, .% ._a.. Y \ ATTACHf1ENT 1 Tj ' Westinghouse . Water Re3C10r i - Electric Corporation Divisions W 'e n:sf0m m sed!5 P rtscurg# tnt'sstet3152 0 NS-TMA-2332 .i i Darrell G. Eisenhut, Director October 31,1980 -i I Division of Licensing i Office of Nuclear _ Reactor Regulation U.S. Nuclear Regulatory Commission Phillips Building . * - 7920 Norfolk Avenue - Bethesda, Maryland ' 20014 Dear Mr. Eisenhut: In response to your letter dated October 1, 1980 concerning the en qualification of safety related equipment, attached please find the qualifi schedules for the safety related equipment within the Westinghouse sc (NSSS). est The attached Table 1 includes only the equipment which is curre supply or is scheduled to be tested within the next two years and doesn't incl ested equipment which may require testing as a result of TMI, i.e., incore thermo c onal containment monitor, etc , c uples, - -The information in Table 1 Includes: . 1. Equipment description (type, manuf acturer, etc.), 2. The safety-related system in which the equipment operates, 3. The test location and schedule. - equipment committed to be ~ qualified to IEEE-373-1974Th ng WRD supplied described in WCAP B587. Mr. G. Butterworth (412-373-5761) or Mr. A. Ball (412-373-4091) my staff. Very truly yo ,th ' < T. M. Anderson, Manager ' , , Nuc! car Safety Department e c. AB/ keg Attachment (s) 8 0130g0 h . _ , , _ .-- - - . . +
Transcript
Page 1: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

,

.%._a..Y \

ATTACHf1ENT 1 Tj

'Westinghouse .

Water Re3C10ri - Electric CorporationDivisions W 'e n:sf0m m

sed!5P rtscurg# tnt'sstet3152 0

NS-TMA-2332.i

i Darrell G. Eisenhut, Director October 31,1980-iI Division of Licensingi Office of Nuclear _ Reactor Regulation

U.S. Nuclear Regulatory CommissionPhillips Building.

* -

7920 Norfolk Avenue-

Bethesda, Maryland ' 20014

Dear Mr. Eisenhut:

In response to your letter dated October 1, 1980 concerning the environmentalqualification of safety related equipment, attached please find the qualification tschedules for the safety related equipment within the Westinghouse scope of(NSSS). est

The attached Table 1 includes only the equipment which is curren:!y being tsupply

or is scheduled to be tested within the next two years and doesn't include any additiestedequipment which may require testing as a result of TMI,i.e., incore thermo c

onalcontainment monitor, etc,

c uples,-

-The information in Table 1 Includes:.

1.Equipment description (type, manuf acturer, etc.),

2.The safety-related system in which the equipment operates,

3.The test location and schedule.

-

equipment committed to be ~ qualified to IEEE-373-1974This transmittal may be referenced by Westinghouse Customers having WRD supplieddescribed in WCAP B587.

Mr. G. Butterworth (412-373-5761) or Mr. A. Ball (412-373-4091) ofThe cognizant licensing contact (item 4 of your letter) will beemploying the methodologymy staff.

Very truly yo

,th ' <

T. M. Anderson, Manager ', ,

Nuc! car Safety Departmente c.AB/ kegAttachment (s)

8 0130g0 h

. _ , , _

.-- - - . . +

Page 2: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

'N.*

ATTACHMENT 1

~ s

TABLE 1(Sheet I of 4)

Scheduled Testing *

W-E40P TestE qu ipnen,t_ Reference fianuf acturer System Location Thermal Aging Radiation Sels.nic I!E t B

Saf ety Related HE-1 & 4 Limitorque CVCS Limitorque Start 9-29-80 10-28-80 12-05-t:0 1-04-81valve Electric SIS Complete 10-07-80 12-05-80 12-18-60 2 '2-81Hator Operators CCS

RitRS

Safety Related IIE-2 & S ASCO CVCS ASCO Start 9-23-80 10-22-80 11-19-80 2-16-81Solenold Valves SIS Complete 10-08-80 11-15-80 12-22-80 3-30-81

RCSWPSSS *

SGBP'. RHRi

Saf ety Related HE-3 NMCO CVCS NAMCO St art 9-23-80 10-10-80 11-25-80 1-01-81*

; Externally SIS Complete 10-07-80 11-25-80 12-08-80 2-01-81Limit Switches CSS

T AllRRCS

(' ') HE-6 MMCO WPS Start 10-03-80 11-14-80 1-20-81 2-10-81SS Complete 10-30-80 1-20-91 2-0$-81 3-19-81( 3 SGUP

