Markup Summary
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/10/2019 9:04:59 AMColor:
Provide bearing and distance information fordrainage easement.
Daniel Torres (16)
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/10/2019 9:28:38 AMColor:
Update note 10 to identify if the road impact fee isto be paid in full or if the developer is requesting tobe included in a PID (5 mil or 10 mil)
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/10/2019 9:28:44 AMColor:
Update to current FEMA FIRM panel number anddate
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/10/2019 9:31:45 AMColor:
Insert the following after the first sentence in note4 (Keep the last sentence): " Public drainageeasements as specifically noted on the plat shallbe maintained by the individual lot owners unlessotherwise indicated."
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 2:22:41 PMColor:
Please indicate the ROW dedication to El Pasocounty
Provide bearing and
distance information
for drainageeasem
ent.
Update note 10 to
identify if the roadim
pact fee is to bepaid in full or if thedeveloper isrequesting to beincluded in a P
ID (5
mil or 10 m
il)
Update to current
FE
MA
FIR
M panel
number and date
Insert the following after the first sentence
in note 4 (Keep the last sentence): " P
ublicdrainage easem
ents as specifically notedon the plat shall be m
aintained by theindividual lot ow
ners unless otherwise
indicated."
Please indicate theROW dedication to ElPaso county
Subject: Text BoxPage Label: 1Author: Daniel TorresDate: 6/12/2019 4:34:21 PMColor:
Please add the following notes:
1. Developer shall comply with federal and statelaws, regulations, ordinances, review and permitrequirements, and other agency requirements, ifany, of applicable agencies including, but notlimited to, the Colorado Division of Wildlife,Colorado Department of Transportation, U.S. ArmyCorps of Engineers and the U.S. Fish and WildlifeService regarding the Endangered Species Act,particularly as it relates to the listed species (e.g.,Preble’s Meadow Jumping Mouse).
2. No lot or interest therein, shall be sold,conveyed, or transferred whether by deed or bycontract, nor shall building permits be issued, untiland unless either the required public and commondevelopment improvements have beenconstructed and completed and preliminarilyaccepted in accordance with the SubdivisionImprovements Agreement between theapplicant/owner and El Paso County as recordedunder Reception Number ________________ inthe Office of the Clerk and Recorder of El PasoCounty, Colorado or, in the alternative, othercollateral is provided to make provision for thecompletion of said improvements in accordancewith the El Paso County Land Development Codeand Engineering Criteria Manual. Any suchalternative collateral must be approved by theBoard of County Commissioners or, if permitted bythe Subdivision Improvements Agreement, by thePlanning and Community DevelopmentDepartment Director and meet the policy andprocedure requirements of El Paso County prior tothe release by the County of any lots for sale,conveyance or transfer.
3. Lot 9 and Lot 10 of this property is subject to aPrivate Detention Basin/Stormwater Quality BMPMaintenance Agreement and Easement asrecorded at Reception No._______ of the recordsof El Paso County. The _______ HOA (or Owneror District) is responsible for maintenance of thesubject drainage facilities.
4. Individual lot purchasers are responsible forconstructing driveways, including necessarydrainage culverts from Abert Ranch Drive andSilver Nell Drive per Land Development CodeSection 6.3.3.C.2 and 6.3.3.C.3. Due to theirlength, some driveways will need to be specificallyapproved by the (name of Fire District)
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 4:34:52 PMColor:
This may be removed
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 4:38:21 PMColor:
Please remove temporary turnaround as SilverNell is planned to be constructed providingnecessary access to this subdivision
Please add the follow
ing notes:
1. Developer shall com
ply with federal and state law
s, regulations, ordinances, review and perm
itrequirem
ents, and other agency requirements, if any, of applicable agencies including, but not lim
ited to,the C
olorado Division of W
ildlife, Colorado D
epartment of T
ransportation, U.S
. Arm
y Corps of E
ngineersand the U
.S. F
ish and Wildlife S
ervice regarding the Endangered S
pecies Act, particularly as it relates to
the listed species (e.g., Preble’s M
eadow Jum
ping Mouse).
