ATTACHf1ENT 1 Tj
'Westinghouse .
Water Re3C10ri - Electric CorporationDivisions W 'e n:sf0m m
sed!5P rtscurg# tnt'sstet3152 0
NS-TMA-2332.i
i Darrell G. Eisenhut, Director October 31,1980-iI Division of Licensingi Office of Nuclear _ Reactor Regulation
U.S. Nuclear Regulatory CommissionPhillips Building.
* -
7920 Norfolk Avenue-
Bethesda, Maryland ' 20014
Dear Mr. Eisenhut:
In response to your letter dated October 1, 1980 concerning the environmentalqualification of safety related equipment, attached please find the qualification tschedules for the safety related equipment within the Westinghouse scope of(NSSS). est
The attached Table 1 includes only the equipment which is curren:!y being tsupply
or is scheduled to be tested within the next two years and doesn't include any additiestedequipment which may require testing as a result of TMI,i.e., incore thermo c
onalcontainment monitor, etc,
c uples,-
-The information in Table 1 Includes:.
1.Equipment description (type, manuf acturer, etc.),
2.The safety-related system in which the equipment operates,
3.The test location and schedule.
-
equipment committed to be ~ qualified to IEEE-373-1974This transmittal may be referenced by Westinghouse Customers having WRD supplieddescribed in WCAP B587.
Mr. G. Butterworth (412-373-5761) or Mr. A. Ball (412-373-4091) ofThe cognizant licensing contact (item 4 of your letter) will beemploying the methodologymy staff.
Very truly yo
,th ' <
T. M. Anderson, Manager ', ,
Nuc! car Safety Departmente c.AB/ kegAttachment (s)
8 0130g0 h
. _ , , _
.-- - - . . +
'N.*
ATTACHMENT 1
~ s
TABLE 1(Sheet I of 4)
Scheduled Testing *
W-E40P TestE qu ipnen,t_ Reference fianuf acturer System Location Thermal Aging Radiation Sels.nic I!E t B
Saf ety Related HE-1 & 4 Limitorque CVCS Limitorque Start 9-29-80 10-28-80 12-05-t:0 1-04-81valve Electric SIS Complete 10-07-80 12-05-80 12-18-60 2 '2-81Hator Operators CCS
RitRS
Safety Related IIE-2 & S ASCO CVCS ASCO Start 9-23-80 10-22-80 11-19-80 2-16-81Solenold Valves SIS Complete 10-08-80 11-15-80 12-22-80 3-30-81
RCSWPSSS *
SGBP'. RHRi
Saf ety Related HE-3 NMCO CVCS NAMCO St art 9-23-80 10-10-80 11-25-80 1-01-81*
; Externally SIS Complete 10-07-80 11-25-80 12-08-80 2-01-81Limit Switches CSS
T AllRRCS
(' ') HE-6 MMCO WPS Start 10-03-80 11-14-80 1-20-81 2-10-81SS Complete 10-30-80 1-20-91 2-0$-81 3-19-81( 3 SGUP
P essure ESE-1 Barton RPS Barton Start 7-22-80 12-01-80 1-10-81 2-10-81Ir.n sm i t t er s PM W-Forest Hills Complete 11-15-80 12-31-80 2-01-81 3-01-81
l _3 Group A W-AESDISOMEDIXu
' Piessure ESE-2 Barton RPS Barton Startf] Y 1ransmitters PM W-forest Hills Complete 1979
Geoup 8 W-AE SD
Mu; ISO:4EDix-,
Dif f erential ESE-3 Barton RP$ W-Forest Hills Start 7-22-80 12-01-80 1-10-81 2-10-81gPressure PM W-AESD Complete 11-15-80 12-31-80 2-01-81 3-01-80
b G,oup A ISOMEDIX
Ditferential ESE-4 Barton PAM W-Forest Hills StartPressure RPS W-AESO Complete 1979
Transmitter iSOME01XGroup 8
Hesistence ESE-S Rdf .RPS W-Forst Hills Start 5-19-80 6-27-80 9-24 80 11-01-60femperature W-AESD Complete 6-13-80 7-23-80 10-22-80 11 20-80Detector ISOMEDIX'
, 'I (UC-Bypass) SURGICuiUniv. of Buffalo*
.