P essure ESE-1 Barton RPS Barton Start 7-22-80 12-01-80 1-10-81 2-10-81Ir.n sm i t t er s PM W-Forest Hills Complete 11-15-80 12-31-80 2-01-81 3-01-81

l _3 Group A W-AESDISOMEDIXu

' Piessure ESE-2 Barton RPS Barton Startf] Y 1ransmitters PM W-forest Hills Complete 1979

Geoup 8 W-AE SD

Mu; ISO:4EDix-,

Dif f erential ESE-3 Barton RP$ W-Forest Hills Start 7-22-80 12-01-80 1-10-81 2-10-81gPressure PM W-AESD Complete 11-15-80 12-31-80 2-01-81 3-01-80

b G,oup A ISOMEDIX

Ditferential ESE-4 Barton PAM W-Forest Hills StartPressure RPS W-AESO Complete 1979

Transmitter iSOME01XGroup 8

Hesistence ESE-S Rdf .RPS W-Forst Hills Start 5-19-80 6-27-80 9-24 80 11-01-60femperature W-AESD Complete 6-13-80 7-23-80 10-22-80 11 20-80Detector ISOMEDIX'

, 'I (UC-Bypass) SURGICuiUniv. of Buffalo*

.

Resistence ESE-6 Rdf PAMS W-rorest Hills Start 5-19-80 6-21-80 9-24-80 !!-01-80 9

' temperature W-A E SO Complete 6-13-80 7-13-80 , 10-22-80 l'.-20-80,

i

Detector IS0:tEDIX-'

k .-.J (Wtil-mounted) SURGICUTUalv. of Buffalo Jj

*

l il 9A

Page 3: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

, ..

. ATTACHMENT 1 ..

FABLE 1 (Sheet 2 of 4) Scheduled I sting ! 5 .

titl e,, ' ),)- ,"

.'

SeismicRadi at ton

Test 9-24-80 11-01-80j -

Thermal Agi_ng. l oc ation 6-27-86 10-22-80 Il-20-80- } j

,4W-EQDP Manuf acturer $ntes '5-19-80 7-13-80 .};

1Start 6-13-80Reference W-forest lillis Complete y

1

pgqignaent RPSNdf ,W AE50 ;

ESE-7 s

Hes ntence 150MEDIX --

SURGICUTTemperature Univ, of Buf f alo 4t4 Quarter 1981 --hetettors(f451 response)

W. forest liills CompleteSt art

RP5W lGTD W-AE5D

E5E-9 ~ 'W-!GID ~Enore

tkutron - 1979 -Detectors 5 tert

-

|W-AESD Complete(Source) RPS

ESE-10- ~W-ID

-

t-W-ID- 4th Quarter 1981 - i'Nuclear .

- j'Instrumentation W-forest tillis Complete

'

StartSystem (NIS) APS

ESE-Il.W-AE50W-ID

Source Range . W-10--

i- 1st Quarter 1981 -Preet.plifier

_

(outside Con- 5 tart-1W-AESD Completetalmaent)

Electroswitch RP5 11-30-80 N/A lESF N/A 12-05-80-~ E5E-12

Main Control N/A1: w d Switch Start

W-AESD Completeibiales RP5W-ISD 5-01-80 N/A

E5E-13 ~ N/A 8-01-80Process 'N/AP,otection 5 tartW-AESD . Complete 8-01-19 N/A

Systera PAMESE-14 .W-RID N/A 10-10-79N/AStart tY Indicators ,

W-AE50 Complete -

PAML) ESE-15 ~

5' tart- - -

W-CID - 1979-

(< >) He(ordersW-AE50 Cunplete

RPS' W-ID W-IDESE-16 - E5F

Solid State*

Prutectionb, Syston -

g & Saf eguard TestCabinet(2 Train) Start-

- 1979 -W-AE5D Complete

RPSW-ID W-IDb solid state ESE-17 - E5F

-.

Protection system - 1979 -g & Safeguard TestCabinet (3 Trains Electrical W-AESD Complete

-Start

W-PED,

ESE-18 - PowerInstruncut Bus

'

Supply -.