2. No lot or interest therein, shall be sold, conveyed, or transferred w
hether by deed or by contract, norshall building perm
its be issued, until and unless either the required public and comm
on development
improvem
ents have been constructed and completed and prelim
inarily accepted in accordance with the
Subdivision Im
provements A
greement betw
een the applicant/owner and E
l Paso C
ounty as recordedunder R
eception Num
ber ________________ in the Office of the C
lerk and Recorder of E
l Paso C
ounty,C
olorado or, in the alternative, other collateral is provided to make provision for the com
pletion of saidim
provements in accordance w
ith the El P
aso County Land D
evelopment C
ode and Engineering C
riteriaM
anual. Any such alternative collateral m
ust be approved by the Board of C
ounty Com
missioners or, if
permitted by the S
ubdivision Improvem
ents Agreem
ent, by the Planning and C
omm
unity Developm
entD
epartment D
irector and meet the policy and procedure requirem
ents of El P
aso County prior to the
release by the County of any lots for sale, conveyance or transfer.
3. Lot 9 and Lot 10 of this property is subject to a Private D
etention Basin/S
tormw
ater Quality B
MP
Maintenance A
greement and E
asement as recorded at R
eception No._______ of the records of E
l Paso
County. T
he _______ HO
A (or O
wner or D
istrict) is responsible for maintenance of the subject drainage
facilities.
4. Individual lot purchasers are responsible for constructing driveways, including necessary drainage
culverts from A
bert Ranch D
rive and Silver N
ell Drive per Land D
evelopment C
ode Section 6.3.3.C
.2 and6.3.3.C
.3. Due to their length, som
e driveways w
ill need to be specifically approved by the (name of F
ireD
istrict)
This m
ay be removed
Please rem
ovetem
porary turnaroundas S
ilver Nell is
planned to beconstructed providingnecessary access tothis subdivision
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 4:44:10 PMColor:
Provide easement for channel. See comment ondrainage report.
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 4:45:43 PMColor:
Please indicate that Settlers Ranch Rd is to be theemergency access road.
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 7:56:28 AMColor:
Drainage easement to continue upstream asshown on the drainage plan.
Subject: HighlightPage Label: 1Author: Daniel TorresDate: 6/12/2019 7:56:35 AMColor:
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/12/2019 8:59:56 AMColor:
Increase the width of the drainage easement tocontain the top width of the channel (100 yr flow).See comment on Drainage plan
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/6/2019 5:20:11 PMColor:
Resolution 18-471
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/6/2019 5:20:37 PMColor:
Lot 1 and Lot 2
Subject: CalloutPage Label: 1Author: Daniel TorresDate: 6/6/2019 5:20:55 PMColor:
SF1911
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 2:52:56 PMColor:
If this is going to be approved administrativelyremove this and place Director, Planning andCommunity Development
dsdparsons (21)
Provide easem
ent forchannel. S
eecom
ment on drainage
report.P
lease indicate thatS
ettlers Ranch R
d isto be the em
ergencyaccess road.
Drainage easem
entto continue upstreamas show
n on thedrainage plan.
Increase the width of
the drainageeasem
ent to containthe top w
idth of thechannel (100 yr flow
).S
ee comm
ent onD
rainage plan
Resolution 18-471
Lot 1 and Lot 2
SF
1911
If this is going to beapprovedadm
inistrativelyrem
ove this and placeD
irector, Planning
and Com
munity
Developm
ent
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 2:56:10 PMColor:
No lots may be subdivided a max of 10 lots isallowed
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:01:47 PMColor:
add note offsite easement/tract for ER accessprovided through tract ? of Settlers Ranch 2C andwill be built by X and maintained by X until SettlersRanch Road is brought up tp County Roadstandards as a public road by the developer to thesouth.
