31
ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results Respond Project Fault Level Report for Electricity North West Ltd ENWL Fault Level Report 3 V1, 15/11/2016 Report written by John Outram Change record Date Edited by Reason 17/11/2016 J.D.Outram
Transcript

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Respond Project Fault Level Report for Electricity North West Ltd ENWL Fault Level Report 3 V1, 15/11/2016

Report written by John Outram

Change record Date Edited by Reason 17/11/2016 J.D.Outram

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Contents

Introduction .......................................................................................................................................................... 3

Connection checks ................................................................................................................................................ 3

Fault Level results ................................................................................................................................................. 3

General comment on results ................................................................................................................................ 3

Appendix 1. : Bamber Bridge Primary. FLM Serial No 887 ................................................................................... 4

Sources of error ................................................................................................................................................ 4

Bamber Bridge results, General observations .................................................................................................. 4

Fault Level Results ............................................................................................................................................ 8

Downstream Fault Level contribution ............................................................................................................ 14

Appendix 2. Littleborough Primary. FLM Serial No 0888 ................................................................................... 18

Sources of error .............................................................................................................................................. 18

Littleborough Primary results, General observations. ................................................................................... 18

Fault Level Results .......................................................................................................................................... 21

Downstream Fault Level contribution ............................................................................................................ 29

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Introduction This report documents the results obtained from Fault Level Monitors installed at two ENWL sites in summer 2016. These installations and the fault level results obtained are listed below. Detailed results and interpretations are included in the appendices for each site.

On 4th November 2016, data was received from ENWL for the FLMs at each of the two substations. These are:

FLM serial No Installed at Recording Start Date Recording End Date 0887 Bamber Bridge Primary 30/06/2015 31/10/2016 0888 Littleborough Primary 30/06/2015 31/10/2016

Connection checks Connection checks were made on both sites by examination of phases of typical waveforms obtained during the recording. Both sites showed correct phase relationships.

Fault Level results Fault Level results were obtained for each site as shown in the table. All results are in kA.

FLM serial No Installed at 10ms Peak Upstream

10ms Peak Downstream

90ms RMS upstream

Combined 10ms Peak[1]

0887 Bamber Bridge Primary 17.76 1.931 7.313 19.691 0887 Bamber Bridge Primary [2] 9.574 N/A 4.007 N/A 0888 Littleborough Primary 34.51 3.337 12.79 37.847 0888 Littleborough Primary [3] 18.2 3.337 7.14 21.57

[1] Assuming the Upstream and downstream results are relevant at the same time, and that the phase of the downstream contribution is exactly in phase with the Upstream contribution. This assumption implies that the downstream phase remains constant and worst case. In practice, it has been observed that some motor contributions slowly rotate in phase from the inception of the disturbance, consequently the vectors may not precisely line up, and hence this figure may be slightly overstated.

[2] From ~8am to ~11am on 28/9/16 and from ~9am to ~10pm on 12/10/16

[3] From start to ~17:30 on 5/7/16, and from ~13:30 on 20/8/16 to ~11:30 on 7/9/16

General comment on results Results at Bamber Bridge were generally tight, with little scope for manipulation. On two occasions the Fault Level distinctly changed to a lower value, as listed in the table above. Littleborough results at 10ms were also very tight, and also revealed two distinct Fault Level regimes, but the 90ms RMS results were widely distributed, possibly because although there were many useful disturbances to work on, they were predominantly very short, with little disturbance energy left at 90ms.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Appendix 1. : Bamber Bridge Primary. FLM Serial No 887 Sources of error The overall results for Bamber Bridge over the 4 month period are good. There is very little room for manipulation of these results, so sources of error are principally the systematic ones of incorrect assumptions, wrong CT settings, faulty sensors, cables etc. If the current and voltage results recorded by the PM7000 and shown below match the independent measurements reported by the ENWL SCADA or other systems, then it is very unlikely that these results are wrong.

Bamber Bridge results, General observations Graph 1 shows the voltage and current for the full recording period.

Graph 1. Volts and Current for the full recorded period.

There appear to have been three voltage interruptions. None of them ostensibly appear to have been caused by a load downstream of this substation/feeder, though the waveforms immediately before the short interruption on 12th October may be relevant. There was a short series of high current events on 2nd August, the worst of which pulled the 11kv down by approximately 1000V. Graphs 2, 3, 5 show the RMS detail, and Graph 4 shows the waveforms ahead of the 12th October event.

