Page 1: Retro-Commissioniong: The Who, What, Why, When and How
Page 2: Retro-Commissioniong: The Who, What, Why, When and How
Page 3: Retro-Commissioniong: The Who, What, Why, When and How

Presented by: Shawn Carr, P.Eng

Building Retro-Commissioning:Why Retro-Commissioning and What Incentives are available?

Page 4: Retro-Commissioniong: The Who, What, Why, When and How

TODAY’S OBJECTIVES

• What is building retro-commissioning?

• Why retro-commission your building?

• How Save On Energy Audit Funding incentives can help

Page 5: Retro-Commissioniong: The Who, What, Why, When and How

What is Building Retro-Commissioning?

Page 6: Retro-Commissioniong: The Who, What, Why, When and How

“Systematic process to improve an existing building’s performance”

RETRO-COMMISSIONING

Page 7: Retro-Commissioniong: The Who, What, Why, When and How

RETRO-COMMISSIONING IS..A tune-up for your existing building

Page 8: Retro-Commissioniong: The Who, What, Why, When and How

Building Commissioning

Re-commissioning

Retro-commissioning (ReCx) or Existing Building Commissioning

Ongoing commissioning

TERMINOLOGY

Page 9: Retro-Commissioniong: The Who, What, Why, When and How

COMPARED TO ENERGY AUDIT

Occupant UseBuildingOperations

Building Systems

Savings

Savings

Savings

Tenant Energy Audits Focus on Occupant Use

System Optimization

Retro-commissioning Focuses on Operations

Facility Energy Audits Focus on Equipment

Content provided by WSP

Page 10: Retro-Commissioniong: The Who, What, Why, When and How

Why Retro-Commissioning?

Page 11: Retro-Commissioniong: The Who, What, Why, When and How

• Improve system performance

• Save energy

• Improve comfort

• Reduce maintenance

• Train Operations Team

• Establish Process for Performance Tracking and Persistence

• Better documentation

RETRO-COMMISSIONING YOUR BUILDING TO:

Page 12: Retro-Commissioniong: The Who, What, Why, When and How

Retro-Commissioning Stats

• 16% Energy Savings• 13 Month Payback

Page 13: Retro-Commissioniong: The Who, What, Why, When and How

Building Type Energy Savings (%/ ekwh/$)

Simple Payback (years)

Audit Funding Incentive

Commercial Office (Over 1M sq.ft)

21%6,916,950 ekwh$756,500

1.0 Covered 50% of cost

Commercial Office(325,000 sq.ft)

22%1,700,000 ekwh$160,000

4.0 Covered 35% of cost

Commercial Office(420,000 sq.ft)

12%1,700,000 eKwh$170,000

3.2 Covered 44% of cost

Commercial Office (409,000 sq.ft)

5%380,000 eKwh$18,000

1.0 Covered 50% of cost

Retail(900,000 sq.ft)

21%2,100,000 eKwh$190,000

2.0 Covered 50% of cost

Average: ≈16% ≈2.2 years ≈46%

Ottawa Building Stats

Page 14: Retro-Commissioniong: The Who, What, Why, When and How

Audit FundingBy: Hydro Ottawa

Page 15: Retro-Commissioniong: The Who, What, Why, When and How

Incentives to Owners for completing building energy audits, Retro-Commissioning studies, and Building System Audits.

AUDIT FUNDING

Page 16: Retro-Commissioniong: The Who, What, Why, When and How

AUDIT FUNDING PROGRAM OVERVIEW

Incentives for Energy Studies

Audit Funding Program

Four levels of incentives

Electricity Survey & Analysis for Owners

For ASHRAE Level 2 Energy Audits on Entire Building

Building System Audit for Non-Capital

Intensive Modifications

For optimizing existing system performance

Existing Building Commissioning

For ReCx your Chilled Water System

Process & Systems Engineering Studies

For customers running complex systems

Page 17: Retro-Commissioniong: The Who, What, Why, When and How

EB COMMISSIONING PROGRAM CHANGES

Anticipated Program Changes coming in 2016:• EB Commissioning:

• to expand beyond chilled water to include other electricity consuming building systems

• Update eligibility requirements to address impacts of other funding programs

• Update incentive thresholds

• In Market Date: TBD

• Benefits:

• More energy saving options

• More comprehensive projects

Page 18: Retro-Commissioniong: The Who, What, Why, When and How

BUILDING OWNER

EXISTING BUILDING CX

• Incentives to evaluate and increase chilled water system efficiency.• Equipment older than 3 years and not had a major overhaul in last 2 years• No planted overhaul or replacement in next 2 years• Refer to participant agreement and report requirements for more details.