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:04:05 PMColor:
If this is platted ROW does the easement need tobe non-revocable?
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:05:37 PMColor:
Your missing the drainage easements necessaryto include the constraints identified in the GEOreport with the Prelim plan. Also add the geonotes to the notes of the plat.
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:11:40 PMColor:
This s not needed if Mark records and you haveaccess to build the emergency access through hisproperty. the CDS should reflect that if that is whatyour proposing so there is no need to encumber, vacate and revegatete lots 9 & 10
Subject: HighlightPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:12:12 PMColor:
Subject: HighlightPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:12:15 PMColor:
Subject: EnvironmentalPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:12:40 PMColor:
Environmental:Developer shall comply with federal and statelaws, regulations, ordinances, review and permitrequirements, and other agency requirements, ifany, of applicable agencies including, but notlimited to, the Colorado Division of Wildlife,Colorado Department of Transportation, U.S. ArmyCorps of Engineers and the U.S. Fish and WildlifeService regarding the Endangered Species Act,particularly as it relates to the listed species (e.g.,Preble’s Meadow Jumping Mouse).
No lots m
ay besubdivided a m
ax of10 lots is allow
ed
add note offsiteeasem
ent/tract for ER
access providedthrough tract ? ofS
ettlers Ranch 2C
and will be built by X
and maintained by X
until Settlers R
anchR
oad is brought up tpC
ounty Road
standards as a publicroad by the developerto the south.
If this is platted RO
Wdoes the easem
entneed to benon-revocable?
Your m
issing thedrainage easem
entsnecessary to includethe constraintsidentified in the G
EO
report with the P
relimplan. A
lso add thegeo notes to thenotes of the plat.
This s not needed if
Mark records and you
have access to buildthe em
ergencyaccess through hisproperty. the C
DS
should reflect that ifthat is w
hat yourproposing so there isno need to encum
ber, vacate andrevegatete lots 9 &
10
Environm
ental:D
eveloper shall comply w
ith federal andstate law
s, regulations, ordinances, reviewand perm
it requirements, and other agency
requirements, if any, of applicable agencies
including, but not limited to, the C
oloradoD
ivision of Wildlife, C
olorado Departm
ent ofT
ransportation, U.S
. Arm
y Corps of
Engineers and the U
.S. F
ish and Wildlife
Service regarding the E
ndangered Species
Act, particularly as it relates to the listed
species (e.g., Preble’s M
eadow Jum
pingM
ouse).
Subject: Soils & GeologyPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:13:25 PMColor:
Soil and Geology Conditions:Geologic Hazard Note-Final Plat: (to becustomized based upon the individualcircumstances)The following lots have been found to be impactedby geologic hazards. Mitigation measures and amap of the hazard area can be found in the report(Title of Report, generally from the PreliminaryPlan file) by (author of the report) (date of report) infile (name of file and file number) available at theEl Paso County Planning and CommunityDevelopment Department:§Downslope Creep: (name lots or location of area)§Rockfall Source:(name lots or location of area)§Rockfall Runout Zone:(name lots or location ofarea)§Potentially Seasonally High Groundwater:(namelots or location of area)§Other Hazard: In Areas of High Groundwater:Due to high groundwater in the area, allfoundations shall incorporate an undergrounddrainage system.
Subject: WastewaterPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:14:52 PMColor:
Wastewater:Sewage treatment is the responsibility of eachindividual property owner. The El Paso CountyDepartment of Health and Environment mustapprove each system and, in some cases theDepartment may require an engineer designedsystem prior to permit approval. These systemsmay cost more to design, install, and maintain.Soils and Geology conditions on site require thatall (or certain lots)On-Site Wastewater Systemsshall be located and designed by a ProfessionalEngineer, currently registered in the State ofColorado. (Note: this note used in special casesonly when requested by the Health Department orpursuant to a condition of approval)Water and wastewater service for this subdivisionis provided by the ______________ (District orprovider name(s)) subject to the District’s(Providers) rules, regulations and specifications.(Combined note, which can be broken intoseparate notes for water or sewer in the case ofdifferent providers)
Subject: MailboxesPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:14:54 PMColor:
Mailboxes:Mailboxes shall be installed in accordance with allEl Paso County and United States Postal Serviceregulations.