,_ 3 Pineer Supply - 1979 _-U15 tat 6c Inverter) Start

- L7,5 KVA Electrical W-AE50 CompleteW-RED 'g

E5E-19 ~ PoserInstrument Bus Supply - 1979Distribution 5 tart -

W-AE50 Coraplete ~

Panel 7.5 KVA RPS -W-LVSD

CSE-20 -

Reactor Trip% is.h year

Page 4: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

1

NATTACHMENT 1, }

TABLE I ($heet 3 of 4)Scheduled Testing ,

W-EQOP Test

Ergulpsnent Reference Manufacturer System tocation Thermal Aging Radiation Selselc itEt B

Pressure E5E-21 Bartors RPS Barton Start 1-22-80 12-01-80 1-10-81 2-10-81-P#t5 W-Forest Hills Complete 11 15-80 12-31-80 2-01-81- 3-61-81

.5ensorW-AESDISOMEDIX

4 Section ESE-22 W-lGTD RPS W-IGID Start 8-20-80 9-20-80 12-01-80 1-10-81

Escore Neutron-

W-AESD Cunplete 9-15-80 10-05-80 12-31-80 2-01-81

Detector

toop Stop E5E-23 W-ID RPS Analysis Start Not Scheduled

value Cabinet~ Only Complete

RCP E5E-24 W-ISD RPS W-150 5 tart Not Scheduled,

Speed Sensor Electro Corp. Complete

Main Control ESE-25 W-CID RPS W-AESD StartBoard ESF Conplete 3rd Quarter 1980

PAN

Reactor Trip ESE-26 ~W-LVSD RPS W-AESD Start Not ScheduledCompleteSwitch gear

Nitrogen-16 ESE-27 W-lGTP RPS W-IGID Start 9-15-80 10-05-80 10-22-80 11-10-00~

W-AE50 Complete 10-01-00 10-18-80 11-05-80 12-01-00D petector

Huel Position ESE-28 Productos RPf W-AESD Start Not Scheduled -

Detector Electronicos, W R&D Coniplete

Inc.Puerto Rico

% Nod Position ESE-29 W-ID RP5 W-AESD Start Not Scheduled

04ta Cabinet_ Complete

D Integrated ESE-30 -W-ISD RPS * W-AE50 5 tart 3rd Quarter 1981 -Protection Cabinet W-150 Complete ,

togic Cabinet~

RPS W-AE50 5 tart 3rd Quarter 1981int egr ated ESE-31 W-15DW-150 Complete

Cabinet~

RPS W-AESD 5 tart Not Scheduledf ield termir stion ESE-32 W-150

Co mplete

Distr ibut ion~W-AESD Electrical W-AE50 5 tart Nat Scheduled

Instrument Bus ESE-33Power Complete

,

Panel Supply,

instrument Bus ESE-34 W-AESD Electrical W-AESD Start Not ScheduledI

Distr ibut ion~

.

Power Complete

Panel Supply'

%pply~

Electrical W-AESD Start Not Scheduled 8lustronent Power ESE-35 W-AESD~

Power Complete- ' * ay Supply

, ,

Page 5: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

*

ATTACHMEilT 1. ,

.

TABLE I (Sheet 4 of 4)-

|-Scheduled Testing

TM

plu tgnment Reference Manufacturer System tocation Thermal Aginj Radiatha . Se lyg lif t,n

Prcampilfler,

RPS W-Forest tillis Start 4th-Quarter 1981source Range ESE-36 W-IDW-AE50 Compiete

(In Contaltunent)

Demultipleser~W-ISD PAM W-AESD Start Not Scheduled - -

PAMS ESE-31Complete

Muttipleser~

- RPS W-AES!5 Start Not ScheduledControl Board ESE-38 W-ISDESF Complete

Fiber Optic ESE-39 -W-ISD RPS W-ISD Start Not Scheduled ~~ .

Cable Complete.

Saf ety Related AE-1(Medium) ~W-19tLG W-AESD Start 4th Quarter 1980 ---

Punp Motors ISOMEDIX Complete 2nd Quarter 1981 -

W.RLD

AE-2(Large) -W-LHD Buffalo CVCS .W-AESD Start 3rd Quarter 1980 -

EBS - 15DMEDIX Complete 1st quarter 1981 --

' 515AllRSCCWS.

