T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For Proposal (Global Competitive Bidding under Swiss Challenge Method) FOR Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for Thiruvananthapuram Cluster under Public Private Partnership Tender No: KSIDC/PMU/W2E/14/2020 24 th March 2020
Transcript
Page 1: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892

Request For Proposal

(Global Competitive Bidding under Swiss Challenge

Method)

FOR

Development of Integrated Solid Waste Management Project with

a Waste to Energy plant of minimum 300 TPD Processing

capacity on Design, Build, Finance, Operate and Transfer

(DBFOT) basis at Vizhinjam for Thiruvananthapuram Cluster

under Public Private Partnership

Tender No: KSIDC/PMU/W2E/14/2020

24th

March 2020

Page 2: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 2

DISCLAIMER

The information contained in this Request for Proposal document (the “RFP”) or subsequently

provided to Bidder(s), in the documentary form by or on behalf of the Authority or any of its

employees or advisors, is provided to Bidder(s) on the terms and conditions set out in this RFP and

such other terms and conditions subject to which such information is provided.

This RFP is not an agreement and is neither an offer by the Authority to the prospective Bidders or

any other person. The purpose of this RFP is to provide interested parties with information that may

be useful to them in making their financial offers pursuant to this RFP. This RFP includes statements,

which reflect various assumptions and assessments arrived at by the Authority in relation to the

Project. Such assumptions, assessments and statements do not purport to contain all the information

that each Bidder may require. This RFP may not be appropriate for all persons, and it is not possible

for the Authority, its employees or advisors to consider the investment objectives, financial situation

and particular needs of each party who reads or uses this RFP. The assumptions, assessments,

statements and information contained in the Bidding Documents, especially in RFP, Draft Concession

Agreement (DCA) and Schedules, may not be complete, accurate, adequate or correct. Each Bidder

should, therefore, conduct its own investigations and analysis and should check the accuracy,

adequacy, correctness, reliability and completeness of the assumptions, assessments, statements and

information contained in this RFP and obtain independent advice from appropriate sources.

Information provided in this RFP to the Bidder(s) is on a wide range of matters, some of which may

depend upon interpretation of law. The information given is not intended to be an exhaustive account

of statutory requirements and should not be regarded as a complete or authoritative statement of law.

The Authority accepts no responsibility for the accuracy or otherwise for any interpretation or opinion

on law expressed herein.

The Authority, its employees and advisors make no representation or warranty and shall have no

liability to any person, including any Bidder under any law, statute, rules or regulations or tort,

principles of restitution or unjust enrichment or otherwise for any loss, damages, cost or expense

which may arise from or be incurred or suffered on account of anything contained in this RFP or

otherwise, including the accuracy, adequacy, correctness, completeness or reliability of the RFP and

any assessment, assumption, statement or information contained therein or deemed to form part of this

RFP or arising in any way for participation in this Bid Process. The Authority also accepts no liability

of any nature whether resulting from negligence or otherwise howsoever caused arising from reliance

of any Bidder upon the statements contained in this RFP.

The Authority may, but without being under any obligation to do so, update, amend or supplement the

information, assessment or assumptions contained in this RFP. The issue of this RFP does not imply

that the Authority is bound to select a Bidder or to appoint the Selected Bidder or Concessionaire, as

the case may be, for the Project and the Authority reserves the right to reject all or any of the Bidders

or Bids without assigning any reason whatsoever.

The Bidder shall bear all its costs associated with or relating to the preparation and submission of its

Bid including but not limited to preparation, copying, postage, delivery fees, expenses associated with

any demonstrations or presentations which may be required by the Authority or any other costs

incurred in connection with or relating to its Bid. All such costs and expenses will remain with the

Bidder and the Authority shall not be liable in any manner whatsoever for the same or for any other

costs or other expenses incurred by a Bidder in preparation or submission of the Bid, regardless of the

conduct or outcome of the Bidding Process.

Page 3: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 3

REQUEST FOR PROPOSAL DOCUMENT

Contents of the Document

Volume I

: Detailed RFP

Volume II

: Draft Concession Agreement

Volume III

: Schedules to the Draft Concession

Agreement

Page 4: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 4

VOLUME I

DETAILED RFP

Page 5: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 5

CONTENT

DEFINITIONS ....................................................................................................................................................... 7

SECTION A : NOTICE INVITING TENDER(NIT)

1. INTRODUCTION ...................................................................................................................................... 10

2. INVITATION FOR BID ............................................................................................................................. 10

3. MINIMUM ELIGIBILITY CRITERIA ...................................................................................................... 11

4. CONDITIONS FOR FORMATION OF CONSORTIUM .......................................................................... 12

5. KEY DETAILS ........................................................................................................................................... 14

6. INSTRUCTIONS ON E-TENDER ............................................................................................................. 15

SECTION B : PROJECT DETAILS AND SCOPE OF THE PROJECT (PDS)

7. PROJECT BACKGROUND ....................................................................................................................... 18

8. CONCESSION PERIOD ............................................................................................................................ 19

10. SCOPE OF WORK FOR PRIVATE PARTNER ................................................................................... 20

11. ROLE OF THE AUTHORITY .............................................................................................................. 22

SECTION C :INSTRUCTIONS TO BIDDERS (ITB)

12. INTRODUCTION .................................................................................................................................. 23

13. BRIEF DESCRIPTION OF BIDDING PROCESS ................................................................................ 23

14. CONDITIONS FOR BIDDING ............................................................................................................. 23

15. ACKNOWLEDGEMENT BY BIDDER: .............................................................................................. 25

16. CONFLICT OF INTEREST .................................................................................................................. 25

17. FRAUD AND CORRUPT PRACTICES ............................................................................................... 27

18. RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS ..................................................................... 27

19. DISQUALIFICATIONS ........................................................................................................................ 27

20. CONFIDENTIALITY ............................................................................................................................ 28

21. CONTENTS OF THE RFP .................................................................................................................... 28

22. SITE VISIT AND VERIFICATION OF INFORMATION ................................................................... 28

23. AMENDMENT OF RFP ........................................................................................................................ 29

24. CLARIFICATIONS ............................................................................................................................... 29

Page 6: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 6

25. PRE-BID CONFERENCE ..................................................................................................................... 29

26. VALIDITY OF BIDS ............................................................................................................................. 29

27. BID SECURITY .................................................................................................................................... 29

28. PREPARATION AND SUBMISSION OF BID .................................................................................... 30

29. MODIFICATIONS/ SUBSTITUTION/ WITHDRAWAL OF BIDS .................................................... 33

30. BID OPENING ...................................................................................................................................... 33

31. BID EVALUATION ............................................................................................................................. 34

32. FINANCIAL OPENING AND EVALUATION ................................................................................... 35

33. SELECTION OF BIDDER .................................................................................................................... 35

34. AWARD OF THE PROJECT ................................................................................................................ 36

35. CONTACTS DURING BID EVALUATION ........................................................................................ 36

36. DOCUMENT CHECK LIST FOR BID SUBMISSION ........................................................................ 37

37. MISCELLANEOUS ............................................................................................................................... 38

Page 7: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 7

DEFINITIONS

Affiliate means a person who, directly or indirectly, controls, or is controlled by, or is under

common control with, a Bidder (in case of a single bidder) or a Member in a

Bidding Consortium (in the case of a Consortium) and control means ownership by

one person of at least 26% (twenty six percent) of the voting rights of the other

entity.

Authority means the Government of Kerala or Local Self Government Department of

Government of Kerala represented by Kerala State Industrial Development

Corporation

Bid Due Date means the due date specified for the submission of bid under this RFP

Bid Security means the unconditional, unequivocal and irrevocable security required to be

deposited along with the bid under this RFP

Bid Validity Date means a person who submits bid under this RFP in accordance with the terms set

forth in this RFP

Bid(s) means the bid received in pursuant to this RFP in accordance with the terms set

forth in this RFP

Bidder(s) means the person participating in the Bid in accordance with the terms of this RFP

Bidding

Documents

means all the documents specified to be submitted for participating in the bid under

this RFP

Bidding Process means the process for submission of Bid specified in this RFP

BOQ means the file for submission of Price Bid in the e-tender portal

Charter

Document

means the document evidencing the incorporation or registration of the entity under

relevant law along with the documents governing the objects and rules and

regulations of governance

Cluster means the Local Self Governments Institutions operating in Thiruvananthpuram

district in the State of Kerala, identified as the project area under this RFP

COD means the Date of commencement of Commercial Operation of the plant set up

under the Project as specified in article 1.1.24 of Concession Agreement.

Coercive practice means impairing or harming or threatening to impair or harm, directly or indirectly,

any person or property to influence any person‟s participation or action in the

Bidding Process

Concession

Agreement or

Draft Concession

Agreement

means the draft concession agreement given in Volume II of this RFP along with

all the Schedules give in Volume III

Concession Period means the term of project specified in clause 8

Concessionaire means the person entering into Concession Agreement

Conflict of

Interest

means conflict of interest as defined in clause 16

Consortium means the consortium formed for the purpose of bidding under this RFP in

compliance with the terms and conditions specified herein

Corrupt practice means (i) the offering, giving, receiving, or soliciting, directly or indirectly, of

anything of value to influence the actions of any person connected with the Bidding

Process (for example, offering of employment to, or employing, or engaging in any

Page 8: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 8

manner whatsoever, directly or indirectly, any official of the Authority who is or

has been associated in any manner, directly or indirectly, with the Bidding Process

or the LOI or has dealt with matters concerning the Concession Agreement or

arising there from, before or after the execution thereof, at any time prior to the

expiry of three years from the date such official resigns or retires from or otherwise

ceases to be in the service of the Authority, shall be deemed to constitute

influencing the actions of a person connected with the Bidding Process); or (ii) save

and except as permitted under Clause 16 of ITB, engaging in any manner

whatsoever, whether during the Bidding Process or after the issue of the Letter of

Intent (LOI) or after the execution of the Concession Agreement and till the period

of 1 (one) year from the date of signing of the Concession Agreement, as the case

may be, any person in respect of any matter relating to the Project or the Letter of

Intent (LOI) or the Concession Agreement, who at any time has been or is a legal,

financial or technical adviser of the Authority in relation to any matter concerning

the Project

DBFOT

E- tender Portal

means Design, Build, Finance, Operate and Transfer

means the official e-tender portal of Government of Kerala

Eligibility Criteria means the minimum eligibility criteria specified in clause 3

Estimated Project

Cost

means the estimated/ indicative cost of the project specified in this RFP

Financial Offer or

Price Bid

means the financial quote offered by the Bidder under this RFP

Fraudulent

practice

means a misrepresentation or omission of facts or suppression of facts or disclosure

of incomplete facts, in order to influence the Bidding Process

GoK means Government of Kerala

JBA or Joint

Bidding

Agreement

means the binding agreement entered between the members of the Consortium as

per the format provided in Appendix – V

Key Details

KSERC

means the Key Details of RFP given in clause 5

means the Kerala State Electricity Regulatory Commission

Lead Member

Means the member of the Consortium, who is designated as Lead Member in the

Joint Bidding Agreement in compliance with the RFP conditions governing

consortium

LSGI means a Local self-government institutions established by Kerala Municipality

Act,1994 or Kerala Panchayath Raj Act , 1994

Net Worth means the net worth calculated from the audited financial statement as per the

following formula;

Net Worth = Owners Equity/Partner‟s Capital /Corpus Fund + Free reserves

available for distribution to owners/partners – [Revaluation Reserves + Intangible

assets + deferred revenue expenditure + accumulated losses/deficit].

Parent or

Subsidiary

Company

means, in relation to the Bidder / Consortium Member (the “Parent or Subsidiary

Company”), a person who directly or indirectly, controls, is controlled by, or is

under the common control with such Bidder/ Consortium Member (the “Parent or

Subsidiary Company”). As used in this definition, the expression “control” means,

with respect to a person which is a company or corporation, the ownership, of more

than 50% (fifty per cent) of the voting shares of such person, and with respect to a

Page 9: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 9

person which is not a company or corporation, the power to direct the management

and policies of such person by operation of law.

Performance

Security

means the Performance Security to be submitted by the Selected Bidder as specified

in the Draft Concession Agreement

Person means the Person as defined in Income Tax Act, 1961.

Private Partner means the Bidder selected under this RFP process under Public Private Partnership

Project means the project as specified in this RFP in accordance with the terms and

conditions contained in the Concession Agreement

Project Area means the area identified for the project implementation as specified in this RFP

Restrictive

practice

means forming a cartel or arriving at any understanding or arrangement among

Bidders with the objective of restricting or manipulating a full and fair competition

in the Bidding Process

RFP or Request

For Proposal

The request for proposal issued through this document

Selected Bidder The successful bidder under this RFP declared as Selected Bidder under clause 33

Specified Entity means a (i) Company incorporated under Indian Companies Act 1956/2013 as

amended / modified / replaced from time to time or equivalent foreign laws as

applicable in the home country; or (ii) a Limited Liability Partnership (LLP),

registered under Limited Liability Partnership Act, 2012 or equivalent foreign laws

as applicable in the home country; (iii) a partnership firm registered under Indian

Partnership Act, 1932; or (iv) a Trust registered under the Indian Trust Act, 1882.

(In case of foreign entities, the registration in home country shall be supported by a

certificate of incorporation/ registration - issued by competent government authority

of that country.)

SPV

Swiss Challenge

Method

means the company specifically incorporated by the successful bidder for entering

into concession agreement with the Authority and to implement the project, as per

the terms of this RFP means the method of tendering based on an un solicited

receipt of a proposal for the project to invite third parties to match or better it.

Undesirable

practice

means (i) establishing contact with any person connected with or employed or

engaged by the Authority with the objective of canvassing, lobbying or in any

manner influencing or attempting to influence the Bidding Process; or (ii) having a

Conflict of Interest

Work means all the piece and parcel of the services to be performed by the

Concessionaire pursuant to the Concession Agreement

Page 10: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 10

SECTION A

NOTICE INVITING TENDER (NIT)

FOR GLOBAL COMPETITIVE BIDDING

1. INTRODUCTION

Solid Waste Management has been a critical issue in Kerala, especially in urban areas, for

many years. Government of Kerala, through its Local Self Government Department, is in the

process of implementing an integrated Solid Waste Management solution for the State on a

high priority and for this purpose it is envisaged to setup and operate Waste to Energy Plants

at identified locations across the State through Public Private Partnership under „Design Build

Finance Operate and Transfer (DBFOT)‟ basis. Kerala State Industrial Development

Corporation (KSIDC) is appointed as the Nodal Agency for the selection of Private Partner

for the implementation of such projects at various locations/clusters.

KSIDC has received an unsolicited proposal from an agency for the development of a solid

waste management project through a waste to energy plant of 400 TPD capacity in Design,

Build, Finance, Operate and Transfer basis under public private partnership mode at

Vizhinjam in Thiruvananthapuram district

This RFP is issued to invite competent firms for the submission of proposals under Swiss

Challenge tendering method for the development of the project.

2. INVITATION FOR BID

2.1. Kerala State Industrial Development Corporation Ltd. (KSIDC), as the Nodal Agency on

behalf of GoK, invites online Bids (E-Tender) in two cover system under Swiss Challenge

tender process from eligible applicants, who fulfill qualification criteria as stipulated in clause

3 of this section, through the Kerala Government e-tender portal

https://etenders.kerala.gov.in, for the Development of an “integrated solid waste

management project ‘with a Waste to Energy Plant of minimum 300 TPD processing

capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis for the

Thiruvananthapuram cluster comprising of the Local Self Government Institutions of

Thiruvananthapuram District operating in the State of Kerala, under Public Private

Partnership.

2.2. Interested parties may obtain the Request for Proposal documents from the website by paying

a non-refundable fee of INR 25,000/- (Indian Rupees Twenty Five Thousand only)+ GST as

Tender fee.

2.3. The RFP contains information about the Project, bidding process, Bid submission,

qualification and Financial Proposal requirements and includes the following documents.

Volume 1:

Section A: Notice Inviting Tender (NIT)

Section B: Project Details and Scope of the Project (PDS)

Section C: Instruction to Bidders (ITB)

Page 11: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 11

Appendices

Volume 2: Draft Concession Agreement

Volume 3: Schedules to the Draft Concession Agreement

3. MINIMUM ELIGIBILITY CRITERIA

3.1. The Bidder may be a Single Specified Entity OR a group of entities joined together as a

Consortium subject to the conditions specified in clause 4 of this RFP.

3.2. The bid under this RFP will be considered only from those bidders who meet minimum

eligibility criteria stipulated hereunder. If the bidder is a single specified entity, the stipulated

criteria shall be fulfilled by the bidder itself or through its affiliate or parent or subsidiary. If

the bidder is a consortium or joint venture, the stipulated criteria shall be fulfilled by any

member of the consortium by itself or through its Affiliate or Parent or Subsidiary. In case of

consortium, the bidder will be considered to have met the stipulated criteria only if the

condition for consortium specified against each criterion is fulfilled.

3.3. Stipulated Criteria :

Stipulated Criteria Conditions for

Consortium

Supporting Document to be

submitted

(A) Technical Capacity:

For demonstrating technical capacity

and experience (the “Technical

Capacity”), the Bidder;

(i) shall be in continuous existence for

minimum 3 ( Three ) years as on 1st

March 2020 AND has been in

operation since the last three financial

years;

AND

(ii) shall have experience of design &

development of at least one Waste to

Energy Plant of minimum 1 MW in

India or abroad in the period of past

five years from the bid due date and the

relevant plant is currently in operation;

OR

successful operation of at least one

Waste to Energy Plant of minimum 1

MW capacity for a minimum period of

1 year in India or abroad in the period

of past five years from the bid due date

and the relevant plant is currently in

operation;

At least one member of

the consortium (not

being an individual)

shall meet this criterion

Copy of Certificate of

Registration under relevant

Act and certificate by

Statutory Auditors in the

format given in Annex-II of

Appendix I.

AND

Copy of relevant Work Orders

& Invoices OR Work

completion Certificate/

satisfactory client Certificate

or other evidence, certified by

Statutory Auditors in the

format given in Appendix VI.

Page 12: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 12

Stipulated Criteria Conditions for

Consortium

Supporting Document to be

submitted

(B) Financial Capacity:

For demonstrating financial capacity

(the “Financial Capacity”), the Bidder

shall have a minimum Net Worth of

INR.250,000,000/-(Indian Rupees Two

Hundred Fifty Million) or its

equivalent in US Dollars, converted as

per specified Exchange Conversion

Method given in Annex-III-A of

Appendix I, as per the Latest Audited

Financial Statement. For this clause,

the closure of latest financial year shall

not be before 31st March 2017.

At least one member of

the consortium (not

being an individual)

holding more than 26%

(Twenty Six percent)

stake shall meet this

criterion.

Certificate evidencing Net

Worth by the Statutory

Auditors in the format given

in Annex-IIA, Appendix I.

3.4. In the case of bidding by Consortium, the Supporting Document specified above to prove

eligibility criteria shall be submitted for all the members in the Consortium.

3.5. If any of the criteria is met through Affiliate or Parent or Subsidiary, Supporting Document

specified above to prove the relevant criteria shall be submitted for such Affiliate or Parent or

Subsidiary, as the case may be. The Bidder shall also submit a Certificate from the Statutory

Auditors or Company Secretary demonstrating the relationship with the applicant in the

format given in Annex-IV of Appendix – I.

3.6. If the stipulated criteria, either in full or in part, is fulfilled by the Bidder/member of

Consortium through its Affiliate or Parent or Subsidiary, it shall submit an undertaking from

such Affiliate or Parent or Subsidiary to the effect that the experience of such Affiliate or

Parent or Subsidiary shall be available for the use of the bidder if selected for implementation

of the project.

3.7. In addition to the above said technical and financial criteria the bidder should have an asset

value of Rs. 300 Crores as on 01st January 2020. In case of a Consortium, any one of the

members of the Consortium or Joint Partnership as applicable, should satisfy. Certificate

from Chartered Accountant confirming the Asset value shall be submitted along with the bid

documents.

3.8. The bidder should also demonstrate its ability to fund the project with a valid Letter of Intent

(LoI) or Binding term sheet from Banks / Financial institutions

4. CONDITIONS FOR FORMATION OF CONSORTIUM

4.1. The number of members in a Consortium would be limited to Five (five) such as Power

Developer Entity or Investment Entity or Solid Waste Collection & Transportation entity or

Information and Communication Technology (ICT) entity etc.;

4.2. An individual, resident of India or a foreign resident holding Non-Resident Indian (NRI) /

Overseas Citizen of India (OCI)/ Person of Indian Origin (PIO) status, as per Government of

India documents may also become a member of the Consortium. However, such individual

Page 13: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 13

shall not be considered for evaluation of either Technical Capacity or Financial Capacity

requirement of the Bid, though he/she will be counted for the total number of members;

4.3. Any member of the Consortium could be appointed as Lead Member of the Consortium. The

nomination(s) of Lead Member shall be supported by a Power of Attorney, as per the format

at Appendix – II A, signed by all the members of the Consortium;

4.4. The Lead Member and a Member of the Consortium, meeting either Technical Capacity or

Financial Capacity shall each have an equity share holding of at least 26% (Twenty Six

percent) of the paid up and subscribed equity of the SPV in accordance with Clause 9.4 of

this RFP. The other members of the Consortium shall be termed as “Other Members”;

4.5. The shareholding commitments of all the members of the Consortium shall be in accordance

with Clause 9.4;

4.6. The Bid should contain the information required for each member of the Consortium;

4.7. The Bid should include a brief description of the roles and responsibilities of individual

members, particularly with reference to financial, technical and / or operation & maintenance

obligations;

4.8. An individual Bidder cannot at the same time be member of a Consortium applying for

qualification. Further, a member of a particular Bidder Consortium cannot be a member of

any other Bidder Consortium applying for qualification;

4.9. The Parties to the Consortium should agree to establish SPV for executing the Concession

Agreement in respect of the Project(s) awarded to such Consortium.

4.10. Members of the Consortium shall enter into a binding Joint Bidding Agreement (JBA), as per

the format provided in Appendix – IV, for the purpose of submitting Bid and should submit

the same along with the Bid. The JBA should be specific to the Project and should fulfill the

requirements set out below, failing which the Bid shall be considered non-responsive. The

JBA shall, inter alia:

4.10.1. convey the intent to form an SPV with shareholding/ownership equity

commitment(s) in accordance with Clause 9.4, which would enter into the

Concession Agreement and subsequently carry out all the responsibilities as

Concessionaire in terms of the Concession Agreement, in case the Concession to

undertake the Project is awarded to the Consortium;

4.10.2. clearly outline the proposed roles and responsibilities of each member at each stage;

4.10.3. commit the minimum equity stake to be held by each member; and

4.10.4. All members of the Consortium (including Subsidiary or Parent or Affiliate, whose

technical or financial experience has been claimed) shall under the Concession

Agreement, be liable jointly and severally for obligations of the Concessionaire in

relation to the Project.

4.11. Except as provided under this RFP and the Bidding Documents, there shall not be any

amendment to the JBA without the prior consent of the Authority.

Page 14: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 14

5. KEY DETAILS

1) Tender inviting Authority

Designation and Address

The Managing Director

Kerala State Industrial Development Corporation

Limited, T.C. XI/266, Keston Road,

Thiruvananthapuram

Kerala - 695003, INDIA.

Tel: +91 471 2318922

2) Name of the Public Private Partnership

project

(Tender Ref No…KSIDC/PMU/W2E/14/2020

dated 24th

March 2020) : Development of an

integrated solid waste management project

with a Waste to Energy Plant of min 300 TPD

capacity on Design, Build, Finance, Operate and

Transfer (DBFOT) basis at Vizhinjam, for

Thiruvananthapuram cluster in the State of

Kerala for the Local Self Governments of

Thiruvananthapuram District Kerala under

Public Private Partnership

3) Mode of Tender e-tender through the Government of Kerala tender

portal https:\\etenders.kerala.gov.in

(Please visit the e-tender portal for technical details

of submission of tender through the portal)

4) Tender Fee INR.25,000/- (Indian Rupees Twenty Five

Thousand Only) plus 18% GST

(To be paid online through e-tender portal))

5) Bid Security Amount (EMD) INR.10 Million /- (Indian Rupees Ten Million

Only (To be paid online through e-tender portal)

6) Bid validity Min. 180 (One Hundred and Eighty) days from the

Bid Due Date, extendable for maximum of another

180 days on mutual consent.

7) Validity of Bid Security Min 240 (Two Hundred and Forty) days from the

Bid Due Date, inclusive of a claim period of 60

(sixty) days, and may be extended subject to

maximum of 180 days on mutual consent.

8) Completion period of the work and

commissioning of the project.

In consonance with the Swiss Challenge proposal

attached in Appendix VII of this RFP document.

9) Concession Period 25 years from COD

10) Date of start of Tender Document

download

24th March 2020

(at https:\\etenders.kerala.gov.in and

www.ksidc.org)

11) Site Visit Will be arranged on request

12) Last date of seeking clarification 31st March 2020. Queries if any may be sent

before 17.00 hrs to [email protected]

13) Pre-bid Meeting On 2nd

April 2020 at 11:00 hrs at KSIDC

Corporate office, Keston Road, Kowdiar,

Page 15: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 15

Trivandrum

14) Response to Pre-bid Queries On or before 06th April 2020

15) Date of start of Bid upload 15th April 2020

(at https://etenders.kerala.gov.in and

inwww.ksidc.org)

16) Last Date and Time of

submission of Tender

14.00 hrs on 24th

April 2020

(at https://etenders.kerala.gov.in only)

17) Date and Time of opening of Cover 1

(“Fee/Prequal/Technical proposal”)

26th April 2020, IST 17:30 hrs at KSIDC

Corporate office, Keston Road, Kowdiar,

Trivandrum

18) Technical Evaluation and Presentation by

Bidders

On 30th April 2020 at IST 10:00 hrs at KSIDC

Corporate office, Keston Road, Kowdiar,

Trivandrum

19) Date and Time of opening of Cover 2

(“Price Bid”)

2nd

May 2020, IST 16:00 hrs at KSIDC Corporate

office, Keston Road, Kowdiar, Trivandrum

20) Authority for seeking clarifications Kerala State Industrial Development Corporation

Limited

21) Website from which Tender Documents

and any additional information can be

downloaded

https:\\etenders.kerala.gov.in or

www.ksidc.org

22) Hard copy submission of technical

proposal, stamp paper/notarised

documents

On or before 24th April 2020 , IST 15.00 hrs

At

Kerala State Industrial Development Corporation

Limited,

T.C. XI/266, Keston Road,

Thiruvananthapuram

Kerala - 695003, INDIA

23) Issue of Letter Of Intent Before 8 (Eight) weeks from opening of financial

proposal

24) Acceptance by the successful bidder of the

Letter of intent (LOI)

Within 15 (fifteen days) from issuance of LOI

25) Formation of SPV and submission of

performance security by SPV

Formation of SPV Within 30 (Thirty) days and

submission of performance security within 45

(Forty Five) days from acceptance of LOI

26) Signing of concession agreement Within 60 (Sixty) days from acceptance of LOI

Note: (a) If the date of submission of tenders happens to be a public holiday, Tenders will be received

and opened on the next working day at the same venue and time. Bidders are requested to

check the website for regular updates.

(b) Authority will endeavour to adhere to the dates indicated above. However, it reserves the

right to effect changes to the above dates, if the need arises. Such change, if any, would be

uploaded at Authority‟s website (https:\\etenders.kerala.gov.in) from time to time.

6. INSTRUCTIONS ON E-TENDER

6.1. The Bid should be submitted online at website https://etenders.kerala.gov.in in the

relevant covers only, by the due date and time, as specified in the Key Details. Late/delayed

Page 16: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 16

tenders submitted online after the due date and time, for whatsoever reasons will not be

considered. The Server Date & Time as appearing on the website

https://etenders.kerala.gov.in shall only be considered for the critical date and time of

tenders. Offers sent through post, telegram, fax, telex, e-mail, courier will not be considered.

6.2. Partially completed/incomplete bids shall not be considered.

6.3. All communication regarding how to submit offers shall be done online through website

https://etenders.kerala.gov.in

6.4. Bidders shall be required to arrange all resources, including Digital Signature Certificates

and Internet Connections at their own cost, for participating in online tenders at

https://etenders.kerala.gov.in.

6.5. The Authority shall not be responsible for any delays reasons whatsoever in receiving as well

as submitting offers, including connectivity issues. The Authority shall not be responsible for

any other delays in submitting any documents wherever applicable.

6.6. The Authority will not be responsible for the cost incurred in preparation and submission of

bids online including the cost of digital certificate, regardless of the conduct of outcome of

the bidding process.

6.7. Two cover system :

As two bid system is insisted, Bidders are required to submit offer in two covers, namely

“Fee/Prequalification/Technical “and “Financial”.

In Cover I (“Fee/Prequalification/Technical”), Bidders are requested to upload, the

scanned copies of the documents specified under Technical Cover in the Checklist given

in Clause36 Section C of Volume I of RFP, “online”.

In Cover II (“Finance”), Bidders are requested to quote rates in the file „BOQ‟ and

upload the same online. PLEASE DO NOT QUOTE/MENTION RATES ANYWHERE

ELSE IN THE TENDER OTHER THAN BOQ

6.8. Incase if applicant does not hold any document which need to be uploaded OR there is no

need to upload the mentioned document please upload a scanned copy stating the reason for

not uploading OR a blank sheet for proceeding with tendering. Provisions for uploading

cannot be left blank.

6.9. Please note that queries related to enquiry specifications, terms & conditions etc. should be

submitted through email ([email protected]) before the clarification end date/time

specified in the Key Details.

6.10. Tender opening will be done online at the time and dates specified in the tender Key Details.

6.11. The bidders are requested to go through the instruction to the bidders in the website

https://etenders.kerala.gov.in. The bidders who submit their bids for this tender after

digitally signing using their Digital Signature Certificate (DSC), accept that they have clearly

understood and agreed the terms and conditions in the website including the terms and

conditions of this tender.

Page 17: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 17

Page 18: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 18

SECTION B

PROJECT DETAILS AND SCOPE OF THE PROJECT (PDS)

7. PROJECT BACKGROUND

7.1. Local Self Government Department, Government of Kerala, proposes to develop an

Integrated Solid Waste Management project with a Waste to Energy plant of a minimum

processing capacity of 300 Tonnes Per day (TPD) for the Thiruvananthapuram Cluster

operating in the State of Kerala. This RFP is issued for inviting global competitive bids under

swiss challenge method from interested entities or group of entities to execute the Project in

partnership with GoK under Public Private Partnership under „Design, Build, Finance,

Operate and Transfer‟ basis, as detailed in this RFP.

7.2. The project is proposed to be developed as a port based power project at the back up area

near Vizhinjam International Seaport Ltd. The power being generated in the plant will be

consumed for the operation of the port and its allied activities. 15 acres of land adjacent to the

port area at Vizhinjam will be provided on a nominal lease and the Private Partner is expected

to design the plant and a comprehensive plan for the complete chain of solid waste

management, build the same by arranging the finance required for the same, operate the

project for the specified period and transfer it back to GoK/LSGIs at the end of the specified

period, in accordance with the detailed terms and conditions contained in the draft Concession

Agreement.

7.3. An un solicited proposal for the project was received on an integrated manner with state of

the art Waste to Energy (WtE) facility at the proposed site. The complete details of proposal

for collection, segregation, transportation and processing is enclosed as Appendix VII . The

proposal shall require to be adhered in a complete manner. Any deviation in Draft

Concession Agreement and Schedules and the Proposal, the Proposal shall supersede in all

conditions.

7.4. The Thiruvananthapuram Cluster comprises of the following participating LSGIs,

a) Thiruvananthapuram Municipal Corporation

b) Attingal Municipality

c) Nedumangadu Municipality

d) Neyyattinkara Municipality

e) Varkkala Municipality

f) Venganoor Grama Panchayath

g) Kalliyoor Grama Panchayath

h) Balaramapuram Grama Panchayath

i) Parassala Grama Panchayath

j) Poovar Grama Panchayath.

Page 19: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 19

7.5. The scope of the Private Partner include the secondary collection, segregation, transportation

and processing of solid waste generated in the cluster using the similar technology detailed in

Appendix VII of this RFP document or a better technology by which the development of

plant can be completed with in the time frame given in the Swiss Challenge proposal. In the

process, the private partner shall collect, segregate the waste collected and all recyclables like

metal, glass, plastics etc. are either sold to the recycling industry or recycled or re processed

through re cycling/ re processing facilities directly or indirectly with in the allotted site. Such

activity shall be at the risk and cost of the bidder and they may retain all income from such

activity.

7.6. The Bidders are required to quote Tipping Fee, as detailed in Clause 28.4. Bidder shall quote

Tipping Fee as on Bid Due Date.

The Tipping Fee shall be varied each year in the month of April (FY) in proportion to change

in Consumer Price Index, issued by Ministry of Statistics and Program Implementation, Govt

of India, as detailed in the Concession Agreement. First year of Tipping Fee payment would

be the year in which collection & transportation of Solid Waste is started.

7.7. The income of the SPV from the project will be the monthly payable Tipping fee, power

charges for the net exportable power generated at the tariff, as approved by KSERC and the

income from sale of all by-products, the details of which are elaborated in the Draft

Concession Agreement. The Authority shall facilitate the selected bidder to obtain the project

specific power tariff for the WtE project, for which the selected bidder shall petition KSERC

and submit their DPR covering technology proposed, capital investment plan, cost estimates

and project financing details.

7.8. Authority will facilitate in obtaining any eligible financial assistance as per the prevailing

guidelines of Swacch Bharat Mission (SBM) – Urban 2017, or any prevailing schemes of

Ministry of Housing & Urban Affairs, GOI, at the time of execution of the concession

agreement. The concessionaire shall prepare and submit to the Authority for approval, a

DPR, covering the collection mechanism, technology for processing, detailed project costing

and the capital investment plan.

The financial assistance as approved and released by SBM, MoH&UA and the corresponding

GoK share if any will be released as reimbursement to the concessionaire based on the

progress of project development and on recommendation of the PMU.

7.9. An escrow shall be opened by the SPV and all revenue shall be deposited into the same, as

detailed in the Concession Agreement. The payment by Authority shall also be deposited into

the said escrow account.

7.10. As part of the Bidding Documents, the Authority has provided the Draft Concession

Agreement prepared by the Authority / its consultants in Volume II and III of the RFP, which

contains the detailed terms and conditions for grant of the concession, including termination,

exit, force majeure as well as the detailed scope of the Project.

8. CONCESSION PERIOD

The concession period is pre-determined and fixed as 25 (Twenty Five) years from the date of

commencement of commercial operation by the Plant set up under the Project, which shall be

achieved within the period stipulated in the concession agreement, from the date of

completion of conditions precedent as specified in the concession agreement,.

9. SPECIAL PURPOSE VEHICLE

Page 20: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 20

9.1. The Selected Private Partner shall incorporate a Special Purpose Vehicle (“SPV”) who will

be the “Concessionaire” and shall execute the Concession Agreement with the Authority in

the form provided by in Volume II and III of this RFP. The SPV shall be responsible to

execute Work under this project.

9.2. The SPV shall establish an office in Thiruvananthpuram and undertaking to this effect shall

be submitted along with the Bid.

9.3. In case, the Selected Bidder is a single Entity, it shall hold at least 100% (hundred per cent)

of subscribed and paid up equity share capital of the SPV along with its Affiliate or Parent or

Subsidiary Company (whose technical or financial experience has been claimed for

qualification) to implement the Project, until 5th

(Fifth) anniversary of COD. Thereafter, the

Selected Bidder along with its Affiliates or Parent or Subsidiary shall hold at least 51% (fifty

one per cent) in the Project SPV until the 10th

(Tenth) anniversary of COD.

9.4. In case the Selected Bidder is a Consortium, a member of the Consortium meeting technical

capacity or financial capacity subscribe at least 26% (twenty six per cent) or more of the paid

up and subscribed equity of the SPV until 2nd (Second) anniversary of the COD for member

meeting technical criteria and until 1st (First) anniversary of the COD for member meeting

financial criteria. The members of the Consortium along with their Affiliate or Parent or

Subsidiary Company (whose technical or financial experience has been claimed for

qualification) shall collectively hold 100% (hundred per cent) of the subscribed and paid up

equity of the SPV until the 1st anniversary of the COD. The Consortium members in

proportion to their shareholding shall hold at least 51% (Fifty one per cent) of the subscribed

and paid up equity share capital of the Project SPV until 10th (Tenth) anniversary of COD

and thereafter 26% shareholding in the paid up equity capital during the remaining

concession period. The Bidder further acknowledges and agrees that the aforesaid obligation

shall be the minimum, and shall be in addition to such other obligations as may be contained

in the Concession Agreement, and a breach hereof shall, notwithstanding anything to the

contrary contained in the Concession Agreement, be deemed to be a breach of the

Concession Agreement and dealt with as such there under.

10. SCOPE OF WORK FOR PRIVATE PARTNER

10.1. The broad scope of Work of Private Partner shall be as below:

10.1.1. To plan, design, engineering, develop, finance, construct, market, operate, maintain

and manage integrated solid waste management with collection, segregation,

transportation, processing and disposal in identified Cluster as per requisite norms

and standards prescribed by regulatory authorities.

10.1.2. To ensure compliance with the Guidelines & Polices issued by the concerned

Government (Government of India and Government of Kerala), both present and

future, with regard to solid waste management.

10.1.3. To design and set up modern Waste to Energy plant at Project Site of minimum

processing capacity of 300 TPD using the similar technology detailed in Appendix

VII of this RFP document or a better technology by which the development of plant

can be completed with in the time frame given in the Swiss Challenge proposal. The

selected Private Partner shall strive to achieve complete elimination of landfill

requirement but in no circumstances, the landfill shall be more than 10% of waste

received at the Site (to be monitored on a monthly basis).

10.1.4. To collect, segregate and transport solid waste from collection bins in the identified

Cluster. (Participating LSGIs of each cluster);

Page 21: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 21

The collection herein would mean a bin based secondary collection to ensure

maximum coverage of waste collection from the city. The responsibility to undertake

the door to door collection, collection from public spaces, street cleaning and

delivering to the bins provided by the concessionaire at the designated collection

points shall be vested with the participating LSGIs. The location of bins and

concessionaire‟s collection points will be decided depending on area and population

and with mutual consultation between LSGI and Concessionaire.

10.1.5. To transport solid waste to the Processing Facility with minimal handling and limited

inter-vehicle transfers using best practices in vehicle planning, scheduling &

handling to ensure no accumulation at a particular location for more than defined

time;

10.1.6. To preferably segregate the waste (if required) at source by educating and creating

awareness among customers and by providing different collection containers for

biodegradable and non- biodegradable wastes.

10.1.7. To segregate the non-usable and non-biodegradable waste viz. Plastic, Metal, Glass,

Electronics & Other items and recycle /reprocess them through own units or sell

them to re-processors/ recyclers/ Govt. authorized agencies. Other wastes such as

Rubber, Tyre, Upholstery, Bags etc. may be sold to cement or other factories as

energy source. The resources recovery shall be carried out at the cost and risk of the

Concessionaire. It shall also be ensured that no part of Construction & Demolition

waste is used in the plant.

10.1.8. To process the leachate in accordance with Central Pollution Control Board (CPCB)

standards and in case of requirement, to develop Sanitary Landfill of Designed

Capacity and set up a leachate treatment facility at the site;

10.1.9. To develop the surrounding of the plant with greenhouse concept having plants,

lawns, gardens etc. as model spot for educating students/ public on environmental

protection and best environment practices.

10.1.10. To do Operation and maintenance of the Processing Facilities and Sanitary Landfills

by adhering to the pollution control standards for air, water and land prescribed by

Kerala State Pollution Control Board (KSPCB) and Central Pollution Control Board

(CPCB );

10.1.11. To install and operate the plant in full compliance with all laws of the land including

Solid Waste Management Rules (2016) at all times.

10.1.12. To treat the flue gas vented to atmosphere adequately by scrubbing, neutralization

and filtering or any combination of technologies so that the air pollution and other

environmental laws and their amendments within the acceptance level as per

statutory requirements.

10.1.13. To Develop and Manage ICT infrastructure for the project including but not limited

to GPS tracking of vehicles, electronic weigh bridges at Project Site, surveillance

cameras at Project Site etc.

Concessionaire shall provide all assistance in case the Authority is to undertake on its

own or through a Third Party Monitoring Entity (Independent Engineer) the

Development and Management of Information Communication and Technology

(ICT) and IOT (with sensors and video analytics) infrastructure for monitoring the

project, including but not limited to, GPS tracking of vehicles, Sensor based weight

measurement in transportation vehicles, electronic weigh bridges at Project Site,

Page 22: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 22

surveillance cameras at Project Site etc. and a central command centre for all Waste

Management Projects in Kerala.

10.1.14. To deploy its representatives in each participating LSGIs for prompt cognizance and

redressal of any service complaint related to one or more of concessionaire's

obligation.

10.2. The Draft Concession Agreement sets forth the detailed terms and conditions for grant of the

concession to the Concessionaire, including the scope of the Concessionaire‟s services and

obligations (the “Concession”). A detailed Scope of work is provided in “Schedule A” of

Concession Agreement.

10.3. The statements and explanations contained in this Request for Proposal (the “RFP”

document) are intended to provide a better understanding to the Bidders about the subject

matter of this RFP and should not be construed or interpreted as limiting in any way or

manner the scope of services and obligations of the Concessionaire set forth in the Draft

Concession Agreement or the Authority‟s rights to amend, alter, change, supplement or

clarify the scope of work, the Concession to be awarded pursuant to this RFP or the terms

thereof or herein contained. Consequently, any omissions, conflicts or contradictions in the

Bidding Documents including this RFP are to be noted, interpreted and applied appropriately

to give effect to this intent, and no claims on that account shall be entertained by the

Authority.

