+ All Categories
Home > Documents > REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES … Signal Safety... · The proposal should list the...

REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES … Signal Safety... · The proposal should list the...

Date post: 11-Apr-2019
Category:
Upload: tranthuan
View: 217 times
Download: 0 times
Share this document with a friend
6
REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES ON A FEDERAL AID PROJECT FOR TRAFFIC SIGNAL SAFETY IMPROVEMENTS IN THE CITY OF BISMARCK This is a request for proposals from qualified engineering firms for project development, environmental documentation, design, plan preparation, contract administration, and construction inspection for citywide traffic signal safety improvements currently scheduled for construction in 2018 in the City of Bismarck. The City of Bismarck, in cooperation with the North Dakota Department of Transportation and the Federal Highway Administration, are proposing traffic signal safety improvements that are eligible for federal participation for the safety improvements at signalized intersections throughout the city of Bismarck. DESCRIPTION OF PROJECT The proposed project is for the installation of pedestrian count down signal heads and confirmation lights (tattle-tail lights) for red light running enforcement. There are approximately 97 intersections involved is this project. See Exhibit A. SCOPE OF WORK The City of Bismarck intends to contract with a single consultant for all phases of work and execute one cost plus fixed fee contract requiring monthly billings with the selected firm to complete Phase I and II. The City of Bismarck reserves the right to assign work in phases. Project work items may be added or removed from the contract by work authorization or supplementary agreement. Phase 1 Environmental Documentation and Preliminary Design The Scope of Work shall include all activities necessary to complete the environmental document (including FHWA concurrence and approval), perform preliminary design, and coordinate utility locations. The anticipated environmental document to be completed is a Categorical Exclusion by Definition (CED). The required activities for the preliminary engineering and preliminary design phase will be dependent on the environmental classification of the project as determined by the Federal Highway Administration. Environmental approval from FHWA and NDDOT will be considered completion of Phase I Phase II Design and Plan Preparation This phase of the work will include development (and certifications) of the final construction plans, specifications, estimate. This phase shall be in accordance with
Transcript

REQUEST FOR PROPOSALS

FOR ENGINEERING SERVICES ON A FEDERAL AID PROJECT

FOR TRAFFIC SIGNAL SAFETY IMPROVEMENTS IN THE CITY OF BISMARCK

This is a request for proposals from qualified engineering firms for project development, environmental documentation, design, plan preparation, contract administration, and construction inspection for citywide traffic signal safety improvements currently scheduled for construction in 2018 in the City of Bismarck. The City of Bismarck, in cooperation with the North Dakota Department of Transportation and the Federal Highway Administration, are proposing traffic signal safety improvements that are eligible for federal participation for the safety improvements at signalized intersections throughout the city of Bismarck. DESCRIPTION OF PROJECT The proposed project is for the installation of pedestrian count down signal heads and confirmation lights (tattle-tail lights) for red light running enforcement. There are approximately 97 intersections involved is this project. See Exhibit A. SCOPE OF WORK The City of Bismarck intends to contract with a single consultant for all phases of work and execute one cost plus fixed fee contract requiring monthly billings with the selected firm to complete Phase I and II. The City of Bismarck reserves the right to assign work in phases. Project work items may be added or removed from the contract by work authorization or supplementary agreement. Phase 1 Environmental Documentation and Preliminary Design The Scope of Work shall include all activities necessary to complete the environmental document (including FHWA concurrence and approval), perform preliminary design, and coordinate utility locations. The anticipated environmental document to be completed is a Categorical Exclusion by Definition (CED). The required activities for the preliminary engineering and preliminary design phase will be dependent on the environmental classification of the project as determined by the Federal Highway Administration. Environmental approval from FHWA and NDDOT will be considered completion of Phase I

Phase II Design and Plan Preparation This phase of the work will include development (and certifications) of the final construction plans, specifications, estimate. This phase shall be in accordance with

2

federal, state, and city standards. The governing specification for this project will be the NDDOT's "Standard Specification for Road and Bridge Construction" dated 2014 and any revisions thereof.