Phase Incentive DeliverableScoping Study Up to $2,500 or 100% of cost Scoping Study Cx Report

– utility analysis, metering points, ECMs

Investigation $6/ton for data logging equipment (up to 75% of costs)$18/ton for preparing Cx report (up to 75% of costs)Up to a maximum of $30,000

Investigation Phase Cx Report – recommendations and project M&V plan

Implementation Up to $5,000 or 100% of cost for implementation report

Implement phase Cx Report – analysis and results of measured savings.

Hand-off/Completion Up to $2,500 or 100% of cost for completion report Training and documentation for ongoing operations

Page 19: Retro-Commissioniong: The Who, What, Why, When and How

BUILDING OWNERS AND TENANTS

ELECTRICITY SURVEY AND ANALYSIS

• Connected to the LDC’s distribution system, classified as non-residential.• Own or lease the building• Not eligible if the facility has already received a ESA.• Auditor must be a P.Eng, CEM, or Building Assessment Professional (ASHRAE)• Meets ASHRAE Level 2 requirements• Commitment to implement no/low cost measures (<$1,000 and <1 year payback)

Applicant Building Size IncentiveBuilding Owner Up to 30,000 sq.ft $0.10/sq.ft to a maximum of 50%

Building Owner Larger than 30,000 sq.ft

$3000 for 30,000 sq.ft and $0.05/sq.ft thereafter up to $25,000 or 50% of audit costs

Tenant Any Size $0.03/sq.ft up to $7,500 or 50% of audit costs

Page 20: Retro-Commissioniong: The Who, What, Why, When and How

BUILDING OWNERS

BUILDING SYSTEM AUDIT

• Analysis of energy savings by optimizing existing building systems (Ventilation, chilled water distribution, DHW distribution, Controls/BAS, AHU’s, etc)

• One incentive per building system to a maximum of $50,000• Can be used to evaluate design options/repair strategies through an energy lens• Excludes lighting systems

Building Size IncentiveAny 50% of audit costs up to $5,000

Page 21: Retro-Commissioniong: The Who, What, Why, When and How

BUILDING OWNER

PROCESS & SYSTEMS

• Different payment terms and M&V requirements depending on Incentive Stream

Phase Incentive RequirementInvestigation Preliminary Engineering Study (PES): Up to $10,000

Detailed Engineering Study (DES): Up to $50,000- 100 MWh of

Annualized Savings Delivered

- - 3rd party review of report

Project Implementation – Behind the Meter Generation Projects (i.e: Combined Heat and Power, Waste Energy Recovery)- Compressed air systems

Three Incentive Streams:

Small Capital Incentives (<$1,000,000)- Up to 70% of project cost or $200/MWhLarge Capital Incentives (>$1,000,000)- Up to 70% of project cost or $200/MWhRetrofit Program-Up to 50% of project cost

Page 22: Retro-Commissioniong: The Who, What, Why, When and How

HOW TO PARTICIPATE?

Establish Eligibility

Apply to Program

Obtain Pre-Approval

Receive Cheque

Engage us early to determine best funding path based on your needs

Submit Application & Participant Agreement and review audit report requirements before beginning your audit

Refer to Post-Project Evaluation Checklist

Submit Post-Project Documentation

LDC reviews report and meets with you to discuss implementation plans and deliver cheque

cdm.hydroottawa.com

Page 23: Retro-Commissioniong: The Who, What, Why, When and How

QUESTIONS?

Shawn Carr | [email protected] ext. 7474

Page 24: Retro-Commissioniong: The Who, What, Why, When and How

Hydro Ottawa Breakfast Event

Retro-CommissioningChris Frauley P. Eng., LEED AP, CPMP

June 28, 2016

Page 25: Retro-Commissioniong: The Who, What, Why, When and How

25

• The goal of retro-commissioning is to identify operational “drift” and get the building “back on track”.