11. ROLE OF THE AUTHORITY

11.1. The broad scope for the Authority shall be as below:

11.1.1. To earmark a Project Site admeasuring to 15 Acres in Sy Nos. 269,270,271,

272,273,274,275,283,284,286 and 287 at Vizhinjam Village in Neyyattinkara Thaluk

in Thiruvananthapuram district. .. and provide the same on lease of Rs. 100/- per

annum per acre to SPV for a concession period of 25 years for Waste Processing.

11.1.2. To provide all assistance in seeking the requisite clearances and approvals from

regulatory authorities of Government of India and Government of Kerala.

11.1.3. To ensure collection of minimum of 300 TPD from the identified cluster by the

LSGIs and to put in place an appropriate mechanism, which will make it mandatory

for the participating LSGIs to contribute solid waste based on their population,

economic activities, tourism and other features. In case LSGI fails to assure the

minimum assured quantity, LSGIs, will be liable to pay penalty to SPV calculated at

25% of the corresponding year Tipping Fee per ton for each ton of shortfall. The

penalty shall be payable only if the monthly average of quantity received at the Site

is below 90% of assured quantity.

Page 23: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

400 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Section C

INSTRUCTIONS TO BIDDERS (ITB)

12. INTRODUCTION

12.1. This Section aims to provide guidelines/instructions to the Participants, to be used while

submitting the Bid. These are generic in nature, but Bidders are required to abide by them

during the currency of the Project.

13. BRIEF DESCRIPTION OF BIDDING PROCESS

13.1. Based on the unsolicited proposal for the development of an integrated solid waste

management project with a waste to energy plant the Authority has adopted a Swiss

Challenge based Single-Stage Two Cover bidding process under the electronic tendering (e-

tender) procedure of Government of Kerala for selection of the Bidder for award of the

Project (the "Bidding Process") and invites Bids from eligible parties, (which expression

shall, unless repugnant to the context include the members of the Consortium) for the Project

in accordance with the terms of this RFP. The first Cover (the “Fee/Prequalification/Technical

Proposal”) of the Bidding Process involves evidence of payment of tender fee & submission

of bid security, pre-qualification of interested parties on the basis of their Technical &

Financial Capacity (the “Prequalification Stage”) and their Technical Proposal (the

“Technical Proposal Stage”). At the end of the Prequalification Stage, the Authority shall

short list Bidders whose “Financial” cover containing price bid are eligible for opening during

the financial proposal evaluation stage. In the price bid, the proposers are required to quote

Tipping Fee as specified in Clause 28.4.

13.2. After Technical Proposal Stage and subject to requirements of the RFP, the Tipping Fee

shall constitute the sole criteria for evaluation of bids and the selection of the Successful

Bidder.

14. CONDITIONS FOR BIDDING

14.1. A Bidder is eligible to submit only one bid for the Project.

14.2. A bidder bidding individually or as a member of a consortium shall not be entitled to submit

another bid either individually or as a member of any Consortium, as the case may be.

14.3. While Qualification is open to persons from any country, the following provisions shall

apply:

(a) Where, on the date of the Bid, not less than 15% (fifteen percent) of the aggregate issued,

subscribed and paid up equity share capital in a Bidder is held by persons resident outside

India or where a Bidder is controlled by persons resident outside India; or

(b) if at any subsequent stage after the date of the Bid, there is an acquisition of not less than

15% (fifteen percent) of the aggregate issued, subscribed and paid up equity share capital

or control by persons resident outside India in or of the Bidder;

then the Qualification of such Bidder or in the event described in sub clause (b) above, the

continued Qualification of the Bidder shall be subject to approval of the Authority from

national security and public interest perspective. The decision of the Authority in this behalf

shall be final, conclusive and binding on the Bidder.

The holding or acquisition of equity or control, as above, shall include direct or indirect

holding/ acquisition including by transfer of the direct or indirect legal or beneficial

ownership or control by persons acting for themselves or in concert and in determining such

Page 24: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 24

holding or acquisition, the Authority shall be guided by the principles, precedents and

definitions contained in the Securities and Exchange Board of India (Substantial Acquisition

of Shares and Takeovers) Regulations, 1997 or any substitute thereof as in force on the date

of such acquisition.

14.4. Change in Ownership :

14.4.1. The Bidder shall promptly inform the Authority of any change in the shareholding,

as above, and failure to do so shall render the Bidder liable for disqualification from

the Bidding Process.

14.4.2. By submitting the Bid, the Bidder shall also be deemed to have acknowledged and

agreed that in the event of a change in control of a Affiliate, Parent or Subsidiary

Company whose Technical Capacity and/ or Financial Capacity was taken into

consideration for the purposes of short-listing under and in accordance with the RFP,

the Bidder shall be deemed to have knowledge of the same and shall be required to

inform the Authority forthwith along with all relevant particulars about the same and

the Authority may disqualify the Bidder or withdraw the LOI from the Selected

Bidder, as the case may be. In the event such change in control occurs after signing

of the Concession Agreement but prior to Financial Close of the Project, it would,

notwithstanding anything to the contrary contained in the Concession Agreement, be

deemed to be a breach of the Concession Agreement, and the same shall be liable to

be terminated without the Authority being liable in any manner whatsoever to the

Concessionaire. In such an event, notwithstanding anything to the contrary contained

in the Concession Agreement, the Authority shall be entitled to forfeit the Bid

Security or Performance Security, as the case may be, as Damages, without prejudice

to any other right or remedy that may be available to the Authority under the Bidding

Documents and/ or the Concession Agreement or otherwise.

14.5. Cost of Bidding: The Bidders shall be responsible for all of the costs associated with the

preparation of their Bids and their participation in the Bid Process. The Authority will not be

responsible or in any way liable for such costs, regardless of the conduct or outcome of the

Bidding Process.

14.6. Notwithstanding anything to the contrary contained herein, in the event that the Bid Due

Date falls within three months of the closing of the latest financial year of a Bidder, it shall

ignore such financial year for the purposes of its Bid and furnish all its information and

certification called for in this RFP with reference the financial year immediately preceding

the latest financial year. For the avoidance of doubt, financial year shall, for the purposes of a

Bid hereunder, mean the accounting year followed by the Bidder in the course of its normal

business.

14.7. The documents including this RFP and all attached documents, provided by the Authority are

and shall remain or become the properties of the Authority and are transmitted to the Bidders

solely for the purpose of preparation and the submission of a Bid in accordance herewith.

Bidders are to treat all information as strictly confidential and shall not use it for any purpose

other than for preparation and submission of their Bid. The provisions of this Clause shall

also apply mutatis mutandis to Bids and all other documents submitted by the Bidders, and

the Authority will not return to the Bidders any Bid, document or any information provided

along therewith.

14.8. The Authority reserves the right to verify all statements, information and documents

submitted by the Bidder in response to the RFP. Any such verification or lack of such

verification by the Authority shall not relieve the Bidder of its obligations or liabilities

hereunder nor will it affect any rights of the Authority thereunder.

Page 25: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 25

15. ACKNOWLEDGEMENT BY BIDDER:

15.1. It shall be deemed that by submitting the Bid, the Bidder has;

15.1.1. made a complete and careful examination of the RFP;

15.1.2. received all relevant information requested from the Authority;

15.1.3. accepted the risk of inadequacy, error or mistake in the information provided in this

RFP or furnished by or on behalf of the Authority relating to any of the matters

referred to in this RFP;

15.1.4. agreed to be bound by the undertakings provided by it under and in terms hereof;

15.1.5. satisfied itself about all matters, things and information including matters relating to

the project site necessary and required for submitting an informed Bid, execution of

the Project in accordance with the Bidding Documents and performance of all of its

obligations thereunder; and

15.1.6. acknowledged and agreed that inadequacy, lack of completeness or incorrectness of

information provided in the Bidding Documents or ignorance of any of the matters

relating to the project shall not be a basis for any claim for compensation, damages,

extension of time for performance of its obligations, loss of profits etc. from the

Authority, or a ground for termination of the Concession Agreement by the

Concessionaire.

15.2. The Authority shall not be liable for any omission, mistake or error in respect of any of the

above or on account of any matter or thing arising out of or concerning or relating to the RFP

or the Bidding Process, including any error or mistake therein or in any information or data

given by the Authority.

16. CONFLICT OF INTEREST

16.1. A Bidder shall not have a conflict of interest (the “Conflict of Interest”) that affects the

Bidding Process. Any Bidder found to have a Conflict of Interest shall be disqualified. In the

event of disqualification, the Authority shall forfeit 100% (one hundred percent) of the value

of Bid Security or Performance Security, as the case may be, as mutually agreed genuine pre-

estimated compensation and damage payable to the Authority for, inter alia, the time, cost and

effort of the Authority, including consideration of such Bidder‟s proposal, without prejudice

to any other right or remedy that may be available to the Authority hereunder or otherwise.

Without limiting the generality of the above, a Bidder shall be deemed to have a Conflict of

Interest affecting the Bidding Process, if:

16.1.1. the Bidder or its Affiliate, Parent or Subsidiary Company (or any constituent thereof)

and any other Bidder or any of its Affiliate, Parent or Subsidiary Company thereof

(or any constituent thereof) have common controlling shareholders or other

ownership interest; provided that this disqualification shall not apply in cases where

the direct or indirect shareholding of a Bidder or an Affiliate, Parent or Subsidiary

Company thereof (or any shareholder thereof having a shareholding of not more than

25% (twenty five per cent) of the paid up and subscribed share capital of such Bidder

or Affiliate or Parent or Subsidiary Company, as the case may be) in the other Bidder

or Affiliate or Parent or Subsidiary Company, is not more than 25% (twenty five per

cent) of the subscribed and paid up equity share capital thereof; provided further that

this disqualification shall not apply to any ownership by a bank, insurance company,

pension fund or a public financial institution referred to in section 4A of the

Companies Act, 1956 or its equivalent legislation. For the purposes of this Clause,

Page 26: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 26

indirect shareholding held through one or more intermediate persons shall be

computed as follows: (aa) where any intermediary is controlled by a person through

management control or otherwise, the entire shareholding held by such controlled

intermediary in any other person (the “Subject Person”) shall be taken into account

for computing the shareholding of such controlling person in the Subject Person; and

(bb) subject always to sub-clause (aa) above, where a person does not exercise

control over an intermediary, which has shareholding in the Subject Person, the

computation of indirect shareholding of such person in the Subject Person shall be

undertaken on a proportionate basis; provided, however, that no such shareholding

shall be reckoned under this sub-clause (bb) if the shareholding of such person in the

intermediary is less than 26% of the subscribed and paid up equity shareholding of

such intermediary; or

16.1.2. such Bidder or any Affiliate, Parent or Subsidiary Company thereof receives or has

received any direct or indirect subsidy, grant, concessional loan or subordinated debt

from any other Bidder or Affiliate, Parent or Subsidiary Company, or has provided

any such subsidy, grant, concessional loan or subordinated debt to any other Bidder

or any Affiliate or Parent or Subsidiary Company thereof; or

16.1.3. such Bidder has the same legal representative for purposes of this Bid as any other

Bidder; or

16.1.4. such Bidder, or any Affiliate, Parent or Subsidiary Company thereof has a

relationship with another Bidder, or any Affiliate, Parent or Subsidiary Company

thereof, directly or through common third party/ parties, that puts either or both of

them in a position to have access to each other‟s‟ information about, or to influence

the Bid of either or each other; or

16.1.5. such Bidder, or any Affiliate, Parent or Subsidiary Company thereof has participated

as a consultant to the Authority in the preparation of any documents, design or

technical specifications of the Project.

16.2. Notwithstanding anything stated herein, a conflict of interest situation arising at the

Qualification will be considered to subsist only, as between such Applicants attracting

conflict of interest provisions on account of shareholdings, who submit bids under this

document.

16.3. A Bidder shall be liable for disqualification if any legal, financial or technical adviser of the

Authority in relation to the Project is engaged by the Bidder, its Member or any Affiliate,

Parent or Subsidiary Company thereof, as the case may be, in any manner for matters related

to or incidental to the Project during the Bidding Process or subsequent to the (i) issue of the

LOI or (ii) execution of the Concession Agreement. In the event any such adviser is engaged

by the Selected Bidder or Concessionaire, as the case may be, after issue of the LOI or

execution of the Concession Agreement for matters related or incidental to the Project, then

notwithstanding anything to the contrary contained herein or in the LOI or the Concession

Agreement and without prejudice to any other right or remedy of the Authority, including the

forfeiture of the Bid Security or Performance Security, as the case may be, which the

Authority may have there under or otherwise, the LOI or the Concession Agreement, as the

case may be, shall be liable to be terminated without the Authority being liable in any

manner whatsoever to the Selected Bidder or Concessionaire for the same. For the avoidance

of doubt, this disqualification shall not apply where such adviser was engaged by the Bidder

or its Affiliate, Parent or Subsidiary Company in the past but its assignment expired or was

terminated 6 (six) months prior to the date of issue of this RFP. Nor will this disqualification

apply where such adviser is engaged after a period of 1 (one) year from the date of signing of

the Concession Agreement.

Page 27: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 27

17. FRAUD AND CORRUPT PRACTICES

17.1. The Bidders and their respective officers, employees, agents and advisers shall observe the

highest standard of ethics during the Bidding Process and subsequent to the issue of the LOI

and during the subsistence of the Concession Agreement. Notwithstanding anything to the

contrary contained herein, or in the LOI or the Concession Agreement, the Authority may

reject a Bid, withdraw the LOI, or terminate the Concession Agreement, as the case may be,

without being liable in any manner whatsoever to the Bidder or Concessionaire, as the case

may be, if it determines that the Bidder or Concessionaire, as the case may be, has, directly or

indirectly or through an agent, engaged in corrupt practice, fraudulent practice, coercive

practice, undesirable practice or restrictive practice in the Bidding Process. In such an event,

the Authority shall be entitled to forfeit the Bid Security or Performance Security, as the case

may be, as Damages, without prejudice to any other right or remedy that may be available to

the Authority under the Bidding Documents and/or the Concession Agreement, or otherwise.

17.2. Without prejudice to the rights of the Authority under Clause 17 hereinabove and the rights

and remedies which the Authority may have under the LOI or the Concession Agreement, or

otherwise if a Bidder or Concessionaire, as the case may be, is found by the Authority to

have directly or indirectly or through an agent, engaged or indulged in any corrupt practice,

fraudulent practice, coercive practice, undesirable practice or restrictive practice during the

Bidding Process, or after the issue of the LOI or the execution of the Concession Agreement,

then both Bidder and Concessionaire shall not be eligible to participate in any tender or RFP

issued by the Authority during a period of 2 (two) years from the date such Bidder or

Concessionaire, as the case may be, is found by the Authority to have directly or indirectly or

through an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive

practice, undesirable practice or restrictive practices, as the case may be.

18. RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS

18.1. Notwithstanding anything contained in this RFP, the Authority reserves the right to accept or

reject any Bid and to annul the Bidding Process and reject all Bids, at any time without any

liability or any obligation for such acceptance, rejection or annulment, and without assigning

any reasons thereof.

19. DISQUALIFICATIONS

19.1. Bids submitted by fax, telex, telegram or e-mail shall not be entertained and shall be

disqualified and rejected as non-responsive.

19.2. Bids received by the Authority after the specified time on the Bid Due Date shall not be

eligible for consideration and shall be summarily rejected.

19.3. The Authority reserves the right to disqualify and reject any Bid if:

19.3.1. at any time, a material misrepresentation is made or uncovered, or

19.3.2. the Bidder does not provide, within the time specified by the Authority, the

supplemental information sought by the Authority for evaluation of the Bid or

19.3.3. the financial quote is included, directly or indirectly, in the Technical Proposal or any

document accompanying the Technical Proposal.

19.4. Such misrepresentation / improper response shall lead to the disqualification of the Bidder. If

the Bidder is a Consortium, then the entire Consortium and each Member may be

disqualified / rejected. If such disqualification/ rejection occurs after the Bids have been

Page 28: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 28

opened and the Lowest Bidder gets disqualified/ rejected, then the Authority reserves the

right to annul the Bidding Process and to invite the fresh Bids.

19.5. Any condition or qualification or any other stipulation contained in the Bid shall render the

Bid liable to rejection as a non-responsive Bid.

19.6. In case it is found during the evaluation or at any time before signing of the Concession

Agreement or after its execution and during the period of subsistence thereof, including the

concession thereby granted by the Authority, that one or more of the pre-qualification

conditions have not been met by the Bidder, or the Bidder has made material

misrepresentation or has given any materially incorrect or false information, the Bidder shall

be disqualified forthwith if not yet appointed as the Concessionaire either by issue of the LOI

or entering into of the Concession Agreement, and if the Bidder/SPV has already been issued

the LOI or has entered into the Concession Agreement, as the case may be, the same shall,

notwithstanding anything to the contrary contained therein or in this RFP, be liable to be

terminated, by a communication in writing by the Authority to the Bidder, without the

Authority being liable in any manner whatsoever to the Bidder. In such an event, the

Authority shall be entitled to forfeit the Bid Security or Performance Security, as the case

may be, as Damages, without prejudice to any other right or remedy which the Authority

may have under this RFP, the Bidding Documents, and the Concession Agreement or under

applicable law.

20. CONFIDENTIALITY

Information relating to the examination, clarification, evaluation, and recommendation for the

short-listed Bidders shall not be disclosed to any person who is not officially concerned with

the process or is not a retained professional advisor advising the Authority in relation to or

matters arising out of, or concerning the Bidding Process. The Authority will treat all

information, submitted as part of Bid, in confidence and will require all those who have

access to such material to treat the same in confidence. The Authority may not divulge any

such information unless it is directed to do so by any statutory entity that has the power under

law to require its disclosure or is to enforce or assert any right or privilege of the statutory

entity and/ or the authority or as may be required by law or in connection with any legal

process.

21. CONTENTS OF THE RFP

21.1. This RFP comprises the disclaimer set forth hereinabove, the contents as listed in Table of

Content at the beginning of this document.

21.2. The Draft Concession Agreement and Schedules provided by the Authority as part of the Bid

Documents shall be deemed to be part of this RFP.

22. SITE VISIT AND VERIFICATION OF INFORMATION

22.1. Bidders are encouraged to submit their respective Bids after visiting the Project site and

proposed locations for transfer stations for ascertaining for themselves the existing conditions,

location, surroundings, climate, availability of power, water and other utilities for

construction, access to site, handling and storage of materials, weather data, applicable laws

and regulations, and any other matter considered relevant by them. Bidders are also advised to

visit the municipal / panchayat area of Participating LSGIs to understand the existing solid

waste practices & process, people behavior, locations of secondary collection centres, routes

of solid waste vehicles etc.

22.2. The request for Site Visit shall be submitted to the Authority as specified in Key Data. The

Authority will make necessary arrangement for the Site Visit and will intimate the dates.

Page 29: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 29

23. AMENDMENT OF RFP

23.1. At any time prior to the Bid Due Date, the Authority may, for any reason, whether at its own

initiative or in response to clarifications requested by a Bidder, modify the RFP by the

issuance of Addenda.

23.2. Any Addendum thus issued will be uploaded on the website. Bidders are advised to keep

watch on www.etenders.kerala.gov.in for any modification in RFP and other updates about

the Project. The Bidders must submit their Bids in compliance of the latest updates,

addendums, modifications or amendments issued by the Authority. The Authority does not

assume any responsibility to bidders, who fails to submit their bids in accordance with latest

updates, addendums, modifications or amendments issued by the Authority before Bid Due

Date. In such case the Authority may reject any bid for the non-compliance of hereunder.

23.3. In order to afford the Bidders a reasonable time for taking an Addendum into account, or for

any other reason, the Authority may extend the Bid Due Date.

24. CLARIFICATIONS

24.1. Bidders requiring any clarification on the RFP may notify the Authority through email to the

id provided in key details . They should send in their queries before the date specified in Key

Details. The Authority shall endeavor to respond to the queries within the period specified

therein. The responses will be sent by e-mail. The Authority will forward all the queries and

its responses thereto, to all purchasers of the RFP and upload on the website

https://etenders.kerala.gov.in without identifying the source of queries.

24.2. The Authority shall endeavor to respond to the questions raised or clarifications sought by

the Bidders. However, the Authority reserves the right not to respond to any question or

provide any clarification and nothing in this Clause shall be taken or read as compelling or

requiring the Authority to respond to any question or to provide any clarification.

24.3. The Authority may also on its own motion, if deemed necessary, issue interpretations and

clarifications to all Bidders. All clarifications and interpretations issued by the Authority

shall be deemed to be part of the RFP. Verbal clarifications and information given by the

Authority or its employees or representatives shall not in any way or manner be binding on

the Authority.

25. PRE-BID CONFERENCE

25.1. A Pre-Bid conference of the interested parties shall be convened at the designated date as

provided in Key Details. A maximum of two representatives of each Bidder shall be allowed

to participate on production of authority letter from the Bidder.

25.2. During the course of Pre-Bid conference, the Bidders will be free to seek clarifications and

make suggestions for consideration of the Authority. The Authority shall endeavor to provide

clarifications and such further information, as it may consider appropriate for facilitating a

fair, transparent and competitive Bidding Process.

26. VALIDITY OF BIDS

The Bids shall be valid for a period of not less than 180 (One Hundred and Eighty) days from

the Bid Due Date (the "Bid Validity Date"). The validity of Bids may be extended subject to

a maximum period of 180 (One Hundred and Eighty) days by mutual consent of the

respective Bidders and the Authority.

27. BID SECURITY

Page 30: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 30

27.1. The Bidder shall deposit an unconditional, unequivocal and irrevocable Bid Security of

INR.10,000,000 (Indian Rupees Ten Million only) in accordance with the provisions of this

RFP, using the online payment facility available in the e-tender website

https://etenders.kerala.gov.in .

27.2. The Bid Security shall be returnable no later than 60 (Sixty) days from the Bid Validity Date except in the case of the Selected Bidder whose Bid Security shall be retained till it has provided a Performance Security under the provisions of Draft Concession Agreement.

27.3. The Authority shall be entitled to forfeit the Bid Security as Damages inter alia in any of the events specified herein below. The Bidder, by submitting its Bid pursuant to this RFP, shall be deemed to have acknowledged and confirmed that the Authority will suffer loss and damage on account of withdrawal of its Bid or for any other default by the Bidder during the period of Bid validity as specified in this RFP, no relaxation of any kind on Bid Security shall be given to any Bidder.

27.4. The Bid Security shall be forfeited as Damages without prejudice to any other right or remedy that may be available to the Authority under the Bidding Documents and/ or under the Concession Agreement, or otherwise, under the following conditions:

a) If a Bidder engages in a corrupt practice, fraudulent practice, coercive practice,

undesirable practice or restrictive practice;

b) In the case of Selected Bidder, if it fails within the specified time limit:

(i) to sign and return the duplicate copy of LOI;

(ii) to sign the Concession Agreement; or

(iii) to furnish the Performance Security.

c) In case the Selected Bidder, commits any breach of any RFP condition prior to

furnishing the Performance Security.

d) Under any clause for forfeiture of Bid Security contained elsewhere in this RFP.

28. PREPARATION AND SUBMISSION OF BID

28.1. Language

The Bid and all related correspondence and documents in relation to the Bidding Process

shall be in English language. Supporting documents and printed literature furnished by the

Bidder with the Bid may be in any other language provided that they are accompanied by

true translations of it in the English language, duly authenticated and certified by the Bidder.

Supporting materials, which are not translated into English, may not be considered. For the

purpose of interpretation and evaluation of the Bid, the English language translation shall

prevail.

28.2. Format and signing of Bid

28.2.1. The Bidder shall submit the Bid in the format specified at Appendix-I, together with

all the documents specified hereunder and upload it in “Fee/ Prequalification /

Technical Proposal”. The formats given is the minimum requirement and the Bidders

shall furnish all the relevant details necessary to ascertain the technical and financial

capabilities of the bidder as well as the detailed technical and business plan for

implementation of the project proposed by the bidder.

Page 31: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 31

28.2.2. The Bidder shall upload the Financial Offer by duly filling up the BOQ file provided

under the Financial Cover in e-tender portal.

28.2.3. Bidders should attach clearly marked and referenced continuation sheets in the event

that the space provided in the prescribed forms in the Annexures is insufficient.

Alternatively, Bidders may format the prescribed forms making due provision for

incorporation of the requested information.

28.2.4. Information supplied in the Bid by the Bidder (or other constituent Member, if the

Bidder is a Consortium) shall pertain either to the Bidder or to the Bidder‟s Affiliate

or Parent or Subsidiary Company named in the Bid and not, unless specifically

requested, to other associated companies or firms.

28.2.5. The Bidder shall provide all the information sought under this RFP. The Authority

will evaluate only those Bids that are received in the required formats and complete

in all respects. Incomplete and /or conditional Bids shall be liable to rejection.

28.2.6. The Bidder shall submit a Power of Attorney along with Board resolution in favour

of executants as per the format at Appendix-II, authorizing the signatory of the Bid to

commit the Bidder. In case the Bidder is a Consortium, the members thereof shall

furnish a Power of Attorney in favour of the Lead Member in the format at Appendix

– IIA.

28.2.7. The Bid and its copy shall be typed or written in indelible ink and signed by the

authorized signatory of the Bidder who shall also initial each page in blue ink. In

case of printed and published Documents, only the cover shall be initialled. All the

alterations, omissions, additions or any other amendments made to the Bid shall be

initialled by the person(s) signing the Bid. The Bid shall contain page numbers and in

the case of hard copy submitted, it shall be bound together in hard cover.

28.3. Submission of Technical Proposal

28.3.1. The Bidder shall upload its Bid on www.etenders.kerala.gov.in by following all

processes and systems defined under e-procurement rules of the State of Kerala by

affixing the Digital Signature Certificate of the person authorized to sign the Bid as

per the Power of Attorney submitted with the Bid.

28.3.2. Each Fee/Prequalification/Technical Proposal submitted online shall contain:

(i) Bid in the prescribed format (Appendix-I) along with Annexes I to V and supporting documents;

(ii) Power of Attorney for signing the Bid as per the format at Appendix-II;

(iii) A Certificate from the Company Secretary of the Bidder certifying that the Bid signatory is authorized by the Board of Directors of the Company to do so with resolution number and date

(iv) Copy of Charter Document (Memorandum and Articles of Association/ Partnership Deed/ Trust Deed, as the case may be);

(v) Copies of Bidder‟s duly audited Financial Statement along with all schedules, auditors report and annual report for the preceding three financial years;

(vi) Payment Receipt towards the tender fee as specified in Key Details;

Page 32: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 32

(vii) Payment Receipt towards Bid Security

(viii) Certificate from the Company Secretary of Bidder (including each member of Consortium) clearly specifying the Affiliate, Parent or Subsidiary Company relationship as mentioned by the Bidder

(ix) Certificate from the Company Secretary to the effect that the Bidder (including each member of Consortium) is not blacklisted by any of the Ministry/ Department of Government of India/ State Governments

(x) Undertaking from the authorised signatory of the Bidder/Lead Member Certificate from the Company Secretary to the effect that the Bidder shall establish an office in Thiruvananthpuram

(xi) Power of Attorney for Lead Member of the Consortium in the prescribed format (Appendix II A), if applicable.

(xii) Joint Bidding Agreement (in case of Consortium) as prescribed in the prescribed format at Appendix IV

(xiii) Technical Proposal with details required is to be provided as Appendix VI of this RFP. The detailed Technical Plan required as part of the Technical Proposal shall not be more than 50 pages and it shall contain all requisite details specified in the Technical Plan Data Sheet (Appendix V Annex 2). The Detailed Technical Plan shall be final and binding during implementation of the project, however, it could be improved by mutual consent of both parties.

28.3.3. The Bidder shall also submit the hardcopies of the Fee/Prequalification/Technical

Proposal IN TRIPLICATE (together with originals/ copies of documents required to

be submitted along therewith pursuant to this RFP) to the address specified in Key

Details. In the event of any discrepancy between the uploaded bid and the hard copy

submission, the bid uploaded shall prevail.

28.3.4. All the original Stamp Papers and Notarized documents shall be submitted along

with ORIGINAL set of hard copies. The duplicate and triplicate hard copies may be

true photo copy of the Original set. Scanned copy shall be uploaded along with the

Technical proposal submitted online.

28.3.5. The Fee/Prequalification/Technical Proposal submission in hard copy form shall

clearly bear the following identification:

Bid for: “Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership. In addition, the Bid Due Date should be indicated on the right hand corner of each of the envelopes.

28.3.6. If the Proposal is not sealed and marked as instructed above, the Authority assumes

no responsibility for the misplacement or premature opening of the contents of the

Bid and consequent losses, if any, suffered by the Bidder.

28.4. Submission of Financial Proposal

28.4.1. Bids are invited on the basis of the lowest Tipping Fee per metric ton of waste at the

waste processing site (“Bidding Criteria”). The Bidders shall submit the quote

Tipping Fee in terms of INR per MT as on bid due date. The quote shall be

Page 33: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 33

submitted in the BOQ file available in the Financial Cover of tender portal

www.etenders.kerala.gov.in. The format of Price Bid is given in Appendix III for

reference.

28.4.2. The Bidder shall upload the financial cover by affixing the Digital Signature

Certificate of the person authorized to sign the Bid as per the Power of Attorney

submitted with the Bid.

28.4.3. THE PRICE BID SHALL NOT BE SUBMITTED IN HARD COPY. Only

uploaded version of the Price Bid would be accepted.

29. MODIFICATIONS/ SUBSTITUTION/ WITHDRAWAL OF BIDS

29.1. No Bid shall be modified, substituted or withdrawn by the Bidder after its submission to the

Authority.

30. BID OPENING

30.1. The Authority shall open the Fee/Prequalification/Technical Proposals through the e-tender

at the time and date as specified in Key Details and in the presence of the Bidders who choose

to attend.

30.2. The Authority will subsequently examine and evaluate Bids in accordance with the

provisions set out under clause 31.

30.3. Bidders are advised that qualification of Bidders will be entirely based on the provision

contained in this RFP. Bidders shall be deemed to have understood and agreed that no

explanation or justification on any aspect of the Bidding Process or selection will be given.

30.4. Any information contained in the Bid shall not in any way be construed as binding on the

Authority, its agents, successors or assigns, but shall be binding against the Bidder if the

Project is subsequently awarded to it on the basis of such information.

30.5. The Authority reserves the right not to proceed with the Bidding Process at any time without

notice or liability and to reject any or all Bid(s) without assigning any reasons.

30.6. Where any information is found to be patently false or amounting to a material

misrepresentation, the Authority reserves the right to reject the Bid in accordance with the

provisions contained herein.

30.7. Clarifications on Technical Proposal :

30.7.1. To facilitate evaluation of Bids, the Authority may seek clarifications from any

Bidder regarding its Bid. Such clarification(s) shall be provided within the time

specified by the Authority for this purpose. Any request for clarification(s) and all

clarification(s) in response thereto shall be in writing.

30.7.2. If a Bidder does not provide clarifications sought by the Authority within the

prescribed time, its Bid shall be liable to be rejected. In case the Bid is not rejected,

the Authority may proceed to evaluate the Bid by construing the particulars requiring

clarification to the best of its understanding, and the Bidder shall be barred from

subsequently questioning such interpretation of the Authority.

Page 34: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 34

30.8. Correspondence with the Bidder

Save and except as provided in this RFP, the Authority shall not entertain any correspondence

with any Bidder in relation to the acceptance or rejection of any Bid.

30.9. Short-Listing and Notification

30.9.1. After the evaluation of the Bids for Pre-qualification, the Authority would announce

a list of short-listed Bidders who will be eligible for participation in the Technical

Proposal Stage and Financial Bid Stage.

30.9.2. The Authority will not entertain any query or clarification from Bidders who fail to

qualify.

31. BID EVALUATION

31.1. The Authority will carry out evaluation of the Bids through a Bid Evaluation Committee

constituted by it at its sole discretion. The Committee will proceed with evaluation process as

detailed hereunder.

31.2. Stage 1: Pre-Qualification

31.3. On opening of the bid, the Authority will ensure that the Bid is accompanied by Tender fee

and Bid Security, as specified. The Bids without Tender Fee or Bid Security will be

summarily rejected and will not be considered for further processing.

31.4. The Committee will verify the fulfillment of Minimum Eligibility Criteria by the bidders

based on the documents submitted by the bidders and Bidders who do not meet these criteria

will be rejected.

31.5. Stage 2: Evaluation of Technical Proposal

31.6. The Bidders qualified in the Pre-qualification stage shall be required to make presentation of

their Technical Plan before the Committee on the date specified in the Key Data. The

Authority may at its discretion change the date, time or venue of presentation.

31.7. The Authority shall communicate the status of pre-qualification by email and invite the

qualified bidders to make the presentation and shall also confirm the date, time and venue of

the presentation.

31.8. The bidders may be present in person.

31.9. Bidder shall depute a technically competent person to make the presentation and he/she shall

be authorized to make decisions/ commitments to the Authority on behalf of the Bidder. The

letter authorizing the person shall be submitted at least one day prior to the date of

presentation.

31.10. The Committee shall evaluate the Technical Proposal based on the documents submitted by

the bidder and the presentation of the Technical Plan before the Committee.

31.11. The Committee may seek technical clarifications from the Bidder during the presentation and

the Bidder shall provide the clarifications or documents so required to be submitted. If a

Bidder does not provide clarifications sought by the Authority within the prescribed time, its

Bid shall be liable to be rejected. In case the Bid is not rejected, the Authority may proceed

to evaluate the Bid by construing the particulars requiring clarification to the best of its

Page 35: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 35

understanding, and the Bidder shall be barred from subsequently questioning such

interpretation of the Authority.

31.12. The Committee shall award Technical Score, out of total score of 100 (One Hundred), as per

the scoring criteria given hereunder.

31.13. Technical Scoring Criteria

The Technical Evaluation Committee will award technical score on the following criteria,

after evaluating the Technical Proposal.

Criteria Marks

Number of years that the bidder has experience

in successfully operating Waste to Energy

Plants

More than 3 years 25

2-3 years 20

1-2 years 15

Less than 1 year 0

Number of Waste to Energy projects

implemented during the past 5 (five) years

More than 2

projects

40

2 projects 35

1 project 30

Average energy produced per day during the

last financial year from the Waste to Energy

projects implemented by the Bidder

More than

1,20,000 units /

day

25

90,001 – 1,20,000

units / day

20

30,000 – 90,000

units / day

15

Less than 30,000

units / day

0

Quality of Technical Presentation 10

32. FINANCIAL OPENING AND EVALUATION

32.1. Price Bid of Prequalified Bidders only will be opened for Financial Evaluation.

32.2. The Bidders who are shortlisted in Pre-qualification shall be informed about the opening date

of the Financial Proposal in writing and on the following website i.e.

https:\\etenders.kerala.gov.in.

32.3. The Committee shall open the Financial Bid through the e-tender portal in the presence of the

shortlisted Prequalified Bidders who choose to attend.

32.4. The Prequalified Bidder who offers the lowest „Tipping Fee as on bid due date‟ shall be the

Lowest Bidder, who will be ranked as the L1..

33. SELECTION OF BIDDER

33.1. The authority has received an unsolicited proposal from an agency ( here in after called

“Proposer”) for the development of the project. The proposer will then be invited to match or

lower the Tipping Fee offered by the lowest bidder ( here in after called “Challenger”)

Page 36: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 36

keeping the scope of services and technical parameters (as specified in the concession

agreement) unchanged.

33.2. If the Proposer is not matching the Tipping Fee to the final quoted fee of the Challenger

within 15 days the Tipping Fee offered by the Challenger will be Considered as the Final and

project will be awarded to the Challenger. The Challenger, in this case, shall be considered as

Selected Bidder.

33.3. If the Proposer matches or lower the Tipping Fee to the final quoted fee of the Challenger,

the fee quoted by the Proposer shall be considered final and Proposer is considered Selected

Bidder and project will be awarded to the Proposer.

34. AWARD OF THE PROJECT

34.1. After selection, a Letter of Intent (the “LOI”) shall be issued, in duplicate, by the Authority

to the Selected Bidder and the Selected Bidder shall, within 15 (fifteen) days of the receipt of

the LOI, sign and return the duplicate copy of the LOI in acknowledgement thereof.

34.2. The Selected Bidder shall, then, within 30 (Thirty) days of acceptance of LOI incorporate a

Special Purpose Vehicle (SPV) in the form of “Company” under the provisions of Companies

Act, 2013. This SPV shall be the Concessionaire and Concession Agreement shall be

executed amongst Concessionaire and Authority. Selected Bidder shall be the Confirming

Party to the Concession Agreement.

34.3. The SPV shall furnish the Performance Security of INR.100,000,000/- (Indian Rupees

Hundred Million), which is more particularly described in the Draft Concession Agreement,

by way of Bank Guarantee in the manner and form specified in the Draft Concession

Agreement, on achievement of necessary financial closure till the COD. Post COD, the

Performance Security shall be reduced to INR. 50,000,000 (Indian Rupees Fifty Million only)

till the end of Concession Period or till the Termination Date, as the case may be.

34.4. In the event the duplicate copy of the LOI duly signed by the Selected Bidder or the

Performance Security by SPV is not received by the stipulated date, the Authority may, unless

it consents to extension of time for submission thereof, forfeit the Bid Security of such Bidder

as Damages on account of failure of the Selected Bidder to accept the award.

34.5. After acknowledgement of the LOI, formation of SPV and submission of Performance

Security as aforesaid, it shall cause the Concessionaire, the SPV, to execute the Concession

Agreement within the period prescribed in Key Details.

34.6. The Selected Bidder shall not be entitled to seek any deviation, modification or amendment

in the Concession Agreement.

35. CONTACTS DURING BID EVALUATION

Bids shall be deemed to be under consideration immediately after they are opened and until

such time the Authority makes official intimation of award/ rejection to the Bidders. While

the Bids are under consideration, Bidders and/ or their representatives or other interested

parties are advised to refrain, save and except as required under the Bidding Documents, from

contacting by any means, the Authority and/or their employees/representatives on matters

related to the Bids under consideration.

Page 37: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 37

36. DOCUMENT CHECK LIST FOR BID SUBMISSION

A MINIMUM ELIGIBILITY

1 Copy of Certificate of Registration under relevant Act and certificate by Statutory

Auditors in the format given in Annex-II of Appendix I.

2 Copy relevant Work Orders & Invoices OR Work completion Certificate/

satisfactory client Certificate or other evidence, certified by Statutory Auditors in

the format given in Appendix VI.

3 Certificate evidencing Net Worth by the Statutory Auditors in the format given

in Annex-IIA, Appendix I

B PRE-QUALIFICATION

1 Bid in the prescribed format (Appendix-I) along with Annexes I to V and

supporting documents, signed and stamped in all pages by the authorised

Signatory

2 Evidence of payment of Tender Fee

3 Evidence of submission of Bid Security

4 Power of Attorney for signing the Bid as per the format at Appendix-II

5 A Certificate from the Company Secretary of the Bidder certifying that the Bid

signatory is authorized by the Board of Directors of the Company to do so with

resolution number and date

6 Charter Document of the Bidder (including each member of Consortium),

Affiliate or Parent or Subsidiary Company (if any

7 Annual Report including Audited Financial Statements with its all schedules for

the previous three audited years for the Bidder (including each member of

Consortium)/Affiliate or Parent or Subsidiary Company

8 Certificate from the Company Secretary of Bidder (including each member of

Consortium) clearly specifying the Affiliate, Parent or Subsidiary Company

relationship as mentioned by the Bidder

9 Certificate from the Company Secretary to the effect that the Bidder (including

each member of Consortium) is not blacklisted by any of the Ministry/

Department of Government of India/ State Governments

10 Undertaking from the authorised signatory of the Bidder/Lead Member Certificate

from the Company Secretary to the effect that the Bidder shall establish an

office in Thiruvananthapuram

11 Power of Attorney for Lead Member of the Consortium in the prescribed format

(Appendix II A), if applicable

12 Joint Bidding Agreement (in case of Consortium) as prescribed in the prescribed format at Appendix IV

13 Technical Proposal is submitted with complete Technical Plan as per Appendix V

C FINANCIAL COVER

1 Bid in the prescribed BOQ format to be uploaded

Page 38: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 38

37. MISCELLANEOUS

37.1. The Bidding Process shall be governed by, and construed in accordance with, the laws of

India and the competent Courts at Thiruvananthapuram shall have exclusive jurisdiction over

all disputes arising under, pursuant to and/ or in connection with the Bidding Process.

37.2. The Authority without incurring any obligation or liability, reserves the right, at any time, to;

(a) suspend and/ or cancel the Bidding Process and/ or amend and/ or supplement the Bidding Process or modify the dates or other terms and conditions relating thereto;

(b) consult with any Bidder in order to receive clarification or further information;

(c) pre-qualify or not to pre-qualify any Bidder and/ or to consult with any Bidder in order to receive clarification or further information;

(d) retain any information and/ or evidence submitted to the Authority by, on behalf of, and/ or in relation to any Bidder; and/ or

(e) independently verify, disqualify, reject and/ or accept any and all submissions or other information and/ or evidence submitted by or on behalf of any Bidder.

