575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
1
REQUEST FOR PROPOSALS: Fitness Equipment
March 11, 2016
Parkmerced Owner LLC invites you to submit a proposal for turn-key services for designing,
purchasing and maintaining fitness rooms and fitness equipment for Blocks 1 (Lot 2 & 3), 6, and
22 of Phase IA and 1B of the Parkmerced Vision Plan. Parkmerced is a quality apartment
community with exceptional amenities that bring the concept of Well Living to alive. To support
such effort, fitness rooms and equipment selection should be user friendly, high quality, state of
the art and commercially durable that reflects the goals of the project and a wide range of
residents and their life styles.
PROJECT BACKGROUND
Parkmerced Vision Plan, San Francisco CA
The Parkmerced Vision Plan will pioneer a complete transformation from an existing, resource
consumptive neighborhood located in San Francisco to a vibrant, pedestrian-focused, efficient
community for the future. The site is currently a 3,221-unit rent-controlled apartment community
with a mix of low-rise garden apartments and mid-rise towers. Over a period of 20 to 30 years,
the project will replace 1,538 existing garden apartment homes and construct 5,679 net new
residences, bringing the whole neighborhood to a total of 8,900 residences with a mixture of
rental and for sale and ranging in height from 35 feet to 145 feet. In addition to the residences,
the plan includes the development of a social heart including neighborhood serving retail,
markets, and commercial spaces serviced by the realignment of MUNI Metro light rail,
neighborhood commons providing social gathering spaces with small retail shops and outdoor
activities, as well as large open spaces including recreation fields, and walking and bike paths.
The project is fully described in the adopted Development Agreement (D.A.) dated July 9, 2011
and associated Master plan documents. You may find them posted at http://www.sf-
planning.org/index.aspx?page=2529. You may also refer to http://parkmercedvision.com/.
Phase I
The Parkmerced Vision Plan is divided into Major Development Phases (and sub-phases) as
described in the Development Agreement. Phase I includes approximately 1,013 residential
units in Phase 1A & 1B (Blocks 1, 6, 20 and 22), and 711 residential units in Phase 1C & 1D (Blocks
3W, 4, and 21) located along both the western and eastern edges of the Parkmerced. These
phases will be apartment homes, but mapped as condominiums to protect future options with
the exception of 56 replacement units in Phase 1A, 66 replacements units in Phases 1C and 100
replacement units in Phase 1D.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
2
Interior Designers
STYLE Interiors will serve as the Interior Designer for Block 1 (Lot 2 &3) and HBA will serve as the
Interior Designers for Block 6 and 22 for all amenity spaces. Each block has a separate team
comprising of an associate designer and assistant designer. Initial layouts for fitness rooms have
been completed but the bidders should further develop these to fully functioning and
integrated fitness facilities.
PROJECT SCOPE OF SERVICES AND DELIVERABLES
Area of Scope
Blocks 1 (Lot 2 & 3), 6, and 22 are being considered in this RFP for fitness equipment and services.
Block 1 Lot 2 (300 Arballo Drive) consists of one 8-story residential building. Gathering is all about
the individual as part of a community – looking to be more, do more, and share more. From
yoga as a personal statement, to group sports as leisure, and FitMob that is both social while
athletic. The 700 SF fitness room is located on the 2nd floor and will be shared with residents from
Lot 3. This space is designed for flex space such as yoga, Zumba and other specialty classes that
require minimal equipment. On the same block we have Lot 3 (199 Vidal Drive) that consists of
one 5-story residential building. Maximizing self and body are the core of this resident’s fitness
routine. It may be individually based of part of a couple’s commitment to a healthy lifestyle. It
may be trainer and group-based for focused boot camps and routines. The boutique fitness
experience that can support this daily regimen. The 1,547 SF fitness room is located on the
ground floor with an adjacent courtyard space. The fitness center will be shared with residents
from Lot 2 and will provide standard cardio and weight equipment.
