The future holds many unknowns and risks from a variety of climate-based hazards. But what will district life be like when the proverbial sun is out? A framework for flexibility, diversity and innovation is presently more achievable than planning for any specific metrics or standards of performance. By focusing on resiliency strategies that are multifaceted – that both delight and perform – we can ensure that stakeholders have an unmatched urban experience, even as they face the challenges of climate change. Global gateway cities will require resilient districts to remain competitive on the world stage and offer the lifestyle urban dwellers seek. The 100 Acre District must perform and captivate. RESILIENT LINKAGES proposes a strategy that embraces the fluctuations of the tide and mounting sea level by building a higher level “ground plane” through both public and private investment in a responsive infrastructure and creating an aqueous Central Park that doubles as a water management system. Planning policies that raise the resiliency requirements and incentivize responsible building and contributions to the public realm ensure successful development of a desirable and resilient urban district. The District: THE DISTRICT
Transcript
Page 1: "Resilient Linkages" led by NBBJ

The future holds many unknowns and risks from a variety of climate-based hazards. But what will district life be like when the proverbial sun is out? A framework for flexibility, diversity and innovation is presently more achievable than planning for any specific metrics or standards of performance. By focusing on resiliency strategies that are multifaceted – that both delight and perform – we can ensure that stakeholders have an unmatched urban experience, even as they face the challenges of climate change. Global gateway cities will require resilient districts to remain competitive on the world stage and offer the lifestyle urban dwellers seek. The 100 Acre District must perform and captivate.

RESILIENT LINKAGES proposes a strategy that embraces the fluctuations of the tide and mounting sea level by building a higher level “ground plane” through both public and private investment in a responsive infrastructure and creating an aqueous Central Park that doubles as a water management system. Planning policies that raise the resiliency requirements and incentivize responsible building and contributions to the public realm ensure successful development of a desirable and resilient urban district.

The District:THE DISTRICT

Page 2: "Resilient Linkages" led by NBBJ

B

Stormwater retention ponds

Saltwater waterparks

Ground-level open space

Plaza-level open space

New Harborwalk

Levee

Central Artery Tunnel

A

A

B

B C

C

FOCU

S AR

EA

CENTRAL ARTERY TUNNEL

2006 100 ACRE PLAN

• Apply targeted planning policies that provide incentives for responsible development and enable public/private investment in the District’s infrastructure and public realm.

• Create a vital urban district by including a comprehensive mix of uses and services in the development plan.

• Build a higher level “ground plane” through public and private investment in an elevated infrastructure.

• Install advanced sustainable systems for water management and treatment, energy production, distribution and building performance.

• Integrate a water park system to accept wicked high tides, storm surges and provide rainwater storage from roofs and streets in the form of cisterns for potable water and phytoremediated holding ponds.

• Connect the District to higher ground across the Channel to South Station and to the “Arks” at BCEC and Gillette.

Linkages:

100 Acre Plan Resilient Linkages

Total Land Area (ac) 88.7 61.3Open Space (ac) 11.4 22.9Underutilized Land (sf) 1,524,600 1,500,000New Development Footprint (sf) 602,000 460,000New Development (sf) 5,900,000 6,780,000Ex. Development (sf) 4,500,000 2,300,000FAR New Development 3.87 4.52 % Residential 39% 42%

THE PLAN

Page 3: "Resilient Linkages" led by NBBJ

3

RAISE THE ROAD

The development incentive framework is designed to hold public and private sectors to minimum baseline standard of development for resiliency shown in the strategies that must be deployed on all parcels. After those are conditions are met developers can obtain development incentives tailored to their site by deploying as many of the optional public benefits as possible. Incentives include height for parcels where height is desired. For other parcels, a range of non-dimensional incentives provides an opportunity for responsible development practices.

START AT THE TOP

ENERGIZED

UP WE GO

THE TAX MAN LEVETH

MORE MORE MOREPLAZASCAPES

CLEAN IT

DON’T PARK HERE 2.0GET ME A J-O-B

GREENOVATE

WATER EVERYWHERE

WALK THIS WAY

FLOOD RELIEF 1.0

DON’T PARK HERE 1.0AFFORDABLE DIGS

FLOOD RELIEF 2.0HOME GROWN

RENEWABLE

LOBBY IN THE SKY

LEED THE WAY

MAKE A B.I.D.