37.3. It shall be deemed that by submitting the Bid, the Bidder agrees and releases the Authority,

its employees, agents and advisers, irrevocably, unconditionally, fully and finally from any

and all liability for claims, losses, damages, costs, expenses or liabilities in any way related

to or arising from the exercise of any rights and/ or performance of any obligations hereunder

and the Bidding Documents, pursuant hereto, and/ or in connection with the Bidding Process,

to the fullest extent permitted by applicable law, and waives any and all rights and/ or claims

it may have in this respect, whether actual or contingent, whether present or in future.

Page 39: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 39

APPENDICES

Page 40: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 40

APPENDIX I

Letter Comprising the Bid

Dated: [ ] To,

Managing Director, Kerala State Industrial Development Corporation Ltd. T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram,

Kerala – 695003

Sub: Bid for “Development of Integrated Solid waste Management Project with a Waste to Energy plant of

minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis

at Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership on Swiss Challenge route

Dear Sir,

With reference to your RFP document dated __________ 2020, I/we, having examined the RFP document and understood its contents, hereby submit my/our Bid for the aforesaid project. The Bid is unconditional and unqualified.

2. I/ We acknowledge that the Authority will be relying on the information provided in the Bid and the documents accompanying such Bid for selection of the Concessionaire for the aforesaid project, and we certify that all information provided in the Bid and in Annexes I to IV is true and correct; nothing has been omitted which renders such information misleading; and all documents accompanying such Bid are true copies of their respective originals.

3. This statement is made for the express purpose of our selection as Concessionaire for the development, construction, operation and maintenance of the aforesaid Project.

4. I/ We shall make available to the Authority any additional information it may find necessary or require to supplement or authenticate the Bid.

5. I/ We acknowledge the right of the Authority to reject our Bid without assigning any reason or

otherwise and hereby waive to the fullest extent permitted by applicable law our right to challenge the same on any account whatsoever.

6. I/ We certify that in the last three years, we / any of the consortium member or our/their Affiliates or Parent or Subsidiary Company have neither failed to perform on any contract, as evidenced by imposition of a penalty by an arbitral or judicial authority or a judicial pronouncement or arbitration award, nor been expelled from any project or contract by any public authority nor have had any contract terminated by any public authority for breach on our part.

7. I/ We declare that: (a) I/ We have examined and have no reservations to the Bidding Documents, including any

Addendum issued by the Authority;

(b) I/ We do not have any conflict of interest in accordance with the RFP document;

(c) I/We have not directly or indirectly or through an agent engaged or indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice, as defined in the RFP document, in respect of any tender or request for proposal issued by or any agreement entered into with the Authority or any other public sector enterprise or any government, Central or State in India; and

Page 41: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 41

(d) I/ We hereby certify that we have taken steps to ensure that in conformity with the provisions of the RFP document, no person acting for us or on our behalf has engaged or will engage in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice.

(e) the undertakings given by us along with the Application in response to the RFP for the

Project were true and correct as on the date of making the Application.

8. I/ We understand that you may cancel the Bidding Process at any time and that you are neither bound to accept any Bid that you may receive nor to invite the Bidders to Bid for the Project, without incurring any liability to the Bidders, in accordance with the RFP document.

9. I/ We believe that we / our Consortium Partner satisfy(s) the Net Worth criteria and meet(s) all the requirements as specified in the RFP document and are/ is qualified to submit a Bid.

10. I/ We certify that in regard to matters other than security and integrity of the country, we / any member of the Consortium or any of our / their Affiliate or Parent or Subsidiary Company have not been convicted by a Court of Law or indicted or adverse orders passed by a regulatory authority which could cast a doubt on our ability to undertake the Project or which relates to a grave offence that outrages the moral sense of the community.

11. I/ We further certify that in regard to matters relating to security and integrity of the country, we /

any member of the Consortium or any of our /their Affiliate or Parent or Subsidiary Company have not been charge-sheeted by any agency of the Government or convicted by a Court of Law.

12. I/ We further certify that no investigation by a regulatory authority is pending either against us or

against any member of the Consortium or against our / their Affiliate or Parent or Subsidiary Company or against our CEO or any of our Directors/ Managers/ employees.

13. I/ We undertake that in case due to any change in facts or circumstances during the Bidding Process, we are attracted by the provisions of disqualification in terms of the provisions of this RFP, we shall intimate the Authority of the same immediately.

14. The Statement of Legal Capacity as per format provided in Appendices of the RFP document, and duly signed, is enclosed. The power of attorney for signing of Bid as per format provided at Appendix II, power of attorney for Lead Member at Appendix II a (in case of Consortium) of the RFP, is also enclosed.

15. I/ We hereby irrevocably waive any right or remedy which we may have at any stage at law or howsoever otherwise arising to challenge or question any decision taken by the Authority in connection with the selection of the Bidder, or in connection with the selection/ Bidding Process itself, in respect of the above mentioned Project and the terms and implementation thereof.

16. I/ We agree and undertake to abide by all the terms and conditions of the RFP document.

17. I/ We certify that in terms of the RFP, my/our Net Worth is INR .……………….. (Indian Rupees ……………….. in words).

18. I/ We acknowledge and agree that in the event of a change in control of an Affiliate or Parent or

Subsidiary Company whose Technical Capacity and/ or Financial Capacity is taken into consideration for the purposes of short-listing and pre-qualification in accordance with this RFP, I/We shall inform the Authority forthwith along with all relevant particulars and the Authority may disqualify us or withdraw the Letter of Intent, as the case may be. I/We further acknowledge and agree that in the event such change in control occurs after signing of the Concession Agreement but prior to Financial Close of the Project, it would, notwithstanding anything to the contrary contained in the Agreement, be deemed a breach thereof, and the Concession Agreement shall be liable to be terminated without the Authority being liable to us in any manner whatsoever.

Page 42: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 42

19. I/ We understand that if selected, we shall incorporate a Special Purpose Vehicle as Company incorporated under the Indian Companies Act, 2013 within the time stipulated in the RFP.

20. In the event of I / we being declared as the Selected Bidder, I/we agree to enter into a Concession Agreement through SPV in accordance with the Draft Concession Agreement that has been provided to me/us prior to the Bid Due Date.

21. We agree not to seek any changes in the aforesaid draft and agree to abide by the same. 22. I/ We have studied all the Bidding Documents carefully and also surveyed the Project site. We

understand that except to the extent as expressly set forth in the Concession Agreement, we shall have no claim, right or title arising out of any documents or information provided to us by the Authority or in respect of any matter arising out of or relating to the Bidding Process including the award of Concession.

23. I/ We offer an unconditional, unequivocal and irrevocable Bid Security of INR.10 Million /- (Indian Rupees Ten Million Only) to the Authority in accordance with Clause 27 Volume I of the RFP Document.

24. The non-refundable irrevocable Tender Fee has been remitted to your account through electronic bank transfer under reference no………………...

25. The Bid Security has been transferred to your account through electronic bank transfer under reference no……………….. OR in the form of Bank Guarantee is attached (strike out whichever is not applicable).

26. I/ We agree and understand that the Bid is subject to the provisions of the Bidding Documents. In no case, I/we shall have any claim or right of whatsoever nature if the Project / Concession is not awarded to me/us or our Bid is not opened or rejected.

27. The Tipping Fee has been quoted by me/us after taking into consideration all the terms and conditions stated in the RFP, draft Concession Agreement, our own estimates of cost and after a careful assessment of the site and all the conditions that may affect the project cost and implementation of the Project.

28. I/ We shall keep this offer valid for 180 (one hundred and eighty) days from the Bid Due Date specified in the RFP.

29. I/ We declare that we/ any Member of the Consortium, or our/ its associates are not a Member of a/

any other Consortium submitting a Bid for the Project. 30. {We, the Consortium Members agree and undertake to be jointly and severally liable for all the

obligations of the Concessionaire under the Concession Agreement in accordance with the Concession Agreement.}

31. I/We submit our Price Bid offer for Tipping Fee as per the process specified for the submission of

BOQ in e-tender portal https://etenders.kerala.gov.in , to be paid to us for undertaking the aforesaid Project in accordance with the Bidding Documents and the Concession Agreement.

In witness thereof, I/ we submit this Bid under and in accordance with the terms of the RFP document.

Yours faithfully,

Date: (Signature, name and designation of the Authorized Signatory)

Place: Name and seal of the Bidder

Page 43: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 43

Appendix I

Annex-I

Details of Bidder

(In case of consortium, to be submitted for all consortium members separately& to be

submitted separately for all Affiliate/Parent/ Subsidiary whose data has been are used for

prequalification)

Details of the Bidder / Lead Member (Company)

1. Name of the Bidder/Prime Bidder

2. Address of the Bidder

3. Status of the Company ( Trust/ Firm/ LLP/Public Ltd/Pvt. Ltd)

4. Details of Incorporation of the Company Date :

Ref #

5. Details of Commencement of Business Date :

Ref #, if any

6. Valid GST registration no

7. Permanent Account Number (PAN)/ Tax Identification

Number

8. Name & Designation of the contact person to whom all

references shall be made regarding this RFP

9. Telephone No. (with STD Code)

10. Mail of the contact person

11. Fax No. (with ISD Code)

12. Website url

13. Name & Designation of Authorized Signatory

Telephone No. (with ISD Code)

E-Mail

14 Net Worth as per Latest audited Financial Statement (in INR)

15 Brief description of experience in implementation of Solid

Page 44: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 44

Waste Management Projects in the last 5 years.

16 Awards / recognitions received in the relevant area

17 Any other relevant information.

18 A statement by the Bidder or any of their Affiliate or Parent or

Subsidiary Company disclosing material non-performance or

contractual non-compliance in past projects, contractual

disputes and litigation/ arbitration in the recent past is given

below (Attach extra sheets, if necessary)

19 Name & Address to the Bankers

Date: (Signature, name and designation of the Authorised Signatory)

Place: Name and seal of the Bidder

Note :

As required in RFP, the Bidder shall attach copies of the balance sheets, financial statements and

Annual Reports for 3 (three) years preceding Financial years. The financial statements shall: a. reflect the financial situation of the Bidder and its Affiliate or Parent or Subsidiary

Company where the Bidder is relying on its Affiliate or Parent or Subsidiary

Company‟s financials; b. be audited by a Statutory Auditor; c. be complete, including all notes to the financial statements; and d. correspond to accounting periods already completed and audited (no statements for

partial periods shall be requested or accepted).

Page 45: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 45

Appendix –I

Annex-II

Format of certificate from Statutory Auditor certifying the Technical Capacity of the Bidder

(To be issued in the Letterhead of the Audit Firm)

Certificate from the Statutory Auditor

Based on its books of accounts and other published information authenticated by it, this is to certify that …………………….. (name of the Applicant/ Affiliate, Parent or Subsidiary Company) is in existence and was incorporated on “________“and is into continuous Operations since “______________”.

We also certify that the above information is in terms of Clauses 3.3 of the RFP: {Signature}

{Name & membership No of Partner /Proprietor}

{Name of the audit firm :}

{Firm Identification No}

{Seal of the Audit Firm}

Page 46: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 46

Appendix-I

Annex-III

(To be issued in the Letterhead of the Audit Firm by the Statutory Auditors)

Certificate of Financial Capacity

Net Worth as on

___\____\______

Rate of

Exchange

applied In home Currency

(Specify currency)

In INR Equivalent

Name of Sole Bidder *

Lead Member *

Other Member 1 *

Other Member 2 *

TOTAL

* Strike off whichever is not applicable

{Signature}

{Name & membership No of Partner /Proprietor}

{Name of the audit firm :}

{Firm Identification No}

{Seal of the Audit Firm}

Note:

1. Each Consortium Member, or Affiliate/Parent/ Subsidiary whose financial data is relied

on to meet Minimum Eligibility Criteria, shall provide details of its own Certificate of

Financial Capacity.

2. For conversion of US Dollars to Rupees, the rate of conversion shall be Rupees 65 (sixty

five) to a US Dollar. In case of any other currency, the same shall first be converted to

US Dollars as on the date 60 (sixty) days prior to the Bid Due Date, and the amount so

derived in US Dollars shall be converted into Rupees at the aforesaid rate. The

conversion rate of such currencies shall be the daily representative exchange rates

published by the International Monetary Fund for the relevant date.

3. Net Worth shall be computed as per the definition of Net worth given in the RFP as at

the end of the Latest Audited Financial Year.

Page 47: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 47

Appendix I

Annex-IV

In the event that credit is being taken for the Eligible Experience of an Affiliate / Parent or Subsidiary Company, as defined in RFP, the Bidder should also provide a certificate in the format below:

Certificate from Statutory Auditor/ Company Secretary regarding Affiliate or Parent Company or Subsidiary Company

(To be issued in the Letterhead of the Audit Firm/ Company Secretary)

Based on the authenticated record of the company, this is to certify that more than [50% (fifty per cent) in case of Parent / Subsidiary OR 26% (twenty six percent) in case of Affiliate] {strike out whichever is not applicable} of the subscribed and paid up voting equity of ………………(name of the Bidder / Affiliate/Parent or Subsidiary) is held as on 31st March 2018, directly or indirectly by ……………….. (name of Affiliate or Parent / Subsidiary / Applicant). By virtue of the aforesaid share-holding, the latter exercises control over the former, who is an Affiliate or Parent or Subsidiary as defined in the RFP. A brief description of the said equity held, directly or indirectly, is given below: {Describe the share-holding of the Bidder and the Affiliate or Parent or Subsidiary.}

{Signature}

{Name & membership No of Partner /Proprietor}

{Name of the audit firm}

{Firm Identification No}

{Seal of the Audit Firm}

$ In the event that the Bidder exercises control over an Affiliate or Parent or Subsidiary Company

by operation of law, this certificate may be suitably modified and copies of the relevant law may

be enclosed and referred to.

Page 48: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 48

Appendix I

Annex-V

Statement of Legal Capacity

(To be forwarded on the letterhead of the Bidder / Lead Member)

Ref. Date: To, Managing Director, Kerala State Industrial Development Corporation Ltd. T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram, Kerala – 695003 Dear Sir, We hereby confirm that we/ our members in the Consortium (constitution of which has been described in the application) satisfy the terms and conditions laid out in the RFQ document.

We have agreed that …………………… (insert member‟s name) will act as the Lead Member of our

consortium.*

We have agreed that ………………….. (insert individual‟s name) will act as our representative/ will

act as the representative of the consortium on its behalf* and has been duly authorized to submit the

RFP. Further, the authorized signatory is vested with requisite powers to furnish such letter and

authenticate the same.

Thanking you, Yours faithfully, (Signature, name and designation of the authorized signatory) For and on behalf of……………………………..

Page 49: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 49

APPENDIX II

Power of Attorney for signing of Bid

(To be executed on Non Judicial Stamp Paper of relevant jurisdiction)

Know all men by these presents, We…………………………………………….. (name of the firm

and address of the registered office) do hereby irrevocably constitute, nominate, appoint and authorize

Mr/ Ms (name), …………………… son/daughter/wife of ……………………………… and

presently residing at…………………., who is presently employed with us / the Lead Member

of the Consortium and holding the position of ……………………………., as our true and lawful

attorney (hereinafter referred to as the “Attorney”) to do in our name and on our behalf, all such acts,

deeds and things as are necessary or required in connection with or incidental to submission of our

Bid for the “Development of Integrated Solid waste Management Project with a Waste to Energy

plant of minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer

(DBFOT) basis at Vizhinjam for Thiruvananthapuram cluster under Public Private Partnership on

Swiss Challenge route” (hereinafter referred to as “the Project”)proposed or being developed by the

Kerala State Industrial Development Corporation Ltd. (the “Authority”) including but not limited to

signing and submission of all bids and other documents and writings, participate in pre-bids and other

conferences and providing information/ responses to the Authority, presenting us in all matters before

the Authority, signing and execution of all contracts including the Concession Agreement and

undertakings consequent to acceptance of our bid, and generally dealing with the Authority in all

matters in connection with or relating to or arising out of our bid for the said Project and/ or upon

award thereof to us and/or till the entering into of the Concession Agreement with the Authority.

AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and things done or caused to be done by our said Attorney pursuant to and in exercise of the powers conferred by this Power of Attorney and that all acts, deeds and things done by our said Attorney in exercise of the powers hereby conferred shall and shall always be deemed to have been done by us.

IN WITNESS WHEREOF WE, …………………………., THE ABOVE NAMED PRINCIPAL HAVE EXECUTED THIS POWER OF ATTORNEY ON THIS ……… DAY OF …………. 2….. For ………………………….. (Signature, name, designation and address) Witnesses: 1.

2.

Page 50: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 50

Appendix II

Page 2

(Notarized) Person indentified by me/ personally appeared before

me / signed before me/ Attested / Authenticated*

(* Notary to specify as applicable)

(Signature, Name and Address of the Notary)

Seal of the Notary Registration Number of the Notary

Date: ______________

Accepted …………………………… (Signature) (Name, Title and Address of the Attorney)

Notes:

fl The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid down by the applicable law and the charter documents of the executant(s) and when it is so required, the same should be under common seal affixed in accordance with the required procedure.

fl Wherever required, the Bidder should submit for verification the extract of the charter

documents and documents such as a board or shareholders’ resolution/ power of attorney in favour of the person executing this Power of Attorney for the delegation of power hereunder on behalf of the Bidder.

fl For a Power of Attorney executed and issued overseas, the document will also have to be

legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Apostille certificate.

Page 51: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 51

APPENDIX –II A

Power of Attorney for Lead Member of Consortium (To be executed on Non Judicial Stamp Paper of relevant jurisdiction)

Whereas, the Kerala State Industrial Development Corporation Limited (“the Authority”) has

invited Bids, from qualified parties for ““Development of Integrated Solid waste Management Project

with a Waste to Energy plant of minimum 300 TPD Processing capacity on Design, Build, Finance,

Operate and Transfer (DBFOT) basis at Vizhinjam for Thiruvananthapuram cluster under Public Private

Partnership (“the Project”).

Whereas, ____________, ____________, and ____________ (collectively the “Consortium”)

being Members of the Consortium are interested in bidding for the Project in accordance with the

terms and conditions of the Request for Proposal and other connected documents in respect of the

Project, and

Whereas, it is necessary for the Members of the Consortium to designate one of them as the Lead

Member with all necessary power and authority to do for and on behalf of the Consortium, all

acts, deeds and things as may be necessary in connection with the Consortium‟s Bid for the

Project and its execution.

NOW THEREFORE KNOW ALL MEN BY THESE PRESENTS

We, ____________ having our registered office at ____________, M/s. ____________, having

our registered office at ____________, and M/s. ____________, having our registered office at

____________, [the respective names and addresses of the registered office] (hereinafter

collectively referred to as the “Principals”) do hereby irrevocably designate, nominate, constitute,

appoint and authorize M/s ____________, having its registered office at _____________, being one of the Members of the

Consortium, as the Lead Member and true and lawful attorney of the Consortium (hereinafter

referred to as the “Attorney”) and hereby irrevocably authorize the Attorney (with power to sub-

delegate) to conduct all business for and on behalf of the Consortium and any one of us during the

Bidding Process and, in the event the Consortium is awarded the Concession/ Contract, during the

execution of the Project and in this regard, to do on our behalf and on behalf of the Consortium,

all or any of such acts, deeds or things as are necessary or required or incidental to the submission

of its Bid for the Project, including but not limited to signing and submission of all applications,

Bids and other documents and writings, participate in Bidders‟ and other conferences, respond to

queries, submit information/ documents, sign and execute contracts and undertakings consequent

to acceptance of the Bid of the Consortium and generally to represent the Consortium in all its

dealings with the Authority, and/ or any other Government Agency or any person, in all matters in

connection with or relating to or arising out of the Consortium‟s Bid for the Project and/ or upon

award thereof till the Concession Agreement is entered into with the Authority.

AND hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and

things lawfully done or caused to be done by our said Attorney pursuant to and in exercise of the

powers conferred by this Power of Attorney and that all acts, deeds and things done by our said

Attorney in exercise of the powers hereby conferred shall and shall always be deemed to have

been done by us/ Consortium.

Page 52: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 52

IN WITNESS WHEREOF WE THE PRINCIPALS ABOVE NAMED HAVE EXECUTED THIS

POWER OF ATTORNEY ON THIS ________ DAY OF ________ 20**.

For ____________ (Name & Title) For ____________ (Name & Title) For ____________ (Name & Title)

Witnesses: 1 2

(Executants) (To be executed by all the Members of the Consortium)

Notes:

• The mode of execution of the Power of Attorney should be in accordance with the

procedure, if any, laid down by the applicable law and the charter documents of the

executant(s) and when it is so required, the same should be under common seal

affixed in accordance with the required procedure.

• Also, wherever required, the bidder should submit for verification the extract of the

charter documents and documents such as a board or shareholders‟ resolution/ power

of attorney in favour of the person executing this power of attorney for the delegation

of power hereunder on behalf of the bidder.

Page 53: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 53

APPENDIX III

Format of BOQ for reference purpose only and not for submission in hard copy.

Tipping Fee as on bid due date

(To be submitted online and in a separate envelope with covering letter)

Tipping Fee ( Rs. / MT)

(Rs in figures)

(Rs in words)

Page 54: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 54

Appendix – IV

Joint Bidding Agreement

(Applicable for incase of Consortium)

(To be executed on Stamp paper of appropriate value) THIS JOINT BIDDING AGREEMENT is entered into on this the ………… day of

………… 20…

AMONGST

1. {………… } having its registered office at ………… (hereinafter referred to as the “First

Part” which expression shall, unless repugnant to the context include its successors and permitted assigns)

AND

2. {………… } having its registered office at ………… (hereinafter referred to as the

“Second Part” which expression shall, unless repugnant to the context include its successors and permitted assigns)

AND

3. {…………} having its registered office at ………… (hereinafter referred to as the “Third Part” which expression shall, unless repugnant to the context include its successors and permitted assigns)}♣

The above mentioned parties of the FIRST, SECOND and, THIRD PART are collectively referred to as the “Parties” and each is individually referred to as a “Party”

WHEREAS,

A. _____________, established under the _____________, represented by its

_____and having its principal offices at ___________] (hereinafter referred to as “the Authority” which expression shall, unless repugnant to the context or meaning thereof, include its administrators, successors and assigns) has invited Bids (the “Bids”) by its Request for Proposal ………… dated …………(the “RFP”) for selection of bidders for __________________”,Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum 300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for Thiruvananthapuram cluster under

Public Private Partnership’ (the “Project”) through public private partnership.

♣ The number of Parties will be shown here, as applicable, subject to a maximum of 3 (three).

B. The Parties are interested in jointly bidding for the Project as members of a Consortium and in accordance with the terms and conditions of the RFP document and other bid documents in respect of the Project.

C. It is a necessary condition under the RFP document that the members of the

Consortium shall enter into a Joint Bidding Agreement and furnish a copy thereof with the Bid.

Page 55: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 55

NOW IT IS HEREBY AGREED as follows:

1. Definitions and Interpretations

In this Agreement, the capitalized terms shall, unless the context otherwise requires, have the meaning ascribed thereto under the RFP.

2. Consortium

The Parties do hereby irrevocably constitute a consortium (the “Consortium”) for the purposes of jointly participating in the Bidding Process for the Project.

The Parties hereby undertake to participate in the Bidding Process only through this Consortium and not individually and/ or through any other consortium constituted for this Project, either directly or indirectly or through any of their Affiliate or Parent or Subsidiary Company.

3. Covenants

The Parties hereby undertake that in the event the Consortium is declared the selected Bidder and awarded the Project, it shall incorporate a special purpose vehicle (the “SPV”) under the Indian Companies Act 1956 for entering into a Concession Agreement with the Authority and for performing all its obligations as the Contractor in terms of the Concession Agreement for the Project.

4. Role of the Parties

The Parties hereby undertake to perform the roles and responsibilities as described below:

a) Party of the First Part shall be the Lead member of the Consortium and shall have

the power of attorney from all Parties for conducting all business for and on behalf of the Consortium during the Bidding Process and until the Appointed Date under the Concession Agreement when all the obligations of the SPV shall become effective;

b) {Party of the Second Part shall be ________________ and}

c) {Party of the Third Part shall be __________________ }

5. Joint and Several Liability

The Parties do hereby undertake to be jointly and severally responsible for all obligations

and liabilities relating to the Project and in accordance with the terms of the RFP document

and the Concession Agreement.

6. Shareholding in the SPV

6.1. The Parties agree that the proportion of shareholding among the Parties in the

SPV shall be as follows:

First Party:

Second Party: {Third Party:}

Page 56: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 56

The Parties undertake that the members in the consortium shall hold equity as follows:

6.2. In case the Consortium is selected as the Selected Bidder, the Lead Member and a member of the Consortium meeting either technical capacity or financial capacity shall subscribe to 26% (twenty six per cent) or more of the paid up and subscribed equity of the SPV until 5th anniversary of COD.

6.3. The members of the Consortium along with its Affiliate or Parent or its Subsidiary Company (whose technical or financial experience has been claimed for qualification) shall collectively hold at least 100% (hundred per cent) of the subscribed and paid up equity of the SPV at all times until the 5thanniversary of COD.

6.4. The Parties shall comply with all equity lock-in requirements set forth in the Concession Agreement.

7. Representation of the Parties

Each Party represents to the other Parties as of the date of this Agreement that:

a. Such Party is duly organized, validly existing and in good standing under the laws

of its incorporation and has all requisite power and authority to enter into this Agreement;

b. The execution, delivery and performance by such Party of this Agreement has been

authorized by all necessary and appropriate corporate or governmental action and a copy of the extract of the charter documents and board resolution/ power of attorney in favour of the person executing this

Agreement for the delegation of power and authority to execute this Agreement on

behalf of the Consortium Member is annexed to this Agreement, and will not, to the

best of its knowledge:

i. require any consent or approval not already obtained;

ii. violate any Applicable Law presently in effect and having applicability to it;

iii. violate the memorandum and articles of association, by-laws or other

applicable organizational documents thereof;

iv. violate any clearance, permit, concession, grant, license or other governmental

authorization, approval, judgment, order or decree or any mortgage agreement, indenture or any other instrument to which such Party is a party or by which such Party or any of its properties or assets are bound or that is otherwise applicable to such Party; or

v. create or impose any liens, mortgages, pledges, claims, security interests,

charges or Encumbrances or obligations to create a lien, charge, pledge, security interest, encumbrances or mortgage in or on the property of such Party, except for encumbrances that would not, individually or in the aggregate, have a material adverse effect on the financial condition or prospects or business of such Party so as to prevent such Party from fulfilling its obligations under this Agreement;

c. this Agreement is the legal and binding obligation of such Party, enforceable in

accordance with its terms against it; and

Page 57: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 57

d. there is no litigation pending or, to the best of such Party's knowledge, threatened to which it or any of its Affiliates is a party that presently affects or which would have a material adverse effect on the financial condition or prospects or business of such Party in the fulfillment of its obligations under this Agreement.

8. Termination

This Agreement shall be effective from the date hereof and shall continue in full force and effect until the Financial Close of the Project is achieved under and in accordance with the Concession Agreement, in case the Project is awarded to the Consortium. However, in case the Consortium is either not qualified for the Project or does not get selected for award of the Project, the Agreement will stand terminated in case the Bidder is not qualified or upon return of the Bid Security by the Authority to the Bidder, as the case may be.

9. Miscellaneous

This Joint Bidding Agreement shall be governed by laws of India.

The Parties acknowledge and accept that this Agreement shall not be amended by the Parties

without the prior written consent of the Authority.

IN WITNESS WHEREOF THE PARTIES ABOVE NAMED HAVE EXECUTED AND DELIVERED THIS AGREEMENT AS OF THE DATE FIRST ABOVE WRITTEN.

SIGNED, SEALED AND DELIVERED

For and on behalf of

LEAD MEMBER by:

SECOND PART

(Signature) (Name) (Designation) (Address)

(Signature) (Name) (Designation) (Address)

SIGNED, SEALED AND DELIVERED For and on behalf of

SIGNED, SEALED AND DELIVERED For and on behalf of

THIRD PART

(Signature) (Name) (Designation) (Address) SIGNED, SEALED AND DELIVERED

For and on behalf of

In the presence of:

1.

2.

Page 58: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster t under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 58

Notes:

1. The mode of the execution of the Joint Bidding Agreement should be in accordance with the procedure, if any, laid down by the Applicable Law and the charter documents of the executant(s) and when it is so required, the same should be under common seal affixed in accordance with the required procedure.

2. Each Joint Bidding Agreement should attach a copy of the extract of the charter

documents and documents such as resolution / power of attorney in favour of the person executing this Agreement for the delegation of power and authority to execute this Agreement on behalf of the Consortium Member.

For a Joint Bidding Agreement executed and issued overseas, the document shall be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney has been executed.

Page 59: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 59

Appendix – V

Technical Proposal

Item Total

1 Number of years that the bidder has experience in

successfully operating Waste to Energy Plants [fill in no of years]

2 Number of Waste to Energy projects implemented during

the past 5 (five) years [fill in no of projects]

3 Energy produced in units in the last financial year from the

Waste to Energy projects implemented by the Bidder [fill in MWh]

Date: (Signature, name and designation of the Authorised Signatory)

Place: Name and seal of the Bidder

Note:

1. If the bidder is a single specified entity, the stipulated criteria shall be fulfilled by the bidder itself

or through its Affiliate or Parent or Subsidiary. If the bidder is a consortium or joint venture, the

stipulated criteria shall be fulfilled by any member of the consortium by itself or through its Affiliate

or Parent or Subsidiary, wherein the equity share of that member in the SPV shall be as specified in

clause 5.4 of the RFP document.

2. If any of the criteria is met through Affiliate or Parent or Subsidiary, Supporting Document

specified above to prove the relevant criteria shall be submitted for such Affiliate or Parent or

Subsidiary, as the case may be. The Bidder shall also submit a Certificate from the Statutory Auditors

or Company Secretary demonstrating the relationship with the applicant in the format given in Annex-

IV of Appendix – I.

3. If the stipulated criteria, either in full or in part, is fulfilled by the Bidder/member of Consortium

through its Affiliate or Parent or Subsidiary, it shall submit an undertaking from such Affiliate or

Parent or Subsidiary to the effect that the experience of such Affiliate or Parent or Subsidiary shall be

available for the use of the bidder if selected for implementation of the project.

[The following table shall be filled in for the Applicant and for each member of the Consortium]

Bidder/ Legal Name: [insert full name]

Date: [Insert day, month, year]

Consortium Members Legal Name: [insert full name]

Page [Insert Page Number] of [Insert total number of pages]

Page 60: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 60

Sl No Starting

Month/Y

ear

Ending

Month/Y

ear

Contract Identification Role of

Applicant

Certificate

provided

[Month/Y

ear]

[Month/Y

ear]

Project Name:

Brief Description of the

Project performed by the

Bidder: [describe the works

performed briefly]

Client Name:

Investment/Cost:

Energy produced:

[Implementation

/Operation etc.]

[Work Orders &

Invoices OR

Work

completion

Certificate/

satisfactory

client Certificate

or other

evidence,

certified by

Statutory

Auditors.]

(Please attach)

Page 61: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 61

Annex 2: Technical Plan Data Sheet

[Please attach detailed Technical Plan of length not more than 50 pages as per clause 28.3.2 (xiii),

covering the following aspects]

Secondary

Collection Secondary collection strategy from all types of waste

sources with collection time from each during the day

Any collection methodology (e.g., automated, semi-automated,

one- or two-person crews, etc.), including discussion of special

methods (if any) for collecting in narrow streets, courts, and

alleys and special method (if any) for serving particular regions

Number of and description of the collection vehicles to be

utilized (e.g. vehicle description, manufacturer and model

number, cost, capacity, age, lease or ownership arrangements,

etc.)

Any plans to make available bins to collect solid waste,

recyclables or organic materials in various sizes

City wide waste collection - pickup approach & strategies

Monitor and report the volume, weight, frequency of pickup,

recycled materials and all other relevant metrics on a periodic

basis

Segregation

Strategy and action plan for promoting segregation either at

source (optional) or centralized at waste processing site or their

combination

Proposed Segregation process, tools, equipment and machine

at Project Site including its effectiveness & limitations

Identify the best markets for all non-usable and non-degradable

materials in the solid waste and arrange for the collection,

segregation, processing and transportation of these resources to

ensure materials enter those markets. This shall include all

such non-usable and non-degradable materials in this plant, but

not limited to, Metals, plastics, glass, electronics, Rubber,

Tyre, Upholstery, Leather, Bags etc.

Requirement of land and product/process disposition diagram

on the land

Transportation Proposed plan for pick-up schedule (regular &

emergency if any), transportation from waste streams,

including frequency, pickup points, alerting of waste

generators, bin cleaning and routing strategies etc.

Measure waste destined for disposal, maintain accurate records

of each pickup‟s weights and volumes for transportation and

disposal.

Vehicle Planning, Scheduling & dispatching

Strategies and use of ICT/IOT, if any

Processing Detailed description of proposed technology to generate energy

as well as 10% waste discharge including process flow

diagrams for waste processing with its success stories and

demonstration, including technology limitations, if any

Expected number of average units of electricity generation out

of each tonnes of solid waste collected

Details of material balance, input/output, average throughput,

power/water consumption etc., appropriateness and relevance

of the technology, its track record and how it will ensure 10%

Page 62: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 62

waste discharge & adherence to pollution control standards &

environmental laws etc.

Intermittent processes e.g. Drying, Refuse Derived Fuel (RDF)

Pelletization, digestion etc.

RDF Pellets selling strategy and quantum during operation

phase or subsequently as per evolved strategy.

Biogas selling strategy if bio-methanation is used

Fertilizer selling strategy if bio-methanation is used

Grid connectivity – ensuring voltage & frequency stability and

sustainability of power supply during the day

Plant Maintenance & Management schedule with spare

management & redundancy and other aspects for continued

power supply and zero downtime for the plant.

Requirement of land and product/process disposition diagram

on the land

Technology specific interventions & innovativeness

Handling & Management of Byproducts of Processing unit e.g.

fly ash due to combustion, Bio-digester residues etc. to ensure

zero waste discharge

Environmental emissions including flue gas emissions &

Social issues and their mitigation strategies to meet Indian/

state standards. Details of flue gas treatments viz; scrubbing,

neutralization and filtration to be included.

A detailed cost & revenue analysis for the activity

Disposal Overall disposal ratio at landfill site (less than or equal to 10%)

Type and variety of disposals (if any) with justification for no

scientific process to reuse, recycle or decompose it.

Comply with all applicable laws governing the recycling,

storage, transportation, treatment and disposal (if any) of waste

Environment & Social issues and their mitigation strategies

Implementation Strategies

Design standards and basis of calculation of capital and

operating costs. The estimated project costs for the entire

project life-cycle should be provided, including clearly the

capital cost to be incurred

Present the type, quantity and periodicity of replacement of

infrastructure (bins, push -carts, tools) and vehicles to be

provided for execution of the project

Set out the area utilization plan for the New Site and Project

Facilities including the secondary waste collection bins,

processing facility, any other facilities and common areas etc.

Implementation Plan – present a detailed activity schedule

along with milestones in line with the requirements set out in

the Concession Agreement. This should include a

schedule for procuring installing, deploying equipment

(including bins & ancillary equipment as applicable) for

collection, transportation and processing of solid waste in the

Site. This should also outline the timeline envisaged for

obtaining various Government approvals

Planning, development & implement strategy based on a

greenhouse concept

Operational strategy of the processing plant to ensure 24x7

uninterrupted operations

Strategy to tackle gaseous emissions and meeting of Indian

emission standards

Page 63: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Development of Integrated Solid Waste Management Project with a Waste to Energy plant of minimum

300 TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at Vizhinjam for

Thiruvananthapuram cluster under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 63

Manpower Bidders should present the calculations for manpower

requirement for different parts of the SWM value-chain.

Proposed organization structure and composition of the project

and operational team to be presented, including staff

deployment plan, number of shifts per day of operations and

roles and responsibilities Bidders should indicate the number

of staff to be sourced locally.

Page 64: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

RFP for Integrated Solid Waste Management with a Waste to Energy (WTE) Project of minimum 300

TPD Processing capacity on Design, Build, Finance, Operate and Transfer (DBFOT) basis at

Njalianparambu, Thiruvananthpuram District in the State of Kerala for Thiruvananthpuram

Corporation, Government of Kerala under Public Private Partnership

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 64

Appendix – VI

Technical Capacity

Bidder/ Legal Name: [insert full name]

Date: [Insert day, month, year]

Consortium Members Legal Name: [insert full name]

Page [Insert Page Number] of [Insert total number of pages]

Starting

Month/Yea

r

Ending

Month/Yea

r

Contract Identification Role of Applicant Certificate

provided

[Month/Ye

ar]

[Month/Ye

ar]

Project Name:

Brief Description of the Project

performed by the Bidder:

[describe the works performed

briefly]

Client Name:

Investment/Cost:

Energy produced:

[Design &

Development/Ope

ration etc.]

[Work Orders &

Invoices OR

Work completion

Certificate/

satisfactory client

Certificate or

other evidence,

certified by

Statutory

Auditors.] (Please

attach)

Page 65: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

Kerala State Industrial Development Corporation Limited (KSIDC) | P a g e 65

Appendix – VII:

Swiss Challenge Proposal

Page 66: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

ForGovernmentofKerala

WASTETOENERGYPROPOSAL-THIRUVANANTHAPURAM

MARCH18,2020

Page 67: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

Table of Contents

Executive Summary .................................................................................................................... 3

Chapter – 1: Introduction & Background .................................................................................... 6

1.0 Introduction .................................................................................................................... 6

2.0 Project Idea ..................................................................................................................... 6

3.0 Approach & Methodology .............................................................................................. 7

Chapter – 2: Sector Profile, Market Assessment & Opportunities .............................................. 8

2.0 Industry Overview (IO) .................................................................................................... 8

2.1 Definitions of Waste and Related Management Under Municipal Solid Waste .............8

2.2 Municipal Solid Waste Generation in India .................................................................... 9

2.3 Municipal Solid Waste Composition ............................................................................... 9

2.4 Municipal Solid Waste Management (collection, transportation, treatment &

recycling) ....................................................................................................................................10

2.5 Current Waste Management Methods in India ............................................................ 11

2.6 Recent Developments in India ...................................................................................... 13

2.7 MSW Opportunities & Projections in India................................................................... 15

2.8 Regional Profile (RP) ..................................................................................................... 15

2.9 Key Issues (KI) & Opportunities in Kerala ..................................................................... 16

Chapter – 3: Project Concept .................................................................................................... 19

3.0 Description of the Project ............................................................................................. 19

3.1 Components of the Project ........................................................................................... 20

3.2 Pollution Control ........................................................................................................... 30

3.3 Community Integration ................................................................................................ 35

3.4 Planning Considerations / Innovativeness / Synthesis and Recommended Design .....38

Chapter – 4: Statutory & Legal Framework............................................................................... 40

4.0 Introduction .................................................................................................................. 40

1 |oPuath

g eA

Page 68: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

4.1 Municipal Solid Waste Regulation, 2016 ...................................................................... 40

4.2 Plastic Waste Management Regulation, 2016 .............................................................. 45

4.3 Construction & Demolition (C&D) Waste Management Regulation, 2016 ..................52

4.4 Policy Initiative .............................................................................................................. 58

4.5 Statutory Clearances ..................................................................................................... 60

4.6 Conclusion..................................................................................................................... 61

Chapter – 5: Environmental & Social Impacts ........................................................................... 62

6.0 Introduction .................................................................................................................. 62

6.1 Environmental Impacts ................................................................................................. 62

5.2 Social Impacts & Mitigation Measures ......................................................................... 68

Chapter – 7: Operating Framework .......................................................................................... 73

7.0 Introduction .................................................................................................................. 73

7.1 Risks & Mitigation ......................................................................................................... 73

7.2 Indicative Selection Criteria .......................................................................................... 74

7.3 Conclusions ................................................................................................................... 74

Chapter – 8: Way Ahead ........................................................................................................... 76

8.0 Introduction .................................................................................................................. 76

8.1 Requirements from Government of Kerala .................................................................. 76

8.2 Project Development Framework, Staffing & Deployment Plan ..................................76

Page 69: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

3 | P a g e

ExecutiveSummaryIntroductionGovernment of Kerala, through its Local Self Government Department, is in theprocess of implementing an integrated Solid Waste Management solution for theentire State on a high priority and for this purpose it is envisaged to setup andoperate Waste to Energy Plants at identified locations across the State throughPublic Private Partnership under ‘Design Build Finance Operate and Transfer(DBFOT)’basisunderSwisschallengemodeforTrivandrumcluster.Thisprefeasibilityreportisbeingsubmittedbytheproposerundertheswisschallengemethod.MSWSectorOverview,MarketAssessment&ProjectionTheReportoftheTaskForceonWastetoEnergyofthePlanningCommissionin2014estimatesMSWgeneration inIndiaat62milliontonnesby377millionpopulation in2013-14.TheMinistryofUrbanDevelopment,GovernmentofIndiaestimatesarethesamefortheyear2014-15.Assumingurbanpopulationof440million in2017(basedonprojectionsfromUnitedNationspopulationestimates)andpercapitadailywastegenerationof450gm,theMSWgeneratedfor2017comesto72milliontonnes.ThecompositionofMunicipalSolidWasteinIndiaaspertheReportoftheTaskForceofthePlanningCommission (2014). It indicates that biodegradable componentof thetotalmunicipal solidwaste in India is 51%. Besides, biodegradable content,MSW inIndiacontains10%plastic,7%paperand32%othersliketextile,glass,metal,drainsilt,street sweeping & inerts. According to Report of Task Force onWaste to Energy(2014)1,about80%isdisposedofindiscriminatelyatdumpyardsinanunhygienicandunscientific manner. Considering, business as usual scenario of 62 million tonnesannual generation of MSW continues to be dumped without treatment, it wouldneed340,000cubicmetres(1240hectaresperyearat10metreheightanddensityof500 kg/m3) of landfill space every day.3 With projected waste generation of 165milliontonnesby2031,thelandconsumedbylandfillsfor20yearscouldbeashighas45,400 hectares of precious land, which the country cannot afford. Data on theachievements on waste management under Clean India Mission for the year 2018indicates that 36.69% of solidwaste is processed in the country,with 88.4MWofwaste to energy production and 1.5 million tonnes per annum of compostproduction.Therefore,thereisagrowingmarketforenvironmenttechnologiesthatspecificallydealwithMunicipalSolidWastemanagement.End-usersareprimarilythecivic authorities, and various pollution control boards. However, given thetremendouspotential of convertingwaste into usable products/services, there is astrongtrendofprivatesectorparticipation inthissub-sectorthroughpublicprivatepartnerships. Urban population of Kerala generates about 7168 tonnes per day ofMSW.Thisisbasedonurbanpopulationestimatesof15.93million(census2011)and

1ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May12,2014(http://planningcommission.nic.in/reports/genrep/rep_wte1205.pdf)

Page 70: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

4 | P a g e

percapitawastegenerationestimatesof450gmperday.Theexistingwastedisposalprocess is restricted to collection, limited treatment like composting followed bysurfacedumping.ThereisaneedtoarrestthewastegoingintolandfillsiteinIndiaaswellas inKerala.Thisneedhasbeen identifiedtobeat least75%of thetotalMSWgenerationthroughitsprocessingusingappropriatetechnologies.Theseappropriatetechnologiescanassistinrealizingabout50to60MWofwastetoenergypotentialinthe state. SWOT analysis indicates that (RDF based) waste to energy options orincinerationbasedoptionsaresuitedforKeralaconsidering limitationofavailabilityof land.However, the incineration (RDF /OpenBurning) technologyneed tomeetinternationalstandardsforemissionsalongwithzerolandfilldischarge.Technology/Advantages/Innovativeness:TheproposerhasproposedaveryinnovativeWTEtechnologybasedontheconceptof3R,whichnotonlymeetsthehigherenergyproductionpertonofMSWbutalsomeets the international air emission standards. Further, there is no requirementoflandfillforashdisposal.Theuniquenessofthetechnologyisdescribedbelow.Theproposedprojecthasuniquefeaturesashighlightedbelow.