Block 6 consists of two 11-story residential buildings at the center of Parkmerced. The South tower
(850 Gonzalez Drive) contains the fitness amenities totaling 3,490 SF. Providing a tailored space
to meet the holistic lifestyle of each resident. Each fitness space provides the key tools for
marathon runners, cross-country bicyclist, CrossFit enthusiast, and dedicated yogi’s. Fitness
amenities include a dedicated room for top-of-the-line cardio equipment, range of weight lifting
equipment and spacious Zen/wellness facility with dedicated terrace. Each fitness room have
direct access to the exterior terrace that leads to a community park.
Block 22 consists of two 14-story residential buildings. The fitness center is located at the West
tower (99 Chumasero Drive) and is open to all Parkmerced residents. Providing a variety of
equipment to meet the broad range of the resident’s fitness capabilities. Creating a space of
community and social outlet while inspiring your neighbors to live a healthier lifestyle. The 2,577
SF fitness center is split into two spaces with a view of the neighboring terrace and park. The
main fitness floor contains a variety of cardio and weight equipment and in the adjacent room is
a spacious flex space for yoga, Zumba or Spinning class.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
3
Fitness Package Proposal
Design Services:
1. Provide space plan and design services. Backgrounds will be provided by design team.
Please provide equipment layouts to be provided in CAD/PDF. (Must show ADA
diagrams)
2. Coordination with architects, interior designer, mechanical, electrical, low voltage, and
Audio Visual consultant and design build team.
3. Provide project milestone schedule.
Products:
The fitness equipment provider shall act as a turn-key sourcing specialists for fitness equipment
specific to the programming listed in the above scope.
1. Equipment specifications and brochures. Maximus may request demonstration of specific
equipment.
2. Warranty – Minimum warranty on all equipment must be (1) years on parts and labor and
lifetime on frames. Provide detailed maintenance schedule during the warranty duration
including response time for repair and replacement parts.
Maintenance Services:
The fitness equipment provider shall provide maintenance services including the following:
1. O&M manuals to be provided for each piece of equipment, before or at time of delivery
of equipment to site.
2. Preventative maintenance program beyond warranty term, confirm what services are
included, response time and scheduling process.
3. Training – On site training required to Parkmerced staff on basic function and
maintenance of equipment.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
4
FITNESS EQUIPMENT PROPOSAL
The proposal shall be concise and include, but not limited to, the following:
Cover letter:
o Introduction of provider and company description, capabilities and overview
o Provide description of what distinguishes your company from your competitors and
why Maximus would benefit from your design services, products and maintenance
package.
List relevant work, in particular innovative, multi-family residential, resort, and hospitality
projects. Include exemplary work for maintaining project budgets.
Description of work process and typical deliverable schedule
Résumé for the proposed team that will be working on the project including the responsible
Principal and applicable team members, highlighting relevant experience.
o Provide client referrals (3 minimum, including contact information) for each project
member
Design services proposal:
o Completed equipment layout plans
o Equipment specifications for design team to coordinate with electrical on low voltage
and data.
o Milestone Project Schedule
Proposal:
o Recommended equipment and quantity
o Unit pricing (MSRP) and proposed discount terms
o Lead time for major equipment
o Delivery cost (per building)
o Installation cost (per building)
o SF/CA tax (if applicable)
o Warehouse fee per month (if applicable)
o Preventative maintenance program extended beyond warranty (3 years, 5 years and
7 years)
o Equipment loaner package cost
o Training cost/schedule
o Payment terms
o Warranty terms and conditions included
o Extended Warranty for: 2, 3 and 4 years
o Sample Insurance Certificate evidencing coverage
Recommended media fitness programs.
Provide typical installation schedule and process. The awarded vendor(s) will be notified of
when construction schedule is finalized.
Provide installer’s qualifications and if installation is covered with in house provider or
subcontractor.
Identify turnaround times on equipment repairs, response time and process from request of
repair to completion of repair.
Please review the sample contract in Attachment H and include any exceptions to the contract language
with your proposal.
