bid upon the prevailing rates of wages as ascertained by the Ohio

Department of Commerce, Wage and Hour Bureau. Comply with ORC Section 4115.03

through 4115.04

o “New” construction threshold is $250,000.

o “Reconstruction, enlargement, alteration, repair, remodeling, renovation, or painting”

threshold is $75,000.

The prevailing wage rates are available at the Ohio Department of Commerce’s web site;

http://com.state.oh.us/.

Any price increase granted by Tri-C will be in the form of a written addendum to the original

purchase order.

3.2 Delivery of Products and Services

Delivery requirements including inside delivery, and or installation for products and services are to be

coordination with Cuyahoga Community College or its designee, Late deliveries may be assessed a late

fee.

Additionally deliveries of products & services must also be coordinated and scheduled with

Tri-C.

Target delivery/installation date ranges are: From issuing of purchase order to December 31,

2017 for all items in the Project.

6 | P a g e

3.3 Billing

Invoices must reflect the purchase order number and be submitted to:

Cuyahoga Community College

Capital & Construction

700 Carnegie Avenue

Cleveland, Ohio 44115

Attention: Nancy Stopp

Or emailed to [email protected]

3.4 Contract and License Agreements

Respondents must comply with all State of Ohio and Federal regulations concerning wages, liability

insurance, worker’s compensation, discrimination, intimidation, and any other applicable regulations.

4 TERMS AND CONDITIONS Tri-C’s Terms and Conditions are accessible on our web site at:

http://www.tri-c.edu/administrative/sms/Documents/Terms.pdf

4.1 Entire Agreement

The RFP and any resulting Contract shall be the complete and exclusive statement of the agreement between Tri-C and the Bidder and supersedes all prior oral or written agreements. The terms and conditions of any purchase order, agreements, amendments, modifications, or other documents submitted by either party which conflict with or in any way purport to amend or add to any of the terms and conditions of the Contract are specifically objected to by the other party and shall be of no force or effect; nor shall govern in any way the subject matter hereof, unless set forth in writing and signed by both parties.

4.2 Time of Performance Bidder agrees to perform all obligations and render services set forth in the Contract, in accordance with the schedules herein and as mutually agreed upon between Tri-C and the Bidder during the term of the Contract.

4.3 Contracts Amendments

The Contract may be amended within the Contract period by mutual consent of both parties. No

modification or amendment to the Contract shall become valid unless in writing and signed by both

parties. All correspondence regarding modifications or amendments to the Contract must be forwarded

to Tri-C’s Vice President of Financial Services for prior review and approval.

4.4 Insurance

A. For any Contract which requires the Bidder to provide on-site services, prior to commencement of work, Bidder shall provide Tri-C with Certificates of Insurance in the amounts shown below as a minimum requirement and shall maintain such coverage in effect for the duration of the contract.

The insurer must be rated at least an ‘A’ by A. M. Best and Company.

Worker’s Compensation Statutory

Employer’s Liability $1,000,000

7 | P a g e

Comprehensive General Liability $1,000,000 each occurrence $2,000,000 in the aggregate

Comprehensive Automobile Liability (Any auto, hired auto, non-owned auto) a) Bodily Injury $ 500,000 each occurrence b) Property Damage $ 500,000 each occurrence

If any part of the Contract is sublet, similar insurance shall be provided by or on behalf of the subcontractor to cover the subcontractor’s operations. The Bidder shall provide evidence of such insurance. In the event a subcontractor is unable to furnish insurance in the limits required under the Contract, the Bidder shall endorse the subcontractor as an additional insured on the Bidder’s policies.

The Bidder and Tri-C will include reciprocal “hold harmless” language in the contractual agreement.

B. Bidder shall deliver to Tri-C:

1. Certificates evidencing the existence of all such insurance promptly after the execution and delivery of contract and prior to the continued or additional performance of any services to be performed by the Bidder from or after the date of any agreement or purchase order; and

2. Such Certificates shall name Tri-C and its Board of Trustees as additional insured, with the exception of Workers Compensation and Employers Liability, and shall provide that the policies will not be cancelled until after 30 days unconditional written notice to Tri-C, giving Tri-C the right to pay the premium to maintain coverage.

C. The insurance policies required in this RFP shall be kept in force for the periods specified below:

1. The Bidder shall keep Commercial General Liability Insurance in force until receipt of final payment.

2. Workers’ Compensation Insurance shall be kept in force until the Bidder’s obligations have

been fully performed and accepted by Tri-C in writing.

D. The Bidder shall provide Tri-C a full and complete copy of any insurance policy promptly upon request by Tri-C, and without charge.

4.5 Indemnification The Bidder agrees to indemnify Tri-C, its officers, agents, employees, and/or subcontractors and hold them harmless from any and all liability (statutory or otherwise), claim, suit, demand, damage, judgment, cost, interest, and expense including but not limited to reasonable attorneys’ fees and charges, which the Bidder may incur or pay out, by reason of or resulting from the performance of Bidder; or by any negligent act or omission by Bidder, its officers, agents, employees, and/or subcontractors in connection with any resulting Agreement, other than as may result from the gross negligence or willful misconduct of Tri-C. Furthermore, the indemnification contained herein may not be assigned of subrogated to any third party, whether by operation of law or otherwise. The indemnities herein shall survive the termination of any agreement or purchase order for any reason whatsoever.

4.6 Other Benefits

It is understood and agreed that no benefits, payments or considerations received by Bidder for the performance of services associated with and pertinent to a resulting Contract shall accrue directly or

8 | P a g e

indirectly to any employees, elected or appointed officers or representatives, persons identified as agents of, or who are by definition an employee of Tri-C.

4.7 Non-Disclosure

The Bidder and Tri-C acknowledge that in the performance of a resultant Contract employees of either parties may come into the possession of proprietary or confidential information owned by or in the possession of the other. Neither party shall use any such information for its own benefit or make such information available to any person, firm, corporation, or other organization regardless of whether directly or indirectly affiliated with the Bidder or Tri-C, unless: (1) required by law; (2) by order of any court or tribunal; (3) such disclosure is necessary for the assertion of a right or defense of an assertion of a right; by one party against the other party hereto; or (4) such information has been acquired from other sources.

4.8 Publicity

The Bidder agrees that it shall not publicize the Contract or disclose, confirm, or deny any details thereof to third parties; use any photographs or video recordings of Tri-C employees; or use Tri-C’s name in connection with any sales promotion or publicity event without the prior express written approval of Tri-C.

4.9 Severability

In case any provision hereof, or of any resulting agreement or purchase order, shall, for any reason be held invalid or unenforceable in any respect, such invalidity or unenforceability shall not affect any other provision thereof, and this Contract shall be construed as if such invalid or unenforceable provision had not been included herein.

4.10 Assignment

This agreement is with the Bidder, and Bidder’s interest in such agreement, duties hereunder, and/or fees due hereunder may not be assigned or delegated to a third party.

4.11 Observance of College Rules and Regulations

The Bidder agrees that at all times its employees will observe and comply with all regulations of Tri-C, including but not limited to smoking, parking, facility usage and security regulations. As of August, all Tri-C campuses are 100% smoke free (inside and out).

5 ADDITIONAL INFORMATION

A. PRICING OF PROPOSAL

Each proposal is to be submitted on the attached Bid Form. Complete all of the relevant blank spaces

and requested information. These forms must be properly signed.

Proposals are to be submitted in a sealed envelope and labeled:

“PRICING – C20187060 MTC Air Handler Replacement”

Installation will be performed under direct coordination of the selected Bidder and Cuyahoga

Community College.

If you are not able to provide the specified product, please indicate “N/A” (for not applicable). Refer to

Paragraph 5.D for Substitutions.

9 | P a g e

It is requested that Bidders who may have any questions pertaining to these documents, or any concerns

that may be in doubt as to the true meaning of any part of the RFP documents, shall submit to R.E.

Warner and Associates a faxed or email request for an interpretation thereof. The person submitting the

request will be responsible for its prompt delivery. Any interpretation of the proposed documents will

be made by Addendum duly issued and a copy of such Addendum will be e-mailed, delivered, or faxed

to each person receiving a set of pricing documents.

Pricing for the above described work must be submitted on the blank summary sheets furnished with the

pricing documents. Said pricing must be submitted in duplicates.

B. WITHDRAW OF PROPOSAL

No bidder may withdraw their proposal for a period of (90) days after the date of opening.

C. REJECTION OR ACCEPTANCE OF PRICING PROPOSAL

Cuyahoga Community College reserves the right to reject any or all proposal and any part or parts of

any proposal and the right to waive any informalities of any kind.

D. SUBSTITUTIONS

Proposed substitutions are to be e-mailed or faxed to Phil Pallone’s attention for review. The

substitution shall be included if and only if written approval is received via Tri-C’s addendum.

Proof of equality & a comparison to basis of specification shall be included with each proposed

substitution.

Substitutions are to be delivered to Farres Sarrouh at RE Warner’s office no later than 2 PM on

October 16, 2017.

E. PRODUCT

Workmanship and materials will be warranted for a period of not less than one year from the date of

final acceptance by Tri-C. Should defects develop within warranty period, the manufacturer and/or the

Bidder, shall remedy the defects and reimburse Tri-C for all damage to other work, whether caused by

the defects or the work of correcting the same. Warranties extending beyond the one-year period shall

be specifically provided in the Contract and may be fulfilled by the written warranty of the

manufacturer.

F. DELIVERY, STORAGE, & HANDLING

The Bidder shall be responsible for the receipt of products and supplies necessary to provide a complete

installation. All deliveries shall be scheduled and coordinated with the individual campus plant

managers. Materials must be promptly installed after delivery. All products shall be delivered in good

condition and in its original and unopened packaging and covering.

G. DESIGN SERVICES

N.A.

10 | P a g e

H. SUBMITTALS

The following items shall be submitted at Bid Time:

1. Completed Bid Form.

2. Certificate of Insurance (ACCORD Form is acceptable)

3. Up-dated W-9 Form.

4. Registered, Legal Name of Vendor.

5. List of three past or current projects of similar size, include Owner’s contact information.

The following items shall be submitted within 10 days of Contract:

6. Product Data / MSD sheets of all products included in Bidder’s bid package.

7. List of sub-contractors of whom you would be working with on this project (i.e. General Trades,

Mechanical, Electrical, Installation groups, etc).

I. INSTALLATION

The Bidder will have full-time personnel capable of completing the job requirements in the project

timeframe. Installation will be in accordance with the manufacturer’s installation procedures. The

Bidder will be responsible for the removal of all trash and debris associated with the installation of all

materials in this project.

Installation Services: The Bidder (Contractor) shall (where applicable):

1. Notify the College One (1) week prior to performance of work. Timing of work shall be

coordinated with the College.

2. Conduct an inspection of the building to identify phasing and staging or any restrictions,

which might impact project installation activities.

3. Identify appropriate delivery area with Tri-C; use freight or passenger elevator permitted only

with approval of the College, if applicable. Elevator may not be available for use at all times.

4. Provide all necessary equipment required to transport.

5. The site is to be left “broom-cleaned” daily.

6. Coordinate the work of all trades along with other contractors, owner, etc. as necessary for

project completion. Submit a project schedule one (1) week after NTP. Two-week detailed

construction/installation schedule look-aheads are required to be updated bi-weekly.

11 | P a g e

7. Protect all doors, door jambs, walls, and floor finishes from construction/installation

activities.

8. Repair all scratches, tears, and dents that were a result of construction/installation activities.

9. Contractor to provide on-site field supervisor during full-term of on-site work. Cost of this

person shall be included in the Bidder’s bid.

10. Safety

a. Bidders are to comply with all pertinent sections of CFR 1926 (OSHA) and related codes.

Provide required signage, temporary protection, and barricades necessary for the

protection of the public. Hard hats, safety glasses, and appropriate work gloves are

required to be worn by contractors’ labor force at all times.

11. Installation

a. Related Documents

1) Scope of Work Document Appendix C

b. Excess Materials

1) Turn over to Tri-C upon request.

c. Labor Requirements

1) The Bidder shall base its bid upon the prevailing rates of wages as ascertained

by the Ohio Department of Commerce, Wage and Hour Bureau. Comply with

ORC Section 4115.03 through 4115.04.

a. “New” construction threshold is $250,000.

b. “Reconstruction, enlargement, alteration, repair, remodeling,

renovation, or painting” threshold is $75,000.

2) Use adequate numbers of skilled workmen who are thoroughly trained and

experienced in the necessary crafts and who are completely familiar with the

specified requirements and the methods needed for proper performance of the

work in this section.

d. Examination

1) Examine Project site 24 hours before performing work, including loading dock

area, elevators, and staging area, to ensure conditions are satisfactory for

proper performance of work. Existing damage to building or debris that

hinders performance shall immediately be called to the attention of the

campus’ plant manager and Phil Pallone.

a. Examine substrate and conditions under which work is to be performed.

2) Examine materials or equipment immediately upon delivery and again prior to

installation. Reject damaged or defective items.

3) Do not proceed until unsatisfactory conditions have been corrected.

e. Performance of Work:

1) Provide Scope as identified in this RFP.

2) Comply with manufacturer’s installation instructions and recommendations.

3) Provide connection devices, hardware and accessories required for complete

installation.

4) Install components securely into place at heights and dimensions

indicated.

12 | P a g e

f. Cleaning

1) Remove material and debris from Project site at the end of

each working day. The job site is to be maintained in a clean, orderly

condition and kept free from the accumulation of waste materials and rubbish.

g. Finishes

1) Factory or site finish, color, sheen, and texture shall be uniform.

h. Protection 1) Cover, ventilate, and protect work to protect from damage caused by

weather, moisture, heat, staining, dirt, abrasions, or other conditions that may

adversely affect appearance or use.

2) Protect against deterioration of finish, warpage, distortion, twisting, opening of

joints and seams, delamination, or other injury.

3) Limit exposure to the following:

a. Excessively high or low temperatures

b. Excessively high or low humidity

c. Water/mold

d. Solvents

e. Puncture

f. Abrasion

g. Spoiling, staining, and corrosion

h. Rodent and insect infestation

i. Combustion 12. Project Closeout:

a. See Appendix D: Close-out Checklist

b. Final Cleaning

1) Cleaning: Employ experienced workers or professional cleaners for final

cleaning. Clean surfaces to the condition expected in building cleaning and

maintenance program. Comply with manufacturer’s instructions.

a) Complete the following cleaning operations before requesting inspection

for Certification of Contract Completion: i. Remove labels that are not required to be permanent

ii. Clean exposed hard-surfaced finishes to a dust-free condition, free

of stains, films, and similar foreign substances.

iii. Remove temporary protection

iv. Repair finished surfaces damaged during project to like new

condition.

13. Scope of Work:

a. Refer to the enclosed Appendix C Scope of Work Document and R.E. Warner

drawings for detailed scope and specifications.

13 | P a g e

Appendix A

Proposal Form

MTC Air Handling Unit Replacement Tri-C Project No. C20187060

Having read the Request for Proposal, prepared by the Office of the Capital & Construction, Cuyahoga Community

College District Office, Cleveland, Ohio 44115 and having also received, read, and taken into account any Addendum

and likewise having inspected the sites of, and conditions affecting and governing the construction of the said project,

the undersigned hereby proposes to furnish all material and to perform all labor, as specified in this RFP for the said

work, for the following sum(s) (please round all numbers to the nearest dollar):

Time of Completion It is expected that the work in this Contract shall be completed by December 31, 2017. Anticipated P.O. / NTP is

October 27, 2017.