30-06-1611:35:43

31-10-1609:40:54

01-08-16 01-09-16 01-10-16Time 122 22:05:11 (dd-mm-yy)

0

200

400

600

800

1000

1200

1400

1600

AC

Cur

rent

(Aac

)

0.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 13.971 0.000 11.026kV RMS of Vcb 13.145 0.000 11.055

Maximum Minimum AverageAac RMS of Ia 1564 15 356Aac RMS of Ic 643 16 338

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 2. Interruptions over ~3 hours on 27th September 2016.

Graph 3. 100msec interruption on 12th October 2016.

06:36:1027-09-16

11:59:3027-09-16

07:30 08:00 08:30 09:00 09:30 10:00 10:30 11:00Time 05:23:20 (hh:mm)

350

400

450

500

AC

Cur

rent

(Aac

)

0.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 13.971 0.000 10.139kV RMS of Vcb 13.145 0.000 10.170

Maximum Minimum AverageAac RMS of Ia 543 389 473Aac RMS of Ic 521 326 454

03:59:15.712-10-16

03:59:17.112-10-16

16.0 16.2 16.4 16.6 16.8Time 00:00:01.4000 (ss)

100

200

300

400

500

600

AC

Cur

rent

(Aac

)

2.000

4.000

6.000

8.000

10.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 11.183 0.397 10.015kV RMS of Vcb 11.284 0.397 10.158

Maximum Minimum AverageAac RMS of Ia 593 15 233Aac RMS of Ic 433 16 220

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 4. Waveforms ahead of the 100msec interruption on 12th October shown in Graph 3.

Graph 5. Current spikes and associated voltage dips on 2nd August 2016.

03:59:16.14812-10-16

03:59:16.20012-10-16

16.160 16.165 16.170 16.175 16.180 16.185 16.190Time 52 millisecs (ss)

-500

0

500

1000

AC

Cur

rent

(Aac

)

-15.000

-10.000

-5.000

0.000

5.000

10.000

15.000Vo

ltage

(kV)

Maximum Minimum AverageInput Vab (V1) (Waveform) 16.132 -15.198 1.499Input Vcb (V3) (Waveform) 15.359 -15.201 -0.001

Maximum Minimum AverageInput Ia (I1) (Waveform) 1367 -595 317Input Ic (I3) (Waveform) 780 -897 -105

10:48:0702-08-16

10:50:2002-08-16

48:30 49:00 49:30 50:00Time 00:02:13 (mm:ss)

400

600

800

1000

1200

1400

1600

AC

Cur

rent

(Aac

)

10.200

10.400

10.600

10.800

11.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 11.120 10.042 11.052kV RMS of Vcb 11.156 10.132 11.073

Maximum Minimum AverageAac RMS of Ia 1564 328 383Aac RMS of Ic 558 279 349

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Useful Fault Level type disturbances.

Apart from the major events noted above, there was nothing of great magnitude, but plenty of modest disturbances. Graph 6 below shows examples of the best of these.

Graph 6. Examples of typical disturbances.

10:56:0704-10-16

11:36:5504-10-16

11:00 11:05 11:10 11:15 11:20 11:25 11:30Time 00:40:48 (hh:mm)

440

460

480

500

520

AC

Cur

rent

(Aac

)

10.960

10.980

11.000

11.020

11.040

11.060

11.080

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 11.053 10.957 11.020kV RMS of Vcb 11.080 10.962 11.040

Maximum Minimum AverageAac RMS of Ia 521 453 477Aac RMS of Ic 500 435 456

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Fault Level Results

Graph 7. Upstream RMS Fault level at 90ms. 3D Distribution shown with 2% filtering.

Graph 7 shows that the mean Upstream 90ms RMS Fault Level for the period was 7.313 kA. Graph 8 shows the same thing in 2 dimensions.

Graph 8. Upstream RMS Fault level at 90ms. 2D Distribution shown with 2% filtering.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

A modest degree of filtering was used to extract this peak, but even without it, the nose of the distribution is in almost exactly the same place, as shown in Graph 9 below.

Graph 9. Upstream RMS Fault level at 90ms. 2D Distribution shown with no filtering.

