PREPARED BY: Md. Murad Pervez Monitoring and Research Officer Programme Quality, Learning & Research (PQLR) Unit TEAM LEADER: Munshi Mahabubur Rahman Coordinator- PQLR ADVISOR : Md. Moniruzzaman Head of Programme Quality, Learning & Research (PQLR) Unit Funded by Islamic Relief-UK and UKaid Result Based Monitoring Report (October, 2016) On Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh (ECCADR) project Climate Change and Disaster Resilience (CDR) Program Islamic Relief, Bangladesh House No: 10, Road No: 10, Block-K Baridhara, Dhaka-1212 Funded by Islamic Relief-UK and UKaid Programme Quality Learning and Research Unit (PQLR), Islamic Relief Bangladesh
Transcript
Page 1: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

PREPARED BY:

Md. Murad Pervez Monitoring and Research Officer Programme Quality, Learning &

Research (PQLR) Unit

TEAM LEADER: Munshi Mahabubur Rahman

Coordinator- PQLR ADVISOR :

Md. Moniruzzaman Head of Programme Quality, Learning

& Research (PQLR) Unit

Funded by Islamic Relief-UK and

UKaid

Result Based Monitoring Report (October, 2016) On

Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh (ECCADR) project

Climate Change and Disaster Resilience (CDR) Program Islamic Relief, Bangladesh House No: 10, Road No: 10, Block-K Baridhara, Dhaka-1212

Funded by Islamic Relief-UK and UKaid Programme Quality Learning and Research Unit (PQLR), Islamic Relief Bangladesh

Page 2: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

2

RBM REPORT

Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh (ECCADR) project

STUDY TEAM MEMBER

Md. Moniruzzaman Head of Programme Quality, Learning & Research Unit Islamic Relief, Bangladesh Munshi Mahabubur Rahman Coordinator -MEL Programme Quality, Learning & Research Unit Mahmud Hossain Senior Monitoring and Research Officer Programme Quality, Learning & Research Unit Md. Murad Pervez Monitoring and Research Officer Programme Quality, Learning & Research Unit Emadul Islam Assistant Monitoring and Research Officer Programme Quality, Learning & Research Unit Kazi Lutfun Nahar Ahmed

Intern, Climate Change and Disaster Resilience (CDR) Program Nazmul Nabid

Intern, Climate Change and Disaster Resilience (CDR) Program

Page 3: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

3

ACRONYMS AND ABBREVIATION

BDT Bangladeshi Taka

CBO Community Based Organization

CCA Climate Change Adaptation

CDR Climate Disaster Resilience

CPP Cyclone Preparedness Programme

CRA Community Risk Assessment

DDMC District Disaster Management Committee

DMC Disaster Management Committee

DPH Department of public health

DRR Disaster Risk Reduction

ECCADR Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh

FGD Focus Group Discussion

HH Household

IGA Income Generating Activities

IRB Islamic Relief Bangladesh

KII Key Informant Interview

MFI Micro finance institution

NGO Non-Government Organization

PQLR Programme Quality, Learning and Research

PWD Person with Disability

RRAP Risk Reduction Action Plan

SHG Self Half Group

SMC School Management Committee

UDMC Union Disaster Management Committee

UP Union Parishad (The lowest tier of local government)

UzMC Upazila Disaster Management Committee

VGD Vulnerable Group Development

VGF Vulnerable Group Feeding

WDMC Ward disaster management committee

Page 4: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

4

TABLE OF CONTENTS ACRONYMS AND ABBREVIATION .......................................................................................................... 3

EXECUTIVE SUMMARY .......................................................................................................................... 6

Target VS reality .................................................................................................................................... 9

CHAPTER - I: BACKGROUND, OBJECTIVES AND METHODOLOGICAL ................................................. 12

1.3: METHODOLOGICAL CHOICE AND CNSEDERATION OF THE STUDY .............................................. 13

CHAPTER II: FINDINGS: EFFICIENCY, EFFECTIVENESS AND RESULTS .................................................. 16

SECTION 1: DEMOGRAPHIC INFORMATION ....................................................................................... 16

SECTION 2: Climate adaptive income generating activities of the climate-vulnerable communities.16

SUB-SECTION 2.1: ECONOMIC RESOURCE PROFILE ............................................................................ 16

2. 2: CLIMATE ADAPTIVE LIVELIHOOD OPTIONS (INVOLVEMENT IN IGA) .......................................... 20

2.3: CAPACITY BUILDING TRAINING ON IGA ....................................................................................... 22

2.4: profit through income generating activities ................................................................................ 23

2.5: IGA replication ............................................................................................................................. 28

2.6: Homestead gardening of the targeted livelihood beneficiaries .................................................. 28

2.7: Increased Family income: Behind factors .................................................................................... 29

2.8: GROUP ACTIVITIES ....................................................................................................................... 30

2.9: Migration...................................................................................................................................... 31

2.10: FOOD SECURITY ......................................................................................................................... 31

2.11: Housing status ............................................................................................................................ 32

2.12: Water sanitation and health hygiene status .............................................................................. 34

2.13: Toilet facilities ............................................................................................................................ 35

2.14: Membership of various organization ......................................................................................... 35

SECTION 3: DMS are reactivated and functional as per sod which covered 27106 households ........ 36

3.1: Functioning disaster management committees (UDMCs & WDMC) ........................................... 36

3.2: Union Disaster Management Committees (UDMCs) are working for disaster risk reduction .... 36

3.3: A Cost-benefit Analysis: Value for Money (VFM) ...................................................................... 39

3.4: School safety plan ....................................................................................................................... 40

SECRION 4: PEOPLE IN VULNERABLE COMMUNITIES ARE BETTER ABLE TO MANAGE DISASTER RISK

REDUCTION PLANNING AND MITIGATION (OUTCOME-3) .................................................................. 41

Page 5: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

5

4.1: Collaboration of Community people and DMCs .......................................................................... 41

4.2: Training and awareness on DRR and CCA: ................................................................................... 41

4.3: Amrao ready (we are ready) campaign........................................................................................ 41

4.4: Disaster Risk Reduction (DRR) practices at household level........................................................ 42

4.5: Homestead gardening (Vegetables and tree plantation): ........................................................... 43

4.6: Participation in advocacy program of targeted HHs: ................................................................... 43

4.7: Existing multi-hazard early warning system operationalised (5 unions with early warning

systemized) .......................................................................................................................................... 43

4.8: Climate Adaptive Livelihood Option (CALO): Farmers Field Laboratory ...................................... 43

4.9: Local Adaptation Plan of Action (LAPA): ...................................................................................... 44

4.10: Community Resource Center (CRC): ......................................................................................... 44

4.11: Access to existing social protection scheme (10% increase of targeted socially excluded

person to access existing social protection schemes) ........................................................................ 45

SECTION 5: POLICY AND ADVOCACY TO MORE INFORMED OF DISASTER RISK REDUCTION AND

MORE PREPARED FOR UNEXPECTED DISASTERS (OUTCOME -4) ....................................................... 45

5.1: People reached through local level media and advocacy campaigns ......................................... 45

5.2: Number of policy and advocacy events organized at national and local level ........................... 45

5.3: Number of people reached or has access to DRR and CCA related publications ....................... 46

CHAPTER III: Key Changes/Impact during the project period ............................................................ 47

CHAPTER IV: STRENGTHS, LIMITATION & CHALLENGE AND RECOMMENDATIONS ........................... 48

CHAPTER V: ANEXTURE: ADDITIONAL ................................................................................................ 50

Annexure -1 : Sampling Calculation .................................................................................................... 50

Annexure 2: IGA Replication .............................................................................................................. 50

Annexure 3: Homestead gardening .................................................................................................. 50

Annexure 4: GROUP ASSESSMENT TOOLS .......................................................................................... 51

Annexure 5: Cost benefit analysis ....................................................................................................... 52

Page 6: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

6

EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh” (ECCADR) (for period of up to October, 2016) project which has employed both qualitative and quantitative methods. A sample survey was carried out among the 555 beneficiaries from four project implementation areas e.g Sunamgonj, Satkhira, Patuakhali and Khulna

districts respectively for quantitative data. On the one hand, qualitative methods like FGD, Group

assessment, KII, case study and document check/review were applied to collect data from project related stakeholders like- SHG, Apex body, WDMC, UDMC, UzDMC, GO officer and project implementation officer. The summary findings of the evaluation are depicted below-

MAJOR FINDINGS OF THE STUDY Climate adaptive livelihood: The average monthly income of the HH has been increased 180 percent (from BDT 2500 to BDT 7004). 77 percent households’ monthly income is from BDT 4501 to above BDT 10500 while baseline was 15 percent. Moreover, lower limit monthly income of the family is BDT 1500 and upper limit is BDT 21543. A- Category beneficiaries have been increased than baseline from 13 percent to 65 percent. On the one hand, D-category has been decreased between 2 and 56 percent. Monthly average expenditure of the households is BDT 5744 that means average surplus value is BDT 1260 while at the time of baseline their monthly average expenditure’s deficient was 541 BDT.The productive and non-productive assets have been increased 198 percent and 10 percent between baseline and RBM. Productive asset multiplied significantly. Possess land status of the targeted households have increased 9 percent. 96 percent targeted beneficiaries are continuing their IGA. 4 percent have turned over from IGA owing to migration and death of the beneficiary. IGA diversification has been seen among the targeted 87 percent households from two to four IGAs and 48 percent HHs have multiplied their IGAs. 88 percent HHs have been profited by their IGAs while 12 percent have not got any profit yet because of over economically active aged of beneficiaries, died of Households head, lost of asset by the disease and waiting to get profit ( especially for cow rearing though their asset value has been increased). All of the targeted beneficiaries trained on IGAs from IRB whilst in baseline study it was 1 percent. Average monthly profit through existing IGAs is BDT 1917. In addition, lower limit and upper limit of monthly profit is BDT 120 and BDT 21543. 55 percent targeted livelihood households stated that other HH elated by their income generating activities as a consequence it replicated in the other HH and community. Replication IGAs are Crop and vegetable cultivation, Livestock rearing, Crab cultivation and fattening, Fish cultivation and tree plantation. SHG are functioning but one third of the livelihood groups seemed less organized that is questionable to sustainable after withdraw the project actives. However, 35 percent are in A-category, 29 percent B-category, 12 percent C-category and 24 percent groups are D-category. 10 apex bodies have been formed and functioning. Of them, 50 percent have got registration certificate from the government. They are working on disaster risk reduction at households and community levels, Strengthening SHG, enhance production of the IGAs and make market linkage to sale the product and manage Risk fund. At the homestead 85 percent beneficiaries were able to produce average 96 KG vegetables whereas 42 percent households sold vegetables alongside consumed which amount is average BDT 819. Lower limit is 10 KG and upper limit is 4000 KG. Through the project intervention targeted beneficiaries have made positive changed in food intake in a day; at present 67 percent can afford 3 meals in a day while at the time of baseline it was 53 percent. Ownership of housing status has been seen constant but housing structure has been improved than before. Tin with wooden house has been increased while thatched and straw made house is decreased. It is sign of economical solvency of households as well as disaster preparedness. 21 percent HHs are

Page 7: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

7

confident house is able to protect any disaster while near half of the HHs’ living houses any minor damage at the time of big disaster. On the other hand, 12 percent HH’s house is in decrepit state. 93 percent HHs have covered safe drinking water facilities while at the time of baseline 77 percent. On the one hand, 81 percent HHs can meet their demand round the year where at the time of baseline it was 67 percent. Open defecation, open or pit and hanging latrine of the targeted people have been reduced significantly while sanitary and slab latrine user increased drastically. 100 percent project beneficiaries are involved in any organization while at the time of baseline it was only 4 percent. They are involved with various organization including SHG, Apex body or CBO, WDMC, UDMC, SMC and micro finance institution. Reactivation and functioning of DMCs: All of the UDMCs have revitalized and the committees are functioning and active. But, due to re-elected UDMC members and president now a days a number of DMCs do not continue regular meeting. It was found that out of total 50 percent UDMC members are newly appointed. However, previous members are also been aware their roles and responsibilities. They received various training like CRA, Disaster risk reduction, first aid search and rescue etc. On the one hand, all of the WDMC was formed and functioning. As a contrary, now a number of WDMCs are not proactive because, due to hold last tire of local government election (Union Parishod) around 60 percent WDMC members have been changed. In the mean time, the project tried to functionalize these committees and of them 50 percent have covered. Remain 50 percent is inactive. The DMCs and community people have completed around 143 small scales work like roads construction, Bamboo Bridge, ground raising, vaccination camp and tree plantation in the four areas by their own support which estimated value is amount of around BDT 902620 alongside laboring. By the institutional support at respective four upazilla there were around 500 risk reduction or mitigation worked have been done including Embankment, Guide wall, Latrine, Road, Ground raising,