ITEM I – Base Bid Scope: All work done during normal hours (weekdays 8am-5:30pm)

For the Sum of: $_______________________________

Sum in words: __________________________________________________________________________________

ITEM 2 – Alternate #1: Additional fee if all work done is after hours and/or weekends

For the Sum of: $_______________________________

Sum in words: __________________________________________________________________________________

Signature:

Printed Name:

Title:

Company:

Date:

14 | P a g e

Appendix B

Bidder’s Certification and Authorization to Execute The Bidder hereby acknowledges that the following representations in this bid are material and not mere

recitals:

1. Bidder has read and understands the Contract Documents and agrees to comply with all requirements

of the Contract Documents, regardless of whether the Bidder has actual knowledge of the requirements

and regardless of any statement or omission made by the Bidder, which might indicate a contrary

intention.

2. The Bidder represents that the bid is based upon the Standards specified by the Bidding Documents.

3. Bidder has become familiar with local conditions and has correlated personal observations about the

requirements of the Bidding Documents. The Bidder has no outstanding questions regarding the

interpretation or clarification of the Bidding Documents.

4. Bidder understands that the award of the Single Prime Contract for the Project will require sequential,

coordinated and interrelated operations, which may involve interference, disruption, hindrance or

delays in the progress of the Bidder's Work. The Bidder agrees that the Contract price, as amended

from time to time, shall cover all amounts due from Tri-C resulting from interference, disruption,

hindrance or delay caused by or between its Subcontractors or his agents and employees. The Bidder

agrees that any such interference, disruption, hindrance or delay is within the contemplation of the

Bidder and Tri-C and that the Bidder’s sole remedy for any such interference, disruption, hindrance or

delay shall be an extension of time in accordance with the Contract Documents. This provision is

intended to be, and shall be construed as, consistent with, and not in conflict with, Section 4113.62,

ORC.

5. During the performance of the Contract, the Bidder agrees to comply with OAC Chapters 123:2-3

through 123:2-9 and agrees to incorporate the provisions contained in the Ohio Administration Code

Section 123:2-9-01 into all subcontracts on the Project, regardless of tier. The Bidder understands that

the Ohio Equal Opportunity Center may conduct pre-award and post-award compliance reviews to

determine if the Bidder maintains nondiscriminatory employment practices, maintains an affirmative

action program and is exerting good faith efforts to accomplish the goals of the affirmative action

program. For a full statement of the rules regarding Equal Employment Opportunity in the

Construction Industry, see OAC Chapters 123:2-1 through 123:2-9.

6. The Bidder and each person signing on behalf of the Bidder certifies, and in the case of a joint or

combined bid, each party thereto certifies as to such party's organization, under penalty of perjury, that

to the best of the undersigned's knowledge and belief: (a) the Base Bid, any Unit Prices and any

Alternate Bid in the bid have been arrived at independently without collusion, consultation,

communication or agreement, for the purpose of restricting competition as to any matter relating to

such Base Bid, Unit Prices or Alternate bid with any other Bidder; (b) unless otherwise required by

law, the Base Bid, any Unit Prices and any Alternate bid in the bid have not been knowingly disclosed

by the Bidder and will not knowingly be disclosed by the Bidder prior to the bid opening, directly or

indirectly, to any other Bidder who would have any interest in the Base Bid, Unit Prices or Alternate

15 | P a g e

bid; (c) no attempt has been made or will be made by the Bidder to induce any other individual,

partnership or corporation to submit or not to submit a bid for the purpose of restricting competition.

7. Bidder understands that the Contract is subject to all the provisions, duties, obligations, remedies and

penalties of Chapter 4115, ORC, "Wages and Hours on Public Works," and that the Bidder shall pay

any wage increase in the locality during the term of the Contract.

8. The Bidder shall pay the prevailing wage rates of the Project locality, as issued by the Ohio Department

of Commerce Wage and Hour Bureau, to laborers and mechanics performing Work on the Project.

9. If the Bidder or its Subcontractors fail to comply with O.R.C Chapter 4115, Tri-C may withhold

payment. The Bidder is liable for violations committed by the Bidder and/or its Subcontractors.

10. Bidder certifies that upon the award of a Contract, the Bidder will make a good faith effort to ensure

that all of the Bidder’s employees, while working on Tri-C property, will not purchase, transfer, use or

possess illegal drugs or alcohol or abuse prescription drugs in any way and will ensure that its

employees will not carry any firearm onto Tri-C premises or job site.

11. Bidder agrees to furnish any information requested by Tri-C to evaluate the responsibility of the Bidder.

12. Bidder certifies that it is enrolled and in good standing in an Ohio Bureau of Workers’ Compensation

(BWC) Drug Free Workplace Program (DFWP) or an equivalent BWC approved DFWP. Bidder

certifies that it will require each of its Subcontractors on the Project to also be enrolled in a BWC

approved DFWP and will submit confirmation of enrollment of its Subcontractors to Tri-C with this

Bidder’s Certification.

13. Bidder certifies that the Personal Property Tax Certificate attached hereto is true and accurate in all

respects.

14. All signatures must be original.

15. By signature hereto, Bidder offers and agrees to furnish products and / or services as proposed and

comply with all terms, conditions, and requirements set forth in the RFP documents contained herein.

16. Bidder further certifies that all statements and information prepared and submitted in response to

this solicitation are complete and accurate.

17. Bidder certifies that the individual signing this document and documents made part of the RFP is

authorized to sign documents on behalf of the said company and to bind the company under any

Contract that may result from the submission of a proposal.

18. Bidder certifies compliance with all Federal laws and regulations pertaining to Equal Employment

Opportunities and Affirmative Action.

16 | P a g e

BIDDER’S NAME: ___________________________________

Authorized Signature:

Date Signed:

Print Name:

Title:

Company Name:

Mailing Address:

Telephone Number:

Facsimile Number:

E-Mail Address:

Where Incorporated:

Federal Identification Number:

Contact person for Contract processing:

Date enrolled in an OBWC-approved

DFWP (month/date/year): ____________/____________/__________

President or Primary Officer Name and Title:

Acknowledge Receipt of all Addenda:

Appendix C

p. 1 of 1

Scope of Work Document – MTC Air Handling Unit Replacement

This project is to remove and replace the existing air handling unit (M-108) in the Manufacturing

Technologies Center. The contractor is to remove and dispose of the existing air handling unit following

all applicable guidelines and codes. The contractor is then to replace the unit with one of equal

performance as specified in the construction drawings created by R.E. Warner and Associates. The scope

of this project also includes integrating the new unit into the existing building automation system. The

contractor shall maintain a safe work area and properly clean all debris and unused material from the

construction area at the end of each work day.

Please refer to the following drawings created by R.E. Warner and Associates.

Dwg. No. G001 – Cover sheet

Dwg. No. M001 – Mechanical Legend & Abbreviations

Dwg. No. M101 – Mechanical Demo Plan & Section

Dwg. No. M201 – Mechanical Plan & Section

Dwg. No. M501 – Mechanical Schedule & Details

Dwg. No. M701 – Mechanical Controls Diagram

Dwg. No. E001 – Electrical General Notes

Dwg. No. E101 – Electrical Demo Plan

Dwg. No. E201 – Electrical Power Plan

Appendix D

N/A Included Not Included

Closeout Forms / Certifications Required (3 original copies to Owner required):

Closeout Action Items and Record Documents (3 original copies to Owner required):

Reviewed by:

Name: Signature Date:

Name: Signature Date:

Name: Signature Date:

Plant Manager

Capital and Construction

Project Location

Contract Completion Checklist

Address:

Project Name: Contractor Name:

Project Number:

Affidavit of Contractor/Subcontractor

Affidavit of Compliance to Prevailing Wages for each sub

Final Certification of Contract Completion

Partial Certification of Contract Completion

Certification of Equipment Demonstrations

Warranties and Guarantees, including the most recent address and telephone number of

any Subcontractors, Material Suppliers, or manufacturers

Construction Manager (or Architect / Engineer for Stipulated Sum Contracts)

Detailed Drawings - concealed utilities, MEP systems

Payment Release Affidavit

Final Certified Payroll Reports

Updated Form 26

Certification of Warranty Commencement

Waiver of Lien

As-Built Drawings

Inspection Certificates

Consent of Surety for Final Payment

Letter of Approval - State Fire Marshal for Fire Suppression System

Operations and Maintenance Manuals

Certificate of Occupancy

Final Cleaning

Complete Punch List Work

Extra Material, e.g. Attic Stock, keys, specialized wrenches, etc.

J:\03 Forms, Templates, Processes\07 Construction Phase Requirements\Construction Phase Manual

expanded\Appendix - Expanded\Appendix 5 - Closeout Forms

DPT-01 OSFC

Appendix E Document 00 62 46 Delinquent Personal Property Tax Affidavit

State of Ohio

Ohio Facilities Construction Commission

DELINQUENT PERSONAL PROPERTY TAX AFFIDAVIT (Section 5719.042, ORC)

State of Ohio }

} SS.

County of ________________________ }

The undersigned individual, or duly authorized representative of the identified company, having been first

duly cautioned and sworn, alleges and states that said individual or company has been advised that he has

or it has received a Notice of Intent to Award a Contract(s) let by competitive bid by Cuyahoga

Community College District, on behalf of the State of Ohio under Section 3318.10, ORC, but prior to

the execution of said Contract(s), and pursuant to Section 5719.042, ORC, provides this statement to the

Treasurer under oath that he or it was not charged, on the date the Bid(s) was submitted, with any

delinquent personal property taxes on the general tax list of personal property of

_______________________ County, Ohio, or that he or it is so charged in the following amount:

Delinquent Tax: __________________________________

Penalties and interest due and unpaid: __________________________________

Total (if none, indicate “NONE”) __________________________________

A copy of this sworn statement will be attached to and incorporated into the Contract(s) for this Project

which shall enable payments to be made under said Contract(s).

By: ________________________________________ Date: ____________________, ______

Company:____________________________________________________________________________

Project:

Sworn to and executed before me this _______ day of _________________________, __________