1. Noneedforsecondary landfill for thedumpingofAshgeneratedbyWTEprocess.

2. Noneedforthereceiptofsegregatedwaste3. No need for on site bio-drying which can cause objectionable odors for

nearbycommunities4. Guaranteed commercial viability, due to theability togenerate 1000 kWh

forelectricityperMTofMSW5. PatentedTechnology.6. CommunityIntegration

RegulatoryRequirements&Environmental&SocialImpactAssessmentEmergingtrendsfromregulatoryandpolicyframeworkindicatesthatthereismajorfocus on resource recovery with emphasis on waste segregation andinstitutionalizationof3Rs implementation.Theuniqueof theproposedfacility is toinstitutionalize resource recovery consisting of extraction of discarded materialsfrom waste for reuse so as to defer consumption of virgin resources, mitigategreenhouse effect, and minimize the amount of waste disposed into landfills.Therefore, components,materialandenergynot recovered fromwastestreamssofarinKeralaoffertremendousvaluewhichcanbepotentiallyrealizedbyeliminatingwastethroughtheadoptionofcircularbusinessmodels.Theprojectlocationaswellastechnologyproposedisexpectedtohaveminimumimpactduringconstruction&operationoftheproject.

Page 71: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

5 | P a g e

Theprojectdoesnot involveanypopulationfor rehabilitationandresettlement.Allthelaborrequiredforconstructionofthefacilitywillbeprovidedwithadequatecivicas well as health and safety facilities. Further, all the measures prescribed in theenvironmental&socialstatutorypermissionwillbeimplemented. FinanceTheproposedWTEfacilitywillrequireatotalinvestmentof680Crores.ThefundingrequirementfortheProjectisproposedtobemetthroughamixofShareholders’equityandTermdebtatanaggregateDebt:Equityratioof80:20.Theproposerhasalreadyreceivedfirmcommitmentsfromfunding institutionsfor100%of the Termdebt and iswilling to produce documentary evidence to establish thesame.Theproposerhasmadeallfinancialprojectionsbasedoftheavailabilityof450TPDofMSW. Any changes to the amount of availableMSWwill result in changes to thesizing of the proposed WTE facility and proportional changes to the proposedfinancials.RiskProfile/RequirementfromGovernment/ProjectStructureTheGovernmentofKerala canplay a critical role in the successful implementationandoperationofaWTEfacility.Themajor requirementfromthestategovernmentaregivenbelow.

• AllotmentoflandatacurrentMSWprocessingsite.• Operatingcontract(ConcessionPeriod)for25yearsorhigher.• Onewindowclearanceorassistancewithalllicense&permits.• Assistance with signing a Power Purchase Agreement (PPA) with State

ElectricityBoard,atapprovedratesforWastetoEnergyplans,forfulllengthofconcession.

• Tipping &I Storage charges equal to those offered to other concessionholders.

• Guaranteedsupplyof450metrictonsperday,orgreater,ofunsortedMSW.• Assistancewithinterconnectiontolocalpowergrid.

Conclusions Theriskprofileoftheprojectindicatesthatmajorityofrisksarelowduetofinancial& technical strength of the proposer. The proposer has developed a well-definedprojectstructure,whichwillbeestablishedoncegivenanopportunitytoimplementtheproject.

Page 72: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

6 | P a g e

Chapter–1:Introduction&Background

1.0 IntroductionIndia is facingoneof itsmostdifficult challenges like anyother rapidly developingcountrywithitslargequantitiesofwastebeingproducedasaresultoffasteconomicgrowth and urbanization. The growing population combined with economicmigrationintothecitiesnotonlygeneratesanever-increasingamountofwaste,butalso requires an increase in electrical power to meet the extra demand. In thiscontext, solid waste management has been a critical issue in Kerala, especially inurban areas, for many years. Government of Kerala, through its Local SelfGovernment Department, is in the process of implementing an integrated SolidWaste Management solution for the entire State on a high priority and for thispurpose it is envisaged to setup and operateWaste to Energy Plants at identifiedlocations across the State through Public Private Partnership under ‘Design BuildFinanceOperate and Transfer (DBFOT)’ basis. Kerala State Industrial DevelopmentCorporation (KSIDC) is appointed as theNodal Agency for the selection of PrivatePartner for the implementation of such projects at various locations/clusters.Therefore, a prefeasibility study report is being submitted for development ofTrivandrumclusterinKeralaIndia.2.0 ProjectIdeaThe current situation in the city of Trivandrum (Kerala, South India) is that, theexistingwastedisposalprocess is limited to just collectionandsurfacedumpingofthe waste into uncontrolled sites. The environmental damage and risks to humanhealthfromthisactivitycreatesareescalatingdaily.Developedcountrieshaveoverthepastthreedecadesmasteredtheartofconvertingwastetoenergyasananswerto the challenges of processing Municipal Solid Waste (MSW) into a sustainablegreenenergysource.The technologyandbusinessmodelareverywellestablishedandrapidlygrowingacross theglobeandthisprojectwillbean initiative to launchthissuccessfulsolutioninIndiathroughtheTrivandrumwastetoenergyplant.Inthisregard, Local Self Government Department, Government of Kerala, proposes todevelop an Integrated Solid Waste Management project with a Waste to Energyplant of a minimum processing capacity of 450 Tonnes Per day (TPD) for theThiruvananthapuram Cluster. This project will be implemented by inviting globalcompetitivebidsunderswisschallengemethodfrominterestedentitiesorgroupofentities to execute the Project in partnership with GoK under Public PrivatePartnershipunder‘Design,Build,Finance,OperateandTransfer’basis.

Page 73: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

7 | P a g e

3.0 Approach&MethodologyThe prefeasibility report has been prepared considering theMSW sector profile &market assessment, project concept, statutory & legal framework, impacts(environmental&social),projectdevelopment&operatingframework&wayahead.Itconsistsofeightchaptersasgivenbelow.Chapter1 : IntroductionChapter2 : SectorProfile&MarketAssessmentChapter3 : ProjectConceptChapter4 : Statutory&LegalFrameworkChapter5 : Environmental&SocialImpactsChapter6 : ProjectFinancialsChapter7 : OperatingFrameworkChapter8 : WayAhead

Page 74: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

8 | P a g e

Chapter–2:SectorProfile,MarketAssessment&Opportunities2.0 IndustryOverview(IO)ThestatusofMSWinIndia&Keralahasbeendescribedintermsofitsdefinition,itsgeneration, its composition, handling and management. It is followed by marketassessment, identification of opportunities & key issues. The following sectionssummarizeeachoftheseitemsbasedonsecondarydata.2.1 DefinitionsofWasteandRelatedManagementUnderMunicipalSolidWasteMunicipalsolidwasteisdefinedtoincludehouseholdwaste,commercialandmarketarea waste, slaughter house waste, institutional waste (e.g., from schools,community halls), horticultural waste (from parks and gardens), waste from roadsweeping, silt from drainage, and treated biomedical waste (Figure 2.1). Earlier,construction and demolition (C&D)waste used to be defined as part ofmunicipalsolid waste until 2015. However, SolidWaste Management Rules 2016 have takenC&DwasteoutofthedefinitionofMSW.

MunicipalSolidWaste

WasteStreams1.HouseholdWaste

2.Commercial&InstitutionalWaste3.Market&CateringWaste4.StreetSweepingsandSiltfromDrains5.HorticultureandDairyWaste6.SlaughterHouseWaste7.TreatedBiomedicalWaste

Figure2.1:WasteStreamsunderMunicipalSolidWasteSource: Ministry of Housing and Urban Affairs, GoI (2017); Waste to Wealth; A Ready Reckoner forSelectionofTechnologiesforManagementofMunicipalWasteIt may be noted that C&D Waste, Plastic waste, E-waste, Biomedical Waste,Hazardous Waste & Battery Waste are covered under different regulations. AsimplifiedversionofmunicipalsolidwastemanagementacrosswastevaluechaininIndiaisshowninFigure2.2.

Page 75: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

9 | P a g e

DefinitionsofdifferentwastestreamsasperFigure2.2givenbelow.2

Figure2.2:WasteStreamsunderMunicipalSolidWaste

2.2 MunicipalSolidWasteGenerationinIndiaA number of municipal solid waste generation estimates are given by differentsourcesat country level. Theseestimatesaredescribed inTable 2.1.AsperCentralPollutionControlBoard,GovernmentofIndia’sestimatesMSWgenerationfor2014-15is52milliontonnesperannum.TheMinistryofUrbanDevelopment,GovernmentofIndiaestimatesarethesamefortheyear2014-15.TheReportoftheTaskForceonWastetoEnergyofthePlanningCommissionin2014estimatesMSWgenerationat62milliontonnesby377millionpopulationin2013-14.Assumingurbanpopulationof440millionin2017(basedonprojectionsfromUnitedNationspopulationestimates)andpercapitadailywastegenerationof450gm,theMSWgeneratedfor2017comesto72milliontonnes.2.3 MunicipalSolidWasteCompositionThecompositionofMunicipalSolidWasteinIndiaaspertheReportoftheTaskForceof the Planning Commission (2014) is shown in Figure 2.3. It indicates thatbiodegradablecomponentofthetotalmunicipalsolidwasteinIndiais51%.However,it has been reported that based on the data available for a few cities, thebiodegradablecomponentwouldbesomewherebetween55%and60%onanannualbasis.2 As Figure 2.4 shows through a comparison across the different incomegroupings of countries, the biodegradable component of municipal solid wastedeclines with rise in income.3 The high income countries have 28%, upper middleincomecountries54%,andthelowermiddleincomecountries59%oftheirmunicipalsolidwaste,whichisbiodegradable.India’sbiodegradablecomponent,bycontrast,islower than its group of lower middle income countries.2 Besides, biodegradablecontent,MSWinIndiacontains10%plastic,7%paperand32%othersliketextile,glass,metal,drainsilt,streetsweeping&inerts.

2MSWRules,20163WhataWaste,TheWorldBank2012

MSWGeneration

(WasteStreams)

Treatment(method,technique

&process)

Disposal

Collection&Transportation

Transportation

Handling

Page 76: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

11 | P a g e

wastetoenergyplantswithaproductioncapacityof88.4MW.Numberofwastetoenergyplants,whichareunderconstructionare56withaproductioncapacityof415MW. 4BengaluruandPuneare theonly two largecities (populationgreater than5million)with around50%of thewaste segregatedat source.Amongmid-size cities(population 1 million to 5million), Indore andMysore have achieved 90% and 95%segregationatsource,respectivelyandanumberofsmalltownshaveattained100%segregation.2The 2018 cleanliness rankings of all ULBs indicated participation of 4203 ULBscovering all states and UTs in the country (barring Lakshadweep).5 The resultsindicatedthatthereare1863ULBswhichpracticedoortodoorgarbagecollectioninmorethan40%ofwards.Further,436ULBshavealreadyinitiatedsourcesegregationofwasteinatleast40%ofthewards.About168ULBsareprocessing80%ormoreoftheircollectedwetwastewithinthecityand100ULBsareprocessingatleast80%oftheircollecteddrywaste.62.5 CurrentWasteManagementMethodsinIndiaTheReportofTaskForceonWastetoEnergy,Governmentof India6clearlydepictsthe classification/ characterization of thewaste and the technology options for itstreatment.

Figure2.5:PathwaysforWasteProcessingTechnology

Source:ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May2014 4SwachhBharatMission(Urban)12thFebruary2018;AFD-CPRWorkshopon‘ValuingWasteorWastingValue’;RethinkingWasteValorizationinFastGrowingMiddleIncomeCities5MinistryofHousingandUrbanAffairs,GoI(2019);SwachhSurvekshan20196ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May12,2014(http://planningcommission.nic.in/reports/genrep/rep_wte1205.pdf)

Page 77: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

10 | P a g e

Figure2.3:CompositionofMunicipalSolidWasteinIndia(percentoftotal)

Source:TaskForceonWastetoEnergy,PlanningCommission,20143

Figure2.4:BiodegradableWasteGeneration:India,ChinaandOtherCountries4

Note:GroupsClassifiedaccordingtoTheWorldBankestimatesof2018GNIpercapitaSource:WhataWaste,TheWorldBank,20122.4 MunicipalSolidWasteManagement(collection,transportation,treatment&

recycling)DataontheachievementsonwastemanagementunderCleanIndiaMissionindicatesthat 36.69% of solidwaste is processed in the country,with 88.4MWofwaste toenergyproductionand 1.5million tonnesperannumofcompostproduction.Thereareabout 145compostplants,whichare functionalhavingan input capacityof6.2million tonnesper annum. There are about 150 compostplants under constructionwithan input capacityof 3.3million tonnesper annum.Thereare seven functional

Page 78: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

11 | P a g e

wastetoenergyplantswithaproductioncapacityof88.4MW.Numberofwastetoenergyplants,whichareunderconstructionare56withaproductioncapacityof415MW. 4BengaluruandPuneare theonly two largecities (populationgreater than5million)with around50%of thewaste segregatedat source.Amongmid-size cities(population 1 million to 5million), Indore andMysore have achieved 90% and 95%segregationatsource,respectivelyandanumberofsmalltownshaveattained100%segregation.2The 2018 cleanliness rankings of all ULBs indicated participation of 4203 ULBscovering all states and UTs in the country (barring Lakshadweep).5 The resultsindicatedthatthereare1863ULBswhichpracticedoortodoorgarbagecollectioninmorethan40%ofwards.Further,436ULBshavealreadyinitiatedsourcesegregationofwasteinatleast40%ofthewards.About168ULBsareprocessing80%ormoreoftheircollectedwetwastewithinthecityand100ULBsareprocessingatleast80%oftheircollecteddrywaste.62.5 CurrentWasteManagementMethodsinIndiaTheReportofTaskForceonWastetoEnergy,Governmentof India6clearlydepictsthe classification/ characterization of thewaste and the technology options for itstreatment.

Figure2.5:PathwaysforWasteProcessingTechnology

Source:ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May2014 4SwachhBharatMission(Urban)12thFebruary2018;AFD-CPRWorkshopon‘ValuingWasteorWastingValue’;RethinkingWasteValorizationinFastGrowingMiddleIncomeCities5MinistryofHousingandUrbanAffairs,GoI(2019);SwachhSurvekshan20196ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May12,2014(http://planningcommission.nic.in/reports/genrep/rep_wte1205.pdf)

Page 79: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

12 | P a g e

Therefore,theseveralmethodsofprocessingandtreatmentofmunicipalsolidwastecanbegroupedtogetheras:1.BiologicalProcessing(CompostingandBiomethanation)2.ThermalProcessingorWastetoEnergyProcessing3.ProcessingforReuseFigure2.5givesthepathwaysastothemunicipalsolidwasteprocessingtechnologyto be opted for a given type of waste. Therefore, there is a growing market forenvironment technologies that specifically deal with Municipal Solid Wastemanagement. End-users are primarily the civic authorities, and various pollutioncontrolboards.However,given the tremendouspotentialof convertingwaste intousableproducts/services,thereisastrongtrendofprivatesectorparticipationinthissub-sectorthroughpublicprivatepartnerships.ThevariousmethodsoftreatmentofMSWareasfollows:2.5.1 Composting(i)AerobicCompostingThebacterialconversionoftheorganicspresentinMSWinthepresenceofairunderhotandmoistconditions iscalledcomposting,andthefinalproductobtainedafterbacterialactivityiscalledcompost(humus),whichhasveryhighagriculturalvalue.Itisusedasfertilizer,anditisnon-odorousandfreeofpathogens.(ii)Vermi-compostingVermi-compostinginvolvesstabilizationoforganicwastethroughthejointactionofearthworms and aerobic microorganisms. Initially, microbial decomposition ofbiodegradable organic matter occurs through extra cellular enzymatic activity(primary decomposition). Earthworms feed on partially decomposed matter,consumingfivetimestheirbodyweightoforganicmatterperday.Theingestedfoodis furtherdecomposed in thegutof theworms, resulting inparticlesize reduction.Thewormcastproductcanserveasabio-fertilizerinagriculture.However,thearearequiredislarger,whencomparedtodrycomposting.2.5.2 WastetoEnergyWithlimitedlandavailableforsolidwastedisposalandunscientificwaysofdisposingsolidwaste,generatingenergyformwasteprovidessolutiontothetwinproblemofpower shortage and overflowing landfill sites and deteriorating ecosystems. Theconcept of energy recovery fromwastes has been taken up byMinistry ofNew&Renewable Energy (MNRE) on amuch focused level. Thepotential for recovery ofenergyfromwasteishighinIndia.AspertheMNREaround4,566MWofpowercanbegeneratedfromMSWby2017.

Page 80: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

13 | P a g e

Figure2.6:WtEInstalledCapacityandGrowthfigures

State-wiseGridInteractiveWtEInstalledCapacity(MW)

GrowthinWtECapacityinIndia(MW)2.6 RecentDevelopmentsinIndiaGovernmentofIndiahadtakenmajorinitiativebylaunchingSwachhBharatMission,AMRUTandSmartCitiesMissiontoimprovetheUrbanInfraandsanitationinIndia.TheseprogrammesareexpectedtoprovideimpetustotheSolidWasteManagementandWastetoEnergySectorforaccelerationandrealizationofthepotential.SwachhBharatMission(SBM)SwachhBharatMissionhasthefollowingobjectives:

• Eliminationofopendefecationanderadicationofmanualscavenging• Modernandscientificmunicipalsolidwastemanagement• Generateawarenessaboutsanitationanditslinkagewithpublichealth• Tobringaboutbehavioralchangeregardinghealthysanitationpractices

Page 81: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

14 | P a g e

• TocreateanenablingenvironmentforprivatesectorparticipationinCapex&Opex

• CapacityaugmentationofULBsPlannedimpactofSBMonMSWSector

• NewWtEplantsandBio-methanationplantswillbebuilt• An integrated approach for waste disposal will be adopted starting from

sourcesegregationtodisposal.• Spreading of segregation related awareness with the help of NGOs and

RWAsAtalMissionforRejuvenationandUrbanTransformation(AMRUT)AMRUT launchedonJune25th,2015aimsatprovidingbasicservicessuchaswatersupply,sewerageandurbantransporttohouseholdsandbuildingamenitiesincitiestoimprovethequalityoflifeforall,especiallythepoorandthedisadvantaged.PlannedimpactofAMRUTonMSWSector

• NewModernandScientificSWMplantswillbebuilt• PhysicalandInstitutionalinfraforSWMviaprojectbasedapproach• UseofClosedbodyleakedproofcontainerstopreventspillageofwasteon

Road• GPS devised and sensors on waste trucks will ensure that the garbage is

collectedanddisposedoffinatimelymanner.SmartCitiesMissionTheSmartCitiesprogrammelaunchedonJuly25th,2015aimstodevelopcitiesthatapplysmartsolutionstoprovidecoreinfrastructureandgivedecentqualityoflifetoits citizens. It aims at developing an entire urban eco-system along with the fourpillarsofcomprehensivedevelopment– Institutional,physical, socialandeconomicinfrastructure.Thegovernmentplanstobuild100smartcitiesunderthemission.PlannedimpactofSmartCitiesMissiononMSWSector

• ThecitiestofocusonscientificdisposalofwastewiththesettingupofnewWtEandZerowasteplants.

• Theseplantstofocusonmaximumresourcerecovery/minimalemissions• AutomatedWastecollectionsystemswithminimumhumanintervention• Tracking device on transportation vehicle to avoid overpayment based on

numberoftrips,weight,andtimetaken• Installationofpollutionsensorsatallplants• Useofsensortechnologyforsorting/segregationofwastematerials

Page 82: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

15 | P a g e

2.7 MSWOpportunities&ProjectionsinIndiaConsidering growing population & waste generation is growing in India, if theassumptionwithrespecttopercapitadailywastegenerationisloweredto400gm,theestimateofMSWgeneratedfor2017 is lower, i.e.,64milliontonnes.7Thisdoesnot includeotherwaste streams likeConstruction andDemolitionwaste forwhichtheestimatesrangefromamere10milliontonnesperannum.2Thisindicatesthatarangeof52to64milliontonnesofMSWgenerationcanbeconsideredforplanningthewastemanagement.AccordingtoReportofTaskForceonWastetoEnergy(2014)8,about80%isdisposedof indiscriminately at dump yards in an unhygienic and unscientific manner.Considering, business as usual scenario of 62 million tonnes annual generation ofMSW continues to be dumped without treatment, it would need 340,000 cubicmetres (1240 hectares per year at 10 metre height and density of 500 kg/m3) oflandfill spaceeveryday.3Withprojectedwastegenerationof 165million tonnesby2031,thelandconsumedbylandfillsfor20yearscouldbeashighas45,400hectaresofpreciousland,whichthecountrycannotafford.3

2.8 RegionalProfile(RP) Urban population of Kerala generates about 7168 tonnes per day ofMSW. This isbased on urban population estimates of 15.93million (census 2011) and per capitawastegenerationestimatesof450gmperday.Theexistingwastedisposalprocessisrestricted to collection, limited treatment like composting followed by surfacedumping.2.8.1CompositionThe physical composition of MSWs at the collection point and dumping sites, asreportedbytheKSUDP(KeralaStateUrbanDevelopmentProject), isgiveninTable2.1.ItindicatesthatinTrivandrum,around85%ofthewasteiscompostableorganicsfollowedPaperandPlastics.Table2.1:PhysicalcompositionofMSW(Trivandrum)TypeofMSW PercentPerTon

CollectionPoint DumpsitePaper 3.10 4.38Plastic 2.95 4.39

7IsherJudgeAhluwalia&UtkarshPatel(2018);IndianCouncilforResearchonInternationalEconomicRelations; Working Paper No. 356; Solid Waste Management in India An Assessment of ResourceRecoveryandEnvironmentalImpact8ReportoftheTaskForceonWastetoEnergy,PlanningCommission,May12,2014(http://planningcommission.nic.in/reports/genrep/rep_wte1205.pdf)

Page 83: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

16 | P a g e

TypeofMSW PercentPerTonCollectionPoint Dumpsite

Metals 0.32 0.51Glass 0.76 1.06Rubber&Leather 0.84 1.53Inerts 0.77 0.00Ash&FineEarth 1.90 2.45CompostableOrganics 88.34 84.32DomesticHazardous 0.17 0.38Thechemicalcharacterizationofwasteis importanttounderstandtheutilizationaswellasthepollutionpotentialofthewaste.ThechemicalcompositionofMSWfromTrivandrum,asreportedbytheKSUDPisgiveninTable2.2.Itindicateshighmoisturecontent,lowcalorificvalue.Table2.2:ChemicalcharacteristicsofMSW(Trivandrum)Characteristic MeasurementDensity(Kg/m3) 207.06MoistureContent(%) 74.32CalorificValue(K.Cal/kg) 1656pH 7.72C(%) 24.97N(%) 0.97C/N 25.74Thehazardouscomponentsof thewastestreamwerealso identified in theKSUPDstudy.Table2.3containsthefindingsasreported.Thisreportwasusedtodetermineifitisfeasibleorbeneficialtoremoveanyhazardouscomponentsbeforethewasteisstoredforcombustion.Table2.3:HazardouscomponentsofMSW(Trivandrum)ArgonMg/kg

Nickelppm

Cadmiumppm

Leadppm

Chromiumppm

Copperppm

Zincppm

MercuryMg/kg

3.43 2.48 0.2 5.13 -- 11.95 24.3 <0.1ThesestudieswereconductedbyKSUDPin2006.Basedonhistoricalexperience,wecan assume that the chemical composition ofMSWwould have changed, with anincrease inNon-Biogenicwaste, in comparison to Biogenicwaste.We also assumethatthischangewouldhaveincreasedthecalorificvalueoftheMSWinTrivandrum.2.9 KeyIssues(KI)&OpportunitiesinKeralaThereisaneedtoarrestthewastegoingintolandfillsiteinIndiaaswellasinKerala.Thisneedhasbeenidentifiedtobeatleast75%ofthetotalMSWgenerationthrough

Page 84: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

17 | P a g e

its processing using appropriate technologies. These appropriate technologies canassistinrealizingabout50to60MWofwastetoenergypotentialinthestate.SWOT analysis of various technology options available for WTE projects arementionedbelow:Table-:SWOTAnalysisofWtETechnologyOptionsTECHNOLOGY STRENGTHS WEAKNESSES OPPORTUNITIES THREATSMassBurningOrIncineration

Purificationofwetwaste andminimization ofodour problemsdue to possibilityof chargingmixedwaste into theIncineratorrelativelysooner.

Incineration ofmixed waste leadsto wastage ofenergy on accountofmoisture contentin the waste andthusresultsinlowernet energyproduction.

No segregation atsource; no segregatedtransportationrequired.

Wastageofenergyonaccountofwetwaste.

PyrolysisandGasification

High-energyrecoveryduetouseofwell-segregatedandcontrolledfeedstock

SegregationofMSWisnecessary.Thisnecessitatesadditionalland,infrastructureandO&Mcost.

Productionoffuelgas/oil,whichcanbeusedforavarietyofapplications.

Excessivemoistureinwasteleadstouseofairpollutioncontroltechnologyandresultsinincreasedcostofinstallation

Biomethanation Variabilityindailycompositionoffeedstockdoesnottypicallyaffectthecompositionofgasproducedattheplant.

Biologicalprocessesaretimeconsuming;henceenergy-generationratesarelow;efficiencyoftheplantisdirectlydependentonthedegreeofsegregationandthequalityofbiodegradablewetwaste.

Enclosedsystemenableallthegasproducedtobecollectedforuseeitherforpublicutilitiessuchasstreetlightsorfordomesticfuelgas,aswellasallowsforthecontrolofGreenHouseGasEmissions

Technologyhaslimitedapplicationasitcanhandleonlybiodegradablewasteandthuscanonlybeapartofanintegratedfacilityforwasteprocessing.

RefuseDeriveFuel

Settingupofsmallpowerplantsiseconomicallyviable.

Plant’sefficiencyislinkedtothedegreeofwastesegregation.

Suitableforprocessingdrywasteintownsandcitieshavingapopulationrangeof50,000to1millionorincitieswhereMSWgenerationisbelow500TPD

UncertaintywithregardtomarketingofRefuseDeriveFuel

PlasticWastetoFuelOil

SeparatecollectionsystemcanbeestablishedtocollectplasticwasteasperthePlasticWasteHandlingRulesandcanbeusedasfeedstock

Plasticwaste,ifnotproperlysegregated,willhaveanadverseimportontheproductionandqualityoffueloil.

Directandhighrate(97%)ofconversionofplasticwastetofuel.Smallandlargeplantscanbesetuptoprocessplasticwasterangingfrom50kgto1000TPD

Aspecialcatalystisrequired,whichisprohibitivelyexpensiveandregenerationislimitedtofewcycles.

Page 85: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

18 | P a g e

TECHNOLOGY STRENGTHS WEAKNESSES OPPORTUNITIES THREATSPlasmaPyrolysisandGasification

Differentkindsoforganicwastecanbesubjectedtoplasmapyrolysis,whichproducesacombustiblegasandacarbonaceousresidue(char).Itofferspotentialforcarbon-blackrecoveryfromusedtyres.

Costlierthanconventionalpyrolysistechnology;gasplasmatechnologiesforwastetreatmentuseelectricityasenergysource

Thehightemperatureconditionsofplasmagasificationresultinthedecompositionoforganiccompoundsintotheirelementalconstituents,formingahighenergysynthesisgas,whichcanbeusedfortheproductionofelectricityorsecond-generationoils/fuel.

ThetechnologyisveryexpensiveandhasnotbeenappliedtoMSWmanagementsofar.

Source:IndiaInfrastructureResearch

2.8 RegionalProfile(RP)SWOT analysis indicates that (RDF based)waste to energy options or incinerationbased options are suited for Kerala considering limitation of availability of land.However, the incineration (RDF / Open Burning) technology need to meetinternationalstandardsforemissionsalongwithzerolandfilldischarge.

Page 86: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

19 | P a g e

Chapter–3:ProjectConcept3.0 DescriptionoftheProjectLocalSelfGovernmentDepartment,GovernmentofKerala,proposestodevelopanIntegrated Solid Waste Management project with a Waste to Energy plant of aminimum processing capacity of 450 Tonnes Per day (TPD) for theThiruvananthapuramClusteroperating in theStateofKerala throughopenbiddingunder Swiss Challenge Method. The selected entity will execute the Project inpartnershipwithGoKunderPublicPrivatePartnershipunder‘Design,Build,Finance,OperateandTransfer’basis,asdetailedinthisRFP.Theproject isproposedtobedevelopedasaportbasedpowerprojectatthebackupareanearVizhinjamInternationalSeaportLtd.TheproposedWTEplantwouldbebuilt on a 90,000 square foot (~2 acre) section of this site. The power beinggenerated intheplantwillbeconsumedfortheoperationoftheportand itsalliedactivities.15acresoflandadjacenttotheportareaatVizhinjamwillbeprovidedonanominal lease and the Private Partner is expected to design the plant and acomprehensive plan for the complete chain of solidwastemanagement, build thesame by arranging the finance required for the same, operate the project for thespecifiedperiodandtransferitbacktoGoK/LSGIsattheendofthespecifiedperiod,in accordance with the detailed terms and conditions contained in the draftConcession Agreement. The latitude & longitude of the project is 8º22’16.5”N &77º00’11.4’’EandgiveninFigure3.1.

Page 87: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

20 | P a g e

TheThiruvananthapuramClustercomprisesofthefollowingparticipatingLSGIs.

1. ThiruvananthapuramMunicipalCorporation2. AttingalMunicipality3. NedumangaduMunicipality4. NeyyattinkaraMunicipality5. VarkkalaMunicipality6. VenganoorGramaPanchayath7. KalliyoorGramaPanchayath8. BalaramapuramGramaPanchayath9. ParassalaGramaPanchayath10. PoovarGramaPanchayath.

The scope of the Private Partner include the secondary collection, segregation,transportation and processing of solid waste generated in the cluster using anappropriatetechnology.3.1 ComponentsoftheProjectThewastetoenergyprojectisbeingdevelopedtogenerateelectricityandheatwhilecan be used for the industrial processes developed in the future, including lowtemperature heat recovery and processing. The largest part of the electricitygenerated by the plant will be sold to the grid. Heat generated is a value-addcomponent and will be used in a secondary generation process based on lowtemperatureheat recovery.Thesecondarygeneration iscontemplatedasasecondphaseoftheproject.Pairingmultiple industrial processeson allotted sitewould create an Eco-IndustrialPark and showcase Trivandrum & Kerala at the forefront of sustainable wastemanagementpractices.Eco-industrialparksstrivetotakefulladvantageofsymbioticindustrial processes and provide numerous benefits to the community and theenvironment. Finally, this reduces the volume of waste being landfilled and heavyemissionfromtrucktrafficneededtodoso,whilemovingTrivandrumupthewastepyramid(seeFigure3.2,below).

Page 88: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

21 | P a g e

Figure3.2:TheHierarchyofWasteManagement

This Waste Management Hierarchy prioritizes the industry’s best practices, withsourcereductionandreusefavoredoverrecycling,composting,WTE,andlandfilling.Energy recovery and/or conservation are a theme throughout, as any wastereductionpromotesefficiencysomewhereinthedisposalsystem.Becausetherearebothmaterialandpracticallimitstotheamountofwastewhichcanberecycledandcomposted,alternativesfortheremainderofthewastestreammustbeconsideredafter recycling, reduction, and reusearemaximized.WTE is highlypreferable to alllandfillingpracticesandthereforeshouldbetakenseriouslyasavalidandbeneficialmeansofwastedisposal.3.1.1 DesignandAnalysisConsidering the overarching principle of 3R, the overall background and goalsdiscussedearlierthissectionswilldetailthedesignprocessitselfasdescribedbelow.Annexure3.1describestheoverallmaterialflowdiagram.3.1.2 PreparationandFeed3.1.2.1 PoliciesandProceduresA framework has been described below, for standard tipping floor policies andproceduresand itencompassesunloading locationanddistance requirements (e.g.thebackendof trucks transportingMSWto theplantmust remainat least 10 feet

Page 89: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

22 | P a g e

awayfrompitopening)aswellassafetyguidelines(e.g.locationswhereemployeesmustwear safety harnesses). A distinct unloading areawill be allocated for truckswithdepositsthatrequiremorethanonepersontohelpunload.Effortswillbemadetominimize all pedestrian traffic on the tipping floor to helpminimize health andsafetyrisks.Allalarmsandsignalswillbeprovidedwiththerequiredamountback-uppowersupplyandwillbeequippedwithlightstoincreaseawarenessofalarmsduringhighambientnoiseperiods.3.1.2.2 PermittingRequirementsWTE facilities in Kerala State are subject to the permitting and monitoring bymultiple, State and Central government agencies. WTE facilities are subject topermittinginthreeprimaryareas:SolidWasteManagement Facility permitting, Air Pollution Control, and HazardousWasteManagementFacility).There isafourthpermittype,WasteHauling,thatwilllikely be necessary for objects that the facility is not able to combust (i.e. undulybulkyorhazardousobjects),andthesematerialswillneedtobetransportedoff-site.Notethatawastehaulingpermitisnotneededforthetransportationofincineratorash.Thesepermitsensurethatallpotentialemissionsandwastematerialsproducedduringfacilityoperationsareaccountedandbelowlocalandfederalstandardlevels.It is therefore necessary for the responsible party to perform a full environmentalimpact analysis before the facility is constructed. Some of the completenessrequirementsforpermitapprovalinclude:

• Engineeringplans,reports,andspecificationsthatcomprehensivelyaddresstheprojectinitsenvironmentalsetting

• Planofoperationsandmaintenance,contingencyplansforwastecontrol• Certifiedlocationofpropertyboundaries• Detailedclosureplansforthefacility• Adescriptionoftheemissionunits'processesandproducts• Alistofallemissionunitsatthefacility• Thetype,rateandquantityofemissionsinenoughdetailforthedepartment

to determine those State and Federal requirements that are applicable tothefacility

• AssessmentofenvironmentalimpactsAlthoughcomplianceandnon-compliance feesandpenaltiesareclear, the fees forpermitapplicationcanvarygreatly.Theapplicationsthemselvesdonotrequirefeesforsubmission,butthepreparationofeachpermitmustbecompletedinfull(bypaidemployees or contractors), and permit applications and subsequent discussion ormediationwiththevariousState&Centralagencieswillrequireslegaladvice.Thesecosts will be variable depending on the amount of time taken by application andcompliancemonitoring.

Page 90: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

23 | P a g e

3.1.2.3 Segregation&ContaminantRemovalBatteriesareshowntobethesinglegreatestcontributortothehazardouschemicalcomponentoftheincomingMSW.Reportsindicatethat,evenafter80%oflead-acidautomobilebatteriesarerecoveredforrecycling,theremaining20%areestimatedtocontribute66%of the lead inMSW.Householdbatteriesaccount forapproximately90%of themercury...nickel-cadmiumbatteriesmayberesponsible forupto52%ofthecadmium.By first targeting batteries as important items to remove, the identified primaryhazardous waste sources could be reduced by almost 50%. This analysis is alsovaluable, as it demonstrates the feasibility of size-based separation for a largeincomingwastestream.Atrommelscreeningmethodmaybeusedtosize-separatehouseholdbatteriesfromthe incomingwaste stream, by sendingwaste through a rotating "trommel" drumwithperforationsaround itsperiphery, so thatobjects smaller than theperforatedopeningscanbeseparatedfromthemainstreamofMSW.ExperimentsperformedattheHong KongUniversity of Science and Technology have demonstrated that theremovalefficiencyofbatteriesincreasesasthedegreeofinclinationofthetrommeland rotational speed decreases, increasing the residence time of thewaste in thetrommel. If system parameters like feed rate, degree of inclination, and rotationalspeedaremaximized,thenrecoveryefficiency,especiallyforsmallbatteries,canbegreaterthan80%.Sizesofthetrommelsrangefrom2.5-3.5mindiameterand3.5-4minlength.WhilethisisnotprohibitivelylargeforaWTEfacilitytoincorporateintoitsincomingwastehandlingspace,theresidencetimerequiredtomaximizeremovalisin the order of 1.2-1.8 tons of MSW per hour (depending upon target removalefficiency). Thiswould require between 111 and 166 hours to process the incomingwaste stream, which is clearly not practical. If multiple trommels were operatingsimultaneously, this would reduce the processing time, but the percentage of thewastethatwouldbeabletopassthroughthetrommelseachdayisstillfarbelowthesizeofthefacility’sincomingstream.Integratingtentrommels,asshowninTable3.1below (which considers both high and low ends of the residence time range); atmost, amaximumof 11.9% of total batteriesmay be removed. The introduction ofeachadditionaltrommelrelaysanincreaseof0.79%inresultantbatteryremoval.

Table3.1:NumberofTrommelsdeployedTrommels Waste Processed

(TPD)Batteries Removed(TPD)

Batteries Removed(%)

1 43.2 0.07 1.192 86.4 0.14 2.383 129.6 0.21 3.584 172.8 0.28 4.77

Page 91: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

24 | P a g e

3.1.2.4 TippingFloorAlthoughthefacilitywillnottargethazardousmaterialsspecificallyforremoval,thetippingfloorwillallowforremovalof incombustiblematerials, includinglargeitemsmadeofglassandmetalorlargeappliancesgatheredaspartofbulkitemcollections.Byunloadingtrucksinasecurearea(thetippingfloor),andthenutilizingsecondaryvehicles tomovewaste intoor away from theboiler feedpit, facilities can controland normalize the distribution of size and material in the boiler feed. AlthoughseparationofmetalsatWTEfacilitiesexperiencessuccess throughuseofmagneticseparation and other post combustion separation technologies, the tipping floorallows for removalof largeandclearly identifiable sourcesofmetals, subsequentlyreducingtheresultingvolumeofashandmaximizingtheheatingvalue.Currentlyatmassburn facilities in theUS, approximately43%of ferrousmetals, and5%ofnon-ferrousmetals are recovered, percentages which could potentially be increased iflargesourceswereremovedfromthetippingfloor.Waste brought to transfer stations occurs around the clock, but peaks during thesecond shift - between the hours of 8AM and 12 PM - as a response to density ofresidential collection routes and municipal trucks collection shift scheduling. Thetipping floor design must accommodate the peak arrival rate of municipal trucks,given that no intermediary transfer station will be used. In response to municipaltrucks scheduling, the facility needs tobeopen to acceptwaste 24hoursperday,over three shifts. During nighttime (8 PM to 8AM), when there will be fewermunicipal truck deliveries, the facility may be able to benefit from acceptingdeliveries of commercial waste. This increase in number of hours for deliverieschangesthenumberofdepositbaysrequiredandthefootprintoftheoveralldepositbayarea.Thecalculationstodeterminebayrequirementsarebasedonthefollowingassumptions,whichallowfordepositofapeakmaximumrateof200TPDofwaste:Thefacilitywilloperate24hoursperday,brokendownintothreeshifts.Inkeepingwithcompanylaborpolicies,weighingstationandtippingflooremployeeswillwork6.5hoursoutofeach8-hourshift,toallowforshiftchangesandbreaktime,sothefacilitywillacceptwasteatotalof19.5hoursoutofeach24-hourperiod.Thefacilitywill need tobe able to accept approximately 60 collection trucks eachday,with apeak rateof 10 trucks/hourbetween9AMand 11AM.Allowing forhourlypeakingfactorof150%,andseasonalpeakingfactorof125%,thisrequiresamaximumdepositcapacity of 15 trucks per hour. Given an average unloading time of 10 minutes, 3deposit bay’s will be needed. At a standard of 13 feet per bay, 50 feet width, 3unloadingspaceswould requirea totalbayzone lengthof40 feet,anda totalbayzone area of 1900 square feet. This area represents the space requirement forunloadingonly, andnot for transportofwaste into thepit.Averageweigh stationwaitingtimepervehicleisapproximately2minutes,soinordertomeetthe15truckperhourrequirement,thefacilitywillneedone(1)weighstation.