• Retro-Commissioning is a systematic, forensic process.

• You need to think like a detective.• Once you understand the building, improvements

can be explored.

RETRO-COMMISSIONING: BACKGROUND

Page 26: Retro-Commissioniong: The Who, What, Why, When and How

26

• The building operator is your greatest asset.• In the typical construction approach, the operator is

often left with drawings and little else.• They must often learn the system by themselves.

RETRO-COMMISSIONING: BACKGROUND

Page 27: Retro-Commissioniong: The Who, What, Why, When and How

27

• Wasted energy can be hard to recognize.• Often the result of years of “tweaks” and fit-ups.• Your job is to restore the building overall

performance.• To start the process, you need to gather as much

original documentation as possible• You need to assemble your Commissioning Team.

RETRO-COMMISSIONING: HOW IT WORKS

Page 28: Retro-Commissioniong: The Who, What, Why, When and How

28

• How does the building work?• Sometimes a single “choke point” can have a large

impact.• Is the equipment operating efficiently?• Have the controls equipment been calibrated?• Does the building use outdated control sequences?

RETRO-COMMISSIONING:HOW YOU CAN GET IT DONE

Page 29: Retro-Commissioniong: The Who, What, Why, When and How

29

• You need a “benchmark”• How does the building compare to its “Peers”?• Is energy metering available• Training for O&M personnel is fundamental.

RETRO-COMMISSIONING: AN EFFECTIVE PROCESS

Page 30: Retro-Commissioniong: The Who, What, Why, When and How

30

• Assembling the proper Commissioning Team is important.

• Often sub-contractors will be required.• It is difficult to estimate the hours of support personnel

until the process has begun.• Approach every building with an open mind.

RETRO-COMMISSIONING: AN EFFECTIVE PROCESS

Page 31: Retro-Commissioniong: The Who, What, Why, When and How

31

• That doesn’t mean you can’t have a toolkit of typical energy saving measures.

RETRO-COMMISSIONING: AN EFFECTIVE PROCESS

Page 32: Retro-Commissioniong: The Who, What, Why, When and How

32

• Retro-Commissioning is most often motivated by “energy savings”.

• The terms used in ReCx are often associated with energy audits.

• How is Retro-Commissioning different?• Retro-Commissioning is a much more “in-depth”

process.• However, an energy audit forms the perfect starting

point for the Retro-Commissioning process.

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 33: Retro-Commissioniong: The Who, What, Why, When and How

33

Terminology:

• No Cost Opportunity

• Low Cost Opportunity

• Capital Retrofit

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 34: Retro-Commissioniong: The Who, What, Why, When and How

34

• If no energy audit is available, you will need to gather the energy information.

• Scope of work can often “expand” due to poor documentation.

• The Owner’s objective is often that they want to save 10% on energy.

• Don’t fixate on energy so much that you lose the other benefits of ReCx.

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 35: Retro-Commissioniong: The Who, What, Why, When and How

35

CSA Standard Z320 “Building Commissioning”Provides a comprehensive outline of the commissioning process:

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 36: Retro-Commissioniong: The Who, What, Why, When and How

36

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

CSA Standard Z320 “Building Commissioning”Appendix G-3 recommends the following adjustment for Retro-Commissioning

• PLANNING

• Select the building

• Define objectives

• Assemble the team

• Develop project plan

Page 37: Retro-Commissioniong: The Who, What, Why, When and How

37

• INVESTIGATION

• Review documentation

• Perform diagnostic monitoring and testing

• Develop master list of findings

• Prioritize measures to implement

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 38: Retro-Commissioniong: The Who, What, Why, When and How

38

• IMPLEMENTATION

• Develop the retro-commissioning implementation

plan

• Implement selected operational improvements

• Verify results

• Prepare retro-commissioning implementation report

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 39: Retro-Commissioniong: The Who, What, Why, When and How

39

• HAND-OFF

• Prepare retro-commissioning final report

• Conduct staff training

• Hold hand-off meeting

• Develop / Recommend / Implement ongoing

commissioning strategies

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 40: Retro-Commissioniong: The Who, What, Why, When and How

40

• The Canmet ENERGY document provides a sample RFP.