Resistence ESE-6 Rdf PAMS W-rorest Hills Start 5-19-80 6-21-80 9-24-80 !!-01-80 9
' temperature W-A E SO Complete 6-13-80 7-13-80 , 10-22-80 l'.-20-80,
i
Detector IS0:tEDIX-'
k .-.J (Wtil-mounted) SURGICUTUalv. of Buffalo Jj
*
l il 9A
, ..
. ATTACHMENT 1 ..
FABLE 1 (Sheet 2 of 4) Scheduled I sting ! 5 .
titl e,, ' ),)- ,"
.'
SeismicRadi at ton
Test 9-24-80 11-01-80j -
Thermal Agi_ng. l oc ation 6-27-86 10-22-80 Il-20-80- } j
,4W-EQDP Manuf acturer $ntes '5-19-80 7-13-80 .};
1Start 6-13-80Reference W-forest lillis Complete y
1
pgqignaent RPSNdf ,W AE50 ;
ESE-7 s
Hes ntence 150MEDIX --
SURGICUTTemperature Univ, of Buf f alo 4t4 Quarter 1981 --hetettors(f451 response)
W. forest liills CompleteSt art
RP5W lGTD W-AE5D
E5E-9 ~ 'W-!GID ~Enore
tkutron - 1979 -Detectors 5 tert
-
|W-AESD Complete(Source) RPS
ESE-10- ~W-ID
-
t-W-ID- 4th Quarter 1981 - i'Nuclear .
- j'Instrumentation W-forest tillis Complete
'
StartSystem (NIS) APS
ESE-Il.W-AE50W-ID
Source Range . W-10--
i- 1st Quarter 1981 -Preet.plifier
_
(outside Con- 5 tart-1W-AESD Completetalmaent)
Electroswitch RP5 11-30-80 N/A lESF N/A 12-05-80-~ E5E-12
Main Control N/A1: w d Switch Start
W-AESD Completeibiales RP5W-ISD 5-01-80 N/A
E5E-13 ~ N/A 8-01-80Process 'N/AP,otection 5 tartW-AESD . Complete 8-01-19 N/A
Systera PAMESE-14 .W-RID N/A 10-10-79N/AStart tY Indicators ,
W-AE50 Complete -
PAML) ESE-15 ~
5' tart- - -
W-CID - 1979-
(< >) He(ordersW-AE50 Cunplete
RPS' W-ID W-IDESE-16 - E5F
Solid State*
Prutectionb, Syston -
g & Saf eguard TestCabinet(2 Train) Start-
- 1979 -W-AE5D Complete
RPSW-ID W-IDb solid state ESE-17 - E5F
-.
Protection system - 1979 -g & Safeguard TestCabinet (3 Trains Electrical W-AESD Complete
-Start
W-PED,
ESE-18 - PowerInstruncut Bus
'
Supply -.