Page 92: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

25 | P a g e

3.1.2.5 WasteStorageOncetheMSWarrivesonsiteandisunloadedontothetippingfloor,itwillbemovedintoastoragepit.Thestoragepitisdesignedtoholdacapacityof600tonsor30,000cubicfeetofMSW,whichwillallowfor3daysofstorage.Although3daysofstorageisshorterthantheaveragestoragecapacitiesofsuburbanWTEfacilities,thesmallerstoragecapacitywasdesigned toaccommodate the limited spaceavailable for theWTEfacility.Thestoragepitwillbeoperatedbyanoverheadcrane.AtypicaloverheadcraneforWTE storage pits can handle approximately 60 tons per hour and can pick upapproximately 1 tonofMSWper scoop. In addition tomoving thewaste from thestorage pit into the hopper, the crane operator is also responsible to “fluff” thewaste(i.e.mixthewasteinthepit)inordertoobtainamorehomogenousstreamofwasteenteringthecombustionchamber.3.1.3 CombustionandPowerGenerationPreprocessing of waste can increase combustor efficiency and can make a morehomogeneous waste stream, which increases combustion stability, and decreasesmaintenance costs of the boiler. On the other hand, pre-processing of wasteincreasescapitalcostsandcanuseasignificantamountofenergyupfront.Duetothesizeconstraintsofthesite,extensivepreprocessingofwasteintorefusederivedfuelwasnotfeasible.Becausefluidizedbedcombustorsrequirepreprocessingofwastestream, they were not considered for our site. Removal of particularly hazardouscomponentsofthewasteissometimesusefulfordecreasingemissionsandthecostof pollution control equipment, but as discussed above, the benefits of hazardouscomponentremovalprovednegligibleforthisfacility.3.1.3.1 GrateAmovinggratesystemwasconsideredinsteadofastationarygratesystemsothatwaste could bemoved continuously through the combustion chamber because ofthe large volume of waste that must be processed. The grate moves the wastethrough the burner/boiler to be combusted. The grate continues moving the ashthroughthesystemtobequenched,andtheashisthentransportedbyaconveyortoash treatment units or to storage where it can then be shipped off site. Gratesystems are typically designed to move in either a reciprocating or reversereciprocating direction. Reciprocating grates move in the direction of waste flow,primarilytomovewastealong,whilereversereciprocatinggratesmoveagainsttheflow of MSW to increase the mixing of the waste and help facilitate completecombustion.

Page 93: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

26 | P a g e

Our design utilizes reverse reciprocating grates because of the enhanced burnout.Another concern with grates is their ability to withstand high temperatures. Hightemperaturecanbedestructivetothegrate;thus,itmustbecooledbyeitherwaterorair.Water-cooledgratesareneededforwastewithhigherenergycontent(10-30MJ/kg)asthegratewillbecomemuchhotter,buttheyarecostlierandmoredifficulttodesignandoperate.Air-cooledgratescanbeusedforlowerenergycontentfuels(6-14MJ/kg)andcanbedesignedandoperatedmoreeasily.NYCMSWhasanenergycontentofabout9.67MJ/kg;thus,theair-cooledgratewillworkwellinthisdesign.An air-cooledgratepulls in primary combustion air over thewaste storagepit andpushesthisairthroughthegratetocoolthegrateandthencombustthewaste.Theprocessneeds12tonsofairpertonofwastebasedonthestoichiometricairneededandtheoptimalcombustionconditionsof80%excessair.3.1.3.2 BoilerComputerized Fluid Dynamics (CFD) programs have contributed to significantprogress in the field ofWTE boiler design. Boilermodeling programs assist in theanalysis of the profiles of temperature, velocity and concentrations of gaseouscomponents and they allow for analysis of the boiler under various conditionswithout making costly physical models. These modeling programs can also helpidentify key areas of concern for issues like corrosion, boiler wall melting ordeformation,incompleteburnoutandNOxformation(Annexure3.2).CorrosionOneofthemostimportantconcernswithintheboileriscorrosion.Whilecorrosionisalso a concern in typical coal boilers it is a much bigger problem in waste boilersbecause of the high level of fuel variation and contaminants in MSW, particularlychlorine.Corrosionissignificantlyimpactedbytemperature.Itmaybeasurprisethatlowtemperaturecorrosioncanoccurintheboilerduetocondensation,butthereisalargetemperaturegradientacross theboilerandacidity in the fluegascauses it tocondenseathighertemperatures.Hightemperaturecorrosionistypicallycausedbyaseries of reactions of chlorinewith iron and iron chloridewith oxygen resulting insublimationofsomeofthetubewallasironchlorideoroxidationofthetubewall.Inorder tominimize both types of corrosion, adequatemixing is necessary to avoidlarge temperature gradients. This is aided by a Very Low NOx (VLN) processdiscussed below which increases turbulence with flue gas recirculation. VLNprocesses will be implemented in this facility. Additionally, high temperaturecorrosion can be avoided by keeping boiler tube temperatures below 570oF andsuperheatertubesbelow840oF.Additionally,refractory liningcanbeusedonthelowerhalfoftheboilerwherethegastemperaturesaremostsevere,Iconel625plasmasprayedcoatingcanbeusedontheboilertubesthatdonothaverefractoryliningandTiO2–Al2O3/625cementcanbeappliedusinga thermal spray to the superheater tubewallswherehigh steamtemperaturesleadtohighmetaltemperatures,whichareparticularlysusceptibleto

Page 94: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

27 | P a g e

corrosion.45Therehavealsobeensome recentattempts to recirculate sulfur fromtheAPCunitstohelpmitigateeffectsofchlorine.CompleteBurnoutCompleteburnoutisalsoamajorconcerninWTEboilersduetohealthhazardsfromgaseous emissions after incomplete combustion and the environmental andeconomic cost of hauling excess ash. Burnout is optimized when there is enoughoxygen supplied to exceed the combustion demands, but when excess oxygen isminimized because too much oxygen can cool the boiler to the point of flamedestabilization.Toensurecompleteburnout, secondaryairandVLNgas (describedbelow) are addedabove thegrate to increase turbulence andmixing.Additionally,theboilermustbetallenoughtoensurethatthegaswillstayat1560oFfor2secondsasperbestpractice.NOxNOx is a significantpollutantof concern, but it canbe controlledbymaintaining alower air to fuel ratio in the hotter sections of the boiler and by injecting ureatowardsthetopofthefirstboilerpassbeforetheentrancetothesuperheater.Thechemistry of NOx reduction in this process (referred to as selective non-catalyticreduction,SNCR)willbediscussedbelowintheairpollutioncontrolsection.TheVeryLow NOx process designed by Martin Gmbh will be used at this facility.47 Thisprocessinvolvesdrawingoff“VLNgas”atthebackofthegrateandreintroducingitbelowtheureainjectionpoint.SeetheVLNProcessinFigure3.2.

Page 95: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

28 | P a g e

Figure3.2:VLNProcessDiagramTherearemanybenefitsofthissystem:

1. OxygenpoorconditionsarecreatedinthelowersectionofthefurnaceduetotheVLNgasdrawoff,whichpromotesNOxreductionconditionsandreducesNOxformation.

2. ReinjectionoftheVLNgasleadstoadecreaseinfluegastemperatureandanincrease inturbulenceandmixing,which leadsto increasedefficiencyoftheSNCRprocess.

3. This increaseinturbulenceandcoolingcreatesabarrierwhichblocksflamesandunreactedparticles.Thebarrierisexpectedtoreducethecorrosioninthetopportionoftheboiler.

4. Theresidencetimeofthefluegasintheburnerisincreasedbecausethemassflow rate of the flue gas is decreased when the VLN gas is removed. Thisincreasesburnoutanddecreasesflyashproduction.

5. TheVLNsystemalsoreducesthenecessaryexcessairratewhichyieldsacostreductionforthesteamgeneratorandfluegascleaningsystemandimprovestheefficiencyofthesteamgenerator.

BoilerParametersAtthis facility there is toomuchwaste forone individualboiler toprocessand it isoptimal to havemultiple boilers to accommodate for timeswhen one is down formaintenance,theotherscanstilloperate.Thisfacilitywillutilize2boilers.Theheightoftheboilerisbasedtheresidencetimeneededtoensurecompleteburnoutofthefluegasesfluegasseswillremainintheboilerat1560oFfor2seconds.3.1.3.3 TurbineTheheatinthecombustiongasesistransferredthroughthewater-cooledwallofthecombustionchambertowaterthatevaporates.Thesteamisthensuperheatedinthesuperheatertubes.Thegeneratedhighpressureandhightemperaturesteamissenttoasteamturbinewhere itexpandsandcauses theturbineto rotateandproducemechanicalwork,whichisthenconvertedtoelectricity.Thesteamparametersattheturbineoutletdependonturbineoperationmode,whichisthemaindesigndecisionregardingtheturbine.TurbineOperationModeThetwomodesofoperationarebackpressure(BP)andreheat-condensing(R-C).Abackpressure turbine expands the high pressure and high temperature steam to aspecifiedtemperatureandpressureatwhichthesteamcanstillbeusedforanotherprocess. After the process, the steam is condensed, pumped to high pressure andreturned to theboiler to complete the closed loop cycle.On this site, the exhauststeamfromtheturbinemaybeusedforlowtemperatureheatrecovery.Thereheat-

Page 96: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

29 | P a g e

condensingturbinealsoexpandsthehighpressureandhightemperaturesteamtoproduce electricity, but it does not send the steam to process afterward. Instead,afterthesteamisexpandedinthehigh-pressurestagesoftheturbine,itisextractedand sent back to the boiler to be reheated to its initial temperature. Then, lowpressure, high temperature steam is readmitted back into the turbine at the low-pressure stages and expanded further formore electricity generation. At the low-pressure turbine exit, the steam enters a vacuum condenser, which increases thepressure drop across the system. Therefore, theR-C cyclemaximizes the electricalefficiencyoftheturbine;but,since itdoesnotallowforprocessheatrecovery,theoverallefficiencyismuchlowerthanaBPoperation.Inordertodecidebetweenthetwomodesofoperation,oneneedstoconsiderhowmuchoftherecoveredheatcanbeusedonsiteorsold,andtheeconomicviabilityofeachoption.Inordertodecideonthemodeofoperation,powerandheatrecoverydetailsneedto be calculated for each mode. A low-end value for isentropic efficiency wasassumed to be 85%. A hydrogen-cooled generatorwill be used,which is becomingincreasinglycommonwithsteamturbines,becauseitmaximizesefficiency.Typically,alargeunitlikethiscanexpectahydrogencooledgeneratorefficiencyof99%,butaconservativegeneratorefficiencyof90%wasusedinthecalculations.Giventhatthecombustion in the boilers and heat transfer to the working fluid can produce aminimum400˚C steam, the steamparameters could thenbe calculated toproduce1800 kWh of electricity per ton of waste. Once the parameters were determined,theywerecomparedwithactualsteamturbineoperationcriteriatovalidatethattheturbinewouldoperatewithinthefeasiblelimits.Finally,theamountofhotwaterthatcanbeproducedforheatrecoverybysendingtheexhauststeamtoaheatexchangercanalsobecalculated.Bycomparingthecalculationsandtechnicaldata,amodernBP turbine that produces up to 5 MW can handle the steam pressures andtemperaturesrequiredforthisfacility.Thereheat-condensingmodeofoperation ismorewidelyused inareaswhereWTEfacilities are generally not locatednear a district heatingnetwork. Thedecisiononthemodeofoperationisbasedoneconomics.Thepriceofbackpressureandreheat-condensing turbines are similar; and in fact, many modern steam turbines can beadjustedtooperateineithermode.3.1.3.4 ElectricityTransmissionThe electricity producedon sitewill be transmitted to the grid operatedbyKeralaState Electricity Regulatory Commission (KSERC). In order to connect to the gridoperatedbyKSERC,aformalinterconnectionprocessmustbefollowedasoutlinedintheFigure3.

Page 97: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

30 | P a g e

Figure3–Projectdevelopmentplanforgridinterconnection

3.2 PollutionControl3.2.1 AirPollution3.2.1.1 RegulationsTheAirPollutionControl(APC)designforfluegastreatmentwillcomplywithcurrentKerala Air (Prevention and Control of Pollution) Rules, 1984 and The Central Air(PreventionandControlofPollution)Act1981,amended1987.The above rules notwithstanding, we propose the internal standards contained inTable3.2fortheTrivandrumWTEfacility:

Table3.2:ProposedemissionlevelsPollutant Averageemission UnitDioxin/furan,TEQbasis 0.05 ng/dscmParticulatematter 4 mg/dscmSulphurdioxide 6 PpmvNitrogenoxides 170 PpmvHydrogenChlorides 10 PpmvMercury 0.01 mg/dscmCadmium 0.001 mg/dscmLead 0.02 mg/dscmCarbonmonoxide 33 ppmvdscm:drystandardcubicmeterofstackgas

Page 98: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

31 | P a g e

Inordertomeetandexceedthesestandards,therearemanytechnologiesthatcanbeused,thefollowingAPCunitsarechosenforthisproject:SelectiveNon-CatalyticReduction (SNCR), Dryer Absorber (SDA) and Dry Injection Adsorption (DIA),ActivatedCarbonInjection(ACI),andBaghouseFabricFilters.3.2.1.2 SelectiveNon-CatalyticReductionSelective Non-Catalytic Reduction will be used instead of Selective CatalyticReduction (SCR) to reduce NOx because it requires less space to install, does notgenerate heavy metal waste from the spent catalyst, and has a much lowerinvestment and operating cost as shown inTable 3.3below. SNCR can reduce thesameamountofNOxasSCR (up to90%)as it is compatiblewithother techniquessuchas theVeryLowNOxprocessor theAcousticGasTemperatureMeasurementSystem’Urea((NH2)2CO)willbeusedasareductionagenttoreactwithNOxinsteadof anhydrous or aqueous ammonia because it is a less expensive substitute, thesafesttostoreandtransport,andlesstoxic.TheureaisinjectedathightemperatureintohotfluegasesinthefurnaceinordertoreduceandconverttheNOxemissionsto nitrogen, water and carbon dioxide. A simplified reaction for urea with NOx isshownbelow:NH2CONH2+2NO+½O2→ 2N2+CO2+2H2O

Table3.3:OperatingParametersandcostsfordenitrificationsystems

Unit SNCRUrea(45%) SNCR NH4OH(25%)

SCRNH4OH(25%)

Wastethroughput MT/h 15 Flue gas volumestream

Nm3/h,dry 80,000

Operatinghours h/a 7,800 NOxbaseline mg/Nm3 400 Nox mg/Nm3 20 100 70Pressureloss Mbar 25Temperatureincrease

ºC 20

InvestmentCosts USD $200,000 $500,000 $2,500,000Operatingtime Years 1 15 15Interestrate 6 6% 6%Annuity USD/a 20,000 50,000 250,000Ammoniawater USD/h - 16.5 6Ureasolution USD/h 11.3 - -Processwater USD/h 0.5 - -Demineralisedwater

USD/h 1.2

Electricalenergy USD/h 0.1 0.15 6.7Naturalgas USD/h - - 38Compressedair USD/h 2 2 -Operating costs perhour

USD/h 14.03 19.85 50.7

Operating costs peryear

USD/a $109,434 $154,830 $395,460

Page 99: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

32 | P a g e

Urea ((NH2)2CO) will be used as a reduction agent to react with NOx instead ofanhydrousoraqueousammoniabecauseit isa lessexpensivesubstitute,thesafesttostoreandtransport,and lesstoxic.Theurea is injectedathightemperature intohot fluegases in the furnace inorder to reduceandconvert theNOxemissions tonitrogen,waterandcarbondioxide.AsimplifiedreactionforureawithNOxisshownbelow:NH2CONH2+2NO+½O2→2N2+CO2+2H2O40.0% urea solutionwill be used instead of 32.5% or 50% because it has a freezingpointat32°F,whereas32.5%ureasolutionhasa freezingpointat 11°Fand50%ureasolutionhasafreezingpointat55°F.Afreezingpointat32°Fisadvantageousbecausethedropletswouldnotevaporatetooquickly,causingmoreNOxtobeformed,andwouldnotevaporatetooslowly,causingmoreammoniasliptooccur.Inotherwords,40% urea solution maximizes NOx control while minimizing ammonia emissions. Aratioof0.16-1.56gallonsofurea/tonwastewillbeused.The best method to avoid urea storage is to receive dry urea and immediatelyconvertthematerialtoaliquidforstorageintanks.Theprocesstoconvertdryureatoaliquidutilizesdemineralizedorsoftwaterblendedwiththeureagravimetricallyonabatchbasiswiththeadditionofapproximately900BTU/lbs.ofheat.Inthisway,the system has an affirmative control on solution strength, which is essential forprocesscontrolandmonitoring.Theoptimumtemperaturerange,whereanoticeableNOxreductionisachieved,alsoplaysalargeroleinNOxcontrol.AccordingtoFigure7below,therangeisbetween900 and 1,100°C (1600-2100°F) depending on the composition of the flue gas65.Above this temperature range, ammonia is increasingly oxidized causing morenitrogenoxides to form.At lower temperatures the reaction rate is sloweddown,causingahigh levelofammoniaemissionsfromthestack.Thereshouldbeat least0.5secondsofresidencetimeintheboilerafterammoniainjection.3.2.1.3 SprayDryAbsorberandDryInjectionAdsorptionAftertheSNCRprocess,thefluegasentersacombinationofSprayDryerAbsorber(SDA) andDry Injection Adsorption (DIA) unitwhere scrubbers spray amixture oflimeandwaterintothehotexhaustgasestosignificantlyreduceandneutralizeacidgases.Dryscrubbersystemstrapuptohalfofthemercurypresentinthegas.Unlikeawetscrubbingsystem,thistypeofcombinationhaszerowastewaterdischarge.Acalcium-basedsolidsorbentwillbeusedinsteadofasodiumbasedsolidsorbentasthe most widely used dry scrubbing system is calcium-based hydrated lime (Ca(OH)2).Aslurryofhydratedlimeandwaterisinjectedintothespraydryerandreactswiththeacidgasesinasimplifiedmannerasfollows:Ca(OH)2+SO2→CaSO3(s)+H2OCa(OH)2+2HCl→CaCl2(s)+2H2O

Page 100: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

33 | P a g e

Thehydrogenchloride(HCl)isremovedatahigherratethanthesulfurdioxide(SO2).OnemoleofCa(OH)2willneutralizeonemoleofSO2,whereasonemoleofCa(OH)2willneutralizetwomolesofHCl.SinceSO2is64lbs./lb.-mole,HClis36lbs./lb.-mole,andCa(OH)2is74lbs./lb.-mole,onepoundofcalciumhydroxidecanneutralize0.86poundsofSO2or0.97poundsofHCl.However, due to inefficiencies in the mixing process, more than the theoreticalamount of alkaline material is required to assure compliance with applicablestandards.Thus,stoichiometricfeedratesof1.5to2.5havebeenusedtoachieveSO2removal level in the 75-85% rangeandHCl removal efficienciesof95%onmunicipalwastecombustors.Acidgasremovalefficienciescanbeincreasedbycoolingand/orhumidifyingthefluegasstream.Reducingfluegastemperatureincreasestherateofreactionbetweenthesorbentandacidgases.Thetemperaturemustbemaintainedhighenoughtoensurethatallthewaterdropletsusedtoquenchareevaporated.Aratioof12.50-18.75lb.lime/tonwastewillbeused.Arotaryatomizersystemwillbeusedinsteadofadual-fluidnozzlessystemonspraydryersasithasahighercapacityperunitandasimplerpipingsystemasusuallyonlyone feed pipe per atomizer is used. Atomizerwheels range from8 to 16 inches indiameter and have rotational speeds from 7,000 to 20,000 revolutions perminute(rpm). The liquid is atomized into discrete droplets that are propelled radiallyoutward.Thesedroplets,generally25-150umindiameter,dryrapidlyinthehotfluegaswithinthespraydryer.Toavoidwalldeposition,thedesignedradialdistancebetweentheatomizerandthespray-dryerchamberwallmustbeenoughtoallowforadequatedryingofthelargestdroplets.ThisisaccomplishedbyproperchoiceoftheL/D,dropletsize,andresidencetime.Thelength-todiameterratioofthespray-dryerchamber(L/D)foranatomizertypeofspraydryeristypically0.8.Fluegasmayenteraspraydryer ineitheraconcurrentoracountercurrentpatternrelativetotheslurry.Themostcommonflowpatterninacidgascontrolsystemsareco-currentspraydryers,whichwillbeusedinsteadofacountercurrentsystem.Allofthe gas enters through a roof gas disperser in the top of the vessel, where itsrotation iscontrolledbyangledvanesthatdirectthegasaroundtheatomizer.Thistypeofgasdistributionpreciselycontrolstheexitgastemperaturesincethegasandslurrytravelinthesamedirection.

Page 101: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

34 | P a g e

3.2.1.4 ActivatedCarbonScrubbing can also improve the capture of heavy metals such as mercury in theexhaustgases.Theremainingmercurycanbecontrolledbyblowingdry-powdered,activated charcoal/carbon into the hot exhaust gas for absorption and removal.Carboninjectionalsoreducesemissionsoftraceorganiccompoundssuchasdioxinsand furans. A ratio of 1.56 lbs. activated carbon/ton waste will be used for thisproject.3.2.1.5 BaghouseFabricFiltersFinally, the particulate exiting the chamber contains fly ash, calcium salts and un-reactedlimethatmustbesenttoaparticulatecontroldevice.Baghousefabricfiltersare used to clean the air of soot, smoke and metals, while also controllingparticulates from the flue gas. Fabric filters can collect particleswith sizes rangingfrom submicron to several hundredmicrons in diameter at efficiencies generally inexcessof99or99.9percentfromthegasesbeforetheyarefinallyreleasedfromthestack.Apulse jet (compressedair cleaning)baghouse is the typicalbaghouseusedformunicipalwasteincinerators,asopposedtoreverseair(gascleaning)andshakerbaghouse (mechanical cleaning). The pulse jet baghouse is combined with acontinuous online sequence rather than an intermittent or continuous offlinesequence as it is fully automated, and the process flow continues during cleaning.Theproperair-to-cloth(A/C)ratio isthekeyparameterforoptimaldesign.Pulse-jetbaghouses have the highest A/C ratios but should still be operated within areasonableA/Cratiorange.ToohighanA/Cratioresultsinexcessivepressuredrops,reducedcollectionefficiency,blinding,andrapidwear.Typicalair-to-clothratiosforbaghouses usedmunicipalwaste incinerators are listed in the table below. TypicalA/Cratios[(ft3/min)/ft2] formunicipalwaste incineratorsare2.5-4 for thepulse jet.Table 3.4 below also shows typical A/C ratios for fabric filters used for control ofparticulateemissionsfromindustrialboilers.Table3.4:TypicalA/CRatiosforParticulateFabricFiltersBoiler size (103 lbsteam/hr)

Temp(ºF) Air to cloth ratio[(ft3/min)/ft2]

Cleaningmechanism

Fabricmaterial

260(3boilers) 400º 4.4:1 On or off linepulse jet orreverseair

Glass with 10%Tefloncoating(24oz/yd2)

170(5boilers) 500º 4.5:1 Reverse air withpulsejetassist

Glass with 10%Tefloncoating

140(2boilers) 360º 2:01 Reverseair No. 0004Fiberglass withsilicone graphiteTeflonfinish

250 338º 2.3:1 Shakeanddeflate Woven fiberglasswith siliconegraphitefinish

200(3boilers) 300º 3.6:1 Shakeanddeflate Woven Fiberglass

Page 102: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

35 | P a g e

Boiler size (103 lbsteam/hr)

Temp(ºF) Air to cloth ratio[(ft3/min)/ft2]

Cleaningmechanism

Fabricmaterial

with siliconegraphite

400(2boilers) Stoker, 285º to300º; pulverizedcoal,350º

2.5:1 Reverseair Gass with Teflonfinish

75 150º 2.8:1 Reverseair Fiberglass withTeflonCoating

50 350º 3:01 Onlinepulsejet Glass with Teflonfinish

270(2boilers) 330º 3.7:1 Onlinepulsejet Teflonfelt(23oz)450(4boilers) 330º 3.7:1 Onlinepulsejet Teflonfelt(23oz)380 NA 2:01 Reverse air

vibratorassistGlass with 10%Tefloncoating

645 NA 2:01 Reverse airvibratorassist

Glass with 10%Tefloncoating

1440(3boilers) 360º 3.4:1 Shakeanddeflate Woven Fiberglasswith siliconegraphitefinish

3.3.2AshTreatment/Disposal3.3.2.1RegulationsonWTEashdisposalTheWTEprocessgenerates twotypesofashwasteproducts,bottomashwhich iscollectedat theendof thecombustion from the furnacebottomandgrate fly ashthatiscollectedatthebaghouse.Thequalityoftheashmustbeincompliancewithcurrently existing regulatory limits.Ash treatment is anessential step that reducestheleachabilityofhazardousheavymetalssuchasBa,As,Cr,Pb,Ag,Cd,Se,andHg,especiallyfortheheavy-metalladenflyash.3.3.2.2CurrentindustrypracticesToachieveconcentrationlevelsbelowthemaximumregulatorylimits,approximately80%ofcurrentoperatingWTEfacilitiespractice“themixingofashes”whichinvolvescombiningthebottomashandflyash(75%bottomash,25%flyash)tostabilizethehazardousflyashcomponent.Thestabilizedashmixtureisoftentransportedforsafelandfill disposal or recycled as alternate daily cover (ADC) for active landfills. TheMSWashmixturehasbeengenerallyapprovedtobeimplementedasADC,tocoverthe active surface of MSW landfills at the end of each operating day to controlvectors,odor,andfire.Bottomashhaspotentialtobeutilizedasconstructionfillermaterial.3.3 CommunityIntegrationPerhapsthemostsignificantbarriertothesuccessofanyWTEprojectiscommunityapproval. Public outcry over WTE development has led to a dearth of WTE

Page 103: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

36 | P a g e

constructioninthepast15years,whichhasseennonewplantscompletedintheUSsince 1997.Awidespread informationdistributionplan toget communitymembersand representatives on board with the proposal is necessary. In order to furtherincreaseeducationalandoutreachpossibilitiesandturnthepotentialWTEplantintoaresourceforthecommunity,aplantoengagethecommunitysothatthepositiveeffectsoftheWTEplantwillreachbeyondtheenvironmentalandeconomicspheresand into thehumanonewill be incorporated. Thiswill includeanoutreachplanaswell as a proposed community and visitor center, which will serve to engagecommunitymembers,provideeducationalopportunitiesforchildrenandadultsalike,andfacilitatethespreadof informationonthebenefitsofWTEtechnology.TypicalcriticismsofWTEdevelopmentincludeclaimsofdangerouspollutantconcentrationsthat cause public health risks, especially in underprivileged neighborhoods, NIMBYarguments, a decline in surrounding housing values, odor problems, high capitalcosts requiring too much financial risk, and an assertion that WTE developmentdiscouragesrecyclinginneighboringcommunities.Whilethereishistoricalprecedentforsomeof theseclaims,WTEtechnologyhasevolvedata fast rate in thepast20yearsandbecomeaverywell-refinedandaboveall safe technology.Manymodernplants now include real-time emissions monitoring systems with outputs publiclyavailable to demonstrate a commitment to accountability for health and safetyawareness.Still, not-in-my-backyard (NIMBY) concerns will remain an issue if WTE remainsunfamiliartopopulationswithinpotentiallyaffectedneighborhoods.JustastheCapeWind project, an energy development focused on significantly less controversialtechnology,wasdelayedmanyyearsduetoprimarilyaestheticconsiderations,suchconcernshaveimpededWTEprojects.Otherproposeddesigns,includingtheoneputforthbythefirmBIGinDenmarkforaCopenhagenWTEplant, go a step further, incorporatingnotonly architectural butfunctionalcomponentswhichareabletodirectlyinvolveandattractnearbyresidentsandtouristsalike.InnovativeandattractivedesignssuchasthesehavetheabilitytomakeWTEplantsmorepalatabletoadiversecommunityofpeople,withsignificantroom left for growth in developing new means of showcasing WTE technologythrougharchitecturaldesign.Odors due to a waste processing facility are also a typical concern raised bycommunity members, however all modern WTE plants operate with a negativepressureinsideoftheplant,ensuringthatwithfewexceptionstheodoriscontainedwithin their walls. This negative pressure is achieved via the intake of air for thewastecombustion,whichispulledinoverthewastestoragepit.A certain amount of risk is taken on by any financial investment, and WTE is noexception. However, the financial involvement of the public sector is not entirelynecessary.Anytrulysustainabletechnologymustalsobeprofitable inthe longrun.While investments from local government can be beneficial, serious financial

Page 104: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

37 | P a g e

hardshipissomethingtobeavoided,andgiventhefinancialviabilityofWTEplantsisnotalwaysnecessary.With respect to the final assertion thatWTEcombustors“compete”with recyclingplants for material, there is no known evidence substantiating this claim. To thecontrary,manyanalysesshowthatrecyclingratesincreaseinareaswithhigherWTEcapacity.The recyclingandWTEfeedstockdonotcompete,because theymakeupseparatestreams–andwhilerecyclablesmayentertheWTEfeedstock,MSWcannotbe recycled. WTE development in Trivandrum, if done correctly, could provide aneconomicboon to the surroundingarea,which ishistoricallyhome tocitizenswithlow incomes.Withthedevelopmentofsimilar-sizedplants leadingtoover600full-time construction jobs, greater than 50 permanent full-time positions, and manymore in supporting industries, WTE could provide many opportunities for localresidents. The presence of WTE technology would also place Trivandrum at thecuttingedgeofurbanwastedisposalpracticesandhelptoestablishitasaleaderingreenjobscreation.Significanteffortsmustbemadetoensurethatoutreachtocommunitymembersiscomprehensive, and that the public has easy access to all relevant educationalmaterials. Specifically, direct engagementwithWTE’smost vocal opponentsmighthelptoalleviatesomeofthestressbetweencommunities,andtheirinputshouldbeanintegralpartoftheplanningprocess.Avisitor’scenterandeducationalresourceswill be provided, allowing for a continued expansion of understanding amonginterestedcommunities.Thereare reasons tobeoptimistic, asan increaseddialoghasbeen takingplace inrecent years. This has happened alongside neutral and, in some cases, favorablemediacoverageawelcomeshiftinperspective.AsmallhandfulofWTEplantsinAsiaarecurrentlyindevelopment.Finally,wastemanagementandWTEcorporationsaretaking steps to improve transparency and showcase their sustainability initiatives,both intermsofsustainabilityandethicalresponsibility.Suchethicalconsiderationsarethebasisofsoundengineering.Thesedonotsimplyinvolvecommunityconcernsofpollutionandeconomicdevelopment,butalsoissuesofenvironmentalethicsandjobcreation.Ingeneral,appropriateexternalitiesshouldbetakenintoconsiderationduringdecisionmakingprocessestoensurethebest-informedresultpossible,evenwhen not quantifiable. One would be particularly remiss to ignore environmentalconsiderations like the life cycle analysis of the plant and its operations, includingwastetransport,etc.Afterall,thedecisiontoimplementWTEtechnologyinthefirstplace ismotivatedbyconcernsof sustainability, soa failure todesigna facility inasustainablemannerwoulddefeat thepurposeofbuildingsucha facility in the firstplace.

Page 105: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

38 | P a g e

3.4 Planning Considerations / Innovativeness / Synthesis and RecommendedDesign

ThelayoutoftheproposedfacilityisgiveninAnnexure3.3.TechnologyAdvantages/Innovativeness:Theproposedprojecthasuniquefeaturesashighlightedbelow.

7. Noneedforsecondary landfill for thedumpingofAshgeneratedbyWTEprocess.

8. Noneedforthereceiptofsegregatedwaste9. No need for on site bio-drying which can cause objectionable odors for

nearbycommunities10. Guaranteedcommercialviability,duetotheabilitytogenerate1000kWh

forelectricityperMTofMSW11. PatentedTechnology.

AnalysisofBottomAshThe combustion residues produced in combustion of WP pellets can be storedwithoutanydifficulty,maybeusedinconstructionandareeluatefree.Thisisduetothestablestateof theboundcontaminants.Theboundingof theheavymetalsviaSi02, Ah03 and Fe203 etc. effects solid structures; it makes it impossible for theheavy metals to be released under ecological conditions. Sulphur dioxide (S02)combineswithcalciumtoformCaS04(plaster).However,plasterbecomesanhydriteplasteratcombustiontemperaturesof700°to9000°(alsoCaS04),alsoasubstanceoflowsolubility.ThetestresultsofthebottomasharegiveninAnnexure3.4.

CompositionandanalysisofbottomAsh.

HeavyMetals PartsPerMillionLead 0.03Cadmium 0.003Chromium 0.045Mercury toolowtoverifyZinc 0.11Nickel 0.01Arsenic toolowtoverify

Page 106: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

39 | P a g e

AreasofUtilisationRoadConstructionMaterial:Bottomashcanbeusedasaggregate in foundation layers,sub-base,embankmentandascappingmaterialinroadconstruction.Aggregateinconcrete,ConstructionSandandGravel:Itcanbeusedtomakeconcrete,forroadconstruction,formixingwithasphalt,asaconstruction fill, and in production of constructionmaterials like concrete blocks,bricksandpipes.CementRawMealAdditive:This can be a very useful component in eco cement industry, which has beenbecomingverypopularandishighlyrecommended.PotentialAreasofUtilisationAutoclavedaeratedconcrete.Manufacturingofceramics.The design of the proposedWTE facility is anchored by four basic constraints: thewasteinputstream(450TPD),theavailableoperatingtime(90%~328daysperyear)andtheavailablespaceontheallottedproperty.Eachoftheseparametersinfluencesour design and shapes the layout, technology choices, and many more decisionsinvolved in theoveralldesignprocess.Anothermajorgoalof thisdesign is tosetapositiveexampleforWTEtechnologyandtointegratethefacilitysmoothlyintothecommunity.TohelpachievethisgoaltheplantwillprovidecommunityoutreachandeducationonWTE,andworkwith itsneighbors toaddressanyconcerns thatarisebefore,during,orafteritsconstruction.

Page 107: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

40 | P a g e

Chapter–4:Statutory&LegalFramework4.0 IntroductionRegulatory&policyframeworkformsthebasisforwastemanagementinIndia.Thischapter briefly describes threemajorwastemanagement rules i.e.Municipal SolidWaste Regulations 2016, Plastic Waste Regulations 2016 and Construction andDemolition (C&D)WasteManagementRules2016consideringanywaste treatmentfacilityreceivesmixedwaste.ThesethreeregulationsbroadlycoverMunicipalSolidWaste Management in India. Further, the proposed waste to energy facility inTrivandrumisbasedontheconceptof3Rswithzerolandfilldischarge.4.1 MunicipalSolidWasteRegulation,20169The applicability of the new Solid Waste Management Rules, 2016 has now beenincreased to cover,besidesurban localbodies in the country, all urbanisedvillageshaving a population of over 5000 and declared as census towns as per nationalcensus2011.Theserulesarealsonowapplicabletolargevillagesdeclaredascensustowns,theapplicabilityoftheseruleshasbeenextendedtonotifiedareas,notifiedindustrial townships, areas under the control of Indian Railways, airports, airbases,portsandharbours,defenceestablishments,specialeconomiczones,stateandcentralgovernmentorganisations,placesofpilgrims,placesofreligious&historicalimportanceas may be notified by respective state government from time to time and to everydomestic,institutional,commercialandanyothernonresidentialsolidwastegeneratorsituatedintheareascoveredundertherules.10SWMRules,2016mandateeverywastegeneratortodischargehisobligationsspecifiedintheRule4asunder:WasteGeneratorsClassification

1. Everydomestic, institutional, commercialandanyothernon-residential solidwastegeneratorsituatedinanyoftheaboveareas.

2. EventOrganizers3. StreetVendors4. RWAs&MarketAssociations5. GatedCommunitieshavingmorethanarea5000sq.meters6. HotelsandRestaurants,etc.

DutiesofWasteGenerators(1)Everywastegeneratorshall:

9http://www.npcindia.gov.in/itf_event/draft-kit-tools/10 Ministry of Housing & Urban Affairs / CPCB / NPC (2019); Toolkit On Implementation Of Solid WasteManagementRules,2016;CapacityBuildingProgrammeOnImplementationOfWasteManagementRules,2016

Page 108: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

41 | P a g e

a) segregate and store the waste generated by them in three separatestreams namely bio-degradable, non-biodegradable and domestichazardous wastes in suitable bins and handover segregated wastes toauthorised waste pickers or waste collectors as per the direction ornotificationbythelocalauthorizesfromtimetotime;

b) wrap securely theused sanitarywaste likediapers, sanitarypadsetc., inthe pouches provided by the manufacturers or brand owners of theseproducts or in a suitable wrapping material as instructed by the localauthorizesandshallplacethesameinthebinmeantfordrywasteornon-bio-degradablewaste;

c) store separatelyConstructionandDemolition (C&D)waste,asandwhen

generated, in his own premises and shall dispose off as per theConstructionandDemolitionWasteManagementRules,2016;and

d) store horticulturewaste and gardenwaste generated from his premisesseparately in his own premises and dispose off as per the directions of thelocalbodyfromtimetotime.

(2)Nowastegeneratorshallthrow,burnorburrythesolidwastegeneratedbyhim,onstreets,openpublicspacesoutsidehispremisesorinthedrainorwaterbodies.(3) All waste generators shall pay such user fee for solid waste management, asspecifiedinthebye-lawsofthelocalbodies.(4) No person shall organise an event or gathering of more than one hundredpersons at any unlicensed place without intimating the local body, at least threeworkingdaysinadvanceandsuchpersonortheorganiserofsucheventshallensuresegregation of waste at source and handing over of segregated waste to wastecollectororagencyasspecifiedbythelocalbody.(5)Everystreetvendorshallkeepsuitablecontainersforstorageofwastegeneratedduring the courseof his activity such as foodwaste, disposableplates, cups, cans,wrappers, coconut shells, leftover food, vegetables, fruits, etc., and shall depositsuchwaste atwaste storagedepot or container or vehicle as notified by the localbody.(6)Allresidentwelfareandmarketassociationsshall,withinoneyearfromthedateof notification of these rules and in partnership with the local body ensuresegregation of waste at source by the generators as prescribed in these rules,facilitate collection of segregated waste in separate streams, handover recyclablematerialtoeithertheauthorizedwastepickersortheauthorizedrecyclers.Thebio-degradablewasteshallbeprocessed,treatedanddisposedoffthroughcomposting

Page 109: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

42 | P a g e

orbio-methanationwithinthepremisesasfaraspossible.Theresidualwasteshallbegiventothewastecollectorsoragencyasdirectedbythelocalbody.(7) All gated communities and institutions with more than 5,000 sqm. area shall,withinoneyearfromthedateofnotificationoftheserulesand inpartnershipwiththe local body, ensure segregation of waste at source by the generators asprescribed in these rules, facilitate collection of segregated waste in separatestreams,handoverrecyclablematerialtoeithertheauthorisedwastepickersortheauthorized recyclers. The bio-degradable waste shall be processed, treated anddisposedoff throughcompostingorbio-methanationwithin thepremisesas far aspossible. The residual waste shall be given to the waste collectors or agency asdirectedbythelocalbody.(8)Allhotelsandrestaurantsshall,withinoneyearfromthedateofnotificationofthese rules and in partnershipwith the local body ensure segregation ofwaste atsource as prescribed in these rules, facilitate collection of segregated waste inseparate streams, handover recyclable material to either the authorised wastepickers or the authorised recyclers. The bio-degradable waste shall be processed,treated and disposed off through composting or bio-methanation within thepremisesasfaraspossible.Theresidualwasteshallbegiventothewastecollectorsoragencyasdirectedbythelocalbody.

• Prohibitlittering,burning&buryingofwaste.

• Lay emphasis on segregation and storage of bio-degradable, non bio-degradableanddomestichazardouswastesatsourceinthreeseparatebinsby waste generators and keeping C&D waste and horticulture wasteseparatelyasandwhengeneratedforsafedisposalasperthedirectionsoftheUrbanLocalBody(ULB)/separatesetofRulesframedbyMoEF&CC.

• Givesstressondecentralizedprocessingsuchashomecomposting/biogas

generationorcommunityleveltreatment.

• Directswastegeneratortohandoversegregatedwastetoauthorisedwastepickersorwastecollectors.