RETRO-COMMISSIONING:A GOOD “SCOPE OF WORK”

Page 41: Retro-Commissioniong: The Who, What, Why, When and How

41

• Frequent contact with the Owner is key.• You need to make sure the Owner requirements

are being met.• Some measures may make sense on paper, but

have unintended consequences.

RETRO-COMMISSIONING:ALIGNING EXPECTATIONS

Page 42: Retro-Commissioniong: The Who, What, Why, When and How

42

• Ongoing Commissioning• The importance of “persistence”

RETRO-COMMISSIONING:ALIGNING EXPECTATIONS

Page 43: Retro-Commissioniong: The Who, What, Why, When and How

43

• Updated schematics• Updated sequences of operation• A better understanding of building systems• Updated troubleshooting tools (trend logs, training,

etc.)• Lower energy consumption

• HAPPIER, MORE SATISFIED TENANTS.

RETRO-COMMISSIONING:BENEFITS TO THE OWNER

Page 44: Retro-Commissioniong: The Who, What, Why, When and How

44

• LEED EB:OM Project• Constructed mid 60’s• Recent upgrades completed.• Documentation readily available• Recent energy audit.• ReCx lasted several months.• All proposed changes were presented to the owner

in the “Master List of Findings”

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 45: Retro-Commissioniong: The Who, What, Why, When and How

45

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 46: Retro-Commissioniong: The Who, What, Why, When and How

46

• Each “Energy Efficiency Measure” was presented as a line item to the owner.

• Individual measures then had an individual data sheet.

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 47: Retro-Commissioniong: The Who, What, Why, When and How

47

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 48: Retro-Commissioniong: The Who, What, Why, When and How

48

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 49: Retro-Commissioniong: The Who, What, Why, When and How

49

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 50: Retro-Commissioniong: The Who, What, Why, When and How

50

• Recent upgrades meant opportunities were limited.• Many items identified were able to be implemented

by O&M staff immediately.• Three follow-up meetings were provided to help

with the implementation of remaining measures and to review questions.

CASE STUDY:Downtown Office BuildingOttawa, ON

Page 51: Retro-Commissioniong: The Who, What, Why, When and How

51

• Motivated by tenant complaints• MH had recently completed a Building Condition

Assessment.• We assisted with the initial gathering of information

for an RFP.• The majority of the BAS was replaced.• More efficient HVAC sequences• Easier to use graphics• The client received incentive funding• Client copied the process for other buildings on

their campus.

CASE STUDY:Tech Sector BuildingOttawa, ON

Page 52: Retro-Commissioniong: The Who, What, Why, When and How

52

• ReCx included a major retrofit of the building.• The project started as a water audit.• We were then engaged for Retro-Commissioning• A list of Capital Improvements was created and

reviewed with the owner.

CASE STUDY:Provincial Government Building Peterborough, ON

Page 53: Retro-Commissioniong: The Who, What, Why, When and How

53

CASE STUDY:Provincial Government Building Peterborough, ON

Page 54: Retro-Commissioniong: The Who, What, Why, When and How

54

CASE STUDY:Provincial Government Building Peterborough, ON

Page 55: Retro-Commissioniong: The Who, What, Why, When and How

55

• Became a Capital Retrofit project.• New chillers installed• BAS replaced• Ventilation upgrade to improve IAQ• VAV controllers replaced• Air and Water re-balancing• Greywater

CASE STUDY:Provincial Government Building Peterborough, ON

Page 56: Retro-Commissioniong: The Who, What, Why, When and How

56

• Winner of a 2016 Consulting Engineers of Ontario Award of Excellence

• First government building to achieve LEED EB:OM Platinum

CASE STUDY:Provincial Government Building Peterborough, ON

Page 57: Retro-Commissioniong: The Who, What, Why, When and How

57

REFERENCES

• ASHRAE Journal February 2011 – Capturing the Potential – Evan Mills

• ASHRAE Journal September 2007 – Existing Building Commissioning – Jim Poulos

• CSA Standard Z320-11 Building Commissioning• Building Commissioning Association – Best Practices• Piping/HVAC – Retro-Commissioning Opportunities Dec/Jan 2012• Canmet ENERGY – Re-commissioning Guide for Building Owners

(adapted from PECI Retro Commissioning Guide for Building Owners)