,_ 3 Pineer Supply - 1979 _-U15 tat 6c Inverter) Start
- L7,5 KVA Electrical W-AE50 CompleteW-RED 'g
E5E-19 ~ PoserInstrument Bus Supply - 1979Distribution 5 tart -
W-AE50 Coraplete ~
Panel 7.5 KVA RPS -W-LVSD
CSE-20 -
Reactor Trip% is.h year
1
NATTACHMENT 1, }
TABLE I ($heet 3 of 4)Scheduled Testing ,
W-EQOP Test
Ergulpsnent Reference Manufacturer System tocation Thermal Aging Radiation Selselc itEt B
Pressure E5E-21 Bartors RPS Barton Start 1-22-80 12-01-80 1-10-81 2-10-81-P#t5 W-Forest Hills Complete 11 15-80 12-31-80 2-01-81- 3-61-81
.5ensorW-AESDISOMEDIX
4 Section ESE-22 W-lGTD RPS W-IGID Start 8-20-80 9-20-80 12-01-80 1-10-81
Escore Neutron-
W-AESD Cunplete 9-15-80 10-05-80 12-31-80 2-01-81
Detector
toop Stop E5E-23 W-ID RPS Analysis Start Not Scheduled
value Cabinet~ Only Complete
RCP E5E-24 W-ISD RPS W-150 5 tart Not Scheduled,
Speed Sensor Electro Corp. Complete
Main Control ESE-25 W-CID RPS W-AESD StartBoard ESF Conplete 3rd Quarter 1980
PAN
Reactor Trip ESE-26 ~W-LVSD RPS W-AESD Start Not ScheduledCompleteSwitch gear
Nitrogen-16 ESE-27 W-lGTP RPS W-IGID Start 9-15-80 10-05-80 10-22-80 11-10-00~
W-AE50 Complete 10-01-00 10-18-80 11-05-80 12-01-00D petector
Huel Position ESE-28 Productos RPf W-AESD Start Not Scheduled -
Detector Electronicos, W R&D Coniplete
Inc.Puerto Rico
% Nod Position ESE-29 W-ID RP5 W-AESD Start Not Scheduled
04ta Cabinet_ Complete
D Integrated ESE-30 -W-ISD RPS * W-AE50 5 tart 3rd Quarter 1981 -Protection Cabinet W-150 Complete ,
togic Cabinet~
RPS W-AE50 5 tart 3rd Quarter 1981int egr ated ESE-31 W-15DW-150 Complete
Cabinet~
RPS W-AESD 5 tart Not Scheduledf ield termir stion ESE-32 W-150
Co mplete
Distr ibut ion~W-AESD Electrical W-AE50 5 tart Nat Scheduled
Instrument Bus ESE-33Power Complete
,
Panel Supply,
instrument Bus ESE-34 W-AESD Electrical W-AESD Start Not ScheduledI
Distr ibut ion~
.
Power Complete
Panel Supply'
%pply~
Electrical W-AESD Start Not Scheduled 8lustronent Power ESE-35 W-AESD~
Power Complete- ' * ay Supply
, ,
*
ATTACHMEilT 1. ,
.
TABLE I (Sheet 4 of 4)-
|-Scheduled Testing
TM
plu tgnment Reference Manufacturer System tocation Thermal Aginj Radiatha . Se lyg lif t,n
Prcampilfler,
RPS W-Forest tillis Start 4th-Quarter 1981source Range ESE-36 W-IDW-AE50 Compiete
(In Contaltunent)
Demultipleser~W-ISD PAM W-AESD Start Not Scheduled - -
PAMS ESE-31Complete
Muttipleser~
- RPS W-AES!5 Start Not ScheduledControl Board ESE-38 W-ISDESF Complete
Fiber Optic ESE-39 -W-ISD RPS W-ISD Start Not Scheduled ~~ .
Cable Complete.
Saf ety Related AE-1(Medium) ~W-19tLG W-AESD Start 4th Quarter 1980 ---
Punp Motors ISOMEDIX Complete 2nd Quarter 1981 -
W.RLD
AE-2(Large) -W-LHD Buffalo CVCS .W-AESD Start 3rd Quarter 1980 -
EBS - 15DMEDIX Complete 1st quarter 1981 --
' 515AllRSCCWS.
SIS
AE-3(Canned) Chempump W -AESD 5 tart 1978 =- -- - --
Lockheed Complete 1st Quarter 1981Permagrain
AE-4(CBS) WEIR --- Start Not ScheduledComplete
.
hN0l[5:
CVCS = Chemical Volume Control SystemSIS = Safety injection System gWP5 = Waste Processing SystemSG6P = Steam Generator Blowdown (Waste) Processing (System)Rifft . = Residual lleat Removal (System) CPAf4 = Post Accident Monitoring M,
RPS = Reactor Protection System,. -
E5f = Engineered Saf eguard FeatureRC5 = R. actor Caolant System gq
.