Notary Public

My commission expires: _____________________

CUYAHOGA COMMUNITY COLLEGE

MANUFACTURING TECHNOLOGY CENTER

AIR HANDLING UNIT REPLACEMENT

2415 WOODLAND AVE, CLEVELAND, OH 44115

TRI-C PROJECT NO. C20187060

WARNER

E

2

2

N

D

S

T

C

O

M

M

U

N

IT

Y

C

O

L

L

E

G

E

A

V

E

W

O

O

D

L

A

N

D

A

V

E

E

3

0

T

H

S

T

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
09/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
G001
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE,
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
& LOCATION MAP
AutoCAD SHX Text
FSS
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MRP
AutoCAD SHX Text
08/28/17
AutoCAD SHX Text
NONE
AutoCAD SHX Text
O:\39817\Issue\Bid\G001.dwg FSS 9/28/2017 2:08 PMG001.dwg FSS 9/28/2017 2:08 PM FSS 9/28/2017 2:08 PMFSS 9/28/2017 2:08 PM 9/28/2017 2:08 PM9/28/2017 2:08 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:08 PMFSS on Thursday, September 28, 2017 - 2:08 PM on Thursday, September 28, 2017 - 2:08 PMThursday, September 28, 2017 - 2:08 PM - 2:08 PM2:08 PM
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
DWG No
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
G001
AutoCAD SHX Text
TITLE SHEET & LOCATION MAP
AutoCAD SHX Text
M001
AutoCAD SHX Text
MECHANICAL LEGENDS & SPECS
AutoCAD SHX Text
M101
AutoCAD SHX Text
MECHANICAL DEMO PLAN AND SECTION
AutoCAD SHX Text
M201
AutoCAD SHX Text
MECHANICAL PLAN AND SECTION
AutoCAD SHX Text
M501
AutoCAD SHX Text
MECHANICAL SCHEDULE AND DETAIL
AutoCAD SHX Text
M701
AutoCAD SHX Text
MECHANICAL CONTROLS DIAGRAM
AutoCAD SHX Text
E001
AutoCAD SHX Text
ELECTRICAL GENERAL NOTES
AutoCAD SHX Text
E101
AutoCAD SHX Text
ELECTRICAL DEMO PLAN
AutoCAD SHX Text
E201
AutoCAD SHX Text
ELECTRICAL POWER PLAN
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
N
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
JLR
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
E001
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
JLR
AutoCAD SHX Text
JLR
AutoCAD SHX Text
DLW
AutoCAD SHX Text
9/18/17
AutoCAD SHX Text
NONE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\E001.dwg FSS 9/28/2017 2:06 PME001.dwg FSS 9/28/2017 2:06 PM FSS 9/28/2017 2:06 PMFSS 9/28/2017 2:06 PM 9/28/2017 2:06 PM9/28/2017 2:06 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:06 PMFSS on Thursday, September 28, 2017 - 2:06 PM on Thursday, September 28, 2017 - 2:06 PMThursday, September 28, 2017 - 2:06 PM - 2:06 PM2:06 PM
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
GENERAL NOTES: 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY OF ANY FIELD CONDITIONS THAT COULD ADVERSELY AFFECT THE ELECTRICAL INSTALLATION. 2. CONTRACTOR SHALL COORDINATE THE ELECTRICAL WORK WITH ALL CONTRACTOR SHALL COORDINATE THE ELECTRICAL WORK WITH ALL OTHER TRADES WORKING IN THE SAME AREA. 3. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. LISTED OR LABELED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH ANY INSTRUCTIONS INCLUDED IN THE LISTING OR LABELING. 4. ALL WORK SHALL BE PERFORMED IN A NEAT WORKMANLIKE MANNER ALL WORK SHALL BE PERFORMED IN A NEAT WORKMANLIKE MANNER AND SHALL COMPLY WITH REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE (LATEST EDITION), OWNER'S STANDARD SPECIFICATIONS, AND APPLICABLE LOCAL CODES. 5. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VERIFY THAT ALL BEFORE BEGINNING WORK, THE CONTRACTOR SHALL VERIFY THAT ALL CIRCUIT BREAKERS ARE OPEN AND THAT ALL EQUIPMENT TO BE SERVICED IS DE-ENERGIZED. 6. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING A THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR SUPPLYING A COMPLETE, WORKABLE ELECTRICAL SYSTEM. 7. CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS OF ALL DEVIATIONS CONTRACTOR SHALL MAINTAIN ACCURATE RECORDS OF ALL DEVIATIONS AND CHANGES FROM THE CONTRACT DOCUMENTS INCLUDING DIMENSIONS, LOCATIONS, ROUTES, PANEL SCHEDULES, AND APPURTENANCES TO REFLECT A COMPLETE RECORD OF THE INSTALLED ELECTRICAL SYSTEMS. TURN OVER TO OWNER AT PROJECT COMPLETION. 8. ALL ELECTRICAL EQUIPMENT AND MATERIAL SUCH AS SWITCHES, FUSES, ALL ELECTRICAL EQUIPMENT AND MATERIAL SUCH AS SWITCHES, FUSES, CONDUIT, WIRE AND CABLE, PULLBOXES, AND ASSOCIATED HARDWARE SHALL BE FURNISHED BY THE CONTRACTOR UNLESS OTHERWISE NOTED ON THE DRAWINGS. MATERIAL SHALL BE NEW AND IN PERFECT CONDITION WHEN INSTALLED AND SHALL BE PROTECTED FROM ALL DAMAGE UNTIL FINAL ACCEPTANCE OF THE INSTALLATION. 9. ELECTRICAL CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM THE ELECTRICAL CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM THE OWNER'S REPRESENTATIVE BEFORE MAKING ANY EQUIPMENT SUBSTITUTIONS. THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR ALL CHANGES OF LAYOUT AND DESIGN AS A RESULT OF THE SUBSTITUTIONS. 10. ALL CONDUIT SHALL BE RGS AND SHALL BE UL LISTED. THE MINIMUM ALL CONDUIT SHALL BE RGS AND SHALL BE UL LISTED. THE MINIMUM SIZE SHALL BE 3/4" TRADE DIAMETER UNLESS OTHERWISE NOTED. CONTRACTOR MAY, AT HIS OPTION, USE EMT WITH COMPRESSION FITTINGS WHERE PERMITTED BY CODE. SET SCREW FITTINGS ARE NOT ACCEPTABLE. TYPE MC CABLE IS NOT ACCEPTABLE. TYPE MC CABLE IS NOT ACCEPTABLE. 11. ALL WIRE AND CABLE SHALL BE COPPER 600V TYPE THHN/THWN ALL WIRE AND CABLE SHALL BE COPPER 600V TYPE THHN/THWN UNLESS NOTED OTHERWISE. THE MINIMUM SIZE SHALL BE AWG #12 UNLESS NOTED OTHERWISE. 12. ALL ELECTRICAL EQUIPMENT SHALL BE PROVIDED WITH WIRE ALL ELECTRICAL EQUIPMENT SHALL BE PROVIDED WITH WIRE TERMINATIONS RATED FOR A MINIMUM OF 75 DEGREE CELSIUS. 13. CONTRACTOR SHALL WIRE, CONNECT, CHECK AND TEST ALL ELECTRICAL CONTRACTOR SHALL WIRE, CONNECT, CHECK AND TEST ALL ELECTRICAL EQUIPMENT AND DEVICES, AS INDICATED IN THE CONTRACT DOCUMENTS. 14. ALL CONDUIT SHALL BE CONCEALED IN FINISHED AREAS UNLESS ALL CONDUIT SHALL BE CONCEALED IN FINISHED AREAS UNLESS OTHERWISE NOTED. EXPOSED CONDUIT SHALL BE USED IN MECHANICAL/ELECTRICAL ROOMS AND OTHER UNFINISHED LOCATIONS. 15. ALL DEVICES, EQUIPMENT, FIXTURES AND THE LIKE MUST BE GROUNDED ALL DEVICES, EQUIPMENT, FIXTURES AND THE LIKE MUST BE GROUNDED BY USE OF A PROPERLY SIZED GROUNDING CONDUCTOR. MECHANICAL/ELECTRICAL BONDS OF THE METALLIC RACEWAY SYSTEM SHALL ALSO BE MAINTAINED. 16. ALL BRANCH CIRCUITS AND FEEDERS SHALL CONTAIN AN INSULATED ALL BRANCH CIRCUITS AND FEEDERS SHALL CONTAIN AN INSULATED GROUNDING CONDUCTOR SIZED PER NEC TABLES 250.66, 250.102.C.1, OR 250.122, WHICHEVER IS APPLICABLE, IN ACCORDANCE WITH ELECTRICAL SERVICE AND POWER DISTRIBUTION SPECIFICATIONS. NEUTRAL CONDUCTORS IN RECEPTACLE CIRCUITS SERVING DATA EQUIPMENT LOADS SHALL NOT BE SHARED WITH OTHER CIRCUITS. 17. REFER TO MECHANICAL PLANS FOR EXACT LOCATIONS OF MECHANICAL REFER TO MECHANICAL PLANS FOR EXACT LOCATIONS OF MECHANICAL EQUIPMENT AND LOCATE DISCONNECT SWITCHES IN ACCORDANCE WITH NEC OR AS SHOWN. 18. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF MECHANICAL EQUIPMENT WITH THE MECHANICAL CONTRACTOR. EXACT ELECTRICAL REQUIREMENTS SHALL BE VERIFIED IN THE FIELD WITH THE EQUIPMENT'S NAMEPLATE DATA. THE CONTRACTOR SHALL MAKE APPROPRIATE ADJUSTMENTS TO WIRE AND FUSE SIZES IN ACCORDANCE WITH THE NAMEPLATE DATA. THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL HVAC EQUIPMENT WIRING REQUIREMENTS WITH THE MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. 19. ALL BRANCH CIRCUITS THAT ARE ON SINGLE POLE CIRCUIT BREAKERS ALL BRANCH CIRCUITS THAT ARE ON SINGLE POLE CIRCUIT BREAKERS SHALL HAVE SEPARATE NEUTRAL CONDUCTORS. NO SHARING OF NEUTRAL CONDUCTORS FOR SINGLE PHASE CIRCUITS. 20. THE ELECTRICAL WIRING, CONNECTION AND PROTECTION REQUIREMENTS THE ELECTRICAL WIRING, CONNECTION AND PROTECTION REQUIREMENTS FOR OWNER FURNISHED EQUIPMENT SHALL BE VERIFIED IN THE FIELD WITH THE OWNER'S EQUIPMENT SUPPLIER, AND WITH THE NAMEPLATE DATA. CONTRACTOR SHALL FURNISH THE PROPER NEMA RECEPTACLE CONFIGURATIONS, CONNECTIONS, CORDS AND PLUGS, AND CIRCUITS IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 21. THE DISCONNECTING MEANS FOR ALL MOTORS AND EQUIPMENT SHALL THE DISCONNECTING MEANS FOR ALL MOTORS AND EQUIPMENT SHALL BE INSTALLED IN A "READILY ACCESSIBLE" LOCATION AND SHALL HAVE PROPER WORKING SPACE AS DEFINED IN N.E.C. ARTICLE 100 AND 110. 22. UTILIZATION OF THE PHRASE "PROVIDED BY" WITHIN THE CONTEXT OF UTILIZATION OF THE PHRASE "PROVIDED BY" WITHIN THE CONTEXT OF THESE DOCUMENTS SHALL EXPLICITLY REPRESENT "FURNISHED AND AND INSTALLED BY". 23. BRANCH CIRCUIT WIRE SIZES (AND CONDUITS) SHALL BE INCREASED BRANCH CIRCUIT WIRE SIZES (AND CONDUITS) SHALL BE INCREASED FROM THOSE INDICATED ON THE PLANS TO PREVENT EXCESSIVE VOLTAGE DROP. BRANCH CIRCUITS SHALL BE INSTALLED WITH WIRES OF SUFFICIENT SIZE SO THAT VOLTAGE DROP BETWEEN THE PANEL AND THE LOADS DOES NOT EXCEED A LIMIT OF 3%. 24. CONTRACTOR SHALL WIRE, CONNECT, CHECK, AND TEST ALL ELECTRICAL CONTRACTOR SHALL WIRE, CONNECT, CHECK, AND TEST ALL ELECTRICAL EQUIPMENT AND DEVICES AS INDICATED IN THE CONTRACT DOCUMENTS.
AutoCAD SHX Text
ELECTRICAL ABBREVIATIONS
AutoCAD SHX Text
A
AutoCAD SHX Text
AMPERE
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
HEATING, VENTING, AIR CONDITIONING
AutoCAD SHX Text
AC
AutoCAD SHX Text
ALTERNATING CURRENT
AutoCAD SHX Text
HOA
AutoCAD SHX Text
HANDS-OFF AUTOMATIC
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
JB
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
AFG
AutoCAD SHX Text
ABOVE FINISHED GRADE
AutoCAD SHX Text
KCMIL
AutoCAD SHX Text
ONE THOUSAND CIRCULAR MILS
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AIR HANDLING UNIT
AutoCAD SHX Text
KV
AutoCAD SHX Text
KILOVOLTS
AutoCAD SHX Text
AIC
AutoCAD SHX Text
ASYMMETRICAL INTERRUPTING CURRENT
AutoCAD SHX Text
KVA
AutoCAD SHX Text
KILOVOLT AMPERE
AutoCAD SHX Text
AWG
AutoCAD SHX Text
AMERICAN WIRE GAUGE
AutoCAD SHX Text
KW
AutoCAD SHX Text
KILOWATT
AutoCAD SHX Text
BKR
AutoCAD SHX Text
BREAKER
AutoCAD SHX Text
LTG
AutoCAD SHX Text
LIGHTING
AutoCAD SHX Text
CDT
AutoCAD SHX Text
CONDUIT
AutoCAD SHX Text
MAU
AutoCAD SHX Text
MAKE UP AIR UNIT
AutoCAD SHX Text
CAP
AutoCAD SHX Text
CAPACITOR
AutoCAD SHX Text
MCB
AutoCAD SHX Text
MAIN CIRCUIT BREAKER
AutoCAD SHX Text
CB
AutoCAD SHX Text
CIRCUIT BREAKER
AutoCAD SHX Text
MCC
AutoCAD SHX Text
MOTOR CONTROL CENTER
AutoCAD SHX Text
CKT
AutoCAD SHX Text
CIRCUIT
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
CU
AutoCAD SHX Text
COPPER
AutoCAD SHX Text
MLO
AutoCAD SHX Text
MAIN LUGS ONLY
AutoCAD SHX Text
DISC
AutoCAD SHX Text
DISCONNECT
AutoCAD SHX Text
MSB
AutoCAD SHX Text
MAIN SWITCHBOARD
AutoCAD SHX Text
DN
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
MTD
AutoCAD SHX Text
MOUNTED
AutoCAD SHX Text
DP
AutoCAD SHX Text
DISTRIBUTION PANEL
AutoCAD SHX Text
NEC
AutoCAD SHX Text
NATIONAL ELECTRIC CODE
AutoCAD SHX Text
DPDT
AutoCAD SHX Text
DOUBLE POLE DOUBLE THROW
AutoCAD SHX Text
NFPA
AutoCAD SHX Text
NATIONAL FIRE PROTECTION ASSOCIATION
AutoCAD SHX Text
DS
AutoCAD SHX Text
DISCONNECT SWITCH
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
PB
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text
EC
AutoCAD SHX Text
ELECTRICAL CONTRACTOR
AutoCAD SHX Text
P/C
AutoCAD SHX Text
PHOTOCELL
AutoCAD SHX Text
EF
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
PH ( )
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
EH
AutoCAD SHX Text
ELECTRICAL HEATER
AutoCAD SHX Text
PNL
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
EM
AutoCAD SHX Text
EMERGENCY
AutoCAD SHX Text
PVC
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
RGS
AutoCAD SHX Text
RIGID GALVANIZED STEEL CONDUIT
AutoCAD SHX Text
ETR
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
SW
AutoCAD SHX Text
SWITCH
AutoCAD SHX Text
EUH
AutoCAD SHX Text
ELECTRICAL UNIT HEATER
AutoCAD SHX Text
SWBD
AutoCAD SHX Text
SWITCHBOARD
AutoCAD SHX Text
EWH
AutoCAD SHX Text
ELECTRICAL WATER HEATER
AutoCAD SHX Text
SWGR
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
TC
AutoCAD SHX Text
TIME CLOCK
AutoCAD SHX Text
FA
AutoCAD SHX Text
FIRE ALARM
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
FAAP
AutoCAD SHX Text
FIRE ALARM ANNUNCIATOR PANEL
AutoCAD SHX Text
UH
AutoCAD SHX Text
UNIT HEATER
AutoCAD SHX Text
FACP
AutoCAD SHX Text
FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
UL
AutoCAD SHX Text
UNDERWRITER'S LABORATORY
AutoCAD SHX Text
FLR
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
UNO
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
FU
AutoCAD SHX Text
FUSE
AutoCAD SHX Text
UPS
AutoCAD SHX Text
UNINTERRUPTIBLE POWER SUPPLY
AutoCAD SHX Text
FWE
AutoCAD SHX Text
FURNISHED WITH EQUIPMENT
AutoCAD SHX Text
V
AutoCAD SHX Text
VOLT
AutoCAD SHX Text
GC
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text
VA
AutoCAD SHX Text
VOLT AMPERE
AutoCAD SHX Text
GEN
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VARIABLE FREQUENCY DRIVE
AutoCAD SHX Text
GFI
AutoCAD SHX Text
GROUND FAULT INTERRUPTER
AutoCAD SHX Text
W
AutoCAD SHX Text
WATT
AutoCAD SHX Text
GFCI
AutoCAD SHX Text
GROUND FAULT CIRCUIT INTERRUPTER
AutoCAD SHX Text
WP
AutoCAD SHX Text
WEATHERPROOF
AutoCAD SHX Text
GND
AutoCAD SHX Text
GROUND
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
TRANSFORMER
AutoCAD SHX Text
HP
AutoCAD SHX Text
HORSEPOWER
AutoCAD SHX Text
HOA
AutoCAD SHX Text
HANDS-OFF AUTOMATIC
AutoCAD SHX Text
(NOTE: ALL ABBREVIATIONS MAY NOT BE USED.)

ABB

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
WOODLAND AVE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
JLR
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\E101.dwg FSS 9/28/2017 2:07 PME101.dwg FSS 9/28/2017 2:07 PM FSS 9/28/2017 2:07 PMFSS 9/28/2017 2:07 PM 9/28/2017 2:07 PM9/28/2017 2:07 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:07 PMFSS on Thursday, September 28, 2017 - 2:07 PM on Thursday, September 28, 2017 - 2:07 PMThursday, September 28, 2017 - 2:07 PM - 2:07 PM2:07 PM
AutoCAD SHX Text
UTC KEY PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
N
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
E101
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
DEMOLITION PLAN
AutoCAD SHX Text
JLR
AutoCAD SHX Text
JLR
AutoCAD SHX Text
DLW
AutoCAD SHX Text
9/18/17
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
DEMOLITION NOTES: 1. THE DRAWINGS ARE TO BE USED ONLY AS A GUIDELINE THE DRAWINGS ARE TO BE USED ONLY AS A GUIDELINE FOR DEMOLITION. THE ELECTRICAL CONTRACTOR MUST VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL WORK REQUIRED FOR A COMPLETE JOB AND INCLUDE THE COST OF SUCH WORK IN HIS BID. 2. THE ELECTRICAL CONTRACTOR SHALL MAINTAIN EXISTING THE ELECTRICAL CONTRACTOR SHALL MAINTAIN EXISTING SERVICES TO AND IN THE EXISTING AREA AS REQUIRED. 3. IF NECESSARY, THE ELECTRICAL CONTRACTOR SHALL IF NECESSARY, THE ELECTRICAL CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES IN THE EXISTING AREAS. 4. ANY EXISTING CONDUIT, WIRING AND/OR ELECTRICAL ANY EXISTING CONDUIT, WIRING AND/OR ELECTRICAL DEVICES BEING DISTURBED BY THE WORK SHALL BE REMOVED BY THIS CONTRACTOR OR REPLACED AS REQUIRED TO RETURN TO ITS FORMER EXISTING OPERATING CONDITION. 5. ANY CIRCUITS FEEDING THROUGH WALLS, DEVICES OR ANY CIRCUITS FEEDING THROUGH WALLS, DEVICES OR EQUIPMENT BEING RELOCATED, REWORKED, REMOVED OR ABANDONED AND SERVING OTHER ELECTRICAL DEVICES AND/OR EQUIPMENT SHALL BE MAINTAINED BY PROVIDING J-BOXES OR OTHER ACCEPTABLE METHOD AS REQUIRED. 6. EXISTING MATERIALS SHALL BE TURNED OVER TO THE EXISTING MATERIALS SHALL BE TURNED OVER TO THE OWNER. IF NOT REQUIRED BY OWNER, THE ELECTRICAL CONTRACTOR SHALL DISPOSE OF THESE MATERIALS AS DIRECTED BY THE OWNER. 7. SEE MECHANICAL DEMOLITION DRAWINGS FOR HVAC SEE MECHANICAL DEMOLITION DRAWINGS FOR HVAC EQUIPMENT BEING REMOVED. REMOVE ALL ASSOCIATED ELECTRICAL DEVICES. 8. ISOLATE SOURCE OF POWER AND LOCKOUT, TAGOUT, AND ISOLATE SOURCE OF POWER AND LOCKOUT, TAGOUT, AND TEST TO VERIFY NO POWER TO EQUIPMENT BEING REMOVED
AutoCAD SHX Text
DEMOLITION LEGEND: HATCHING INDICATES EQUIPMENT TO BE REMOVED DURING DEMO.
AutoCAD SHX Text
GENERAL SHEET NOTESNERAL SHEET NOTES
AutoCAD SHX Text
1.
AutoCAD SHX Text
EXISTING ELECTRICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM THAT DESCRIBED IN THE DOCUMENTS.
AutoCAD SHX Text
2.
AutoCAD SHX Text
REFER TO DRAWINGS AND PROJECT SPECIFICATIONS OF OTHER DISCIPLINES FOR ADDITIONAL PROJECT INFORMATION AND REQUIREMENTS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN THE INFORMATION PRESENTED AND FIELD CONDITIONS.
AutoCAD SHX Text
3.
AutoCAD SHX Text
PRIOR TO ANY ISOLATION OF SYSTEMS, SHUTDOWNS OR DEMOLITION, THE CONTRACTOR SHALL PROVIDE NECESSARY INVESTIGATION AND NOTIFY THE FACILITIES ENGINEERING/MAINTENANCE PERSONNEL OF WORK TO BE PERFORMED SO AS TO AVOID ANY DETRIMENTAL SHUTDOWN OF SYSTEMS TO ADJACENT SPACES.
AutoCAD SHX Text
5.
AutoCAD SHX Text
MAINTAIN AND RESTORE, IF INTERRUPTED BY DEMOLITION OR IN THE PATH OF NEW CONSTRUCTION, ALL UTILITIES PASSING THROUGH AND SERVING AREAS OUTSIDE OF DEMOLITION AREA. THIS SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
8.
AutoCAD SHX Text
REFER TO DRAWING E001 FOR ELECTRICAL GENERAL NOTES.
AutoCAD SHX Text
ELECTRICAL DEMOLITION PLAN
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
N
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
LOOKING NORTHEAST
AutoCAD SHX Text
EXISTING AC-2
AutoCAD SHX Text
EXISTING ABB ACH500 VFD FOR AC-2
AutoCAD SHX Text
EXISTING 200A DISC SW FOR AC-2
AutoCAD SHX Text
FED FROM 200A BREAKER IN SWITCHBOARD MDP LOCATED IN BASEMENT.
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
EXISTING ABB ACH500 VFD FOR AC-2
AutoCAD SHX Text
EXISTING AC-2
AutoCAD SHX Text
AC-2 200A
AutoCAD SHX Text
SWITCHBOARD MDP
AutoCAD SHX Text
SWITCHBOARD MDP ELEVATION
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
(LOCATED IN BASEMENT)
AutoCAD SHX Text
DEMOLITION KEYNOTES
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING DISCONNECT CAN REMAIN IF IT IS FUSIBLE. WIRING FROM DISCONNECT TO SWITCHBOARD MDP TO BE RE-USED.
AutoCAD SHX Text
2
AutoCAD SHX Text
VFD AND ASSOCIATED CONDUIT AND WIRE TO BE REMOVED.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: "=1'-0"
AutoCAD SHX Text
4'
AutoCAD SHX Text
3'
AutoCAD SHX Text
2'
AutoCAD SHX Text
1'
AutoCAD SHX Text
0
AutoCAD SHX Text
12"