• ASHRAE Guideline 0-2005 “The Commissioning Process”

Page 58: Retro-Commissioniong: The Who, What, Why, When and How

PRESENTED BY:

STEVEN MOGRIDGE, P.ENG, CEM, CMVP, LEED AP

RETROCOMMISSIONING

NATIONAL CAPITAL REGION

Page 60: Retro-Commissioniong: The Who, What, Why, When and How

GREEN BUILDING CONSULTING

500+2000+$70B+

LEED Certified Projects

Successful Commissioning Projects

Assets Under Management Influenced By Our Sustainability Insights

Page 61: Retro-Commissioniong: The Who, What, Why, When and How

True Story:Sir Wilfrid Laurier BuildingLEED Gold Pursuit

Page 62: Retro-Commissioniong: The Who, What, Why, When and How

True Story:Sir Wilfrid Laurier Building

Savings Identified:

- O&M Measures

- 5% Energy Reduction- 3 Month Simple Payback

- Retrofit Measures

- 23% Energy Savings- 5 Year Simple Payback

ReCx Findings

29% ENERGY REDUCTION

5 year SIMPLE PAYBACK

Page 63: Retro-Commissioniong: The Who, What, Why, When and How

ReCx O&M Key Findings

With Cadillac Fairview

- Synchronize AHU and Reheat Coil Control

- Economizer Refinement

- Scheduling Fan Operation

- Setpoint Adjustments

True Story:Sir Wilfrid Laurier Building

Page 64: Retro-Commissioniong: The Who, What, Why, When and How

True Story:Holland CrossLEED -EB Gold Certified

Page 65: Retro-Commissioniong: The Who, What, Why, When and How

True Story:Holland Cross

Savings Identified:O&M Measures (14%)

- 14% Energy Reduction- 6 Month Simple Payback

Retrofit Measures (8% Savings)

- 8% Energy Reduction- 4 Year Simple Payback

ReCx Findings

22% ENERGY REDUCTION

4 year SIMPLE PAYBACK

Page 66: Retro-Commissioniong: The Who, What, Why, When and How

ReCx O&M Key Findings

With Cadillac Fairview

- Unoccupied Control - Sensor Repair- Fresh Air Adjustment - Reprioritize Heating

Sequence

True Story:Holland Cross

Page 67: Retro-Commissioniong: The Who, What, Why, When and How

True Story:275 SlaterLEED – Silver Pursuit

Page 68: Retro-Commissioniong: The Who, What, Why, When and How

True Story:275 Slater

Savings Identified:- O&M Measures

- 5% Energy Savings- 1 Year Simple Payback

- Retrofit Measures

- 4% Energy Savings- 5 Year Simple Payback

ReCx Findings

9% ENERGY REDUCTION

4 year SIMPLE PAYBACK

Page 69: Retro-Commissioniong: The Who, What, Why, When and How

ReCx O&M Key Findings

With Cadillac Fairview

- Refine Free Specialty Cooling

- AHU Setpoint Adjustments

- Unoccupied Space Temperature Control

True Story:275 Slater

Page 70: Retro-Commissioniong: The Who, What, Why, When and How

QUESTIONS?

Page 71: Retro-Commissioniong: The Who, What, Why, When and How

CONTINUOUS COMMISSIONING:MAINTAINING PERFORMANCE AFTER RETROCOMMISSIONING June 28, 2016

Page 72: Retro-Commissioniong: The Who, What, Why, When and How

WHAT IS CONTINUOUS COMMISSIONING

Performing the commissioning process on an ongoing basisMaintain performance of the building achieved through retro-commissioningMaintain the design intent and the Owner’s operating requirements

May 2, 2023 Page 72

Page 73: Retro-Commissioniong: The Who, What, Why, When and How

TEAM EFFORT

May 2, 2023 Page 73

Building Operato

r

Manage-ment

Champion

RCx Consultant

BAS Contractor

Mechanical

Contractor

Page 74: Retro-Commissioniong: The Who, What, Why, When and How

SET TARGETS FOR ENERGY/WATER REDUCTION

Management supportCustomize target to buildingReasonable and achievableRetrocommissioning reportBenchmark against similar buildings and historical performanceEnergy auditRevisit targets every year

