NOTES: 1. All Interval metering requires telemetry. 2. Grouped meter location and installation shall be according to National Grid’s jurisdiction applicable service and tariff requirements. See ESB 750 and ESB 756 Appendix C for the MA service jurisdiction (https://www.nationalgridus.com/ ProNet/Technical-Resources/Electric-Specifications). IC installs meter socket trough grouped at service location accessible for National Grid’s AMR meters (net type for load + DER and bi-directional for MA SMART DER). < 60 kW applications are watthour type revenue meters and > 60 kW are interval type. All kWh measured through the MA SMART meter is compensated through the MA SMART incentive rate. 3. Generator disconnect installed according to NEC and National Grid’s MDPU Interconnection Tariff. 4. Inverters shall be UL 1741 or UL 1741 SA certified for parallel operation with the utility (area EPS). 5. Where existing PCC meter is inside, the IC will upgrade their service connection to change it to outside location grouped with MA SMART Solar meter. 6. Bypass meter sockets required in accordance to ESB 750 table 7.2-1. 7. Certified Inverter-based DER Interconnections <25kW may not be required to have an additional disconnecting means in accordance with ESB 756 Appendix C. 8. The following drawings are conceptual only. It is the responsibility of the customer to adhere to all applicable codes, standards and requirements. 9. For systems 25 kW and below a disconnecting or isolation means shall be required to be located between the Company meter installation and the DER device to allow for Company testing of the meter socket prior to meter installation.(1) This device may be located based on customer preference, although where this device is not accessible to the Company (2), this may cause delay with associated meter installation and testing. 10. Line side Disconnect in addition to the load side disconnect required for 480/277 Volt installations. 11. All Interval Meters will require telemetry 12. Ganged metering sockets are not allowed in this program. 13. PV and ESS will be wired to the load side of the Meter Socket. DER: Distributed Energy Resource DG: Distributed Generator (a subset of DER) EPS: Electric Power System IC: Interconnection Customer PCC: Point of Common Coupling PoC: Point of Connection Wh: Watthour Meter (may include demand quantities of Watts and VA) Residential/Commercial DG Customer SMART SOLAR Metering Notes (1) The need for this disconnect is not a new requirement for testing meter socket installations. With existing load customer as well as behind-the-meter DER installations, the customer’s main service or parallel power production disconnect is in a position where isolation has been available. This isolation has typically been the main service overcurrent protection device. With the inclusion of sub metering installations, the main service OCP is no longer between the circuit path between the sub meter and the connected DER device, therefore an isolation point to allow for testing is required. (2) The Company recommends locating this outside, adjacent to the meter socket to allow for the most flexibility for meter installation and future change-outs.
Transcript
Page 1: Residential/Commercial DG Customer SMART SOLAR …

NOTES:1. All Interval metering requires telemetry.2. Grouped meter location and installation shall be according to National Grid’s jurisdiction applicable service and tariffrequirements. See ESB 750 and ESB 756 Appendix C for the MA service jurisdiction (https://www.nationalgridus.com/ProNet/Technical-Resources/Electric-Specifications).

IC installs meter socket trough grouped at service location accessible for National Grid’s AMR meters (net typefor load + DER and bi-directional for MA SMART DER).< 60 kW applications are watthour type revenue meters and > 60 kW are interval type.

All kWh measured through the MA SMART meter is compensated through the MA SMART incentive rate.3. Generator disconnect installed according to NEC and National Grid’s MDPU Interconnection Tariff.4. Inverters shall be UL 1741 or UL 1741 SA certified for parallel operation with the utility (area EPS).5. Where existing PCC meter is inside, the IC will upgrade their service connection to change it to outside locationgrouped with MA SMART Solar meter.6. Bypass meter sockets required in accordance to ESB 750 table 7.2-1.7. Certified Inverter-based DER Interconnections <25kW may not be required to have an additional disconnecting meansin accordance with ESB 756 Appendix C.8. The following drawings are conceptual only. It is the responsibility of the customer to adhere to all applicable codes,standards and requirements.9. For systems 25 kW and below a disconnecting or isolation means shall be required to be located between theCompany meter installation and the DER device to allow for Company testing of the meter socket prior to meterinstallation.(1) This device may be located based on customer preference, although where this device is not accessible tothe Company (2), this may cause delay with associated meter installation and testing.10. Line side Disconnect in addition to the load side disconnect required for 480/277 Volt installations.11. All Interval Meters will require telemetry12. Ganged metering sockets are not allowed in this program.13. PV and ESS will be wired to the load side of the Meter Socket.