The NDDOT will conduct the bid opening, certify that all applicable DBE participation requirements have been met, and tabulate the bids. The City will determine the lowest responsible bidder and execute the construction contracts. Phase III may be negotiated and authorized based on the outcome of Phase II, Engineer’s proposal, Engineer’s performance, and available funding. Phase III Construction, Administration, and Supervision The selected firm will be responsible for all construction inspection, materials testing, and survey to verify the contractor’s work is to be performed according to the governing specifications, plans, and special provisions including the provisions of the NDDOT Standard Specifications for Road and Bridge Construction, Materials Sampling and Testing Manual, and Construction Records Manual. The consultant’s material sampling and testing personnel must be certified under NDDOT Testing Qualification Program. The selected firm shall provide a Registered Engineer to directly supervise all Construction Engineering as required by Title 28 of the North Dakota Administrative Code. The selected firm will prepare the required engineering and administrative documents and records as required by the NDDOT. The selected firm shall provide adequate work force to perform the work necessary to meet the Contractor’s work schedule. The Consulting Engineers’ Project Manager assigned to the project shall be capable of reading and interpreting the project documents for proper execution of the project in accordance with the plans and specifications. The Consultant shall, as applicable, include but not limited to conducting the preconstruction meeting, construction engineering and inspection, construction survey, measuring and computing pay quantitates, construction administration, claims, change orders, review shop drawings, preparing and submitting final documentation and project close out. GIS Data Requirements

Projection Information Projection: Stateplane coordinate system Zone: North Dakota South zone (fips 3302) Horizontal Datum: North American Datum (NAD)83 Vertical Datum: North American Vertical Datum 29 Units: International feet Acceptable Formats

Arc Info coverage Arc View shape file ArcGIS geo-database

3

Project Schedule

The proposed schedule for this project is:

RFP Submittal Deadline March 3, 2017

RFP Review Completion & Ranking March 13, 2017

Notification for Interviews

Interviews March 24, 2017

Selection and Notification of Firm March 27, 2017

Negotiation of Scope of Work and Work Fee April 4, 2017

Anticipated Notice to Proceed April 11, 2017

Environmental Documentation October 6, 2017

Final Plans & Bid Documents December 1, 2017

Bid Opening February 9, 2018

The consultant will provide monthly updates, via memorandums, regarding the status of the project to the city of Bismarck and biweekly status reports to the NDDOT.

CONTENT OF PROPOSALS

The consultants are requested to be as brief and concise as possible, and the submitted proposals are not to exceed twenty (20) pages in length. The proposal should list the personnel who will be assigned to work on the project, including titles, education, and work experience. The proposals pages shall be numbered. An appendix may be added to the proposal to furnish updated Forms 330 (related services questionnaire pertaining to engineering, land surveying, and architectural firms). The consultant’s written proposal shall contain the following information: 1. Recent, current, and projected workloads 2. Staff experience and technical capabilities 3. Related experience and performance records on similar projects 4. Understanding of project and proposed work approach

4

5. Willingness to meet time and budgetary requirements 6. Past performance

Selection of firms for oral interviews will be based on the evaluation of the submitted written proposals. A selection committee will conduct oral interviews of the selected firms. A recommendation to the Bismarck Board of City Commissioners will be made by the selection committee. Price will be negotiated with the successful firm and if negotiations are successful, an engineering agreement will be executed with a single consultant. Approved sub-agreements for minor portions of the work will be permitted.

RIGHT OF REJECTION

The City of Bismarck reserves the right to reject any or all proposals.

DISCLOSURE OF PROPOSAL

At the conclusion of the selection process, the contents of all proposals will be subject to the City of Bismarck’s Open Records Law and may be open to inspection by interested parties. Any information included in the proposal that the proposing party believes to be a trade secret or proprietary information must be clearly identified in the proposal. Any identified information recognized as such and protected by law may be exempt from disclosure.

CIVIL RIGHTS Title VI assures that no person or group of persons may, on the grounds of race, color, national origin, sex, age, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any and all programs or activities administered by the City of Bismarck. The City of Bismarck will consider every request for reasonable accommodation to provide:

an accessible meeting facility or other accommodation for people with disabilities,

language interpretation for people with limited English proficiency (LEP), and

translations of written material necessary to access City of Bismarck programs and information.

Appropriate provisions will be considered when the City of Bismarck is notified at least 10 days prior to the meeting date or the date the written material translation is needed. To request accommodations, contact (Robert McConnell, Director of Human Resources and Title VI Coordinator for the City of Bismarck at (701-355-1337) or

5

([email protected]). TTY users may use Relay North Dakota at 711 or 1-800-366-6888.

