54 Homes & 4 Community Buildings Deep Retrofit Energy Upgrading Works

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Better Energy CommunitiesClare 2015

Project Partners

Project Coordinator:

Lead Applicant:

Funding Partners:

Northside Community Enterprise

KingdomInstallation Ltd.

Application Process

• Kingdom Installation Ltd. carried out 2 successful projects in conjunction with Respond! (46

units in Limerick and Clare and 37 in Sligo in 2014) completing deep retrofit energy upgrade

works, delivering high quality within budget and within the scheme time allowed. As a result,

Respond! were very interested in replicating this success in 3 new projects in the west of

Ireland. 2 of these projects will be completed by the end of October 2015.

• Pre-survey inspections of all properties were carried out.

• Cost analysis of viable energy upgrades were also undertaken.

• Respond!, through their Designated In House Energy Team and an Energy Champion from each

estate, intend to carry out a survey of the upgraded works and will endeavor to collate 12

months of utility bills which will be used to determine the actual savings made. This information

will be made available to SEAI if required.

• The measures selected within the units were specific to the properties involved.

• In all cases the current energy analysis for these buildings were carried out by analysing current

utility bills over a 12 month period.

• Respond! undertook a detailed Condition Survey of all their existing stock and this information

was used to analyse and identify the most suitable upgrade measures for all the units.

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Aims of Better Energy Communities Clare Project

• Increase comfort within the units.

• Provide long term sustainable living for existing and prospective residents.

• Reduce fuel and energy costs to a practical and more manageable level to

tenants thus reducing the impact of fuel poverty and ensuring that tenants

can simply afford to live adequately.

• Create energy awareness amongst the residents and the wider community in

order to develop and gain knowledge which will aid in sustaining constant

reductions on energy bills.

• Include Community Facilities which cater for invaluable services and supports

for residents and the wider community.

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Project Particulars

• 54 Residential Homes

• 2 Community Buildings

• A 15 Bed HSE Group Home

• A 6 Bed Sheltered Group Home

• Approximately €1m invested

• 14 week timescale for the works

• Projected annual energy savings as a result of the upgrading works is €110,000

• Projected annual energy savings for the entire works - 900,000kWh

KingdomInstallation Ltd.

Bridge View (20 Homes)

Ennis, Co. Clare

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Orchard Grove (8 Homes)

Ennis, Co. Clare

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Stonecourt (23 Homes) and Waterpark View (3 Homes)

Ennis, Co. Clare

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Stonecourt (Community Centre)

Ennis, Co. Clare

Before

After

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Orchard Grove (Community Centre)

Ennis, Co. Clare

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Before

After

Orchard Grove (15 Bed HSE Group Home)

Ennis, Co. Clare

Before

After

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Orchard Grove (6 Bed Haven Refuge)

Ennis, Co. Clare

Before

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

After

Roof Insulation

Upgrading Elements Carried Out

25% Energy Saving

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Cavity Wall Insulation

Upgrading Elements Carried Out

35% Energy Saving

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Gas and Oil Heating Upgrades

Upgrading Elements Carried Out

50% Energy SavingKingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Full Window & External Door Replacement

Upgrading Elements Carried Out

Before

After

10% Energy

Saving

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

CFL Lighting for Domestic and Non-Domestic Buildings

Upgrading Elements Carried Out

50% Energy Saving

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Solid Fuel Room Heater

Upgrading Elements Carried Out

50% Energy Saving

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Roof and Wall Ventilation

Upgrading Elements Carried Out

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Building Energy Rating

Before After

Based on the elements of works upgraded, an average annual energy saving of

€960 per year, per home is expected.KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Building Energy Rating

Before After

Based on the elements of works upgraded, an average annual energy saving of

€960 per year, per home is expected.KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Paul Hargaden, Regional Manager Respond!; Sean Cremen, Head of Treasury, Housing Finance Agency; Ned Brennan, CEO

Respond!; Mary Howard, Leas Cathaoirleach, Clare County Council, Ciarán Carmody, Senior Project Coordinator, Kingdom

Installation Ltd; John Randles, Head Of Delivery, SEAI; Cllr. Pat Daly, Mayor Of Ennis.

KingdomInstallationPhone: 066 7135991

E-mail: [email protected]

Ennis, Co. Clare54 Homes & 4 Community Buildings

Deep Retrofit Energy Upgrading Works