Fee for additional work outside the Scope of Services above shall not be included in the base purchase
fee. Please provide a list of additional services that are available but excluded from the proposal. Provide
billing rates for each category of employees that may be engaged in Additional Work. Reimbursable
expenses shall not be included in the service fee. Reimbursable expenses are to be paid at cost. Original
official receipts are required to be submitted for reimbursements.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
5
EQUAL OPPORTUNITY PROGRAM - LOCAL BUSINESS ENTERPRISE (LBE)
Parkmerced and The City desire a strong level of participation by Local Business Enterprise (LBEs)
certified by the San Francisco Contract Monitoring Division (CMD) as well as local (San
Francisco) residents at all contracting tiers. As such, the Owner and CMD have agreed to a
good faith LBE goal of 15% and strongly encourage LBEs to submit their qualifications; and for
Prime Contractors to submit proposals with LBE sub-consultants / subcontractors as part of their
team. Copy of the Equal Opportunity Program is included as Exhibit E for your review.
SCHEDULE
March 24, 2016 Requests for Information due 9am
March 31, 2016 Owner to provide responses to all RFIs by end of day
April 8, 2016 Proposals due 5pm
PHASE 1A
Fall, 2016 Start of construction for Block 1 Lot 3
*Construction duration approx. 14 months
Fall, 2016 Start of construction for Block 1 Lot 2
*Construction duration approx. 16 months
Fall, 2016 Start of construction for Block 6
*Construction duration approx. 22 months
PHASE 1B
Fall, 2016 Start of construction for Block 20
Spring, 2017 Start of construction for Block 22
*Construction duration approx. 23 months.
A fully developed design and construction schedule will be issued upon award as well as a
project budget per building. For the purposes of this proposal, assume mid-grade finishes with
some selective higher end spaces.
Please email all Requests for Information and PDF copy of proposal only to:
Catherine Veasey
Parkmerced Owner LLC
575 Florida Street, Suite 150
San Francisco, CA 94110
Attachment A: Phase I Existing and Proposed Plans, List of Project Sites
Attachment B: Selected Project Team
Attachment C: Insurance Requirements
Attachment D: Proposal Form
Attachment E: First Source Hiring Program (If Applicable)
Attachment F: Proposal
Attachment G: Floor Plans
Attachment H: Contract
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
6
Attachment A: LIST OF PROJECT SITES
Note: Number of stories and footprint areas are approximate based on the maximum allowed
per the Development Agreement and the Design Standards and Guidelines.
Phases 1A, 1B
Block 1 Landscape
01-0-01 Existing thirteen stories, 153 units
01-0-04 Existing thirteen stories, 153 units
01-0-03 Eight stories, 12,000 sf footprint, approximately 89 units
01-0-02 Four stories, 15,500 sf footprint, approximately 64 units
Block 6 Landscape
06-0-01 Eleven stories, 12,000 sf footprint, approximately 124 units
06-0-02 Eleven stories, 12,000 sf footprint, approximately 124 units
06-0-03 Existing thirteen stories, 153 units
06-0-04 Existing thirteen stories, 153 units
Block 20 Landscape
20-0-01 Existing thirteen stories, 153 units
20-0-02 Existing thirteen stories, 153 units
20-0-04 Existing thirteen stories, 153 units
20-0-03a Seventeen stories, 12,000 sf footprint, approximately 188 units
20-0-03b Eight stories, 14,600 sf footprint, approximately 111 units
Block 22 Landscape
22-0-01 Existing thirteen stories, 153 units
22-0-02 Fourteen stories, 12,000 sf footprint, approximately 149 units
22-0-03 Fourteen stories, 12,000 sf footprint, approximately 164 units
All buildings in Blocks 20 and 22 are built over a contiguous 3 level subterranean garage and
buildings in Block 6 are built over a contiguous 2 level subterranean garage.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
7
Phases IC, 1D
03-W-01 Four stories, 18,500 sf footprint, approximately 62 units
03-W-04 Three stories, 5,400 sf footprint, approximately 15 units
03-W-02 Four stories, 10,700 sf footprint, approximately 43 units
03-W-05 Three stories, 7,500 sf footprint, approximately 18 units
03-W-03 Four stories, 22,200 sf footprint, approximately 82 units