SIS

AE-3(Canned) Chempump W -AESD 5 tart 1978 =- -- - --

Lockheed Complete 1st Quarter 1981Permagrain

AE-4(CBS) WEIR --- Start Not ScheduledComplete

.

hN0l[5:

CVCS = Chemical Volume Control SystemSIS = Safety injection System gWP5 = Waste Processing SystemSG6P = Steam Generator Blowdown (Waste) Processing (System)Rifft . = Residual lleat Removal (System) CPAf4 = Post Accident Monitoring M,

RPS = Reactor Protection System,. -

E5f = Engineered Saf eguard FeatureRC5 = R. actor Caolant System gq

.

~55 = Sampilng System ,

*

a CSS = Contaltunsnt Spray System 7E8. = Emergency Boration System *

CCW) = Component Coollag Water System ,

b^ "

" nm

____ ________________ - ______ - - - _ _- __

Page 6: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

, - . _

-,

..

*

ATTACHMENT 2

'A. 1. Equipment Description:

Type: Modular. Type Electrical Penetration AssembliesCa.nister Type Electrical Penetration Assemblies

Manufacturer: Conax Corporation2300 Walden AvenueBuffalo, New York 14225

'

2. . System where equipment is installed:

Containment Electrical -Penetrations to provide electricalcircuits to the containment.2

3. Test Location and Schedule:

.(a) Irradiation - Georgia Tech, Atlanta

Splices, Connectors Tenninal Blocks 1/5/81 -2/4/81

Terminal' Blocks 2/6/81-3/16/81

(b) ' Short Circuit Current - GE/HPC, Philadelphia

Medium Voltage Penetration 12/8/80-12/15/80

|(c) Maximum Environment - Conax, Buffalc

Medium Voltage Penetration 10/10/80-10/28/80Splices, Connectors, Terminal Blocks 3/6/81-3/24/81

Terminal Blocks 6/22/81-7/22/81

B. 1. Equipment Description: Main Feedwater Isolation Valve -

Type: Double disc gate with self-contained hydraulicactuator

Model: 900 DD~

Manufacturer: Anchor / Darling Valve, Williamsport, Penn.

2. System where equipment is- installed _..

Locatt.d in the main feedwater line to the steam generators.Must close on receipt of containment isolation / SIS signal.DBE will be a main steam line break.

Page 7: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

'< ,.

ATTACHMENT 2 (Continued)Page 2

B. (Continued)

3. Test Location and Schedule:

Test program and schedule has not been firmed as yet. The follow-ing are tentative:

(a) Testing Labs:

Wyle Labs - Huntsville, Alabama - 6/81-l'/81SDRC - Cincinnati, Ohio - 6/81-11/81

C. 1. Equipment Description: Main Steam Safety Valves

Type: Spring Actuated Safety Valve

Model: 6 RIO HA-75-FN

Manufacturer: Crosby Valve and Gage CompanyWrentham, Massachusetts-

2. System where equipment is installed:

Main Steam Line, Upstream of Main Steam Isolation Valve

3. Test Location and Schedule:

Crosby Valve and Gage Company, Wrentham, Massachusetts2/1/81-8/1/81

0. 1. Equipment Description: Main Steam Power Actuated Relief Valve

Type: -Atmospheric Steam Dump Valve with HydraulicActuator

Manufacturer: Control Components InternationalIrvine, California

2. System where equipment is installed:

Main Steam Line, Upstream of Main Steam Isolation Valve

Page 8: Responds to 801001 ltr re environ qualification of safety ...'N. * ATTACHMENT 1 ~ s TABLE 1(Sheet I of 4) Scheduled Testing * W-E40P Test E qu ipnen,t_ Reference fianuf acturer System

. -- - . -. _. .. .. . - - .-.

** '

. .. -

| ATTACHMENT 2 (Continued)'.Page'3

,

D.- (Continued)4

3. aTest' Location and Schedule:

Test program and schedule has not been firmed as yet. :Thefollowing are tentative:

L(a) Testing Lab:

Wyle Labs - Norco, California- 1/ 81 -2/ 81

:P

; C. 1. - Equipment Description: Containment Isolation Valves

Type: , Nuclear Butterfly Valves'

Model: :No. 9220,

tManufacturer: -Fisher Controls Company

Marshalltown, Iowa

2. System where equipment'is installed:

! (a) : Component cooling water supply and-return to the containmentcoolers.

(b) Post-LOCA' purge exhaust system.

'3. Test Location and Schedule:

-(a) Testing Labs:

Wyle Labs Huntsville, Alabama Present-1/8/81''

Isimedix - Parsippany, New Jersey 12/80-1/9/81

!

,

.

! -

I

-._. - _ , . _ _ . _ . _ _ _ __


Recommended