REQUEST FOR PROPOSAL INFORMATION AND QUESTIONS

Questions regarding the Request for Proposals should be directed to Mark A. Berg, PE, Traffic Engineer, at the office of City Engineer at 221 N. 5th Street, Bismarck, North Dakota, telephone (701) 355-1505, [email protected] or fax (701) 222-6593. SUBMITTAL OF PROPOSALS Proposals from qualified consultants will be accepted until 4:00 p.m. on March 3, 2017 Submit eight (8) hard copies and one PDF copy of proposal to: Gabe Schell, P.E. City Engineer 221 North Fifth Street P.O. Box 5503 Bismarck, ND 58506-5503 Federal Acquisition Regulations (FARs)

All proposals must include a copy of the firm’s most current Cognizant Audit Report of Indirect Costs (as approved by another State agency) in compliance with the Federal Acquisition Regulations (FARs) costs principles contained in the Code of Federal Regulations (CFR), Title 48, Part 31. The report must include all subsidiary or supporting indirect cost schedules.

01-20-17

Century & W Interstateped countdown 8confirmation light 6832: 11800

Century & Washingtonped countdown 8confirmation light 8829: 12400Century & N 4thped countdown 8confirmation light 6826: 12400 Century & N 19thped countdown 8confirmation light 8840: 12400

State St & Capitolped countdown 8confirmation light 8823: 12400

Capitol & N 19thped countdown 8confirmation light 4838: 12400

State St & Interstate Avped countdown 4confirmation light 8820: 12400

State St & CenturyPed countdown 6confirmation light 8819: 12400

State St & Weissped countdown 4confirmation light 8817: 12400

State St & Calgaryconfirmation light 6816: 1800

State St & 43rdconfirmation light 6815: 1800

Broadway & 19thPed countdown 6confirmation light 3869: 12400 26th & RosserPed countdown 8conf light 4860: 12400Washington & BroadwayPed countdown 8confirmation light 4864: 12400

Washington & RosserPed countdown 8confirmation light 4853: 12400

Washington & Ave CPed countdown 8confirmation light 4848: 12400

Washington & Divideped countdown 8confirmation light 8837: 12400

Burnt Boat &Tyler Pkwyped countdown 8confirmation light 8834: 12400

Century & Ithicaped countdown 8confirmation light 4830: 11200

4th & Divideped countdown 8confirmation light 4839: 12400

State St & SkylineConfirmation light 5814: 1500

State St & LaSalleConfirmation light 8813: 2400

State St & N Rampped countdown 2confirmation light 4821: 6200State St & S Rampped countdown 2confirmation light 4822: 6200

State St & Divideped countdown 4confirmation light 8824: 12400

Century & Pinehurstped countdown 8confirmation light 6833: 11800

Tyler Pkwy & N Rampped countdown 2confirmation light 3835: 5900Tyler Pkwy & S Rampped countdown 4confirmation light 8836: 12400

Washington & Turnpikeped countdown 8confirmation light 6827: 12400

19th & Divideped countdown 6confirmation light 6825: 1240026th & Divideped countdown 8confirmation light 6841: 12400Washington & Blvdped countdown 8confirmation light 4842: 12400

Main Ave & MemorialPed countdown 8confirmation light 4870: 12400

Main & 12thPed countdown 8confirmation light 4878: 12400

Main & AirportPed countdown 8confirmation light 4879: 12400Washington & BowenPed countdown 8confirmation light 4886: 12400Washington & ArborPed countdown 8confirmation light 4887: 12400

7th & ArborPed countdown 8confirmation light 4888: 124009th & ArborPed countdown 8confirmation light 3889: 12400

Expy & WashingtonPed countdown 8confirmation light 8890: 12400 Washington & DenverPed countdown 8confirmation light 8891: 12400Washington & RenoPed countdown 8confirmation light 4892: 12400