Soil and G
eology Conditions:
Geologic H
azard Note-F
inal Plat: (to be custom
ized based upon the individual circumstances)
The follow
ing lots have been found to be impacted by geologic hazards. M
itigation measures and a m
apof the hazard area can be found in the report (T
itle of Report, generally from
the Prelim
inary Plan file) by
(author of the report) (date of report) in file (name of file and file num
ber) available at the El P
aso County
Planning and C
omm
unity Developm
ent Departm
ent:§D
ownslope C
reep: (name lots or location of area)
§Rockfall S
ource:(name lots or location of area)
§Rockfall R
unout Zone:(nam
e lots or location of area)§P
otentially Seasonally H
igh Groundw
ater:(name lots or location of area)
§Other H
azard: In A
reas of High G
roundwater:
Due to high groundw
ater in the area, all foundations shall incorporate an underground drainage system.
Wastew
ater:S
ewage treatm
ent is the responsibility of eachindividual property ow
ner. The E
l Paso C
ountyD
epartment of H
ealth and Environm
ent must
approve each system and, in som
e cases theD
epartment m
ay require an engineer designedsystem
prior to permit approval. T
hese systems
may cost m
ore to design, install, and maintain.
Soils and G
eology conditions on site require thatall (or certain lots)O
n-Site W
astewater S
ystems
shall be located and designed by a Professional
Engineer, currently registered in the S
tate ofC
olorado. (Note: this note used in special
cases only when requested by the H
ealthD
epartment or pursuant to a condition of
approval)W
ater and wastew
ater service for thissubdivision is provided by the ______________(D
istrict or provider name(s)) subject to the
District’s (P
roviders) rules, regulations andspecifications. (C
ombined note, w
hich can bebroken into separate notes for w
ater or sewer in
the case of different providers)
Mailboxes:
Mailboxes shall be installed in
accordance with all E
l Paso C
ountyand U
nited States P
ostal Service
regulations.
Subject: Water SuppyPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:14:57 PMColor:
Water Supply: (utilized when the water supply isindividual wells) (Note: The exact wording of plat notes regardingwell water supply depends upon the language ofthe water decree and/or augmentation plan, andwill be reviewed and approved by the CountyAttorney’s Office)Individual wells are the responsibility of eachproperty owner. Permits for individual wells mustbe obtained from the State Engineer who by lawhas the authority to set conditions for the issuanceof these permits.Water in the Denver Basin Aquifers is allocatedbased on a 100-year aquifer life; however, for ElPaso County planning purposes, water in theDenver Basin Aquifers is evaluated based on a300-year aquifer life. Applicants and all futureowners in the subdivision should be aware that theeconomic life of a water supply based on wells ina given Denver Basin Aquifer may be less thaneither the 100 years or 300 years indicated due toanticipated water level declines. Furthermore, thewater supply plan should not rely solely uponnon-renewable aquifers. Alternative renewablewater resources should be acquired andincorporated in a permanent water supply plan thatprovides future generations with a water supply.(Utilized when there is a joint well agreement forcommon use of wells)Permits for individual wells must be obtained fromthe State Engineer who by law has the authority toset conditions for the issuance of these permits.Two (2) existing well permits Nos. ________ and________ will serve two (2) single family dwellingseach. Well permit No. ________ will serve Lots __and __, Block __ subject to a joint Use Water WellAgreement as recorded under Reception No.__________. Well permit No. ________ will serveLot __, Block __ and Lot __, Block __, subject to aJoint Use Water Well Agreement as recordedunder Reception No. _________, which limitsproduction to the ____________ Aquifer at aninterval between ___ and ___ feet below groundsurface. Lot __ and __, Block __ and Lots __through __, Block __ will limit production to the____________ Aquifer at an interval between____ and ____ feet below ground surface. Owner, its successors and assigns shall advise theProperty Owners Association (or HomeownersAssociation) and all future owners of these lots ofall applicable requirements of the decree enteredin Case No. __________ (Division __), and theircosts of operating the plan for augmentation andresponsibility for metering and collecting dataregarding water withdrawals from wells. Owner shall reserve in any deeds of the property_________ acre-feet of __________ Aquifer and________ acre feet total of _____________Aquifer water as decreed in Case No. ________(Division __) for use in this augmentation plan.Water withdrawal and wells are subject tolimitations, restrictions and augmentationrequirements and responsibilities as found withinthe Covenants for this subdivision recorded inReception No. ___________, of the Office of the ElPaso County Clerk and Recorder and the terms ofthe water court approved water augmentation plan.