May 2, 2023 Page 74

Page 75: Retro-Commissioniong: The Who, What, Why, When and How

GET UTILITY ANALYSIS TO THE TEAM

Regular review intervalsConsumption and cost for all utilitiesKPI – kWh/sq.ft, litres/sq.ft.Identify trends– Year over year comparison– Rolling 12-month averageNet out factors beyond your control – weather, tenant IT loadsKeep it simple

May 2, 2023 Page 75

Page 76: Retro-Commissioniong: The Who, What, Why, When and How

GET UTILITY ANALYSIS TO THE TEAM

May 2, 2023 Page 76

Page 77: Retro-Commissioniong: The Who, What, Why, When and How

REAL-TIME PERFORMANCE TRACKING

Collect pulses from meters and display on a dashboard in real timeAutomatically identifies the impact of changes to your building and BASImmediate feedback instead of waiting for monthly utility billsSimple overview with deep dive capability

May 2, 2023 Page 77

Page 78: Retro-Commissioniong: The Who, What, Why, When and How

REAL TIME METERING – BIG PICTURE

7.9% better than same day last year

May 2, 2023 Page 78

Page 79: Retro-Commissioniong: The Who, What, Why, When and How

REAL-TIME METERING – DEEPER DIVE

Make-up air unit loses weekend schedule

May 2, 2023 Page 79

Page 80: Retro-Commissioniong: The Who, What, Why, When and How

GET THE MOST OUT OF YOUR BAS

Make sure all staff are trained– BAS– HVAC systems– CommissioningSet access levels based on competency, comfort & roleRemote access for the teamKnow the terms of your service contract– Location of backups– Ongoing verification of end devices

May 2, 2023 Page 80

Page 81: Retro-Commissioniong: The Who, What, Why, When and How

GET THE MOST OUT OF YOUR BAS - CONTINUED

Set up trends– Not just 24 hours of data - storage is cheap – Automatic backup to front endSet up reports/queries on major energy users– Overrides– Minimum outdoor air damper positionConnect your documentation to your graphics

May 2, 2023 Page 81

Page 82: Retro-Commissioniong: The Who, What, Why, When and How

OLD SCHOOL – MANUAL READINGS

Chiller logsMotor amperage tagsLog book of building changes– Emergency repairs– Construction projects– Changes to use of spaceTrack non-energy metrics– Comfort calls– Indoor air quality readingsIncorporate this info into the utility analysis

May 2, 2023 Page 82

Page 83: Retro-Commissioniong: The Who, What, Why, When and How

CITY OF OTTAWA – BEEM GROUP

City’s dedicated resource for ongoing CxBenchmark and compare similar buildingsRegular review of monthly utility dataRemote access to over 100 BAS – 60 day review cycle– Systems in hand– Setbacks overridden– Sensors out of calibration– Setpoints outside of City’s recommended practice– Investigate changes with operator and provide support

May 2, 2023 Page 83

Page 84: Retro-Commissioniong: The Who, What, Why, When and How

HOT WATER RESET STRATEGY

Heating demand is a representation of how many zones are in heating mode (0°C to 6°C)

May 2, 2023 Page 84

Page 85: Retro-Commissioniong: The Who, What, Why, When and How

HOT WATER RESET STRATEGY

Assemble all rooms on one page for easy review

May 2, 2023 Page 85

Page 86: Retro-Commissioniong: The Who, What, Why, When and How

SANDY HILL CC

May 2, 2023 Page 86

Page 87: Retro-Commissioniong: The Who, What, Why, When and How

THE DETAILS

Ground Floor

Second Floor

North

Page 88: Retro-Commissioniong: The Who, What, Why, When and How

THE DETAILS

Ground Floor

Second Floor

North

Page 89: Retro-Commissioniong: The Who, What, Why, When and How

THE DETAILS

Ground Floor

Second Floor

North

Page 90: Retro-Commissioniong: The Who, What, Why, When and How

IN CONCLUSION

Get management support and make it a priorityPut together a team with a champion to leadEmpower the team and the building operatorProvide the time and the tools (target, utility analysis, dashboard)Recognize & reward the results Make it a habit

May 2, 2023 Page 90

Page 91: Retro-Commissioniong: The Who, What, Why, When and How

THANK YOU