REQUEST FOR QUOTATIONS Geotechnical Engineering Services for the Determination of Posted Load Limits on Selected Roadways within Lapeer County Issuing Agency: Lapeer County Road Commission 820 Davis Lake Road Lapeer, Michigan 48446
Transcript
Page 1: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

REQUEST FOR QUOTATIONS

Geotechnical Engineering Services

for the

Determination of Posted Load Limits on Selected Roadways within Lapeer

County

Issuing Agency:

Lapeer County Road Commission 820 Davis Lake Road

Lapeer, Michigan 48446

Page 2: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

SECTION 1: GENERAL INFORMATION

I. Objective

The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants

with specific information to prepare and submit a proposal for geotechnical engineering services for the

project described in Section 2. The LCRC shall use a qualifications-based selection (“QBS”) process as

described in Section 4. In addition, estimated hours of staff classification along with hourly rates and

grand total of cost for project with breakdown on each segment of roadway is required to be included in

proposal.

II. Issuing Office

The RFQ is issued by the Lapeer County Road Commission (“LCRC”) Engineering Department. All

correspondence, questions and submittals regarding this RFQ shall be addressed to:

Destain D. Gingell, P.E.

County Highway Engineer

Lapeer County Road Commission

820 Davis Lake Road

Lapeer, MI 48446

Phone: 810-664-6272

E-Mail: [email protected]

Verbal inquiries or requests for information shall not be made of Lapeer CRC staff. Any attempt on the

part of a consultant or any of its employees, agents or representatives to contact Lapeer CRC staff with

respect to this RFQ, other than as described above, may lead to disqualification.

III. Proposals

Two (2) copies of the proposal shall be submitted. The information included therein should be as

concise as possible. The proposal must be signed in ink by an official authorized to bind the Proposer to

its provisions. Each proposal must remain valid at least ninety (90) days from the due date of this RFQ.

All key personnel shall be listed with their experience. The principal engineer and project manager must

be specified in the Proposal. If Sub-Consultants will be utilized, qualifications for the firm and their key

personnel must be submitted. The selected firm must submit a written request to substitute key

personnel or Sub-Consultants.

Each proposal shall include a proposed timeline for completion of the work. The timeline should be

based upon the schedule outline in the project specific scope noted later in this RFQ.

IV. Changes in RFQ

Should any prospective Proposer be in doubt as to the true meaning of any portion of this RFQ, or

should the Proposer find any patent ambiguity, inconsistency or omission therein, the Proposer shall

make a written request for an official interpretation or correction. Such requests shall be submitted to

the issuing office not less than six (6) business days prior to the final date of submittal of the proposal.

The person making the request shall be held responsible for its prompt delivery.

Page 3: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

Such interpretation or correction, as well as any additional RFQ provisions that the LCRC may decide to

include, will be made only as addenda, which will be emailed to each firm recorded as having received a

copy of the RFQ. Any addenda issued by the LCRC shall become a part of the RFQ and shall be taken into

account by each Proposer in preparing his or her proposal.

V. Proposal Receipt

Sealed proposals must arrive at the Lapeer CRC, 820 Davis Lake Road, Lapeer, Michigan on or before

9:00 a.m., Wednesday, October 26, 2016 and be clearly marked RFQ for Geotechnical Engineering

Services. Each Proposer is responsible for the timely delivery of his or her proposal. Late proposals will

not be considered. Proposals may be packaged separately or together.

VI. Disclosures

All information in a Proposer’s proposal is subject to disclosure under the provisions of Public Act No.

442 of 1976 known as the “Freedom of Information Act.” This Act also provides for the complete

disclosure of contracts and attachments thereto. All unsuccessful proposals will be retained for thirty

(30) days after acceptance of the successful proposal.

VII. Type of Contract

A standard Engineering Services Agreement will be executed between the Lapeer CRC and the

Consultant. The Lapeer CRC reserves the right to award any proposals, to reject any and all proposals in

whole or in part, and to waive any informality or technical defects if, in the Lapeer CRC’s sole judgment,

the best interests of the LCRC will be so served.

VIII. Cost Liability

The Lapeer CRC assumes no responsibility or liability for costs incurred by the Consultant prior to the

execution of an Engineering Services Agreement. The liability of the Lapeer CRC is described in the

standard Engineering Services Agreement, a copy of which is available upon request.

SECTION 2: GENERAL SCOPE OF WORK, SERVICES, AND DELIVERABLES

I. Project Specific Scope

The Lapeer CRC has identified various roadway segments that require determinations of allowable load

limits. A geotechnical investigation, including soil borings, will be conducted by the Consultant to make

recommendations to the Lapeer CRC. The roadways identified include both County Primary and Local

Township roads and consist of bituminous pavement and/or aggregate surfaces. The Consultant’s

recommendations will be considered by the Road Commission and/or the appropriate Township Board

of Trustees.

The selected consultant will provide all necessary material, equipment and labor necessary to complete

the work.

If this analysis determines that any roadways need to be posted with reduced load limits, Lapeer CRC

will place any necessary signage.

Page 4: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

The roadway segments included in the scope of services includes those shown on Exhibit A.

II. Work will include, but is not limited to:

A. Perform (2) soil borings or as recommended within each roadway segment, as needed to

perform engineering analysis to make load limit determinations. Segments included are as

shown in the attached Exhibit A.

B. The principal engineer or project manager for the Consultant will be required to drive the

roadways identified in Exhibit A with the County Highway Engineer and/or his representative to

select the location of each soil boring.