Water S
upply: (utilized when the w
ater supply is individual wells)
(Note: T
he exact wording of plat notes regarding w
ell water supply
depends upon the language of the water decree and/or
augmentation plan, and w
ill be reviewed and approved by the
County A
ttorney’s Office)
Individual wells are the responsibility of each property ow
ner. P
ermits for individual w
ells must be obtained from
the State
Engineer w
ho by law has the authority to set conditions for the
issuance of these permits.
Water in the D
enver Basin A
quifers is allocated based on a 100-yearaquifer life; how
ever, for El P
aso County planning purposes, w
ater inthe D
enver Basin A
quifers is evaluated based on a 300-year aquiferlife. A
pplicants and all future owners in the subdivision should be
aware that the econom
ic life of a water supply based on w
ells in agiven D
enver Basin A
quifer may be less than either the 100 years or
300 years indicated due to anticipated water level declines.
Furtherm
ore, the water supply plan should not rely solely upon
non-renewable aquifers. A
lternative renewable w
ater resourcesshould be acquired and incorporated in a perm
anent water supply
plan that provides future generations with a w
ater supply.(U
tilized when there is a joint w
ell agreement for com
mon use of
wells)
Perm
its for individual wells m
ust be obtained from the S
tateE
ngineer who by law
has the authority to set conditions for theissuance of these perm
its. Tw
o (2) existing well perm
its Nos.
________ and ________ will serve tw
o (2) single family dw
ellingseach. W
ell permit N
o. ________ will serve Lots __ and __, B
lock __subject to a joint U
se Water W
ell Agreem
ent as recorded underR
eception No. __________. W
ell permit N
o. ________ will serve Lot
__, Block __ and Lot __, B
lock __, subject to a Joint Use W
ater Well
Agreem
ent as recorded under Reception N
o. _________, which
limits production to the ____________ A
quifer at an intervalbetw
een ___ and ___ feet below ground surface. Lot __ and __,
Block __ and Lots __ through __, B
lock __ will lim
it production to the____________ A
quifer at an interval between ____ and ____ feet
below ground surface.
Ow
ner, its successors and assigns shall advise the Property O
wners
Association (or H
omeow
ners Association) and all future ow
ners ofthese lots of all applicable requirem
ents of the decree entered inC
ase No. __________ (D
ivision __), and their costs of operating theplan for augm
entation and responsibility for metering and collecting
data regarding water w
ithdrawals from
wells.
Ow
ner shall reserve in any deeds of the property _________acre-feet of __________ A
quifer and ________ acre feet total of_____________ A
quifer water as decreed in C
ase No. ________
(Division __) for use in this augm
entation plan.W
ater withdraw
al and wells are subject to lim
itations, restrictionsand augm
entation requirements and responsibilities as found w
ithinthe C
ovenants for this subdivision recorded in Reception N
o.___________, of the O
ffice of the El P
aso County C
lerk andR
ecorder and the terms of the w
ater court approved water
augmentation plan.