• Mandatespayinguserfeesto localbodiesasmaybespecified intheirbye-

laws.Measures to be taken by Local Authorities to Ensure Compliance by WasteGeneratorsThe regulatory framework, which requires behavioural change and day to daycomplianceby the citizens,need tobewidelypublicized throughawell structured

Page 110: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

43 | P a g e

awarenesscampaign.Thestateagenciesandlocalauthoritiesthereforeneedtodrawupaplanofcreatingpublicawarenessexpeditiously.Followingstepsmaybetakeninthisregard:Theurbandevelopmentdepartmentand/ordepartmentinchargeofpanchayatsmayformacommitteecomprisingof:

o Representativeofthesecretariatdepartmento CMA/DMA/CDOo Twomayors/twoBDOso Twochairpersonsofmunicipalauthorities/grampanchayatso Twomunicipalcommissionerso Twoexecutiveofficers/twosecretariesofvillagepanchayato TwoofficersinchargeofSWMinlocalauthoritieso OneNGOo Twomembersofcivilsocietyo Onesubjectexpert

• This committee may deliberate on planning the Information, Education &

Communication (IEC) campaign, various modes of communication, theintensityofcommunication,timeframeandbudgetaryrequirements

• Thiscommitteemay recommendthe IECactivities tobe takenupcentrallythrough professional agencies and the activities that may be taken up atcity/town/villagelevelandproposeallocationofbudgetforthesame.

• The professional agency may be hired by state government/ DMA/ CMA/

CDOwithinthreemonthsandIECmaterialmaybegotpreparedwithintwomonthsfromdateofworkorder.

• In themeantime, the local level IECactivitiesmaybe initiatedbythe local

authorities. On receiving the IEC material from professional agencies, IECcampaign may be intensified and its outcome may be assessed. Thecampaignmayprincipallyfocusoneducatingwastegenerators(citizens)on:

o Not to litterwasteon the streets, drains,waterbodies, open spaces

etc.o Nottoburnorburythewasteo Segregatewetanddrywasteatsourceandstoreintwoseparatebins

(educate on bio-degradable and non bio-degradable wastecomponents)

o Keep domestic hazardous waste, C&D waste, horticulture wasteseparatelyasandwhengeneratedanddealwiththemasdirectedbylocalauthorityfromtimetotime

Page 111: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

44 | P a g e

o Howtohandlesanitarywaste,diapers,asandwhengeneratedo PracticetheconceptofReduce,Reuse,RecycleandRecover(RRRR)o Practice home/institutional level composting/bio-gas generation or

communitylevelcomposting/bio-gasgenerationo Handoverrecyclablestowastepickersorrecyclersatsourceo Handoversegregatedwastetothewastecollectorso Payuserchargesforthesustainabilityoftheproject.o Educating street vendors, resident welfare associations, market

associations,gatedcommunities&institutions,hotels&restaurantstodischargetheirobligationasperRule4.

• TheimpactofIECcampaignmaybecarefullymonitoredandassessedatthe

localleveleachquarterandcorrectivemeasuremaybetakentoensurethatthe citizens adhere to directions contained in Rule '4' and are fully awarethattheirfailuretocomplymayleadtopunishmentunderthemunicipalbye-laws

• The local authority may also create a mechanism to take punitive actionagainstthedefaultersandpublicizethesametodeterothers

• Withaviewtomotivatewastegeneratorsonhomecompostingandbio-gas

generation,localauthoritymayorganiselocaltrainingprogramsorpictorialguidelinesanddeclareincentives.

DutiesofAuthorities/StakeholdersBesidesmakingthecitizensresponsibleasabove,theRuleshaveprescribeddutiesofvariousconcernedauthorities/stakeholdersasmentionedunder:

1. MinistryofEnvironment,Forest&ClimateChange2. MinistryofHousing&UrbanAffairs3. MinistryofChemicalsandFertilizers4. MinistryofAgriculture5. MinistryofPower6. MinistryofNewandRenewableEnergySources7. Secretary,UrbanDevelopmentofstategovernments8. Secretary, Village Panchayats/Rural Development Department of state

governments9. DistrictMagistrate/DistrictCollector/DeputyCommissioner10. CentralPollutionControlBoard11. StatePollutionControlBoardsorPollutionControlCommittees12. Local (Municipal) Authorities and Village Panchayats of Census Towns &

UrbanAgglomerations13. Manufacturers or Brand Owners of Disposable Products/Sanitary

Napkins/Diapers

Page 112: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

45 | P a g e

14. Industrial Units located within 100 km from Refuse Derived Fuel/Waste toEnergyPlantsbasedonSolidWaste

Rule nos. '5' to '18' of SWM Rules, 2016 clearly lay down the duties of aforesaidauthorities/stakeholders.MSWRules2000revisedin2016duetoinabilityofthemunicipalitiestoimplementwastesegregation,andlackofinstitutionalandfinancialmeanstoimplementwasteprocessinganddisposalprojects.Aspernewrules,atimeframetill2021hasbeenearmarked for establishing and managing the complete collection, treatment &disposalofMSWsystemincludingbio-remediationorcappingofexistingdumpsiteinthecountry.TheentiresystemistobecompletedinamissionmodebythenameCleanIndiaMission(SBM/SwachhBharatMission).Annexure 4.1 describes about various duties of major stakeholders forimplementationofMSWRules,2016.4.2 PlasticWasteManagementRegulation,201611KeyDefinitionsSomeoftheimportantkeywordsasperPWMRules,2016areexplainedbelow:i) Brand Owner: Brand Owner means a person or company who sells any

commodityunderaregisteredbrandlabel.ii) Carry bags:Carry bagsmeanbagsmade fromplasticmaterial or compostable

plastic material, used for the purpose of carrying or dispensing commoditieswhich have a self carrying feature but do not include bags that constitute orformanintegralpartofthepackaginginwhichgoodsaresealedpriortouse.

iii) Commodity:means tangible item thatmay be bought or sold and includes allmarketablegoodsorwares.

iv) Compostable Plastics: Compostable Plastics mean plastic that undergoesdegradation by biological processes during composting to yield CO₂, water,inorganic compounds and biomass at a rate consistent with other knowncompostable materials, excluding conventional petro-based plastics, and doesnotleavevisible,distinguishableortoxicresidue.

v) Extended Producer's Responsibility (EPR): EPR means the responsibility of aproducer for the environmentally soundmanagement of the product un�l theendofitslife.

vi) Importer:ImportermeansapersonwhoimportsorintendstoimportandholdsanImporter-ExporterCodenumber,unlessotherwisespecificallyexempted.

11https://cpcb.nic.in/status-of-implementation-of-solid-waste-rules/

Page 113: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

46 | P a g e

vii) Manufacturer:Manufacturer means and includes a person or unit or agencyengagedinproductionofplasticrawmaterialtobeusedasrawmaterialbytheproducer.

viii) MultilayeredPackaging:MultilayerPackagingmeansanymaterialusedortobeused for packaging and having at least one layer of plastic as the mainingredients incombinationwithoneormore layersofmaterialssuchaspaper,paperboard,polymericmaterials,metalizedlayersoraluminumfoil,eitherintheformofalaminateorco-extrudedstructure.

ix) Plastic:Plasticmeansmaterialwhichcontainsasanessential ingredientahighpolymer such as polyethylene terephthalate, high density polyethylene, Vinyl,lowdensitypolyethylene,polypropylene,polystyreneresins,multi-materialslikeacrylonitrile butadiene styrene, polyphenylene oxide, polycarbonate,Polybutyleneterephthalate.

x) PlasticSheet:PlasticSheetmeansPlasticsheetisthesheetmadeofplastic.xi) PlasticWaste:PlasticWastemeansanyplasticdiscardedafteruseoraftertheir

intendeduseisover.xii) Producer:Producermeanspersonsengaged inmanufactureor importofcarry

bagsormultilayeredpackagingorplasticsheetsor like,and includes industriesor individuals using plastic sheets or like or covers made of plastic sheets ormultilayeredpackagingforpackagingorwrappingthecommodity.

xiii) WasteGenerator:WasteGeneratormeansand includeseverypersonorgroupof persons or institution, residential and commercial establishments includingIndian Railways, Airport, Port and Harbor and Defense establishments whichgenerateplasticwaste.

xiv) Waste Management: Waste Management means the collection, storage,transportationreduction, re-use, recovery, recycling,compostingordisposalofplasticwasteinanenvironmentallysafemanner.

ThesalientfeaturesofthePWMRules,2016aregivenbelow:

• PWMRules, 2016 shall apply to everyWaste Generator, Local Body, GramPanchayat,Manufacturer,Importer,ProducerandBrandOwner.(Figure3.1)

Page 114: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

47 | P a g e

Figure3.1:StakeholdersasperPWMRules,2016

• Carry bag made of virgin or recycled plastic shall not be less than fiftymicrons in thickness. The provision of thickness shall not be applicable tocarrybagsmadeupofcompostableplastic,complyingIS/ISO:17088.

• WasteGenerators including institutional generators, event organizers shallnot litter theplasticwaste. They shall segregatewaste andhandover it toauthorized agency and shall pay user fee as prescribed by ULB for wastemanagementorspotfineincaseofviolation.

• Within a period of six months from publication of PWM Rules, 2016 asamended 2018 in official Gazette, Producer, Brand Owner shall work outmodalitiesforwastecollectionsystemforcollectingbacktheplasticwastegenerated due to their products, in consultationwith local authority/StateUrban Development Department and implement it within two yearsthereafter.

• Promote use of plasticwaste for road construction or energy recovery orwastetooilorco-processingincementkilnsetc.

• SPCB/PCCshallbetheauthorityforenforcementoftheprovisionsofPWMRules,2016asamended2018,relatingtoregistration,manufactureofplasticproducts and multi- layered packaging, processing and disposal of plasticwastes.

• Concerned Secretary-in-charge of Urban Development of the State or aUnionTerritoryandconcernedGramPanchayatintheruralareaoftheStateoraUnionTerritoryshallbetheauthorityforenforcementoftheprovisionsof PWMRules, relating towastemanagement bywaste generator, useofplastic carrybags,plastic sheetsor like, coversmadeofplastic sheets andmulti-layeredpackaging.

• Stakeholders&ResponsibleAuthoritiesshalluseFormsItoVIofthePWMRules, 2016 for providing information to respective authorities onimplementationofPWMRules,2016o FormI:ApplicationforregistrationforProducersorBrandownerso Form II: Application form for registration of units engaged in

processingorrecyclingofplasticwasteo Form III:Application for registration formanufacturersofplastic raw

materialso Form IV: Format of Annual Report by Operator of plastic waste

processing or recycling Facility to the Local Body by 30th June eachyear.

o FormV:Formatforannualreportonplasticwastemanagementtobesubmittedbythelocalbodyby31stJulyeachyear.

o Form VI: State-wise status of implementation of plastic wastemanagement rules, 2016 for the year annual report format by 31stAugusteachyear.

Page 115: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

48 | P a g e

• Brand owners are required to register in SPCB/PCC, if operating in one ortwostate/UT,however,ifoperatinginmorethan2states/UTs,itshallreportwithCPCBalongwithEPRplan.

ResponsibilitiesofLocalAuthorities

• Ensure setting up an infrastructure for segregation, collection, storage,transportation,processinganddisposalofplasticwaste.Suchsystemshouldbe developed along with the infrastructure developed for collection,segregation, processing and disposal of SolidWaste as per the provisionsunderSolidWasteManagementRules,2016.

• Coordinate with State Urban Development and the producers/importers/brand owners to facilitate a mechanism for collection andchannelization of plastic waste with the infrastructure developed forcollection, segregation, processing and disposal of SolidWaste as per theprovisionsunderSolidWasteManagementRules,2016.

• Engaging with civil societies or groups working with waste pickers incollectionsegregationandchannelizationofPlasticWaste.

• Ensure setting up an infrastructure for segregation, collection, storage,transportation,processinganddisposalofplasticwaste.Suchsystemshouldbe developed along with the infrastructure developed for collection,segregation, processing and disposal of SolidWaste as per the provisionsunderSolidWasteManagementRules,2016.

• Enforceamechanismtostopopenburningofplasticwaste• Frameby-lawsonmanagementofplasticwastewhichmayincludetherates

forimpositionoffine/penaltyonlittering/openburningofplasticwaste.ResponsibilitiesofProducers/Importers/Brandowners

• Theproducers,withinaperiodofsixmonthsfromthedateofpublicationoftheserules,shallworkoutmodalitiesforwastecollectionsystembasedonExtendedProducersResponsibilityand involvingStateUrbanDevelopmentDepartments, either individually or collectively, through their owndistributionchannelorthroughthelocalbodyconcerned.

• Primary responsibility for collection of usedmulti-layered plastic sachet orpouches or packaging is of Producers, Importers and Brand Owners whointroduce theproducts in themarket. Theyneed toestablisha system forcollectingbacktheplasticwastegeneratedduetotheirproducts.Thisplanof collection to be submitted to the State Pollution Control Boards whileapplyingforConsenttoEstablishorOperateorRenewal.TheBrandOwnerswhoseconsenthasbeenrenewedbeforethenotificationoftheserulesshallsubmitsuchplanwithinoneyearfromthedateofnotificationoftheserulesandimplementwithtwoyearsthereafter.

Page 116: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

49 | P a g e

• Manufactureanduseofnon-recyclablemultilayeredplasticifanyshouldbephasedoutinTwoyearstime.

• The producer, within a period of three months from the date of finalpublicationoftheserules intheOfficialGazetteshallapplytothePollutionControlBoardorthe

• PollutionControlCommittee,asthecasemaybe,oftheStatesortheUnion• Territoriesadministrationconcerned,forgrantofregistration.• NoproducershallonandaftertheexpiryofaperiodofSixMonthsfromthe

dateoffinalpublicationoftheserulesintheOfficialGazettemanufactureoruse any plastic or multilayered packaging for packaging of commoditieswithout registration from the concerned State Pollution Control Board orthePollutionControlCommittees.

• Everyproducershallmaintaina recordofdetailsof thepersonengaged insupplyofplasticusedas rawmaterial tomanufacturecarrybagsorplasticsheetorlikeorcovermadeofplasticsheetormultilayeredpackaging.

ResponsibilitiesofPrescribedAuthoritiesAspertheprovisionsunderRule12ofPlasticWasteManagementRules,2016,theresponsibilityofvariousauthoritiesisgiveninTable4.1asbelow:Table4.1:ResponsibilitiesofPrescribedAuthoritiesSr.No.

PrescribedAuthority Responsibilities

1. State Pollution ControlBoard (SPCB)/ PollutionControlCommittee

EnforcementoftheprovisionsofPWMRules,2016,relatingtoregistration,manufacture of plastic products andmultilayeredpackaging,processinganddisposalofplasticwastes.

2. Secretary-in-Charge,UrbanDevelopmentDepartment

EnforcementoftheprovisionsofPWMRules,2016,relatingtowaste management by waste generator, use of plastic carrybags, plastic sheets or like, coversmadeof plastic sheets andmultilayeredpackaging.

3. GramPanchayat Enforcement of the provisions of PWM Rules, 2016, rulesrelatingtowastemanagementbythewastegenerator,useofplasticcarrybags,plasticsheetsor like,coversmadeofplasticsheetsandmultilayeredpackagingintheruralareaoftheStateoraUnionTerritory.

4. DistrictMagistrateorDeputyCommissioner

Shall provide the assistance to SPCBs/PCCs, Secretary -in-Charge,UrbanDevelopmentDepartmentandGramPanchayatunder his jurisdiction, whenever required for enforcement ofprovisionsofPWMRules,2016.

ResponsibilitiesofCentralPollutionControlBoard(CPCB)AsperPlasticWasteManagementRules,2016,theresponsibilityofCentralPollutionControlBoard(CPCB)isinTable4.2givenasbelow:

Page 117: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

50 | P a g e

Table4.2:ResponsibilitiesofCentralPollutionControlBoard(CPCB)Sr.No.

Rule No. (asper PWMRules,2016As amended2018)

Description

1. 4(h) Themanufacturersorsellerofcompostableplasticcarrybagsshallobtainacertificate from the Central Pollution Control Board before marketing orsellingtheirproducts.

2. 5(c) Thermoset plastic waste shall be processed and disposed of as per theguidelinesissuedfromtimetotimebytheCentralPollutionControlBoard.

3. 6(2)(d) The Local Bodies shall ensure processing and disposal of non - recyclablefraction of plastic waste in accordance with the guidelines issued by theCentralPollutionControlBoard.

4. 17(d) The CPCB shall prepare a consolidated Annual Report on the use andmanagement of plastic waste and forward it to the Central Governmentalongwithitsrecommendationsbeforethe31stAugustofeveryyear.

5. 13(2) Producer/Brand owners who are working in one or two states/UTs shallregisterinSPCBs/PCCs,However,ifworkinginmorethan2states/UTsthenregistertoCPCB

ResponsibilitiesofStatePollutionControlBoard(SPCB)

• SPCBs/PCCs are required to interact with ConcernedMunicipalities and toprovide technical support to municipalities in setting-up of proper plasticwaste management system for segregation, collection, transportation,disposalofPWasperPWMRules,2016.

• SPCBs/PCCS can ask State Urban Development Department to constituteStateLevelAdvisoryBodyforimplementationofPWMRules,2016.

• SPCBs/PCCS should constitute vigilance squad in collaboration withConcernedMunicipalitiestoundertakesurprisechecksforthicknessofcarrybags (bothmanufacturing& stocking), for not allowing <50 μm thicknesscarrybags.

• SPCBS/PCCs can organize Mass-Awareness programme in various districtsinvolving

• Municipalities&Stake-holdersfornotusinglessthanfiftymicroncarrybags.ActionRecommendedforManagementofPlasticWasteThe concerned Local Bodies and Gram Panchayats are responsible for collection,storage, segregation, transportationanddisposalofwaste in their jurisdiction. Therecommendedprocess forcollection,segregation,utilizationanddisposalofplasticwasteisdepictedinFigure4.2.Foreffectivemanagementofplasticwastegeneratedfromdifferentactivities, the recommendedactionplan for implementationby localauthoritiesisgivenbelow:

Page 118: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

51 | P a g e

Figure4.2:PlasticWasteManagementProcess

Thefollowingoptions(Figure4.3)shouldbeenvisagedforutilizationorrecyclingofplastic:

• Useof shreddedplasticwaste in constructionofbituminous road throughhotmixplant(IRCCodeSP98:2013).

• Conversion of plasticwaste into liquid fuel (As per document available atCPCBwebsite).

• Transportingstoredplasticwastetonearestcementkilnsforco-processing(asperCPCBguideline).

• Transfertoplasticwasterecyclerforrecyclingintootherplasticproducts.

Figure4.3:PlasticWasteTreatmentOptions

The following options should be envisaged for utilizationof non -recyclable plasticandtherejects/residues(havingcalorificvalue)generatedfromrecyclingunits

• Sendforco-processinginnearestcementkilns• MayremainincombustiblefractionofsolidwasteforproductionofRDF

Page 119: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

52 | P a g e

• May remain in combustible fraction of solid waste as feed to waste toenergyplant

The followingoptions shouldbeenvisaged fordisposal ofplasticwastewhere theoptionofrecyclingandutilizationarenotfeasible:

• Destructionbyplasmapyrolysisplant• Disposalbyincinerationunitcomplyingwithemissionstandardsstipulated

under SolidWaste Management Rules, 2016 as amended 2018 (part C ofscheduleII)

• Theresidues/rejectsgeneratedduringrecycling/processingofplasticwasteshould be disposed in sanitary landfills as per the provisions under SolidWasteManagementrules,2016

4.3 Construction&Demolition(C&D)WasteManagementRegulation,201612TheGovernmenthasnotifiedConstruction&DemolitionWasteManagementRules,2016forthefirsttime.Theserulesshallbecalledthe“ConstructionandDemolitionWasteManagementRules,2016”.TheguidingprincipleoftheseRulesistorecover,recycleandreuse(3R's)thewastegeneratedthroughconstructionanddemolition.Segregating construction and demolitionwaste and depositing it to the collectioncentersforprocessingwillnowbetheresponsibilityofeverywastegenerator.Cities with a population ofmore than onemillion will commission processing anddisposal facilitywithin 18months from thedateof final notificationof these rules,whilecitieswithapopulationof0.5to1millionandthosewithapopulationof lessthan0.5millionwillhavetoprovidethesefacilitieswithintwoyearsandthreeyearsrespectively.(Rule–13)MonitoringshallbemadebyStatePollutionControlBoards(SPCBs)3timesayeari.e.once in 4 months for cities having population more than one million. Cities withpopulation of 0.5-1million and less than 0.5million shall bemonitored by SPCBs 2timesayeari.e.oncein6months.(Rule–13)“Permissionforconstructionwillbegivenonlywhenthecompleteconstructionanddemolitionwastemanagementplanispresented”,andlargegeneratorsofwastewillhavetopayrelevantchargesforcollection,transportation,processinganddisposal,asnotifiedbytheconcernedauthorities.The following are the important features of the Construction & DemolitionWasteManagementRules,2016.

12http://www.npcindia.gov.in/itf_event/draft-kit-tools/

Page 120: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

53 | P a g e

Application(Rule–2)

- Applies to everyone who generates construction and demolitionwaste.

DutiesofwasteGenerators(Rule–4)

- Every waste generator shall segregate construction and demolitionwasteanddepositatcollectioncenterorhandovertotheauthorizedprocessingfacilities.

- Shall ensure that there is no littering or deposition so as to preventobstructiontothetrafficorthepublicordrains.

- Largegenerators(whogeneratemorethan20tonsormoreinonedayor 300 tonsperproject in amonth) shall submitwastemanagementplan and get appropriate approvals from the local authority beforestartingconstructionordemolitionorremodelingwork,

- Largegeneratorsshallhaveenvironmentmanagementplantoaddressthelikelyenvironmentalissuesfromconstruction,demolition,storage,transportationprocessanddisposal/reuseofC&DWaste.

- Large generators shall segregate the waste into streams such asconcrete,soil,steel,woodandplastics,bricksandmortar,

- Large generators shall pay relevant charges for collection,transportation, processing and disposal as notified by the concernedauthorities;

DutiesofServiceprovidersandContractors(Rule–5)

- The service providers shall prepare a comprehensive wastemanagementplanforwastegeneratedwithintheirjurisdiction,withinsixmonthsfromthedateofnotificationoftheserules,

- Shall remove all construction and demolition waste in consultationwith the concerned local authority on their own or through anyagency.

- AccidentsifanyduringtheprocessshallbeReportedtoLocalauthorityonme(FORMV)(Rule–14)

DutiesofStateGovernmentandLocalAuthorities(Rule–6&9)

- The Secretary, Urban Development Department in the StateGovernmentshallpreparestate'spolicywith respect tomanagementof construction and demolition waste within one year from date offinalnotificationoftheserules.

- TheconcerneddepartmentintheStateGovernmentdealingwithlandshall provide suitable sites for setting up of the storage, processingand recycling facilities for construction and demolition waste withinone-and-a-halfyearsfromdateoffinalnotificationoftheserules.

Page 121: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

54 | P a g e

- TheTownandCountryplanningDepartmentshallincorporatethesitein the approved land use plan so that there is no disturbance to theprocessingfacilityonalongtermbasis.

- Thedepartment shallprocureandutilize 10-20%materialsmade fromconstruction and demolition waste in municipal and Governmentcontracts.

- LocalAuthority(LA)shallplaceappropriatecontainersforcollectionofwaste,removalatregularintervals,transportationtoappropriatesitesforprocessinganddisposal.

- LA shall seek detailed plan or undertaking from large generator ofconstruction and demolition waste and sanction the wastemanagementplan;

- Seek assistance from concerned authorities for safe disposal ofconstruction and demolition waste contaminated with industrialhazardousortoxicmaterialornuclearwasteifany;

- LA shall give appropriate incentives to generator for salvaging,processingandorrecyclingpreferablyin-situ;

- LAshallestablishadatabaseandupdateonceinayear,- Millionpluscities(basedon2011censusofIndia),shallcommissionthe

processinganddisposal facilitywithinone-and-a-half years fromdateoffinalnotificationoftheserules

- 0.5to1millionpopulationcities,shallcommissiontheprocessinganddisposalfacilitywithintwoyearsfromdateoffinalnotificationoftheserules

- Forothercities (<0.5millionpopulations), theyshall commission theprocessing and disposal facility within three years from date of finalnotificationoftheserules

- LAshallreviewandissueinstructionstothein-chargeofthefacilityifanyaccidents reportedby in chargeof theprocessing facility (Rule–14). Checklists of safety concerns are included in annexure-1 forreference.

DutiesofCPCB,SPCBorPollutionControlCommittee(Rule–8&10)

- The Central Pollution Control Board shall prepare operationalguidelinesrelatedtoenvironmentalmanagementofconstructionanddemolitionwaste.

- SPCB shall grant authorization to construction and demolitionwasteprocessingfacility.(Form-III)

- Monitor the implementation of these rules by the concerned localbodies

- Submitannual report to the Central Pollution Control Board and theStateGovernment.(FormIV)

Page 122: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

55 | P a g e

Standardsforproductsofconstructionanddemolitionwaste(Rule–11)- TheBureauofIndianStandardsneedtopreparecodeofpracticesand

standardsforproductsofconstructionanddemolitionwaste- Indian Roads Congress needs to prepare standards and practices

pertainingtoproductsofconstructionanddemolitionwasteforroadsconstruction.

DutiesofCentralMinistries(Rule–12)

- The Ministry of Urban Development, and the Ministry of RuralDevelopment,MinistryofPanchayatRaj,shallfacilitatelocalbodiesinobtainingcomplianceoftheserules;

- TheMinistryofEnvironment, ForestandClimateChange shall reviewimplementationoftheserulesasandwhenrequired.

Facilityforprocessing/recyclingfacility(Rule–7)

- The operator of the facility shall obtain authorization from StatePollutionControlBoardorPollutionControlCommittee.(Form-I)

- Theprocessing / recyclingsiteshallbeawayfromhabitationclusters,forestareas,waterbodies,monuments,NationalParks,Wetlandsandplacesofimportantcultural,historicalorreligiousinterest.(Schedule-I)

- The processing/recycling facility exceeding five Tonnes per daycapacity, shallmaintain abuffer zoneofnodevelopmentaround thefacility.

- TheoperatorofthefacilityshallsubmittheannualreporttotheStatePollutionControlBoard(FormII).

Table4.3:SchedulesinC&DWasteManagementRules-2016ScheduleI : Criteria for Site Selection for Storage and Processing or

RecyclingFacilitiesforConstructionandDemolitionWaste[SeeRule7(1)]

ScheduleII : Application of materials made from Construction andDemolitionwasteanditsproducts[SeeRule7(3)]

ScheduleIII : TimeframeforPlanningandImplementation[SeeRule13]StakeholdersinvolvedintheimplementationofC&DWasteManagementDifferentstakeholders,whichareinvolvedforC&DwastemanagementaredescribedinFigure4.4.

Page 123: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

56 | P a g e

Figure4.4:StakeholdersforC&DWasteManagement

Theimplementationoftherulesrequiresunderstandingofactivitiestobeperformedby each of these stakeholders and comprehension of interdependency on eachother.MunicipalAuthoritybeingtheprimeimplementationbodyneedstoensurealldepartments/sections understand roles and responsibilities pertaining to theimplementationofC&DWasteManagementRules.Table4.4summarizestherolesof different departments who may have to undertake for further effectiveimplementationofC&Drules.Table3.4:RolesofDifferentDepartmentsMunicipalDepartment/Section RoleBuildingpermission/developmentcell Assess thequantumthat is likely tobegeneratedand

thetrendsthatare likely toemerge inC&Dactivitiesarea/wardwise.

PublicHealth Assessandidentifytheseverityofthewasteeffectsformorestringentrules

TownPlanningdepartment Basedonthisdata,collectioncentresandtheircapacityrequirementcanbeassessed.

Buildingpermission/developmentcell&TownPlanningdepartment

The landfortheprocessingandcollectioncentreswillhavetobeidentifiedandtonotifythelandusechangeplan.

Trainingdepartment Buildcapacityontheresponsibilitiesofthegeneratorsandthelocalgovernmentbodies

PublicRelationsdepartment Dissemination of the waste handling and depositionawarenessmessagesinlocallanguages.

SolidwastemanagementDepartment

• PrepareTORforcollection,processing&disposal.• Technicalcriteriaforselectionofcontractors.• Superviseoperatingcostatsite.

Procurementcell • Define type of bidding/tendering & evaluationcriteria

• DraftcontractElectoral representatives in consultation with MayorandExecutiveManagementofficers

Incentive schemes for recycling and salvaging ofmaterialsmaybedevelopedandnotified

AccountsandfinanceDepartment Costs for collection anddisposalwill have to be fixedandnotified.

Legalcell/PROcell TheactivitiesthatconstituteviolationofTORbyfacilitydevelopersandoperators,needstobeclearlydefined,whiledraftingandengagingthecontract.

ChiefEngineerandMunicipalCommissioner/Secretary Theannual reports submittedby theoperators to theMunicipal Authorities will have to be compiled and

Page 124: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

57 | P a g e

MunicipalDepartment/Section RoleproducedtotheSPCB/SecretaryandCPCB.

The interdepartmental/section interaction/communication approaches accordinglyneedstobeestablishedandupdatedtomaketheimplementationprocesseffective.ActivityChartforImplementingC&DWasteManagementRules,2016Activity chart for implementing C&D Waste Management Rules, 2016 is given inFigure4.5.

Figure4.5:ActivityChartforC&DWasteManagementRules

Agencies,planningcollectioncentersneedtoundertakeaforecaststudyaboutthelikelyC&Dwastegeneration ineachareaandaccordinglydesignthefacility.Anewresidentialareamaynotneedthefacilityfornext15-20yearsandanoldorupcomingareamay require the facility andhence this aspectneeds tobeaddressedkeepinglocalconditionsinmind.As per the rules the C&D waste needs to be stored by generators within theirpremises andeitherdepositedat collection centeron theirownor through facilityarrangedbylocalpublic/privateagencyforafee.Sincethecriteriaiswasteneedstobestoredwithinone'spremiseshowitwillbestoredis lefttothegeneratorwithamandatethatthewastedoesnotcauselittering,blockageofdrainsandnotobstructtraffic.Also,theamountofwasteforminorormoderaterepairsinexistingbuildings,tocompletedestruction,variesandnostandardizedbinsizescanbeadvocated.

Page 125: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

58 | P a g e

4.4 PolicyInitiativeEmergingTrendsinPolicyEvolutionWASTETOENERGY6The Union Cabinet has approved the proposal of the Ministry of Power foramendments in the Tariff Policy. Swachh Bharat Mission to get a big boost withprocurementof100%powerproducedfromWaste-to-Energyplants.Theprovisioninthe Electricity Tariff Policy 2006 is to “Mandatorily Purchase All Power GeneratedfromMunicipal SolidWaste at the Rate Determined by Appropriate Authority” byStateElectricityDISCOMs.Consideringthehighcostsoftransportationofwasteaswellastheprocessedwasteproducts and existence of extensive urban sprawl in largeULBs, coupledwith theobligation of renewable energy on Electricity Discoms mandated to procure 100%powerforWtEplantsunderTariffPolicyDt.28.01.2016,settingupWtEPlantsisidealforlargeULBs.PolicyInitiativesforWtEunderSwachhBharatMissionCERCTariffforRDFbasedMSWProjectsandMSWProjectsTechnology Levellised

FixedCostVariableCost Applicable

TarffRateBenefitofAcceleratedDepreciation

NetLevellisedTariff

FY2015-16 FY2015-16 (ifavailed) (uponadjustingforAcceleratedDepreciationbenefit) (ifavailed)

(Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh) (Rs/kWh)MSW 7.04 0.00 7.04 0.54 6.50RDFbasedMSW 4.34 3.56 7.90 0.31 7.59Theabovetariffwillbeapplicableforentireusefullifeof20yearsfortheMSW/RDFbasedMSWprojectscommissionedduringFY2015-16.However,incaseofRDFbasedMSWprojects,thevariablecomponentoftariffwillchangeeachyearbasedontheescalationfactorof5%.Based on this guidance of CERC, the appropriate State Electricity RegulatoryCommission(SERC)candeterminethetarifffortheparticularWastetoEnergyplantsetupundertheareaofitsjurisdictionORSERCcanhaveitsownanalysis.TariffPolicyunderCentralElectricityAct,2003asamended6Thepolicyasnotifiedon28.01.2016mentionsat6.4(1)(ii)thatDistributionLicensee(s)shallcompulsoryprocure100%powerproducedfromallwaste-to-energyplantin

Page 126: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

59 | P a g e

theState,intheratiooftheirprocurementofpowerfromallsourcesincludingtheirown,atthetariffdeterminedbytheappropriateCommissionunderSection-62oftheAct (Ministry of Power Resolution, New Delhi, 28 January, 2016 regarding TARIFFPOLICY).ConstructionandDemolitionWaste6Tominimizethequantityofinertreachingtolandfillandtopromotereuse/recycleofconstruction&demolitionwaste (C&Dwaste), theBureauof IndiaStandards (BIS)has amended the specification for coarse and fine aggregate for concrete (ThirdRevision) (IS: 383-2016).Theproducts fromC&Dwastecouldalsobeused fornon-structuralpurposeslikekerbstone,paverblockandroadconstruction,etc.aswellasforstructuralpurposes.IndiahasdevelopedDraftNationalResourceEfficiencyPolicy2019.Majorelementsofthispolicyare:13TheNational Resource Efficiency Policy (NREP), 2019 seeks to create a facilitativeandregulatoryenvironmenttomainstreamresourceefficiencyacrossallsectorsbyfostering cross-sectoral collaborations, development of policy instruments, actionplansandefficientimplementationandmonitoringframeworks.NREP,2019isguidedbythe16principlesof(i)reductioninprimaryresourceconsumptionto‘sustainable’levels, in keeping with achieving the Sustainable Development Goals and stayingwithin the planetary boundaries, (ii) creation of higher value with less materialthrough resource efficient and circular approaches, (iii) waste minimization, (iv)materialsecurity,and(v)creationofemploymentopportunitiesandbusinessmodelsbeneficialtothecauseofenvironmentprotectionandrestoration.NREP,2019aimstoimplementresourceefficiencyacrossallresourcesincludingbothbiotic and abiotic resources, sectors and life cycle stages. The policy draws inputsfrom available sectoral studies and initiates sections on selected sectors for earlytake-up. With formal establishment of NREA and expected participation of lineministriestogrow,moreresourcesincludingbioticresourceswillalsobecovered.Further, in the case of the resource recovery business model, producing rawmaterials via recycling, rather than from non-renewable natural resources, canreduce greenhouse gas emissions by asmuch as 90%. Themagnitude of emissionsreductions involved varies across materials, but is significant in almost all cases(Figure4.6).14

13http://moef.gov.in/wp-content/uploads/2019/07/Draft-National-Resourc.pdf14OECD(2018);BusinessModelsfortheCircularEconomy–OpportunitiesandChallengesfromaPolicyPerspective

Page 127: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

60 | P a g e

Figure4.6:AvoidedGHGemissionspertonneofrecycledmaterial

4.5 StatutoryClearancesAlistofrequiredstatutoryclearancesaregiveninTable5.5.Table5:StatutoryClearances/Approvals/PermitsrequiredClearanceRequired StatutoryAuthority Status RemarksEnvironmentalClearance Ministry of

Environment, Forestsand Climate Change(MoEFCC),NewDelhi

NotApplicable

Not Applicable as powerplants upto 15 MW basedon non- hazardousmunicipalwaste.

ForestClearance Ministry ofEnvironment, Forestsand ClimateChange,NewDelhi

NotApplicable

The sub-project is notlocatedin forestarea.

The Wildlife ProtectionAct, 1972 & BiologicalDiversityAct,2002

Ministry ofEnvironment, Forestsand ClimateChange,NewDelhi;NationalBiodiversityAuthority

NotApplicable

Not required as project sitedoes not lie within or inclose vicinity to anyNational Park, Wild LifeSanctuary or biodiversityrich area as informed byprojectdeveloper.

ConsentforEstablishment ProjectFacility

KeralaStatePollutionControlBoard

ToApply Consent for Establishmentfrom the State PollutionControl Board underSection 25 of Water(Pollution & Control ofPollution) Act, 1974 andunder Section 21 of Air(Pollution & Control ofPollution)Act, 1981.

Authorization underSolid WasteManagement Rules,

KeralaStatePollutionControlBoard

ToApply

Page 128: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

61 | P a g e

ClearanceRequired StatutoryAuthority Status Remarks2016WaterSupplyPermission Municipal

Corporation /PortAuthority

ToApply

GroundWaterPermissions

State Level GroundWaterAuthority

ToApply

FireNoObjectionCertificate

State Level FireDepartment

ToApply

FactoriesAct,1948 Factories Department,GovernmentofKerala

ToApply

NoObjectionCertificatefor HeightPermission

Airports Authorityof India

ToApply

FuelStoragePermission ControllerofExplosives(CCoE),Governmentof Kerala

ToApply

4.6 ConclusionEmergingtrendsfromregulatoryandpolicyframeworkindicatesthatthereismajorfocus on resource recovery with emphasis on waste segregation andinstitutionalizationof3Rs implementation.Theuniqueof theproposedfacility is toinstitutionalize resource recovery consisting of extraction of discarded materialsfrom waste for reuse so as to defer consumption of virgin resources, mitigategreenhouse effect, and minimise the amount of waste disposed into landfills.Recycling, energy generation fromwaste offer alternative possibilities of resourcerecovery so thatwaste going into landfills isminimised. 15Therefore, components,material and energy not recovered from waste streams so far in Kerala offertremendousvaluewhichcanbepotentiallyrealizedbyeliminatingwastethroughtheadoptionofcircularbusinessmodels.16

15IsherJudgeAhluwalia&UtkarshPatel(2018);IndianCouncilforResearchonInternationalEconomicRelations;Working Paper No. 356; Solid Waste Management in India An Assessment of Resource Recovery andEnvironmentalImpact16FICCI(2018)CircularEconomySymposium;AcceleratingIndia’sCircularEconomyShift;AHalf–TrillionUSDOpportunityFutureProofingGrowthinaResourceScarceWorld

Page 129: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

62 | P a g e

Chapter–5:Environmental&SocialImpacts6.0 Introduction Theestablishmentofphysicalinfrastructurerequiresassessmentofenvironmental&socialimpactstoinstitutionalizerequiredsafeguardduringconstruction&operationoftheproject.Eachoftheseitemshasbeendescribedinthefollowingsection.6.1 EnvironmentalImpactsEnvironmental impacts & mitigation have been described below in terms ofconstruction&operationphase.6.1.1 Anticipated Environmental Impacts During Construction Phase and

MitigationMeasuresTheimpactsduringconstructionphaseandmitigationstatusthereonareelaboratedbelow:Land Use: At present, the land allotted for the project (approx. 55 acres) is anexisting/operatingport.TheareawheretheWtEfacilityisbeingconstructedwillbehandedovertothesub-projectdeveloperbytheportauthority.Hencethelandusepatternoftheareaisnotchangingduetocomingupoftheproject.However,sometemporary disturbances due to construction activity are anticipated duringconstruction phase. The impacts are temporary andwill go after the constructionactivity is over. Thus, the impact on land use during the construction work istemporaryandnotsignificantinnature.Air Quality: Construction activities involve excavation for construction of variousfacilities/unitsofthesub-project.Thiswill result in limitedfugitiveemissionsatsite.Sprayingofwaterduringconstructionwillreducethedustfalltoagreatextent.Themitigationmeasureswillbeadoptedbyprojectproponent toavoidairpollution. Itwill include management of vehicular movement to avoid traffic congestions,mechanicalwatersprinklingforsuppressionofdust,vehicletocomplywithvalidPUCcertificate.NoiseLevels:Duringconstructionphase,thesourcesofnoisepollutionwillprimarilybe limited to movement of vehicles transporting construction material andequipmenttothesite.Theprojectsite,however,isnotinclosedvicinitytohabitationarea.Useoflownoisegeneratingequipmentandrestrictionofconstructionactivityforlimitedperiodswillfurtherreducethedisturbancefromnoisepollution.