04-0-01a Four stories, 9,100 sf footprint, approximately 28 units
04-0-01b Eight stories, 12,000 sf footprint, approximately 85 units
Block 21 Landscape
21-S-01a Fourteen stories, 12,000 sf footprint, approximately 123 units
21-S-01b Six stories, 8,500 sf footprint, approximately 42 units
21-S-02a Fourteen stories, 12,000 sf footprint, approximately 123 units
21-S-02b Six stories, 17,400 sf footprint, approximately 90 units
21-S-03 Existing thirteen stories, 153 units
All buildings in Block 21 are built over a contiguous 1 level subterranean garage and buildings in
Block 3W are built over a contiguous 2 level subterranean garage.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
8
Attachment B: Selected Project Team
Mater Architect Skidmore Owings Merrill LLP (SOM)
Master Civil BKF
Master Hydrology Hydroconsult
Geotechnical Langan Treadwell Rollo
Master Landscape Architect PWP Landscape Architecture
Master MEP PAE Consulting Engineers
Master Acoustic SMW
Master IT/AV/Security TBD/ Design Build Team
Master Lighting Design Horton Lees Brogden
Master Vertical Transportation Syska Hennessy
Architects Block 1 01-0-02 Fougeron Architecture
Block 1 01-0-03 Leddy Maytum Stacy Architects
Block 6 Woods Bagot
Block 20 Kwan Henmi
Block 22 SOM
Structural Engineer Block 1 01-0-02 Murphy Burr & Curry
Block 1 01-0-03 / DCI + SDE Engineers
Block 6 / Block 20
Block 22 Skidmore Owings Merrill LLP (SOM)
Interior Designer Block 1 01-0-02/ STYLE Interior Design
Block 1 01-0-03 STYLE Interior Design
Block 6 HBA International
Block 20 STYLE Interior Design
Block 22 HBA International
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
9
Attachment C: Insurance
Owner's insurance requirements for the Contract were included in the RFP. Owner and Vendor will
negotiate in good faith to finalize those requirements for inclusion in the Contract.
A. Required Insurance. Prior to the commencement of the Work, the vendor shall procure and
maintain, for the term of this Contract, from insurance companies licensed in the State of California,
with a Best's rating of A- IX or better the following insurance, in the limits specified unless (unless
otherwise agreed to in writing by the Managing Agent):
(I) Workers Compensation insurance in accordance with statutory requirements of the
State of California, Employers Liability (with $1,000,000 limit of liability). Longshoremen's
and Harbor Workers' coverage shall also be included if such exposure might exist.
(II) Commercial General Liability insurance which shall be on a per occurrence basis and
shall include, without limitation coverage for all operations, Independent Contractors,
Blanket Contractual Liability (oral or written), Completed Operations and Products
Liability, Broad Form Property Damage, Explosion, Collapse and Underground Hazards
(X, C, and U). The policy shall:
(a) Contain limits of liability of not less than $1 Million per project Combined Single Limit
per occurrence with a $2 Million Aggregate Limit. Said insurance shall not have any
deductible or self-insured retention amount unless otherwise agreed to in writing by
the Managing Agent in its sole discretion (and if the Managing Agent shall so agree,
the Contractor shall be fully responsible for payment of all deductibles and self-
insured retention amounts).
(b) Provide that the Completed Operations shall cover a period of two years following
termination of the Project and shall include continued contractual indemnity for
the same period of time and contain limits of liability of not less than $1 Million;
(c) Include (i) Knowledge of Occurrence and Notice of Occurrence Endorsements,
and (ii) an Unintentional Errors and Omissions Clause; and
(d) Require 30 Days Written Notice of Cancellation to named and additional insured’s.
(III) Comprehensive Automobile Liability insurance, covering Owned, Non-Owned and
Hired Vehicles, providing Bodily Injury and Property Damage coverage, all on a per
occurrence basis. Limits of Liability shall be not less than $1 Million Combined Single
Limit.
(IV) Umbrella insurance for not less than $10 Million per project. If umbrella insurance is
written by more than one company, any layers above the first one shall follow the form
of the primary policy.