In fact the main distribution is relatively narrow so that there is very little variation between the two. There is some disturbance energy forming a population at a lower Fault Level, but this is very short lived. This is examined later.

Graphs 10 and 11 show the Peak Upstream Fault Level for the whole period.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 10. Upstream Peak Fault level at ½ cycle. 3D Distribution shown with 2% filtering.

Graph 11 Upstream Peak Fault level at ½ cycle. 2D Distribution shown with 2% filtering.

Exactly the same result is obtained without filtering as shown in Graph 12.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 12 Upstream Peak Fault level at ½ cycle. 2D Distribution shown with no filtering.

Examining the ½ cycle RMS result, on the grounds that it should be the cleanest and any anomalies most easily seen on it, we can see that if the time period for results accrual is reduced to 2 hours, there are two regions for which a lower Fault Level appears to apply. Graph 13 applies.

Graph 13. Upstream RMS Fault level at ½ cycle. Time plot and 2D Distribution shown with 2% filtering.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Both these regions are discernible on both graphs 7 & 10, but we need to graph the data over a much shorter period in order to establish whether these are truly different Fault Level conditions. Graph 14 shows the two regions.

Graph 14. Upstream RMS Fault level at ½ cycle. Reduced Time plot and 2D Distribution shown with 2% filtering.

Although it is clear from the time graph (the upper graph) that the lower Fault Level region on the right has unambiguously moved from 7-8kA to 4kA, it is less clear that the same applies to the left hand region. By looking at the blue line in the population part of graph 14 (the lower of the two graphs above), we can see that there is no contribution from the higher Fault Level population during the relevant period. We conclude that for the ~13 hour period on the 12th October, some significant generation was lost. The same applies to the earlier period, though this was much shorter. By moving the time slide bar to obtain the relevant population during that earlier region, we can again confirm that the reduction in Fault level is genuine and unambiguous. See Graph 15.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 15. Upstream RMS Fault level at ½ cycle. Reduced Time plot and 2D Distribution shown with 2% filtering. Population shown for earlier reduced Fault Level region.

In both cases, the reductions occurred largely during the day when there were plenty of disturbances to evaluate, and the weighting graph confirms this.

The combination of these two regions together and the likely Fault Level arising can be obtained by expanding out the accrual time from the two hours used above to the full interval shown, then deliberately excluding contributions from the upper population in the evaluation process. Graph 16 shows this process applied to the 90ms RMS Upstream result.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 16. Showing Upstream RMS 90ms result for the combined reduced Fault Level periods.

In this case the Fault Level Span (Upper side) is reduced to below the main population so that the peak associated with it (the main population) is excluded. Even so, such is the weight of the predominant population above the fault level span position (the red line), that it is necessary to use the time restriction function as well in order to isolate the required peak. In this case the accrual period contributing is 23rd Sept 6am to 14th October 10am (enough to embrace both reduced FL periods), the filtering is 2%, and now the peak associated with the little bump below the red line can be found. It is well centred between the two individual results shown in graphs 14 & 15.

Downstream Fault Level contribution

There is very little downstream disturbance energy, but what there is, is fairly consistent. Graphs 17 and 18 show the Peak half cycle Fault Level detected for downstream contribution with 5% filtering.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 17. Downstream Peak Fault Level contribution at ½ cycle. 3D representation with 5% filtering.

Graph 18. Downstream Peak Fault Level contribution at ½ cycle. 2D representation with 5% filtering.

Without any filtering, the result is very similar. Graph 19 refers.

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 19. Downstream Peak Fault Level contribution at ½ cycle. 2D representation with no filtering.

The following graphs 20 and 21 show the detail results and weighting applied at ½ cycle and 90 ms respectively. Both cases show the low weightings available. They are both good examples of why the weighted population method of evaluation is preferred, because these unweighted graphs show large numbers of bad results arising from extremely small disturbance events (with correspondingly small weightings). Graph 22 shows an expanded section of the ½ cycle weighting and Fault Level current results illustrating the association.

30-06-1611:35:43

31-10-1609:40:54

01-08-16 01-09-16 01-10-16Time 122 22:05:11 (dd-mm-yy)

0

100

200

300

400

500

Valu

e (Q

ty)

0.00

50.00

100.00

150.00

Curre

nt (k

A)

Maximum Minimum AveragePeak Fault 1/2 Cycl 163.58 0.00 22.08

Maximum Minimum AverageWt of 1/2 cycl rslt 581 0 18

ENWL Fault Level Report 3 V1. Appendix 1: Bamber Bridge Primary FLM Results

Graph 20. Peak upstream results and weighting present at ½ cycle.