Tube well, Pond excavation, Cyclone shelter repaired, Culvert, Bridge, School repair, solar, Killa,

embankment, Submersible Road etc which amount is BDT 58,11,79,081(fifty eight core). As a part of RRAP, DMCs have done a number of small scale mitigation works with financial and technical supported by IRB. Near about 150 small scales mitigation work have been completed by IRB like Installation Solar system at home, Bio Gas Plant, community toilet, Saplings, Killa, Ground raising, Pond excavation, rain water harvesting, tube-well, Stair, Waste management cum fertilizer production and clean environment, Road re-construction, Canal excavation Saplings, eco-park, public toilet, Stair, tree plantation, homestead and school ground raising etc. However, as part of study, of them 37 small scale works have been analyzed to assess benefits (Economical, social and environmental) against the cost. The impressive benefits have found. To accomplish these works (37) IRB has spent around 2,54,44,131 BDT and through the analysis it has found that the community people got benefits which amount is around more than 8,60,17,735 BDT. Targeted schools prepared school safety plan and received training on First Aid, Search and Rescue. They prepared contingency plan about disaster risk reduction and submitted to relevant department. There are need based school safety worked have done like school ground raising, installed drinking water sources, sanitation, tree plantation and First Aid, Search and Rescue materials etc by the support of IRB and institutional support. The SMC played an important role to teach and aware the student regarding first aid, search and rescue etc. Disaster risk reduction and mitigation work: 73 percent targeted people have idea on DMCs especially WDMC and UDMC as well as their activities. DMCs members visit their group meeting to aware and do practices on disaster preparedness. 17 percent livelihood beneficiaries (who are group leaders) received training on DRR, First aid and search & rescue and climate change adaptation. Rests of the beneficiaries have learnt on DRR and search & rescue for the group leaders as on the job training. HH level disaster preparedness has been increased significantly. The significant change occurred in the proportion of food stock, portable oven, and

Page 8: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

8

homestead rising, saving, tree plantation, shelter tied, improved storage facilities and conserved livestock foods while at the time of baseline it was little practices at household level. WDMC did Amrao Ready (We are Ready) campaign successfully. Assessment of campaign it was also found targeted people have made impressive progress on disaster risk reduction activities. 46 percent households are in green symbol while at the time of baseline assessment it was 17 percent. On the one hand, red symbol have decreased 22 percent. 31 percent targeted people were participated in various advocacy programs ( Human chain, Rally, Campaign, Seminar etc) on climate resilient, disaster risk reduction and climate changed adaptation. 88.2 percent HH have knowledge about early warning system while at the time of base line it was 60 per cent. A total 58 farmers from four areas had taken CALO where 32 different crops, vegetables, grass and fish were cultivated in 101 plots of project implementation area as tested feasibility to cultivate types of crops and vegetable in climate vulnerable area. 82 percent tested fields have succeeded. Moreover, famer shared field laboratory’s learning with the wider community as a result it has been replicated in community farmer. Community based resource center (CRC) is using effectively where community people get information and learn on DRR &CCA and climate adaptive livelihoods from the CRC. Moreover, they are getting information on early warning and WDMC and SHGs are doing meeting in the CRC. Access to social protection scheme has been increased (67%- 75%) 8 percent then before. Policy and advocacy to more informed of disaster risk reduction: The project people observed day on disaster Preparedness where around 837 vulnerable targeted HHs participated. 36 Articles related to climate change adaptation and disaster risk reduction have been published in the daily newspapers reaching around 15000 people. The WDMC organized mass awareness campaign named “AMRAO READY” (We are Ready) has covered 26006 HHs of 10 unions. A number of policy and advocacy events organized at national and local level as a result Bangladesh water development board is disseminating early warning flood forecasting massages two times in a day instead of one time as well as it has been digitalized where people are getting authentic information . IRB produced and distributed different types of education and communication materials on DRR and CCA like Flip Chart on DRR and CCA session, Skill Training Module for Saline Prone and Haor Area, livelihood Group Nursing Guideline, IEC materials for Group Nursing, Climate Change Adaptation Module, and Flash Card WASH for Livelihood Group, Display of Risk & Resource Map. As a result this intervention reached out almost 90000 people along with project targeted beneficiaries. IRB organized a number of workshops where university teacher, student, government official, national and local political leaders and mass people participated as well as developed reading working paper. More than 1000 people attend in different workshops and working papers reached to more than 1000 people. It is also mentioned that the project produced huge number of visibility materials like IRB Resilience Model and set up it in different places; even at the community level which is not much effective as all level of people are not able to understand the model (written in English). Conclusion and recommendation: To sum up, in conclusion, the project’s all targeted indicators have succeeded been fruitfully. However,

for excellent achievement of all indicators the study recommended some areas as follows: - 1) as an

organizational stability, livelihood groups need to be more active and functional. So nourishment of the

groups should be continuing minimum more than one year in order to sustain the group. 2) Beneficiaries

need to have clear understanding about utilization of seed money. 3) The group members have to clear

understand about objectives installment in the group saving against seed money, process of Quard-al-

hasana, ownership of money and where money is deposit otherwise there is possibility to break group

activities as well as is possibility to misuse this saving money. 4) Moreover, it is imperative to make sure

establish internal relationship among the group members. That’s why flow-up of the group should

Page 9: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

9

continue. 5) Apex body is now in initial stage, so to see sustainable apex body nourishment is needed. 6)

A number of WDMC and UDMC members have been changed due to hold last tire of local government

election (Union Parishod). So, newly appointed members need to develop skill on their role and

responsibility. 7) Only necessary and justified visibility materials should be produced in future to be cost

effective, 8) The project should be extended for another two years more for all areas; especially where

distributed 2nd round seed money).

TARGET VS REALITY

SL OVI of Achievement Baseline Status End line

Outcome indicator Milestone

1 Household income among project beneficiaries

50% increased in income of 85 % targeted households

- Average Income of the HH is 2500 BDT

- Average productive asset value is 9708

- Average monthly income is 7004 BDT -77 % HH’s income increased 50 % than average baseline income. -Average productive asset value is 28980 (increased 198 %)

2 Households covered by effective and operational disaster management institutions

27,106 HHs - No household found as such in the project area according to the baseline data

More than 27,106 HHs covered by effective and operational disaster management institutions

3 Households adopting recognised adaptive practices

2400 HHs However 22% have no idea about adaptation

2400 households have been practicing on disaster risk reduction initiatives and adaptation practicing.

Output 1- Households supported to take-up new climate / disaster resistant income generating activities

1.1 People trained in alternative climate resilient income generating activities

2400 HHs (960 women headed HHs)

As per baseline study 5 % of the population in targeted areas trained on new alternative climate resilient IGAs

2400 HHs (960 women headed HHs) trained in alternative climate resilient income generating activities

1.2 Households provided assets required to facilitate climate resilient income generating activities

2400 HHs No such support were provided to the respondents according to baseline data

-61 % received 24000 BDT and 39 received 12000 - 100 % received vegetable seeds

1.3 New producer groups created and successfully linked to markets within target communities

120 Producer group

0 producer groups available in the project area according to baseline data

-100 SHG have formed and functioning - 10 Apex body have formed and 5 have got registration

Output 2- Institutions in target districts are developed to provide comprehensive disaster risk management to vulnerable communities

2.1 Management Committees (UDMCs) incorporate credible risk reduction action

10 UDMCs are inactive and non-functional according to SOD

-10 UDMCs have revitalized and functioning -90 WDMCs have formed and functioning

Page 10: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

10

SL OVI of Achievement Baseline Status End line

plans into Annual Development Plans

2.2 DMC staff and partners trained in emergency response

600 (95 women) DMC staff and 06 partners

A small number of UDMC staff received training from NGOs on emergency response

-2250 WDMC member,100 SMC member, UDMC & UzDMC members and other partner trained-up in emergency response

2.3 Individuals complete targeted DRR training programmes (disaggregated by gender with target of 60% female)

220 women No female members received training according to baseline data

More than 220 women targeted women trained-up on DRR

Output-3: People in vulnerable communities are better able to manage disaster risk reduction planning and mitigation

3.1 Households in target areas supported by small-scale low cost adaptation initiatives and preparedness measures.

2400 HHs (960 women headed HHs)

No such cases found in the baseline data

2400 HHs (960 women headed HHs) have supported by low cost adaptation initiatives and preparedness measures.

3.2 Existing multi-hazard early warning system operationalised

5 unions with early warning systemized

The early warning system is not in great shape though community receives info from different source. However, more than 40% do not have any idea about early warning system

-5 unions covered with early warning systemized -88 % HHs are aware on early warning system. - Through the project initiatives country people care getting early warning flood forecasting massages two times in day instead of one time and it have been digitalized (covered 16 core people)

3.3 Proportion of women and socially excluded (particularly elderly, ethnic groups and persons with disability) with access to existing social protection schemes

10% increase Some of the respondents belong to a socially excluded group (14.5%) receives benefits from existing social protection schemes

8 % has been increased

Output-4 : Local vulnerable communities are more informed of disaster risk reduction and thus more prepared for unexpected disasters

4.1 People reached through local level media and advocacy campaigns organized

3200 HHs( 12% HHs)

0 Respondent could not even mention any such event though they watch TV and listen to radio

-Around 837 HHs observed day -- The WDMC organized mass awareness campaign named “AMRA READY” (We are Ready)

Page 11: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

11

SL OVI of Achievement Baseline Status End line

by DMCs and CBOs where message on disaster delivered. However 34% of the respondents are not aware of anything like this

has covered 2400HHs. -36 Articles published reached around 15000 people.

4.2 Number of policy and advocacy Events organized at national and local level by different CBOs supported by project (e.g. TRM, women in CCA, Islam and environment and water logging)

events organized at national level

No corresponding data collected during baseline survey

More than 4 events organized at national level

4.3 Number of people reached or have access to DRR an CCA related publications

15000 persons reached with DRR and CCA related publication

No publication Almost 15000 persons reached with DRR and CCA related publication

4.4 Number of people attends sharing workshops and reading working papers

400 people attend workshops and working papers reach 700 people

No More than 1000 people attend in different workshops and working papers reached more than 1000 people

Page 12: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

12

CHAPTER - I: BACKGROUND, OBJECTIVES AND METHODOLOGICAL CONSIDERATION OF THE STUDY

1.1: Introduction: This document is a report on Result Based Monitoring (till October, 2016) of the ECCAD project of Islamic Relief Bangladesh titled as “Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh”. The adaptation to climate change is the major development agenda in many developing countries like Bangladesh where Coastal and Haor Basin has been considered the most disaster prone area. The negative effect of climate change is made worse situation for its victim by poverty, unemployment, land degradation, food insecurity and malnutrition. The overall impacts of climate change on Bangladesh are expected to be significant. However, climate change may significantly impact on access to assets and incomes of households throughout the rural areas. This is particularly true for households with low adaptive capacity, having constrained abilities to cope the impacts and risks of climate change. With aiming to address the integrated climate adaptive social protection model in two unique geographical area ‘Coastal & Haor’, Islamic Relief Bangladesh (IRB) has been implementing a project named “Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh” (ECCADR) in the most vulnerable districts of Bangladesh including Khulna, Satkhira, Patuakhali and Sunamgonj under Climate Change and Disaster Resilience (CDR) Program Since 2014. 1.2: Objective of the assignment The objective of the assignment are, to assess the relevancy, efficiency, effectiveness & impact of the

project in light with the project overall goal, specific objective and results.

The specific objectives of this evaluation are:

To review programme organizational performance against stated organizational objectives ;

To assess the socio-economic changes/effect in the lives of targeted climate vulnerable households,

To assess performance of the DMCs and community people to climate resilience, adaptation and disaster risk reduction.

To determine the extent to which IRB is building on lessons learnt from similar previous responses.

To provide recommendations for future strategic directions for scale up or replication of the current project strategy & approach based on the findings.

Page 13: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

13

1.3: METHODOLOGICAL CHOICE AND CNSEDERATION OF THE STUDY

The study was employed a mixed approach combining qualitative and quantitative method for data collection and analysis. Data was collect from both primary and secondary sources. Primary data was collect through qualitative and quantitative survey. Household survey was used for quantitative study. On the other hand, FGD, KII, case study and observation etc were mainly used for collecting qualitative information from project related stakeholders such as SHG, DMCs, government officials, SMC community leader, and project implementation officer & manager. For the secondary data collection and analysis, literature review method was applied. Flowing is a brief discussion of different methods used for this study:

Enhancing Climate Change Adaptation and Disaster Resilience

Research approach & Broad Methods

Quantitative Methods Qualitative Methods

Desk Review of

existing literature,

Project Documents,

Reports, Sampling

Household survey

with structured

questionnaires

Group Assessment

Focus Group Discussion : SHG, WDMC and

Apex body

KII: with Government Officials, UDMC,

SMC, CLO farmer and Community leader

Case study

Observation

Field data/Information collection

Data Analysis & Triangulation

Draft Report Dissemination and Feedback

Final Report

Page 14: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

14

Literature Review: Literature review was covered relevant journal/article, project proposal, project budget, Project Implementation Plan (PIP), different reports, etc. Selection of study area: Usually, project has been implementing at 10 Unions in 5 Sub-districts (Upazila) under 4 Districts named Khulna, Patuakhali, Satkhira and Sunamgonj of Bangladesh. However, the RBM study covered project targeted the entire project implementing area.

Sample selection: Out of total 2400 livelihood beneficiaries’ 555 households (considering 95% confidence level and 3.5% significance level error margin) (Please click here to see calculation) was selected for the data collection. Cluster and Stratified sampling were followed for area selection and simple random sampling was applied for household selection. Household Survey: The household survey was carried out through structured questionnaires to capture the response from households. A structured and mostly pre-coded questionnaire was developed through a rigorous and systematic process. The survey was covered a total of 555 livelihood households from respective 4 areas.

Focus Group Discussion (FGD): A total of 32 FGDs were conducted with SHG, Apex body and WDMs

using purposive sampling for gather in-depth information and gap in the analysis of the household

surveyed data.

Key informant interview (KII) : Key Informant Interview was conducted with around 20 key informants mainly with UDMcs, CLO farmer and government officials and political larders to figure out their understanding, insight and initiatives, contribution and cooperation in completing project activities and achievement of results, changes in the lives of community people, lessons learnt, impacts, sustainability and recommendation, etc.