~55 = Sampilng System ,
*
a CSS = Contaltunsnt Spray System 7E8. = Emergency Boration System *
CCW) = Component Coollag Water System ,
b^ "
" nm
____ ________________ - ______ - - - _ _- __
, - . _
-,
..
*
ATTACHMENT 2
'A. 1. Equipment Description:
Type: Modular. Type Electrical Penetration AssembliesCa.nister Type Electrical Penetration Assemblies
Manufacturer: Conax Corporation2300 Walden AvenueBuffalo, New York 14225
'
2. . System where equipment is installed:
Containment Electrical -Penetrations to provide electricalcircuits to the containment.2
3. Test Location and Schedule:
.(a) Irradiation - Georgia Tech, Atlanta
Splices, Connectors Tenninal Blocks 1/5/81 -2/4/81
Terminal' Blocks 2/6/81-3/16/81
(b) ' Short Circuit Current - GE/HPC, Philadelphia
Medium Voltage Penetration 12/8/80-12/15/80
|(c) Maximum Environment - Conax, Buffalc
Medium Voltage Penetration 10/10/80-10/28/80Splices, Connectors, Terminal Blocks 3/6/81-3/24/81
Terminal Blocks 6/22/81-7/22/81
B. 1. Equipment Description: Main Feedwater Isolation Valve -
Type: Double disc gate with self-contained hydraulicactuator
Model: 900 DD~
Manufacturer: Anchor / Darling Valve, Williamsport, Penn.
2. System where equipment is- installed _..
Locatt.d in the main feedwater line to the steam generators.Must close on receipt of containment isolation / SIS signal.DBE will be a main steam line break.
'< ,.
ATTACHMENT 2 (Continued)Page 2
B. (Continued)
3. Test Location and Schedule:
Test program and schedule has not been firmed as yet. The follow-ing are tentative:
(a) Testing Labs:
Wyle Labs - Huntsville, Alabama - 6/81-l'/81SDRC - Cincinnati, Ohio - 6/81-11/81
C. 1. Equipment Description: Main Steam Safety Valves
Type: Spring Actuated Safety Valve
Model: 6 RIO HA-75-FN
Manufacturer: Crosby Valve and Gage CompanyWrentham, Massachusetts-
2. System where equipment is installed:
Main Steam Line, Upstream of Main Steam Isolation Valve
3. Test Location and Schedule:
Crosby Valve and Gage Company, Wrentham, Massachusetts2/1/81-8/1/81
0. 1. Equipment Description: Main Steam Power Actuated Relief Valve
Type: -Atmospheric Steam Dump Valve with HydraulicActuator
Manufacturer: Control Components InternationalIrvine, California
2. System where equipment is installed:
Main Steam Line, Upstream of Main Steam Isolation Valve
. -- - . -. _. .. .. . - - .-.
** '
. .. -
| ATTACHMENT 2 (Continued)'.Page'3
,
D.- (Continued)4
3. aTest' Location and Schedule:
Test program and schedule has not been firmed as yet. :Thefollowing are tentative:
L(a) Testing Lab:
Wyle Labs - Norco, California- 1/ 81 -2/ 81
:P
; C. 1. - Equipment Description: Containment Isolation Valves
Type: , Nuclear Butterfly Valves'
Model: :No. 9220,
tManufacturer: -Fisher Controls Company
Marshalltown, Iowa
2. System where equipment'is installed:
! (a) : Component cooling water supply and-return to the containmentcoolers.
(b) Post-LOCA' purge exhaust system.
'3. Test Location and Schedule:
-(a) Testing Labs:
Wyle Labs Huntsville, Alabama Present-1/8/81''
Isimedix - Parsippany, New Jersey 12/80-1/9/81
!
,
.
! -