Page 130: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

63 | P a g e

WaterQuality:Theconstructionactivitywillbecausingsomeimpactonthesurface&ground water quality in the absence of mitigation measures. The water forconstructionwillbetakenfromgettingpermissionfromtherelevantauthorityintheprojectarea.Mitigationmeasureswillbeadoptedtopreventwaterpollution.Soil: The excavation work involved in the project is limited to construction offoundation for various units of the plant. The soil is envisaged to be used duringconstructionactivities.Flora: The constructionworkmay cause loss of vegetation. The sub-project is notlocatedinforestareaorprotectedarea,thereforeminimumimpactisanticipatedonthe flora. The site used by the sub-project is already an existing port site withminimum vegetation. The site will have adequate vegetation / green belt tocompensatefloralossifany.Fauna:Theexistinglanduseforthesub-projectsiteisexistingport.Noforestareasare falling in proposed project area and the sub-project is not part of any eco-sensitive areas like national park or sanctuaries thereby no presence of rare andendangeredspeciesisanticipated.HealthandSafety:About300 labor isexpectedtobeengagedduringconstructionphase. Labour camps with adequate amenities in line with labor laws will beestablished.Generalhealthcheck-upswillbeconductedregularlyforallemployeesandcontractemployees.Health register ismaintained and recorded regularly for all employees.Medicalcampandhealthawarenesscampaignwillbeorganized inassociationwithlocalhospitalsperiodically.CulturalSites:Noarchaeological,heritage,historicalorculturallyimportantsitesarelocatedclosetotheproposedsub-project.The records of HSE related details will be maintained in the Monthly ProgressReportsofthesub-project.Quarterly reports on compliance of conditions of Authorization under SolidWasteManagement Rules, 2016 and Consent for Establishment of the facility are beingsubmittedtotheAndhraPradeshPollutionControlBoard.6.1.2 AnticipatedEnvironmental ImpactsDuringOperationPhase andMitigation

MeasuresLandUse&Soil:Changes in landusepatternareenvisagedoncethesub-project isunder operation. The WtE facility once operational will not impact the land usepattern.Theprocessrejectsincludethebottomashandresidualmaterialgenerated

Page 131: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

64 | P a g e

during WtE process will be reused. The design concept involves appropriateprocedure and safety considerations. Plantation tobedone in sufficient density tominimizesoilerosion.AirandNoiseQuality:AirpollutionisanticipatedduringoperationalphaseoftheWtEfacility.Unloadingandprocessingofwaste isnotanticipated togeneratedustandodour,sincetheseactivitiesarecarriedoutincoveredareas.Theairpollutioncontrolsystemshallbeinstalledalongwiththecommissioningofthefacilityandshallcomplywithnormsforcontrollingairpollution.Emissioncontrolsystem isproposedattheWtEplant,thesystemwillconsistessentiallyofthefollowingmajorcomponents:

• Fluegassysteminletduct• Reactorandproductrecirculationsystem• Baghousefilter• Sorbenthandlingsystem• Endproducthandlingsystem• Processwatersystem• Auxiliarysystems(compressedairsystem,nitrogeninertingsystem)

Fugitive emissions will be controlled by the following mitigation options duringoperationoftheWtEfacility:

• Maintainingand/orre-establishmentofagrasscoveronareawherethereisnoongoingActivity

• Frequentwateringofunsealedroadsandstockpilearea-covermaterial• Blacktopoftheroadsasandwhentheyaresettledandreadyforthesame• Repair,relayingofblacktoproadsfromthelandfillareatothemainroad• Usingdustcontrolspraysduringloadingandunloadingofwastes• Ceasingdustgeneratingactivitiesduringhighwindtimes• Minimizingworkingdistancesforinternaltransportofwastes• Periodicalmonitoringofambientairqualityforallrelevantparameters• Odourcontrolbyrapidstabilizationanddisposalofwastes

Outlet emissions are proposed to bemonitored through sophisticated continuousemissionmeasuringinstruments.Thesystemwillmeasurethefollowingparameters-CO2, HCI, NO,NOx,O2, SOx and SPM. Gas temperature and the pressure are alsoproposedtobeanalysedcontinuouslytoregulatethedosingofsorbents.However,allotherparameterswouldbemonitoredonweeklybasis.Excessive noise shall be avoided by providing noise enclosure where reasonablypractical.Hearingprotectionisproposedtobewornbylabourwhileworkinginhighnoiseareasexceeding85dB.Thefollowingstrategiesareproposedtobeadoptedtofurtherminimizethenoiselevels:

• Maintainingthesitemachineryingoodoperatingcondition• Regularmaintenanceofsystemsandinstallationofnoisecontrolequipment

whereverrequired

Page 132: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

65 | P a g e

• Developmentofgreenbeltallaroundthesite• Periodicalmonitoringofnoiselevels

Water Quality: Surface water quality including ground water is anticipated to beimpactedduringoperationphaseof the sub-project ifmitigationmeasures arenotadopted. At theWtE processing facility, leachate collection system and treatmentfacility is proposed.A concreteplatform is proposed tobe constructed topreventgroundwatercontaminationduetoleachate.Leachategeneratedshallbestoredinanundergroundleachatetank,treated&reusedforhorticulture&otherpurposes.Leachate Treatment Process: The leachate treatment shall be carried out throughvariousprocessesintanksatthefacilityfortreatmentanddisposal.Theprocesswillinclude passing the leachate through equalization tank followed by flash mixing,flocculation and anaerobic treatment. Further, the leachate will be treated inaerationtanksfollowedbysecondaryclarificationandultra-filtration.Thesludgewillbeconvertedtocakesafterthickeningandbeltpressprocess.Flora: The WtE plant in operation phase is not anticipated to have impact onvegetation in the area. It is proposed by the project developer to develop avegetativecover inastriparoundthesiteboundary.Greenbeltsshallbedevelopedall around the boundary of the facility for MSW based on waste to energy plant.Greenbeltwillcreateoverallpositiveimpactontheaestheticsofthesite.Fauna:Theprojectareawillbefencedtorestrictentryofstraycattleifany.Health and Safety:Risk analysis will be done for the project and safetymeasuresproposedat thesite for staff.All the listedactivitieswhich require riskassessmentandworkprocedureswillbeidentified.Sitepersonnelaretoattendasiteinductionincludingbriefingonthesiterulesandregulations.AllworkersshallbeequippedwithproperPPEmaintainedingoodcondition.Hearingprotectorsshallbeworninareaswhere noise levels exceed 85 dB. Respirators to be worn in contaminatedatmospheres.Equipmentshallbeusedbytrainedpersonnelonly. 6.1.3 EnvironmentalManagementPlanAnenvironmentalmanagement&monitoringplanhasbeenprepared&describedinTable5.1&Table5.2forconstruction&operationphase.Table5.1:EnvironmentManagementPlanImplementationMatrixforConstructionStagePotentialImpacts MitigationMeasure MonitoringofmitigationAirQuality

• Spraying water when necessary tosuppressdustandfugitiveemissions;

• Allvehiclestopossessavalidpollutioncontrolcertificate;

• Periodicmonitoringofambientair quality for all relevantparametersintheplantarea

Page 133: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

66 | P a g e

PotentialImpacts MitigationMeasure MonitoringofmitigationFloraandFauna

• Minimizeremovalofvegetation• Green belts to be developed around

boundaryofperiphery• Prohibit employees from poaching

andcuttingoftreesforfirewood.

• Record of plantations to bemaintainedatsite

• Fencing shall be done aroundthe entire periphery of thefacility to keep stray animalsaway

• Recordofsaplingsplantedandsurvivalratetobekept

• Employees to be supervisedandsensitizedtowardscuttingoftreesandpoaching

Surfacewaterquality

• Stockpiling of earth fill shall beavoided unless covered during themonsoonseason

• Prioritize re-use of excess spoils andmaterialsintheconstructionworks.

• Install temporary silt traps orsedimentation basins along thedrainageleadingtothewaterbodies

• Disposal of anywastes generated byconstructionactivitiesshallbedoneindesignatedsites

• Surface quality monitoring tobedone

NoiseLevels

• Construction activities with thegreatest potential to generate noiseshall be conductedduringperiodsofthe day which will result in leastdisturbance;

• Restrictionofvehicularmovementataspeedlimitforminimumnoise

• Procuring machinery/ constructionequipment in accordance to thespecifications confirming to sourcenoiselevels

• Maintain maximum sound levels notexceeding 80 decibels (dbA) whenmeasuredatadistance

• Noisequalitymonitoringtobedone

Bufferzonearoundfacility

• Buffer zone area to be left as perlayout approval of State PollutionControlBoard

• Greenbeltbuffertobemaintainedinviewofpublicsafety

Plantation records to bemaintained

Health&Safety

• LabourshallbeprovidedwithPPE• First aid kits and doctor shall be

availableatsite• Job safety analysis, tool box talk,

induction training and job specifictrainingsshallbeprovidedtostaff

• ContinuousinspectionshallbedoneatsitebyContractor

• HSE related matters are shallbereportedonmonthlybasis

Page 134: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

67 | P a g e

Table5.2:EnvironmentManagementPlanImplementationMatrixforOperationStagePotentialImpacts MitigationMeasure MonitoringofmitigationAirQuality• Dueto

emissionsfromvehiclestransportingMSWfromULBs

• FluegasemissionsfromWtEfacility

• All vehicles to possess a validpollutioncontrolcertificate;

• Maintaining and/or re-establishmentofagrasscoveronareawherethereisnoon-goingactivity

• Theapproachandinternalroadsshallbe concreted or paved to avoid dustgeneration due to movement ofvehicles

• Using dust control sprays duringloadingandunloadingofwastes

• AirPollutionControlsystem

• Periodicmonitoringofambientair quality for all relevantparametersintheplantarea

• Continuous emissionmonitoringofoutletemissions

• Green belt shall be developedall along the boundary andvacant spaces indigenousspecies

NoiseQuality

• Sitemachineryshallbemaintainedingoodoperatingcondition

• Regularmaintenanceofsystemsandinstallation of noise controlequipmentwhereverrequired

• Developmentofgreenbeltallaroundthesite

• Periodic monitoring of noiselevels

OdourproblemduetoMSW

• Waste to be transported in coveredvehicles

• Unloading as well as processing ofthe waste to be carried out undercoveredareas.

• Odour control by rapid stabilizationand disposal of wastes with dailycoverplacement

• Odour nuisance at downwinddirection on the boundary ofprocessing plant shall becheckedregularly

• Recordstobemaintained

Waterconsumption&Quality

• Leachate treatment plan shallinclude leachate collection andtreatment system including of :influentleachatecollectiontank;barscreens; oil & grease chambers;anaerobic reactor; secondaryclarifier;aerationtanks;carbonfilter;ultra-filtration;sludgethickener;beltpressetc.

• Treatedleachateshallberecycledorutilized after meeting standards asspecifiedbyPollutionControlBoard

• Water from Cooling systemswill beneutralizedintheneutralizedpitandutilized

• Surface water quality andtreated leachate qualitymonitoring shall be done atWtEfacility

• Ground water quality to bemonitored within 50 m ofperiphery covering differentseasons

• Waterconsumptionrecordstobekept

Bufferzonearoundfacility

• Buffer zone area to be left as perlayout approval of State PollutionControlBoard

• Green belt buffer to be maintainedinviewofpublicsafety

• Greenbeltshallbedevelopedall along the boundary andvacantspaces

Health&Safetyofworkers

• Good housekeeping to bemaintainedattheplant

• Tool box talks, induction trainingsshallbeconducted

• Trainingandhealthrecordstobemaintainedatsite

• Accident/incident reports tobemaintainedatsite

Page 135: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

68 | P a g e

PotentialImpacts MitigationMeasure Monitoringofmitigation• WorkersshallbeprovidedwithPPE• Hearing protectors shall beworn in

areaswherenoise levelsexceeds85dB

• Respirators shall; be worn incontaminatedareas

• All pipe valves, sewers, drains shallbeleakproof

• Dyke walls shall be constructedaroundstorageofchemicals/fuels

• Fire-fighting equipment shall beinstalledallovertheplant

• Fire-fighting system /equipment maintenancerecords

5.2 SocialImpacts&MitigationMeasuresTheprojectdoesnot involveanypopulationfor rehabilitationandresettlement.Allthelaborrequiredforconstructionofthefacilitywillbeprovidedwithadequatecivicas well as health and safety facilities. Further, all the measures prescribed in theenvironmental&socialstatutorypermissionwillbeimplemented.

Page 136: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

73 | P a g e

Chapter–7:OperatingFramework7.0 IntroductionRiskprofilingalongwithriskmitigativemeasureshavebeenproposedintheproject.Thisisaccompaniedwithcriteriatoqualify&selectthebidder.7.1 Risks&MitigationWhile cost estimates for some individual components are included in the report, alackofcomprehensivedataaswellasuncertaintywithregardstotheuniquecostsanticipatedforanyconstructioninTrivandrum,excludethepossibilityofathorough,component-bycomponenteconomicanalysis.Effortshavebeenmadetoprovideaneducated estimate based on similarly sized WTE plants currently undergoingdevelopmentinKerala&India,butthepossibilityforerror issignificant.Inordertodevelopamoreaccurateestimate,eachcomponentof theplantwouldneedtobepricedandanup-to-dateTrivandrum-specificcostadjustmentforbothshippingandconstruction provided. It isworth reiterating, however, that the current analysis isintendedtobeconservativeandthusshouldnotbeoverlyoptimistic.Beforemovingforwardwiththe implementationofaWTEplant, it isessentialtohavea long-termbuyerinplaceforgeneratedelectricity,sincealongwithtippingfeesitisoneoftheprimaryincomesourcesfortheplant.Additionalinfrastructuralconsiderationsmustbemade, specificallywith respect to transmittingelectricity fromtheWTEplant totheclosestgridaccesspoint.Following Table 7.1 presents details of risks identified for the projects and theproposedallocation:RiskFactor RiskAllocation MitigationMeasuresManagementRiskImplementationcapability&experience Proposer Risk:LOWFundingRisk Proposer Risk:LOWPre-completionriskApprovalsandPermits Governmentof

KeralaforSPVRisk:LOW

Landacquisition SPVs Risk:LOWCostandtimeOverrun Proposer Risk:LOWPostcompletionrisksMSWAvailabilityRisks ULBs Risk:LOW–MEDIUMMSWQualityRisks ULBs Risk:LOW–MEDIUMEnvironmentalRisks SPVs Risk:LOWAvailabilityofWater SPVs Risk:LOWEvacuationrisks KSEBforSPV Risk:LOWTerminationRisk SPVs Risk:MediumOfftakerisk SPVs Risk:LOWPaymentrisk SPVs Risk:LOWTechnologyRisksTechnologyrisk/EquipmentunderPerformance SPVs Risk:LOW

Page 137: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

74 | P a g e

WhileWTE isaproventechnology,thereremainassociatedpollutionandeconomicriskswithanyWTEdevelopment. These risks canbeminimized, thoughnever fullyeliminated, through sound engineering and financial planning. Possible pollutionissuescouldariseiftheAPCunitsfail,butthefacilitywillbeequippedwithpollutionsensors and alarm systems to minimize the impact of such a failure and quicklyresolveissuesduetocomponentfailure.Emissionsareconstantlymonitoredaspartof regulations but additionally, to ensure the smooth operation of the plant,especially with regards to variations in the incoming waste stream. Safety is theprimary concern of the plant operations, given high temperature and pressurerequirementsinherentinthecombustionprocessesaswellasthepresenceofheavymachineryandpotentialforhazardousmaterials.Itisinthebestinterestoftheplantowners, developers, employees, and neighbors to minimize and, when possible,eliminate negative impacts of WTE construction, and steps must be immediatelytakenintheeventofanysystemsfailurewhichresultsinnegativehealthimpactsorotherwise.Noinvestmentisever100%guaranteed,butriskislowgiventhetrackrecordofWTE.Withcarefulplanningandthorougheconomicanalysis,theproposedplantshouldbeeconomicallyviableinitscurrentstate.Additionally,problemshaveariseninthepastwhenmunicipalitieshavetakenontoomuchofthedebtassociatedwithWTEplantdevelopment.Theroleofgovernmentagencies inourproposedstructure is limitedtosubsidizingtheplant’soperationsunderstateprograms,which is idealgiventhefinancial stresses that most municipalities, Trivandrum included, are undergoingtoday.7.2 IndicativeSelectionCriteriaThe project has very unique features as described below. The selection of biddershouldbebasedonthesefeatures.

1. No need for secondary landfill for the dumping of Ash generated by WTEprocess.

2. Noneedforthereceiptofsegregatedwaste3. Noneedforonsitebio-dryingwhichcancauseobjectionableodorsfornearby

communities4. Guaranteedcommercialviability,duetotheabilitytogenerate1000kWhfor

electricityperMTofMSW7.3 ConclusionsA mass-burn WTE facility for Trivandrum, Kerala is economically feasible. Theconsistent,dependableincomefromtippingfees,electricityproductionandmetals&ash recovery provide the incentive to finance the high capital costs of the plant.Citywide economics regardingWTE in Trivandrum are also favorable. Amass-burnWTE facility for Trivandrum is environmentally beneficial. Trivandrum’s current

Page 138: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

75 | P a g e

methodofdumpinginlandfillsisunsustainable.Itresultsinalargeamountoflandfillgas (mostly methane and carbon dioxide) which contribute to climate change asgreenhousegases.Thecombustionof thewastereducesthevolumethatneedstobe landfilledandavoids long-haul trucking.TheAPCunits at theWTE facility abatethevariousemissionstobelowthestrictregulatorystandardsforemissions,ensuringthatincinerationdoesnotleadtoairpollution.Theenergyproducedfromthewasteoffsets the energy that would need to be produced from fossil fuels. Despite themisconceptionthatWTEandrecyclingdonotwork inunison,WTErecoversmetalsandenhancesrecyclingefforts.Finally,thebottomandflyashistreatedanddonotposeathreattotheenvironment.Amass-burnWTEfacilityforTrivandrummustbe incorporated intothecommunity.The proposed facility is in a largely a residential area, so it will face opposition.However,foranyprojectofthiscalibertocometofruition,communityengagementmust play a role. The community must know that WTE is not hazardous to theenvironment and that it is beneficial. People will also want to know how theirpropertyvalue,dailylifeandcommunitywillbeaffected.AWTEfacilitymustbeopenwiththecommunityby firsteducating itsneighborsbeforebeingbuiltandthenbystaying involved with the neighborhood throughout its operating lifetime. AcommunitycenterandpublictoursareaneasywayfortheWTEfacilitytoaccomplishthesegoals.Another importantaspectforthecommunity isthearchitectureofthefacility.Animpressive,captivatingstructurecanmaketheWTEfacilityacommunitylandmarkthatresidentsareproudtohaveintheircommunity.

Page 139: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

76 | P a g e

Chapter–8:WayAhead8.0 IntroductionThe project requires assistance from the government in order to fast track thedevelopmentoftheproject.Thefollowingsectiondescribestherequirementsfromthegovernmentaswellasprojectdeploymentframework.8.1 RequirementsfromGovernmentofKeralaTheGovernmentofKerala canplay a critical role in the successful implementationandoperationofaWTEfacility.

• AllotmentoflandatacurrentMSWprocessingsite.• Operatingcontract(ConcessionPeriod)for25yearsorhigher.• Onewindowclearanceorassistancewithalllicense&permits.• Assistance with signing a Power Purchase Agreement (PPA) with State

ElectricityBoard,atapprovedratesforWastetoEnergyplans,forfulllengthofconcession.

• Tipping &I Storage charges equal to those offered to other concessionholders.

• Guaranteedsupplyof450metrictonsperday,orgreater,ofunsortedMSW.• Assistancewithinterconnectiontolocalpowergrid.

8.2 ProjectDevelopmentFramework,Staffing&DeploymentPlanDue to the involvement of various government agencies the time for the variouspermitstobeawardedisunknown.It is our overall understanding that, if there is no need for a public hearing, theprocess may be completed within 8 months. If the public hearing occurs, and isconcluded within one session, the process may take 10 months. However, if thepublic review process continues for longer than one session, this process cancontinue much longer than 10 months. This can pose a significant impedance tofacility constructionwithin a densely populated area like the one allocated by theauthority, for the project, where both professional and public review will beperformedwith incredible scrutinyandconservatism,aspublic contactwithaWTEfacility would occur more frequently, than if the facility was constructed in asuburbanor rural area. Inaddition tomeetingpermitting requirements, the facilitywouldalsoneedtoremain incompliancewithKeralaStatePollutionControlBoard(KSPCB) and Central Pollution Control Board (CPCB) prescribed standards for suchfacilities.Thefacilityandanydevelopmentonsitewillmeetpermitstandardsorany

Page 140: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

77 | P a g e

constructionproject inthecityandanytenetsthereof, includingnoiseandworkinghourrestrictionsforheavyconstruction,healthandsafetyrestrictionsonsourcesofwaterandsewerconnectionstobeusedduringconstruction,reductionofintrusionofanimalsandpeststothefacilitysite,amongothers.Weintendtoallocateadequatetimetofileandreviewapplications,providingpublicnotice, holding public hearings, and reaching final decisions. This is intended toensure a fair and thorough review, eliminate inconsistencies in procedure, and toencouragepublicparticipation.Waste brought to transfer stations occurs around the clock, but peaks during thesecond shift, between the hours of 8 AM and 12 PM, as a response to density ofresidential collection routes and municipal trucks collection shift scheduling. Thetipping floor design must accommodate the peak arrival rate of municipal trucks,given that no intermediary transfer station will be used. In response to municipaltrucks scheduling, the facility needs tobeopen to acceptwaste 24hoursperday,over three shifts. During nighttime (8 PM to 8AM), when there will be fewermunicipal truck deliveries, the facility may be able to benefit from acceptingdeliveriesofcommercialwaste.The calculations to determine bay requirements are based on the followingassumptions,whichallowfordepositofapeakmaximumrateof200TPDofwaste:Thefacilitywilloperate24hoursperday,brokendownintothreeshifts.Inkeepingwithcompanylaborpolicies,weighingstationandtippingflooremployeeswillwork6.5hoursoutofeach8-hourshift,toallowforshiftchangesandbreaktime,sothefacilitywillacceptwasteatotalof19.5hoursoutofeach24-hourperiod.Thefacilitywill need tobe able to accept approximately 60 collection trucks eachday,with apeak rateof 10 trucks/hourbetween9AMand 11AM.Allowing forhourlypeakingfactorof150%,andseasonalpeakingfactorof125%,thisrequiresamaximumdepositcapacityof15trucksperhour.Consideringtheaboveoperatingschedule.Thefacilitywillemployapproximately50local individualsonafull-timebasis.Table8.1 liststhevariouspositionsandthestaffingrequirementsforeachposition.JobDescription PositionsRequiredFacilityManager 1AssistantManager 1ChiefEngineer 2AssistantEngineer 3ShiftSupervisors 6ControlRoomOperators 5CraneOperators 3Security 3ClericalStaff 6WeighBridge 2Community&VisitorCenter 3

Page 141: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

78 | P a g e

JobDescription PositionsRequiredGeneralLabor 15Total 50

Page 142: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

79 | P a g e

Annexure3.1 OverallMaterialFlowDiagram

Page 143: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

80 | P a g e

Annexure3.2 DetailedDescriptionoftheBoilerSeeFigure1foraschematicofahopperandgratedesignedforusewithsolidwastefuelsfromDetroitStoker.1)Hopper,2)Throat,3)Ram,4)Grates(reciprocating),5)Roller Bearings – these help in minimize friction and wear. 6) Hydraulic PowerCylinders and Control Valves -- allow for the individual movement of the gratesections.7)VerticalDropOff–whereprimaryairenters8)OverfireAirJets–wheresecondaryortertiaryairenters9)CombustionAir–primarycombustionairispulledinacrossthepit10)AutomaticSiftingRemovalSystem.

SchematicforaHopperandGrateDesignTheboilerproducesheatfromthecombustionofwasteandtransfersthisenergytowater,generatinghighpressuresteamtodrivetheturbine.Themostpopularboilerin the fieldofwaste to energy is thewaterwall boiler.Water tubes run along thewallsoftheboilertosimultaneouslycoolthewallsandheattheprocesswaterthatisheaded for the turbine. In this system the tubeson thewallsof theboiler containonly liquid water at a high pressure. Decreasing the pressure forces the water tovaporizeandmakesteam.Thissteam is furtherheated inasuperheaterbyexitingexhaustgases.

Page 144: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

81 | P a g e

Annexure3.3FacilityLayout

Figure2:SchematicofFacilityLayout

Page 145: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

82 | P a g e

Annexure3.3ConfidentialTechnicalDocuments

Page 146: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

83 | P a g e

Page 147: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

84 | P a g e

Page 148: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

85 | P a g e

Page 149: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

86 | P a g e

Page 150: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

87 | P a g e

Page 151: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

88 | P a g e

Page 152: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

89 | P a g e

Page 153: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

90 | P a g e

Page 154: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

91 | P a g e

Page 155: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

92 | P a g e

Page 156: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

93 | P a g e

Page 157: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

94 | P a g e

Page 158: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

95 | P a g e

Page 159: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

96 | P a g e

Page 160: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

97 | P a g e

Page 161: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

98 | P a g e

Page 162: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

99 | P a g e

Page 163: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

100 | P a g e

Page 164: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

101 | P a g e

Annexure4.1

MinistryofEnvironment,ForestandClimateChange(MoEFCC)DutiesofMinistryofEnvironment,ForestandClimateChange(MoEFCC):(1)TheMinistryofEnvironment,ForestandClimateChangeshallberesponsibleforoverallmonitoringofthe implementationoftheserules inthecountry. ItshallconstituteaCentralMonitoringCommitteeundertheChairmanshipofSecretary,MinistryofEnvironment,ForestandClimateChangecomprisingofficernotbelowtherankofJointSecretaryorAdvisorfromthefollowing:

1) MinistryofHousing&UrbanAffairs2) MinistryofRuralDevelopment3) MinistryofChemicalsandFertilizers4) MinistryofAgriculture5) CentralPollutionControlBoard6) Three State Pollution Control Boards or Pollution Control Committees by

rotation7) UrbanDevelopmentDepartmentsofthreeStateGovernmentsbyrotation8) RuralDevelopmentDepartmentsfromtwoStateGovernmentsbyrota�on9) ThreeUrbanLocalbodiesbyrota�on10) Twocensustownsbyrota�on11) FICCI,CII12) Twosubjectexperts

(2) This Central Monitoring Committee shall meet at least once in a year to monitor andreviewthe implementationoftheserules.TheMinistryofEnvironment,ForestandClimateChangemayco-optotherexperts, ifneeded.TheCommitteeshallbe renewedevery threeyears.ActionsRecommendedforMoEF&CCforimplementationoftheRule:Ministry of Environment, Forest and Climate Change (MoEF&CC) being overall responsiblefor monitoring of the implementation of the Rules, MOEF&CC may take up this workimmediatelybyinvitingallstakeholderstoappraisethemoftheirrolesandrequestthemtoplan&strategiseimplementationofthefunctionsentrustedtothem.Unlessallstakeholderscomeonboardandsimultaneouslyplanfortheactivitiestobeundertakenbythem,itwouldnotbepossibletoimplementtheRuleseffectivelyinthegiventimeframe.Soon after the first meeting, in initial six months, the monitoring committee may beconvenedonabi-monthlybasistotakeastockofthesituationsandascertainwhetherallthestakeholderslistedinRules'5'to'18'haveinitiatedthemeasuresentrustedtothemfollowedbyhalfyearlyreviewmeeting infirst twoyearstoreviewthe implementationoftheRules.Annualreviewmaybetakenonlythereafter.TheMoEF&CCmayalsoconsiderrollingouttherulesinallthestatesbyorganizingstatelevelsensitizationworkshopssimultaneouslyastimeisrunningout.

Page 165: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

102 | P a g e

MinistryofHousing&UrbanAffairs(MoHUA)DutiesofMinistryofHousing&UrbanAffairs(MoHUA):(1) The Ministry of Housing & Urban Affairs (MoHUA) shall coordinate with StateGovernmentsandUnionterritoryAdministrationsto:(a)takeperiodicreviewofthemeasurestakenbythestatesandlocalbodiesforimprovingsolid waste management practices and execution of solid waste management projectsfundedbytheMinistryandexternalagenciesatleastonceinayearandgiveadviceontakingcorrectivemeasures;(b) formulate national policy and strategy on solidwastemanagement including policy onwaste to energy in consultation with stakeholders within six months from the date ofnotificationoftheserules;(c)facilitateStatesandUnionTerritoriesinformulationofstatepolicyandstrategyonsolidmanagement based on national solid waste management policy and national urbansanitationpolicy;(d)promoteresearchanddevelopmentinsolidwastemanagementsectoranddisseminateinformationtoStatesandlocalbodies;(e)undertaketrainingandcapacitybuildingoflocalbodiesandotherstakeholders;and(f) provide technical guidelines and project finance to states, Union territories and localbodiesonsolidwastemanagementtofacilitatemeetingtimelinesandstandards.ActionsrecommendedonpriorityforimplementationoftheRule:1.MoHUAmayimmediatelyappointateamofconsultants/expertstopreparedraftnationalpolicyandstrategyonSolidWasteManagementincludingpolicyonwastetoenergywithinthreemonthsandorganisestakeholderconsultationsinclusiveofafewstaterepresentativesandexpertstocriticallylookatthepracticabilityofpolicy&strategypreparedbytheministrybeforenotifyingthepolicyandstrategy.2. IssuesuitableguidelinestotheStates/UTstopreparesimilarpolicyandstrategyfortheirrespectivestates.Thisneedtobedoneinatimeboundmannerasthetimelinegivenforthisactivityisalreadyover.3.MoHUAmayorganisestatelevelorregionalleveltrainingandcapacitybuildingprogramsfor sensitising local authorities and stakeholdersonvariousprovisionsofSWMRules, 2016and steps that need to be taken by various stakeholders for the implementations of theRulesbydrawingexpertsfromcentralagencies,institutionsandvariousstates.Thismaybeplanned on a war footing in consultation with state governments. While organising suchprograms,alllogisticsmaybeprovidedbystateagenciesintheirrespectivestatesusingSBMfunds,theMoHUAmaytaketheresponsibilitytoprovidefacultyforimpartingtraining.4. MoHUAmay immediately identify at least three to four institutions in the country andentrustthemthetaskofresearchanddevelopmentinthefollowingareasofSWM.

a. Identification of appropriate technologies for treatment of variouscomponentsofwastewithintheparametersofSWMRules,2016.

b. Identificationofsuitabletools,equipment,andvehiclesforstorageatsource,primarycollection,secondarystorageandtransportationofwasteinvariouslevelsofcitiesandtowns.

Page 166: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

103 | P a g e

c. ManpowerandmachineryrequirementsforvariousactivitiesinSWMsector.5. MoHUA may create a mechanism for funding the SWM projects in various states andreview the performance of local authorities and agencies through identifiedexperts/institutions on a quarterly basis in the first year followed by half yearly review insubsequentyears.MinistryofChemicalsandFertilizers(MoC&F)DutiesofDepartmentofFertilisers,MinistryofChemicalsandFertilisers:(1)TheDepartmentofFertilisersthroughappropriatemechanismsshall:(a)providemarketdevelopmentassistanceoncitycompost;and(b)ensurepromotionofco-marketingofcompostwithchemicalfertilisersintheratioof3to4bags:6to7bagsbythefertilisercompaniestotheextentcompost ismadeavailableformarketingtothecompanies.ActionsRecommendedforimplementationoftheRule:Thesuccessofcompostingindustrywilldependheavilyonthissupportfromthisministrytothelocalbodiesandtowasteprocessingindustryinthecountry.Thedepartmentmaythereforetakethefollowingmeasuresexpeditiously:

1. TheDepartmentofFertilizersintheMinistryofChemicalsandFertilizersmaycreateadatabaseofcompostplantssetup inallurbancentres in India inconsultationwithCentralPollutionControlBoardandrespectivestategovernments.

2. Createastatewisemechanismtoascertainwhetherthecompostmeetsthequalitystandardslaiddownandthequantityofcompostproducedeachday/month.

3. Createamechanismforitsmarketingwithinthestatetotheextentpossiblethroughtheir fertilizeroutletsalongwithchemical fertilizers intheproportionmentioned intheRules.

4. Optimallyutilisethemarketdevelopmentassistancefund inpropagatingtheuseofcompostwithchemicalfertilizertoprotectsoilhealthandtransportofcompostfromtheproducerstotheconsumerend.

MinistryofAgriculture&FarmersWelfare(MoAFW)DutiesofMinistryofAgriculture&FarmersWelfare,GovernmentofIndia:TheMinistryofAgriculture&FarmersWelfare,throughappropriatemechanisms,shall:

(a) provideflexibilityinFertiliserControlOrderformanufacturingandsaleofcompost;(b) propagateu�lisa�onofcompostonfarmland;(c) setup laboratoriestotestqualityofcompostproducedby localauthoritiesortheir

authorisedagencies;and(d) issue suitableguidelines formaintaining thequalityof compost and ratioofuseof

compostvisa-a-vischemicalfertilizerswhileapplyingcomposttofarmland.

Page 167: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

105 | P a g e

wastetoenergyprojectsoveraperiodofnext20-25yearsfromthequality&quantityof nonbiodegradable combustiblewaste that are allowed to be utilised for powergeneration.

3. The ministry may determine the tariff or charges for the purchase of power

generatedfromwastetoenergyplantsbycriticallylookingatthecostofgeneratingpowerattheseplantsandthefairratethatneedtobepaidforthesustainabilityofsuchplantsinthecountry.

4. Theministrymaymandatethepowerdistributioncompaniestopurchasethepower

fromwastetoenergyplantsattheratesprescribed.MinistryofNewandRenewableEnergy(MNRE)DutiesofMinistryofNewandRenewableEnergy(MNRE):TheMinistryofNewandRenewableEnergythroughappropriatemechanismsshall:(a)facilitateinfrastructurecreationfor'wastetoenergy'plants;and(b)provideappropriatesubsidyorincentivesforsuch'wastetoenergy'plants.ActionsRecommendedforimplementationoftheRules:

1. MNREhasaveryimportantroletoplayinthepromotionofwastetoenergyplants.The ministry needs to carefully look at the SWM Rules, 2016 and evaluate thepotentialofgeneratingpowerfromthenonrecyclablecombustiblefractionofwasteand give suitable advice to local authorities and investors about the suitability ofurbanresidualcombustiblewasteforgenerationofpoweratareasonablecost.

2. Ministrymayadvisethestatesandlocalauthoritiesonappropriatetechnologiesthatcouldbeadoptedforpowergenerationfromsolidwaste.

3. Theministrymay assess the capital andO&M cost of 'waste to energy' plants andworkout the viability gap and come up with an incentive scheme for promoting'wastetoenergy'plantsinthecountry.

4. Ministry may facilitate creation of necessary infrastructure for facilitatingconstructionof'wastetoenergy'plants.

Secretary,UrbanDevelopment(States&Uts)DutiesoftheSecretary–in-charge,UrbanDevelopmentintheStatesandUnionTerritories(UTs):(1)TheSecretary,UrbanDevelopmentDepartment in theStateorUnionTerritory throughtheCommissionerorDirectorofMunicipalAdministrationorDirectoroflocalbodiesshall,-(a)preparea statepolicyandsolidwastemanagementstrategy for thestateor theunionterritory in consultation with stakeholders including representative of waste pickers, self

Page 168: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

104 | P a g e

ActionsRecommendedforimplementationoftheRules:

1. TheMinistryofAgriculture&FarmersWelfareneedtotakeaveryproactivemeasureineducatingthefarmersonthebenefitsofuseofcitycompostintheirfarmlandtoprotect soil health from the adverse impacts of using chemical fertilizer, improveporosityofsoilandmoistureretainingcapacityandprovidedesirednutrientstotheplants.

2. The use of compost may be integrated in the Ministry's ongoing campaigns for

increasingagricultureproduction.

3. Theministrymaycritically lookat thegroundrealityof thequalityofcompost thatcan be produced fromurban biodegradablewaste and the standard laid down forcity compost in the fertilizer control order and considers providing flexibility inacceptanceof compost for application on farm landwithout compromising on thecriticalaspects.

4. Withaviewtofacilitatelocalauthoritiesandoperatorsofthecompostingfacilitiesto

testthequalityofcomposttheyproducefromtimetotime,theministrymaysetuporfacilitateprivatesectorsettinguplaboratories invariouspartsofthestatesonachargeablebasistomakethemselfsustainableandcreateamechanismofcertifyingwhetherthecompostmeetsthequalityasperthefertilizercontrolorder.

5. Theministrymay guide themanufactures on adopting processes thatmay help in

maintainingqualityofcompostanditsmarketability.

6. The ministry may issue guidelines on the use of compost along with chemicalfertilizersinsuitableproportionsforvarioustypesofagriculturalproducts.

MinistryofPower(MoP)DutiesoftheMinistryofPower:TheMinistryofPowerthroughappropriatemechanismsshall:

(a) decide tariff or charges for the power generated from thewaste to energy plantsbasedonsolidwaste.

(b) compulsory purchase power generated from such waste to energy plants bydistributioncompany.

ActionsRecommendedforimplementationoftheRule:1. The Ministry of Power, in co-ordination with Central Pollution Control Board, may

createadatabaseofexistingwastetoenergyplants,thenewwastetoenergyplantscomingupinthecountryandtheirpotentialofgeneratingpowerfromwaste.

2. Theministrymaylookattherecentreportofthetaskforceonwastetoenergyset

up by the planning commission (12thMay 2014) and assess the future potential of

Page 169: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

105 | P a g e

wastetoenergyprojectsoveraperiodofnext20-25yearsfromthequality&quantityof nonbiodegradable combustiblewaste that are allowed to be utilised for powergeneration.

3. The ministry may determine the tariff or charges for the purchase of power

generatedfromwastetoenergyplantsbycriticallylookingatthecostofgeneratingpowerattheseplantsandthefairratethatneedtobepaidforthesustainabilityofsuchplantsinthecountry.

4. Theministrymaymandatethepowerdistributioncompaniestopurchasethepower

fromwastetoenergyplantsattheratesprescribed.MinistryofNewandRenewableEnergy(MNRE)DutiesofMinistryofNewandRenewableEnergy(MNRE):TheMinistryofNewandRenewableEnergythroughappropriatemechanismsshall:(a)facilitateinfrastructurecreationfor'wastetoenergy'plants;and(b)provideappropriatesubsidyorincentivesforsuch'wastetoenergy'plants.ActionsRecommendedforimplementationoftheRules:

1. MNREhasaveryimportantroletoplayinthepromotionofwastetoenergyplants.The ministry needs to carefully look at the SWM Rules, 2016 and evaluate thepotentialofgeneratingpowerfromthenonrecyclablecombustiblefractionofwasteand give suitable advice to local authorities and investors about the suitability ofurbanresidualcombustiblewasteforgenerationofpoweratareasonablecost.

2. Ministrymayadvisethestatesandlocalauthoritiesonappropriatetechnologiesthatcouldbeadoptedforpowergenerationfromsolidwaste.

3. Theministrymay assess the capital andO&M cost of 'waste to energy' plants andworkout the viability gap and come up with an incentive scheme for promoting'wastetoenergy'plantsinthecountry.

4. Ministry may facilitate creation of necessary infrastructure for facilitatingconstructionof'wastetoenergy'plants.

Secretary,UrbanDevelopment(States&Uts)DutiesoftheSecretary–in-charge,UrbanDevelopmentintheStatesandUnionTerritories(UTs):(1)TheSecretary,UrbanDevelopmentDepartment in theStateorUnionTerritory throughtheCommissionerorDirectorofMunicipalAdministrationorDirectoroflocalbodiesshall,-(a)preparea statepolicyandsolidwastemanagementstrategy for thestateor theunionterritory in consultation with stakeholders including representative of waste pickers, self

Page 170: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

106 | P a g e

help group and similar groupsworking in the field ofwastemanagement consistentwiththeserules,nationalpolicyonsolidwastemanagementandnationalurbansanitationpolicyoftheministryofurbandevelopment, inaperiodnot laterthanoneyearfromthedateofnotificationoftheserules;(b)whilepreparingStatepolicyandstrategyonsolidwastemanagement, layemphasisonwaste reduction, reuse, recycling, recoveryandoptimumutilisationofvariouscomponentsofsolidwastetoensureminimisationofwastegoingtothe landfillandminimise impactofsolidwasteonhumanhealthandenvironment;(c)statepoliciesandstrategiesshouldacknowledgetheprimaryroleplayedbytheinformalsector of waste pickers, waste collectors and recycling industry in reducing waste andprovidebroadguidelinesregarding integrationofwastepickeror informalwastecollectorsinthewastemanagementsystem.(d)ensureimplementationofprovisionsoftheserulesbyalllocalauthorities;(e)directthetownplanningdepartmentoftheStatetoensurethatmasterplanofeverycityin the State or Union territory provisions for setting up of solid waste processing anddisposalfacilitiesexceptforthecitieswhoaremembersofcommonwasteprocessingfacilityorregionalsanitarylandfillforagroupofcities;and(f)ensureidentificationandallocationofsuitablelandtothelocalbodieswithinoneyearforsettingupofprocessinganddisposalfacilitiesforsolidwastesandincorporatetheminthemasterplans(landuseplan)oftheStateorasthecasemaybe,citiesthroughmetropolitananddistrictplanningcommitteesortownandcountryplanningdepartment;(h) direct the town planning department of the State and local bodies to ensure that aseparate space for segregation, storage, decentralised processing of solid waste isdemarcated in thedevelopmentplan forgrouphousingorcommercial, institutionaloranyothernon-residentialcomplexexceeding200dwellingorhavingaplotareaexceeding5,000squaremeters;(i) direct the developers of Special Economic Zone, Industrial Estate, Industrial Park toearmarkatleastfivepercentofthetotalareaoftheplotorminimumfiveplotsorshedsforrecoveryandrecyclingfacility.(j) facilitate establishment of common regional sanitary land fill for a group of cities andtownsfallingwithinadistanceof50km(ormore)fromtheregionalfacilityonacostsharingbasisandensureprofessionalmanagementofsuchsanitarylandfills;(k) arrange for capacity building of local bodies inmanaging solidwaste, segregation andtransportationorprocessingofsuchwasteatsource;(l)notifybufferzoneforthesolidwasteprocessinganddisposalfacilitiesofmorethanfivetonsperdayinconsultationwiththeStatePollutionControlBoard;and(m)startaschemeonregistrationofwastepickersandwastedealers.

Page 171: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

107 | P a g e

ActionsRecommendedforImplementationoftheRules:TheSecretary,UrbanDevelopmentDepartment(UDD)ofstates/UTshasaverycriticalroletoplayatthestateleveltofacilitateandensuretheimplementationoftheRulesbytheurbanlocalauthoritiesinthestate.Themostcriticalactivitiesthatsecretary,UDDneedtotakeupsimultaneouslyis:

• PrepareStatePolicyandStrategyonSWMinlinenationalpolicyandstrategythatmaybepreparedbyMoHUA layingemphasisonwasteReduce,Reuse,Recycle&Recovery(RRRR)andintegratinginformalsectorinwastemanagementsystems.