Group assessment: Around 16 SHG were assessed to figure out the performance and sustainability the

groups and identify gap and gaps of these groups.

Site visit & observation: The study team visited different sites of the project; especially disaster risk

reduction small scale work and the best practices of the beneficiaries.

Case study: 10 case studies have taken place on different issues such as livelihood, disaster risk

reduction activities etc.

Data analysis and interpretation: Quantitative data were input in FoxPro, SPSS and Microsoft

Excel were applied for data analysis and employed data presentation and interpretation. The

qualitative data were analyzed based on narratives (what respondents share about

themselves).

Page 15: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

15

CHAPTER II: 2.A: FINDINGS: RELAVENCY, EFFICIENCY, EFFECTIVENESS AND RESULTS 2. A. RELAVENCY ANALYSIS

Undoubtedly Islamic Relief Bangladesh has designed very meaningful development interventions of the “Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh” (ECCADR)” project. Quality program largely depends on management capacity and functional supports. It is very obviously expected that the project management must strive for efficiency, effectiveness, transparency and accountability, so that they can ensure quality control of project implementation. At the RBM, the study tried to look into relevancy of the project activities as flows:-

It is relevance that integrated projects design was based on through analysis of policy context of

MDG’s goals (1, 4, 5, 6 and 7).

Appropriate areas were selected to implement the projects. Because, these areas were climate

vulnerable where a large number of people were suffering from disaster, safe water and

sanitation as well as there are huge number of people lives under extreme poverty line.

In terms of selected beneficiary appropriateness it was found that most extreme vulnerable

beneficiaries were selected in the project through participatory approaches.

Staffing is one of the important management issues for carrying out different activities of the

project including programmatic, finance and administration. In terms of magnitude of project

activities the staff provision designed by the project has considerably look adequate.

For implementing such kind of integrated project, staff capacities development activities must

have and in this project designing staff capacity development activities was sufficient.

Project offices were setup at the congenial place where project staff can communicate to field

easily.

Formation of Apex body concept was relevant to ensure sustainable SHG.

Distributed seeds money among the SHG’s members of the project was so relevant to increase

income level as well as for sustainability of the groups.

Project proposal’s activities were achievable to reach the project framework.

At the designing phase, especially logical framework was designed properly using SMART

indicators that helped for asses the project properly.

Relevant stakeholders were involved with the project from designing to phase out (national and

local institutions, civil society organizations, unions, local community organizations etc).

Page 16: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

16

CHAPTER II: 2.B: FINDINGS: EFFICIENCY, EFFECTIVENESS AND RESULTS

SECTION 1: DEMOGRAPHIC INFORMATION The result based monitoring (up to October, 2016) of the ECCARD project conducted with survey of 555 households in four fields including Satkhira, Sunamgonj, Patuakhali and Khulna. Total population of survey households are 2425 where average family size is 4.5. Out of 555 surveyed households, 53 percent beneficiaries are female where 47 percent are male.

SECTION 2: CLIMATE ADAPTIVE INCOME GENERATING ACTIVITIES OF THE CLIMATE-VULNERABLE AND SOCIALLY EXCLUDED COMMUNITIES

2.1: Economic resource profile To assess the progress of family income and asset profile the study applied comparison strategies with the baseline as follows:

A. Monthly family income status Income level of targeted households has been increased significantly. It is revealed on figure that the average income has been increased 180 percent (from BDT 2500 to BDT 7004). As a contrary, considering the national yearly inflation 14 percent in two years targeted household’s average monthly income level increased 147 percent which is BDT 6024. However, the below chart

depicts at the time of outcome monitoring around 77 percent household’s monthly income is from 4501 to above10500 while baseline was 15 percent. Moreover, lower limit monthly income of the family is BDT 1500 and upper limit is BDT 21543. B. Expenditure: On the one hand, monthly average expenditure of the households is BDT 5744 that means average surplus velue is BDT1260 while at the time of baseline their monthly average expenditure’s deficient was 541 BDT.

57

28

11

45

18 18

26

19

14

0

10

20

30

40

50

60

1000-3000 3001-4500 4501-6000 6001-8000 8001-10500 10500>

Pe

rce

nt

Monthly family income ( BDT)

Baseline

Present

2500

7004

0

2000

4000

6000

8000

Baseline Present

Inco

me

(B

DT)

Monthly Family income (Compare with baseline)

Page 17: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

17

C. Classified livelihood beneficiary as per family income level.

However, the study tried to classified targeted households into four categories (A,1 B, C and D) based on HH’s income that is inserted in below footnote and it is reveals on figure that A category beneficiary have been increased than baseline from 13 percent to 65 percent. On the one hand, D-category has been decreased between 2 and 56 percent.

The study shows

periodical assessment figure of

targeted household’s income and found that through the project intervention HHs family monthly income level has been increased gradually without any fluctuation.

1 A category (i.e. average income at least 15% above minimum target – 50 % increased in income from baseline) B category (average income close to minimum target +/- 15%), C category (i.e. average income is below 15% of minimum target but above baseline) D category (i.e. average income still similar to average baseline value).

2500

4620

6246

7004

0

1000

2000

3000

4000

5000

6000

7000

8000

Baseline 1st RBM 2nd RBM Final RBM

Inco

me

(B

DT)

Monthly family income by cronologicaly

65

1914

2

59

23

6

121316 15

56

0

10

20

30

40

50

60

70

A-Category B-Category C-Category D-Category

Pe

rce

nt

Category of HH by Income

RBM (Oc16)

RBM(Ja 16)

Baseline

Page 18: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

18

D. Average asset value In terms of asset value above figure shows both productive and non-productive assets has been increased then before.

E. Assets increased and multiplication

Productive assets multiplication, increased and diversification has been seen among the surveyed HHs. The above figure shows 84, 67 and 44 percent HH have tree, poultry and cows while at the time of baseline it was only 23, 5 and 1 percent. On the one hand, below table shows average 12 poultry, 1 cow and 2 goats have per HH while at time of baseline there was no cow and goat of the HHs.

0 01

3

0 0 0 0 0 0 0 0 0 0.31 1

15

8

0.80.04 0.15

0.07 0.74 0.20.06 2

4

6

0

2

4

6

8

10

12

14

16

Co

un

t

Average productive asset ( compare with baseline)

Baseline

present

1 15

23

0 3 2 1

92 0

12 13

2

44

24

67

84

114

15

7

33

17

6

40 40

10

0

10

20

30

40

50

60

70

80

90

Pe

rce

nt

Productive asset has in the HH ( compare with baseline)

Baseline

present

4386

9708

4805

28980

0

5000

10000

15000

20000

25000

30000

35000

Non-Productive asset Productive asset

Val

ue

Asset status

Baseline

Present

Page 19: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

19

F. Classified livelihood beneficiary as per productive assets

The study tried to classified HHs into four categories (A,2 B, C and D) based on family’s productive assets that is inserted in below footnote and it is reveals on figure that A category beneficiary have been increased than baseline from 20 percent to 85 percent while D-category have

been decreased between 71 and 8 percent. G. Classified livelihood beneficiary as per both income and productive assets

The study tried to classified HHs into four categories (A,3 B, C and D) based on HH’s income and productive assets that is inserted in below footnote and it was reveals on figure that A category beneficiary have been increased than baseline from 13 percent to 63 percent while D-category have been decreased between 56 and 22 percent.

2

A category of assets (i.e. at least 15% above minimum target productive asset value is baseline productive asset

value + amount transferred); B category (assets close to minimum target +/- 15%), C category (i.e asset value of

productive assets is at least equal baseline value + value of transferred amount), are D category (i.e. productive

asset value is lower than baseline asset + value of amount transferred).

3

A category of income/assets (i.e. average income at least 15% above minimum target and total productive asset

value is above baseline productive asset value + amount transferred); B category (average income and assets close

to minimum target +/- 15%), C category (i.e average income is below 15% of minimum target but above baseline;

asset value of productive assets is at least equal baseline value + value of transferred amount), D category (i.e.

average income still similar to average baseline value and productive asset value is lower than baseline asset +

value of amount transferred).

20

5 4

71

85

4 38

0

10

20

30

40

50

60

70

80

90

A-Category B-Category C-Category D-Category

Pe

rce

nt

Category of HH by productive assets

Baseline

RBM

13 16 14

5663

18

4

15

0

10

20

30

40

50

60

70

A-Category B-Category C-Category D-Category

Pe

rce

nt

HH category by income and productive assets

BaselineRBM

Page 20: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

20

H. Possess land

Posses land is an indicator of economic solvency in the family, however, in terms of possess land of the

targeted households the study

have seen positive changed. The

below figure shows 83 percent

people have land while at the

time baseline it was 74 percent.

The below figure depict that

land status have seen among

own and lease in.

2. 2: Climate adaptive livelihood options (involvement in IGA)

2.2.1. Status targeted Climate adaptive livelihood beneficiary

Aiming with a sustainable and climate

resilient source of income, in the project

there are 2400 climate-vulnerable and

socially excluded are involved in climate

adaptive IGA. However, the study found

that almost 96 percent targeted

beneficiaries are continuing their IGA. On

the other hand, 4 percent have turned over

from IGA owing to migration and death of

74

83

68

70

72

74

76

78

80

82

84

Baseline Present

Pe

rce

nt

Possess land

96%

4%

Status of livehood beneficiary

Continue the IGA

Dropped out

66

0 17

26

71

05 7

17

0

10

20

30

40

50

60

70

80

Own Lease out Lease in Khash Other's land

Pe

rce

nt

Discription of land

Baseline

Present

Page 21: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

21

the beneficiary. Dropped out status have seen all of the fields among of them the below table shows it ratio

is high in the Golachipa and sulla.

Dropped out status

Area Number of HH

Sulla 9

Golachipa 10

Sathkhira 3

Koyra 1

Total 24

2.2.2: Involvement status of IGA and IGA diversification and multiplication SL Name of secondary IGA Diversification in IGA

1st

IGA (HH percent) 2nd

IGA (HH percent) 3rd

IGA(HH percent)

4th

( IGA HH percent)

1 Crop or vegetable cultivation 15

28

18 12

2 Fish cultivation 14 8 2

3 Cow rearing 38 5 1 1

4 Goat / sheep rearing 7 14 1

5 Duck and Poultry rearing 6

21 9

6 Small business 15 8 2 1

7 Rickshaw/van pulling 2 2 1

8 Fishing net making 2

8 Crab cultivation and fattening 1

1

Total 100 87 32 16

According to ecological diversification and nature of livelihoods targeted households are involved in diversify types IGA. However, through sample survey finding the above table reveals as a prime highest 50 percent HH are involved in livestock while second highest 30 percent in Fish cultivation and crop cultivation and third highest 14 percent involved in small business. On the one hand, targeted beneficiaries are not confined them in one IGA. IGAs multiplication and diversification has seen among the targeted households. However, 87 percent beneficiary is running two IGAs while 32 percent is doing three IGAs and at a time there is 16 percent engaged in four IGAs. In addition, by the FGD it was found people are engaged in diversified IGA owing to got profit by their primary IGA. On the one hand, 48 percent HH multiplied their IGA.

Page 22: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

22

1

100

0

20

40

60

80

100

120

Baseline Outcome (till Aug,15)

Pe

rce

nta

ges

Received Skill development traning

2.2.4: Received seed money from IBB to start the IGA

Cash or seed money support From the IRB

Amount Frequency Percent

12000 217 39.1

24000 338 60.9

555 100.0

Before start the IGA all of the targeted livelihood beneficiaries received amount of 12000 BDT as seed money (Cash) from IRB. On the one hand, the study found at the last quarter of the project, IRB again distributed 12000 BDT seeds money among the 61 percent HHs, as a second installment, in the three fields named shaymnagar, Koyraand Golachipa out of four. The objectives of second time distribution were as flows:-

Establish a complete livelihood model in the project, Introduce Qardal-hasana among the SHG, Enhance practices interest free loan among the beneficiaries and Strengthen the Apex body.

However, 70 percent HH stated provided assets form IRB was sufficient while stated it was not sufficient

to run IGA. So, they added extra amount in the IGA that’s why they approached to different sources

including Family investment, NGO micro finance and from relatives and money laundering etc.

Utilization of the second time distributed seeds money: The study tried to efficiency and effectiveness

of this money, utilization the money by the beneficiaries. FGD with SHG It was found that a few

percentages beneficiaries are properly invested this money in their IGA while more than half of them are

waiting to invest in a proper time. A few percentages are misused the money like purchased phone,

purchase furniture and one case also found he using this money with interest loan.

2.3: Capacity building training on IGA

2.3.1: Training on livelihood Income generating Capacity development training is important components of the project. The study findings reveal that all of the targeted Climate vulnerable beneficiaries were received capacity development training on IGAs from IRB whilst in baseline study it was 1 percent. 2.3.2: IGA training information

Page 23: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

23

The study found, from the project beneficiaries received five types of training including fish cultivation, crops and vegetable cultivation, crab cultivation, livestock rearing and small business. Data illustrates on figure that the more than half of the HH, 58

percent, received training on livestock (Cow, goat, sheep, duck and poultry) rearing and the second highest received training on small business and fish cultivation almost covered 33 percent. 2.3.3: Training quality The study findings presented lion proportion of training receiver have good knowledge on how to improve income generating activities. In terms of quality of training, findings illustrates on figure that nearer half of the respondents informed, the training quality is well and 36 percent are stated very good.