Washington & WachterPed countdown 8confirmation light 4893: 12400

Expy & 3rdconfirmation light 8894: 4000

Expy & 7thconfirmation light 6334: 3000Expy & 9thconfirmation light 6335: 3000

Expy & 12thconfirmation light 8895: 4000

Expy & Airport Rdconfirmation light 8896: 4000

Expy & 26thconfirmation light 8897: 4000

Expy & Burlingtonconfirmation light 8898: 4000

Expy & Yegenconfirmation light 8899: 4000

Expy & Mainconfirmation light 8900: 4000

Expy & Rosserconfirmation light 8901: 4000

Expy & Divideconfirmation light 8902: 4000

Expy & Miriamped countdown 4confirmation light 8903: 9000

Expy & S Rampped countdown 2confirmation light 3904: 5000

Centennial & N Rampped countdown 2confirmation light 3905: 5000

Centennial & Trentonped countdown 8confirmation light 6906: 12400

Centennial & Centuryped countdown 8confirmation light 8907: 12400

Centennial & 43rdconfirmation light 8908: 4000

University & DenverPed countdown 6confirmation light 4909: 12400

University & WachterPed countdown 8confirmation light 4910: 12400 University & 12thPed countdown 8confirmation light 8911: 12400University & AirportPed countdown 6confirmation light 4912: 12400

See Inset

Century & 11thped countdown 8confirmation light 8818: 12400

Washington & Interstateped countdown 8confirmation light 4828: 11200

Interstate & 4thped countdown 8confirmation light 4831: 11200

Washington & FrontPed countdown 8confirmation light 4880: 12400

Ave C, Griffen, WardPed countdown 8confirmation light 4915: 12400

Divide & Collegeped countdown 8confirmation light 4916: 12400

43rd & Washingtonconfirmation light 8917: 4000

Washington & LaSalleconfirmation light 8918: 4000

Main & 26thconf light 4919: 4000

²

23 USC § 409 DocumentsNDDOT Reserves All Objections

State systemLocal system

Blvd & 3rdped countdown 8conf light 4843: 12400

Blvd & 4thped countdown 8confirmation light 4844:12400

Blvd & 6thped countdown 8confirmation light 4845: 12400

Blvd & 7thped countdown 6confirmation light 4846: 12400

Blvd & 9thped countdown 6confirmation light 4847: 12400

Ave C & 3rdped countdown 8conf light 4849: 12400 Ave C & 4thped countdown 8conf light 4850: 12400

7th & Ave Cped ctdn 8conf light 4851: 12400

9th & Ave Cped ctdn 8conf light 4852: 12400

Rosser/3rdped ctdn 8conf light 4854: 12400Rosser/4thped ctdn 8conf light 4855: 12400

Rosser/5thped ctdn 8conf light 4856: 12400Rosser/6thped ctdn 8conf light 4857: 12400

7th/Rosserped ctdn 8conf light 3858: 12400

Rosser/9thped ctdn 8conf light 3859: 12400

Thayer/5thped ctdn 8conf light 3861: 124007th/Thayerped ctdn 8conf light 3862: 12400

9th/Thayerped ctdn 8conf light 3863: 12400Brdwy/3rdped ctdn 8conf light 4865: 12400

Brdwy/5thped ctdn 8conf light 4866: 12400

7th/Brdwyped ctdn 8conf light 3867: 124009th/Brdwyped ctdn 8conf light 3868: 12400

Main/2ndped ctdn 8conf light 4871: 12400

Main/3rdped ctdn 8conf light 4872: 12400

Main/4thped ctdn 8conf light 4873: 12400

Main/5thped ctdn 8conf light 4874: 12400

Main/6thped ctdn 8conf light 4875: 12400

Main/7thped ctdn 8conf light 4876: 12400

Main/9thped ctdn 8conf light 4877: 12400

Front/3rdped ctdn 8conf light 4881: 12400Front/5thped ctdn 8conf light 4882: 12400

Front/7thped ctdn 6conf light 3883: 12400Front/9thped ctdn 6conf light 3884: 12400Bowen/3rdped ctdn 8conf light 4885: 12400

N 5 St

N 6 St

N 7 St

N 8 St N 9 St

N 4 St

N 3 St

S 5 St

S 9 StS 7

St

S 3 St

Bowen Ave

Front Ave

Main Ave

Broadway

Thayer

Rosser

Ave B

Ave C

Ave D

Ave E

Ave F

Blvd

N 2 St

Indiana Ave

3rd/Indianaped ctdn 8conf light 4913: 12400

Thayer/3rdped ctdn 8conf light 3914: 12400

HSIP 151004Bismarck signalsFY 2018$1,127,600

Scope_Map_151004 1/25/2017


Recommended