• EnsureimplementationofSWMRulesbyalllocalauthorities• Identificationandallocationoflandforprocessinganddisposalofwaste• Facilitate establishment of common landfills for cluster of cities to achieve

economyofscaleandfacilitateprofessionalmanagementoflandfills.• Notifybufferzone/nodevelopmentzonearoundprocessinganddisposalfacilities• Arrangetrainingandcapacitybuildingprogrammes

TheSecretary,UDDofstategovernmentsmayini�atethefollowingsteps:

1. SecretaryUDDmayappraiseallurbanlocalbodies inthestateabouttheprovisionsof SWM Rules 2016, the timelines to be achieved and motivate them to takeappropriatemeasures towards implementationsof theRules.Hemay lay stressonensuring:

a. Community participation and waste Reduce, Reuse, Recycle & Recovery

(RRRR)b. Segregation of wet and dry waste and storage of waste at source in two

separatebins,involvementofwastepickersandrecyclersinreducingwastec. Doortodoorcollectiond. Decentralised processing and minimising collection and transport cost and

wastegoingtolandfillse. Settingupofregionalcommonlandfillsfordisposalofresidualwastef. Payuserchargesforthesustainabilityofthesystem.

2. Secretary UDD may simultaneously assign the task to prepare state policy and

strategy on SWM before December, 2017. This document may be fine tuned onreceivingnationalpolicyandstrategydocumentfromMOUDandthencirculatedtolocalbodiesinthestatewithinthetimelimitofoneyearprescribedintherules.

3. Secretary UDDmay assess the requirement of land for processing and disposal of

wastebyvarious sizesof cities& towns in the stateadopting theyard sticksgivenbelowandascertaintheavailabilityofsuitablelandwithlocalbodies.

S.No.

Cluster sizepopulation

Land requirement forregional landfill per 1 lakhpopulation

Land requirement forprocessing of wasteper1 lakhpopulation

1 1to5lakh 15Acres 1acre2 5to10lakh 12Acres 1acre3 10lakh+ 8Acres 1acre

Page 172: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

108 | P a g e

4. Advisethedistrictcollectorstoallocatesuitablelandtothelocalauthoritieswhodo

nothavesuitableland/adequatelandforsettingupprocessinganddisposalfacilityinagiventimeframe.

5. Withaviewtominimizerequirementoflandforsanitarylandfills,economiseinO&M

costoflandfills,facilitateprofessionalmanagementoflandfillsandreducethescopeof public outcry against setting up city wise landfills very close to habitation,SecretaryUDDmayfacilitateestablishmentofregionalsanitary landfills inthestateforclusterofcitieswhichareclosetoeachother.

6. Hemayidentifylargeparcelsofwastelandawayfromhabitationwhichcanmeet20-

25years'requirementsoflandfortheclusterofthecitiesfallingwithinaradiusof50km from the land identified and develop a mechanism of its professionalmanagementon a cost sharingbasis. Satellite imagerymaybeused for identifyinglarge parcels of land in the state which could be allocated for setting up regionalfacilities.

7. ThesecretaryUDDmaywiththeassistanceofDMAorCMAorDMdeterminebuffer

zone for restricting development around the processing and disposal sites. Aminimum distance as advised by CPHEEO, MOHUA may be notified from theboundary of the land required for processing and disposal of waste prohibitingdevelopmentinthatarea.Assuchthisbufferzonemaybeincludedwithinthelandtobe allocated to local authorities to ensure that no development takes placewithinthebufferzone.

8. Withaviewtopromoterecoveryofrecyclablesandrecyclingofwaste,thesecretary

UDD may direct the developers of special economic zones, industrial estates andindustrial park to earmark at least 5% of their total land and construct shades forresource recovery, segregation and recycling ofwaste and direct all the industriessituatedwithintheestatetoavailthisfacilitytopromoterecycling.

9. SecretaryUDDmay give special emphasis to training and capacity buildingof local

bodies intheareasofsegregationandprocessingatsourceofwastegenerationaswellasinthecollection,transportation,communityorcitylevelprocessingandfinaldisposalofresidualwasteatthesanitarylandfill.

10. With a view to promote recycling andwasteminimization, the secretaryUDDmay

facilitateregistrationofwastepicker,recyclersandwastedealersintheirrespectivecities so that theycouldbe involved indoor todoor collectionof recyclablesor itscollectionfrommaterialrecoveryfacilities.Thewastepickerscouldbemotivatedtoget involved in door to door collection ofwaste in away that they take away therecyclables to earn their living and also derive some income from door to doorcollectionofotherwastetoimprovetheirfinancialhealthandqualityoflife.

11. Withaviewtopromotedecentralizedprocessinginthestate,thesecretaryUDDmay

direct its town planning department and municipal authorities to ensure thatadequatespace isearmarkedforsegregation,storageanddecentralizedprocessingof solidwaste in all schemes of group housing or commercial, institutional or nonresidentialcomplexeshavingmorethan200dwellingunitsoraplotareaexceeding

Page 173: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

109 | P a g e

5000 sq meters. This may be done by adding a condition in the building planregulations as well as by listing out all existing housing schemes, commercial andinstitutionalcomplexesthatfallintheabovecategoryanddirectthemtosetapartaportion of land and create common facilities for storage and processing of wastewithinthecampus.

12. ThesecretaryUDDasheadofthedepartmentmaycreateamechanismtoreviewthe

performance of all urban local bodies under his charge once in quarter and takesuitablemeasuresforexpeditiousimplementationoftheRules.

Secretary,VillagePanchayatsorRuralDevelopmentDepartmentDutiesoftheSecretary–in-chargeofVillagePanchayatsorRuralDevelopmentDepartmentintheStatesandUnionTerritories:(1)TheSecretary–in-chargeofVillagePanchayatsorRuralDevelopmentDepartment in theState and Union territory shall have the same duties as the Secretary–in-charge, UrbanDevelopmentintheStatesandUnionterritories,fortheareaswhicharecoveredundertheserulesandareundertheirjurisdictions.ActionsRecommendedforimplementationoftheRule:

• Thesecretary inchargeofgrampanchayats (withwhatevernamecalled)needtoplaythesimilarroleasenvisagedfromsecretaryurbandevelopment,inrespectiveofcensustowns(urbanisedpanchayatsabove5000populationthataredeclaredascensustownsintheirstates.

• The Secretary Panchayats need to list out the panchayats that are declared ascensus towns in each district, appraise the district and block level developmentofficers to educate the notified census towns on their role and responsibilitiesunderasSWMRules,2016.

• For the sake of uniformity, the secretary may get developed simple IEC(Information, Education and Communication)material in vernacular language forcreatingpublicawareness incensustownsandshare itwithallthedistrictsunderhischarge.

• Regionaltrainingprogramsmaybeorganisedforcensustowns.Districtandblocklevelofficers inchargeofSwachhBharatMission(SBM)maybechargedwiththeresponsibilitytoensurethatthecensustownsimplementtheRuleseffectively.

• Villages being small entities, very simple systems of waste management may beadoptedanddecentralizedprocessingatthedoorsteporatacommunitylevelmaybe advocated. Segregation and storage of bio-degradable (food waste) and nonbiodegradablewastesmaybeinsistedatsource.

• Emphasismaybelaidonhomecompostingorbio-gasgeneration.Thesegregatedrecyclablescanbepassedontowastepickersorrecyclersfromthedoorsteporitmay be collected by the panchayats, stored at a common shade and sold outperiodicallytorecyclers.

• The panchayatsmay have to be additionally educated onmanaging animal dungand animal feed waste. Such wastes are generally deposited by each ruralhouseholdon thestreets.Suchsitesofwastedepositioncouldbeconverted into

Page 174: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

110 | P a g e

vermi-pitsandanimaldungcanbeconverted intoausefulbioorganicfertiliserbythehouseholds.

• The panchayats could be encouraged to continue the current practice ofhouseholdscleaningtheareasinfrontofthedwellingunitsandorganisesweepingofcommercialstreetsandimportantpublicplacesschools,officesetc.

DistrictMagistrateorDistrictCollectororDeputyCommissionerDutiesofDistrictMagistrateorDistrictCollectororDeputyCommissioner:TheDistrictMagistrateorDistrictCollectororasthecasemaybe,theDeputyCommissionershall:

§ facilitateidentificationandallocationofsuitablelandasperclause(f)ofRule'11'forsetting up solid waste processing and disposal facilities to local authorities in hisdistrict in close coordination with the Secretary-in-charge of State UrbanDevelopment Department within one year from the date of notification of theserules;

§ review the performance of local bodies, at least once in a quarter on wastesegregation, processing, treatment and disposal and take corrective measures inconsultation with the Commissioner or Director of Municipal Administration orDirectoroflocalbodiesandsecretary-in-chargeoftheStateUrbanDevelopment.

ActionsRecommendedforImplementationoftheRules:The District Magistrate is the most respected officer in the district administration havingwidepowersandhiswordsaretreatedascommands.Hehastwoprincipalrolestoplay.1)InclosecoordinationwithsecretaryUDDofthestate,prepareadatabaseofurbanlocalbodiesandcensustownsinhisdistrict,theirpopulation,wastegenerationrate,requirementof land for processing and disposal of residual waste (as per yard stick given earlier) andavailability of suitable land with each urban area. He may identify the deficiency in theavailability of landwith the local authorities and allocate suitable lands for processing anddisposalofwaste to theurban localbodieswhichdonothave suitable landavailablewiththem.Hemayallocatethelandeitherfreeofcostoronatokenleaserentforaperiodof25-30years.2) Review the performance of urban local bodies and census towns in his district at leastonce in a quarter to ensure waste segregation, collection, transportation, processing anddisposal as per SWMRules, 2016 and take correctivemeasures as required in consultationwithCMA,DMAandsecretaryUDD/panchayats.

Page 175: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

111 | P a g e

CentralPollutionControlBoard(CPCB)DutiesofCentralPollutionControlBoard.-TheCentralPollutionControlBoardshall:(a)co-ordinatewiththeStatePollutionControlBoardsandthePollutionControlCommitteesfor implementation of these rules and adherence to the prescribed standards by localauthorities;(b) formulate the standards for ground water, ambient air, noise pollution, leachate inrespectofallsolidwasteprocessinganddisposalfacilities;(c) review environmental standards and norms prescribed for solid waste processingfacilitiesortreatmenttechnologiesandupdatethemasandwhenrequired;(d)reviewthroughStatePollutionControlBoardsorPollutionControlCommittees,at leastonce in a year, the implementation of prescribed environmental standards for solidwasteprocessingfacilitiesortreatmenttechnologiesandcompilethedatamonitoredbythem;(e)reviewtheproposalsofStatePollutionControlBoardsorPollutionControlCommitteesonuseofanynewtechnologiesforprocessing,recyclingandtreatmentofsolidwasteandprescribeperformancestandards,emissionnormsforthesamewithin6months;(f) monitor through State Pollution Control Boards or Pollution Control Committees theimplementationoftheserulesbylocalbodies;(g) prepare an annual report on implementation of these rules on the basis of reportsreceivedfromStatePollutionControlBoardsandCommitteesandsubmittotheMinistryofEnvironment,ForestandClimateChangeandthereportshallalsobeputinpublicdomain;(h)publishguidelines formaintainingbufferzonerestrictinganyresidential,commercialorany other construction activity from the outer boundary of the waste processing anddisposalfacilitiesfordifferentsizesoffacilitieshandlingmorethanfivetonsperdayofsolidwaste;(i) publish guidelines, from time to time, on environmental aspects of processing anddisposalofsolidwastetoenable localbodies tocomplywiththeprovisionsof theserules;and(j)provideguidancetoStatesorUnionterritoriesoninter-statemovementofwaste.ActionsRecommendedforImplementationoftheRules:

• CPCB is an apexbody for preventing environmental pollution in the country. TheCPCBneedtokeepatrackontheimplementationoftheseRulesthroughtheeyesofStatePollutionControlBoards/Committees.

• Itmay in initial three years, takeaquarterly reviewof the implementationof theRules by urban local bodies, census towns and other entities covered under theRules through State Pollution Control Boards and advise them to take follow-up/punitiveaction.Themostimportantroleishowevertoprescribethestandardsof ground water, ambient air, noise pollution, leachate in respect of newtechnologies in SWM sector and monitor the adherence to environmentalstandards prescribed from time to time for SolidWaste processing facilities anddisposalsitesinthecountry.

• It needs to ensure that these standards are maintained by all local authorities/operators of the facility. CPCB may take a half yearly critical review of the

Page 176: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

112 | P a g e

adherence to the standards by local authorities and operators of the facilitiesthrough State Pollution Control Boards/Committees and through its own staffwhereconsiderednecessary.

• As the apex body it may also issue guidelines from time to time on theenvironmental aspects of processing and disposal facilities and also publishguidelines formaintaining buffer zones restricting any residential, commercial oranyotherconstructionactivity fromtheouterboundaryofprocessingordisposalfacilityofdifferentcapacities.

• The CPCB may issue guidelines on inter-state movement of waste to facilitatesettingupofregionalprocessinganddisposalfacilities

StatePollutionControlBoardorPollutionControlCommitteesDutiesofStatePollutionControlBoardorPollutionControlCommittee:(1)TheStatePollutionControlBoardorPollutionControlCommitteeshall,-

(a) enforcetheserulesintheirStatethroughlocalbodiesintheirrespectivejurisdictionandreviewimplementationoftheserulesatleasttwiceayearinclosecoordinationwith concernedDirectorate ofMunicipal Administration or Secretary-in-charge ofStateUrbanDevelopmentDepartment;

(b) monitorenvironmental standardsandadherence toconditionsas specifiedundertheScheduleIandScheduleIIforwasteprocessinganddisposalsites;

(c) examine the proposal for authorisation and make such inquiries as deemed fit,after the receiptof theapplication for thesame inForm I fromthe localbodyoranyotheragencyauthorisedbythelocalbody;

(d) whileexaminingtheproposalforauthorisation,therequirementofconsentsunderrespective enactments and views of other agencies like the State UrbanDevelopment Department, the Town and Country Planning Department, DistrictPlanning Committee or Metropolitan Area Planning Committee, as may beapplicable,AirportorAirbaseAuthority,theGroundWaterBoard,Railways,powerdistributioncompanies,highwaydepartmentandother relevantagenciesshallbetaken into consideration and they shall be given four weeks time to give theirviews,ifany;

(e) issueauthorisationwithinaperiodofsixtydays inFormII tothe localbodyoranoperator of a facility or any other agency authorised by local body stipulatingcompliancecriteriaandenvironmentalstandardsasspecified inSchedules Iand IIincludingotherconditions,asmaybenecessary;

(f) synchronisethevalidityofsaidauthorisationwiththevalidityoftheconsents;(g) suspendor cancel the authorization issuedunder clause (a) any time, if the local

body or operator of the facility fails to operate the facility as per the conditionsstipulated: provided that no such authorization shall be suspended or cancelledwithoutgivingnoticetothelocalbodyoroperator,asthecasemaybe;and

(h) onreceiptofapplicationforrenewal, renewtheauthorisationfornext fiveyears,after examining every applica�on onmerit and subject to the condition that theoperator of the facility has fulfilled all the provisions of the rules, standards orconditionsspecifiedintheauthorisation,consentsorenvironmentclearance.

Page 177: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

113 | P a g e

(2) The State Pollution Control Board or Pollution Control Committee shall, after givingreasonable opportunity of being heard to the applicant and for reasons thereof to berecordedinwriting,refusetograntorrenewanauthorisation.(3) In case of new technologies,where no standards have been prescribed by the CentralPollutionControlBoard,StatePollutionControlBoardorPollutionControlCommittee,asthecasemaybe,shallapproachCentralPollutionControlBoardforgettingstandardsspecified.(4)TheStatePollutionControlBoardorthePollutionControlCommittee,asthecasemaybe,shall monitor the compliance of the standards as prescribed or laid down and treatmenttechnologyasapprovedandtheconditionsstipulatedintheauthorisationandthestandardsspecified inSchedules I and IIunder these rulesasandwhendeemedappropriatebutnotlessthanonceinayear.(5)TheStatePollutionControlBoardorthePollutionControlCommitteemaygivedirectionstolocalbodiesforsafehandlinganddisposalofdomestichazardouswastedepositedbythewastegeneratorsathazardouswastedepositionfacilities.(6)TheStatePollutionControlBoardorthePollutionControlCommitteeshallregulateInter-Statemovementofwaste.ActionsRecommendedforImplementationoftheRules:State Pollution Control Board (SPCB) has a very critical role to play for enforcing theimplementationoftheRulesintherespectivestates.TheSPCBmaythereforedrawoutplantoeffectivelyensureimplementationoftheRuleswhichmayinclude:

• Reviewimplementationofrulestwiceayearandenforcecompliance• Monitoradherencetoenvironmentalstandards• Giveauthorizationforsettinguptreatmentanddisposalfacilities• Regulateinter-statemovementofwaste• Givedirectionstolocalbodiesforsafehandlinganddisposalofdomestichazardous

waste• GetthestandardslaiddownthroughCPCBforthetechnologieswhicharenewand

nostandardshavebeenprescribedearlier• Take proactive measure to appraise the local authorities from time to time the

deficiency observed in the implementation of the Rules and the correctivemeasures the local authorities need to take to avoid penal action. This programcouldbejointlyorganizedbythestateagencyandstatePCBatleastonceinayear.

Local(Municipal)Authorities,VillagePanchayatsofCensusTowns&UrbanAgglomerationsDutiesandresponsibilitiesoflocalauthoritiesandvillagePanchayatsofcensustownsandurbanagglomerations.-ThelocalauthoritiesandPanchayatsshall,-(a) prepareasolidwastemanagementplanasperstatepolicyandstrategyonsolidwaste

management within six months from the date of notification of state policy and

Page 178: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

114 | P a g e

strategyandsubmitacopytorespectivedepartmentsofStateGovernmentorUnionterritory Administration or agency authorised by the State Government or UnionterritoryAdministration;

(b) arrange for door-to-door collection of segregated solid waste from all householdsincluding slums and informal settlements, commercial, institutional and other nonresidentialpremises.Frommulti-storagebuildings,largecommercialcomplexes,malls,housing complexes, etc., this may be collected from the entry gate or any otherdesignatedlocation;

(c) establish a system to recognise organisations of waste pickers or informal wastecollectors and promote and establish a system for integration of these authorizedwaste-pickers and waste collectors to facilitate their participation in solid wastemanagementincludingdoortodoorcollectionofwaste;

(d) facilitateformationofSelfHelpGroups,provideidentitycardsandthereafterencourageintegrationinsolidwastemanagementincludingdoortodoorcollectionofwaste;

(e) framebye-lawsincorporatingtheprovisionsoftheseruleswithinoneyearfromthedateofnotificationoftheserulesandensuretimelyimplementation;

(f) prescribefrom�meto�meuserfeeasdeemedappropriateandcollectthefeefromthewastegeneratorsonitsownorthroughauthorisedagency;

(g) directwastegenerators not to litter i.e. throwordisposeof anywaste such aspaper,waterbottles,liquorbottles,so�drinkcanes,tetrapacks,fruitpeel,wrappers,etc.,orburn or burry waste on streets, open public spaces, drains, waste bodies and tosegregate the waste at source as prescribed under these rules and hand over thesegregatedwaste toauthorised thewastepickersorwaste collectorsauthorisedbythelocalbody;

(h) set-upmaterialrecoveryfacilitiesorsecondarystoragefacilitieswithsufficientspaceforsorting of recyclable materials to enable informal or authorised waste pickers andwaste collectors to separate recyclables from thewaste and provide easy access towaste pickers and recyclers for collection of segregated recyclable waste such aspaper, plastic, metal, glass, textile from the source of generation or from materialrecovery facilities; Bins for storageofbio-degradablewastes shall bepaintedgreen,thoseforstorageofrecyclablewastesshallbeprintedwhiteandthoseforstorageofotherwastesshallbeprintedblack;

(i) establishwastedepositioncentresfordomestichazardouswasteandgivedirectionforwaste generators to deposit domestic hazardous wastes at this centre for its safedisposal.Suchfacilityshallbeestablishedinacityortowninamannerthatonecentreis set up for the area of twenty square kilometres or part thereof and notify thetimingsofreceivingdomestichazardouswasteatsuchcentres;

(j) ensure safe storage and transportation of the domestic hazardous waste to thehazardouswastedisposalfacilityorasmaybedirectedbytheStatePollutionControlBoardorthePollutionControlCommittee;

(k) directstreetsweepersnottoburntreeleavescollectedfromstreetsweepingandstorethemseparatelyandhandover to thewastecollectorsoragencyauthorizedby localbody;

(l) providetrainingonsolidwastemanagementtowaste-pickersandwastecollectors;(m) collectwastefromvegetable,fruit,flower,meat,poultryandfishmarketondaytoday

basisandpromotesettingupofdecentralisedcompostplantorbiomethanationplantat suitable locations in the markets or in the vicinity of markets ensuring hygienicconditions;

Page 179: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

115 | P a g e

(n) collect separately waste from sweeping of streets, lanes and by-lanes daily, or onalternatedaysor twiceaweekdependingon thedensityofpopulation, commercialactivityandlocalsituation;

(o) set-upcoveredsecondarystoragefacilityfortemporarystorageofstreetsweepingsandsilt removed from surfacedrains in caseswheredirect collectionof suchwaste intotransport vehicles is not convenient. Waste so collected shall be collected anddisposedofatregularintervalsasdecidedbythelocalbody;

(p) collect horticulture, parks and garden waste separately and process in the parks andgardens,asfaraspossible;

(q) transport segregated bio-degradable waste to the processing facilities like compostplant,bio-methanationplantoranysuchfacility.Preferenceshallbegivenforonsiteprocessingofsuchwaste;

(r) transport non-bio-degradable waste to the respective processing facility or materialrecoveryfacilitiesorsecondarystoragefacility;

(s) transport construction anddemolitionwaste as per theprovisionsof theConstructionandDemolitionWasteManagementRules,2016;

(t) involvecommunitiesinwastemanagementandpromotionofhomecomposting,bio-gasgeneration,decentralisedprocessingofwasteatcommunitylevelsubjecttocontrolofodourandmaintenanceofhygienicconditionsaroundthefacility;

(u) phaseouttheuseofchemicalfertilizerintwoyearsandusecompostinallparks,gardensmaintained by the local body and wherever possible in other places under itsjurisdiction. Incentives may be provided to recycling initiatives by informal wasterecyclingsector.

(v) facilitate construction, operation and maintenance of solid waste processing facilitiesand associated infrastructure on their own or with private sector participation orthrough any agency for optimum utilisation of various components of solid wasteadoptingsuitabletechnologyincludingthefollowingtechnologiesandadheringtotheguidelines issued by theMinistry ofHousing&UrbanAffairs from time to time andstandardsprescribedbytheCentralPollutionControlBoard.Preferenceshallbegivento decentralised processing to minimize transportation cost and environmentalimpactssuchas:

a)bio-methanation,microbialcomposting,vermi-composting,anaerobicdigestionoranyotherappropriateprocessingforbio-stabilisationofbiodegradablewastes;

b)wastetoenergyprocessesincludingrefusederivedfuelforcombustiblefractionofwasteorsupplyasfeedstocktosolidwastebasedpowerplantsorcementkilns;

(w) undertake on their own or through any other agency construction, operation and

maintenance of sanitary landfill and associated infrastructure as per Schedule-I fordisposalofresidualwastesinamannerprescribedundertheserules;

(x) make adequate provision of funds for capital investments as well as operation andmaintenanceofsolidwastemanagementservicesintheannualbudgetensuringthatfunds for discretionary functions of the local body have been allocated only aftermeeting the requirementofnecessary funds for solidwastemanagementandotherobligatoryfunctionsofthelocalbodyaspertheserules;

(y) makeanapplicationinForm-Iforgrantofauthorisationforsettingupwasteprocessing,treatmentordisposal facility, if thevolumeofwaste isexceedingfivemetric tonnesper day including sanitary landfills from the State Pollution Control Board or thePollutionControlCommittee,asthecasemaybe;

Page 180: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

116 | P a g e

(z) submit application for renewalof authorisationat least sixtydaysbefore theexpiryofthevalidityofauthorisation;

(aa) prepare and submit annual report in Form IV on or before the 30th April of thesucceeding year to the Commissioner or Director, Municipal Administration ordesignatedOfficer;

(bb) the annual report shall then be sent to the Secretary -in-Charge of the StateUrbanDevelopmentDepartmentorvillagepanchayatorruraldevelopmentdepartmentandtotherespectiveStatePollutionControlBoardorPollutionControlCommitteebythe31stMayofeveryyear;

(cc) educate workers including contract workers and supervisors for door to doorcollection of segregatedwaste and transporting the unmixedwaste during primaryandsecondarytransportationtoprocessingordisposalfacility;

(dd) ensure that the operator of a facility provides personal protection equipmentincluding uniform, fluorescent jacket, hand gloves, raincoats, appropriate footwearand masks to all workers handling solid waste and the same are used by theworkforce;

(ee) ensurethatprovisionsforsettingupofcentresforcollection,segregationandstorageof segregated wastes, are incorporated in building plan while granting approval ofbuildingplanofagrouphousingsocietyormarketcomplex;and

(ff) framebye-lawsandprescribecriteriaforlevyingofspotfineforpersonswholittersorfails tocomplywiththeprovisionsof theserulesanddelegatepowerstoofficersorlocalbodiestolevyspotfinesasperthebyelawsframed;and

(gg) create public awareness through Information, Educa�on and Communication (IEC)campaignandeducatethewastegeneratorsonthefollowing;namely:-

1. nottolitter;2. minimisegenerationofwaste;3. reusethewastetotheextentpossible;4. practice segregation of waste into bio–degradable, non-biodegradable

(recyclableandcombustible),sanitarywasteanddomestichazardouswastesatsource;

5. practice home composting, vermi-composting, bio-gas generation orcommunitylevelcomposting;

6. wrap securely used sanitary waste as and when generated in the pouchesprovided by the brand owners or a suitablewrapping as prescribed by thelocalbodyandplacethesameinthebinmeantfornon-biodegradablewaste;

7. storageofsegregatedwasteatsourceindifferentbins;8. handover segregatedwaste towastepickers,waste collectors, recyclersor

wastecollectionagencies;and9. paymonthly user fee or charges towaste collectors or local bodies or any

other person authorised by the local body for sustainability of solid wastemanagement.

(hh) stoplandfillingordumpingofmixedwastesoonafterthetimelineasspecifiedinRule

'22'forsettingupandoperationalisationofsanitarylandfillisover;(ii) allowonlythenon-usable,non-recyclable,non-biodegradable,non-combustibleandnon-

reactive inertwaste and pre-processing rejects and residues fromwaste processingfacilities to go to sanitary landfill and the sanitary landfill sites shall meet thespecificationsasgiveninSchedule–I,however,everyeffortshallbemadetorecycleorreusetherejectstoachievethedesiredobjectiveofzerowastegoingtolandfill;

Page 181: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

117 | P a g e

(jj) investigate and analyse all old open dumpsites and existing operational dumpsites fortheir potential of bio-mining and bio-remediation and wherever feasible, takenecessaryactionstobio-mineorbio-remediatethesites;

(kk) inabsenceofthepotentialofbio-miningandbio-remediationofdumpsite, itshallbescientifically cappedasper landfill cappingnorms toprevent furtherdamage to theenvironment.

ActionsRecommendedforimplementationoftheRule:Municipalauthoritiesandvillagepanchayatsofcensus townsare theauthoritieswhichareprimaryresponsibleforthemanagementofSolidwasteintheirjurisdiction.TheseauthoritiesneedtotakeseriesofmeasurestoensurethattheSolidWaste isminimized,safelystored,collected,transported,processedanddisposedofinanenvironmentallyacceptablemanner.ThefollowingstepsmaybetakenonprioritybyalllocalauthoritiescoveredundertheRules:

• Preparesolidwastemanagementplanasperstatepolicy• Create public awareness on role of the community in the management of Solid

Waste• Prohibit littering, direct segregation of waste at source, arrange door to door

collection of segregated waste from households and other commercial andinstitutionalpremises

• Promotehomecomposting,bio-gasplant,communitylevelprocessing• Recognize organizations of waste pickers/informal recyclers and integrate them

intothesystemsofSWM• Set-up/facilitate the setting-upof, thoughprivate operator, a common facility for

bio-methanationorcompostingofsegregatedwetwaste.(Thoughhighincapitalcost,Biomethanation is apreferredoptionas itmayproduce lessodourandalsoproduceenergyorbio-fuel/gas)

• Setup/facilitatesettingupof,byprivatesector,MaterialRecoveryFacilities(MRF)as defined in the Rules, for sorting of recyclables by authorised wastepickers/recyclers etc and provide easy access to them at the facility. Such MRFshouldhaveestablishedchannelsforutilizationorrecyclingofsegregatedmaterial,such as plastic/metal/glass waste, to recyclers integrated with RDF Plant withlinkage to cement plants or to waste feed based industrial boilers or integratedwith'WastetoEnergy'plantstoproduceelectricity.

• Setup domestic hazardous waste deposition centres at suitable locations in theurban area. Each small city or townmay have at least one such centrewhere aslarge citiesmay havemultiple centres with density of 1 centre per 25 sq.km cityarea.

• FacilitateconstructionsandO&Mofwasteprocessingfacilities.• Transportsegregatedwastetowasteprocessingfacility/materialrecoveryfacility• Setupsanitarylandfillfordisposalofresidualwaste• Frame bye-laws within one year, prescribe spot fines & ensure timely

implementation.• Prescribeuserfees

Page 182: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

118 | P a g e

Descriptionofdutiesandresponsibilitiesofurban localbodies,urbanisedpanchayatsandurbanagglomerations:ThelocalauthoritiesmentionedaboveneedtotakeseveralactionssimultaneouslyasundertoensureexpeditiousimplementationoftheRulesasspeltoutinRule'15':i) The local authorities should carefully look at the state policy and strategy that may becirculated to themandprepareSolidWasteManagementplan for the localbodyand takemeasuresfortimeboundimplementationoftheRules.Thismaybedonebysettingupataskforcewithintheorganisationforpreparingtheplan.Externalassistanceofexpertsmaybetakenifandwhenrequiredtomakeacomprehensivesustainableplaninkeepingwithstatepolicy.ii)While thepolicydocument is underpreparation; the local bodymay in accordancewithSWMRules,2016; takeupamassivepublicawarenesscampaigntoeducatethemassesonthefollowing:a)Nottolitteronthestreets,openspaces,waterbodies,drainsetc.b)Keepat leasttwobinsof12-15 litrecapacityathomeoneforbiodegradable(wet)wasteandanotherfornonbiodegradable(dry)waste.c)Segregatewetanddrywasteatsourceandstoreinseparatebins.d)Makeanefforttodohomecompostingorbio-gasgenerationfrombio-degradablewasteandhandoverrecyclablestowastepickersorrecyclersandminimizethewasteatsourceandhandovertheremainingwastetothewastecollectorsdesignatedbythelocalauthority.e) Municipal authority may involve, educate and promote the community in homecomposting,bio-gasgenerationanddecentralisedprocessingensuringthatitdoesnotcauseanyunhygienicconditions,odouretc.f)Asandwhenanydomestichazardouswaste isgenerated, itmaynotbemixedwith thewaste kept in binsmeant forwet and drywaste and instead itmay be kept separate forbeinghandledseparatelyandsafely.g)AsandwhenConstructionandDemolition(C&D)orhorticulturewasteisgeneratedinthepremises,suchwasteshallalsobekeptseparateanddisposedoffasperC&DWasteRules2016andSWMRules2016respectively.iii) Theawareness campaignmaybe followedbyorganisingdoor todoor collectionof thesegregatedwaste. The local authoritymay identify areas accessible bymotorized vehiclesand non accessible areas in the city and plan for door to door collection on a daily basis.KeepinginviewhighdensityofIndianwaste,alightcommercialvehicleof3-5cumcapacitymay be procured per 2000 households and a containerised tricycle or hand cart may beprocured per 200 households for door to door collection from in accessible areas. Thecollectionvehiclesmayhavecentralpartitiontofacilitatecollectionofwetanddrywasteinseparatecompartmentsorcollectionsystem/timingsmaybespecifiedtocollectwetanddrywasteseparately.ThedoortodoorcollectionmaybeadoptedasperAnnexure–A.iv)Collectionfromlargecommercialcomplexesorgatedhousingsocietiesmaybeorganisedfromtheentrygateordesignatedlocationsinsteadofcollectingwastefromindividualunits.Suchcomplexescouldbedirectedtostoretheirwasteinasegregatedmanneratdesignatedlocationtofacilitateeasycollection

Page 183: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

119 | P a g e

v) With a view to promote recycling, identify or promote waste pickers/recyclers/associations /organisations/self-help-groupsandmakeaneffort to integrate them into thesystemofprimarycollectionofwastethatmayenablethemtopickuprecyclablesfromthedoorsteptoearntheirlivingwithoutbeingpartofthemunicipalestablishment.Theycouldbe given identity cards by the local authority as persons associated in Solid WasteManagementof thecity.Theassociationcouldparticipate in the tenderprocess for takingcontracts for door to door collection by suitably relaxing the condition of the contract infavourofinformalsectorwithoutcompromisingonthequalityofservice.vi)CreationofMaterialRecoveryFacilities(MRF)Theidealsituationwouldbetofacilitatethecollectionofrecyclablesfromthedoorstep.Inasituation where integration of waste pickers/recyclers has not been made at the wastecollection stage, the municipal authority may provide one more opportunity to wastepickers/authorisedrecyclerstopickuprecyclablesfromthewastestreambeforethewasteistakenupforprocessingordisposal.MRFmaybesetupatsuchlocationthatitmayminimisemultiple handling and transportation ofwaste. TheMRFmay therefore be suitably set upnearthetransferstationorata location incloseproximitytothewasteprocessingfacility.Wastepickers/recyclersmaybegivenfreeaccesstoMRFtopickuprecyclablessothatthequantity of waste is minimised and recyclables are optimally processed for deriving newproductsavingnaturalresources.TheMRFfacilityshouldhaveadequatespacetoenableragpickers/recyclerstoweedoutrecyclablesfromrestofthewaste.vii)Withaviewtoensuresafedisposalofdomestichazardouswaste,themunicipalauthoritymaysetuponeormorehazardouswastecollectioncentrewiththedensityof1suchcentreper25sqkmofthecityareaandgivedirectionstothecitizenstodepositalltheirdomestichazardouswasteatsuchcentreduringthe�mespecified.Themunicipalauthoritymaytieupand make arrangement with hazardous waste disposal facility in consultation with statepollution control board for ensuring safe transportation and disposal of such waste. Thecentresoestablishedmaybewellequippedtostoreseparatelyandsafelyvarioustypesofdomestichazardouswastes.viii) Themunicipal authoritymay promote seting up decentralized compost plants or bio-methanation plants at suitable locations within the vegetable, fruit, flower, meat, fish,poultry markets or in the vicinity of markets and minimise the cost of collection,transportation and centralized processing. Themarket associations could bemotivated toset up such facility and educate its members to segregate all bio-degradable wastes anddepositattheprocessingfacilitythatmaybecreatedwithinthemarketor inthevicinityofthemarketandcontributetowardsthecostofO&Mofsuchfacility.ix) Municipal authority may set up compost plants within the parks and gardens forprocessinghorticultureandgardenwasteandutilizethesamewithintheparksandgardenstotheextentpossiblethusminimizethecostofcollectionandtransportationofthisorganicmatteraswellasreducethecostofpurchasingfertilizers.x) The municipal authority may create a mechanism of collection and transportation ofdifferentstreamsofwasteasunder:

a)Bio-degradablewastefromthedoorsteptotheprocessingfacility

Page 184: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

120 | P a g e

b)Drynonbio-degradablewastes includingrecyclableswastesthatarenothandedovertowastepickersorrecyclersatthedoorstep,tothematerialrecoveryfacilitiessetupatsecondarystorage,transferstationoratwasteprocessingfacilityc)StreetsweepingstothedisposalsitethroughMRFd)ConstructionanddemodulationwastefromthecityintermsofC&DWasteRules,2016e)Horticultureandgardenwastethatcouldnotbecompostedwithinthepremises.

xi)Municipalauthoritymay identify locationswheresecondarystoragefacilitiesneedtobecreated to enable street sweepers to deposit the waste collected by them in theirhandcars/tricycles etc to facilitate onward transportation in bulk to the M R F/disposalfacilities.Suchfacilitiesmaybecreatedattherateofatleast4storagedepotspersqkmofthecityareaandtoensurethatabinisavailableatanintervalof500metersandsanitationworker does not have to walk for more than 250 meters to deposit his waste in thecontainer.Thesizeofcontainercoulddependonquantityofwasteexpectedtobereceivedatthedepot.Thesedepotsshouldbekeptcleanandthewastedepositedinthecontainersmustbetransportedbeforethebinsstartoverflowingoratleasttwiceaweekwhicheverisearlier.Effortshouldbemadetodirectlytransportthestreetsweepingsthroughcollec�onvehiclesandmakethecitybinless.xii) Municipal authority may construct or facilitate the construction, operation, andmaintenance of solid waste processing facilities on their own or through private sectorparticipation or through any agency and ensure optimum utilisation of all components ofwaste adopting most appropriate technology such as bio methenation, microbialcomposting,vermicomposting,anaerobicdigestiontechnologyand'wastetoenergy'fromcombustiblefractionofnonrecyclablewasteorkeepasidecombustiblematerialandsupplythesameasfeedstocktosolidwastebasedpowerplantsorcementkilns.xiii) Municipal authority may undertake on their own or through any other agency theconstruction, operation and maintenance of sanitary landfill and associated infrastructuresuchasinternalroads,office,shadeforparkingofvehiclesandmachineries,washroomsetcforthedisposalofresidualwastesuchasstreetssweepings,siltfromdrains,residualwastefromprocessingfacilitiesetc.ManufacturersorBrandOwnersofDisposableProductsandSanitaryNapkins&DiapersDutyofmanufacturersorbrandownersofdisposableproducts and sanitarynapkins anddiapers.-(1) All manufacturers of disposable products such as �n, glass, plas�cs packaging, etc., orbrandownerswho introducesuchproducts in themarket shallprovidenecessary financialassistancetolocalauthoritiesforestablishmentofwastemanagementsystem.(2)Allsuchbrandownerswhosellormarkettheirproductsinsuchpackagingmaterialwhichare non-biodegradable shall put in place a system to collect back the packaging wastegeneratedduetotheirproduction.(3)Manufacturersorbrandownersormarketingcompaniesofsanitarynapkinsanddiapersshall explore the possibility of using all recyclablematerials in their products or they shall

Page 185: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

121 | P a g e

provideapouchorwrapperfordisposalofeachnapkinordiapersalongwiththepacketoftheirsanitaryproducts.(4)Allsuchmanufacturers,brandownersormarketingcompaniesshalleducatethemassesforwrappinganddisposaloftheirproducts.ActionsRecommendedforimplementationoftheRules:Themanufacturersofdisposableproductsneedtobeconsciousabouttheircorporatesocialresponsibility and take proactive measures to facilitate implementation of the Rules asunder:

• Provide financial assistance to local authorities to establish waste managementsystem to collect, transport and dispose off disposable material from the wastestreams.

• The manufacturers of branded products using non bio-degradable packagingmaterial shall put in place a system to collect back suchpackagingmaterial fromtheiroutletsorbysettingupspecialwastecollectioncentres.Theymayincentivisewastepickers/recyclers to joinhandswith the localauthority incollectionof suchwaste.

• The use of sanitary napkins and diapers is increasing rapidly in the country.Therefore before the management of such waste becomes vey cumbersome,manufacturers of sanitary napkins and diapersmay be persuaded to explore thepossibility of using recyclable materials or provide pouch or wrapper for safedisposal of such waste. It may be emphasised that in larger interest andenvironmental production the first option of replacing non bio-degradablecomponentfromtheirproductwouldbemostdesirable.

IndustrialunitsLocatedwithin100kmfromRefuseDerivedFuel(RDF)and'WastetoEnergy'PlantsbasedonSolidWasteDutiesoftheindustrialunitslocatedwithinonehundredkmfromtherefusederivedfuelandwastetoenergyplantsbasedonsolidwaste-All industrialunitsusing fueland locatedwithinonehundredkmfromasolidwastebasedrefuse derived fuel plant shall make arrangements within six months from the date ofnotificationoftheserulestoreplaceatleastfivepercentoftheirfuelrequirementbyrefusederivedfuelsoproduced.ActionsRecommendedforImplementationoftheRules:

• The local authoritiesmayprepare a list of industries situatedwithin 100 km fromtheurbanareaandascertaintherequirementofpower/fuelofsuchplants.

• The local authoritiesmay explore the optionof setting upRDFplantwithin theirown city or for a cluster of cities at a suitable location at their own or throughprivatesectorparticipation.

• Thelocalauthoritytogetherwiththeoperatorofthefacilitymaynegotiatewiththeindustry to utilise RDF produced by the local authority in their industry as anoptional fuel, taking intoconsideration thecalorific valueofRDFvis-à-vis the fuel

Page 186: Request For Proposal (Global Competitive Bidding under ...€¦ · T.C. XI/266, Keston Road, Kowdiar, Thiruvananthapuram - 695003 Tel: 0471-2318922, Fax: 0471-2315892 Request For

122 | P a g e

the industry currently uses in the plant and the cost benefit the industry mayderivedbyusingRDFinleaveofconventionalfuel.

• Incasethematterdoesnotgetsettledthroughnegotiations,theindustrymaybemandatedtouseRDFatleasttotheextentof5%ofthefueltheyuseintheindustryasperRule'18'above.