M/T Clipper Golfito
BASIC WATCH CONDITION
Month: JANUARY 2011
O F F I C E R SORDINARY SEA WATCHES
00:00 - 04:00 / 12:00 - 16:00 04:00 - 08:00 / 16:00 - 20:00 08:00 - 12:00 / 20:00 - 24:00
2nd Officer Josko Barac (Tel.33) Chief Officer Ivica Brcic (Tel.32) 3rd Officer Ivan Brcic (Tel.34)
CARGO AND TANK CLEANING WATCHES00:00 - 06:00 / 12:00 - 18:00 OVERALL IN CHARGE 06:00 - 12:00 / 18:00 - 24:00
2nd Officer Josko Barac (Tel.33) Chief Officer Ivica Brcic (Tel.32) 3rd Officer Ivan Brcic (Tel.34)
R A T I N G S ORDINARY SEA WATCHES
00:00 - 04:00 / 12:00 - 16:00 04:00 - 08:00 / 16:00 - 20:00 08:00 - 12:00 / 20:00 - 24:00
ABS : Zayar Soe Win (Tel 66) ABS : Zaw Win Maung (Tel. 65) ABS : Thet Naing (Tel 67)
DOUBLE WATCH IN THE PORT00:00 - 06:00 / 12:00 - 18:00 06:00 - 12:00 / 18:00 - 24:00
ABS : Zayar Soe Win (Tel. 66) ABS : Thet Naing (Tel. 67)OS : Zaw Ko Ko Hlaing (Tel. 72) ABS : Zaw Win Maung (Tel. 65)
Cadet : Stamatovic Tonci (Tel. 42) Cadet : Sosic Petar (Tel. 43)DAYMAN (08:00 - 12:00 / 13:00 - 17:00)
Sasa Gvozdenovic (Tel:39)
00:00 - 04:00 / 12:00 - 16:00 04:00 - 08:00 / 16:00 - 20:00 08:00 - 12:00 / 20:00 - 24:002nd Officer Josko Barac (Tel 33) Chief Officer Ivica Brcic (Tel.32) 3rd Officer Ivan Brcic (Tel.34)
ABS : Zayar Soe Win (Tel 66) ABS : Zaw Win Maung (Tel. 65) ABS : Thet Naing (Tel 67)Cadet: Stamatovic Tonci (Tel. 42) OS: Zaw Ko Ko Hlaing (Tel. 72) Cadet : Sosic Petar (Tel. 43)
Master: Capt. Drasko Svalina (Tel: 31)REMARK:
Guidance regarding watch keepingIN CONNECTION WITH ISM CODE SOME IMPORTANT REGULATIONS ARE TO BE NOTED
Extrat from "STCW"1)All pearsons who are assigned duty as on officer in charge or as a rating forming a watch shall be provided a min.of 10 hrs of rest in 24 hrs
2)The hours of rest may be divided into no more then two periods, one of watch shall be at least 6 hours in length…………………………….
3)The requirements for rest periods laid down in 1 and 2 need to be maintained in the case of emergency or drill or in other overriding opere-
tional conditions……………………………………………………………………………………………………………………………………
4)Notwithstanding the provisions of 1 and 2,the minimum period of 10 hours may be reduced to not less then 6 consecutive hours provided
that any such reduction shall not extend beyound and not less then 70 hours of rest are provided each seven days period…………………….
Prepared by: Chief Officer Approved by: Master
Ivica Brcic Capt. Drasko SvalinaTel: 32 Tel: 31
COMPOSITION OF THE NAVIGATIONAL WATCH IN CASE OF HEAVY WEATHER, REDUCED VISIBILITY, HEAVY TRAFFIC, NAVIGATION IN DANGEROUS AREA (THREAT OF PIRACY ATTACK, ETC) AND IN ANY ABNORMAL
CIRCUMSTANCES
IF PREVAILING CONDITIONS REQUIRE TO HAVE ADDITIONAL OFFICER ON BRIDGE THEN OFFICER WHO HAD AT LEAST 4HRS OF REST PERIOD SHOULD BE CALLED FOR ASSISTANCE.