DER: Distributed Energy ResourceDG: Distributed Generator (a subset of DER)EPS: Electric Power SystemIC: Interconnection CustomerPCC: Point of Common CouplingPoC: Point of Connection

Wh: Watthour Meter (may include demand quantities of Watts and VA)

Residential/Commercial DG CustomerSMART SOLAR Metering Notes

(1) The need for this disconnect is not a new requirement for testing meter socket installations. With existing load customer as well as behind-the-meter DER installations, thecustomer’s main service or parallel power production disconnect is in a position where isolation has been available. This isolation has typically been the main serviceovercurrent protection device. With the inclusion of sub metering installations, the main service OCP is no longer between the circuit path between the sub meter and theconnected DER device, therefore an isolation point to allow for testing is required.(2) The Company recommends locating this outside, adjacent to the meter socket to allow for the most flexibility for meter installation and future change-outs.

Page 2: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh Wh

UTILITY SERVICE METER

FACILITYLOADS

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerBehind the Meter MA SMART < 60 kW

(Behind Main Service Equipment)

This diagram is representative ofone proposal and the utility may

require other configurations.

DG

Main ServiceEquipment

DG/DERProtection &

Control

OUTSIDE

INSIDE

Generator Disconnect

1a

See Note 9Disconnectrequired formeteringtesting.

$

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

All Meters >60 kW; Bi-directionalwith Telemetry

Line

Load

Page 3: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoCWh

Wh

FACILITYLOADS

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerBehind the Meter MA SMART < 60 kW

(Tap Ahead of Main Service Equipment)

DG

Main ServiceEquipment #1

Main ServiceEquipment #2

(GeneratorDisconnect)

OUTSIDE

INSIDE

Tap Box cannotbe associated

with the metersocket

1b

$

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

All Meters >60 kW; Bi-directionalwith Telemetry

Line

LoadSee Note 9Disconnectrequired formeteringtesting.

Page 4: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh Wh

FACILITYLOADS

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerBehind the Meter MA SMART < 60 kW

With AC ESS SYSTEM

DG

Main ServiceEquipment

DG Protection& Control

OUTSIDE

INSIDE

Generator Disconnect

1c

BatteryAC

Disconnect

BatteryStorage

Inverter(charge &discharge)

ESS System

DG Protection& Control

$

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

All Meters >60 kW; Bi-directionalwith Telemetry

Line

LoadSee Note 9Disconnectrequired formeteringtesting.

Page 5: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh Wh

FACILITYLOADS

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerBehind the Meter MA SMART < 60 kW

With DC ESS SYSTEM

DG

Main ServiceEquipment

DG Protection& Control

OUTSIDE

INSIDE

Generator Disconnect

1d

BatteryStorage

(charge &discharge)

ESS System

Version 10-04-2018

$

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

All Meters >60 kW; Bi-directionalwith Telemetry

Line

LoadSee Note 9Disconnectrequired formeteringtesting.

Page 6: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

PremisesLoads

Wh

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnect

Collector PVArray

ACDisconnect

PV Array

ServiceEntrance

Inverter(string)

Service Point or PCC

Generatoror DG

Facility

STGU AC Connection to Utility EPS 60 to 500kWBehind the Meter MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

+ -

+ -

$Wh

2a

Note 10Note 10

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 7: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

PremisesLoads

Wh

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnectCollector PV

ArrayAC

Disconnect

PV Array

BatteryAC

Disconnect

BatteryStorage

ServiceEntrance

Inverter(string) Inverter

(charge &discharge)

Service Point or PCC

Generatoror DG

Facility ESS System

ESSDisconnect

ESS Battery + STGU Paired AC Connection to Utility EPS 60 to 500kWBehind the Meter MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

Wh

+ -

+ -

2b

$

Note 10

Note 10

Note 10

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh UTILITY PV GENERATION METER

Wh UTILITY STORAGE METER

Wh

All Meters >60 kW; Bi-directionalwith Telemetry

Page 8: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

PremisesLoads

Wh

Main ServiceDisconnect

Main Distribution Panel

Collector PVArray

ACDisconnect

PV ArrayBatteryStorage

ServiceEntrance

Inverter

(charge &discharge)