However, table shows 91 percent of HH mentioned training develops their skill. Among of them, who are mentioned training develop their skills, the highest 47.5 percent respondent’s level of skill is good and 26 percent have expert level skill.

2.4: profit through income generating activities

2.4.1: Profit status through IGA

Develop skill through the training

Response Percent

Yes 91

No 9

Total 100.0

15

82

57.5

17.5

0

10

20

30

40

50

60

70

fish cultivation/ catch

Crop/vegetable cultivation

Crab cultivation livestock Small bussines

Pe

rce

nta

ge

IGA training information

Page 24: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

24

The column chart revels, who are continuing the IGA, the major proportion HH, 88, have been profited by their IGA while 12 percent have not got any profit yet who are mostly livestock rearing IGA holders. Moreover, meeting with project staff and

livelihood beneficiaries it was found that the reason of not get profit is over economically active age of beneficiaries, died of Households head, lost of asset by the disease and waiting to get profit ( especially for cow rearing). 2.4.2: Monthly income through IGA

The study found positive change among the beneficiaries as increased monthly income level of the family through IGA. However, average monthly profit through existing IGAs is BDT 1917 which is closed to Baseline average total family income of the targeted households. However, the above column chart depicts one third household’s monthly profit is from BDT 2001 to BDT above 6000 while 22 percentage’s monthly profit is satisfactory level that is between BDT 1001 and 2000. Moreover, 44 percent HH’s monthly profit is mediocre and poor level (BDT 100 to 1000). In addition, lower and limit of monthly income is BDT 120 and BDT 21543. However, to sum up it can easily conclusion that within one and half year climate adaptive IGA beneficiaries have seen impressive results utilized limited asset.

88

120

20

40

60

80

100

Gotg profit Have not got profit yet

pe

rce

nta

ges

Profit status by the IGA

Page 25: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

25

Case -1 We couldn’t manage food properly owing to economical hardship,

Now we are capable to manage food and other basic needs - Abul kashem and his wife

70 years old, Abul Kashem, lives with his wife at horin khola village in Koyra of Khulna district. They have no offspring. They have no land except homestead. At economically active aged he was making a living by day laboring. Due to old aged he does not any hard work. That’s why, their family depended help of the relatives and neighbor as well as some time they had to begging. However, after enrolled in the project’s livelihood beneficiary he started farming using his homestead. He received 24000 BDT from the project. In the homestead they implemented various IGAs like fish cultivation, vegetable gardening and poultry/duck

& goat rearing. From the fish cultivation every month they earn average 2000 BDT. In the vegetable garden they plant pumpkin, lades figure, Guards, Basil and turmeric so on. By the vegetable gardening they earn average 2000 BDT per month. Moreover, they have around 80 hens and ducks, through duck and poultry they sale 30 eggs per day where in every month they earn average 3000 BDT. As a calculation through these IGAs Abul Kashem’s family is earning around 7000 BDT in every month. Moreover, by the surplus income they also purchased goat now goat gives 3 baby goats.

Page 26: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

26

Case -2 Ever and anon we had to hungry when I was beggar,

Project made me self reliant and poverty have been fled from my house

- Rashid Molla

35 years old, Rasid Molla, living at Golkhali village in Golachipa upazila of Patuakhali district. Before, he was making a living by begging. However, after enrolled in the project’s livelihood beneficiary he started small business (hawker). Through this IGA he is earning around BDT 9000 in every month. Moreover, by the surplus income he also has engaged in diversified IGAs including livestock (Cow, goat

and poultry rearing), vegetable and paddy cultivation. From the secondary IGAs he is also earning around extra BDT 4000 per month.

Case -3 My children’s education was stopped due to economical hardship,

Now they are going to school

- Rebeka

Rebeka, 30 years, lives at Napitkhali in Gabura under satkhira. Four years ago her husband was died by the kidney disease. Her husband left two offspring. With two children she was fallen to find out path. Her in-laws were helpless. So, she suffered miserable surviving with children. Her children’s education was stopped. However, after enrolled in the project’s livelihood beneficiary she opened grocery shop. Through this IGA on an average she earns 10000 BDT per month. Now, her children are going to school.

Page 27: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

27

However, as a comparison with 1st RBM and final RBM of income generating activities of targeted

beneficiaries and it was found that profit by the IGA is in positive trends. However, below figure

compare area wise profit by the IGA and found average monthly income by IGA of Khulna’s beneficiary’s

is highest, 2283 BDT, than other area.

58

26

11

5

43

33

17

7

0

10

20

30

40

50

60

70

100-1000 1001-3000 3001-6000 Above6000

Pe

rce

nt

Monthly profit form IGA compare with 1st RBM and last RBM

RBM,Aust,15

RBM,Oct,16

1917

22832182

1722

1513

0

500

1000

1500

2000

2500

Total KHULNA SUNAMGONJ SATKHIRA PATUAKHALI

Ave

rage

(B

DT)

Total and Area wise monthly average profit by the IGA

Page 28: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

28

2.5: IGA replication

The study finding reveals 55 percent targeted livelihood households stated that other HH elated by their income generating activities as a consequence it replicated into other HH and community. Replication have been diffused to neighbors, relatives, own house, friends and even neighboring community. Out of 55 percent, around 65 percent HH stated it has been

replicated to the neighbors (Click here to see the details). However, replication IGAs are Crop and vegetable cultivation, Livestock rearing, Crab cultivation and fattening, Fish cultivation and tree plantation. (Click here to see the details).

2.6: Homestead gardening of the targeted livelihood beneficiaries

Produce vegetable by homestead gardening

Response Frequency Percent

Yes 473 85.2

No 82 14.8

Total 555 100.0

The project distributed seeds and tree among the targeted HHs in order to contributing family nutrition, climate resilient as well as income level. However, it was found that of them, 85 percent of the beneficiaries were able produced around 10 species vegetables. Bellow table shows in the last year they were produced average 96 KG vegetables which lower limit is 10 KG and upper limit is 4000 KG. Moreover, out of them about 42 percent households sold vegetables alongside consumed which amount is average BDT 819 (click here to see the table). To sum up, homestead gardening is contributing family nutrition as well as income level.

Case-4 Shahajada, ID number 1123, lives at Gupterhawla in panpotti under Patuakhali district. After received vegetable’s seeds from IRB she planted Basil, Balsam, Bottle guard, Pumpkin, sponge guard, Radish, tomato, Spinach, chili and eggplant in her homestead and unused land beside home. In the last season she able to produced around 4000 KG vegetables. She sold around 3000 KG vegetables alongside consumed which amount is BDT 24,000.

55%27%

18%

Raplicated IGA in the other HH

Yes

No

Don’t know

Page 29: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

29

2.7: Increased Family income: Behind factors

The study tried to identify and analysis factors behind increased family income. The factor analysis contains two measures like by the project support and other influential factors. And found that around three fourth proportions reasons due to the project support while 26 percent from other support. In terms of project support there are some factors like involvement of alternative IGAs (financial support, skill development training and flow-up IGA by the project), created job opportunity due small scale mitigation work and increased producer group, climate resilience and climate change adaptation, Increased social capital of the targeted people, good health (reduced health expenditure and Increased physical capability) and increased access to social safety net scheme etc. On the other hand, some other factors are comes from naturally not influenced by the project like yearly inflation and increased earning family members so on.

Good health

Access to social safety net

Involvement in

IGA = 28%

Yearly

inflation=14% Created Job

opportunity

Increased earning

member =10%

Climate

resilience

Social Capital

Increased Family income From 3046 to 7004 BDT

Due to project

support=76%

Due to other

factors= 24%

Page 30: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

30

2.8: GROUP ACTIVITIES

2.8.1 Livelihood Groups There have 100 livelihood groups in the four fields. However, to assess the group’s capacity the study conducted the group assessment with 17 groups using group assessment tools (please click here to see group assessment tools). The study found that around 70 groups have impressive capacity on governance sector, financial management and economic condition the while operational management and external & internal relation sectors capacity have 60 groups. In addition, 100 percent have opened bank account. They are doing group saving properly but in the some group a few members are showing reluctant saving as well as reluctant to give installment against next received 12000 BDT afraid of not returned the money. Moreover, in general there are some groups members are not clear about the objectives of installment. Especially in Gabura few members are not aware where their saving money is depositing.

However, the study tried to (compare with last RBM) categories the group into A, B, C and D 4on the basis of the capacity (please see the footnote) and found gradual progress of group capacity. 35 percent groups are in a category while before it was 11 percent. On the other hand, D-category has increased from 21 to 24. However, D-Category group has been seen mostly in

Gabura. Case-5

Shapla Chawul Vandar (Rice shop)

Shapla SHG, 4no. Koyra,

Khulna, consisted with 27

members. They conduct

meeting regularly. Every group

members are increased their

income through their IGA. By

the profit they have opened a

rice and grocery shop through their owned initiatives. In

the shop, first time, each member invested 4000 BDT a

total investment was 108000 BDT. Now, by the shop the

group is earning around 10000 BDT per month.

4 A- Category is group has excellent capacity who’s achievement score is 85-99, B-Category is achievement score

is 75-84, C-Category is 66-75 and finally D-category is below 66. Please see the annexure -2 herewith the group assessment scoring tool)

11

37

32

21

35

29

12

24

0

5

10

15

20

25

30

35

40

A-Category B-Category C-Category D-Category

Pe

rce

nt

Classified the livelihood group

RBM(Ja16)

RBM(Oct16)

Page 31: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

31

2.8.2: Apex body: There are 10 apex bodies have been formed, each body consisted 9 SHG. The objectives of the apex body are:-

To make a platform for SHGs To make sure sustainability of these SHGs Introduce Qard-al-hasana model in the groups in order to discourage interest with loan. Make these groups as like perfect livelihood group model.

However, the study conducted FGD with five apex bodies and all of the bodies have been formed and functioning. Of them, 50 percent have got registration certificate from the government. And rest of the apex bodies already applied for registration and waiting to get registration. They made a station for doing body’s activities. As activities of the bodies at present are:-

They working on disaster risk reduction at households and community level, Strengthening SHG, Production making and sale Risk fund management Other social activities

2.9: Migration

Reduce migration to other place

for earning indicates people able

to manage income opportunity in

their locality, people are adopted

or coping in changing climate and

climate is being resilient. The study

found that among the targeted

people temporary migration to

other place for income earning has

not been reduced satisfactory

level. The figure shows temporary

migration has reduced only 1

percent (from 30 percent to 29

percent) though their family income level increased than before. The study tried to understand the

reasons and found: - in the lean season in wet land people traditionally to go other place for income

because of that time there is no work in haor area, due to involvement of the project targeted people

have come to forward that is the reason to go other place for making a living.

2.10: FOOD SECURITY

The study finding on below chart shows targeted beneficiaries have positive changed in food intake in a day as they, 67 percent, can afford 3 meals

for three times in a day while at the time of baseline it was 53 percent.

Baseline

53 % RBM

67%

3 meals regularly in a day

30

29

28.4

28.6

28.8

29

29.2

29.4

29.6

29.8

30

30.2

Baseline RBM

Pe

rce

nt

Migration for making a living

Page 32: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

32

Data regarding food consumption below figure depict more than two third HH never confronted

shortage of meals while at the time of baseline it was only 14 percent.

2.11: Housing status

Ownership of housing status has been seen constant but housing structure has been improved than before; below chart present tin with wooden house has increased while thatched and straw made house is decreased. It is sign of economical solvency of households as well as disaster preparedness.

1417

22

8

33

6

67

37

3

14

6

0

10

20

30

40

50

60

70

80

Never Every day A few times a week

Once a week A few times a month

Once a months

Pe

rce

nt

Fewer meals during the last six month

Baseline

RBM

84.5

0.5

12

3

84.5

0.5

12

3

0

10

20

30

40

50

60

70

80

90

Owned Rented Living free with neighbor/relative

Others

Pe

rce

nt

Ownership of housing status

Baseline

RBM

Page 33: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

33

On the one hand, the study tried to understand, through physical observation and took perception of households (comparison with baseline), is living house can withstand hazards like strong winds, severe rain, flooding or hail without significant damage. The below figure shows 21 percent are confident their house prepared to protect any disaster while near are half of the HH’s living house prepared with minor damage of big disaster.

2

8

15

56

19

2

8 9

66

15

0

10

20

30

40

50

60

70

Cement building Semi-Pacca with tin Roof

Thatched house Tin/wood/bamboo Mud/straw

Pe

rce

nt

Types of housing

Baseline

RBM

31

20

2623

12

21

48

20

0

5

10

15

20

25

30

35

40

45

50

No Yes yes, with minor damage

significant damage likely

Pe

rce

nt

House Protection from hazard

Baseline

RBM

Page 34: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

34

64

9

04

20

3

70

72

1613

1

0

10

20

30

40

50

60

70

80

Deep tube well Shallow tube-well

Supply Rain water harvesting

Pond Others

Pe

rce

nt

Sources of drinking water ( Multiple answer)

Baseline

RBM

2.12: Water sanitation and health hygiene status

The study has seen positive change among the community people to use safe and quality drinking water. Through the project IRB ensured safe drinking water sources at most vulnerable area by the installed tube-well and rain water harvesting. However, survey finding shows above figures that 93 percent HHs have covered safe drinking water facilities while at the time of baseline 77 percent. On the one hand, below chart shows by the water sources around 81 percent HHs can meet their demand round the year where at the time of baseline it was 67 percent.