Graph 21. RMS upstream results and weighting present at 90ms.

Graph 22. Peak upstream results and weighting present at ½ cycle expanded to show association between poor current results and low disturbance weighting.

30-06-1611:35:43

31-10-1609:40:54

01-08-16 01-09-16 01-10-16Time 122 22:05:11 (dd-mm-yy)

0

50

100

150

200

Valu

e (Q

ty)

0.00

50.00

100.00

150.00

Curre

nt (k

A)

Maximum Minimum AverageRMS Fault 90 ms 163.58 0.00 8.26

Maximum Minimum AverageWt of 90 ms result 205 0 12

17-08-1620:18:36

24-08-1613:27:11

19-00:00 20-00:00 21-00:00 22-00:00 23-00:00Time 6 17:08:35 (dd-hh:mm)

0

20

40

60

80

Valu

e (Q

ty)

20.00

40.00

60.00

80.00

100.00

Cur

rent

(kA

)

Maximum Minimum AveragePeak Fault 1/2 Cycl 99.67 13.15 23.11

Maximum Minimum AverageWt of 1/2 cycl rslt 82 0 17

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Appendix 2. Littleborough Primary. FLM Serial No 0888 Sources of error The overall results for Littleborough Primary over the 4 month period are not as uniformly good as at Bamber Bridge. The ½ cycle results are strong, but the Upstream 90ms RMS population distribution is weak and relatively broad. As discussed below, there were large numbers of regular small and very short disturbances. These yielded good ½ cycle results but little at 90ms. As with Bamber Bridge, there is little room for manipulation of the ½ cycle results, so sources of error are principally the systematic ones of incorrect assumptions, wrong CT settings, faulty sensors, cables etc. If the current and voltage results recorded by the PM7000 and shown below match the independent measurements reported by the ENWL SCADA or other systems, then it is very unlikely that these results are wrong. In the event the 90ms Upstream RMS result is still quite well defined. As discussed below there are two distinct Fault Level regions over the course of the 4 month recording, and the two populations are visible in all the Upstream results, including the 90ms RMS.

Littleborough Primary results, General observations. Graph 1 shows the voltage and current for the full recording period.

Graph 1. Volts and Current for the full recorded period.

During the recording period there was one interruption for ~1 ½ minutes on 5th July, and a cluster of disturbances on 13th September. Graphs 2 and 3 show the effects on the voltage RMS, and graph 4 shows the waveforms associated with the largest of the Sept 13th disturbances.

30-06-1616:10:30

31-10-1611:52:38

01-08-16 01-09-16 01-10-16Time 122 19:42:08 (dd-mm-yy)

400

600

800

1000

1200

AC

Cur

rent

(Aac

)

0.000

1.000

2.000

3.000

4.000

5.000

6.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 6.762 0.000 6.586kV RMS of Vcb 6.757 0.000 6.587

Maximum Minimum AverageAac RMS of Ia 1180 273 606Aac RMS of Ic 1133 266 602

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 2. Voltage interruption on 5th July.

Graph 3. Cluster of disturbances on 13th September.

Graph 4. Waveforms for the worst case RMS disturbance shown in Graph 3.

18:44:3805-07-16

18:55:1605-07-16

18:46 18:47 18:48 18:49 18:50 18:51 18:52 18:53 18:54Time 00:10:38 (hh:mm)

720

740

760

780

800

AC C

urre

nt (A

ac)

0.000

1.000

2.000

3.000

4.000

5.000

6.000Vo

ltage

(kV)

Maximum Minimum AveragekV RMS of Vab 6.712 0.000 5.643kV RMS of Vcb 6.701 0.000 5.630

Maximum Minimum AverageAac RMS of Ia 791 718 744Aac RMS of Ic 801 705 746

17:56:3313-09-16

18:35:1513-09-16

18:05 18:10 18:15 18:20 18:25 18:30Time 00:38:42 (hh:mm)

500

1000

AC

Cur

rent

(Aac

)