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
WOODLAND AVE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
JLR
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\E201.dwg FSS 9/28/2017 2:07 PME201.dwg FSS 9/28/2017 2:07 PM FSS 9/28/2017 2:07 PMFSS 9/28/2017 2:07 PM 9/28/2017 2:07 PM9/28/2017 2:07 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:07 PMFSS on Thursday, September 28, 2017 - 2:07 PM on Thursday, September 28, 2017 - 2:07 PMThursday, September 28, 2017 - 2:07 PM - 2:07 PM2:07 PM
AutoCAD SHX Text
UTC KEY PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
N
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
E201
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
POWER PLAN
AutoCAD SHX Text
JLR
AutoCAD SHX Text
JLR
AutoCAD SHX Text
DLW
AutoCAD SHX Text
9/18/17
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text
GENERAL SHEET NOTESNERAL SHEET NOTES
AutoCAD SHX Text
1.
AutoCAD SHX Text
EXISTING ELECTRICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM THAT DESCRIBED IN THE DOCUMENTS.
AutoCAD SHX Text
2.
AutoCAD SHX Text
REFER TO DRAWINGS AND PROJECT SPECIFICATIONS OF OTHER DISCIPLINES FOR ADDITIONAL PROJECT INFORMATION AND REQUIREMENTS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN THE INFORMATION PRESENTED AND FIELD CONDITIONS.
AutoCAD SHX Text
3.
AutoCAD SHX Text
PRIOR TO ANY ISOLATION OF SYSTEMS, SHUTDOWNS OR DEMOLITION, THE CONTRACTOR SHALL PROVIDE NECESSARY INVESTIGATION AND NOTIFY THE FACILITIES ENGINEERING/MAINTENANCE PERSONNEL OF WORK TO BE PERFORMED SO AS TO AVOID ANY DETRIMENTAL SHUTDOWN OF SYSTEMS TO ADJACENT SPACES.
AutoCAD SHX Text
5.
AutoCAD SHX Text
MAINTAIN AND RESTORE, IF INTERRUPTED BY DEMOLITION OR IN THE PATH OF NEW CONSTRUCTION, ALL UTILITIES PASSING THROUGH AND SERVING AREAS OUTSIDE OF DEMOLITION AREA. THIS SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
8.
AutoCAD SHX Text
REFER TO DRAWING E001 FOR ELECTRICAL GENERAL NOTES.
AutoCAD SHX Text
ELECTRICAL POWER PLAN
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
N
AutoCAD SHX Text
AC-2
AutoCAD SHX Text
NEW 200A, 125AF DISC SW FOR AC-2
AutoCAD SHX Text
FED FROM 200A BREAKER IN SWITCHBOARD MDP LOCATED IN BASEMENT SEE DWG E101 FOR ELEVATION
AutoCAD SHX Text
PLAN KEYNOTES
AutoCAD SHX Text
1
AutoCAD SHX Text
AC-2: 460V-3ɸ, MCA=117.8A, MOCP=125A WIRE WITH 3#1/0, 1#6GND IN 2" CONDUIT. ROUTE CONDUIT FROM UNIT VFD TO 200A DISCONNECT SWITCH LOCATED ACROSS FROM UNIT.
AutoCAD SHX Text
2
AutoCAD SHX Text
REUSE EXISTING 200A DISCONNECT IF FUSIBLE, AND INSTALL 125A FUSES. PROVIDE 200A DISCONNECT SWITCH FUSED AT 125A IF EXISTING DISCONNECT IS NOT FUSIBLE IN LOCATION OF DISCONNECT REMOVED DURING DEMOLITION. INTERCEPT AND EXTEND EXISTING WIRING AND CONDUIT MADE AVAILABLE DURING DEMOLITION. RE-USE EXISTING WIRING FROM 200A/3P BREAKER IN SWITCHBOARD MDP LOCATED IN BASEMENT MAIN ELECTRICAL ROOM.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: "=1'-0"
AutoCAD SHX Text
4'
AutoCAD SHX Text
3'
AutoCAD SHX Text
2'
AutoCAD SHX Text
1'
AutoCAD SHX Text
0
AutoCAD SHX Text
12"