M/T "CLIPPER GOLFITO"
WATCH SCHEDULE IN ENGINE ROOM
Month: Jan-11
O F F I C E R S AND R A TI N G S
WATCH AT SEA
00:00 - 04:00 / 12:00 - 16:00 04:00 - 08:00 / 16:00 - 20:00 08:00-12:00 / 17:30-18:00 / 20:00-24:00
3th Eng: Than Htun (Tel: 37) 2nd Eng: Frane Juretić (Tel:36) 4th Eng.: Lwin Tint OO. (Tel. 38)
Motorman Motorman Zaw Zaw Tun (T:40) Motorman Sa Htin Lin Shein (Tel: 70)
WATCH AT ANCHOR AND IN THE PORT
00:00 - 04:00 / 12:00 - 16:00 04:00 - 08:00 / 16:00 - 20:00 08:00-12:00 / 17:30-18:00 / 20:00-24:00
3th Eng: Than Htun (Tel: 37) 2nd Eng: Frane Juretić (Tel:36) 4th Eng.: Lwin Tint OO. (Tel. 38)
Motorman Motorman Zaw Zaw Tun (T:40) Motorman Sa Htin Lin Shein (Tel: 70)
DOUBLE WATCH (AT SEA & IN THE PORT)
00:00 - 06:00 / 12:00 - 18:00 06:00 - 12:00 / 18:00 - 24:00
2nd Eng: Frane Juretić (Tel:36) Ch. Eng. Dino Topić (Tel; 35)
3th Eng: Than Htun (Tel: 37) 4th Eng.: Lwin Tint OO. (Tel. 38)
USE OF SINGLE OR DOUBLE WATCHES WILL BE DECIDED BY THE VESSEL'S COMMAND DEPENDING ON
CIRCUMSTANCES IN NAVIGATION AND ON INTENSITY OF LOADING/DISCHARGING/TANK CLEANING PROGRAM.
Prepared by: Approved by:
Dino Topić Capt. Draško SvalinaChief Engineer Master
Myint Myat Thaung Ngwe (Tel:69)
Myint Myat Thaung Ngwe (Tel:69)
Vessel: CLIPPER GOLFITO SHIPS ACTIVITY RECORD JANUARY 2011
Month Date Completed (Time)
01.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.
01.01.2010 AT SEA TANK CLEANING 15:00 18:00
01.01.2010 AT SEA TANK CLEANING 18:00 21;00
02.01.2011 ANCHORING 0:20 1:25
02.01.2011 ANCHORAGE 0:00 23:59 As per basic watch schedule DECK & ENG.02.01.2011 DRILL 16:00 17:00 ALL CREW03.01.2011 ANCHORAGE 0:00 23:59 As per basic watch schedule DECK & ENG.03.01.2011 DRILL 16:00 17:00 ALL CREW04.01.2011 ANCHORAGE 0:00 23:59 As per basic watch schedule DECK & ENG.04.01.2011 DRILL SCM 13:00 14:00 ALL CREW05.01.2011 ANCHORAGE 0:00 23:59 As per basic watch schedule DECK & ENG.05.01.2011 DRILL 16:00 17:00 ALL CREW06.01.2011 ANCHORAGE 0:00 6:24 As per basic watch schedule DECK & ENG.06.01.2011 MOORING 6:24 7:12 ALL DECK CREW
06.01.2011 CARGO OPERATION 7:12 12:00
06.01.2011 CARGO OPERATION 12:00 18:00
06.01.2011 CARGO OPERATION 18:00 23:59
07.01.2011 CARGO OPERATION 0:00 8:18
07.01.2011 UNMOORING 4:18 8:18 ALL DECK CREW07.01.2011 DRILL 16:00 17:00 ALL CREW07.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.08.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.08.01.2011 DRILL 15:00 17:00 ALL CREW09.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.09.01.2011 DRILL 16:00 17:00 ALL CREW10.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.11.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.11.01.2011 DRILL 16:00 17:00 ALL CREW
Activity (Cargo operations, tank cleaning operation, mooring/unmooring/anchoring, drills, bunkering operations, other overtime jobs which please specify etc)
Commenced (Time)
Crew members involved (please specify ranks only such as M, CO, 2O, 3O, CE, 2E, 3E, 4E,
PM, AB1, AB2, AB3, OS1, OS2, OS3, MOM1, MOM2, MOM3, W1 W2 W3)
NOVEMBER 2010
As per basic watch schedule DECK in port + PM
As per basic watch schedule DECK in port + PM
As per basic watch schedule DECK & ENG. + CO, PM
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
12.01.2011 AT SEA 0:00 23:59 As per basic watch schedule DECK & ENG.13.01.2011 AT SEA 0:00 7:24 As per basic watch schedule DECK & ENG.13.01.2011 MOORING 7:24 8:48 ALL DECK CREW
13.01.2011 CARGO OPERATION 8:48 12:00
13.01.2011 CARGO OPERATION 12:00 18:00
13.01.2011 CARGO OPERATION 18:00 23:59
14.01.2011 CARGO OPERATION 0:01 2:12
14.01.2011 UNMOORING 2:12 2:48 ALL DECK CREW14.01.2011 AT SEA 2:48 23:59 As per basic watch schedule DECK & ENG.15.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.16.01.2011 AT SEA 0:01 7:00 As per basic watch schedule DECK & ENG.16.01.2010 AT SEA 7:00 21:00 As per basic watch schedule DECK & ENG.16.01.2011 MOORING 21:00 21:48 ALL DECK CREW