67

33

81

19

0

10

20

30

40

50

60

70

80

90

Yes No

Pe

rce

nt

Sufficient water to meet requirment around the year

Baseline

RBM

Page 35: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

35

2.13: Toilet facilities

The study have seen positive changed among the beneficiaries about sanitation. The finding depicts below figure that open defecation, open or pit and hanging latrine of the targeted people have been reduced significantly while sanitary and slab latrine user increased drastically.

2.14: Membership of various organization

Types of Membership Baseline % RBM %

Yes 4 100 No 96 0

Total 100 100

Involvement in various organization is a sign of establish social capital and empowerment. However, the study found that 100 percent project people have involved in any organization while at the time of baseline it was only 4 percent. The below figure shows there are involved with various organization including SHG, Apex body or CBO, WDMC, UDMC, SMC and micro finance institution. Types of member ship

9

22

12

45

125

9 10

63

13

0

10

20

30

40

50

60

70

Open defecation Open or closed pit

Hanging latrine Slab latrine Sanitary latrine

Pe

rce

nt

Toilet facilities

Baseline

RBM

0 1 3 0

100

16

1 3 20

20

40

60

80

100

120

CBO/SHG WDMC UDMC MFI SMC

Pe

rce

nt

Membership in verious organization (Multiple answer)

Baseline

RBM

Page 36: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

36

SECTION 3: HOUSEHOLDS COVERED BY EFFECTIVE AND OPERATIONAL DISASTER MANAGEMENT INSTITUTIONS (27106 HH)

3: DMS are reactivated and functional as per sod which covered 27106 households Through the document review and meeting with project staff it was fund that through the effort or initiatives of the project all the targeted 5 UzDMCs and 10 UDMCs have been reactivated. Moreover, there are 90 WDMCs have been formed under 10 UDMCs. The study conduct meeting with 8 DMCs of respective four fields and KII with four UDMC and an UzDMC. The findings are given below:- 3.1: Functioning disaster management committees (UDMCs & WDMC) All of the UDMCs have revitalized and the committees are functioning and actives. But, due to re-elected UDMC members and president nowadays a numbers of DMCs are not continue regular meeting. It was found that out of total 50 percent UDMC members are newly appointed. However, previous members are also been aware their roles and responsibilities. They received various training like CRA, Disaster risk reduction, first aid search and rescue etc. They prepared and validated RRAP and submitted to institution for DRR support as well as implemented a lot of scheme of work. On the one hand, all of the WDMC was formed and functioning. As a contrary, now a number of WDMCs is not proactive because, due to hold last tire of local government election (Union Parishad) around 60 percent WDMC members have changed. In the mean time, the project tried re functionalized these committees and of them 50 percent have covered. Rest of the 50 percent is inactive. 3.2: Union Disaster Management Committees (UDMCs) are working for disaster risk reduction The study found that Each WDMC prepared Risk Reduction Action Plan (RRAP) at ward level. In the RRAP, there were works prioritized including River re-excavation, Cyclone shelter repairing, Road, Culvert, build embankment, Bamboo Bridge, latrine, pond excavation, tree plantation, home & institution ground raising etc. The committees identified what kinds of activities are possible to address within of their range and what are beyond of them. The committees submitted plans to UP which are beyond of them. However, the UDMC compiled these plans and taken consultation with UzDMC & DDMC submitted to institutional donor. On the one hand, some action plans that were within their range have established by their owned initiatives. In addition, some works that was not possible to accomplished neither institutional support nor own initiatives, these are completing by the IRB support. Details RRAP works are given below: A. Own initiatives action taken by WDMC (As work of RRAP) The DMCs and community people have completed around 143 small scales work like roads, Bamboo Bridge, ground rising, vaccination camp and tree plantation in the four areas by their own support whose estimated value is amount of around BDT 902620 alongside labour (source: physical observation, WDMC and documents reviewed).

Case-6 At the Char-Horidevpur of Golkhali union, there was a road was 15 feet down land where during the rainy season cultivable land were inundated so people deprived from cultivation. So, under initiative of WDMCs road has repaired by raise which has connected to WAPDA embankment. As a consequence around 500 people have

Page 37: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

37

been benefitted. Now, a plenty of acres lands are using for cultivation.

Case-7 Shawdepasha, one of the most vulnerable village of sulla union under sulla upazilla. There is no any social institutions like school, mosque, bazaar etc in the village in that case villagers have to go to neighbor villages named west hati and moshjid hati for education, market and prayer. However, during rainy season this village become a peninsula, there is no bridge to communication with these villages as a results villagers were deprived from institutional services even students confronted difficulties to go to school.

Under the circumstance, during prepare RRAP ward disaster management committee (WDMC) decided to build a bamboo through own contributions. Eventually, the committee has built around 150 meters long a bamboo bridge with assistance of community people. The total cost was BDT 18000 and labour as well. Now villagers are can communicate with these villages. B. Action taken work by institutional support (As a work of RRAP) By the institutional support at respective four upazilla there were around 500 risk reduction worked have been done including Embankment, Guide wall, Latrine, Road, Ground raising, Tube well, Pond excavation, Cyclone shelter repaired, Culvert, Bridge, School repair, solar, Road, Killa, Beribad,

Submersible Road etc which amount is BDT 58,11,79,081(fifty eight core).

Case- 8 Panpotti is the bank of atrocious river Agumuka. As a history of Agunmuka, in 2009, at the time of devastating cyclone SIDOR, it devoured a lot of population and assets. That is why to protect disaster an embankment was built. But, it was eroded due to slack look after and people became anxious. However, under the circumstance, to safe the village WDMC proposed in the RRAP for repairer and submitted

to UDMC. It was validated by UDMC, UzDMC and DDMC and applied for institutional support. Eventually, it was endorsed by the government and repaired.

Page 38: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

38

Case- 9

Rowya notun hati was so vulnerable village in the sulla union, by the strong wave of Haor it was eroded. Under the circumstance, to safe the village from erosion WDMC proposed a protection wall in the RRAP and submitted to UDMC. It was validated by UDMC, UzDMC and DDMC and submitted to CDMP. Eventually proposed protection wall was approved by the CDMP and in last winter it have been built which size is 654 fits and expenditure is BDT 552637. Now the community people are happy for safe their homestead. C. Action taken small scale mitigation work of WDMC with technical and financial supported by IRB (As a work of RRAP) As a part of RRAP, DMCs are doing some small scale mitigation works with financial and technical supported by IRB. Near are about 150 small scales mitigation work have been completed by IRB like Installation Solar system at home, Bio Gas Plant, community toilet, Saplings, Killa, Ground raising, Pond excavation, rain water harvesting, tube-well, Stair, Waste management cum fertilizer production and clean environment, Road re-construction, Canal excavation Saplings, eco-park, public toilet, Stair, tree plantation, homestead and school ground raising etc.

Case -10 There is a canal, at Howlader bari to shener howla village in Panpotti union of Golachipa sub-district, was excavated in 1983. This canal is the main sources of irrigation of around 1500 acres lands (and also pass rainfall water during rainy season) where people cultivate water melo, potato, wheat, paddy, vegetable etc. But, bit by bit it lost her navigability and became died. As a consequence, these lands

were become barren. However WDMC of this ward proposed for re-excavation in RRAP. Eventually it has been re-excavated with collaborate contribution where IRB’s contribution BDT 1054336 and community’s contribution BDT 111057. Now, in this season, community people cultivated water melon, potato, wheat and vegetables which estimated amount value is 2 cores BDT.

Page 39: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

39

Case -11 There was no public toilet at Anandopur’s Bazar in Habibpur union of sulla sub-district, during the rainy seasons surrounding area of bazaar became dirty and messy for open defecation. On the one hand, for energy people depended on carbon emission fuel and limited solar energy. However, WDMC of this ward proposed a “latrine come biogas plant” in RRAP in order to get results three in one including sanitation, get energy and reduce carbon emission. However, eventually it has been making with collaborate contribution where IRB’s contribution BDT 600000, UDMC’s BDT 50000 and WDMC’s contribution BDT 20000.

3.3: A Cost-benefit Analysis: Value for Money (VFM) of Low Cost Adaptation & Mitigation

work

Cost benefit analysis is related to a process that assesses the relation between the cost of an

undertaking and the value of the resulting

benefits. Under the project, IRB have

done a lot of low cost adaptation &

mitigation work. However, as part of

study, of them of 37 small scale works

have been analyzed to assess benefits

(Economical, social and environmental)

against the cost. Through the analysis the

study found impressive benefits. To

accomplish these works (37) IRB have

spent around 2,54,44,131 BDT and

through the analysis it has found the

community people got benefits which

amount is around more than 8,60,17,735

BDT ( Please click the here to see details cost benefit analysis in annexure 4).

Page 40: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

40

3.4: Carbon Emission Reduction Activities The study found that IRB have some work for reducing carbon emission through providing solar among the vulnerable beneficiaries, installed bio-gash plant as a replace kerosene lantern and firewood and tree plantation. It also reduces family expenditure alongside reducing carbon emission.

3.5: School safety plan (school selection, activation or formation of SMC and student councils and capacity building) The study team had visited 3 schools out of 15 project targeted school, where found that all three schools had prepared school safety plan and received training about First Aid, Search and Rescue. All three school management committee are being confident about disaster resilience. It should be noted that they had prepared contingency plan about disaster risk reduction and submitted to relevant department. The SMC had received fund from CDMP & IRB for school safety work like school ground raising, installed drinking water sources, sanitation, tree plantation and First Aid, Search and Rescue materials etc. The SMC played an important role to teach and aware the student regarding first aid, search and rescue etc. However, SMC received DRR, materials and training form the project.

Case -12

Vet Khali A Karim high school,

A model of disaster risk reduction and climate adaptation -Head teacher

Vet khali A karim highschool at shaymnagar. There were no drinking water facilities. Through the project initiatives IRB installed drinking water sources. Moreover, through project intervention teacher and SMC have received training on DRR and first aid and search & rescue. The school developed school safety plan. In the class students leant about DRR, hygiene practise and climate change. By the financial support of IRB students made an agriculture laboratory to discover climate adaptive crops. Furthermore, the students organized a mock drill first aid and search & rescue at school ground where around 1000

community people observed. In addition, they plant tree at school ground.

Page 41: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

41

SECRION 4: PEOPLE IN VULNERABLE COMMUNITIES ARE BETTER ABLE TO MANAGE

DISASTER RISK REDUCTION PLANNING AND MITIGATION Households in target areas supported by small-scale low cost adaptation initiatives and preparedness measures

(2400 HHs)

4.1: Collaboration of Community people and DMCs

The table shows 73 percent targeted people have idea on DMCs especially WDMC and UDMC as well as

their activities. FGD with SHG it was also found that the DMCs members visit their group meeting to

aware and do practices on disaster preparedness. It also noted that around 16 percent targeted

livelihood households have been members of WDMC and 1 percent is UDMC.

4.2: Training and awareness on DRR and CCA:

The quantitative study found that around 17 percent livelihood beneficiaries (who are group leaders)

received training on DRR, First aid and search & rescue and climate change adaptation. They developed

their knowledge on these issues and have been aware. The FGD with beneficiaries it also found that they

learn on DRR and search & rescue for the group leaders as on the job training.

4.3: Amrao ready (we are ready) campaign

WDMC had done Amrao Ready (We are Ready) campaign successfully in the first year of the project period. In the camping the committee, identified baseline status on disaster preparedness at household level based on around 13 needs based action taken prepared measured in HH level to reduce disaster risk. Among the 13 they divided into 3 symbols like Red, yellow and

green (please see the footnote about symbol)5 . Then WDMC prepared action plan and have done work to reach DRR practice in congenial level.

5 Among 13, HH has existing 4 DRR preparation symbol is red, 8 existing preparation symbol is yellow and HH has

existing above 8 preparation symbol is green.

Households have Idea about DMCs

Response Percent Yes 73 No 27

85%

15%

Have knowledge on Amarao ready Campaign

Yes

No

Page 42: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

42

However, study tried to compare with baseline assessment on DRR preparedness and found targeted people have made impressive progress on disaster risk reduction activities. The figure shows 46 percent households are in green symbol while at the time of baseline assessment it was 17 percent. On the one hand, red symbol have decreased 22 percent. On the other hand, 15 HHs have not aware on this

objective of campaign and as a consequence 12 percent HHs have not fastened symbolic sticker.

4.4: Disaster Risk Reduction (DRR) practices at household level

However, as action of DRR practices, the study found significant change among the targeted community. It was observed by the study team that targeted HH received support from the ECCADR project. Distribution of comparative findings illustrates in figure that HH level preparedness measures has been increased significantly. The significant change occurred in the proportion of food stock, portable oven, and homestead rising, saving tree plantation shelter tied, improved storage facilities and conserved livestock foods while at the time of baseline it was little practices at household level.

12

30

41

1712

8

34

46

05

101520253035404550

No symbol Red Yellow Green

Pe

rce

nt

Disaster Preparedness through Amorao ready campaign

Before

Present

1

75

21

8

30

2 03

61

13

50

70

88

58

84

54

10 12

24

34

12

8387

3

0

10

20

30

40

50

60

70

80

90

100

Pe

rce

nt

Action taken for DRR

Baseline

Present

Page 43: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

43

4.5: Homestead gardening (Vegetables and tree plantation):

For climate change resilient, climate adaptation, disaster risk reduction as well as increase family

income the project promoted to the beneficiaries for homestead gardening. As a consecutive the

project distributed vegetable seeds and tree. However, the study found that 100 percent HHs was did

homestead gardening. Of them, 85 have succeeded the gardening that have been made them disaster

preparedness as well as contributed income level of the family.