Subject: Subdivision ImprovementsPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:14:59 PMColor:
Public and Common Subdivision Improvements:No lot or interest therein, shall be sold, conveyed,or transferred whether by deed or by contract, norshall building permits be issued, until and unlesseither the required public and commondevelopment improvements have beenconstructed and completed and preliminarilyaccepted in accordance with the SubdivisionImprovements Agreement between theapplicant/owner and El Paso County as recordedunder Reception Number ________________ inthe Office of the Clerk and Recorder of El PasoCounty, Colorado or, in the alternative, othercollateral is provided to make provision for thecompletion of said improvements in accordancewith the El Paso County Land Development Codeand Engineering Criteria Manual. Any suchalternative collateral must be approved by theBoard of County Commissioners or, if permitted bythe Subdivision Improvements Agreement, by thePlanning and Community DevelopmentDepartment Director and meet the policy andprocedure requirements of El Paso County prior tothe release by the County of any lots for sale,conveyance or transfer.This plat restriction may be removed or rescindedby the Board of County Commissioners or, ifpermitted by the Subdivision ImprovementsAgreement, by the Planning and CommunityDevelopment Department Director upon eitherapproval of an alternative form of collateral orcompletion and preliminary acceptance by the ElPaso Board of County Commissioners of allimprovements required to be constructed andcompleted in accordance with said SubdivisionImprovements Agreement. The partial release oflots for sale, conveyance or transfer may only begranted in accordance with any planned partialrelease of lots authorized by the SubdivisionImprovements Agreement.
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:16:28 PMColor:
customize each note for this application
Subject: ArrowPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:18:13 PMColor:
Subject: ArrowPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:18:16 PMColor:
Public and C
omm
on Subdivision Im
provements:
No lot or interest therein, shall be sold, conveyed, or
transferred whether by deed or by contract, nor shall
building permits be issued, until and unless either the
required public and comm
on development im
provements
have been constructed and completed and prelim
inarilyaccepted in accordance w
ith the Subdivision
Improvem
ents Agreem
ent between the applicant/ow
nerand E
l Paso C
ounty as recorded under Reception N
umber
________________ in the Office of the C
lerk andR
ecorder of El P
aso County, C
olorado or, in thealternative, other collateral is provided to m
ake provisionfor the com
pletion of said improvem
ents in accordancew
ith the El P
aso County Land D
evelopment C
ode andE
ngineering Criteria M
anual. Any such alternative
collateral must be approved by the B
oard of County
Com
missioners or, if perm
itted by the Subdivision
Improvem
ents Agreem
ent, by the Planning and
Com
munity D
evelopment D
epartment D
irector and meet
the policy and procedure requirements of E
l Paso C
ountyprior to the release by the C
ounty of any lots for sale,conveyance or transfer.T
his plat restriction may be rem
oved or rescinded by theB
oard of County C
omm
issioners or, if permitted by the
Subdivision Im
provements A
greement, by the P
lanningand C
omm
unity Developm
ent Departm
ent Director upon
either approval of an alternative form of collateral or
completion and prelim
inary acceptance by the El P
asoB
oard of County C
omm
issioners of all improvem
entsrequired to be constructed and com
pleted in accordancew
ith said Subdivision Im
provements A
greement. T
hepartial release of lots for sale, conveyance or transfer m
ayonly be granted in accordance w
ith any planned partialrelease of lots authorized by the S
ubdivisionIm
provements A
greement.
customize each note
for this application
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:19:40 PMColor:
Are you intending to be included into a PID?
Subject: CalloutPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:19:58 PMColor:
Delete this sig block
Subject: HighlightPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:20:06 PMColor:
Subject: HighlightPage Label: 1Author: dsdparsonsDate: 6/10/2019 3:20:11 PMColor:
Are you intending to
be included into aP
ID?
Delete this sig block