16.01.2011 CARGO OPERATION 21:48 0:00
17.01.2011 CARGO OPERATION 0:01 6:00
17.01.2011 CARGO OPERATION 6:00 8:00
17.01.2011 UNMOORING 8:00 8:42 ALL DECK CREW
17.01.2011 AT SEA 8:42 23:59 As per basic watch schedule DECK & ENG.
18.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.
19.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.
20.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.
21.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.
22.01.2011 AT SEA 0:01 16:00 As per basic watch schedule DECK & ENG.
22.01.2011 MOORING 16:00 18:00 ALL DECK CREW
22.01.2011 CARGO OPERATION 18:00 23:59
23.01.2011 CARGO OPERATION 0:01 2:48
23.01.2011 UNMOORING 2:48 3:00 ALL DECK CREW
23.01.2011 AT SEA 3:00 23:59 As per basic watch schedule DECK & ENG.
NOVEMBER 2010
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
NOVEMBER 2010
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
24.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.25.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.26.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.27.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.28.01.2011 AT SEA 0:01 7:00 As per basic watch schedule DECK & ENG.28.01.2011 MOORING 7:00 8:30 ALL DECK CREW
28.01.2011 CARGO OPERATION 8:30 12:00
28.01.2011 CARGO OPERATION 12:00 18:00
28.01.2011 CARGO OPERATION 18:00 23:59
29.01.2011 CARGO OPERATION 0:01 6:00
29.01.2011 CARGO OPERATION 6:00 12:00
29.01.2011 CARGO OPERATION 12:00 18:00
29.01.2011 CARGO OPERATION 18:00 19:00
29.01.2011 CARGO OPERATION 19:00 20:00 ALL DECK CREW29.01.2011 AT SEA 20:00 23:59 As per basic watch schedule DECK & ENG.30.01.2011 AT SEA 0:01 23:59 As per basic watch schedule DECK & ENG.31.01.2011 AT SEA 0:01 As per basic watch schedule DECK & ENG.
NOVEMBER 2010
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
2O,AB1,OS,C2 ( C/O as required ,PM as per dayman watch or as necessary)
CO,3O, AB3,AB2,C1 (PM as per dayman watch or as necessary)
NOVEMBER 2010
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank MASTER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 X X X X X X X X X X 10 NO NO ###1/1/2011 X X X X X X X X X X X 11 NO NO ###1/2/2011 X X X X X X X X X X 10 NO NO ###1/3/2011 X X X X X X X X X X X 11 NO NO ###1/4/2011 X X X X X X X X X X 10 NO NO ###1/5/2011 X X X X X X X X X X X 11 NO NO ###1/6/2011 X X X X X X X X X X 10 NO NO NO ###1/7/2011 X X X X X X X X X X 10 NO NO NO ###1/8/2011 X X X X X X X X X X X 11 NO NO NO ###1/9/2011 X X X X X X X X X X X 11 NO NO NO ###1/10/2011 X X X X X X X X X X X 11 NO NO NO ###1/11/2011 X X X X X X X X X X 10 NO NO NO ###1/12/2011 X X X X X X X X X X 10 NO NO NO ###1/13/2011 X X X X X X X X X X X 11 NO NO NO ###1/14/2011 X X X X X X X X X X X 11 NO NO NO ###1/15/2011 X X X X X X X X X X X X 12 NO NO NO ###1/16/2011 X X X X X X X X X X 10 NO NO NO ###1/17/2011 X X X X X X X X X X 10 NO NO NO ###1/18/2011 X X X X X X X X X X X 11 NO NO NO ###1/19/2011 X X X X X X X X X X X 11 NO NO NO ###1/20/2011 X X X X X X X X X X X X 12 NO NO NO ###1/21/2011 X X X X X X X X X X X X 12 NO NO NO ###1/22/2011 X X X X X X X X X X X X 12 NO NO NO ###1/23/2011 X X X X X X 6 YESNO NO ###1/24/2011 X X X X X X X X X X X 11 NO NO NO ###1/25/2011 X X X X X X X X X X X 11 NO NO NO ###1/26/2011 X X X X X X X X X X X 11 NO NO NO ###1/27/2011 X X X X X X X X X X X 11 NO NO NO ###1/28/2011 X X X X X X X X X X X 11 NO NO NO ###1/29/2011 X X X X X X X X X X X 11 NO NO NO ###1/30/2011 X X X X X X X X X X X 11 NO NO NO ###1/31/2011 X X X X X X X X X X X 11 NO NO NO ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank CHIEF OFFICER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name JOSKO BARAC Rank 2ND OFFICER
Vessel M/T CLIPPER GOLFITO
Year 2011 Month FEBRUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation
################################################################################################