5.000

6.000

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 6.695 4.119 6.618kV RMS of Vcb 6.670 5.854 6.598

Maximum Minimum AverageAac RMS of Ia 1102 315 851Aac RMS of Ic 1101 444 855

18:16:20.43813-09-16

18:16:20.78813-09-16

20.50 20.55 20.60 20.65 20.70Time 350 millisecs (ss)

-1000

0

1000

AC

Cur

rent

(Aac

)

-5.000

0.000

5.000

Volta

ge (k

V)

Maximum Minimum AverageInput Vab (V1) (Waveform) 9.266 -9.270 -0.060Input Vcb (V3) (Waveform) 9.231 -9.291 -0.181

Maximum Minimum AverageInput Ia (I1) (Waveform) 1741 -1488 -4Input Ic (I3) (Waveform) 1595 -1598 -22

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Useful Fault Level type disturbances.

There were large numbers of very short and fairly regular disturbances. Graph 5 shows a 6 hour example. Graph 6 expands a typical one of these, and shows that although there is ~0.5% voltage variation for 40A current change, it is not really long enough to give a 90ms evaluation.

Graph 5. Section of recording showing reasonably regular current spikes leading to useable voltage disturbances.

09:15:5922-08-16

15:22:0722-08-16

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30Time 06:06:08 (hh:mm)

720

740

760

780

800

820

840

860

AC

Cur

rent

(Aac

)

6.540

6.560

6.580

6.600

6.620

6.640

6.660

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 6.647 6.533 6.600kV RMS of Vcb 6.657 6.544 6.604

Maximum Minimum AverageAac RMS of Ia 857 713 777Aac RMS of Ic 840 713 767

12:41:37.1422-08-16

12:41:37.9122-08-16

37.3 37.4 37.5 37.6 37.7 37.8Time 770 millisecs (ss)

760

770

780

790

800

810

820

830

AC C

urre

nt (A

ac)

6.540

6.550

6.560

6.570

6.580

6.590

Volta

ge (k

V)

Maximum Minimum AveragekV RMS of Vab 6.586 6.536 6.570kV RMS of Vcb 6.594 6.553 6.580

Maximum Minimum AverageAac RMS of Ia 830 772 789Aac RMS of Ic 808 757 775

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 6. Expansion of typical spike at 12:41 illustrating duration.

Fault Level Results

As discussed above, the Upstream 90ms RMS result is weak. When compared with the ½ cycle RMS result, the peaks of the 90ms populations are sensible, but in isolation, they are not definitive. This analysis begins with the ½ cycle results which are at least an order of magnitude stronger.

Graph 7. Upstream RMS Fault level at ½ cycle. 3D Distribution shown with 2% filtering.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 8. Upstream RMS Fault level at ½ cycle. 2D Distribution shown with 2% filtering.

The main population is very tight, and eliminating filtering altogether yields an almost identical result of 12.80kA.

Clearly there are in fact two populations, and from graph 7 we can see a few days at the start and a 2½ week period starting late August for which the Fault Level was lower than the 12.83kA listed above. Graph 9 shows the Fault Level against time for the accrual period reduced to 1 day.

Graph 9. Fault Level against time for a 1 day sliding accrual period window, with 2% filtering.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

By accruing results over the full four months, and using the 2D presentation, we can exclude the upper result and obtain a composite result for the two lower periods, as shown in Graph 10

Graph 10. Upstream ½ cycle RMS result for the Low Fault Level regime, 2% filtering.

Using the ½ cycle Upstream RMS result as a reference, we can look at the 90ms RMS result. See graphs 11 and 12.

Graph 11. Upstream 90ms RMS result, 2% filtering, 3D presentation.

With the accrual time set to the full recording period, it is much less easy to see what is happening.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 12. Upstream 90ms RMS result, 2% filtering, 2D presentation.

However with the accrual period reduced to seven days, and results shown against time, we can again see that there are four distinct periods. Graph 13 refers.

Graph 13. Upstream 90ms RMS result, 2% filtering, Fault Level against time, 7 day accrual boxcar.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Unfortunately as can be seen from the lower faded blue lines in the upper time graph, the result for the Lower Fault Level cannot be distinguished from the Upper on the basis of Fault Level value alone, because even during the High Fault Level periods, there are clearly many results producing low Fault Level values, so it is necessary to use “time” as a discriminator as well. Bear in mind that the total disturbance energy for 90ms is very low so these results do not merit the confidence we can apply to the ½ cycle RMS result.