C. Calculations necessary to determine the allowable load limit for each roadway segment

identified.

D. Utility Coordination: The Consultant is responsible for contacting Miss Dig as required prior to

performing soil borings.

E. Permits: All work is within Lapeer CRC rights-of-way. Therefore, no permits are required.

F. Maintenance of Traffic: The Consultant is responsible for providing appropriate traffic controls

while performing soil borings.

G. Lapeer CRC will provide traffic count information and projected additional traffic volumes.

III. Deliverables

A. Geotechnical Report. The geotechnical report will include an executive summary,

recommendations for posting roads with reduced load limits and any other relevant findings.

For Coldwater Road and German Road south of Stanley Road, the Consultant will also provide a

proposed flexible pavement design based on the findings of the geotechnical investigation. A

map showing the location of all soil borings, as well as all soil boring logs, will be attached as an

appendix to the geotechnical report.

B. Report shall also include recommendations to preserve pavement integrity of proposed detour

route roads with increased traffic.

SECTION 3: PROJECT ADMINISTRATION

I. Project Schedule

The Geotechnical Report will be delivered to the LCRC within 30 days after execution of the Engineering

Services Agreement.

II. Fee

Once the Consultant is selected based on qualifications, the LCRC will attempt to negotiate a fee for

engineering services that considers all work and staff required, including appropriate overhead and fixed

fee (profit). Unless the scope of the project changes, this fee will be considered a “Not to Exceed

Amount based on hourly submitted fees by personnel classification”.

Estimated hours of staff classification along with hourly rates and grand total of Engineering Cost is

required to be submitted with proposal. Failure to provide an overall estimated cost for a project may

result in rejection of proposal for that project.

Page 5: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

III. Payment

Payment will be made to Consultant following delivery of acceptable deliverables meeting the LCRC’s

requirements outlined in Section 2.

SECTION 4: PROPOSAL RATING METHOD

I. Professional Qualifications - 5 points

A. State the full name and address of the organization and, if applicable, the branch office or other

subordinates that will perform, or assist in performing, the work hereunder. Indicate whether it

operates as an individual, partnership or corporation. If as a corporation, include the state in which it is

incorporated. If appropriate, indicate whether it is licensed to operate in the State of Michigan.

B. Include the number of executive and professional staff who will be employed in the work by skill

and qualification. Show where these personnel will be physically located during the time they are

engaged in the work. Indicate which of these individuals are considered key to the successful completion

of the project. Identify individuals who will do the work on this project by name and title. Resumes or

qualifications are required for key project personnel.

C. State the history of the firm in terms of length of experience, types of services provided and

other relevant information. Identify the technical details that make the firm uniquely qualified for this

work.

II. Past Performance with Similar Projects - 10 points

The written proposal shall include a list of specific experiences in these areas and indicate the firm’s

ability to have projects completed within the budgeted amounts as well as references. A summary of

related projects with the original deadline and cost estimate versus the actual design completion date

and final cost of the design is appropriate in this section.

III. Proposed Work Plan - 15 points

A detailed work plan is to be presented which lists all tasks determined to be necessary to accomplish

the work of this project. The work plan shall define resources needed for each task (title and person

hours) and the staff person completing the project element tasks. In addition, the work plan shall

include a time line schedule depicting the sequence and duration of tasks and showing how the work

will be organized and executed.

The work plan shall be sufficiently detailed and clear to identify the progress milestones (i.e. when

project elements, measures and deliverables are to be completed). Additional project elements

suggested by the Proposer are to be included in the work plan and identified as Proposer suggested

elements.

The Proposer shall also submit, as part of the work plan, a sheet entitled “Consultant’s Understanding of

the Project.” The Proposer shall include specific items that were omitted from the RFQ and, in

particular, any “gray areas” of the RFQ that will need to be addressed during the project. The

Page 6: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific

“Consultant’s Understanding of the Project” shall become part of the contract and a basis for

negotiating extra work. Any item sufficiently addressed in the RFQ shall supersede the “Consultant’s

Understanding of the Project.”

Include any other information believed to be pertinent but not specifically requested elsewhere.

IV. Authorized Negotiator

Include the name and contact information of the person(s) in the organization authorized to negotiate

the Engineering Services Agreement with the Lapeer CRC.

V. Interview

The LCRC will evaluate each proposal by the above-described criteria and point system (I through III) to

select the Consultant for this project. The LCRC reserves the right to reject any proposal that it

determines to be unresponsive and deficient in any of the information requested for evaluation.

The LCRC then may schedule interviews, if necessary, with the selected firms. The selected firms will be

given the opportunity to discuss in greater detail their qualifications, experience, proposed work plan

and fee proposal. The interview shall consist of a presentation of no longer than fifteen (15) minutes by

no more than two (2) representatives of the firm (including the person who will be project manager on

this project). The presentation will be followed by no more than one (1) hour of questions and answers.

Audiovisual aids may be used during the oral interviews.

The firms interviewed will be re-evaluated using the above criteria (I through V), after the interview and

a final decision made.

Page 7: REQUEST FOR QUOTATIONS - Lapeer County - Geotech Services.pdf · The purpose of this Request for Quotations (“RFQ”) is to provide interested and qualified consultants with specific
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Callout
Proposed Detour
dgingell
Callout
Pavt study
dgingell
Callout
Prop WM paved Rd
dgingell
Callout
Prop WM agg Rd
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Polygonal Line
dgingell
Callout
Prop No Thru Trucks
prp
Typewritten Text
EXHIBIT A
dgingell
Polygonal Line

Recommended