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank 3RD OFFICER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank CHIEF ENGINEER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank 2ND ENGINEER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank 3RD ENGINEER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank 4TH ENGINEER
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank PUMPMAN
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank ABS 2
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank ABS 1
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank ABS 3
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank CADET 1
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank CADET 2
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 NN NN 2 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN NN 3 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 NN 1 YESYES YES ###1/14/2011 NN 1 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 NN 1 YESYES YES ###1/17/2011 NN NN 2 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 NN 1 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 NN 1 YESYES YES ###1/23/2011 NN 1 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 NN 1 YESYES YES ###1/29/2011 NN 1 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank OS
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN NN 3 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank MOTORMAN 1
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank MOTORMAN 2
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name DRASKO SVALINA Rank MOTORMAN
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name Rank COOK
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)
M6-47
Date : Oct. 96Maruta Industries SAFETY MANAGEMENT SYSTEM Revised : Apr. 10
Prepared : V.T.Company Limited RECORDS Vol. 6 Distributed : L.Z.
Approved : : L.Z.
RECORDS OF REST PERIODS
Name Rank MESSBOY
Vessel M/T CLIPPER GOLFITO
Year 211 Month JANUARY
General rulesSeafarers must have at least 10 hours of rest in a 24-hour period, and at least 6 of these hours must be consecutive. The 10 hours must
not be divided into more than 2 periods of rest, and there must not be more than 14 hours between the periods of rest. Absence from
work will count as rest only if it has a duration of at least 1 hour. Seafarers’ total weekly hours of rest must be at least 70 hours.
All periods of rest are included in these 70 hours. A workday is a 24-hour period that commences the first time a seafarer starts
working on a calendar day. A week is a consecutive 7-day period.
In any 24 hour period: 8 hours duty 6 hours rest 6 hours duty 4 hours rest or
14 hours duty 10 hours rest or
18 hours duty 6 hours rest
<10 <70 <6Day / Time 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Total Deviation12/31/2010 0 YES YES ###1/1/2011 0 YES YES ###1/2/2011 NN NN 2 YES YES ###1/3/2011 NN NN 2 YES YES ###1/4/2011 NN 1 YES YES ###1/5/2011 NN NN 2 YES YES ###1/6/2011 0 YESYES YES ###1/7/2011 NN NN 2 YESYES YES ###1/8/2011 NN NN 2 YESYES YES ###1/9/2011 NN NN 2 YESYES YES ###1/10/2011 0 YESYES YES ###1/11/2011 NN NN 2 YESYES YES ###1/12/2011 0 YESYES YES ###1/13/2011 0 YESYES YES ###1/14/2011 0 YESYES YES ###1/15/2011 0 YESYES YES ###1/16/2011 0 YESYES YES ###1/17/2011 0 YESYES YES ###1/18/2011 0 YESYES YES ###1/19/2011 0 YESYES YES ###1/20/2011 0 YESYES YES ###1/21/2011 0 YESYES YES ###1/22/2011 0 YESYES YES ###1/23/2011 0 YESYES YES ###1/24/2011 0 YESYES YES ###1/25/2011 0 YESYES YES ###1/26/2011 0 YESYES YES ###1/27/2011 0 YESYES YES ###1/28/2011 0 YESYES YES ###1/29/2011 0 YESYES YES ###1/30/2011 0 YESYES YES ###1/31/2011 0 YESYES YES ###
Crew member(Signature)
Master: SVALINA DRASKO(Name in block letters) (Signature)
Note: Record is mandatory for all crew members.
(for a maximum of 2 consecutive days as long as not less than 70 hours of rest are provided in a 7 day period)