WARNER

A B

C

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
M001
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
LEGEND & ABBREVIATIONS
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
MPR
AutoCAD SHX Text
8/11/17
AutoCAD SHX Text
NONE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\M001.dwg FSS 9/28/2017 2:08 PMM001.dwg FSS 9/28/2017 2:08 PM FSS 9/28/2017 2:08 PMFSS 9/28/2017 2:08 PM 9/28/2017 2:08 PM9/28/2017 2:08 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:08 PMFSS on Thursday, September 28, 2017 - 2:08 PM on Thursday, September 28, 2017 - 2:08 PMThursday, September 28, 2017 - 2:08 PM - 2:08 PM2:08 PM
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text
ENTERING WET BULB
AutoCAD SHX Text
EWB
AutoCAD SHX Text
TSTAT
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
UNLESS OTHERWISE NOTED
AutoCAD SHX Text
UNDERWRITERS LABORATORIES, INC.
AutoCAD SHX Text
MAXIMUM OVER CURRENT PROTECTION
AutoCAD SHX Text
MAKE-UP AIR
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MIXED AIR
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MOUNTED
AutoCAD SHX Text
MOTORIZED DAMPER
AutoCAD SHX Text
MOTOR CONTROL CENTER
AutoCAD SHX Text
MTD
AutoCAD SHX Text
MUA
AutoCAD SHX Text
MECH
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MOCP
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MA
AutoCAD SHX Text
MCC
AutoCAD SHX Text
MD
AutoCAD SHX Text
LEAVING WATER TEMPERATURE
AutoCAD SHX Text
LOCKED ROTOR AMPS
AutoCAD SHX Text
1000 BTU PER HOUR
AutoCAD SHX Text
MINIMUM CIRCUIT AMPACITY
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
LIGHTING
AutoCAD SHX Text
LEAVING WET BULB
AutoCAD SHX Text
LEAVING DRY BULB
AutoCAD SHX Text
LOW PRESSURE
AutoCAD SHX Text
LEAVING AIR TEMPERATURE
AutoCAD SHX Text
INTERNALLY LINED
AutoCAD SHX Text
POUNDS
AutoCAD SHX Text
LWB
AutoCAD SHX Text
LWT
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MCA
AutoCAD SHX Text
MBH
AutoCAD SHX Text
LTG
AutoCAD SHX Text
LBS, #
AutoCAD SHX Text
L
AutoCAD SHX Text
LAT
AutoCAD SHX Text
LRA
AutoCAD SHX Text
LDB
AutoCAD SHX Text
LP
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text
H
AutoCAD SHX Text
KILOVOLT-AMPS
AutoCAD SHX Text
KILOWATT-HOUR
AutoCAD SHX Text
KILOWATTS
AutoCAD SHX Text
KVA
AutoCAD SHX Text
KWH
AutoCAD SHX Text
KW
AutoCAD SHX Text
HEAD, HUB DRAIN
AutoCAD SHX Text
HAND-OFF-AUTOMATIC
AutoCAD SHX Text
HORSEPOWER, HEAT PUMP
AutoCAD SHX Text
HUMIDISTAT
AutoCAD SHX Text
HEATER
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
HEATING, VENTILATING & A/C
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
DOMESTIC HOT WATER
AutoCAD SHX Text
HERTZ
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
HYD
AutoCAD SHX Text
HW
AutoCAD SHX Text
HZ
AutoCAD SHX Text
HSTAT
AutoCAD SHX Text
HTR
AutoCAD SHX Text
HTG
AutoCAD SHX Text
HOA
AutoCAD SHX Text
HD
AutoCAD SHX Text
HP
AutoCAD SHX Text
ELECTRICAL CONTRACTOR
AutoCAD SHX Text
GALLON
AutoCAD SHX Text
GALVANIZED
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text
GROUND FAULT INTERRUPTER
AutoCAD SHX Text
GALLONS PER MINUTE
AutoCAD SHX Text
GALLONS PER HOUR
AutoCAD SHX Text
GALLONS PER DAY
AutoCAD SHX Text
GREASE WASTE
AutoCAD SHX Text
GFI, GFIC
AutoCAD SHX Text
GPD
AutoCAD SHX Text
GPM
AutoCAD SHX Text
GPH
AutoCAD SHX Text
GW
AutoCAD SHX Text
GAL
AutoCAD SHX Text
GALV
AutoCAD SHX Text
GC
AutoCAD SHX Text
DEGREES FAHRENHEIT
AutoCAD SHX Text
FOOT, FEET
AutoCAD SHX Text
ENTERING WATER TEMPERATURE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
FIRE ALARM
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FLEXIBLE
AutoCAD SHX Text
FEET PER MINUTE
AutoCAD SHX Text
FULL LOAD AMPS
AutoCAD SHX Text
FLOOR CLEANOUT
AutoCAD SHX Text
FIRE ALARM CONTROL PANEL
AutoCAD SHX Text
EXHAUST
AutoCAD SHX Text
%%dF
AutoCAD SHX Text
FT
AutoCAD SHX Text
FACP
AutoCAD SHX Text
FLEX
AutoCAD SHX Text
FPM
AutoCAD SHX Text
FCO
AutoCAD SHX Text
FD
AutoCAD SHX Text
FLA
AutoCAD SHX Text
FA
AutoCAD SHX Text
EX
AutoCAD SHX Text
EWT
AutoCAD SHX Text
EXH
AutoCAD SHX Text
EC
AutoCAD SHX Text
VARIABLE AIR VOLUME
AutoCAD SHX Text
VAV
AutoCAD SHX Text
W/
AutoCAD SHX Text
W/O
AutoCAD SHX Text
WB
AutoCAD SHX Text
WC
AutoCAD SHX Text
W
AutoCAD SHX Text
VD
AutoCAD SHX Text
VTR
AutoCAD SHX Text
WITH
AutoCAD SHX Text
WET BULB
AutoCAD SHX Text
WATER COLUMN
AutoCAD SHX Text
WITHOUT
AutoCAD SHX Text
VENT THROUGH ROOF
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
WATT, WIDTH
AutoCAD SHX Text
VAC
AutoCAD SHX Text
VA
AutoCAD SHX Text
UON
AutoCAD SHX Text
U/F
AutoCAD SHX Text
U/G
AutoCAD SHX Text
U/S
AutoCAD SHX Text
UL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
VOLT-AMPERE, VALVE
AutoCAD SHX Text
VACUUM
AutoCAD SHX Text
VOLT, VENT
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
UNDERSLAB
AutoCAD SHX Text
UNDERFLOOR
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
SQUARE FEET, SQUARE FOOT
AutoCAD SHX Text
SMOKE DETECTOR, STORM DRAIN
AutoCAD SHX Text
REVOLUTIONS PER MINUTE
AutoCAD SHX Text
SHEET METAL & A/C CONT NAT'L ASSOC.
AutoCAD SHX Text
TOTAL STATIC PRESSURE
AutoCAD SHX Text
STORM WATER
AutoCAD SHX Text
POST INDICATOR VALVE
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
REFLECTED CEILING PLAN
AutoCAD SHX Text
REINFORCING, REINFORCED
AutoCAD SHX Text
NATIONAL ELECTRICAL CODE
AutoCAD SHX Text
NATIONAL ELECTRICAL MFR'S ASSOC.
AutoCAD SHX Text
NATIONAL FIRE PROTECTION ASSOC.
AutoCAD SHX Text
NOISE CRITERIA
AutoCAD SHX Text
OUTSIDE STEM AND YOKE
AutoCAD SHX Text
OCCUPATIONAL SAFETY &HEALTH ADMIN.
AutoCAD SHX Text
OPPOSED BLADE DAMPER
AutoCAD SHX Text
OUTSIDE AIR (VENTILATION AIR)
AutoCAD SHX Text
TEMPERATURE
AutoCAD SHX Text
AMERICAN WATER WORKS ASSOC.
AutoCAD SHX Text
AWWA
AutoCAD SHX Text
RL
AutoCAD SHX Text
REFRIGERANT LIQUID
AutoCAD SHX Text
EXTERNAL STATIC PRESSURE
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
EQUIPMENT
AutoCAD SHX Text
ENCLOSURE
AutoCAD SHX Text
ENTERING DRY BULB
AutoCAD SHX Text
ENTERING AIR TEMPERATURE
AutoCAD SHX Text
DIRECT EXPANSION
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
EACH
AutoCAD SHX Text
DIRECT DIGITAL CONTROL
AutoCAD SHX Text
ESP
AutoCAD SHX Text
ENCL
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
EDB
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
EA
AutoCAD SHX Text
EAT
AutoCAD SHX Text
DX
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DDC
AutoCAD SHX Text
DOMESTIC COLD WATER
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text
DECIBEL
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
DEGREES
AutoCAD SHX Text
DRY BULB
AutoCAD SHX Text
DEGREES CELSIUS
AutoCAD SHX Text
DISCONNECT
AutoCAD SHX Text
DIMENSION
AutoCAD SHX Text
DOWN
AutoCAD SHX Text
DS
AutoCAD SHX Text
DIA (OR %%c)
AutoCAD SHX Text
DN
AutoCAD SHX Text
DISC
AutoCAD SHX Text
DIM
AutoCAD SHX Text
CW
AutoCAD SHX Text
%%dC
AutoCAD SHX Text
dB
AutoCAD SHX Text
DEG
AutoCAD SHX Text
DB
AutoCAD SHX Text
SPEC
AutoCAD SHX Text
SPECIFICATION
AutoCAD SHX Text
TEMP
AutoCAD SHX Text
THRU
AutoCAD SHX Text
TP
AutoCAD SHX Text
TSP
AutoCAD SHX Text
TDH
AutoCAD SHX Text
STD
AutoCAD SHX Text
SUSP
AutoCAD SHX Text
SURF
AutoCAD SHX Text
ST
AutoCAD SHX Text
SQ
AutoCAD SHX Text
TOTAL DYNAMIC HEAD
AutoCAD SHX Text
THROUGH
AutoCAD SHX Text
TOTAL PRESSURE
AutoCAD SHX Text
SUSPEND
AutoCAD SHX Text
STANDARD
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
SQUARE
AutoCAD SHX Text
SMACNA
AutoCAD SHX Text
SM
AutoCAD SHX Text
SP
AutoCAD SHX Text
SECT
AutoCAD SHX Text
SHT
AutoCAD SHX Text
SF
AutoCAD SHX Text
SD
AutoCAD SHX Text
RS
AutoCAD SHX Text
SA
AutoCAD SHX Text
RPM
AutoCAD SHX Text
RLA
AutoCAD SHX Text
SHEET METAL
AutoCAD SHX Text
STATIC PRESSURE
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFRIGERANT SUCTION
AutoCAD SHX Text
SUPPLY AIR
AutoCAD SHX Text
RUNNING LOAD AMPS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CIRCUIT
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CIRCULATING
AutoCAD SHX Text
COLUMN
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
CUBIC FEET PER MINUTE
AutoCAD SHX Text
CUBIC FEET PER HOUR
AutoCAD SHX Text
CKT
AutoCAD SHX Text
L
AutoCAD SHX Text
CLG
AutoCAD SHX Text
COL
AutoCAD SHX Text
CO
AutoCAD SHX Text
C
AutoCAD SHX Text
CC
AutoCAD SHX Text
CIRC
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CFH
AutoCAD SHX Text
ASSEMBLY
AutoCAD SHX Text
ASSY
AutoCAD SHX Text
RECIRC
AutoCAD SHX Text
RD
AutoCAD SHX Text
REQ
AutoCAD SHX Text
REV
AutoCAD SHX Text
RHG
AutoCAD SHX Text
RH
AutoCAD SHX Text
REINF
AutoCAD SHX Text
RCP
AutoCAD SHX Text
RA
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
REFRIGERANT HOT GAS
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
REVISION, REVISE
AutoCAD SHX Text
RELATIVE HUMIDITY
AutoCAD SHX Text
RECIRCULATE
AutoCAD SHX Text
RETURN AIR
AutoCAD SHX Text
PRV
AutoCAD SHX Text
PSI
AutoCAD SHX Text
PH, %%C
AutoCAD SHX Text
PIV
AutoCAD SHX Text
PLBG
AutoCAD SHX Text
PD
AutoCAD SHX Text
PLUMBING
AutoCAD SHX Text
PRESSURE DROP
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
AMERICAN NAT'L STANDARDS INSTITUTE
AutoCAD SHX Text
AIR CONDITIONER, AIR CONDITIONING,
AutoCAD SHX Text
AMERICAN SOCIETY OF TESTING & MATLS
AutoCAD SHX Text
AMERICAN SOCIETY OF MECHANICAL ENGRS
AutoCAD SHX Text
REFRIGERATION & AC ENGINEERS
AutoCAD SHX Text
AIR CONDITIONING & REFRIG INSTITUTE
AutoCAD SHX Text
ABOVE FINISHED GRADE
AutoCAD SHX Text
AMP, AMPERE
AutoCAD SHX Text
AUXILIARY
AutoCAD SHX Text
AMERICAN SOCIETY OF HEATING,
AutoCAD SHX Text
ARCHITECT, ARCHITECTURAL
AutoCAD SHX Text
AMERICAN WELDING SOCIETY
AutoCAD SHX Text
AMERICAN WIRE GAUGE
AutoCAD SHX Text
AIR PRESSURE DROP
AutoCAD SHX Text
ADJUSTABLE
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
ABOVE FINISHED CEILING
AutoCAD SHX Text
ARI
AutoCAD SHX Text
ASME
AutoCAD SHX Text
ASTM
AutoCAD SHX Text
AUX
AutoCAD SHX Text
AWG
AutoCAD SHX Text
AWS
AutoCAD SHX Text
ASHRAE
AutoCAD SHX Text
AFG
AutoCAD SHX Text
ARCH
AutoCAD SHX Text
A
AutoCAD SHX Text
ANSI
AutoCAD SHX Text
APD
AutoCAD SHX Text
ADJ
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AFC
AutoCAD SHX Text
AIR COOLED CONDENSING UNIT
AutoCAD SHX Text
AIR COOLED CHILLER
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
ACCU
AutoCAD SHX Text
ACC
AutoCAD SHX Text
ABV
AutoCAD SHX Text
A/C
AutoCAD SHX Text
OBD
AutoCAD SHX Text
OS&Y
AutoCAD SHX Text
OSHA
AutoCAD SHX Text
OD
AutoCAD SHX Text
OC
AutoCAD SHX Text
OA
AutoCAD SHX Text
NFPA
AutoCAD SHX Text
NTS
AutoCAD SHX Text
N.O.
AutoCAD SHX Text
NIC
AutoCAD SHX Text
OVERFLOW DRAINAGE, OUTSIDE DIAMETER
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NEC
AutoCAD SHX Text
NEMA
AutoCAD SHX Text
N/A
AutoCAD SHX Text
NC
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
ETR
AutoCAD SHX Text
REX
AutoCAD SHX Text
REMOVE EXISTING
AutoCAD SHX Text
CLEANOUT PLUG
AutoCAD SHX Text
COP
AutoCAD SHX Text
OVERFLOW ROOF DRAIN
AutoCAD SHX Text
ORD
AutoCAD SHX Text
RWC
AutoCAD SHX Text
RAIN WATER CONDUCTOR
AutoCAD SHX Text
ABOVE CEILING
AutoCAD SHX Text
ACOUSTIC LINING
AutoCAD SHX Text
AL
AutoCAD SHX Text
BOTTOM OF PIPE
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BRITISH THERMAL UNIT
AutoCAD SHX Text
BOTTOM OF STRUCTURE
AutoCAD SHX Text
BOTTOM OF DUCT
AutoCAD SHX Text
BOILER FEED WATER
AutoCAD SHX Text
BACKDRAFT DAMPER
AutoCAD SHX Text
BUILDING AUTOMATION SYSTEM
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BOP
AutoCAD SHX Text
BOS
AutoCAD SHX Text
BTU
AutoCAD SHX Text
BOD
AutoCAD SHX Text
BAS
AutoCAD SHX Text
BFW
AutoCAD SHX Text
BDD
AutoCAD SHX Text
BELOW FLOOR
AutoCAD SHX Text
BUILDING MANAGEMENT SYSTEM
AutoCAD SHX Text
BMS
AutoCAD SHX Text
DOMESTIC
AutoCAD SHX Text
DOM
AutoCAD SHX Text
FIRE PROTECTION
AutoCAD SHX Text
FP
AutoCAD SHX Text
FILTERED WATER
AutoCAD SHX Text
FW
AutoCAD SHX Text
GROUND
AutoCAD SHX Text
GRD
AutoCAD SHX Text
MECHANICAL CONTRACTOR
AutoCAD SHX Text
MC
AutoCAD SHX Text
OVERHEAD
AutoCAD SHX Text
O/H
AutoCAD SHX Text
OPENING
AutoCAD SHX Text
OPNG
AutoCAD SHX Text
REL
AutoCAD SHX Text
RELOCATED
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SANITARY
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
D
AutoCAD SHX Text
GAS
AutoCAD SHX Text
G
AutoCAD SHX Text
CONDENSING WATER RETURN/SUPPLY
AutoCAD SHX Text
CWR/CWS
AutoCAD SHX Text
CONNECT, CONNECTION
AutoCAD SHX Text
CONN
AutoCAD SHX Text
COMBUSTION AIR
AutoCAD SHX Text
CA
AutoCAD SHX Text
TWR/TWS
AutoCAD SHX Text
TOWER WATER RETURN/SUPPLY
AutoCAD SHX Text
1
AutoCAD SHX Text
T
AutoCAD SHX Text
(ALL SYMBOLS SHOWN ARE NOT
AutoCAD SHX Text
RISE
AutoCAD SHX Text
POINT OF CONNECTION - NEW TO EXISTING
AutoCAD SHX Text
TURNING VANES
AutoCAD SHX Text
INCLINED RISE IN DUCT
AutoCAD SHX Text
IN-LINE 90 DEGREE RISE IN DUCT
AutoCAD SHX Text
RETURN OR EXHAUST AIR DUCT DOWN
AutoCAD SHX Text
DUCTWORK SIZE TRANSITION
AutoCAD SHX Text
RETURN OR EXHAUST AIR DUCT UP
AutoCAD SHX Text
SUPPLY OR OUTSIDE AIR DUCT UP
AutoCAD SHX Text
SUPPLY OR OUTSIDE AIR DUCT DOWN
AutoCAD SHX Text
HVAC SYMBOLS
AutoCAD SHX Text
20/12
AutoCAD SHX Text
12"%%C
AutoCAD SHX Text
SUPPLY OR OUTSIDE AIR DUCT
AutoCAD SHX Text
ROUND OR RECTANGULAR
AutoCAD SHX Text
RECTANGULAR DUCTWORK BRANCH TAKE-OFF
AutoCAD SHX Text
HIGH EFFIECENY "BUCKLEY" TAP WITH DAMPER
AutoCAD SHX Text
RADIUS DUCTWORK ELBOW -
AutoCAD SHX Text
WITH 45 DEGREE BRANCH INLET
AutoCAD SHX Text
DIFFUSER/GRILLE LABEL:
AutoCAD SHX Text
B - NECK SIZE (INCHES)
AutoCAD SHX Text
A - TYPE/DESIGNATION
AutoCAD SHX Text
C - AIRFLOW (CFM)
AutoCAD SHX Text
RETURN, RELIEF OR EXHAUST AIR DUCT
AutoCAD SHX Text
FIRST NUMBER IS SIDE SHOWN
AutoCAD SHX Text
ROUND DUCTWORK. DIAMETER IN INCHES
AutoCAD SHX Text
RECTANGULAR DUCTWORK. SIZE IN INCHES,
AutoCAD SHX Text
MANUAL VOLUME DAMPER
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
SD
AutoCAD SHX Text
DRAWING NOTE REFERENCE
AutoCAD SHX Text
OVAL OR FLAT OVAL
AutoCAD SHX Text
ROUND
AutoCAD SHX Text
DUCT SMOKE DETECTOR
AutoCAD SHX Text
NECESSARILY USED ON DRAWINGS)
AutoCAD SHX Text
H
AutoCAD SHX Text
HUMIDISTAT
AutoCAD SHX Text
S
AutoCAD SHX Text
SENSOR
AutoCAD SHX Text
F
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
C
AutoCAD SHX Text
CARBON DIOXIDE SENSOR
AutoCAD SHX Text
UNDERCUT DOOR 3/4" FOR AIRFLOW
AutoCAD SHX Text
UC
AutoCAD SHX Text
INTERNALLY LINED DUCT
AutoCAD SHX Text
XX/XXL
AutoCAD SHX Text
CHILLED WATER RETURN/SUPPLY
AutoCAD SHX Text
CHWR/CHWS
AutoCAD SHX Text
NORMALLY CLOSED
AutoCAD SHX Text
N.C.
AutoCAD SHX Text
PB
AutoCAD SHX Text
PUSH BUTTON
AutoCAD SHX Text
HEATING HOT WATER RETURN/SUPPLY
AutoCAD SHX Text
HHWR/HHWS
AutoCAD SHX Text
DOMESTIC RECIRCULATED HOT WATER
AutoCAD SHX Text
HWR
AutoCAD SHX Text
B/F
AutoCAD SHX Text
CONNECT TO EXISTING
AutoCAD SHX Text
CTE
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
FF
AutoCAD SHX Text
RR
AutoCAD SHX Text
REMOVE AND RELOCATE
AutoCAD SHX Text
IN-LINE 90 DEGREE DROP IN DUCT
AutoCAD SHX Text
MOTORIZED DAMPER
AutoCAD SHX Text
MD
AutoCAD SHX Text
INSIDE DIAMETER
AutoCAD SHX Text
ID
AutoCAD SHX Text
INVERT ELEVATION
AutoCAD SHX Text
INCH, INCHES
AutoCAD SHX Text
INCHES OF WATER COLUMN
AutoCAD SHX Text
IN WC
AutoCAD SHX Text
IN
AutoCAD SHX Text
IE
AutoCAD SHX Text
(ALL ABBREVIATIONS SHOWN ARE NOT
AutoCAD SHX Text
NECESSARILY USED ON DRAWINGS)
AutoCAD SHX Text
PIPE FLANGE
AutoCAD SHX Text
ELBOW DOWN
AutoCAD SHX Text
ELBOW UP
AutoCAD SHX Text
UNION
AutoCAD SHX Text
TEE OUTLET UP
AutoCAD SHX Text
TEE OUTLET DOWN
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
PIPING SYMBOLS
AutoCAD SHX Text
CAP ON END LINE
AutoCAD SHX Text
1
AutoCAD SHX Text
DRAWING NOTE REFERENCE
AutoCAD SHX Text
NEW TO EXISTING
AutoCAD SHX Text
POINT OF CONNECTION -
AutoCAD SHX Text
(ALL SYMBOLS SHOWN ARE NOT
AutoCAD SHX Text
NECESSARILY USED ON THE DRAWINGS)
AutoCAD SHX Text
CONDENSATE (CD)
AutoCAD SHX Text
CD
AutoCAD SHX Text
V
AutoCAD SHX Text
FIN TUBE RADIATOR
AutoCAD SHX Text
FTR
AutoCAD SHX Text
GENERAL NOTES A. GENERAL GENERAL 1. EXCEPT AS SPECIFIED TO THE CONTRARY, THIS CONTRACT SHALL INCLUDE THE EXCEPT AS SPECIFIED TO THE CONTRARY, THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE HVAC SYSTEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. CONTRACTOR SHALL PROVIDE ALL LABOR AND DESIGNATED MATERIALS REQUIRED TO PROVIDE THE OWNER A COMPLETE, CODE APPROVED AND OPERATIONAL HVAC SYSTEM. 2. GENERAL CONDITIONS OF THE CONTRACT NOTED IN THE BOOK SPECIFICATION GENERAL CONDITIONS OF THE CONTRACT NOTED IN THE BOOK SPECIFICATION DOCUMENTS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (AIA) AND ANY OF THE OWNER'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE. 3. THE DRAWINGS ARE DIAGRAMMATIC; ALL WORK SHALL BE PERFORMED AS THE DRAWINGS ARE DIAGRAMMATIC; ALL WORK SHALL BE PERFORMED AS INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE WITH NO ADDITIONAL COST TO THE OWNER. 4. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS ARE TO BE FURNISHED WITHOUT ADDITIONAL COST. THE QUESTION AS TO WHETHER THE ITEM OR ITEMS ARE INCIDENTAL SHALL IN ALL CASES BE LEFT TO THE JUDGEMENT OF THE ENGINEER. 5. ALL WORK SHALL BE IN CONFORMANCE WITH THE LATEST EDITIONS OF ALL ALL WORK SHALL BE IN CONFORMANCE WITH THE LATEST EDITIONS OF ALL FEDERAL, STATE AND LOCAL CODES, ORDINANCES AND JURISDICTIONS INCLUDING THE OHIO BUILDING CODE, OHIO PLUMBING CODE, OHIO MECHANICAL CODE, ALL REFERENCED AND INDUSTRY STANDARDS. 6. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS, CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS, INSPECTIONS AND CERTIFICATES REQUIRED TO PROCEED WITH THE WORK. IF AND WHERE APPLICABLE, THIS SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS. PERMITTING AND INSPECTIONS SHALL BE THROUGH THE STATE OF OHIO. 7. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S INSTALLATION MANUALS, REQUIREMENTS AND ANY ADDITIONAL GUIDELINES INDICATED ON THE PLANS OR SPECIFIED HEREIN. CONTRACTOR SHALL PROVIDE ALL ADDITIONAL ACCESSORIES REQUIRED TO COMPLETE THE INSTALLATIONS. 8. SHOP DRAWINGS SHALL BE PROVIDED TO THE ENGINEER OF ALL EQUIPMENT AND SHOP DRAWINGS SHALL BE PROVIDED TO THE ENGINEER OF ALL EQUIPMENT AND ACCESSORIES PROVIDED FOR THE PROJECT WHETHER SPECIFIED HERE-IN OR ON THE DRAWINGS. ELECTRONIC COPIES OF THE SHOP DRAWINGS ARE REQUIRED AND SHALL BE SUBMITTED IN .PDF FORMAT. REVIEW OF THE SHOP DRAWINGS SHALL BE FOR GENERAL DESIGN CONCEPT AND ADHERENCE WITH THE SPECIFICATIONS. QUANTITY OF SHOP DRAWINGS SUBMITTED SHALL BE PER THE CONTRACT DOCUMENTS. SUBMITTALS SHALL INCLUDE THE FOLLOWING: a. HVAC EQUIPMENT AND ACCESSORIES. HVAC EQUIPMENT AND ACCESSORIES. b. DUCTWORK AND PIPING INSULATION. DUCTWORK AND PIPING INSULATION. c. TEMPERATURE CONTROLS. TEMPERATURE CONTROLS. 9. ALL MATERIALS AND METHODS SPECIFIED HEREIN SHALL BE THE MINIMUM ALL MATERIALS AND METHODS SPECIFIED HEREIN SHALL BE THE MINIMUM ACCEPTABLE. IF A CONFLICT OCCURS, THE ENGINEER AND THE OWNER SHALL RESOLVE SUCH CONFLICT WITH THE CONTRACTOR CONFORMING TO THE ENGINEER'S AND OWNER'S DECISION. 10. ALL MECHANICAL SYSTEMS MATERIALS SHALL BE NON-COMBUSTIBLE OR SHALL ALL MECHANICAL SYSTEMS MATERIALS SHALL BE NON-COMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84. 11. AFTER THE ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER, AFTER THE ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER, AS-BUILT DOCUMENTATION SHALL BE PROVIDED TO THE OWNER. IT SHALL INCLUDE, BUT NOT BE LIMITED TO ACCURATE PLAN DRAWINGS WITH CHANGES MARKED-UP IN RED, OPERATION AND MAINTENANCE MANUALS, APPLICABLE SYSTEM SCHEMATICS, WRITTEN SEQUENCE OF OPERATION, AND ALL FACTORY INSTALLATION DIAGRAMS. 12. CONTRACTOR SHALL PROVIDE TRAINING IN OPERATION AND MAINTENANCE OF THE CONTRACTOR SHALL PROVIDE TRAINING IN OPERATION AND MAINTENANCE OF THE SYSTEMS AND EQUIPMENT TO THE OWNER DESIGNATED PERSONNEL AND SHALL PROVIDE CLOSE-OUT DOCUMENTS INCLUDING COPIES OF ALL: PERMITS, LICENSES, HVAC AND INSPECTION REPORTS, PUNCH LIST COMPLETION REPORT, CONSTRUCTION PROGRESS PHOTOS, EQUIPMENT GUARANTEES, BALANCE REPORT, INCLUDE THREE (3) COPIES OF THE OPERATION AND MAINTENANCE MANUALS IN BOUND FORM PRIOR TO CONTRACT CLOSE-OUT. 13. EQUIPMENT WARRANTIES: THE HVAC EQUIPMENT MANUFACTURERS SHALL PROVIDE A EQUIPMENT WARRANTIES: THE HVAC EQUIPMENT MANUFACTURERS SHALL PROVIDE A ONE YEAR FACTORY WARRANTY ON ALL EQUIPMENT AND PARTS. THE AC UNIT MANUFACTURER SHALL PROVIDE AN EXTENDED 5 YEAR FACTORY WARRANTY ON THE AC EQUIPMENT REFRIGERATION COMPRESSORS. 14. SYSTEM PERFORMANCE AND ALL LABOR AND MATERIALS PROVIDED UNDER THIS SYSTEM PERFORMANCE AND ALL LABOR AND MATERIALS PROVIDED UNDER THIS CONTRACT SHALL BE GUARANTEED BY THE CONTRACTOR FOR ONE (1) YEAR AFTER ACCEPTANCE BY THE ENGINEER AND OWNER. 15. DURING CONSTRUCTION, CONTRACTOR TO ADHERE TO THE LATEST INDUSTRY DURING CONSTRUCTION, CONTRACTOR TO ADHERE TO THE LATEST INDUSTRY SAFETY STANDARDS INCLUDING OSHA, NASP AND ASSE STANDARDS. 16. CONTRACTOR TO COORDINATE WORK SCHEDULE WITH FACILITIES PERSONNEL, PRIOR CONTRACTOR TO COORDINATE WORK SCHEDULE WITH FACILITIES PERSONNEL, PRIOR TO THE SHUTDOWN/ISOLATION OF ANY SYSTEM. B. BASIC HVAC SCOPE AND MATERIALS BASIC HVAC SCOPE AND MATERIALS 1. THE SCOPE OF HVAC WORK SHALL INCLUDE THE WORK INDICATED ON THE THE SCOPE OF HVAC WORK SHALL INCLUDE THE WORK INDICATED ON THE DRAWINGS AND AS FOLLOWS: a. PROVIDE AND INSTALL ALL DRAWING DESIGNATED HVAC EQUIPMENT TO MATCH PROVIDE AND INSTALL ALL DRAWING DESIGNATED HVAC EQUIPMENT TO MATCH EXISTING. b. PROVIDE AND INSTALL ALL DUCTWORK AND DUCT PLENUMS/SHAFTS TO MATCH PROVIDE AND INSTALL ALL DUCTWORK AND DUCT PLENUMS/SHAFTS TO MATCH EXISTING. c. PROVIDE AND INSTALL ALL DUCTWORK INSULATION. CLEAN, PREP AND INSULATE PROVIDE AND INSTALL ALL DUCTWORK INSULATION. CLEAN, PREP AND INSULATE ALL EXTERIOR DUCTWORK AND DUCT PLENUMS/SHAFTS. d. RE-INTEGRATE THE NEW HVAC EQUIPMENT WITH THE EXISTING TRIDIUM RE-INTEGRATE THE NEW HVAC EQUIPMENT WITH THE EXISTING TRIDIUM BUILDING AUTOMATION SYSTEM. e. THE HVAC CONTRACTOR SHALL PROVIDE A SYSTEM PERFORMANCE GUARANTEE THE HVAC CONTRACTOR SHALL PROVIDE A SYSTEM PERFORMANCE GUARANTEE AND EQUIPMENT WARRANTIES AS INDICATED IN THE SPECIFICATIONS 2. AHU-2, AIR HANDLER - FURNISH AND INSTALL AS AS SCHEDULED ON THE AHU-2, AIR HANDLER - FURNISH AND INSTALL AS AS SCHEDULED ON THE AIR HANDLER - FURNISH AND INSTALL AS AS SCHEDULED ON THE DRAWINGS. 3. INSTALL FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF AHU-2 FLEXIBLE INSTALL FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF AHU-2 FLEXIBLE AHU-2 FLEXIBLE FLEXIBLE CONNECTIONS SHALL BE MADE WITH 4" WIDE DOUBLE NEOPRENE COATED FLAME RETARDANT, NFPA 90A APPROVED, FIBERGLASS FLEXIBLE CONNECTION. FLEXIBLE CONNECTION TO HAVE A MINIMUM OF 24 GAUGE, 3" WIDE SHEET METAL COLLARS PERMANENTLY ATTACHED TO EACH SIDE. 4. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15 DEGREE. 5. PROVIDE SCHEDULE 40, PVC CONDENSATE DRAINS WITH DEEP SEAL. DISPOSE PROVIDE SCHEDULE 40, PVC CONDENSATE DRAINS WITH DEEP SEAL. DISPOSE CONDENSATE IN THE SAME MANNER AND METHODS AS EXISTING. 6. CONTRACTOR SHALL CHANGE FILTERS IN AIR HANDLING UNIT AFTER ALL WORK HAS CONTRACTOR SHALL CHANGE FILTERS IN AIR HANDLING UNIT AFTER ALL WORK HAS BEEN COMPLETED AND PRIOR TO AIR BALANCE. 7. EQUIPMENT NAMETAGES - HVAC EQUIPMENT AND ALL CONTROL PANELS SHALL EQUIPMENT NAMETAGES - HVAC EQUIPMENT AND ALL CONTROL PANELS SHALL HAVE EQUIPMENT NAMETAGS. WITH IDENTIFICATION TO MATCH THE EQUIPMENT SCHEDULES OR SPECIFICATION DESCRIPTION. NAMETAGS SHALL BE AS MANUFACTURED BY BRIMAR, SETON OR APPROVED EQUAL. NAMETAGS SHALL BE 1/16" ENGRAVED PLASTIC WITH BEVELED EDGES AND WHITE LETTERS ON BLACK BACKGROUND. SIZE TO BE 3" X 1" WITH 1/2" HIGH TEXT. FASTENING TO BE WITH (1) MOUNTING HOLE AND STAINLESS STEEL SCREW ON EACH END. 8. PRIOR TO AIR BALANCING, ALL DUCTWORK SHALL BE CAREFULLY INSPECTED FOR PRIOR TO AIR BALANCING, ALL DUCTWORK SHALL BE CAREFULLY INSPECTED FOR LEAKS. ALL DUCTWORK SHALL BE SEALED AIR-TIGHT WITH PREMIUM QUALITY DUCT SEALANT AND SUPPLEMENTAL MATERIALS AND METHODS PER SMACNA AND INDUSTRY STANDARDS. 9. HVAC UNITS SHALL BE CONTROLLED THROUGH TIME SCHEDULE IN THE EXISTING HVAC UNITS SHALL BE CONTROLLED THROUGH TIME SCHEDULE IN THE EXISTING TRIDIUM BUILDING AUTOMATION SYSTEM. THE MECHANICAL CONTRACTOR SHALL OBTAIN THE SERVICES OF A TEMPERATURE CONTROLS CONTRACTOR FOR THE INTEGRATION OF THE NEW HVAC EQUIPMENT WITH THE EXISTING BUILDING AUTOMATION SYSTEM. 10. EXISTING DUCT SMOKE DETECTORS ARE TO REMAIN. RE-CONNECT EXISTING DUCT EXISTING DUCT SMOKE DETECTORS ARE TO REMAIN. RE-CONNECT EXISTING DUCT SMOKE DETECTORS TO THE UNIT SHUT-OFF RELAY. REFER TO M701 FOR ADDITIONAL INFORMATION. 11. THE TEMPERATURE CONTROL CONTRACTOR IS RESPONSIBLE TO PROVIDE A UNIT THE TEMPERATURE CONTROL CONTRACTOR IS RESPONSIBLE TO PROVIDE A UNIT MOUNTED HARDWARE CONTROLLER THAT MAINTAINS THE OPERABILITY OF THE SYSTEM. THIS CONTROLLER IS RESPONSIBLE FOR OPERATION OF THE UNIT. IT SHALL SEND I/O TO THE EXISTING JACE (NETWORK CONTROLLER). The CONTROLLER SHALL BE A BACNET MS/TP CONTROLLER. THE CONTROLLER SHALL BE ABLE TO RECEIVE ALL USER ADJUSTABLE POINTS AND ADJUST OPERATION OF THE UNIT ACCORDINGLY. THE SYSTEMS INTEGRATOR (BREWER-GARRAT) IS RESPONSIBLE FOR THE GRAPHICS, TOD SCHEDULING, SYSTEM ALARMING, TRENDING, AND ANY PROGRAMMING REQUIRED TO CREATE AN ACTIVE CONNECTION. UNDER A . UNDER A SEPARATE CONTACT TCC TO COORDINATE WITH BREWER-GARRAT. SEE DRAWING M701 FOR CONTROL INFORMATION. 12. CONTACTOR TO PROVIDE ALTERNATE PRICING FOR COMPLETING WORK DURING OFF CONTACTOR TO PROVIDE ALTERNATE PRICING FOR COMPLETING WORK DURING OFF HOURS (5PM-6AM) MONDAY(S) THRU FRIDAY(S), AND SATURDAY(S) AND SUNDAY(S).
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
C20187060