4.6: Participation in advocacy program of targeted HHs:

The quantitative data present 31 percent targeted people were participated in various advocacy

programs ( Human chain, Rally, Campaign, Seminar etc) on climate resilient, disaster risk reduction and

climate changed adaptation.

4.7: Existing multi-hazard early warning system operationalised (5 unions with early

warning systemized)

Local early warning system in the project implementation areas has been occupying significantly. WDMC has been playing an important role in this regard. From the focus group discussion with WDMC, it was found that they are circulated their knowledge among the communities and HH being aware about early warning and cyclone signals. The consecutive changes among the targeted HH also found by the quantitative survey that 88.2 per cent HH have knowledge about early warning system while at the base line time it was 60 per cent only. It should be noted that making awareness regarding DRR, public health first aid and economic progress of IGA beneficiary, discussion highlighted that WDMC is very active in those activities. For example- In the very recent cyclone ROANU, WDMC act as a local actor of resilience. They did emergency meeting to prepare themselves against cyclone and define their roles as per guideline of the ECCADR project. However, through advocacy with Bangladesh water development board communities are getting early warning flood forecasting massages two times in day instead of one time.

4.8: Climate Adaptive Livelihood Option (CALO): Farmers Field Laboratory

Under the result 3 the climate adaptive livelihood option (CALO) is core component, where the project has been piloted in this. A total 58 farmers from four areas had taken CALO where 32 different crops, vegetables, grass and fish were cultivated in 101 plots of project implementation area as tested feasibility to cultivate types of crops and vegetable in climate vulnerable area. The objective of farmer field laboratory was increase the capacity of the framers so that they can test and contextualize the recommended agricultural technologies using his indigenous knowledge for better adaptation. And, disseminate to other farmers about experience of experiment. However, Interviewed with respective respondents, physical observation in the plots and meeting with project staffs it was found that 82 percent tested fields has succeeded. Moreover, famer shared field laboratory’s learning with the wider

60

88.2

0

20

40

60

80

100

Baseline Present

Pe

rce

nt

Knowladge about early warning

Page 44: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

44

community in order to replicate in community farmer. As a consequence, these have been replicated in the number of farmers.

Case-13 Bikash Ranjan Chakroborti, inhabitant of Anandopur village in Habibpur union under Sulla upazila, produced five types of vegetables like Pumpkin, Radish, Spinach, balsam consecutively in the 32 decimals unused land as a field test. In this plot he was able produced around 2000 pumpkins (per pumpkin’s weight was average 15 kg) and sold around BTD 2, 10,000. He also sold radish and balsam alongside which value BDT 12500. Now, about 8 neighbor farmers of Bikas are producing vegetables using same technic and methods by elated to Bikas.

Case-14 Farmer, Md. Yusuf Hawladar, at Naluabagi village in Golkhali union of Galachipa Patuakhali

produced tomato in his 10 decimals land as a

field test. He used DRIP irrigation system that is climate friendly technology, which reduce the waste of water. He had expended only 500 BDT for fungicide. No pesticide used for this variety. He already earned more than 6000 BDT.

4.9: Local Adaptation Plan of Action (LAPA):

At the present implementation stage of the project has been introducing Local Adaptation Plan of Action (LAPA) with the goal of assuring sustainable adaptation initiatives and resilience in the targeted community. Qualitative finding reveals that WDMC was the key actor to implement LAPA in the respective project implementation area.

4.10: Community Resource Center (CRC):

The project has been established community based resource center (CRC) in the ECCADR project area in order to community people get information and learn on DRR &CCA and climate adaptive livelihoods from the CRC. The study team observed and found that CRC is most effective. In the CRC has learning materials on DRR, CCA, Climate resilient, early waning etc where people get information. Moreover, WDMC and SHGs are doing meeting and children as well as older participate education learning.

Bikas is in his field

Page 45: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

45

4.11: Access to existing social protection scheme (10% increase of targeted socially

excluded person to access existing social protection schemes)

In this phase of the project it was targeted that the proportion of targeted socially excluded person to access existing social protection schemes will increase 10 percent. Distribution of data shows on table that – out of 555 HH 67 percent had access to social protection scheme at the baseline period while at present phase of the project 75 percent HH has access to social protection scheme. It can be generalized that the proportion of HH access to social protection scheme has been increased (67%- 75%) 8 percent then before.

SECTION 5: POLICY AND ADVOCACY TO MORE INFORMED OF DISASTER RISK REDUCTION

AND MORE PREPARED FOR UNEXPECTED DISASTERS

5.1: People reached through local level media and advocacy campaigns organized by DMCs

and CBOs (3200 Households (12% Householdes Participated in Media and Advocacy Campaigns)

DMCs and community people observed a National Day for Disaster Preparedness and International Day

for Disaster Reduction where 31 percent community people participated in day observation. 36 Articles

related to climate change adaptation and disaster risk reduction have been published in the daily

newspapers reaching around 15000 people.

The WDMC also initiated community based mass awareness campaign named “AMRA READY” (We are

Ready) on disaster preparedness where this campaign covered most vulnerable wards of targeted 10

unions covering 26000HHs.

5.2: Number of policy and advocacy events organized at national and local level by different

Community Based Organizations (CBOs) . (Milestone 3: 3 events organized at national level)

Islamic Relief Bangladesh has jointly organized the Bangladesh Summit on Sustainable Development

during 16-19th August in association with INGOs, national NGOs and government institutions and

facilitated the plenary session on Universal Access to Water and Sanitation. Islamic Relief, Bangladesh

facilitated a session on second National Community Based Adaptation (NCBA) conference highlighting

11

13

7

10

3

17

01 2

13

16

10

13

3

18

1 13

0

2

4

6

8

10

12

14

16

18

20

VGD VGF Widow Allowance

Elderly Allowance

Food for Work

Food for Education

Shelter Disable Micro Credit

Pe

rce

nt

Access to social protection

Before

Present

Page 46: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

46

the preparation of Risk Reduction Action Plan (RRAP) at union level through Community Risk Assessment

(CRA) process and the way forward for financing of RRAP schemes. The project also organized a

workshop jointly with Action Research for Community Adaptation in Bangladesh (ARCAB) at Rangpur

and Patuakhali district.

However, through advocacy with Bangladesh water development board communities are getting early warning flood forecasting massages two times in day instead of one time.

5.3: Number of people reached or has access to DRR and CCA related publications (15000

persons reached with DRR and CCA related publication)

IRB produced and distributed different types of education and communication materials on DRR and CCA for the community and also for different stakeholders like Flip Chart on DRR and CCA session, Skill Training Module for Saline Prone and Haor Area, Livelihood Group Nursing Guideline, IEC materials for Group Nursing, Climate Change Adaptation Module, Flash Card WASH for Livelihood Group, Display of Risk & Resource Map to reach Livelihood Beneficiaries, DMC members, Community leaders, Volunteers, Government Departments and relevant stakeholders. As a result this intervention reached out almost 90000 people along with project targeted beneficiaries. 5.4: Number of people attends sharing workshops and reading working papers (400 people attend workshops and working papers reach 700 people)

The project initiated a study on water logging in southwest Bangladesh for development of advocacy strategy. About 60 students of North South University were involved in collecting data and information as part of their field work in Satkhira which is one of the water logged areas. A MoU has been signed with Bangladesh Agricultural Research Institute under the Ministry of Agriculture, Patuakhali Science and Technology University, Bangladesh Rural Advancement Committee - BRAC University and North South University.

IRB have Initiated a process of signing a MoU with the Khulna Technical University and Shahjalal University of Science and Technology.

BRAC University has been conducting a study on Roadmap for setting up policy, legal and institutional framework in mainstreaming climate change adaptation on national planning.

Completed a study on climate adaptive and disaster resilient livelihood options (CALO) for coastal and haor areas. The findings of the study will be shared in a workshop of Gobeshona (a research network of climate change adaptation in Bangladesh) in January 2015. The result of the CALO demonstration and low cost adaptation measures also shared.

National sharing workshop on enhancing climate resilience practices and governance in Bangladesh has organized at Dhaka University where more than 500 people were participated.

Page 47: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

47

CHAPTER III: KEY CHANGES/IMPACT DURING THE PROJECT PERIOD

There are most significant changes are appeared in the targeted projects area and project peoples that are represents impacts of the project these are given below:- A. Household Level 1. Created climate adaptive livelihood and increased family income: Through the project intervention 2400 climate-vulnerable and socially excluded households have involved in climate adaptive IGA as a consequence as a consequence 88 percent household’s income level have been increased significantly. 2. People are practices disaster risk reduction activities: Through the project intervention targeted beneficiaries have done Household Adaptation Plan to reach DRR in congenial level by the self initiatives i.e. different disaster preparedness measures with prepared dry food and fuel collection, portable Chula, homestead raising, tree plantation and other essential items to keep available for the disaster time. As a consequence significant numbers of Households are practicing these disaster preparedness measures as action of DRR. 3. Enhanced women empowerment: Through involved in IGA women are contributing in income level as consequences they are participating in the decision making process in the family that are enhanced women empowerment. 4. Targeted people have access safe drinking water: In the safe drinking vulnerable area, project has installed water sources through rain water harvesting and tube-well installation as a consequence a number of safe drinking water vulnerable people have access to safe drinking water. 5. Targeted people have access to Sanitation: The project provided sanitary latrine among the sanitation vulnerable people as a result open defecation have been reduced significantly. 6. Enhanced health hygiene practices: Through the project interventions targeted people have become been aware on health hygiene and practicing, for instance; they washing hand before have and after defecation and keep hygiene house premises and latrine. 7. Reduced Water Born Disease: Due to access to safe drinking water and hygiene latrine as well as practicing the hygiene in their daily lives have been reduced water borne related disease. As a result their medical treatment cost as have been decreased and they are keeping good health that is why they can doing normal daily work cherish fully. 8. Established social capital: in the course of the project intervention targeted HH’s mobility and participation has been increased. They have established good relationship with various stakeholders like government institutions, DMCs, Local representative, community leaders and local administrative as a results they have able been accessed the services from those institutions. 9. Targeted HH have become aware on early warming: Through the project intervention targeted HHs early warning. B. Community Level: 1. Revitalized and functioning DMCs: Through the project intervention existing disaster management committee have been reactivated and functioning as a results climate risk reduction and climate resilient activities are going on. Moreover, newly formed and functioning WDMCs are enhancing disaster management committee’s work. 2. Community people are benefited: Through the project intervention WDMC along with community people have done disaster risk reduction and resilience activities by the own initiatives and institutional support such as made Guide wall, Latrine, Road repairing, Ground raising, Tube well, Pond excavation, Embankment, Culvert, Bridge, School repair, Killa, Beribad, bamboo bridge, ground rising, tree plantation Submersible Road etc as a results community have been benefited. Moreover, for instance owing to school ground rising has been directly benefitted about 9600 School Children.

Page 48: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

48

C. Sub-District Level Union Disaster Management Committee has incorporated 50% small mitigation (159 schemes) to Annual Development Plan as Equivalent to $ 1.94 Million. D. District Level In district level media and advocacy campaign are lead by Disaster Management Committees and Community Based Organization involving civil society, media and other stakeholders. E. National Level The project organized plenty of policy and advocacy events at national as a consequence advocacy central disaster warning, forecasting and system were updated and modernized to disseminate warning more effectively during any emergencies.

CHAPTER IV: STRENGTHS, LIMITATION & CHALLENGE AND RECOMMENDATIONS

4.1: Strengths

SHGs (Livelihood group) are functioning.

Created climate adaptive livelihood is so effective for reduce poverty.

Livelihood groups are made strong linkage with relevant service providers like livestock

department, fisheries department and DMCs.

Formed apex boy has given platform of SHGs and made bandaged among the livelihood group

members toward sustain these groups.

Successful laboratory tested crops are disseminated to community farmers as a results farmers are

cultivating such kind of successful crops.

UDMC &UzDMCs and WDMCs are sustainable functioning.

WDMC have made strong linkage with CCPP and community people. They are working collaborate

process for disaster risk reduction, early warning, climate adaptation and climate resilience.

Under the project, IRB have done a lot of low cost adaptation & mitigation works. Through these

works community people have been benefited as economical, social and environmental.

Homestead gardening is contributing family income level as well as increased nutrition.

Community people have been more knowledgeable about early warning system.

Disaster preparedness activities is increased among the community

4.2: limitation & challenge

Still now a percentage SHG is seem less organized. Members are not clear the objectives of group

activities.

In general, a numbers of group members are clear about saving by the installment against received

12000 BDT in second time. Their notion is they are retuning money to IRB by the installment against

second time received 12000 BDT.

Some of group members don’t know where their or in which bank they saving and installment’s

money is depositing (Especially in Shymnagar fields).

Page 49: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

49

Group members don’t know about quard-al-hasana. Even in the group there is guideline about

utilization quard-al-hasana and revolving fund.

A percentage of members are using seeds money (last time received) as installment, buy furniture,

mobile etc rather than invest in their IGA.

A number of SHG members don’t know about of apex body.

It is difficult to improve IGA there are a number of beneficiary due to economically inactive age.

A number of WDMC and UDMC are not proactive due to hold last tire of local government election (Union Parishad) around 60 percent WDMC members have changed.

4.3: Recommendations

As an organizational stability, livelihood groups need to be more active and functional. So

nourishment of the groups should be continuing minimum more than one year in order to sustain

the group.

Beneficiaries have to clear understand about utilization on seed money.

The group members have to clear understand about objectives installment in the group saving

against seed money, process of Quard-al-hasana, ownership of money and where money is deposit

otherwise there is possibility to break group activities as well as is possibility to misuse this saving

money.

