Requirements of Pebble Bed Reactor's Plant Information Model Topan Setiadipura Research Group on Design and Computational Aspect of HTGR Center for Nuclear Reactor Technology and Safety BATAN - Indonesia Tech. Meeting to Review First Draft of the Document on Application of the Modern Plant Information Models to Support and Manage Design Knowledge throughout NPP Life Cycler. 22 – 26 June 2015, IAEA Headquarters, Vienna, Austria.
Transcript
Page 1: Requirements of Pebble Bed Reactor's Plant Information Model

Requirements of Pebble Bed Reactor'sPlant Information Model

Topan Setiadipura Research Group on Design and Computational Aspect of HTGRCenter for Nuclear Reactor Technology and Safety

BATAN - Indonesia

Tech. Meeting to Review First Draft of the Document on Application of the Modern Plant Information Models to Support and Manage Design Knowledge throughout NPP Life Cycler.22 – 26 June 2015, IAEA Headquarters, Vienna, Austria.

Page 2: Requirements of Pebble Bed Reactor's Plant Information Model

Introduction

Page 3: Requirements of Pebble Bed Reactor's Plant Information Model

Among the Audiences

Page 4: Requirements of Pebble Bed Reactor's Plant Information Model

Contribution to the Objectives of the Meetings

Page 5: Requirements of Pebble Bed Reactor's Plant Information Model

Indonesia's Experimental Power Reactor

Project

In Indonesia, we call it RDE a 'Reaktor Daya Eksperimental'

Page 6: Requirements of Pebble Bed Reactor's Plant Information Model

Reactor Type: Act. No 10/1997 dan PP 2/2014

Power Reactor

Non­Power Reactor

Commercial

Non­Commercial

Commercial

Non­Commercial

Non­Commercial: BATANCommercial : State­Own­Company, Private Company

Page 7: Requirements of Pebble Bed Reactor's Plant Information Model

Impact of RDE

Electricity

Heat Applicat

ion

R&D on HTGR

RDE will produce electricity . 

RDE

RDE will be used in the R&D of nuclear­heat cogeneration.

RDE akan dimanfaatkan sebagai sarana litbang teknologi HTGR untuk pengembangan desain dan konstruksi HTGR di Indonesia.

Page 8: Requirements of Pebble Bed Reactor's Plant Information Model

RDE Project Plan

6/9/15Badan Tenaga Nuklir Nasional

8

Page 9: Requirements of Pebble Bed Reactor's Plant Information Model

6/10/15Badan Tenaga Nuklir Nasional 9

Future RDE Utilization Plan in Indonesia

Wilayah Pengembangan 

HTGR/SMR(Komersialisasi 

RDE)

Wilayah Pengembangan 

PLTN Besar

Kepadatan Penduduk

RDE will become one of “NPP Model” in Indonesia with huge demand for electricity and/ heat application.

Page 10: Requirements of Pebble Bed Reactor's Plant Information Model

6/9/15Badan Tenaga Nuklir Nasional 10

Tahun

2015 2016 2017 2018 2019

Engineering DesignKontrak

RDE Project Schedule

2020

Engineering, Procurement and Construction (EPC)

Construction Permit

Process

2021

Site Permit Process

Construction Management

OUT PUT:1. Feasibility Study2. Conceptual Design4. Safety Analysis Report [SAR}5. Front­End­Engineering­Design [FEED]6.  EPC Tender Document

Pengawas

Page 11: Requirements of Pebble Bed Reactor's Plant Information Model

Progress of the Project

We finish compiling the RDE Requirement

Currently we are working with Consultant for the Basic Engineering Design Package of RDE.

The consultant is a consortium of● Rekayasa Engineering (Indonesian EPC Company)● Kogas Driyap Consultant (Indonesian Technical

Consultant)● NUKEM Gmbh. (German Company which own by

ROSATOM)

Page 12: Requirements of Pebble Bed Reactor's Plant Information Model

Basemap:Worldview­225/08/2013

Lokasi Lintang Bujur

Desa Muncul Desa Kranggan, Kec. Situ, Kota Tangerang Selatan, Banten

6° 21' 26" LS 106° 39' 37" BT

Site Location

Page 13: Requirements of Pebble Bed Reactor's Plant Information Model

General Specification of RDE

- HTGR type Pebble Bed Reactor (PBR)

- Refere to the HTR-Module design.

Page 14: Requirements of Pebble Bed Reactor's Plant Information Model

 RDE Fuel : Pebble Fuel

- HTGR tipe Pebble Bed Reactor (PBR)

- Mengacu pada desain HTR-Module Jerman.

Page 15: Requirements of Pebble Bed Reactor's Plant Information Model

General Specification of  RDE

Page 16: Requirements of Pebble Bed Reactor's Plant Information Model

Safety Feature(1): ControlInherently the core able to control unepected increase of

fission reaction rate.

6/9/15 16

HTR-Module Siemens Design

Page 17: Requirements of Pebble Bed Reactor's Plant Information Model

Safety Feature(2): CoolingIn the case of accident, it able to transfer heat outside

only by natural mechanism.

6/9/15 17

rcore

Page 18: Requirements of Pebble Bed Reactor's Plant Information Model

Safety Feature (3): Contain

Low radiactive release to the environment even in the most severe accident.

6/9/15 18

Page 19: Requirements of Pebble Bed Reactor's Plant Information Model

PBR : Ex. Of Master Logic Diagram

6/9/15 19

Source: G.Brinkmann et.al / NED 236(2006)463-474

Page 20: Requirements of Pebble Bed Reactor's Plant Information Model

PBR : A Moving Core Reactor

6/9/15 20

RDE will follow the Multipass cycle.

Page 21: Requirements of Pebble Bed Reactor's Plant Information Model

PBR : Fuel Handling Mechanism

6/9/15 21

Page 22: Requirements of Pebble Bed Reactor's Plant Information Model

PBR : Analysis requirements

6/9/15 22

Source: IAEA Course on HTGR by F.Reitsma

Page 23: Requirements of Pebble Bed Reactor's Plant Information Model

PBR General Feature (Part of SAR)

6/9/15 23

Page 24: Requirements of Pebble Bed Reactor's Plant Information Model

Remarks on RDE Project and PIM Development

6/9/15 24

Establisment of PIM is a huge help for the newcomer to comprehend the design and assure that the design feature is fulfilled.

For instance, in our RDE requirement development we need to carefully differentiate between the direct or indirect cycle related technology.

Indonesia's RDE Project can take a huge advantage from a PBR-compatible PIM.

It is important for us to involve in the PIM innitiatives lead by IAEA.

Page 25: Requirements of Pebble Bed Reactor's Plant Information Model

Milestone to PBR-Compatible PIM

6/9/15 25

- Development of PBR's Taxonomy and Basic Requirements (as have been done for FR)- Identify the Common NPP Requirements- Identify the specific PBR Requirements