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
WOODLAND AVE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\M101.dwg FSS 9/28/2017 2:08 PMM101.dwg FSS 9/28/2017 2:08 PM FSS 9/28/2017 2:08 PMFSS 9/28/2017 2:08 PM 9/28/2017 2:08 PM9/28/2017 2:08 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:08 PMFSS on Thursday, September 28, 2017 - 2:08 PM on Thursday, September 28, 2017 - 2:08 PMThursday, September 28, 2017 - 2:08 PM - 2:08 PM2:08 PM
AutoCAD SHX Text
GENERAL SHEET NOTES
AutoCAD SHX Text
1.
AutoCAD SHX Text
EXISTING MECHANICAL INFORMATION IS BASED ON LIMITED EXISTING BUILDING DRAWINGS AND FIELD WORK. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING CONDITIONS FOR ACCURACY. CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER OF ANY SITUATIONS THAT MODIFY OR INCREASE THE SCOPE OF WORK FROM WHAT IS DESCRIBED IN THE DOCUMENTS.
AutoCAD SHX Text
2.
AutoCAD SHX Text
REFER TO DRAWINGS AND PROJECT SPECIFICATIONS OF OTHER DISCIPLINES FOR ADDITIONAL PROJECT INFORMATION AND REQUIREMENTS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN THE INFORMATION PRESENTED AND FIELD CONDITIONS.
AutoCAD SHX Text
3.
AutoCAD SHX Text
PRIOR TO ANY ISOLATION OF SYSTEMS, SHUTDOWNS OR DEMOLITION, THE CONTRACTOR SHALL PROVIDE NECESSARY INVESTIGATION AND NOTIFY THE FACILITIES ENGINEERING/MAINTENANCE PERSONNEL OF WORK TO BE PERFORMED SO AS TO AVOID ANY DETRIMENTAL SHUTDOWN OF SYSTEMS TO ADJACENT SPACES.
AutoCAD SHX Text
4.
AutoCAD SHX Text
WHERE PIPE, DUCTWORK, INSULATION, FIXTURES OR EQUIPMENT WHICH IS TO REMAIN IS DAMAGED OR DISTURBED, REMOVE THE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY AND QUALITY. WHERE IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS WHOSE INSTALLED PERFORMANCE EQUALS OR SURPASSES THAT OF THE EXISTING MATERIALS.
AutoCAD SHX Text
5.
AutoCAD SHX Text
MAINTAIN AND RESTORE, IF INTERRUPTED BY DEMOLITION OR IN THE PATH OF NEW CONSTRUCTION, ALL UTILITIES PASSING THROUGH AND SERVING AREAS OUTSIDE OF DEMOLITION AREA. THIS SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
AutoCAD SHX Text
6.
AutoCAD SHX Text
CONTRACTOR TO PROPERLY RECOVER REFRIGERANT AND OIL AND DISPOSE OF PER STATE AND FEDERAL REGULATIONS.
AutoCAD SHX Text
HVAC DEMOLTION PLAN
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
N
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
19'-1"
AutoCAD SHX Text
19'-1"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
LOOKING NORTHEAST
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
M101
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
DEMO PLAN & SECTION
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
MPR
AutoCAD SHX Text
8/11/17
AutoCAD SHX Text
1/2"=1'-0"
AutoCAD SHX Text
UTC KEY PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
N
AutoCAD SHX Text
EXISTING AIR HANDLER TO BE REMOVED
AutoCAD SHX Text
EXISTING EQUIPMENT PAD TO REMAIN
AutoCAD SHX Text
EXISTING AIR HANDLER TO RE REMOVED
AutoCAD SHX Text
EXISTING SHELL AND TUBE HEAT EXCHANGERS AND STRUCTURAL SUPPORTS TO BE REMOVED
AutoCAD SHX Text
EX BUILDING COLUMN
AutoCAD SHX Text
EXISTING OA LOUVER, DAMPER, AND OA INTAKE DAMPER TO REMAIN.
AutoCAD SHX Text
EX RA DUCT TO REMAIN
AutoCAD SHX Text
EX RA DUCT TO REMAIN
AutoCAD SHX Text
EX SA DUCT TO REMAIN
AutoCAD SHX Text
EX RA DUCT PLENUM BE REMOVED
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXISTING CONCRETE EQUIPMENT PAD TO REMAIN
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
EX CWS/R FROM COOLING TOWER TO REMAIN
AutoCAD SHX Text
EX 90"x26" SA
AutoCAD SHX Text
EX 50"x32" RA
AutoCAD SHX Text
EX 50"x32" RA
AutoCAD SHX Text
EX 96"x32" RA PLENUM
AutoCAD SHX Text
EX 117"x48" RA DUCT BEYOND TO BE REMOVED BACK TO RA PLENUM
AutoCAD SHX Text
EX HEAT EXCHANGERS AND ASSOCIATED PIPING AND SUPPORTS TO BE REMOVED
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EX 90"x26" SA
AutoCAD SHX Text
EX 96"x32" RA PLENUM
AutoCAD SHX Text
EX 60"x96" OA
AutoCAD SHX Text
EX LOUVER TO REMAIN
AutoCAD SHX Text
EX OA DAMPER TO REMAIN
AutoCAD SHX Text
EX 117"x48" RA BELOW
AutoCAD SHX Text
ROOM WALL
AutoCAD SHX Text
CONCRETE CEILING
AutoCAD SHX Text
REMOVE PORTION OF PIPING UP TO SHUT OFF VALVES. REFURBISH STRAINER AND REUSE IN PROPOSED WORK
AutoCAD SHX Text
EXISTING CONTROL PANELS, TYP
AutoCAD SHX Text
EX AHU VFD TO BE REMOVED
AutoCAD SHX Text
EX CWS/R FROM COOLING TOWER TO REMAIN
AutoCAD SHX Text
BUILDING EXTERIOR
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
A
AutoCAD SHX Text
THIS SHEET
AutoCAD SHX Text
A
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: "=1'-0"
AutoCAD SHX Text
4'
AutoCAD SHX Text
3'
AutoCAD SHX Text
2'
AutoCAD SHX Text
1'
AutoCAD SHX Text
0
AutoCAD SHX Text
12"