B. Additional Insured’s. All insurance policies required under this Contract shall name the persons or
entities indicated above and such other persons or entities as the Owner or the Managing Agent
may require, as additional insured’s and shall require the insurer to give all additional insured’s at
least thirty (30) days prior written notice of cancellation or amendment to its policy.
C. Evidence of Insurance, etc. The Contractor shall not start any of the Work until all insurance
coverage has been approved by the Owner or the Managing Agent or their assignee. Prior to the
commencement of the Work, The Contractor shall deliver certificates for the required insurance to
the Owner or the Managing Agent or their assignee, with evidence of payment of the premiums
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
10
thereon and, if requested by the Owner, the Managing Agent or their assignee, certified copies of
the policies, with all endorsements thereto. If the Subcontractor shall fail to provide any item
required hereby on a timely basis, the Owner, the Managing Agent or their assignee may obtain
such insurance and charge the cost thereof to the Contractor. The Contractor shall furnish the
Owner, the Managing Agent or the assignee at once with copies of all endorsements which may
be issued amending the coverage of any policy; in no event however, shall any endorsement be
permitted which shall diminish the limits of any insurance required hereby.
D. Policy Renewals. If at any time during the term of this Contract any policy for insurance agreed to
be provided hereunder by the Contractor shall expire or for any reason be cancelled, or if the
Owner, the Managing Agent or their assignee shall deem the amount of the coverage provided
for thereunder to be inadequate, or coverage for risks other than those provided for herein shall
be required by law or deemed reasonably necessary by the Owner, the Managing Agent or their
assignee, the Contractor shall promptly comply with the request of the Owner, the Managing
Agent or its assignee to provide the cancelled or expired coverage or increase the amount of
existing coverage, as the case may be, and upon the Contractor’s failure to so provide within five
(5) days of the giving of notice thereof by the Owner, the Managing Agent or their assignee, the
Owner, the Managing Agent or their assignee may provide therefore and charge the cost to the
Contractor.
E. Insurance of Contractor’s Property: Waiver of Subrogation.
(I) Insurance Required. The Contractor shall maintain insurance (the "Contractor’s Property
Insurance") on the Contractors property and equipment at the Project for All Risks,
including, without limitation, Fire and Extended coverage. The Contractor’s Property
Insurance policy or policies shall contain, in substance, the following endorsement:
"This insurance shall not be invalidated should the insured waive, in writing,
prior to a loss, any or all right of recovery against any party for the loss
occurring to the property described herein".
(II) Waiver of Subrogation. The Contractor shall not make any claim against, or seek to recover
from the Owner, the Managing Agent or the Construction Manager (if any) any loss or
damage to the Contractor’s property or equipment located at the Building or elsewhere,
by the perils within the scope of the Contractor’s Property Insurance, whether or not the
loss or damage is due to their negligence or that of their servants, agents or employees.
F. Primary Policies. The commercial general liability insurance policies required of the Contractor
by this Contract are to be considered primary policies in any dispute, claim or action arising
out of or relating to the performance of this Contract and shall respond in the first instance to
any such claims, actions or disputes. Any policies of insurance not the subject of express
agreement herein shall be considered excess to the commercial general liability insurance
policies as herein before described. Any claims made or arising in any way from the
performance of the Work subject of this Contract may be tendered under the insurance policy
provided by the Contractor as herein above described first and said policy shall respond in the
first instance as primary insurance for and against said claim.
G. All coverage as outlined above.
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
11
Attachment D: Proposal Form
Parkmerced Vision Plan Implementation - Phase I
PROPOSAL FROM: _______________________________________________ (Vendor Name)
Please confirm that each item listed below is included in this proposal package by checking
each box provided:
Cover letter
o Summary of vendor capability in design services, product specification and
maintenance.
