September 2014 Responses to the Examining Authority's First Written Questions Question 6.28 Appendix 1 - Onshore Infrastructure Part 1 of 2
Transcript
Page 1: Responses to the Examining Authority's First Written ......DOGGER BANK TEESSIDE A & B © 2014 Forewind Document Title Dogger Bank Teesside A & B Responses to the Examining Authority’s

September 2014

Responses to the Examining Authority's First Written Questions Question 6.28 Appendix 1 - Onshore Infrastructure – Part 1 of 2

Page 2: Responses to the Examining Authority's First Written ......DOGGER BANK TEESSIDE A & B © 2014 Forewind Document Title Dogger Bank Teesside A & B Responses to the Examining Authority’s

DOGGER BANK TEESSIDE A & B

© 2014 Forewind

Document Title Dogger Bank Teesside A & B

Responses to the Examining Authority’s First Written Questions

Question 6.28 Appendix 1

Forewind Document Reference F-EXL-EQ-001_Q6.28 App1

Issue Number 1.0

Date 3 September 2014

Page 3: Responses to the Examining Authority's First Written ......DOGGER BANK TEESSIDE A & B © 2014 Forewind Document Title Dogger Bank Teesside A & B Responses to the Examining Authority’s

Work No. 3B

Work No. 3A

Work No. 4A

Work No. 4B

Work No. 5B

Work No. 6B Work No. 5A

Mean High Water Spring (MHWS)

Mean Low Water Spring (MLWS)

Sheet 02

Work No. 6A

Work No. 2B

Work No. 2A

A

Work No. 2T

Work No. 2T

Work No. 10A

462500

462500

462750

462750

463000

463000

463250

463250

463500

463500

463750

463750

5227

50

5227

50

5230

00

5230

00

5232

50

5232

50

5235

00

5235

00

5237

50

5237

50

¯!(02

!(01

!(03

!(06!(05

!(04

LEGEND

0 100 200

Metres

The concepts and information contained in this documentare the copyright of Forewind. Use or copying of thedocument in whole or in part without the written permissionof Forewind constitutes an infringement of copyright. Forewind does not warrant that this document is definitivenor free of error and does not accept liability for any losscaused or arising from reliance upon information provided herein.

DOGGER BANK TEESSIDE A & B OFFSHORE WIND FARM

T-INF-0006-01-01DRAWING NUMBER:

VERSION DATE1 28/08/2014

REMARKS CheckedFirst Issue

DRAWING TITLE

PROJECT TITLE

Data Source:Wilton buried services © Sembcorp, 2011Northumbrian Water infrastructure © Northumbrian Water, 2012Cable & Wirless infrastructure © Cable & Wirless, 2012BT infrastructure © BT, 2012Virgin Media infrastructure © Virgin Media, 2012Northern Gas Networks infrastructure © Northern Gas Networks, 2012BOC Gases infrastructure © Boc Gases, 2012SABIC Trans-Pennine Ethylene Pipeline © Sabic, 2012NGET infrastructure © NGET, 2012Yorkshire Potash Scheme © Sirius Minerals, 2013Ordnance Survey © Crown copyright, All rights reserved, 2013. Licence number 0100031673

OSGB36 BNGA11:2,500 DATUM PROJECTIONSCALE PLOT SIZE

DrawnJR JH

Onshore Infrastructure Crossings(based on Onshore Works Plan Sheet 01)

Order limitsMean Low Water (Springs)Work No. 2AWork No. 2BWork No. 2TWork No. 3AWork No. 3BWork No. 4AWork No. 4BWork No. 5AWork No. 5BWork No. 6AWork No. 6BAccess to the Order limits from the public highwayNorthumbrian WaterBT Group

This map is forinformation

purposes only

Page 4: Responses to the Examining Authority's First Written ......DOGGER BANK TEESSIDE A & B © 2014 Forewind Document Title Dogger Bank Teesside A & B Responses to the Examining Authority’s

W ork No. 6B

W ork No. 6A

Sheet 01

Sheet 03

Sheet 02

A

AW ork No. 10CM inor HDD

und er A174

M inor HDD und erRed c a r Roa d

(Bla c k's Brid ge) a ndNetwork Ra il

Tees V a lley Ra ilwa y W ork No. 10B

W ork No. 10D

A

Northum b ria n W a ter p ip e in this vic inity.Exa c t p osition yet to b e d eterm ined .