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
WOODLAND AVE
AutoCAD SHX Text
UNIFIED TECHNOLOGIES CENTER
AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\M201.dwg FSS 9/28/2017 2:09 PMM201.dwg FSS 9/28/2017 2:09 PM FSS 9/28/2017 2:09 PMFSS 9/28/2017 2:09 PM 9/28/2017 2:09 PM9/28/2017 2:09 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:09 PMFSS on Thursday, September 28, 2017 - 2:09 PM on Thursday, September 28, 2017 - 2:09 PMThursday, September 28, 2017 - 2:09 PM - 2:09 PM2:09 PM
AutoCAD SHX Text
HVAC PLAN
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
N
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
19'-1"
AutoCAD SHX Text
19'-1"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
16'-0"
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
LOOKING NORTHEAST
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
M201
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
PLAN & SECTION
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
MPR
AutoCAD SHX Text
8/11/17
AutoCAD SHX Text
1/2"=1'-0"
AutoCAD SHX Text
UTC KEY PLAN
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
N
AutoCAD SHX Text
SECTION B-B
AutoCAD SHX Text
SCALE: 1/2" = 1'-0"
AutoCAD SHX Text
LOOKING NORTHEAST
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
A
AutoCAD SHX Text
THIS SHEET
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
B
AutoCAD SHX Text
THIS SHEET
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
MECHANICAL ROOM
AutoCAD SHX Text
90"x26" SA DUCT
AutoCAD SHX Text
90'x18" TO 90"x26" TRANSITION SA DUCT
AutoCAD SHX Text
90'x18" TO (2) 24"x18" TRANSITION SA DUCT
AutoCAD SHX Text
24"x18" FLEX CONNECTION, TYP OF 2
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
RA (BEYOND)
AutoCAD SHX Text
CONCRETE PAD TO BE REWORKED FOR PROPOSED HVAC REQUIREMENTS
AutoCAD SHX Text
ROUTE CONDENSATE TO DRAIN TERMINATE WITH AIR GAP
AutoCAD SHX Text
3" CHWR
AutoCAD SHX Text
3" CHWS
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
BUILDING EXTERIOR
AutoCAD SHX Text
EX 50"x32" RA
AutoCAD SHX Text
EX 96"x32" RA PLENUM
AutoCAD SHX Text
EX 60"x96" OA DUCT
AutoCAD SHX Text
EX LOUVER
AutoCAD SHX Text
EX OA DAMPER
AutoCAD SHX Text
EX CHWS/R FROM COOLING TOWER
AutoCAD SHX Text
EX CHWS/R FROM COOLING TOWER
AutoCAD SHX Text
EX 32"x50" RA DUCT
AutoCAD SHX Text
EX 32"x96" RA DUCT PLENUM
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
55"x132" RA DUCT
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
NEW
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
ROUTE CONDENSATE TO DRAIN TERMINATE WITH AIR GAP
AutoCAD SHX Text
3" CHWR
AutoCAD SHX Text
3" CHWS
AutoCAD SHX Text
CONCRETE PAD TO BE REWORKED FOR PROPOSED HVAC REQUIREMENTS
AutoCAD SHX Text
132"x55" RA DUCT
AutoCAD SHX Text
EX 50"x32" RA
AutoCAD SHX Text
EX 50"x32" RA
AutoCAD SHX Text
EX LOUVER
AutoCAD SHX Text
EX 32"x96" RA PLENUM
AutoCAD SHX Text
EX 96"x60" OA DUCT
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
SEE SECTIONS FOR SUPPLY AIR DUCT
AutoCAD SHX Text
CONCRETE PAD TO BE REWORKED FOR NEW HVAC EQUIPMENT REQUIREMENTS
AutoCAD SHX Text
EX BUILDING COLUMN
AutoCAD SHX Text
EXISTING CONTROL PANELS, TYP
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
SCALE: "=1'-0"
AutoCAD SHX Text
4'
AutoCAD SHX Text
3'
AutoCAD SHX Text
2'
AutoCAD SHX Text
1'
AutoCAD SHX Text
0
AutoCAD SHX Text
12"

WARNER

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
M501
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
SCHEDULE & DETAILS
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
MPR
AutoCAD SHX Text
8/11/17
AutoCAD SHX Text
NONE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\M501.dwg FSS 9/28/2017 2:09 PMM501.dwg FSS 9/28/2017 2:09 PM FSS 9/28/2017 2:09 PMFSS 9/28/2017 2:09 PM 9/28/2017 2:09 PM9/28/2017 2:09 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:09 PMFSS on Thursday, September 28, 2017 - 2:09 PM on Thursday, September 28, 2017 - 2:09 PMThursday, September 28, 2017 - 2:09 PM - 2:09 PM2:09 PM
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
AIR HANDLING UNIT SCHEDULE
AutoCAD SHX Text
EQUIP No
AutoCAD SHX Text
MFG
AutoCAD SHX Text
MODEL NO
AutoCAD SHX Text
AREA
AutoCAD SHX Text
FAN DATA
AutoCAD SHX Text
MOTOR DATA
AutoCAD SHX Text
CHILLED WATER COIL COOLING DATA
AutoCAD SHX Text
DESIGN WEIGHT (LBS)
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
CFM MAX/MIN
AutoCAD SHX Text
EXT. STATIC PRESSURE ("W.C.)
AutoCAD SHX Text
TOTAL STATIC PRESSURE ("W.C.)
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
RPM
AutoCAD SHX Text
HP
AutoCAD SHX Text
BHP
AutoCAD SHX Text
RPM
AutoCAD SHX Text
VOLT/PH/HZ
AutoCAD SHX Text
MBH (TOTAL)
AutoCAD SHX Text
MBH (SENS)
AutoCAD SHX Text
A.P.D. (IN WG)
AutoCAD SHX Text
E.D.B. (°F)
AutoCAD SHX Text
E.W.B. (°F)
AutoCAD SHX Text
L.D.B. (°F)
AutoCAD SHX Text
L.W.B. (°F)
AutoCAD SHX Text
E.W.T. (°F)
AutoCAD SHX Text
L.W.T. (°F)
AutoCAD SHX Text
GPM
AutoCAD SHX Text
W.P.D. (FT/WG)
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
CARRIER
AutoCAD SHX Text
SCU
AutoCAD SHX Text
MECH ROOM
AutoCAD SHX Text
24,000
AutoCAD SHX Text
2.25
AutoCAD SHX Text
3.07
AutoCAD SHX Text
UB
AutoCAD SHX Text
1015
AutoCAD SHX Text
30
AutoCAD SHX Text
25.40
AutoCAD SHX Text
1015
AutoCAD SHX Text
460/3/60
AutoCAD SHX Text
704
AutoCAD SHX Text
572
AutoCAD SHX Text
0.62
AutoCAD SHX Text
80
AutoCAD SHX Text
67
AutoCAD SHX Text
58
AutoCAD SHX Text
57.80
AutoCAD SHX Text
85
AutoCAD SHX Text
93.30
AutoCAD SHX Text
200
AutoCAD SHX Text
24.20
AutoCAD SHX Text
5198
AutoCAD SHX Text
1-5
AutoCAD SHX Text
REMARKS: 1. VAV UNIT WITH REAR RETURN, TOP SUPPLY. UNIT TO BE SUPPLIED WITH VFD VAV UNIT WITH REAR RETURN, TOP SUPPLY. UNIT TO BE SUPPLIED WITH VFD CAPABILITIES. 2. CONDENSATE OVERFLOW SWITCH CONDENSATE OVERFLOW SWITCH 3. FREEZE PROTECTION SWITCH FREEZE PROTECTION SWITCH 4. CONTRACTOR TO CONFIRM FILTER ACCESS ON ACCESSIBLE SIDE OF UNIT, CONTRACTOR TO CONFIRM FILTER ACCESS ON ACCESSIBLE SIDE OF UNIT, REFER TO PLANS FOR EQUIPMENT ORIENTATION. 5. UNIT TO BE SUPPLIED WITH A BACNET MS/TP CONTROLLER WITH APPROPRIATE UNIT TO BE SUPPLIED WITH A BACNET MS/TP CONTROLLER WITH APPROPRIATE SEQUENCE PRE-PROGRAMMED. REFER TO M701 FOR CONTROLLER SEQUENCE.
AutoCAD SHX Text
C20187060

WARNER

T

OA

RAEA

T

CT

VFD

DX

H

L

SA

M

CO2

SF

N.C.

N.C.