o Summary of what distinguishes your company from your competitors
List of relevant work completed
o Projects (Name and address)
Description of work process and deliverable schedule
Proposed team
o Client references (3 minimum)
Design services proposal
o Completed equipment layout plans
o Equipment specification and brochures
Proposal:
o Unit Pricing (MSRP) and proposed discount terms
o Payment terms
o Lead Time for major equipment
o Warehouse fee per month (if applicable)
o Delivery cost (per building)
o Installation cost (per building)
o SF/CA tac (is applicable)
o Preventative maintenance program extended beyond warranty – 3, 4, 5 years
o Equipment loaner programs/packages details and cost
o Training – cost and schedule
o Warranty terms and conditions
o Extended warranty package – 2, 3 and 4 years
o Sample Insurance Certificate evidencing coverage
Installation schedule
Recommended fitness media programs
Exception to the contract language, if any
List of available additional services and associated fees
By signing below:
You acknowledge that you received and understood the entire RFP package.
Prior to the commencement of the Services, the Consultant shall procure and maintain
for the term of the Agreement insurance requirements to be outlined under separate
cover.
SIGNED: By:
Name:
Title:
Date:
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
12
Attachment E: First Source Hiring Program
First Source Hiring Program for Construction and Equal Opportunity Employment Program
between City and County of San Francisco and Parkmerced Investors Properties, LLC:
https://maximusrepartners.box.com/s/sfauaoak56xhy3fiik5wviixwsp4e8z3
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
13
Attachment F: Proposal
Company Name: Address:
Date Completed:
Submitted By:
Email: Phone:
Volume Discount Offer
Payment Terms
Warehousing Cost Per Month
Preventative Maintenance beyond warranty:
Preventative Maintenance - 3 years
Preventative Maintenance - 4 years
Preventative Maintenance - 5 years
Equipment Loaner Programs/Package
Training - Cost and Schedule
Warranty Terms and Conditions Included
Extended Warranty - 2 years
Extended Warranty - 3 years
Extended Warranty - 4 years
Proposal template per building below:
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
14
Attachment F: Proposal
Continued
Block 1 Lot 2
Description Vendor Model Name/Number
Quantity Unit Cost Extended Cost
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
Overall Product Total: $ -
SF Tax (if applicable): $ -
CA Tax: $ -
Est. Delivery Cost : $ -
Est. Install Cost: $ -
EXTENDED TOTAL $ -
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
15
Attachment F: Proposal
Continued
Block 1 Lot 3
Description Vendor Model Name/Number
Quantity Unit Cost Extended Cost
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
Overall Product Total: $ -
SF Tax (if applicable): $ -
CA Tax: $ -
Est. Delivery Cost : $ -
Est. Install Cost: $ -
EXTENDED TOTAL $ -
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
16
Attachment F: Proposal
Continued
Block 6
Description Vendor Model Name/Number
Quantity Unit Cost Extended Cost
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
Overall Product Total: $ -
SF Tax (if applicable): $ -
CA Tax: $ -
Est. Delivery Cost : $ -
Est. Install Cost: $ -
EXTENDED TOTAL $ -
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
17
Attachment F: Proposal
Continued
Block 22
Description Vendor Model Name/Number
Quantity Unit Cost Extended Cost
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
Overall Product Total: $ -
SF Tax (if applicable): $ -
CA Tax: $ -
Est. Delivery Cost : $ -
Est. Install Cost: $ -
EXTENDED TOTAL $ -
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
18
Attachment G: Floor Plans
Block 1 Lot 3: https://maximusrepartners.box.com/s/ccl1x20b7751bu7zt68nggygggiieg8e
Block 1 Lot 2: https://maximusrepartners.box.com/s/athnh60touy9wiyzu2uueg41xgsed2ny
Block 6: https://maximusrepartners.box.com/s/wthiih2ukrxcnwa5c1ak5adnessz2fpj
Block 22: https://maximusrepartners.box.com/s/3dxihcdlqa4xwf8bhyk14zl8exvuvbmd
575 FLORIDA STREET, SUITE 150, SAN FRANCISCO, CA 94110 | PARKMERCEDVISION.COM O 415.405.4666 | F 415.584.8096
19
Attachment H: Contract
Please review the sample contract and include any exceptions to the contract language with your
proposal:
https://maximusrepartners.box.com/s/qwsdownxh36ld9dezguveuec575636k2