Service Point or PCC

Generatoror DG

Facility

ESS System

DC ESS Battery + STGU Paired Connection to Utility EPS 60 to 500kWBehind the Meter MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

+ -

+ -

Wh

2c

$

Note 10

Note 10

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 9: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

PremisesLoads

Wh

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnect

Collector PVArray

ACDisconnect

PV Array

BatteryAC

Disconnect

BatteryStorage

ServiceEntrance

Inverter

Inverter(charge &discharge)

Service Point or PCC

Generatoror DG

Facility

ESS System

ESSDisconnect

ESS Battery + Multiple STGU Paired AC Connection to Utility EPS 60 to 500kWBehind the Meter MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

Wh

+ -

+ -

2d

$Wh

Note 10Note 10 Note 10

Collector PVArray

ACDisconnect

PV Array

Inverter

Generatoror DG

Facility

+ -

+ -

Behind the Meter DifferentArray with Different Smart

Incentive levels

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 10: Residential/Commercial DG Customer SMART SOLAR …

STGU Paired AC Connection to Utility EPS 500kW and GreaterBehind the Meter MA SMART

Utility

Customer

Customer’s DERFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

Main Bus DER CustomerMain ServiceEquipment

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

PremisesLoads

See Note 2 $

3a

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

MM

All Meters >60 kW; Bi-directionalwith Telemetry

Page 11: Residential/Commercial DG Customer SMART SOLAR …

MM

M

ESS AC Battery + STGU Paired AC Connection to Utility EPS 500kW and GreaterBehind the Meter MA SMART

ESS BatteryAC

Disconnect &O.C. Protection

ESS Battery

Inverter(charge &discharge)

BatteryDC

Disconnect

Utility

Customer

Customer’s DERFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

Main Bus

ESS Step-UpTransformer

Point of CommonCoupling (PCC) or Service

Point

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

See Note 2

$

3b

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

PremisesLoads

Page 12: Residential/Commercial DG Customer SMART SOLAR …

M

M

ESS DC Battery + STGU Paired AC Connection to Utility EPS 500kW and GreaterBehind the Meter MA SMART

ESS Battery

Utility

Customer

Customer’s DERFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

Main Bus

Point of CommonCoupling (PCC) or Service

Point MAINDISCONNECT

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

PremisesLoads

See Note 2

$

(charge &discharge)

3c

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 13: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerStand Alone MA SMART < 60 kW

DG

Main ServiceEquipment

DG/DERProtection &

Control

Generator Disconnect

4a

$

Aux. Load

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 14: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerStand Alone MA SMART < 60 kW

With AC ESS SYSTEM

DG

Main ServiceEquipment

DG Protection& ControlGenerator Disconnect

4b

BatteryAC

Disconnect

BatteryStorage

Inverter(charge &discharge)

ESS System

$

Aux. Load

Wh

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

See Note 9< 25 kWrequired formeteringtesting.

Page 15: Residential/Commercial DG Customer SMART SOLAR …

RETAIL

UTILITY – AREA EPS

INTERCONNECTIONCUSTOMER –

LOCAL EPS

PCC

PoC

Wh

REVENUE METERS ARE BI-DIRECTIONAL, NET METER AMR TYPE AND UTILITY OWNED.

METER LOCATIONS DETERMINED BY UTILITY FOR AMR ACCESS REQUIREMENTS.

Residential/Commercial DG CustomerSTAND ALONE MA SMART < 60 kW

With DC ESS SYSTEM

DG

Main ServiceEquipment

DG Protection& Control

Generator Disconnect

4c

BatteryStorage

Inverter(charge &discharge)

ESS System

$

Aux. Load

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 16: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

Wh

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnect

Collector PVArray

ACDisconnect

PV Array

ServiceEntrance

Inverter(string)

Service Point or PCC

Generatoror DG

Facility

STGU AC Connection to Utility EPS 60 to 500kWStandalone MA SMARTUtility’s Radial Distribution

3-Phase, 4-Wire SystemSecondary Metering

+ -

+ -

5a

Note 10

$

Aux. Load

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 17: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnect

Collector PVArray

ACDisconnect

PV Array

BatteryAC

Disconnect

BatteryStorage

ServiceEntrance

Inverter(string)