Moreover, it is imperative to make sure establish internal relationship among the group members.

That’s why flow-up of the group should continue.

Apex boy is now in liminal stage, so to see sustainable apex body nourishment is needed.

A number of WDMC and UDMC members have been changed due to hold last tire of local government election (Union Parishad). So, newly appointed members need to develop skill of their role and responsibility.

To overcome above- mention issues project should continue minimum two years.

Page 50: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

50

CHAPTER V: ANEXTURE: ADDITIONAL

Annexure -1 : Sampling Calculation

A representative and statistically significant sampling approach has been undertaken. The sample was at 95% confidence level with an accuracy rate or amount of admissible error margin of 3.5%. The following sampling approach and statistical formula was used for sample design.

22

2

)1(..

...

eNqpz

Nqpz

Where, n = Sample size N = Population size e = Precision rate or amount of admissible error in the estimate p = Proportion of defectiveness or success for the indicator q = 1-p z = Standard normal variable at the given level of significance In the sampling estimate, given values are: N = 2400 for households e = 0.03.5 (3.5 % significance level/admissible error margin) p = 0.7 q = factor q (1-p) = 0.7 z = 1.96 (value of standard normal variable at 95% confidence level)

Annexure 2: IGA Replication

2.1: Replication IGA to the other people

SL Replication to the HH Percentage

1 Own household level 3 % 2 Friends 6 % 3 Relatives 24 % 4 Neighbors 65 % 5 Neighboring community 2 %

2.2: Replicated IGA

SL Replicated IGA Percentage

1 Crop and vegetable cultivation 73%

2 Tree plantation 2%

3 Fish cultivation 4 %

4 Crab cultivation and fattening 1 %

5 Lives took rearing 20 %

Annexure 3: Homestead gardening

Average amount of vegetable (KG) got in last season

Average amount of vegetable

sold (KG)in last season

Income from sale vegetable (BDT)

96 50 819

Page 51: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

51

Vegetable gain status by homestead gardening

Lower Limit Upper Limit

Average amount of vegetable (KG) got in last season

10 KG 4000 KG

Average amount of vegetable sold (KG)in last

season 8 KG 35000 KG

Income from sale vegetable (BDT) BDT 100 BDT 45000

Annexure 4: GROUP ASSESSMENT TOOLS

0=Non existence , 1= Required Major improvement, 2= Need little improvement , 3=Excellent achievement .Total score=99

Indicators for Group Assessment Achieved score

SL Governance (3x6=18)

1 SHG members are clearly aware about the objective of the SHG

2 SHG has executive committee and it was selected through participatory process

3 SHG has bylaws/guideline and it operates according to the bylaws/ guideline

4 Executive committee is clearly aware about their role and responsibilities

5 Executive committee attends meeting timely and regularly

6 Quality of SHG leaders ( average educational qualification)

Operation and Management ( 3x10=30)

7 Clearly defined work plan exist for SHG

8 Maintaining rule and regulation of SHG

9 Capable for new planning without external support

10 Regular meeting held (last three month)

11 Capable to writing meeting minutes without external support

12 Percentage of attendance (last three meeting )

13 Proceess of decision making

14 Conflict managed through within the group in a participatory way

15 Raise their voice united way against any kind of violence

16 Level of capacity of group leaders on SHG management

Training and Financial Management (3x9=27)

17 Regular saving is deposited by the members

18 Level of repayment rate of quard Al Hasan/murabaha

19 All savings and credits are properly recorded by full documentation

20 Capable to handle acccounting system without external support

21 Level of capacity of group leaders on financial management of SHG

22 Have access to bank/ Have group account at Bank

23 Deposit of SHG saving at bank regular basis

24 Training on financial management

25 IGA implementation as per training

External and Internal Relation (3x4=12)

26 Relation among the SHG members

27 Relation between SHG and IR staff

28 Level of networking with the service providers

29 Level of awareness on complaint and response mechnism

Awareness on donor and Sharia complaince (3x4=12)

30 Level of awareness of SHG member on sharia based microfanance

31 Practice level of SHG member on sharia based microfanance

32 Aware about donor and implementing organization

33 Aware about Samity name, Samity code and Samity member

Page 52: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

Annexure 5: Cost benefit analysis Low Cost Adaptation & Mitigation Measures: A Cost-benefit Analysis from Coastal and Haor Regions of Bangladesh

Project Name: Enhancing Climate Change Adaptation and Disaster Resilience in Bangladesh Implementation Period: 1 April 2013 to 31 March 2016

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

1 Jialy Canal Re-Excavation in Golkhali Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

1031912

Water logging, damages of crop for each disaster is reduced @ Tk 400000 per disaster (it’s estimated 2 disasters in next 5 years )

500 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 100000 per season

Peanut, amon, dul is harvested @ Tk 360000 per year

Watermelon is harvested @ Tk 10000000 per year

At least 240 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

11032000 10.690

2 Jaider Canal Re-Excavation in Panpotti Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

740848 Water logging, damages of crop for each disaster is reduced @ Tk 452000 per disaster (it’s estimated 2 disasters in next 5 years )

550 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 120000 per season

Peanut, amon, dul is harvested @ Tk 606000 per year

Watermelon is harvested @ Tk 8500000 per year

At least 240 trees were planted which are free from damages and calculated at BDT

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

9870000 13.322

Page 53: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

53

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

300 per tree as their benefits after 5 year

3 Roskomola Canal Re-Excavation in Golkhali Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

1178679 Water logging, damages of crop for each disaster is reduced @ Tk 500000 per disaster (it’s estimated 2 disasters in next 5 years )

800 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 90000 per season

Peanut, amon, dul is harvested @ Tk 730000 per year

Watermelon is harvested @ Tk 10050000 per year

At least 220 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

11532000 9.783

4 Swanirvor Canal Re-Excavation in Panpotti Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

1179793 Water logging, damages of crop for each disaster is reduced @ Tk 408000 per disaster (it’s estimated 2 disasters in next 5 years )

750 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 100000 per season

Peanut, amon, dul is harvested @ Tk 520000 per year

Watermelon is harvested @ Tk 9200000 per year

At least 180 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

10400000 8.815

5 Majhneta Canal Re-Excavation in Rangabali Union of Golachipa Upazila in Patuakhali district

1413991 Water logging, damages of crop for each disaster is reduced @ Tk 450000 per disaster (it’s estimated 2 disasters in next 5 years )

Increase of knowledge on DRR options

Community people proactively participated in

9472000 6.698

Page 54: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

54

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

880 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 75000 per season

Peanut, amon, dul is harvested @ Tk 750000 per year

Watermelon is harvested @ Tk 8050000 per year

At least 200 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

6 Manik Khali Canal Re-Excavation in Romjannagar Union of Shyamnagar Upazila in Satkhira district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

Earth work 419385 Water logging, damages of crop for each disaster is reduced @ Tk 398000 per disaster (it’s estimated 2 disasters in next 5 years )

400 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 155000 per season

Barley, amon, dul is harvested @ Tk 835000 per year

At least 130 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

1582000 3.772

7 Domuria Canal Re-Excavation in Gabura Union of Shyamnagar Upazila in Satkhira district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

938371 Water logging, damages of crop for each disaster is reduced @ Tk 470000 per disaster (it’s estimated 2 disasters in next 5 years )

500 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 95000 per season

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at

1457000 1.552

Page 55: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

55

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Barley, amon, dul is harvested @ Tk 764000 per year

At least 110 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

canal bank Tree plantation at canal

bank reduce carbon emission largely

8 Dorgabari Canal Re-Excavation in Romjannagar Union of Shyamnagar Upazila in Satkhira district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

501312 Water logging, damages of crop for each disaster is reduced @ Tk 570000 per disaster (it’s estimated 2 disasters in next 5 years )

600 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 88000 per season

Barley, amon, dul is harvested @ Tk 520000 per year

At least 140 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

1308000 2.609

9 Nimai Canal Re-Excavation in Gabura Union of Shyamnagar Upazila in Satkhira district Completion Year: 2015 Durability: 7 years Maintenance Cost: 12000 BDT for 5 years

1356232 Water logging, damages of crop for each disaster is reduced @ Tk 370000 per disaster (it’s estimated 2 disasters in next 5 years )

400 acre lands are covered under multi-cropping after getting the supplementary irrigation facilities

The re-excavated cannel removed the drainage congestion and Irrigation cost for agricultural production is reduced @ Tk 75000 per season

Barley, amon, dul is harvested @ Tk 865000 per year

At least 130 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Increase of knowledge on DRR options

Community people proactively participated in the whole process of re-excavation, so their skill, attitude, behavior have been improved

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

1424000 1.049

10 Community Based Solar Panel at Sahadebpasa Village of Sulla Union in Sunamgonj District

1459540

Total 115 families are getting the solar facility without any expenses.

Now each family can save around 300-400 TK monthly on their fuel costs, which is Tk

Reducing emissions of carbon dioxide (CO2), methane (CH4) and nitrous oxide (NO) from

483000

0.330

Page 56: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

56

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

483000 per year. The savings are being used for more

pressing needs such as food, clothing or providing a better education for children.

Nearly 174 students are getting easy access to continue their education

the storage and thus contribute to diminishing of global warming

Up gradation of social status

11 Community Based Solar Panel at Mirzakanda Village of Bahara Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

1243040 Total 88 families are getting the solar facility without any expenses.

Now each family can save around 300-400 TK monthly on their fuel costs, which is Tk 369600 per year.

The savings are being used for more pressing needs such as food, clothing or providing a better education for children.

Nearly 75 students are getting easy access to continue their education

Reducing emissions of carbon dioxide (CO2), methane (CH4) and nitrous oxide (NO) from the storage and thus contribute to diminishing of global warming

Up gradation of social status

369600 0.297

12 Community Based Solar Panel at Hobibpur Hati of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

999035 Total 108 families are getting the solar facility without any expenses.

Now each family can save around 300-400 TK monthly on their fuel costs, which is Tk 453600 per year.

The savings are being used for more pressing needs such as food, clothing or providing a better education for children.

Nearly 134 students are getting easy access to continue their education

Reducing emissions of carbon dioxide (CO2), methane (CH4) and nitrous oxide (NO) from the storage and thus contribute to diminishing of global warming

Up gradation of social status

453600 0.454

13 Connecting Road at Niamotpur Village of Bahara Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 25000 BDT for 5 years

47250 Income of 170 no. of vulnerable people has been increased by cash for work @ 300 for 5 days

Total 185 households have ensured their food availability

Presently more than 1000 acre crops are being harvested in low cost and saves BDT 2450000 per year

During flood, disaster around 130 household and more than 540 people and their livestock can move to cyclone shelter easily

Nearly 140 students got smooth access to schools which can increase the flow of education

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

2705000 57.248

Page 57: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

57

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Products for sale can be easily marketed

14 Connecting Road at Anandapur Boro Hati North Side of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 25000 BDT for 5 years

117000 Income of 480 no. of vulnerable people has been increased by cash for work @ 300 for 3 days

Total 220 households have ensured their food availability

Presently more than 750 acre crops are being harvested in low cost and saves BDT 1715000 per year

During flood, disaster around 220 household and more than 2500 people and their livestock can move to cyclone shelter easily

Nearly 320 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

2147000 18.350

15 Connecting Road at Anandapur Boro Hati South Side of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 10000 BDT for 5 years

85875

Income of 355 no. of vulnerable people has been increased by cash for work @ 300 for 3 days

Total 160 households have ensured their food availability

Presently more than 550 acre crops are being harvested in low cost and saves BDT 1575000 per year

During flood, disaster around 170 household and more than 800 people and their livestock can move to cyclone shelter easily

Nearly 70 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

1894500

22.061

16 Connecting Road at Anandapur Moddho Hati of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000

159075 Income of 667 no. of vulnerable people has been increased by cash for work @ 300 for 3 days

Total 170 households have ensured their food availability

Presently more than 2000 acre crops are being harvested in low cost and saves BDT 500000 per year

During flood, disaster around 190 household and more than 870 people and their

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been

1100300 6.916

Page 58: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

58

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

BDT for 5 years livestock can move to cyclone shelter easily Nearly 165 students got smooth access to

schools which can increase the flow of education

Products for sale can be easily marketed

ensured

17 Connecting Road at Bahara South Hati of Bahara Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 10000 BDT for 5 years

84875 Income of 355 no. of vulnerable people has been increased by cash for work @ 300 for 3 days

Total 140 households have ensured their food availability

Presently more than 500 acre crops are being harvested in low cost and saves BDT 2410000 per year

During flood, disaster around 130 household and more than 350 people and their livestock can move to cyclone shelter easily

Nearly 120 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

2729500 32.159

18 Connecting Road at Nowashek Hati of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 15000 BDT for 5 years

64375 Income of 255 no. of vulnerable people has been increased by cash for work @ 300 for 4 days

Total 110 households have ensured their food availability

Presently more than 100 acre crops are being harvested in low cost and saves BDT 400000 per year

During flood, disaster around 100 household and more than 500 people and their livestock can move to cyclone shelter easily

Nearly 50 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

706000 10.966

19 Connecting Road at Noagaon New Hati of Bahara Union in Sunamgonj District Completion Year: 2015

56900 Income of 247 no. of vulnerable people has been increased by cash for work @ 300 for 3 days

Total 140 households have ensured their food availability

Presently more than 700 acre crops are

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill,

2027300 35.629

Page 59: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

59

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Durability: 7 years Maintenance Cost: 10000 BDT for 5 years

being harvested in low cost and saves BDT 1805000 per year

During flood, disaster around 62 household and more than 190 people and their livestock can move to cyclone shelter easily

Nearly 70 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

attitude, behavior have been improved

Security of vulnerable people have been ensured

20 Connecting Road at Volanagar Village of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 7 years Maintenance Cost: 10000 BDT for 5 years

49200 Income of 192 no. of vulnerable people has been increased by cash for work @ 300 for 5 days

Total 80 households have ensured their food availability

Presently more than 500 acre crops are being harvested in low cost and saves BDT 1575000 per year

During flood, disaster around 70 household and more than 350 people and their livestock can move to cyclone shelter easily

Nearly 120 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

1863000 37.865

21 Killa at Kharuwala Village of Sulla Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

985487 Nearly 25 HH (direct beneficiaries) and 120 HH (indirect beneficiaries) are being benefited from these constructed killa.