If we use the time information obtained from the ½ cycle data, viz. from start to ~17:30 on 5/7/16, and from ~13:30 on 20/8/16 to ~11:30 on 7/9/16 for the Low Fault Level periods, and allow a little margin (1-2 hours), we get four fault level results as shown below.

Period Fault Level result (kA) Start to 15:00 on 5/7/16 7.129

19:00 on 5/7/16 to 12:00 on 20/8/16 12.75 15:00 on 20/8/16 to 10:00 on 7/9/16 7.149

13:00 on 7/9/16 to end 12.82

The distributions from which these Fault Level values were obtained are shown in graphs 14 to 17. Filtering of 2% was applied to all of them.

Graph 14. Upstream 90ms RMS result. Accrual period Start to 15:00 on 5/7/16 (Low value)

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 15. Upstream 90ms RMS result. Accrual period 19:00 on 5/7/16 to 12:00 on 20/8/16 (High value).

Graph 16. Upstream 90ms RMS result. Accrual period 15:00 on 20/8/16 to 10:00 on 7/9/16 (Low value).

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 17. Upstream 90ms RMS result. Accrual period 13:00 on 7/9/16 to end (High value).

Referring back to Graph 12, which shows the result accruing over the full recording period, the lower peak is at 7.248kA and the upper at 12.76kA, both exhibiting a slight pulling influence from the other compared with the averages of the regions in isolation, (7.14kA and 12.79kA).

These compare with the ½ cycle results of 6.97kA and 12.83kA for the Lower and Upper Fault Level regimes. [My view is that in reality, the 90ms RMS Fault Level is unlikely to be above the ½ cycle RMS Fault Level, so since the lower region ½ cycle result from the FLM (6.97kA) is so much stronger and tighter than the 90ms result (7.14kA), the 90ms result is the one more likely to be in error.]

The ½ cycle peak result is straightforward. Graphs 18 and 19 show the 3D and 2D views for the full period with 2% filtering.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 18. Upstream ½ cycle Peal Fault Level result 3D presentation, 2% filtering.

Graph 19. Upstream ½ cycle Peal Fault Level result 2D presentation, 2% filtering.

Without filtering, the result drops to 34.2kA. The lower peak with 2% filtering is at 18.2kA, without, at 18.05kA

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Downstream Fault Level contribution Graphs 20 and 21 show the Peak half cycle Fault Level detected for downstream contribution. Graph 20 is with no filtering, and Graph 21 with 5%.

Graph 20. Downstream ½ cycle Peal Fault Level result 3D presentation, no filtering.

Without filtering, the result is dominated by a single spike from the cluster of events on 13th Sept. The other events during that interval give a higher contribution, so while any one of these results may be correct at the time, the worst case may be better represented by the filtered result below. Graph 21 shows 5% filtering.

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 21. Downstream ½ cycle Peal Fault Level result 3D presentation, 5% filtering.

The following graphs 22 and 23 show the detail results and weighting applied at ½ cycle and 90 ms respectively.

Graph 22. Peak upstream results and weighting present at ½ cycle.

30-06-1616:10:30

31-10-1611:52:38

01-08-16 01-09-16 01-10-16Time 122 19:42:08 (dd-mm-yy)

0

500

1000

1500

2000

Valu

e (Qt

y)

0.00

20.00

40.00

60.00

80.00

100.00

Curre

nt (k

A)

Maximum Minimum AveragePeak Fault 1/2 Cycl 98.78 0.00 31.23

Maximum Minimum AverageWt of 1/2 cycl rslt 2193 0 407

ENWL Fault Level Report 3 V1. Appendix 2: Littleborough Primary FLM Results

Graph 23. RMS upstream results and weighting present at 90ms.

30-06-1616:10:30

31-10-1611:52:38

01-08-16 01-09-16 01-10-16Time 122 19:42:08 (dd-mm-yy)

0

100

200

300

400

Valu

e (Q

ty)

0.00

20.00

40.00

60.00

80.00

100.00

Curr

ent (

kA)

Maximum Minimum AverageRMS Fault 90 ms 98.65 0.00 10.52

Maximum Minimum AverageWt of 90 ms result 416 0 31


Recommended