461250

461250

461500

461500

461750

461750

462000

462000

462250

462250

462500

462500

5217

50

5217

50

5220

00

5220

00

5222

50

5222

50

5225

00

5225

00

5227

50

5227

50

¯!(02

!(01

!(03

!(06!(05

!(04

LEGEND

0 100 200

M etres

The concepts and information contained in this documentare the copyright of Forewind. Use or copying of thedocument in whole or in part without the written permissionof Forewind constitutes an infringement of copyright. Forewind does not warrant that this document is definitivenor free of error and does not accept liability for any losscaused or arising from reliance upon information provided herein.

DOGGER BANK TEESSIDE A & B OFFSHORE WIND FARM

T-INF-0006-02-01DRAW ING NU M BER:

V ERSION DATE1 28/08/2014

REM ARKS Chec kedFirst Issue

DRAW ING TITLE

PROJECT TITLE

Da ta Sourc e:W ilton b uried servic es © Sem b c orp , 2011Northum b ria n W a ter infra struc ture © Northum b ria n W a ter, 2012Ca b le & W irless infra struc ture © Ca b le & W irless, 2012BT infra struc ture © BT, 2012V irgin M ed ia infra struc ture © V irgin M ed ia , 2012Northern Ga s Networks infra struc ture © Northern Ga s Networks, 2012BOC Ga ses infra struc ture © Boc Ga ses, 2012SABIC Tra ns-Pennine Ethylene Pip eline © Sa b ic , 2012NGET infra struc ture © NGET, 2012Yorkshire Pota sh Sc hem e © Sirius M inera ls, 2013Ord na nc e Survey © Crown c op yright, All rights reserved , 2013. Lic enc e num b er 0100031673

OSGB36 BNGA11:2,500 DATU M PROJECTIONSCALE PLOT SIZE

Dra wnJR JH

Onshore Infrastructure Crossings(based on Onshore Works Plan Sheet 02)

Ord er lim itsW ork No. 6AW ork No. 6BW ork No. 10 (A-K)Horizonta l d irec tiona l d rill entry/exit c om p oundTem p ora ry c onstruc tion c om p ound Ac c ess to the Ord er lim its from the p ub lic highwa yNorthum b ria n W a terBT GroupV irgin M ed ia ‎Northern Ga s Networks

This map is forinformation

purposes only

Page 5: Responses to the Examining Authority's First Written ......DOGGER BANK TEESSIDE A & B © 2014 Forewind Document Title Dogger Bank Teesside A & B Responses to the Examining Authority’s

Work No. 6B

Work No. 6AMajor HDD

under Grewgrass Laneand Roger Dikes

Sheet 02

Sheet 04

Work No. 10E

A

Northumbrian Water pipe in this vicinity.Exact position yet to be determined.

460000

460000

460250

460250

460500

460500

460750

460750

461000

461000

461250

461250

5210

00

5210

00

5212

50

5212

50

5215

00

5215

00

5217

50

5217

50

5220

00

5220

00

¯!(02

!(01

!(03

!(06!(05

!(04

LEGEND

0 100 200

Metres

The concepts and information contained in this documentare the copyright of Forewind. Use or copying of thedocument in whole or in part without the written permissionof Forewind constitutes an infringement of copyright. Forewind does not warrant that this document is definitivenor free of error and does not accept liability for any losscaused or arising from reliance upon information provided herein.

DOGGER BANK TEESSIDE A & B OFFSHORE WIND FARM

T-INF-0006-03-01DRAWING NUMBER:

VERSION DATE1 28/08/2014

REMARKS CheckedFirst Issue

DRAWING TITLE

PROJECT TITLE

Data Source:Wilton buried services © Sembcorp, 2011Northumbrian Water infrastructure © Northumbrian Water, 2012Cable & Wirless infrastructure © Cable & Wirless, 2012BT infrastructure © BT, 2012Virgin Media infrastructure © Virgin Media, 2012Northern Gas Networks infrastructure © Northern Gas Networks, 2012BOC Gases infrastructure © Boc Gases, 2012SABIC Trans-Pennine Ethylene Pipeline © Sabic, 2012NGET infrastructure © NGET, 2012Yorkshire Potash Scheme © Sirius Minerals, 2013Ordnance Survey © Crown copyright, All rights reserved, 2013. Licence number 0100031673

OSGB36 BNGA11:2,500 DATUM PROJECTIONSCALE PLOT SIZE

DrawnJR JH

Onshore Infrastructure Crossings(based on Onshore Works Plan Sheet 03)

Order limitsWork No. 6AWork No. 6BWork No. 10 (A-K)Horizontal directional drill entry/exit compoundAccess to the Order limits from the public highwayBT GroupOverhead powerlines

This map is forinformation

purposes only


Recommended