BEST IN CLASS

DEVELOPMENT INCENTIVE FRAMEWORK

PUBLIC BENEFITS

ALL P

ARCE

LS -

REQU

IRED

PRIVATE INCENTIVES

Utilities

Lobby

Retail

2015

2050

20502100

LEED

OPTI

ONAL

PUB

LIC B

ENEF

ITS

NEW

- HE

IGHT

BON

US P

ARCE

LSEX

ISTI

NG B

UILD

ING

PARC

ELS

NEW

- HE

IGHT

CAP

PED

PARC

ELS

LEED

Build a structure capable of accepting a new, higher roadway network

Building height counted from level of future roadway network.

Access to district energy system developed for emergency/supplementary use.

Raised road and utility infrastructure that integrates with private development.

Tax abatment program based on early adoption of flood retrofit.

.75 FAR increase for each measure adopted - up to 300’

Inclusion of additional plaza space within parcel boundaries that integrate with sidewalks/pathways.

Inclusion of onsite stormwater quanitity and quality management.

Full parking relief by 2050. 50% reduction in parking on day 1

Incentives for coworking office space and/or job density above certain thresholds.

Build or retrofit to Living Building Challenge.

Water focused public open space amentities that perform during storms and please during calm weather.

Baseline off street parking requirements 25% below 2015 city standards.

Flood insurance relief based on number of public benefit measures adopted.

.1 reduction in parking ratio for each measure adopted.

Incentive bonus based on % of affordable housing units provided above city standard - allocated in 5% increments.

Flood insurance relief based number public benefit measures adopted.

Inclusion of retail at ground plane occupied by locally owned restaurant or business.

Inclusion of onsite energy production to offset reliance on the grid.

Expand Chapter 91 public space at project inception to integrate with future road nework

New construction and renovations adhere to LEED GOLD standard.

Compulsary participation in a business improvement district to help maintain open space.

All new construction is Type 1 with structures designed for submersion at base and storm surges. Critical building infrastructure is raised above flood levels.

NEW DEVELOPMENT

ELEVATED LINKAGES

WATER INFRASTRUCTURE

BUILDING UP

ELEVATE

YIELD TO WATER ELEVATE

LOBBY IN THE SKYBEST IN CLASS

START AT THE TOPMAKE A B.I.D.

CLEAN IT(STORM WATER THAT IS)

PLAZASCAPESMORE MORE MORE

CLEAN ITGREENOVATERENEWABLE

UP WE GOBEST IN CLASS RAISE THE ROAD

THE TAX MAN LEVETH (IF YOU RETROFIT)

WALK THIS WAY

HEIGHT INCENTIVE PARCELS

HEIGHT CAPPED PARCELS (150’)

ALL PARCELS MEASURE HEIGHT FROM NEW ROAD DATUM

SOLAR AT BCEC

COMMUNITY GARDENS

DISTRICT POWER

ELEVATE ROADS/SIDEWALKS

STORM WATER MANAGEMENT

FRESH WATER

EXISTING BUILDINGS GET BREAKS FOR RETROFITTING

LEVEE BY 2050

BRACKISH WATER

STORM STORAGE

TIDAL POWER

BUILD TO EL. +32. ACTIVATE PODIUM

RAISED ROADS (AND PARKS)

THE WORKS

Page 4: "Resilient Linkages" led by NBBJ

2020 2050

HIGH TIDE +15.5’

LOW TIDE +8’

2015 +8’

2100 + 18’2050 + 15.5’

SALT WATER BRACKISH WATER WATER REGULATION FRESH WATER

SELF- PURIFYING SYSTEM SALINITY TRANSFORMING OVER TIME WATER REGULATION TANK / EXTRA STORM WATER HOLDING CAPACITY

DRINKING WATER CISTERN

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

A water management and treatment system performs as an aqueous landscape of social space and recreation. Water is celebrated within the Central Park and enjoyed through water play areas, swimming pools, irrigated beds for urban agriculture, lush green open spaces, a beach, boardwalks, fishing docks and a terraced tidal play zone. The park is extended over the rail beds and surface road to the BCEC to serve as a conduit for water and renewable energy collection from its roof, and as a means of egress to the Ark in times of emergency.

At the base of the central inlet are two swimming pools floating in Fort Point Channel. Lights within these pools act as indicators of water cleanliness - red means danger and blue/ green means clear to swim.

COMMUNITY GARDEN

STORMWATER MANAGEMENT

SKY TERRACE

STOR

M W

ATER

COL

LECT

PLAY FOUNTAIN PARK SWIMMING POOL

Drinking water collection

Irrigation water collection

BRACKISH AREA 32FT. HIGH PROTEC-TIVE DAM ALONG STREET’

PRELIMINARYSEAWALL

TIDAL POOLSFLOATING POOLS

Aqueous Central Park

THE PARKS


Recommended