H L

M

MT

M

TT

ISSUED FOR

BID PURPOSES ONLY

R.E. Warner & Assoc. Inc.SEPTEMBER 28, 2017

NOT FOR CONSTRUCTION

AutoCAD SHX Text
REFERENCE DRAWINGS
AutoCAD SHX Text
NO
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
A
AutoCAD SHX Text
9/28/17
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text
FSS
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DR BY
AutoCAD SHX Text
DSN BY
AutoCAD SHX Text
CHK BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
M701
AutoCAD SHX Text
39817
AutoCAD SHX Text
CUYAHOGA COMMUNITY COLLEGE
AutoCAD SHX Text
MANUFACTURING TECHNOLOGY CENTER
AutoCAD SHX Text
2415 WOODLAND AVE.
AutoCAD SHX Text
CLEVELAND, OHIO 44115
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
CONTROLS DIAGRAM
AutoCAD SHX Text
FSS
AutoCAD SHX Text
FSS
AutoCAD SHX Text
MPR
AutoCAD SHX Text
8/11/17
AutoCAD SHX Text
NONE
AutoCAD SHX Text
TELEPHONE (440) 835-9400
AutoCAD SHX Text
25777 DETROIT ROAD
AutoCAD SHX Text
WESTLAKE, OHIO 44145
AutoCAD SHX Text
LA OFFICE PLAZA II SUITE 200
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
O:\39817\Issue\Bid\M701.dwg FSS 9/28/2017 2:10 PMM701.dwg FSS 9/28/2017 2:10 PM FSS 9/28/2017 2:10 PMFSS 9/28/2017 2:10 PM 9/28/2017 2:10 PM9/28/2017 2:10 PM
AutoCAD SHX Text
Printed by FSS on Thursday, September 28, 2017 - 2:10 PMFSS on Thursday, September 28, 2017 - 2:10 PM on Thursday, September 28, 2017 - 2:10 PMThursday, September 28, 2017 - 2:10 PM - 2:10 PM2:10 PM
AutoCAD SHX Text
THIS DRAWING IN ELECTRONIC FORM IS BEING PROVIDED FOR THE CLIENT'S USE ONLY. BECAUSE OF POTENTIAL DATA DEGRADATION AND FOR RECORD PURPOSES, R.E. WARNER AND ASSOCIATES INC. (REW) MAINTAINS AN ELECTRONIC COPY IN PORTABLE DOCUMENT FORMAT (ADOBE PDF) OF EACH ISSUE AS THE COPY OF RECORD. MODIFICATION AND/OR USE OF THIS FILE WITHOUT WRITTEN PERMISSION OF REW IS AT THE SOLE RISK OF THE USER. REW SHALL BE INDEMNIFIED AND HELD HARMLESS FOR ANY DAMAGES INCURRED CAUSED BY THE MISUSE OF THIS FILE BY THE USER, INCLUDING COSTS OF REW LEGAL EXPENSES INCLUDING BUT NOT LIMITED TO REW DEFENSE OF ANY CLAIMS, INCLUDING ATTORNEY FEES.
AutoCAD SHX Text
REW ELECTRONIC DRAWING FILE DISCLAIMER
AutoCAD SHX Text
TRI-C PROJECT NUMBER
AutoCAD SHX Text
%%UAIR HANDLING UNIT TEMPERATURE CONTROL DIAGRAM
AutoCAD SHX Text
BI - FREEZESTAT
AutoCAD SHX Text
AO - ECONOMIZER DAMPERS
AutoCAD SHX Text
AI - RETURN AIR TEMP
AutoCAD SHX Text
BI - RETURN AIR SMOKE DETECTOR
AutoCAD SHX Text
AI - RETURN AIR CARBON DIOXIDE PPM
AutoCAD SHX Text
AI - SUPPLY AIR TEMP
AutoCAD SHX Text
BI - HIGH STATIC SHUTDOWN
AutoCAD SHX Text
BO - SUPPLY FAN START/STOP
AutoCAD SHX Text
BI - SUPPLY FAN STATUS
AutoCAD SHX Text
AO - SUPPLY FAN VFD SPEED
AutoCAD SHX Text
BI - SUPPLY FAN VFD FAULT
AutoCAD SHX Text
BO - COOLING STAGE 4
AutoCAD SHX Text
AI - S.A. STATIC PRESSURE
AutoCAD SHX Text
N.O.
AutoCAD SHX Text
BO - COOLING STAGE 3
AutoCAD SHX Text
BO - COOLING STAGE 2
AutoCAD SHX Text
BO - COOLING STAGE 1
AutoCAD SHX Text
JACE POINTS LIST
AutoCAD SHX Text
HARDWARE POINTS
AutoCAD SHX Text
SOFTWARE POINTS
AutoCAD SHX Text
POINT NAME
AutoCAD SHX Text
AI
AutoCAD SHX Text
AO
AutoCAD SHX Text
BI
AutoCAD SHX Text
BO
AutoCAD SHX Text
AV
AutoCAD SHX Text
BV
AutoCAD SHX Text
LOOP
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
TREND
AutoCAD SHX Text
ALARM
AutoCAD SHX Text
SHOW ON GRAPHIC
AutoCAD SHX Text
RA CO2 PPM
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
RA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA STATIC PRESSURE
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
MIXED AIR TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
OUTSIDE AIR TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
ECONOMIZER DAMPERS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN VFD SPEED VERIFICATION
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
FREEZESTAT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH STATIC SHUTDOWN
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
RA SMOKE DETECOR
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN VFD FAULT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 1 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 2 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 3 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 4 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN START/STOP
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
ECONOMIZER MA TEMP SET POINT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA STATIC PRESSURE SETPOINT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA TEMP. SETPOINT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
COMPRESSOR RUNTIME EXCEEDED
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH MA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH RA CO2
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH RA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH SA STATIC PRESSURE
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH SA TEMP
AutoCAD SHX Text
X
AutoCAD SHX Text
LOW MA TEMP
AutoCAD SHX Text
X
AutoCAD SHX Text
LOW RA TEMP
AutoCAD SHX Text
X
AutoCAD SHX Text
LOW SA STATIC
AutoCAD SHX Text
X
AutoCAD SHX Text
LOW SA TEMP
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN FAILURE
AutoCAD SHX Text
X
AutoCAD SHX Text
EXISTING JACE LOCATED ON FIRST FLOOR OF UTC BUILDING
AutoCAD SHX Text
CONTROL WIRING FROM UNIT CONTROLLER TO EXISTING JACE. TEMPERATURE CONTROL CONTRACTOR IS RESPONSIBLE FOR THIS PORTION OF WORK. THIS WIRING SHALL BE BACNET MS/TP CABLING.
AutoCAD SHX Text
UNIT BACNET MS/TP CONTROLLER
AutoCAD SHX Text
C20187060
AutoCAD SHX Text
TEMPERATURE CONTROLS AND SEQUENCE OF OPERATIONS: 1. TEMPERATURE CONTROLS - TEMPERATURE CONTROLS CONTRACTOR IS A SUB TO THE MECHANICAL TEMPERATURE CONTROLS - TEMPERATURE CONTROLS CONTRACTOR IS A SUB TO THE MECHANICAL - TEMPERATURE CONTROLS CONTRACTOR IS A SUB TO THE MECHANICAL CONTRACTOR. TEMPERATURE CONTROL CONTRACTOR TO PROVIDE ALL TEMPERATURE CONTROLS AS DESCRIBED IN THE SCOPE OF WORK AND INDICATED HEREIN. ALL 120V POWER AND 24V CONTROL WIRING SHALL BE IN ACCORDANCE WITH THE NEC AND THE ELECTRICAL SPECIFICATIONS AND SHALL BE INSTALLED IN CONDUIT. THE TEMPERATURE CONTROLS CONTRACTOR SHALL PROVIDE ALL 24V CONTROL WIRING, RELAYS, 4-20mA SIGNAL ISOLATORS, SPLITTERS, CONDITIONERS AND DEVICES TO THE UNIT CONTROLLER AND UNIT SENSORS. TEMPERATURE CONTROL CONTRACTOR IS ALSO RESPONSIBLE FOR ALL WIRING FROM THE UNIT CONTROLLER TO THE JACE LOCATED IN THE FIRST FLOOR IT ROOM IN THE MTC BUILDING. THIS INCLUDES ANY FIELD CONTROL WIRING REQUIRED FOR THE AIR HANDLER'S CONTROL PANEL, SUCH AS THOSE SHOWN IN THE DIAGRAM AND POINTS LIST ON THIS SHEET. THE TEMPERATURE CONTROLS CONTRACTOR IS NOT RESPONSIBLE FOR TRENDING, ALARMING OR GRAPHICS SHOWN ON THE BUILDING AUTOMATION SYSTEM (BAS) INTERFACE (BETWEEN THE JACE AND THE BAS SERVER). AIR HANDLING UNIT CONTROLS 1. UNIT TO BE CONTROLLED BY A UNIT MOUNTED BACNET MS/TP CONTROLLER. THE CONTRACTOR IS UNIT TO BE CONTROLLED BY A UNIT MOUNTED BACNET MS/TP CONTROLLER. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND PROGRAMMING THE CONTROLLER TO ACHIEVE THE SEQUENCE BELOW. FACTORY SUPPLIED PRE-PROGRAMMED CONTROLLERS ARE ACCEPTABLE BUT MUST MEET THE SEQUENCE OF OPERATIONS BELOW. TEMPERATURE CONTROLS CONTRACTOR IS TO ROUTE ALL I/O COMMUNICATION WIRING AND TERMINATE AT THE JACE. PROGRAMMING OF THE JACE IS DONE BY BREWER-GARRETT UNDER THEIR MAINTENANCE CONTRACT WITH THE COLLEGE. 2. PRIOR TO BIDDING AND WORK, THE CONTRACTOR IS TO BECOME FAMILIAR WITH CURRENT UNIT'S PRIOR TO BIDDING AND WORK, THE CONTRACTOR IS TO BECOME FAMILIAR WITH CURRENT UNIT'S CONTROLS AND THE BUILDING AUTOMATION SYSTEM. THE NEW UNIT SHALL OPERATE SIMILAR TO THE REMOVED UNIT. SEQUENCE OF OPERATIONS RUN CONDITIONS - REQUESTED: THE UNIT SHALL RUN ON A SCHEDULE FROM THE BAS. FREEZE PROTECTION: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A FREEZESTAT STATUS. HIGH STATIC SHUTDOWN: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A HIGH STATIC SHUTDOWN SIGNAL. RETURN AIR SMOKE DETECTION: THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A RETURN AIR SMOKE DETECTOR STATUS. SUPPLY FAN: THE SUPPLY FAN SHALL BE ENABLED BY A SCHEDULE IN THE BUILDING AUTOMATION SYSTEM. ONCE THE HE SUPPLY FAN SHALL BE ENABLED BY A SCHEDULE IN THE BUILDING AUTOMATION SYSTEM. ONCE THE SCHEDULE IS ENABLED, THE UNIT SHALL THEN SEND A COMMAND TO THE CONDENSER PUMP AND/OR COOLING TOWER REQUESTING CONDENSER WATER FLOW. TEMPERATURE CONTROLS CONTRACTOR TO VERIFY THIS FUNCTION IN THE EXISTING UNIT PRIOR TO WORK. THE SUPPLY FAN WILL THEN START WITH THE VFD INCREASING THE SPEED OF THE FAN TO MAINTAIN A STATIC PRESSURE SET POINT IN THE DUCT. SUPPLY AIR DUCT STATIC PRESSURE CONTROL: THE CONTROLLER SHALL MEASURE DUCT STATIC PRESSURE AND SHALL MODULATE THE SUPPLY FAN VFD SPEED TO MAINTAIN A DUCT STATIC PRESSURE SETPOINT OF 1.6IN H2O (ADJ. IN THE BAS). THE SUPPLY FAN VFD SPEED SHALL NOT DROP BELOW 30%. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ. IN THE BAS) GREATER THAN SETPOINT. LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ. IN THE BAS) LESS THAN SETPOINT. SUPPLY FAN VFD FAULT. SUPPLY AIR TEMPERATURE SETPOINT - OPTIMIZED: THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE AND SHALL MAINTAIN A SUPPLY AIR TEMPERATURE SETPOINT THAT IS ADJUSTED IN THE BAS. COOLING STAGES: THE CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND STAGE THE COOLING TO MAINTAIN ITS COOLING SETPOINT. TO PREVENT SHORT CYCLING, THERE SHALL BE A DELAY BETWEEN STAGES, AND EACH STAGE SHALL HAVE A MINIMUM RUNTIME. COOLING EQUIPMENT MANUFACTURER'S RECOMMENDED SEQUENCE OF OPERATIONS SHALL BE ADHERED TO. INDIVIDUAL COOLING STAGE ON/OFF STATUS SHALL BE OUTPUT TO BAS FOR REMOTE DISPLAY. THE COOLING SHALL BE ENABLED WHENEVER: OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ. IN THE BAS). AND THE ECONOMIZER IS DISABLED OR FULLY OPEN. AND THE SUPPLY FAN STATUS IS ON. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ.) GREATER THAN SETPOINT AFTER 15 MINUTES (ADJ.). ECONOMIZER: THE CONTROLLER SHALL MEASURE THE MIXED AIR TEMPERATURE AND MODULATE THE ECONOMIZER DAMPERS IN SEQUENCE TO MAINTAIN A MIXED AIR TEMPERATURE SETPOINT. THE OUTSIDE AIR DAMPERS SHALL MAINTAIN A MINIMUM ADJUSTABLE POSITION OPEN WHENEVER OCCUPIED. CONTRACTOR TO VERIFY THE EXISTING MINIMUM POSITION OPEN OF OUTSIDE AIR DAMPERS PRIOR TO WORK. THE NEW OUTSIDE AIR DAMPER SHALL BE SET AT THIS MINIMUM OPEN POSITION HOWEVER SHALL ALSO BE ADJUSTABLE. THE MIXED AIR DAMPER WHICH IS NORMALLY 100% OPEN SHALL CLOSE WHEN THE OUTSIDE AIR INTAKE DAMPER IS OPEN AT 100%. THE ECONOMIZER SHALL BE ENABLED WHENEVER: OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.). OR THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE RETURN AIR TEMPERATURE. AND THE SUPPLY FAN STATUS IS ON. THE ECONOMIZER DAMPERS SHALL CLOSE WHENEVER: MIXED AIR TEMPERATURE DROPS TO 35°F (ADJ.). OR THE FREEZESTAT IS ON. OR ON LOSS OF SUPPLY FAN STATUS. THE OUTSIDE AND EXHAUST AIR DAMPERS SHALL CLOSE AND THE RETURN AIR DAMPER SHALL OPEN WHEN THE UNIT IS OFF. MINIMUM OUTSIDE AIR VENTILATION - FIXED PERCENTAGE: THE OUTSIDE AIR DAMPERS SHALL MAINTAIN A MINIMUM ADJUSTABLE POSITION DURING BUILDING OCCUPIED HOURS AND BE CLOSED DURING UNOCCUPIED HOURS. MIXED AIR TEMPERATURE: THE CONTROLLER SHALL MONITOR THE MIXED AIR TEMPERATURE AND USE AS REQUIRED FOR ECONOMIZER CONTROL. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.). LOW MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS LESS THAN 45°F (ADJ.). RETURN AIR CARBON DIOXIDE (CO2) CONCENTRATION MONITORING: THE CONTROLLER SHALL MEASURE THE RETURN AIR CO2 CONCENTRATION AND OUTPUT TO THE BAS FOR MONITORING. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH RETURN AIR CARBON DIOXIDE CONCENTRATION: IF THE RETURN AIR CO2 CONCENTRATION IS GREATER THAN 1000PPM (ADJ. IN THE BAS) WHEN IN THE UNIT IS RUNNING. RETURN AIR TEMPERATURE: THE CONTROLLER SHALL MONITOR THE RETURN AIR TEMPERATURE AND USE AS REQUIRED FOR SETPOINT CONTROL OR ECONOMIZER CONTROL. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.). LOW RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS LESS THAN 45°F (ADJ.). SUPPLY AIR TEMPERATURE: THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE. ALARMS SHALL BE PROVIDED AS FOLLOWS: HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS GREATER THAN 80°F (ADJ.). LOW SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
AutoCAD SHX Text
NOTE: THIS IS THE POINTS LIST INDICATING WHAT THE JACE SHOULD RECEIVE AND SUBSEQUENTLY WHAT THE BAS IS TO MONITOR. COORDINATE EXACT POINTS WITH TRI-C PERSONNEL AND TRI-C'S BAS MAINTENANCE CONTRACTOR.
AutoCAD SHX Text
AIR HANDLING UNIT CONTROLLER POINTS LIST
AutoCAD SHX Text
HARDWARE POINTS
AutoCAD SHX Text
SOFTWARE POINTS
AutoCAD SHX Text
POINT NAME
AutoCAD SHX Text
AI
AutoCAD SHX Text
AO
AutoCAD SHX Text
BI
AutoCAD SHX Text
BO
AutoCAD SHX Text
AV
AutoCAD SHX Text
BV
AutoCAD SHX Text
LOOP
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
TREND
AutoCAD SHX Text
ALARM
AutoCAD SHX Text
SHOW ON GRAPHIC
AutoCAD SHX Text
RA CO2 PPM
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
RA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA STATIC PRESSURE
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SA TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
OUTSIDE AIR TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
MIXED AIR TEMP.
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
ECONOMIZER DAMPERS
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN VFD SPEED
AutoCAD SHX Text
X
AutoCAD SHX Text
FREEZESTAT
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
HIGH STATIC SHUTDOWN
AutoCAD SHX Text
X
AutoCAD SHX Text
RA SMOKE DETECTOR
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN VFD FAULT
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 1 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 2 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 3 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
COOLING STAGE 4 STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN START/STOP
AutoCAD SHX Text
X
AutoCAD SHX Text
SUPPLY FAN START/STOP STATUS
AutoCAD SHX Text
X
AutoCAD SHX Text
ECONOMIZER MA TEMP SET POINT
AutoCAD SHX Text
X
AutoCAD SHX Text
SA STATIC PRESSURE SETPOINT
AutoCAD SHX Text
X
AutoCAD SHX Text
SA TEMP. SETPOINT
AutoCAD SHX Text
X
AutoCAD SHX Text
NOTE: 1. THIS IS THE POINTS LIST FOR AIR HANDLING UNIT CONTROLLER. THE CONTROLLER SHALL BE A BACNET THIS IS THE POINTS LIST FOR AIR HANDLING UNIT CONTROLLER. THE CONTROLLER SHALL BE A BACNET MS/TP CONTROLLER. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING, INSTALLING AND PROGRAMMING THIS CONTROLLER TO MEET THE SEQUENCE OF OPERATIONS ON THIS SHEET. 2. CONTRACTOR TO RUN BACNET MS/TP CABLING FROM PROGRAMMABLE UNIT CONTROLLER TO JACE. THE CONTRACTOR TO RUN BACNET MS/TP CABLING FROM PROGRAMMABLE UNIT CONTROLLER TO JACE. THE CONTRACTOR IS THEN RESPONSIBLE FOR PROGRAMMING THE UNIT CONTROLLER TO SEND AND RECEIVE THE DESIRED I/O POINTS. 3. INSTALL ALL CONTROLLERS AND SENSORS IN AN EASILY ACCESSIBLE LOCATION FOR FUTURE CALIBRATION INSTALL ALL CONTROLLERS AND SENSORS IN AN EASILY ACCESSIBLE LOCATION FOR FUTURE CALIBRATION AND MAINTENANCE. 4. FURNISH AND WIRE (AS NEEDED) ALL ANALOG SENSORS TO SIGNAL CONDITIONERS, ISOLATORS AND SPLITTER FURNISH AND WIRE (AS NEEDED) ALL ANALOG SENSORS TO SIGNAL CONDITIONERS, ISOLATORS AND SPLITTER UNITS. UNITS TO RECEIVE 4-20 mA SENSOR CURRENT SIGNAL AND PROVIDE TWO IDENTICAL ISOLATED 4-20 mA SIGNALS WHICH PREVENT GROUND LOOPS, REDUCE NOISE AND BLOCKS TRANSIENT SIGNALS.
AutoCAD SHX Text
AI - MIXED AIR TEMP
AutoCAD SHX Text
AI - OUTSIDE AIR TEMP.

Recommended