Inverter(charge &discharge)

Service Point or PCC

Generatoror DG

FacilityESS System

ESSDisconnect

AC ESS Battery + STGU Paired AC Connection to Utility EPS 60 to 500kWSTAND ALONE MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

Wh

+ -

+ -

$

5b

Wh

Note 10 Note 10

Aux. Load

Wh

Note 10

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 18: Residential/Commercial DG Customer SMART SOLAR …

Main ServiceEquipment

Utility

Customer

Main ServiceDisconnect

Main Distribution Panel

PVGeneratorDisconnect

Collector PVArray

ACDisconnect

PV Array

BatteryStorage

ServiceEntrance

Inverter

(charge &discharge)

Service Point or PCC

Generatoror DG

Facility

ESS System

DC ESS Battery + STGU Paired AC Connection to Utility EPS 60 to 500kWSTAND ALONE MA SMART

Utility’s Radial Distribution3-Phase, 4-Wire System

Secondary Metering

+ -

+ -

$

5c

ServiceEntrance

Wh

ServiceEntrance

Note 10

Aux. Load

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 19: Residential/Commercial DG Customer SMART SOLAR …

Utility

Customer

Collector PVArray

ACDisconnect

PV Array

BatteryAC

Disconnect

BatteryStorage

Inverter(string)

Inverter(charge &discharge)

Service Point or PCC

Generatoror DG

FacilityESS System

ESSDisconnect

AC ESS Battery + Multiple STGU’s Paired AC Connection to Utility EPS 60 to 500kWWith Different Smart Incentive Rates if allowed

STAND ALONE MA SMARTUtility’s Radial Distribution

3-Phase, 4-Wire SystemSecondary Metering

Wh

+ -

+ -

5d

ServiceEntrance

Stand Alone DifferentArray with Different

Smart Incentive levels

Collector PVArray

ACDisconnect

Inverter(string)

Generatoror DG

Facility

+ -

+ -

WhPV

GENERATIONMETER 2

PVGeneratorDisconnect

PVGeneratorDisconnect

Note 10 Note 10

PV Array

$

$

Aux. Load

Wh

Main ServiceEquipment

Main ServiceDisconnect

Main Distribution Panel

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

Wh

Wh

Wh UTILITY STORAGE METER

UTILITY PV GENERATION METERService Point or PCC

ServiceEntrance

Wh

PVGENERATION 2

All Meters >60 kW; Bi-directionalwith Telemetry

Page 20: Residential/Commercial DG Customer SMART SOLAR …

M

STGU AC Connection to Utility EPS 500kW and GreaterSTAND ALONE MA SMART

Utility

Customer

Customer’s DGFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

Main Bus

Point of CommonCoupling (PCC) or Service

Point

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

See Note 2

$

6a

InterruptingDevice

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 21: Residential/Commercial DG Customer SMART SOLAR …

M M

M

AC ESS Battery + STGU Paired AC Connection to Utility EPS 500kW and GreaterSTAND ALONE MA SMART

ESS BatteryAC

Disconnect &O.C. Protection

ESS Battery

Inverter(charge &discharge)

BatteryDC

Disconnect

Utility

Customer

Customer’s DERFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

DER CustomerMain ServiceEquipment

ESS Step-UpTransformer

Point of CommonCoupling (PCC) or Service

Point

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

See Note 2

$

6b

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry

Page 22: Residential/Commercial DG Customer SMART SOLAR …

M

DC ESS Battery + STGU Paired AC Connection to Utility EPS 500kW and GreaterSTAND ALONE MA SMART

ESS Battery

(charge &discharge)

Utility

Customer

Customer’s DERFacility

Utility’s Radial DistributionPrimary 3-Phase, 4-Wire System

Primary Metering

MAININTERRUPTING

DEVICE

Main Bus

Point of CommonCoupling (PCC) or Service

Point

Collector PV ArrayAC

Disconnect &O.C. Protection

Inverter

PV ArrayDC

Disconnect

Aux. Load

PV Array+ -

+ -

PV Step-UpTransformer

Customer’s Electrical Energy Sources (Current)

6c

$

UTILITY SERVICE METER

This diagram is representative ofone proposal and the utility may

require other configurations.

M

M

M UTILITY STORAGE METER

UTILITY PV GENERATION METER

All Meters >60 kW; Bi-directionalwith Telemetry