Total 500 acre lands are available for crop processing during flash flood and save crops from destroyed @ BDT 655000 saved per year

Emergency shelter for people and cattle Killas are used as grazing land for 100 cattle

and crop storing place during flash flood Livestock loss protection of 8 cows due to

flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 14 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each cow

Use of the killas for social gathering, cultural event and for children play ground

Knowledge on crop protection from flash flood from of the community people have been improved

Sense of security increase for 145 households

1161600 1.178

Page 60: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

60

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Community people planted 400 trees at edge of killa which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

22 Killa at Suskahai Village of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

849400 Nearly 20 HH (direct beneficiaries) and 400 HH (indirect beneficiaries) are being benefited from these constructed killa.

Total 350 acre lands are available for crop processing during flash flood and save crops from destroyed @ BDT 469000 saved per year

Emergency shelter for people and cattle Killas are used as grazing land for 170 cattle

and crop storing place during flash flood Livestock loss protection of 6 cows due to

flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 18 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each cow

Community people planted 400 trees at edge of killa which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

Use of the killas for social gathering, cultural event and for children play ground

Knowledge on crop protection from flash flood from of the community people have been improved

Sense of security increase for 145 households

992200 1.168

23 Killa at Anandapur Village of Hobibpur Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

3624332 Nearly 32 HH (direct beneficiaries) and 320 HH (indirect beneficiaries) are being benefited from these constructed killa.

Total 700 acre lands are available for crop processing during flash flood and save crops from destroyed @ BDT 1203000 saved per year

Emergency shelter for people and cattle Killas are used as grazing land for 200 cattle

and crop storing place during flash flood Livestock loss protection of 10 cows due to

flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 23 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each

Use of the killas for social gathering, cultural event and for children play ground

Knowledge on crop protection from flash flood from of the community people have been improved

Sense of security increase for 145 households

1871600 0.567

Page 61: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

61

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

cow Community people planted 1000 trees at

edge of killa which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

24 Killa at Beduarkanda Village of Bahara Union in Sunamgonj District Completion Year: 2015 Durability: 10 years Maintenance Cost: 25000 BDT for 5 years

2361188 Nearly 34 HH (direct beneficiaries) and 300 HH (indirect beneficiaries) are being benefited from these constructed killa.

Total 250 acre lands are available for crop processing during flash flood and save crops from destroyed @ BDT 483000 saved per year

Emergency shelter for people and cattle Killas are used as grazing land for 150 cattle

and crop storing place during flash flood Livestock loss protection of 7 cows due to

flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 16 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each cow

Community people planted 600 trees at edge of killa which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

Use of the killas for social gathering, cultural event and for children play ground

Knowledge on crop protection from flash flood from of the community people have been improved

Sense of security increase for 145 households

1051900 0.445

25 Ground Raising Shuhuree High School in Golkhali Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

677653 Total 300 acre lands are available for crop processing during flood

Suffering from diseases due to flood have been reduced

Livestock loss protection of 10 cows for each disaster has been reduced at BDT 25000 each cow (2 disaster estimated in next 5)

Protection of forced sale loss of 13 cows in each disaster @ 2 disaster estimated in next 5 years due to emergency shelter facilities for livestock at BDT 18600 each cow

Community people planted 120 trees in raised grounds which are free from

Knowledge on DRR like flash flood from of the community people has been increased

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 1100 to 1500 people and their cattle take temporary shelter here

The school ground is used for social gathering,

578000

0.778

Page 62: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

62

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

damages and calculated at BDT 300 per tree as their benefits after 5 year

school annual activity and for children play ground

26 Ground Raising Boromolla Primary School in Golkhali Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

186819 Total 700 acre lands are available for crop processing during flood

Suffering from diseases due to flood have been reduced

Livestock loss protection of 14 cows for each disaster has been reduced at BDT 25000 each cow (2 disaster estimated in next 5)

Protection of forced sale loss of 18 cows in each disaster @ 2 disaster estimated in next 5 years due to emergency shelter facilities for livestock at BDT 18600 each cow

Community people planted 120 trees in raised grounds which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Knowledge on DRR like flash flood from of the community people has been increased

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 1900 to 2500 people and their cattle take temporary shelter here

The school ground is used for social gathering, school annual activity and for children play ground

720800 3.858

27 Ground Raising Panpotti High School in Panpotti Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

779895 Total 270 acre lands are available for crop processing during flood

Suffering from diseases due to flood have been reduced

Livestock loss protection of 7 cows for each disaster has been reduced at BDT 25000 each cow (2 disaster estimated in next 5)

Protection of forced sale loss of 10 cows in each disaster @ 2 disaster estimated in next 5 years due to emergency shelter facilities for livestock at BDT 18600 each cow

Community people planted 120 trees in raised grounds which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Knowledge on DRR like flash flood from of the community people has been increased

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 1000 to 1200 people and their cattle take temporary shelter here

The school ground is used for social gathering, school annual activity and for children play ground

397000 0.509

28 Ground Raising Saleha High School in Rangabali Union of Golachipa Upazila in Patuakhali district

104413 Total 100 acre lands are available for crop processing during flood

Suffering from diseases due to flood have been reduced

Knowledge on DRR like flash flood from of the community people has been increased

465600 4.459

Page 63: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

63

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

Livestock loss protection of 9 cows for each disaster has been reduced at BDT 25000 each cow (2 disaster estimated in next 5)

Protection of forced sale loss of 11 cows in each disaster @ 2 disaster estimated in next 5 years due to emergency shelter facilities for livestock at BDT 18600 each cow

Community people planted 120 trees in raised grounds which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 800 to 1000 people and their cattle take temporary shelter here

The school ground is used for social gathering, school annual activity and for children play ground

29 Ground Raising Gobindra Chandra Girls School in Bahara Union of Sulla Upazila in Sunamgonj district Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

216920 Total 80 acre lands are available for crop processing during flash flood

Suffering from diseases due to flood have been reduced

Livestock loss protection of 6 cows due to flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 10 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each cow

Community people planted 300 trees in raised grounds which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

Knowledge on DRR like flash flood from of the community people has been increased

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 700 to 1300 people and their cattle take temporary shelter here

The school ground is used for social gathering, school annual activity and for children play ground

372200 1.715

30 Ground Raising Sulla Madrasha in Sulla Union in Sunamgonj district Completion Year: 2015 Durability: 10 years Maintenance Cost: 30000 BDT for 5 years

532852 Total 300 acre lands are available for crop processing during flash flood

Suffering from diseases due to flood have been reduced

Livestock loss protection of 9 cows due to flash flood has been reduced at BDT 22700 each cow

Protection of forced sale loss of 17 cows before flash flood due to emergency shelter facilities for livestock at BDT 15500 each

Knowledge on DRR like flash flood from of the community people has been increased

Educational environment has improved

Concentration of disease like water borne, diarrhea, etc have been controlled

It’s ensured at least 1100

521800 0.979

Page 64: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

64

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

cow Community people planted 200 trees in

raised grounds which are free from damages and calculated at BDT 270 per tree as their benefits after 5 year

to 1600 people and their cattle take temporary shelter here

The school ground is used for social gathering, school annual activity and for children play ground

31 Rainwater Harvesting Unit in Romjannagar Union of Shyamnagar Upazila in Satkhira district Completion Year: 2015 Durability: 5 years Maintenance Cost: 15000 BDT for 5 years

136273 55 HHs access to 220 liter drinking water for 180 days after rainy season per year @ 5 years benefits 1 liter water @ Tk 0.50

Reducing the incidences of water borne diseases outburst for 2 episodes in a year for 275 community people @ average treatment cost for each episode Tk 700 and will benefit such scale for next 5 years

Disease concentration has been decreased and at least 275 people are secured from water borne diseases

Safe drinking water for at least 55 vulnerable HHs are ensured

Nutritional status has been improved

414700

2.970

32 Deep Tube Well in Sulla Bazar of Sulla Union in Sunamgonj district Completion Year: 2015 Durability: 5 years Maintenance Cost: 10000 BDT for 5 years

83340 Approximately 50 HHs including shopkeeper collect 20 liter water for their daily use for 365 days and saves Tk one for per liter

Reducing the incidences of water borne diseases outburst for 2 episodes in a year for 300 community people @ average treatment cost for each episode Tk 450 and will benefit such scale for next 5 years

Ensure safe drinking water for Sulla bazaar

300 community people of the area are protected from water borne diseases

307300 3.327

33 Deep Tube Well with Double Hand Pump in Koyra Union of Khulna district Completion Year: 2015 Durability: 5 years Maintenance Cost: 10000 BDT for 5 years

94886 Approximately 82 HHs collect 20 liter water for their daily use for 365 days and saves Tk 0.50 for per liter

Reducing the incidences of water borne diseases outburst for 2 episodes in a year for 410 community people @ average treatment cost for each episode Tk 350 and will benefit such scale for next 5 years

Ensure safe drinking water for Sulla bazaar

410 community people of the area are protected from water borne diseases

290650 3.063

34 Community Toilet come Biogas Plant in Horinkhola Village of Koyra Upazila in Khulna district Completion Year: 2015 Durability: 5 years

182000 Total 38 HHs are getting the biogas facility without any expenses.

Now each family can save around 400 TK monthly on their fuel costs, which is Tk 182400 per year.

Reducing the incidences of airborne diseases outburst for 3 episodes in a year for 220 community people @ average

220 community people of the area are protected from contagious diseases

human wastes are being converted to energy for use by households for heating and saving on cutting down of plants

413400 2.271

Page 65: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

65

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Maintenance Cost: 10000 BDT for 5 years

treatment cost for each episode Tk 350 and will benefit such scale for next 5 years

The savings are being used for more pressing needs such as food, clothing or providing a better education for children.

Behavioral attitude of community people has been improved

35 Wooden Bridge in Golachipa Upazila of Patuakhali district Completion Year: 2015 Durability: 5 years Maintenance Cost: 30000 BDT for 5 years

771501 Total 75 households have ensured their food availability

Presently more than 400 acre crops are being harvested in low cost and saves BDT 805000 per year

During flood, disaster more than 1200 people and their livestock can move to cyclone shelter easily

Nearly 134 students got smooth access to schools which can increase the flow of education

Products for sale can be easily marketed

Increase of knowledge on DRR options

Community people proactively participated in the whole process of construction, so their skill, attitude, behavior have been improved

Security of vulnerable people have been ensured

805000 1.043

36

Amlibaria Pond Re-Excavation in Rangabali Union of Golachipa Upazila in Patuakhali district Completion Year: 2015 Durability: 5 years Maintenance Cost: 15000 BDT for 5 years

366098 Approximately 52 HHs collect 30 liter water for their daily use for 365 days and saves Tk 0.50 for per liter

Reducing the incidences of water borne diseases outburst for 2 episodes in a year for 260 community people @ average treatment cost for each episode Tk 400 and will benefit such scale for next 5 years

Water logging for each disaster is reduced @ Tk 100000 per disaster (it’s estimated 2 disasters in next 5 years )

Irrigation cost for agricultural production is reduced @ Tk 75000 per season

Women of 15 families of the community cultivate vegetable at pond bank @ BDT 72000 benefits for 15 families per year

At least 60 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Disease concentration has been decreased and at least 260 people are secured from water borne diseases

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

541475 1.511

37 Kachibunia Pond Re-excavation in Rangabali Union of Golachipa Upazila in Patuakhali district

364386 Approximately 48 HHs collect 28 liter water for their daily use for 365 days and saves Tk 0.50 for per liter

Reducing the incidences of water borne diseases outburst for 2 episodes in a year

Disease concentration has been decreased and at least 240 people are secured from water borne diseases

556710 1.527

Page 66: Result Based Monitoring Report (October, 2016) On ...islamicrelief.org.bd/publications/pqlr/Rsult Based... · 6 EXECUTIVE SUMMARY This report is result based monitoring on “Enhancing

66

SN Name of the Project Expenditure

Items

Total Cost of the Project

Benefits of the Project Benefit-Cost ratio

Tangible Intangible Amount (BDT)

Completion Year: 2015 Durability: 5 years Maintenance Cost: 15000 BDT for 5 years

for 240 community people @ average treatment cost for each episode Tk 400 and will benefit such scale for next 5 years

Water logging for each disaster is reduced @ Tk 120000 per disaster (it’s estimated 2 disasters in next 5 years )

Irrigation cost for agricultural production is reduced @ Tk 82000 per season

Women of 12 families of the community cultivate vegetable at pond bank @ BDT 57600 benefits for 12 families per year

At least 60 trees were planted which are free from damages and calculated at BDT 300 per tree as their benefits after 5 year

Nutritional status has been improved by consuming vegetables at canal bank

Tree plantation at canal bank reduce carbon emission largely

37 project 25444131 86017735


Recommended