Date post: | 15-Sep-2015 |
Category: |
Documents |
Upload: | revelstoke-mountaineer |
View: | 368 times |
Download: | 2 times |
Approved:
Investigative Use Permit
Agricultural Land Reserve Non-Farm Use
CP Rail Private Crossing Permit
In-Process:
Water License
Commercial Access Permit
Zoning & OCP Amendment (July 2015)
Wildlife Assessment
Traffic Study
Bridge Inspection Review
Archeological Assessment
CP Rail Private Crossing Permit
Terrain Stability Assessment
Geotechnical Report on Bluffs
Wildfire Threat Analysis
Wildfire Prevention & Response
Wildfire Development Guidelines
Watershed Assessment
Nearest point is 427.9 m from watershed boundary
Intensive use site is over 2 km away from the watershed boundary